CN110306389B - Lifting combined tool for track traffic prefabricated road bed board - Google Patents

Lifting combined tool for track traffic prefabricated road bed board Download PDF

Info

Publication number
CN110306389B
CN110306389B CN201811644182.0A CN201811644182A CN110306389B CN 110306389 B CN110306389 B CN 110306389B CN 201811644182 A CN201811644182 A CN 201811644182A CN 110306389 B CN110306389 B CN 110306389B
Authority
CN
China
Prior art keywords
plate
shaped plate
bed board
lifting
flat plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811644182.0A
Other languages
Chinese (zh)
Other versions
CN110306389A (en
Inventor
程伟
闫海军
唐薛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changshu Aosiwei Vehicle Technology Co ltd
Original Assignee
Changshu Aosiwei Vehicle Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changshu Aosiwei Vehicle Technology Co ltd filed Critical Changshu Aosiwei Vehicle Technology Co ltd
Priority to CN201811644182.0A priority Critical patent/CN110306389B/en
Publication of CN110306389A publication Critical patent/CN110306389A/en
Application granted granted Critical
Publication of CN110306389B publication Critical patent/CN110306389B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention provides a lifting combined tool for a track traffic prefabricated road bed board, which comprises the following components: the tool comprises a tool main body, wherein a first fixing hole along the horizontal direction and a second fixing hole along the vertical direction are formed in the tool main body; the top of frock main part stretches out along the horizontal direction has the lifter plate. The lifting combined tool for the track traffic prefabricated road bed board is provided with the second fixing hole which is convenient to fixedly connect with the novel prefabricated road bed board, the first fixing hole which is convenient to fixedly connect with the tool in the next working procedure, and the lifting plate which is convenient to grasp by the grabbing mechanism of the plate adjusting robot, thereby facilitating the lifting of the novel prefabricated road bed board in the automatic plate adjusting process.

Description

Lifting combined tool for track traffic prefabricated road bed board
Technical Field
The invention relates to the field of tool clamps, in particular to a lifting combined tool for a track traffic prefabricated road bed board.
Background
At present, a novel prefabricated road bed board is comprehensively popularized in the construction of rail transit, in the construction process, a tool fixture for the traditional prefabricated road bed board is not suitable, and a brand-new lifting combined tool is needed for matching with the automatic board adjusting of the novel prefabricated road bed board.
Disclosure of Invention
The invention aims to solve the technical problems that: in order to solve the problem that the traditional fixture for the prefabricated road bed board is not suitable for the novel lifting of the prefabricated road bed board in the automatic board adjusting process, the invention provides a lifting combined fixture for the track traffic prefabricated road bed board, and solves the problem.
The technical scheme adopted for solving the technical problems is as follows: a lift by crane combination frock for track traffic prefabrication way bed board includes:
the tool comprises a tool main body, wherein a first fixing hole along the horizontal direction and a second fixing hole along the vertical direction are formed in the tool main body;
the top of frock main part stretches out along the horizontal direction has the lifter plate.
Preferably, the tool main body comprises a flat plate, a U-shaped plate and a threaded cylinder, wherein the flat plate is horizontally arranged, the opening of the U-shaped plate is upward, and the flat plate covers the opening of the U-shaped plate and is fixedly connected with the U-shaped plate; the U-shaped plate and the flat plate enclose an elongated cavity; the screw thread cylinder is provided with a horizontal first fixing hole, the first fixing hole is provided with internal threads, a plurality of screw thread cylinders are positioned at one end of the long containing cavity, the length direction of the first fixing hole is consistent with the length direction of the U-shaped plate, and the screw thread cylinder is fixedly connected with the U-shaped plate and the flat plate through a first connecting part; the flat plate is also provided with a plurality of second fixing holes which are vertically penetrated, and the second fixing holes are round through holes and penetrate through the U-shaped plate downwards; the lifting plate extends out of the flat plate along the horizontal direction.
Preferably, the bottom of the lifting plate protrudes downwards to form an anti-falling block.
Preferably, the top of the lifting plate is extended upwards to form a first reinforcing rib, and the first reinforcing rib extends to be connected with the top of the flat plate.
Preferably, the width of the flat plate is larger than that of the U-shaped plate, and two second reinforcing ribs are positioned on two sides of the U-shaped plate and connect the outer side surface of the U-shaped plate and the bottom of the flat plate.
The lifting combined tool for the track traffic prefabricated road bed board has the beneficial effects that the lifting combined tool for the track traffic prefabricated road bed board is provided with the second fixing hole which is convenient to fixedly connect with the novel prefabricated road bed board, the first fixing hole which is convenient to fixedly connect with the tool in the next working procedure, and the lifting plate which is convenient to grasp by the grabbing mechanism of the plate adjusting robot, so that the lifting of the novel prefabricated road bed board in the automatic plate adjusting process is facilitated.
Drawings
The invention will be further described with reference to the drawings and examples.
FIG. 1 is a cross-sectional view of a preferred embodiment of a lifting assembly tooling for a track traffic precast track bed in accordance with the present invention.
Fig. 2 is a schematic structural view of an optimal embodiment of a lifting assembly tool for a track traffic prefabricated track bed board.
In the figure, 1, a flat plate, 101, a second fixing hole, 2, a U-shaped plate, 3, a threaded cylinder, 301, a first fixing hole, 302, a first connecting part, 4, a lifting plate, 401, an anti-falling block, 501, a first reinforcing rib, 502 and a second reinforcing rib.
Detailed Description
Embodiments of the present invention are described in detail below, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to like or similar elements or elements having like or similar functions throughout. The embodiments described below by referring to the drawings are illustrative only and are not to be construed as limiting the invention.
In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "axial", "radial", "circumferential", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings are merely for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the device or element being referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present invention.
Furthermore, the terms "first," "second," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance. In the description of the present invention, it should be noted that, unless explicitly specified and limited otherwise, the terms "connected," "connected," and "connected" are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium. The specific meaning of the above terms in the present invention will be understood in specific cases by those of ordinary skill in the art. Furthermore, in the description of the present invention, unless otherwise indicated, the meaning of "a plurality" is two or more.
As shown in fig. 1-2, the invention provides a lifting combined tool for a track traffic prefabricated road bed board, which comprises:
the tool body comprises a flat plate 1, a U-shaped plate 2 and a thread cylinder 3. The flat plate 1 is horizontally arranged, the opening of the U-shaped plate 2 is upwards, the flat plate 1 covers the opening of the U-shaped plate 2 and is fixedly connected with the U-shaped plate 2, and the U-shaped plate 2 and the flat plate 1 enclose an elongated accommodating cavity. The thread cylinder 3 is provided with a first horizontal fixing hole 301, the first fixing hole 301 is provided with internal threads, the thread cylinders 3 are located at one end of the long containing cavity, the length direction of the first fixing hole 301 is consistent with the length direction of the U-shaped plate 2, and the thread cylinders 3 are fixedly connected with the U-shaped plate 2 and the flat plate 1 through a first connecting portion 302.
The flat plate 1 is also provided with a plurality of second fixing holes 101 which are vertically penetrated, and the second fixing holes 101 are round through holes and penetrate through the U-shaped plate 2 downwards.
The flat plate 1 extends horizontally with a lifting plate 4.
The whole hoisting combined tool is used in the method that a hoisting combined tool for the track traffic prefabricated road bed board is arranged at four corners of the top surface of the prefabricated road bed board, and screws penetrate through the second fixing holes 101 and then are screwed into threaded holes in the prefabricated road bed board. Then, the grabbing mechanism of the robot clamps the lifting plate 4, so that the prefabricated road bed plate can be lifted.
The first fixing hole 301 is fixedly connected with a tool in the next process.
According to a further embodiment, the bottom of the lifting plate 4 protrudes downwards forming a drop-off prevention block 401. In the present embodiment, the anti-drop block 401 can block the gripping mechanism of the robot during the movement after the gripping mechanism grips the lifting plate 4 so as to prevent the gripping mechanism from sliding off the lifting plate.
According to a further embodiment, the top of the lifting plate 4 is extended upwards with a first stiffening rib 501, the first stiffening rib 501 extending to connect with the top of the plate 1. In this embodiment, the first reinforcing rib 501 is to increase the strength of the whole tool.
According to a further embodiment, the width of the flat plate 1 is greater than the width of the U-shaped plate 2, and two second reinforcing ribs 502 are located on both sides of the U-shaped plate 2 and connect the outer side of the U-shaped plate 2 and the bottom of the flat plate 1. In this embodiment, the second reinforcing ribs 502 are used to increase the strength of the whole tool.
In the description of the present specification, a description referring to terms "one embodiment," "some embodiments," "examples," "specific examples," or "some examples," etc., means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the present invention. In this specification, schematic representations of the terms do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
With the above-described preferred embodiments according to the present invention as an illustration, the above-described descriptions can be used by persons skilled in the relevant art to make various changes and modifications without departing from the scope of the technical idea of the present invention. The technical scope of the present invention is not limited to the description, but must be determined according to the scope of claims.

Claims (4)

1. A lift by crane combination frock for track traffic prefabrication way bed board, its characterized in that:
the tool comprises a tool main body, wherein a first fixing hole along the horizontal direction and a second fixing hole along the vertical direction are formed in the tool main body;
a lifting plate extends out of the top of the tool main body along the horizontal direction;
the tool main body comprises a flat plate, a U-shaped plate and a threaded cylinder, wherein the flat plate is horizontally arranged, the opening of the U-shaped plate is upward, and the flat plate covers the opening of the U-shaped plate and is fixedly connected with the U-shaped plate; the U-shaped plate and the flat plate enclose an elongated cavity;
the screw thread cylinder is provided with a horizontal first fixing hole, the first fixing hole is provided with internal threads, a plurality of screw thread cylinders are positioned at one end of the long containing cavity, the length direction of the first fixing hole is consistent with the length direction of the U-shaped plate, and the screw thread cylinder is fixedly connected with the U-shaped plate and the flat plate through a first connecting part;
the flat plate is also provided with a plurality of second fixing holes which are vertically penetrated, and the second fixing holes are round through holes and penetrate through the U-shaped plate downwards;
the lifting plate extends out of the flat plate along the horizontal direction.
2. The lifting assembly tooling for the track traffic prefabricated track bed board as claimed in claim 1, wherein: the bottom of the lifting plate protrudes downwards to form an anti-falling block.
3. The lifting assembly tooling for the track traffic prefabricated track bed board as claimed in claim 1, wherein: the top of lifting board upwards stretches out there is first strengthening rib, first strengthening rib extends to with the top of dull and stereotyped is connected.
4. The lifting assembly tooling for the track traffic prefabricated track bed board as claimed in claim 1, wherein: the width of the flat plate is larger than that of the U-shaped plate, and two second reinforcing ribs are positioned on two sides of the U-shaped plate and are connected with the outer side face of the U-shaped plate and the bottom of the flat plate.
CN201811644182.0A 2018-12-29 2018-12-29 Lifting combined tool for track traffic prefabricated road bed board Active CN110306389B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811644182.0A CN110306389B (en) 2018-12-29 2018-12-29 Lifting combined tool for track traffic prefabricated road bed board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811644182.0A CN110306389B (en) 2018-12-29 2018-12-29 Lifting combined tool for track traffic prefabricated road bed board

Publications (2)

Publication Number Publication Date
CN110306389A CN110306389A (en) 2019-10-08
CN110306389B true CN110306389B (en) 2024-03-26

Family

ID=68074112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811644182.0A Active CN110306389B (en) 2018-12-29 2018-12-29 Lifting combined tool for track traffic prefabricated road bed board

Country Status (1)

Country Link
CN (1) CN110306389B (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0679923U (en) * 1993-04-24 1994-11-08 株式会社淀川製鋼所 Suspension
JPH08282941A (en) * 1995-04-19 1996-10-29 Hitachi Building Syst Eng & Service Co Ltd Scaffold device for installing elevator
JP2012017610A (en) * 2010-07-08 2012-01-26 Shikoku Kaihatsu Kensetsu Kk Rail work vehicle for replacing sleeper
CN202279623U (en) * 2011-08-29 2012-06-20 上海宝冶集团有限公司 Hoisting tool of bent concrete precast slab
CN102704360A (en) * 2012-06-18 2012-10-03 中铁三局集团有限公司 Construction method for ballastless track base plate
CN202626776U (en) * 2012-06-20 2012-12-26 中铁四局集团有限公司 Lower-jacking type adjustable support for urban rail turnout slide plate construction
CN203269354U (en) * 2013-05-08 2013-11-06 中铁六局集团石家庄铁路建设有限公司 Transport sling for prefabricated slab
CN103437298A (en) * 2013-09-04 2013-12-11 中国十九冶集团有限公司 Concrete precast box girder hoisting method and hoisting device
CN204126077U (en) * 2014-07-31 2015-01-28 湖北弘毅钢结构工程有限公司 A kind of temporary fastening device for prefabricated panel and steel column connection
CN205971003U (en) * 2016-06-16 2017-02-22 安徽兴宇轨道装备有限公司 Lay handling tuned plate car of prefabricated board -like railway roadbed
CN206646343U (en) * 2017-02-09 2017-11-17 中国水利水电第十三工程局有限公司 A kind of new precast panel railway roadbed lifting device
CN207919263U (en) * 2017-12-27 2018-09-28 北京城建设计发展集团股份有限公司 Prefabricated road bed board various dimensions fine-tuning mechanism
CN209703215U (en) * 2018-12-29 2019-11-29 常熟市奥斯维车辆科技有限公司 A kind of lifting assembled tool for the prefabricated road bed board of rail traffic

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0679923U (en) * 1993-04-24 1994-11-08 株式会社淀川製鋼所 Suspension
JPH08282941A (en) * 1995-04-19 1996-10-29 Hitachi Building Syst Eng & Service Co Ltd Scaffold device for installing elevator
JP2012017610A (en) * 2010-07-08 2012-01-26 Shikoku Kaihatsu Kensetsu Kk Rail work vehicle for replacing sleeper
CN202279623U (en) * 2011-08-29 2012-06-20 上海宝冶集团有限公司 Hoisting tool of bent concrete precast slab
CN102704360A (en) * 2012-06-18 2012-10-03 中铁三局集团有限公司 Construction method for ballastless track base plate
CN202626776U (en) * 2012-06-20 2012-12-26 中铁四局集团有限公司 Lower-jacking type adjustable support for urban rail turnout slide plate construction
CN203269354U (en) * 2013-05-08 2013-11-06 中铁六局集团石家庄铁路建设有限公司 Transport sling for prefabricated slab
CN103437298A (en) * 2013-09-04 2013-12-11 中国十九冶集团有限公司 Concrete precast box girder hoisting method and hoisting device
CN204126077U (en) * 2014-07-31 2015-01-28 湖北弘毅钢结构工程有限公司 A kind of temporary fastening device for prefabricated panel and steel column connection
CN205971003U (en) * 2016-06-16 2017-02-22 安徽兴宇轨道装备有限公司 Lay handling tuned plate car of prefabricated board -like railway roadbed
CN206646343U (en) * 2017-02-09 2017-11-17 中国水利水电第十三工程局有限公司 A kind of new precast panel railway roadbed lifting device
CN207919263U (en) * 2017-12-27 2018-09-28 北京城建设计发展集团股份有限公司 Prefabricated road bed board various dimensions fine-tuning mechanism
CN209703215U (en) * 2018-12-29 2019-11-29 常熟市奥斯维车辆科技有限公司 A kind of lifting assembled tool for the prefabricated road bed board of rail traffic

Also Published As

Publication number Publication date
CN110306389A (en) 2019-10-08

Similar Documents

Publication Publication Date Title
CN111217266A (en) Working method of assembly type wall body hoisting device with good stability
CN110306389B (en) Lifting combined tool for track traffic prefabricated road bed board
CN210655818U (en) Special lifting appliance for H-shaped steel
CN211850383U (en) Steel bar connecting sleeve
CN211521362U (en) Aluminum profile lifting device
CN220845122U (en) Auxiliary device for hoisting guide rail of T-shaped elevator
CN108862002B (en) Hoisting device and hoisting method for ultrathin steel plate shear wall in tower crane blind area
CN211106922U (en) Battery installing support and contain its electric automobile
CN213834273U (en) Novel hoisting device for building curtain wall
CN217323003U (en) Hoisting tool
CN209817262U (en) Superimposed sheet reinforcing apparatus and superimposed sheet lift by crane structure
CN217734373U (en) Assembled concrete member hoist device
CN217897069U (en) Prefabricated stair tread of assembled
CN216473426U (en) Guardrail plate zinc-plating hangs and plates device
CN213505547U (en) Hydraulic hoist overhead hoist
CN210774671U (en) Open channel reaction frame fixing device for structural test
CN221777428U (en) Lifting appliance structure and lifting device
CN213330273U (en) Rod body and multifunctional comprehensive rod
CN218667164U (en) Be applied to asynchronous spacing connection structure who hangs basket
CN211648730U (en) Novel jackscrew
CN216785441U (en) Prefabricated bridge pier column hoisting accessory
CN219408858U (en) Limit structure and hoisting system
CN220809759U (en) Screw shaft channeling tool
CN215857244U (en) Arc steel protection draw-in groove stop device
CN218403343U (en) Telescopic container spreader

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant