CN110289680A - Method of supplying power to, the apparatus and system of load - Google Patents

Method of supplying power to, the apparatus and system of load Download PDF

Info

Publication number
CN110289680A
CN110289680A CN201910468147.6A CN201910468147A CN110289680A CN 110289680 A CN110289680 A CN 110289680A CN 201910468147 A CN201910468147 A CN 201910468147A CN 110289680 A CN110289680 A CN 110289680A
Authority
CN
China
Prior art keywords
bus
power
control
powered
electric energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910468147.6A
Other languages
Chinese (zh)
Inventor
徐义
刘辉
彭洁
李立群
郭玉娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHUHAI PILOT TECHNOLOGY Co Ltd
Original Assignee
ZHUHAI PILOT TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHUHAI PILOT TECHNOLOGY Co Ltd filed Critical ZHUHAI PILOT TECHNOLOGY Co Ltd
Priority to CN201910468147.6A priority Critical patent/CN110289680A/en
Publication of CN110289680A publication Critical patent/CN110289680A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/26Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
    • H02H7/28Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured for meshed systems
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • H02J9/08Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems requiring starting of a prime-mover

Landscapes

  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The embodiment of the present application provides a kind of method of supplying power to of load, apparatus and system, which comprises monitors the state of every road bus;If determining that all buses stop obtaining the power grid electric energy of power grid according to state, the electric energy that the bus to be powered in all buses obtains generator is controlled, so that the bus to be powered in all buses is load supplying;If being stopped obtaining power grid electric energy according to status-determining section bus, the bus to be powered in the bus of control section obtains electric energy from the bus for obtaining the power grid electric energy, so that the bus to be powered in the bus of part is load supplying.It is thereby achieved that whether part or all of them bus powers off, may continue to realize lasting for load supplying for load supplying after a loss of power.

Description

Method of supplying power to, the apparatus and system of load
Technical field
This application involves power supply technique fields, method of supplying power to, apparatus and system in particular to a kind of load.
Background technique
In the prior art, the electric energy of power grid is usually obtained by bus and load is powered, just with proof load Often running.However once there is the power supply that grid disruption is bus, then the continued power loaded cannot just ensure, especially negative Load is this load for being badly in need of continued power type of data center, not only influences the normal operation of load, or even also will cause Loss of data.
Summary of the invention
The method of supplying power to for being designed to provide a kind of load, the apparatus and system of the application, it is lasting for load to realize Power supply.
In a first aspect, the embodiment of the present application provides a kind of method of supplying power to of load, the method is applied to be connected with more The control equipment of road bus, every road bus are also connected with power grid and load respectively, which comprises
Monitor the state of every road bus;
If determining that all buses stop obtaining the power grid electric energy of the power grid according to the state, all mothers are controlled Bus to be powered in line obtains the electric energy of generator, so that the bus to be powered in all buses is load supplying;
If being stopped obtaining the power grid electric energy according to the status-determining section bus, control in the part bus to Power supply buses obtain electric energy from the bus for obtaining the power grid electric energy, so that the bus to be powered in the part bus For load supplying.
In the embodiment of the present application, part bus power off when, then using normal power supply other buses be power off to Power supply buses power supply;And in the power-off of whole buses, then it is the bussed supply to be powered of power-off using generator.Therefore, it realizes The power-off of whether part or all of them bus, after a loss of power may continue to as load supplying, realizes and lasting supplies for load Electricity.
With reference to first aspect, in the first possible implementation, the bus to be powered in all buses is controlled Obtain the electric energy of generator, comprising:
Obtain the gross output of the generator;
According to the power supply priority of preset each load, the demand power of each load and total output work Rate determines the bus to be powered in all buses, wherein the demand power of all buses to be powered in all buses The sum of matched with the gross output;
Control the bus to be powered and the power generation mechatronics in all buses.
In the embodiment of the present application, due to the sum of demand power of buses to be powered all in all buses and generator Gross output matching, to realize that the electric energy that generator provides can guarantee that the load of bus connection to be powered works normally.
The possible implementation of with reference to first aspect the first, in the second possible implementation, according to default The power supply priority of each load, each load demand power and the gross output, determine all mothers Bus to be powered in line, comprising:
By the power supply priority sequence from high to low of preset each load, successively by the demand function of each load Rate is added and the sum of obtains demand power;
When the sum of described demand power is changed to and matched with the gross output, the matched demand function is determined The corresponding bus of the sum of rate, wherein the corresponding bus is the bus to be powered in all buses.
In the embodiment of the present application, due to bus to be powered be according to the power supply priority of load sequence from high to low according to Secondary determination, therefore realize the load that the electric energy of generator is preferentially supplied to and needs most power supply.
The possible implementation of with reference to first aspect the first, in the third possible implementation, described in control Bus to be powered and the power generation mechatronics in all buses, comprising:
It determines between the bus to be powered and the generator in all buses and machine bus breaker setting Least path;
Described in control is arranged on the path and machine bus breaker is in closed state.
In the embodiment of the present application, the incoming breaker closure between bus and generator to be powered on path is being controlled When, on the one hand, due to the least path that the path is and machine bus breaker is arranged, therefore can be with most fast velocity interpolation simultaneously Machine bus breaker is in closed state, realizes the power supply for restoring load with most fast speed.On the other hand, due to and machine bus Breaker setting it is minimum, therefore appearance can also be reduced and a possibility that machine bus circuit breaker failure can not be closed, improve control Reliability.
With reference to first aspect, in the fourth possible implementation, the bus to be powered in the part bus is controlled Electric energy is obtained from the bus for obtaining the power grid electric energy, comprising:
It determines obtaining the difference between the actual loading power and default bearing power of the bus of the power grid electric energy It is worth power;
According to the power supply priority of preset each load, each load for demand power and the difference function Rate determines the bus to be powered in the part bus, wherein the demand power of all buses to be powered in the part bus The sum of matched with the difference power, each load bus all the way corresponding with the part bus connects;
The bus to be powered controlled in the part bus is connect with the bus for obtaining the power grid electric energy.
In the embodiment of the present application, due to bus to be powered be according to the power supply priority of load sequence from high to low according to Secondary determination, therefore realize the load that the electric energy of generator is preferentially supplied to and needs most power supply.
With reference to first aspect, in a fifth possible implementation, the state of every road bus includes setting in road mother The state of the voltage value and current value of incoming breaker on the end of incoming cables of line and every road bus further includes the electricity of the road bus Pressure value;Determine that the power grid electric energy of the power grid output has not been obtained in all buses according to the state, comprising:
It determines that the voltage value of the incoming breaker of all buses is less than preset first threshold, determines that the inlet wire is disconnected The current value of road device is less than preset second threshold and the voltage value is less than preset third threshold value.
In the embodiment of the present application, it when judging whether bus powers off, not only needs to judge bus voltage value, also needs Judge the voltage value and current value of the incoming breaker on the end of incoming cables of bus.Using this by judging multiple conditional manners Erroneous judgement can be effectively avoided, to avoid accidentally control.
With reference to first aspect or any possible implementation of first aspect, in a sixth possible implementation, The control equipment includes the first control unit and the second control unit for keeping data synchronous, the method also includes:
When the first control unit is in running order, detect whether the first control unit breaks down;
When the first control unit breaks down, it is in running order to control second control unit.
In the embodiment of the present application, due to when first control unit breaks down, the second control unit can be taken over pair The control of load supplying, therefore the reliability improved as load supplying.
Second aspect, the embodiment of the present application provide a kind of power supply unit of load, and described device is applied to be connected with more The control equipment of road bus, every road bus are also connected with power grid and load respectively, and described device includes:
Communication module, for monitoring the state of every road bus;
Processing module, if for determining that all buses stop obtaining the power grid electric energy of the power grid according to the state, The electric energy that the bus to be powered in all buses obtains generator is controlled, so that the bus to be powered in all buses For load supplying;And be also used to, if according to the status-determining section bus stopping acquisition power grid electric energy, described in control Bus to be powered in the bus of part obtains electric energy from the bus for obtaining the power grid electric energy, so that the part bus In bus to be powered be load supplying.
In conjunction with second aspect, in the first possible implementation,
The processing module is also used to obtain the gross output of the generator;According to the confession of preset each load Electric priority, each load demand power and the gross output, determine the mother to be powered in all buses Line, wherein the sum of the demand power of all buses to be powered is matched with the gross output in all buses;Control institute State the bus to be powered and the power generation mechatronics in all buses.
In conjunction with the first possible implementation of second aspect, in the second possible implementation,
The processing module is also used to the power supply priority sequence from high to low by preset each load, according to The secondary demand power by each load the sum of is added and obtains demand power;
When the sum of described demand power is changed to and matched with the gross output, the matched demand function is determined The corresponding bus of the sum of rate, wherein the corresponding bus is the bus to be powered in all buses.
In conjunction with the first possible implementation of second aspect, in the third possible implementation,
The processing module is also used to determine between the bus to be powered and the generator in all buses simultaneously The least path of machine bus breaker setting;Described in control is arranged on the path and machine bus breaker is in and closes Conjunction state.
In conjunction with second aspect, in the fourth possible implementation,
The processing module is also used to determine obtaining the actual loading power of the bus of the power grid electric energy and pre- If the difference power between bearing power;According to the power supply priority of preset each load, each load for demand Power and the difference power determine the bus to be powered in the part bus, wherein need to be supplied in the part bus The sum of demand power of goddess of lightning's line is matched with the difference power, corresponding with the part bus institute all the way of each load State bus connection;The bus to be powered controlled in the part bus is connect with the bus for obtaining the power grid electric energy.
In conjunction with second aspect, in a fifth possible implementation, the state of every road bus includes setting in road mother The state of the voltage value and current value of incoming breaker on the end of incoming cables of line and every road bus further includes the electricity of the road bus Pressure value;
The processing module is also used to determine that the voltage value of the incoming breaker of all buses is less than preset first Threshold value determines that the current value of the incoming breaker is less than preset second threshold and the voltage value and is less than preset the Three threshold values.
The third aspect, the embodiment of the present application provide a kind of electric power supply control system, comprising: control equipment and communication equipment, The control equipment is connect with the communication equipment, and the communication equipment is connect with multichannel bus;
The communication equipment, for obtaining the state of every road bus;
The control equipment, for monitoring the state, if determining that all buses stop obtaining electricity according to the state The power grid electric energy of net, Xiang Suoshu communication equipment sends the first control instruction, so that the bus root to be powered in all buses The electric energy of generator 103 is obtained according to first control instruction;And be also used to, if being stopped according to the status-determining section bus The power grid electric energy is only obtained, Xiang Suoshu communication equipment sends the second control instruction, so as to be powered in the part bus Bus obtains electric energy from the bus for obtaining the power grid electric energy according to second control instruction.
In conjunction with the third aspect, in the first possible implementation, the control equipment includes: to keep data synchronous First control unit and the second control unit, the first control unit are connected by the first control link and the communication equipment It connects, second control unit is connect by the second control link with the communication equipment;
Second control unit, for when the first control unit is in running order, detecting first control Whether unit processed breaks down;And for it is in running order to control itself when the first control unit breaks down.
Fourth aspect, the embodiment of the present application provide a kind of readable storage medium of non-volatile computer, are stored with program generation Code, when said program code is run by computer described in any possible implementation of execution first aspect or first aspect Load method of supplying power to.
To enable the above objects, features, and advantages of the application to be clearer and more comprehensible, preferred embodiment is cited below particularly, and cooperate Appended attached drawing, is described in detail below.
Detailed description of the invention
Technical solution in ord to more clearly illustrate embodiments of the present application, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only some embodiments of the application, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 shows a kind of structural block diagram of electric power supply control system provided by the embodiments of the present application;
Fig. 2 shows a kind of flow charts of the method for supplying power to of load provided by the embodiments of the present application;
Fig. 3 is shown in a kind of method of supplying power to of load provided by the embodiments of the present application using exemplary circuit structure diagram;
Fig. 4 shows a kind of structural block diagram of the power supply unit of load provided by the embodiments of the present application.
Specific embodiment
Below in conjunction with attached drawing in the embodiment of the present application, technical solutions in the embodiments of the present application is described.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.Meanwhile the application's In description, term " first ", " second " etc. are only used for distinguishing description, are not understood to indicate or imply relative importance.
Referring to Fig. 1, the embodiment of the present application provides a kind of electric power supply control system 10, which be can wrap It includes: communication equipment 11 and control equipment 12.
In the present embodiment, communication equipment 11, which can be, is integrated with the equipment of multiple communication interfaces, such as communication equipment 11 can To be ET200M type distribution substation, but it is not intended as limiting.A part of communication interface of communication equipment 11 can connect control Equipment 12, and another part communication interface of communication equipment 11 can connect multichannel bus 101, by this connection type, lead to Letter equipment 11 controls equipment 12 for will be sent in the state of collected multichannel bus 101, and for that will control equipment 12 Multichannel bus 101 is sent under the instruction of transmission.
Alternatively, if the number of bus 101 is few, the quantity of communication equipment 11 can be one, this is logical Believe that multiple communication interfaces of equipment 11 can be connected with multichannel bus 101 and control equipment 12 respectively.For example, bus 101 is Two-way, is bus 101A and bus 101B respectively, multiple communication interfaces of communication equipment 11A then can respectively with bus 101A, bus 101B and control equipment 12 connect.
Multiple communications as another optional way, if the number of bus 101 is relatively more, on a communication equipment 11 Interface be unable to satisfy and meanwhile connect multichannel bus 101 and control equipment 12, therefore the quantity of communication equipment 11 be also possible to it is multiple. Multiple communication interfaces of each communication equipment 11 can respectively at least all the way bus 101 and control equipment 12 connect.For example, female Line 101 is 5 tunnels, is bus 101A, bus 101B, bus 101C, bus 101D and bus 101E respectively, communication equipment 11 Quantity is 3, is communication equipment 11A, communication equipment 11B and communication equipment 11C respectively.Based on this, communication equipment 11A's is more A communication interface can be connect with bus 101A, bus 101B and control equipment 12 respectively, and multiple communications of communication equipment 11B connect It mouthful can be connect respectively with bus 101C, bus 101D and control equipment 12, and multiple communication interfaces of communication equipment 11C can be with It is connect respectively with bus 101E and control equipment 12.
In the present embodiment, control equipment 12 can be the integrated equipment for having signal handling capacity.Controlling equipment 12 can be with For monitoring the state of every road bus 101.If determining that all buses 101 stop obtaining the power grid electric energy of power grid according to state, Control equipment 12 is also used to send the first control instruction to communication equipment 11, so that the bus to be powered 101 in all buses 101 The electric energy that generator can be obtained according to the first control instruction, so that bus to be powered 101 continues as connected load 102 power supplies.If stopping obtaining the power grid electric energy of power grid according to status-determining section bus 101, control equipment 12 is also used to logical Believe that equipment 11 sends the second control instruction, allows the bus to be powered 101 in part bus 101 according to the second control instruction Electric energy is obtained from the bus 101 for obtaining power grid electric energy, so that bus to be powered 101 continues as connected load 102 power supplies.
For the reliability for further improving control, illustratively, control equipment 12 may include: first control unit 121 and second control unit 122.Wherein, first control unit 121 and the second control unit 122 can be had at signal The equipment of reason ability, such as first control unit 121 and the second control unit 122 can be S7400H type control hosts, but It is not intended as limiting.
To avoid the control of first control unit 121 and the second control unit 122 from generating conflict, illustratively, the first control Unit 121 processed can be connect by the first control link 13 with communication equipment 11, and the second control unit 121 is then by independently of the Second control link 14 of one control link 13 is connect with communication equipment 11.Wherein, the first control link 13 and the second Quality Initiative Road 14 can be such as redundancy PROFIBUS net.
Further, to realize the control to multichannel bus 101, first control unit 121 and the second control unit 122 are needed It is synchronous to keep data, and has a control unit that can be in always in first control unit 121 and the second control unit 122 Working condition monitors and controls multichannel bus 101, and another is then in standby or malfunction.
For example, first control unit 121 is for monitoring every road bus when first control unit 121 is in running order 101 state, and when determining that bus 101 powers off, the first control instruction or the second control instruction are sent to communication equipment 11.With This simultaneously, the second control unit 122 may be at standby mode, and in the standby state, the second control unit 122 can detecte this Whether first control unit 121 breaks down.If the second control unit 122 determines that first control unit 121 breaks down, second Control unit 122 continues pair for controlling itself in running order, control of the first control unit 121 of taking over fault Multichannel bus 101 is controlled.If the first control unit 121 of failure restores normal later again, first control unit 121 can be with Itself is controlled to be in standby, and detect in running order second control unit 122 whether failure, to form circulation Control.
Further, how this programme for ease of understanding will monitor and control from the angle description of control equipment 12 below Multichannel bus 101.
In conjunction with Fig. 1, and referring to Fig. 2, present embodiments provide a kind of method of supplying power to of load, the method for supplying power to of the load It can be executed by control equipment 12, the method for supplying power to of the load may include: step S100, step S200 and step S300.
Step S100: the state of every road bus is monitored.
Step S200: if determining that all buses stop obtaining the power grid electric energy of the power grid according to the state, control Bus to be powered in all buses obtains the electric energy of generator, so that the bus to be powered in all buses is negative Carry power supply.
Step S300: if stopping obtaining the power grid electric energy according to the status-determining section bus, the part is controlled Bus to be powered in bus obtains electric energy from the bus for obtaining the power grid electric energy, so that in the part bus Bus to be powered is load supplying.
Combined with Figure 1 and Figure 2, and referring to Fig. 3, the process of method will be described in detail below.
Step S100: the state of every road bus 101 is monitored.
The state of every road bus 101 is acquired by communication equipment 11, and collected state is transferred to control in real time Equipment 12, the state for the every road bus 101 of acquisition that control equipment 12 can continue.
Illustratively, the end of incoming cables of every road bus 101 can be equipped with corresponding incoming breaker, the one of the incoming breaker The end of incoming cables of end connection bus 101, the other end of the incoming breaker then connect power grid.Closed state is in incoming breaker When, every road bus 101 can get the power grid electric energy of power grid input by incoming breaker.Communication equipment 11 is every by acquisition The voltage value and current value of the other end of a incoming breaker, and by acquiring the voltage value on every road bus 101, communication is set Standby 11 can obtain the state of every road bus 101.It is understood that the state of bus 101 includes: that 101 upper incoming line of bus is disconnected The voltage value of the voltage value and current value and bus 101 itself of the other end of road device, but be not intended as limiting, it can be with root It is selected according to actual conditions, for example, the state of bus 101 can also include: the current value of bus 101 itself.
As shown in figure 3, the present embodiment illustrates the scheme of the application by an example.Wherein, in Fig. 3 breaker figure Being designated as black indicates that breaker is in closed state under 101 normal power supply state of bus, conversely, the icon of breaker is white Indicate that breaker is in an off state under 101 normal power supply state of bus.
Fig. 3 shows two-way bus 101, is bus 101X and bus 101Y respectively, and the end of incoming cables of bus 101X is equipped with Incoming breaker QF1, and the end of incoming cables of bus 101Y is equipped with incoming breaker QF2.Communication equipment 11 can connect inlet wire open circuit One end of device QF1 and power supply N1, thus the voltage value and current value of the available incoming breaker QF1 of communication equipment 11.Communication Equipment 11 can also connect one end of incoming breaker QF2 Yu power supply N2, so that communication equipment 11 can also obtain inlet wire open circuit The voltage value and current value of device QF2.Furthermore communication equipment 11 can also be connect with bus 101X and bus 101Y respectively, thus Obtain the voltage value of bus 101X and the voltage value of bus 101Y.Correspondingly, control equipment 12 can obtain bus 101X's State, the state of bus 101X include: the voltage value of incoming breaker QF1 and the voltage value of current value, bus 101X;And control Control equipment 12 can also obtain the state of bus 101Y, and the state of bus 101Y includes: the voltage value and electricity of incoming breaker QF2 The voltage value of flow valuve, bus 101Y.
In the present embodiment, whether accurately monitoring the power-off of every road bus 101 according to state to realize, control equipment 12 can be with For incoming breaker voltage and preset first threshold value, for incoming breaker electric current and default second threshold, Yi Jizhen The default third threshold value to the voltage of bus 101.Wherein, if the voltage of power grid is 10KV, first threshold can indicate normally to supply Minimum amount of voltage that under electricity condition in incoming breaker is, for example, 300V, and second threshold can indicate inlet wire under normal power supply state Minimum current value on breaker is, for example, 5A, and third threshold value can then indicate the minimum on normal power supply state Down Highway 101 Voltage value is, for example, 300V.Certainly, the case where size of above-mentioned threshold value is also not necessarily limited to described in the present embodiment, to guarantee judgement Accuracy, control equipment 12 can adjust threshold size according to the voltage class dynamic of the power grid measured in real time.
Threshold value based on setting, control relationship of the equipment 12 based on the state and threshold value that judge every road bus 101 then can be with Determine whether every road bus 101 has stopped obtaining the power grid electric energy of power grid and be in off-position.Since control equipment 12 is right Whether the judgment mode in off-position is roughly the same for every road bus 101, and the present embodiment judges certain all the way to control equipment 12 Whether bus 101 is illustrated for off-position, in order to understand this programme.
Illustratively, for certain, bus 101, control equipment 12 judge whether the bus 101 can in off-position all the way To be: judging whether the voltage value of the incoming breaker of the bus 101 is less than first threshold, judge that the inlet wire of the bus 101 is disconnected Whether the current value of road device is less than second threshold, and judges whether the voltage value of the bus 101 is less than third threshold value.Wherein, If control equipment 12 judges that the voltage value of the incoming breaker of the bus 101 is less than first threshold, the inlet wire open circuit of the bus 101 The current value of device is less than second threshold, and for the voltage value of the bus 101 again smaller than third threshold value, the mother can be determined by controlling equipment 12 Line 101 stops obtaining the power grid electric energy of power grid, is in off-position.
Optionally, lead to accidentally control to avoid erroneous judgement, such as it may be due to upstream that bus 101, which is in off-position, Substation's reclosing, control equipment 12 is when determining that bus 101 is in off-position for the first time, since bus 101 may be temporary Power grid electric energy has not been obtained, by preset duration after determining that bus 101 is in off-position, communication can be passed through by controlling equipment 12 Whether the most freshly harvested state of equipment 11 determines the bus 101 also in off-position again, wherein preset duration can be 3- 5 seconds.Also determine that the bus 101 also in off-position, controls equipment 12 and determines that the bus 101 has stopped obtaining if detecting again Take power grid electric energy.
In the present embodiment, the time point that the stopping of each road bus 101 obtains power grid electric energy may be different, if determination is more at first There is a certain bus 101 to stop obtaining power grid electric energy in road bus 101, control equipment 12 can stop determining the road bus 101 Judge whether to have stopped obtaining power grid electric energy there are also other buses 101 in preset time period after acquisition power grid electric energy, wherein default The duration of period can be such as 20 seconds.By the judgement in preset time period, if control equipment 12 determines all buses 101 Restore normal and obtain power grid electric energy, control equipment 12 can terminate this execution to follow-up process;Wherein, equipment 12 is controlled The voltage value of the voltage value and the incoming breaker on the bus 101 that judge bus 101 reaches preset voltage value, and judgement The current value of incoming breaker on the bus 101 reaches pre-set current value, then controls equipment 12 and determine that the bus 101 restores just Often.If control equipment 12 determines that all buses 101 stop obtaining power grid electric energy, control equipment 12 can execute step S200. And if control 12 determining section denominator line 101 of equipment stopping acquisition power grid electric energy, control equipment 12 can execute step S300.
For ease of understanding, all buses 101 described hereinafter in the present embodiment refer to that all buses 101 stop obtaining Power grid electric energy, part bus 101 refer to that the part in all buses 101 stops obtaining the bus 101 of power grid electric energy.
Step S200: if determining that all buses stop obtaining the power grid electric energy of the power grid according to the state, control Bus to be powered in all buses obtains the electric energy of generator, so that the bus to be powered in all buses is negative Carry power supply.
If determining that all buses 101 stop obtaining power grid electric energy according to state, to guarantee that bus 101 can continue to be negative 102 normal power supplies are carried, control equipment 12 can control generator 103 and export electric energy to the bus 101 of power-off.
Specifically, switch disjunction instruction can be generated in control equipment 12, the switch disjunction is instructed by communication equipment 11 The incoming breaker being sent on every road bus 101, and it is sent to the normally opened open circuit for being separately connected adjacent two-way bus 101 Device.Incoming breaker and normally opened breaker can be in an off state according to the movement of switch disjunction instruction execution separating brake.
Also it to avoid malfunction that accidentally control, such as incoming breaker is caused although to obtain switch disjunction instruction, but does not hold The movement of row separating brake and keep closed state.By preset duration after sending switch disjunction instruction, controlling equipment 12 can With according to the state of the most freshly harvested incoming breaker of communication equipment 11 and normally opened breaker again determine incoming breaker and often Whether circuit breaker is in off-state.
If it is determined that there are also incoming breakers or normally opened breaker to be not in off-state, control equipment 12 can be to host computer The information of control mistake is sent, and terminates this control flow.
If it is determined that all incoming breakers and normally opened breaker are in off-state, after control equipment 12 then continues to execute Afterflow journey, such as control equipment 12 continue to generate switch disjunction instruction, and are sent to the leading-out terminal for being separately connected every road bus 101 With each wire-outgoing breaker of load 102.Each wire-outgoing breaker can according to switch disjunction instruction execution separating brake movement and It is in an off state.
Also to avoid malfunction from leading to accidentally control, by preset duration after sending switch disjunction instruction, equipment 12 is controlled Whether each wire-outgoing breaker can also be determined again according to the state of the most freshly harvested each wire-outgoing breaker of communication equipment 11 It is in off-state.
If it is determined that there are also wire-outgoing breakers to be not in off-state, it is wrong that control equipment 12 can also send control to host computer Information accidentally, and terminate this control flow.
If it is determined that all wire-outgoing breakers are in off-state, control equipment 12 then continues to execute follow-up process, such as It controls equipment 12 and generates generator enabled instruction, and generator enabled instruction is sent to by generator by communication equipment 11.
After sending generator enabled instruction, accurately to determine which generator starting is run successfully, communication equipment 11 can With the output voltage of the lasting each generator of acquisition, control equipment 12 then can be by judging whether each output voltage reaches Predeterminated voltage and determine whether the generator starts and run successfully.
May be long the time required to the starting of some generators, for it is accurate determine which generator starting operation at Function by a delay duration is, for example, 30 seconds after sending generator enabled instruction, and control equipment 12 can also be according to communication The output voltage of the most freshly harvested each generator of equipment 11 determines which generator starting is run successfully.
In the present embodiment, according to the output power of preset every generator, controlling equipment 12 can incite somebody to action control equipment 12 The output power of the generator of all operations adds up, and obtains the gross output of generator.
In general, if all generators all start operation, then gross output can satisfy the need of all buses 101 It asks.If but the starting operation of part generator, then gross output then meets the needs of part bus 101.It therefore, can be by pre- If the priority of load 102 come so that important load 102 preferentially restores electricity.
Specifically, pre-setting the power supply priority of each load 102 in control equipment 12, wherein every road load 102 Power supply priority height can depend on it is each load 102 significance level.For example, load 102A is in data center Data server, and loading 102B is the lighting apparatus in data center, then the power supply priority of load 102A can be higher than Load the power supply priority of 102B.In addition, also pre-setting the demand power of each load 102 in control equipment 12, wherein The demand power of each load 102 can be the load 102 and operate normally the power needed.
Further, control equipment 12 can by the power supply priority sequence from high to low of preset each load 102, The sum of successively the demand power of each load 102 is added and obtains demand power.At the same time, control equipment 12 can also be sentenced Whether the sum of disconnected acquisition demand power of addition every time changes to matches with gross output.Wherein, matching indicate demand power it With change to the difference of gross output in such as 10% default error range.For example, load 102A, load 102B and The power supply priority for loading 102C is successively load 102A → load 102B → load 102C from high to low, and control equipment 12 first will The demand power of 102A is loaded as the sum of demand power, and the sum of judges the demand power and whether is matched with gross output. If mismatching and being less than gross output, control equipment 12 will load the demand power of the demand power and load 102B of 102A again It is added, and judges after being added whether the sum of the demand power changes to and matched with gross output.If also mismatching and being also less than Gross output, control equipment 12 then again by the demand power for loading 102A, load the demand power and load 102C of 102B Demand power is added, and determine be added again after the sum of the demand power change to and matched with gross output.Wherein, this implementation Example described in matching can refer to be compared the two difference within a preset range, preset range can be such as -5% to+ 5%.
By successively judging whether to match, when the sum of demand power is changed to and matched with gross output, equipment is controlled 12 can determine the corresponding bus 101 of the sum of matched demand power, wherein the corresponding bus 101 is and demand power The sum of the corresponding bus 101 preferentially connected for electric loading 102, the corresponding bus 101 it is also excellent to need in all buses 101 The bus to be powered 101 first powered.For example, bus 101 has 5 tunnels, control equipment 12 determines the preceding 3 road bus of highest priority The sum of 101 demand power is matched with gross output, and the preceding 3 road bus 101 of highest priority is then 3 tunnels bus to be powered 101。
In the present embodiment, the output end of each generator can connect generator doubling bus 101, and every road bus 101 can be connect by simultaneously machine bus breaker with generator doubling bus 101.Certainly, it is normally obtained in every road bus 101 In the case where power grid electric energy, all and machine bus breaker may be in off-state.
After the power-off of all buses 101, however, it is determined that go out the bus to be powered 101 in all buses 101, control equipment 12 can To control the bus to be powered 101 in all buses 101 connects and machine bus breaker closing, so that in all buses 101 Bus to be powered 101 and power generation mechatronics, obtain generator output electric energy and charge again.
Specifically, different a plurality of roads can be passed through between every bus 101 and generator to be powered in all buses 101 Diameter connection controls equipment for the power supply for realizing the bus to be powered 101 quickly and in all buses 101 of recovery of less trouble 12 can be from simultaneously machine bus open circuit between the bus to be powered 101 and generator determined in all buses 101 in mulitpath The least path of device setting.
The control generation of equipment 12 closes the switch instruction, and this is closed the switch instruction by communication equipment 11 and is sent to this most On few path and machine bus breaker.And machine bus breaker can according to close the switch instruction execution combined floodgate movement and In closed state.
Also to avoid malfunction from leading to accidentally control, such as and machine bus breaker although obtain and close the switch instruction, but It is not carried out the movement of combined floodgate and keeps off-state.By preset duration after transmission closes the switch instruction, equipment is controlled 12 can state most freshly harvested according to communication equipment 11 and machine bus breaker determine again it is on the least path and Whether machine bus breaker is in closed state.
If it is determined that on the least path there are also and machine bus breaker be not in closed state, control equipment 12 can be to Host computer sends the information of control mistake, and terminates this control flow.
If it is determined that on the least path and machine bus breaker be in closed state, control equipment 12 can continue Execution follow-up process, such as the control acquisition of equipment 12 most freshly harvested 101 road Zhong Mei of all buses of communication equipment 11 are to be powered The voltage value of bus 101, and judge whether the voltage value of all 101 roads Zhong Mei of bus bus 101 to be powered reaches default electricity Pressure value.
If it is determined that the voltage value for needing power supply buses 101 in all buses 101 is not up to preset voltage value, control is set Standby 12 can send the information of control mistake to host computer, and terminate this control flow.
If it is determined that the voltage value of all buses 101 to be powered in all buses 101 reaches preset voltage value, control is set Standby 12 can continue to execute follow-up process, such as the control of control equipment 12 and each outlet preferentially connecting for electric loading 102 are broken Road device is in closed state.
Specifically, the control generation of equipment 12 closes the switch instruction, and the switch disjunction is instructed by communication equipment 11 and is sent out It is sent to each wire-outgoing breaker preferentially connected for electric loading 102.Wire-outgoing breaker can be closed according to instruction execution is closed the switch The movement of lock and be in closed state.
Also to avoid malfunction from leading to accidentally control, by preset duration after transmission closes the switch instruction, equipment 12 is controlled It can be determined again preferentially according to the state of the most freshly harvested wire-outgoing breaker of communication equipment 11 for each of connection of electric loading 102 Whether wire-outgoing breaker is in closed state.
If it is determined that there are also wire-outgoing breakers to be not in closed state, control equipment 12 can send control mistake to host computer Information, and terminate this control flow.
If it is determined that indicating load with preferentially closed state is in for each wire-outgoing breaker that electric loading 102 is connect 102 regain power supply in a short time, and control equipment 12 can terminate this control flow.
As shown in figure 3, continuing example above-mentioned.
Processing equipment 12 determines that bus 101X and bus 101Y are equal according to the state of bus 101X and the state of bus 101Y In the state for stopping obtaining power grid electric energy.Processing equipment 12 sends switch disjunction and instructs to incoming breaker QF1, inlet wire open circuit Device QF2 and normally opened circuit breaker Q F8.Determining that it is disconnected that incoming breaker QF1, incoming breaker QF2 and normally opened circuit breaker Q F8 are in When open state, processing equipment 12 can also send switch disjunction and instruct to wire-outgoing breaker QF9, wire-outgoing breaker QF10, outlet Circuit breaker Q F11 and wire-outgoing breaker QF12.Processing equipment 12 is determining outlet circuit breaker Q F9, wire-outgoing breaker QF10, outlet When circuit breaker Q F11 and wire-outgoing breaker QF12 are in off-state, processing equipment 12 sends generator enabled instruction to power generation Machine G1 to generator G6.
Then, if processing equipment 12 determines that generator G1 has generator G1, generator G3, generator G4 into generator G6 It is run successfully with generator G6 starting, processing equipment 12 calculates generator G1, generator G3, generator G4 and generator G6 Gross output determines that the load 102 connecting with wire-outgoing breaker QF10 and wire-outgoing breaker QF11 is preferentially for electric loading 102.According to this preferentially for electric loading 102, processing equipment 12 can determine bus 101X and bus 101Y is mother to be powered Line 101.It is female to simultaneously machine bus circuit breaker Q F3, simultaneously machine bus circuit breaker Q F4 and machine that the transmission of processing equipment 12 closes the switch instruction Line circuit breaker Q F5 and and machine bus circuit breaker Q F6.
Finally, in determining and machine bus circuit breaker Q F3 and machine bus circuit breaker Q F4 and machine bus circuit breaker Q F5 and simultaneously When machine bus circuit breaker Q F6 is in closed state, processing equipment 12, which can then be sent, closes the switch instruction to wire-outgoing breaker QF10 and wire-outgoing breaker QF11, so that being connect with wire-outgoing breaker QF10 and wire-outgoing breaker QF11 preferential for electric loading 102 restore electricity.
It should be noted that in the implementation procedure of step S200, switch disjunction instruction closes the switch instruction and generator Enabled instruction can be opened in the implementation procedure of step S300 to being interpreted as the first control instruction above-mentioned in the present embodiment Pass disjunction instructs and close the switch instruction then can be to the second control instruction above-mentioned in the present embodiment be interpreted as, below will be right The process of step S300 is described in detail.
Step S300: if stopping obtaining the power grid electric energy according to the status-determining section bus, the part is controlled Bus to be powered in bus obtains electric energy from the bus for obtaining the power grid electric energy, so that in the part bus Bus to be powered is load supplying.
If being stopped obtaining power grid electric energy according to status-determining section bus 101, to guarantee that bus 101 can continue to as load 102 normal power supplies, the bus 101 that control equipment 12 can obtain power grid electric energy export electric energy to the bus 101 of power-off.
Specifically, switch disjunction instruction can be generated in control equipment 12, the switch disjunction is instructed by communication equipment 11 The incoming breaker being sent on part bus 101.Incoming breaker is located according to the movement of switch disjunction instruction execution separating brake In off-state.
Also to avoid malfunction from leading to accidentally control, by preset duration after sending switch disjunction instruction, equipment 12 is controlled It can be according to the incoming breaker in the state of the most freshly harvested incoming breaker of communication equipment 11 again determining section denominator line 101 Whether off-state is in.
If it is determined that there are also incoming breakers or normally opened breaker to be not in off-state, control equipment 12 can be to host computer The information of control mistake is sent, and terminates this control flow.
If it is determined that the incoming breaker on part bus 101 is in off-state, control equipment 12 can then continue to hold Row follow-up process, such as determine the load 102 preferentially powered.
In general, the power that bus 101 is supplied to load 102 is limited, and bus 101 is at best able to the power provided For 102 power of default load of the road bus 101.When the load 102 that bus 101 connects operates normally, then certain function can be consumed Rate, 102 power of actual loading of the road the power Ze Weigai bus 101 of the consumption.In this way, the actual loading 102 of the road bus 101 The power that the road difference power Ze Weigai bus 101 between 102 power of power and default load can also provide.
When bus 101 all the way stops obtaining power grid electric energy, the bus 101 to obtain power grid electric energy is the stopping The offer electric energy of bus 101 for obtaining power grid electricity, it is not necessarily big to obtain the power that the bus 101 of power grid electric energy can also provide In stop obtain power grid electricity bus 101 actual power, therefore, can also by it is preset load 102 priority come so that The important load 102 for stopping obtaining the connection of bus 101 of power grid electricity preferentially restores electricity.
According to power supply priority (its for each load 102 that the part bus 101 for stopping acquisition power grid electric energy is connected In, for ease of description succinct, load 102 described hereinafter is to refer to that the part bus 101 for stopping obtaining power grid electric energy connects The load 102 connect), control equipment 12 can be by the power supply priority sequence from high to low of preset each load 102, successively The sum of the demand power of each load 102 is added and obtains demand power.At the same time, control equipment 12 also may determine that often Whether the sum of secondary addition acquisition demand power changes to matches with difference power.
By successively judging whether to match, when the sum of demand power is changed to and matched with difference power, equipment 12 is controlled Can determine the corresponding bus 101 of the sum of matched demand power, wherein the corresponding bus 101 be with demand power it With the corresponding bus 101 preferentially connected for electric loading 102, which is also to need in part bus 101 preferentially The bus to be powered 101 of power supply.
It is understood that in the load 102 that the part bus 101 for stopping acquisition power grid electric energy is connected, except preferential power supply Load 102 outside other loads 102 be load 102 without power supply.It will not be supplied to guarantee that other loads 102 are subsequent Electricity, the control generation switch disjunction instruction of equipment 12, and switch disjunction instruction is sent to by communication equipment 11 and is born with other Carry the wire-outgoing breaker of 102 connections.Wire-outgoing breaker can be according to the movement for closing the switch instruction execution separating brake and in disconnection State.
Also to avoid malfunction from leading to accidentally control, by preset duration after sending switch disjunction instruction, equipment 12 is controlled It can determine that the outlet connecting with other loads 102 is disconnected again according to the state of the most freshly harvested wire-outgoing breaker of communication equipment 11 Whether road device is in closed state.
If it is determined that there are also closed state is not in other 102 wire-outgoing breakers for connect of load, controlling equipment 12 can be with The information of control mistake is sent to host computer, and terminates this control flow.
If it is determined that the wire-outgoing breaker connecting with other loads 102 is in closed state, control equipment 12 can continue It executes the bus to be powered 101 in follow-up process, such as control 12 control section bus 101 of equipment and is obtaining power grid electric energy Bus 101 connect.
Specifically, the control generation of equipment 12 closes the switch instruction, and the switch disjunction is instructed by communication equipment 11 and is sent out It is sent to and the bus to be powered 101 in part bus 101 and is obtaining the normally opened open circuit that the bus 101 of power grid electric energy connect Device.Normally opened breaker can be according to the movement for closing the switch instruction execution combined floodgate and in closed state.
Also to avoid malfunction from leading to accidentally control, by preset duration after transmission closes the switch instruction, equipment 12 is controlled It can be determined again and the mother to be powered in part bus 101 according to the state of the most freshly harvested normally opened breaker of communication equipment 11 Whether the normally opened breaker that line 101 and the bus 101 for obtaining power grid electric energy connect is in closed state.
If it is determined that there are also with the bus to be powered 101 in part bus 101 and obtaining power grid electric energy bus 101 company The normally opened breaker connect is not in closed state, and control equipment 12 can send the information of control mistake to host computer, and terminate This control flow.
If it is determined that with the bus to be powered 101 in part bus 101 and obtaining what the bus 101 of power grid electric energy was connect Normally opened breaker is in closed state, indicates that load 102 regains power supply in a short time, control equipment 12 can To terminate this control flow.
It should be noted that in the implementation procedure of step S300, if control equipment 12 determines that all buses 101 stop Power grid electric energy is obtained, then can terminate the execution to step S300, and starts to execute step S200.
As shown in figure 3, continuing example above-mentioned.
Processing equipment 12 determines that bus 101X is in and stops obtaining according to the state of bus 101X and the state of bus 101Y The state of power grid electric energy.Processing equipment 12 sends switch disjunction and instructs to incoming breaker QF1.Determining incoming breaker QF1 When being in an off state, processing equipment 12 calculates the difference power of bus 101Y, determines that is connect with wire-outgoing breaker QF9 bears 102 are carried as preferentially for electric loading 102.According to this preferentially for electric loading 102, processing equipment 12 can determine that bus 101X is Bus 101 to be powered.Processing equipment 12 sends switch disjunction and instructs to wire-outgoing breaker QF10, and is determining wire-outgoing breaker When QF10 is in an off state, the transmission of processing equipment 12 closes the switch instruction to normally opened circuit breaker Q F8, so that and wire-outgoing breaker The preferential of QF9 connection restores electricity for electric loading 102.
Referring to Fig. 4, some embodiments of the present application provide a kind of power supply unit 100 of load, the power supply of the load Device 100 can be applied to control equipment 12, and the power supply unit 100 of the load may include:
Communication module 110, for monitoring the state of every road bus.
Processing module 120, if for determining that all buses stop obtaining the power grid electricity of the power grid according to the state Can, the electric energy that the bus to be powered in all buses obtains generator is controlled, so as to be powered in all buses Bus is load supplying;And be also used to, if being stopped obtaining the power grid electric energy, control according to the status-determining section bus Bus to be powered in the part bus obtains electric energy from the bus for obtaining the power grid electric energy, so that the part Bus to be powered in bus 101 is load supplying.
It should be noted that due to it is apparent to those skilled in the art that, for the convenience and letter of description Clean, system, the specific work process of device and unit of foregoing description can be with reference to corresponding in preceding method embodiment Journey, details are not described herein.
The computer that some embodiments of the application additionally provide a kind of non-volatile program code that computer is executable can Storage medium is read, is stored with program code on the computer readable storage medium, execution when which is run by computer The step of method of supplying power to of the load of any of the above-described embodiment.
In detail, which can be general storage medium, such as mobile disk, hard disk, on the storage medium Program code when being run, the step of being able to carry out the method for supplying power to of the load of any of the above-described embodiment, continued with realizing It is load supplying.
The program code product of data request method provided by the embodiment of the present application, the meter including storing program code Calculation machine readable storage medium storing program for executing, the instruction that program code includes can be used for executing the method in previous methods embodiment, specific implementation It can be found in embodiment of the method, details are not described herein.
In conclusion the embodiment of the present application provides a kind of method of supplying power to of load, apparatus and system.It is disconnected in part bus It is then the bussed supply to be powered of power-off using other buses of normal power supply when electric;And in the power-off of whole buses, then it utilizes Generator is the bussed supply to be powered of power-off.It is thereby achieved that whether part or all of them bus powers off, after a loss of power all The power supply for continuing as loading may be implemented, realize lasting for load supplying.
More than, the only specific embodiment of the application, but the protection scope of the application is not limited thereto, and it is any to be familiar with Those skilled in the art within the technical scope of the present application, can easily think of the change or the replacement, and should all cover Within the protection scope of the application.Therefore, the protection scope of the application should be subject to the protection scope in claims.

Claims (10)

1. a kind of method of supplying power to of load, which is characterized in that the method is applied to be connected with the control equipment of multichannel bus, often Road bus is also connected with power grid and load respectively, which comprises
Monitor the state of every road bus;
If determining that all buses stop obtaining the power grid electric energy of the power grid according to the state, control in all buses Bus to be powered obtain the electric energy of generator so that bus to be powered in all buses is load supplying;
If being stopped obtaining the power grid electric energy according to the status-determining section bus, control to be powered in the part bus Bus obtains electric energy from the bus for obtaining the power grid electric energy, so that the bus to be powered in the part bus is negative Carry power supply.
2. the method for supplying power to loaded according to claim 1, which is characterized in that the mother to be powered in control all buses The electric energy of line acquisition generator, comprising:
Obtain the gross output of the generator;
According to the power supply priority of preset each load, the demand power and the gross output of each load, really Bus to be powered in fixed all buses, wherein the sum of the demand power of all buses to be powered in all buses It is matched with the gross output;
Control the bus to be powered and the power generation mechatronics in all buses.
3. the method for supplying power to loaded according to claim 2, which is characterized in that the power supply according to preset each load is preferential Grade, each load demand power and the gross output, determine the bus to be powered in all buses, wrap It includes:
By the power supply priority sequence from high to low of preset each load, successively by the demand power phase of each load The sum of add and obtain demand power;
When the sum of described demand power is changed to and is matched with the gross output, determine the matched demand power it With corresponding bus, wherein the corresponding bus is the bus to be powered in all buses.
4. the method for supplying power to loaded according to claim 2, which is characterized in that the mother to be powered in control all buses Line and the power generation mechatronics, comprising:
Determine between the bus to be powered and the generator in all buses and the setting of machine bus breaker it is minimum Path;
Described in control is arranged on the path and machine bus breaker is in closed state.
5. the method for supplying power to loaded according to claim 1, which is characterized in that control the mother to be powered in the part bus Line obtains electric energy from the bus for obtaining the power grid electric energy, comprising:
It determines obtaining the difference function between the actual loading power and default bearing power of the bus of the power grid electric energy Rate;
According to the power supply priority of preset each load, each load for demand power and the difference power, really Bus to be powered in the fixed part bus, wherein the sum of the demand power of all buses to be powered in the part bus It is matched with the difference power, each load bus connection described all the way corresponding with the part bus;
The bus to be powered controlled in the part bus is connect with the bus for obtaining the power grid electric energy.
6. the method for supplying power to loaded according to claim 1, which is characterized in that the state of every road bus includes being arranged on the road The state of the voltage value and current value of incoming breaker on the end of incoming cables of bus and every road bus further includes the road bus Voltage value;Determine that the power grid electric energy of the power grid output has not been obtained in all buses according to the state, comprising:
It determines that the voltage value of the incoming breaker of all buses is less than preset first threshold, determines the incoming breaker Current value be less than preset second threshold and the voltage value and be less than preset third threshold value.
7. the method for supplying power to of load described in -6 any claims according to claim 1, which is characterized in that the control equipment includes protecting Data synchronous first control unit and the second control unit are held, the method also includes:
When the first control unit is in running order, detect whether the first control unit breaks down;
When the first control unit breaks down, it is in running order to control second control unit.
8. a kind of power supply unit of load, which is characterized in that described device is applied to be connected with the control equipment of multichannel bus, often Road bus is also connected with power grid and load respectively, and described device includes:
Communication module, for monitoring the state of every road bus;
Processing module, if for determining that all buses stop obtaining the power grid electric energy of the power grid according to the state, control Bus to be powered in all buses obtains the electric energy of generator 103, so that the bus to be powered in all buses For load supplying;And be also used to, if according to the status-determining section bus stopping acquisition power grid electric energy, described in control Bus to be powered in the bus of part obtains electric energy from the bus for obtaining the power grid electric energy, so that the part bus In bus to be powered be load supplying.
9. a kind of electric power supply control system characterized by comprising control equipment and communication equipment, the control equipment with it is described Communication equipment connection, the communication equipment are connect with multichannel bus;
The communication equipment, for obtaining the state of every road bus;
The control equipment, for monitoring the state, if determining that all buses stop obtaining power grid according to the state Power grid electric energy, Xiang Suoshu communication equipment sends the first control instruction, so that the bus to be powered in all buses is according to institute State the electric energy that the first control instruction obtains generator 103;And be also used to, if being obtained according to status-determining section bus stopping The power grid electric energy is taken, Xiang Suoshu communication equipment sends the second control instruction, so that the bus to be powered in the part bus Electric energy is obtained from the bus for obtaining the power grid electric energy according to second control instruction.
10. electric power supply control system according to claim 9, which is characterized in that the control equipment includes: to keep data synchronous First control unit and the second control unit, the first control unit by first control link and the communication equipment connect It connects, second control unit is connect by the second control link with the communication equipment;
Second control unit, it is single for when the first control unit is in running order, detecting first control Whether member breaks down;And for it is in running order to control itself when the first control unit breaks down.
CN201910468147.6A 2019-05-30 2019-05-30 Method of supplying power to, the apparatus and system of load Pending CN110289680A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910468147.6A CN110289680A (en) 2019-05-30 2019-05-30 Method of supplying power to, the apparatus and system of load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910468147.6A CN110289680A (en) 2019-05-30 2019-05-30 Method of supplying power to, the apparatus and system of load

Publications (1)

Publication Number Publication Date
CN110289680A true CN110289680A (en) 2019-09-27

Family

ID=68003163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910468147.6A Pending CN110289680A (en) 2019-05-30 2019-05-30 Method of supplying power to, the apparatus and system of load

Country Status (1)

Country Link
CN (1) CN110289680A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101459337A (en) * 2008-12-30 2009-06-17 上海慧伦电气有限公司 Stabilized control system capable of accurately cut load selection according to load path
CN106160187A (en) * 2014-09-30 2016-11-23 北京机械工业自动化研究所 Middle pressure power transmission and distribution automatic switching control system and control method
CN206878548U (en) * 2017-05-25 2018-01-12 昆明理工大学 A kind of distributed generation system for thering is the quality of power supply to support to priority loads
US20190013676A1 (en) * 2017-07-10 2019-01-10 Institute of Nuclear Energy Research, Atomic Energy Council, Executive Yuan, R.O.C. Apparatus of Controlling Uninterruptible Power Supply for Grid
CN109390941A (en) * 2018-12-21 2019-02-26 重庆樱花能源科技有限公司 A kind of electric power distribution system for distributing-supplying-energy system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101459337A (en) * 2008-12-30 2009-06-17 上海慧伦电气有限公司 Stabilized control system capable of accurately cut load selection according to load path
CN106160187A (en) * 2014-09-30 2016-11-23 北京机械工业自动化研究所 Middle pressure power transmission and distribution automatic switching control system and control method
CN206878548U (en) * 2017-05-25 2018-01-12 昆明理工大学 A kind of distributed generation system for thering is the quality of power supply to support to priority loads
US20190013676A1 (en) * 2017-07-10 2019-01-10 Institute of Nuclear Energy Research, Atomic Energy Council, Executive Yuan, R.O.C. Apparatus of Controlling Uninterruptible Power Supply for Grid
CN109390941A (en) * 2018-12-21 2019-02-26 重庆樱花能源科技有限公司 A kind of electric power distribution system for distributing-supplying-energy system

Similar Documents

Publication Publication Date Title
WO2022193899A1 (en) Balance monitoring control system and method for power battery, server, and storage medium
CN109552104A (en) A kind of charge control method, device, equipment, medium and charging pile
EP2808687A1 (en) Battery system, and ground-fault detection device
US20170331293A1 (en) Power control system with fault detection and data retention for energy generation systems
CN102790418A (en) Modular UPS (Uninterruptible Power Supply) and multi-charger parallel logic control method
JP6251609B2 (en) Power interchange system and power interchange method
US20160254666A1 (en) Adaptive microgrid control
CN105406580A (en) Power supply system and method
EP4075638A1 (en) Energy storage system and method for controlling energy storage system
CN104716734A (en) Energy storage system (ess) using uninterruptible power supply(ups)
CN112448464A (en) Uninterruptible power supply system bypass switch control
CN110739758A (en) uninterrupted power source and power distribution system
CN112104037B (en) Power supply system, control method thereof, automatic driving vehicle and power supply management device
JP7456509B2 (en) Connection DC power distribution system, power adjustment method, and program
Falahati et al. Failure modes in IEC 61850-enabled substation automation systems
CN110289680A (en) Method of supplying power to, the apparatus and system of load
CN106526498A (en) Uninterrupted Power Supply (UPS) self-inspection method and UPS self-inspection circuit
CN116418108A (en) Power conversion circuit, energy storage device and cut-off control method of battery pack
CN113954773B (en) Commercial vehicle low-voltage power supply device
CN114156971B (en) Method, device and equipment for controlling energy storage charge and discharge and energy storage system
CN115091961A (en) Power battery processing system and method, electric vehicle and automatic driving vehicle
CN111030175B (en) Coordination control device and coordination control method of intelligent micro-grid
CN114801749A (en) Intelligent control system for vehicle power battery
CN112260297B (en) Double-bus grid-connected energy storage system management method, device, equipment and medium
CN111277023A (en) Battery equalization management circuit and control method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190927