CN110287449A - It is a kind of meter and topologies change Distribution Network Harmonics measuring point Optimal Configuration Method - Google Patents

It is a kind of meter and topologies change Distribution Network Harmonics measuring point Optimal Configuration Method Download PDF

Info

Publication number
CN110287449A
CN110287449A CN201910534419.8A CN201910534419A CN110287449A CN 110287449 A CN110287449 A CN 110287449A CN 201910534419 A CN201910534419 A CN 201910534419A CN 110287449 A CN110287449 A CN 110287449A
Authority
CN
China
Prior art keywords
node
matrix
measuring point
observability degree
considerable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910534419.8A
Other languages
Chinese (zh)
Other versions
CN110287449B (en
Inventor
仉志华
曲泽奇
田咏桃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum East China
Original Assignee
China University of Petroleum East China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum East China filed Critical China University of Petroleum East China
Priority to CN201910534419.8A priority Critical patent/CN110287449B/en
Publication of CN110287449A publication Critical patent/CN110287449A/en
Application granted granted Critical
Publication of CN110287449B publication Critical patent/CN110287449B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/10Complex mathematical operations
    • G06F17/16Matrix or vector computation, e.g. matrix-matrix or matrix-vector multiplication, matrix factorization
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/10Complex mathematical operations
    • G06F17/18Complex mathematical operations for evaluating statistical data, e.g. average values, frequency distributions, probability functions, regression analysis
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/01Arrangements for reducing harmonics or ripples
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/40Arrangements for reducing harmonics

Abstract

The invention patent disclose it is a kind of meter and topologies change Distribution Network Harmonics measuring point Optimal Configuration Method.Distribution net work structure aiming at the problem that complicated and frequently adjustment, the Observability Analysis method of meter and interconnection switch movement probability coefficent is proposed, the node observability degree and system observability degree under network topology structure situation of change are calculated based on the incidence matrix between node;Using harmonic state estimation measurement matrix conditional number as the index for measuring harmonic state estimation precision, the harmonic wave measuring point Optimal Allocation Model for comprehensively considering system observability degree and measurement matrix conditional number is established.This method can effectively improve Observable range when system topology variation, and ensure that harmonic state estimation precision.

Description

It is a kind of meter and topologies change Distribution Network Harmonics measuring point Optimal Configuration Method
Technical field
The present invention relates to distribution network electric energy quality fields, in particular to Distribution Network Harmonics measuring point Optimal Configuration Method.
Background technique
In recent years, with the continuous improvement of energy-saving and emission-reduction attention degree, the non-linear power electronic equipment such as frequency converter is answered With increasingly extensive, thus caused by Distribution Network Harmonics pollution problem become increasingly conspicuous.The power quality of user has not only been influenced, and And phenomena such as resonance, protection misoperation of harmonic wave initiation, also brings certain challenge to power grid operation, it has also become power supply enterprise Industry and user's question of common concern.Building Distribution Network Harmonics on-line monitoring system is analysis harmonic wave occurrence features, statistics harmonic wave The regularity of distribution proposes the basis of effective braking measure in turn.
In view of power distribution network network topology structure is complicated and easily variability is high, each node installation harmonic wave is supervised online in power grid It is too big to survey terminal projects cost.Therefore, by the way that a certain number of harmonic waves on-line monitoring terminal is optimized configuration, reach power grid To the greatest extent it is considerable, thus using harmonic state estimation technology carry out Distribution Network Harmonics on-line monitoring have important economy And Practical significance.
Existing harmonic wave measures terminal optimized configuration method and is only applicable to single network topological structure at present, does not account for In the case where system network topology variation, original measure configuration may make certain buses lose ornamental or harmonic wave The problem of precision of state estimation is affected by error in measurement.Since power distribution network topological structure is complicated and flexible and changeable, harmonic wave The installation site of on-line monitoring terminal directly determines its Observable region and harmonic state estimation precision, it is therefore necessary to grind Study carefully the terminal optimized allocation problem of harmonic wave on-line monitoring for being suitable for network topology structure variation.
Summary of the invention
Technical problem solved by the present invention is frequently adjusting problem for distribution net work structure, meter and interconnection switch are proposed The Observability Analysis method for acting probability coefficent is calculated under network topology structure situation of change based on the incidence matrix between node Node observability degree and system observability degree;Using harmonic state estimation measurement matrix conditional number as measurement harmonic state estimation The index of precision establishes and comprehensively considers the harmonic wave measuring point that system observability degree harmony wave state estimator surveys Matrix condition number Optimal Allocation Model.
1. direct considerable node and indirectly considerable node judgement
Observability degree can be used to measure the quantity of the directly considerable node of system and indirect considerable node, i.e. system Observable Range.Observability degree is divided into two kinds, respectively node observability degree and system observability degree in the present invention.It provides as follows: node Observability degree refers in the case where system network topology variation, probability that node is observed.If node observability degree is 1, Then claiming must considerable node;If node observability degree is 0, title must not considerable node;If node observability degree is 0~1, claim The considerable node of probability.System observability degree refers to that ratio of the sum of each node observability degree with total node number, observability degree are 1 table Show that system must be completely considerable;Observability degree is that 0 expression system must be completely inconsiderable;Observability degree is 0~1 expression Account Dept Divide considerable.
When system network topology complexity, when node, number of branches are more, the judgement of system Observable range is more multiple It is miscellaneous.The incidence relation in complex electric network network between each node is described using the incidence matrix between node in the present invention.
Incidence matrix A between node is n × n rank symmetrical matrix, and wherein n is number of nodes, and matrix element is by 0 or 1 group At;Definition claims two nodes associated with each other when two nodes are coupled by a branch.If Aij=1, then it represents that i, j node are related Connection;If Aij=0, then it represents that i, j node are not associated with.
System Observability Analysis first has to carry out directly considerable node and indirectly considerable node judgement.
1) assume that distribution number of nodes is n, share k kind measuring point allocation plan, establish directly considerable node judgment matrix:
Fi=AXi
In formula, F is k × n matrix, FiFor the i-th row element of F, indicate through directly considerable node judgement, i-th kind of measuring point Each node ornamental under allocation plan.If Fij>=1, then i-th kind of measuring point allocation plan lower node j is directly considerable;If Fij=0, Then i-th kind of measuring point allocation plan lower node j be not considerable.X is k × n rank matrix, XiFor the i-th row element of X, i-th kind of measurement is indicated Point allocation plan.If Xij=1, then it represents that under i-th kind of measuring point allocation plan, node j is equipped with harmonic wave measuring equipment;If Xij= 0, then it represents that under i-th kind of measuring point allocation plan, node j does not have harmonic wave measuring equipment.
By direct considerable node judgment matrix, directly may be used in addition to measuring point under available every kind of measure configuration scheme The node of sight, i.e., newly-increased directly considerable node.
2) for the newly-increased direct considerable node m under i-th kind of measuring point allocation plan, if it is anharmonic wave source injection section Point can then establish indirect considerable node judgment matrix:
fi,m=Am-Xi
In formula, f is l × n rank matrix, and l is the newly-increased directly considerable of anharmonic wave source injection under i-th kind of measuring point allocation plan The number of node;fi,mFor the corresponding row element of m node in the corresponding f matrix of i-th kind of measuring point allocation plan;AmTo be associated with square Battle array m row;XiFor i-th kind of measure configuration scheme.
If fi,mIn, in addition to m column, an only column element is 1, then the corresponding node of the column is indirect considerable node, FiIn The column add 1.
2. the node observability degree and system observability degree of meter and network topology structure variation calculate
Assuming that node i is measuring point, and 3 branches are shared at node i, wherein one is interconnection branch, distribution is typical Interconnection switch disconnects under operational mode;If node i is measuring point, 2 branches can be made to side gusset under typical mode of operation It is considerable;When power distribution network needs to be reconstructed, interconnection switch closure, 3 branches are considerable to side gusset at this time;Existed according to scene Normally, interconnection switch, which acts probability, at node i is shown to the adjustment experience of distribution network structure under maintenance or emergency operating mode Coefficient is Pi, then node i observability degree is 1+P at this timei
It constructs interconnection switch and acts probability coefficent matrix P:
P=(P1 P2 … Pn)
P is 1 × n rank matrix, PiProbability coefficent is acted for interconnection switch at node i.
There is node observability degree matrix expression at this time:
Oi,j=Fi,j+Xi,j×Pj
In formula, O is k × n matrix, Oi,jIndicate the observability degree of i-th kind of measure configuration scheme lower node j.
System observability degree matrix are as follows:
In formula, K is the rank matrix of k × 1, KiFor the system observability degree matrix under i-th kind of measurement scheme.
3. comprehensively considering system observability degree and the harmonic wave measuring point optimization of harmonic state estimation measurement matrix conditional number being matched Set model
Measurement matrix conditional number reflects the Degree of Ill Condition of measurement matrix, and value is bigger, and matrix is closer to morbid state, harmonic wave shape State estimated accuracy is influenced also larger by error in measurement, is caused even if error in measurement very little, harmonic state estimation result also has The case where large error.
The above analysis, the present invention propose that a kind of meter and the Distribution Network Harmonics measuring point of topologies change are distributed rationally Method, in the case where guaranteeing the maximum situation of system observability degree, measurement matrix conditional number Cond (H) is minimum.Accordingly, harmonic content is established Measuring point distributes objective function rationally:
In formula, σ1、σ2For the weight coefficient reciprocal of system observability degree and measurement matrix conditional number;HiIndicate i-th kind of amount Measurement matrix in the case of measuring point arrangement.
Compared with prior art the beneficial effects of the present invention are:
Distribution Network Harmonics measuring point Optimal Configuration Method disclosed in the invention patent realizes and becomes in network topology structure Under the premise of changing with a certain number of harmonic waves on-line monitoring terminal, system Observable range is maximum;And make system Observable range While reaching maximum, it ensure that harmonic state estimation precision is influenced minimum by error in measurement.Solve existing at present match Mains by harmonics measuring point Optimal Configuration Method can not be suitable for network topology structure and change, and cause reason measure configuration that may make Certain buses, which lose ornamental or harmonic state estimation precision, is influenced the problem of becoming larger by error in measurement.
Detailed description of the invention
Attached drawing 1 is IEEE-33 node standard test system.
Attached drawing 2 is fitness with the number of iterations change curve.
Attached drawing 3 is when measuring point is 3,6,12,15,29, and whether there is or not the harmonic state estimation amplitudes in the case of error in measurement Error comparison diagram.
Attached drawing 4 is when measuring point is 2,6,9,12,29, and whether there is or not the harmonic state estimation amplitude mistakes in the case of error in measurement Poor comparison diagram.
Specific embodiment
Fig. 1 is IEEE-33 node standard test system, and harmonic wave measuring point is carried out by taking 5 subharmonic as an example and distributes emulation rationally Analysis.Assuming that interconnection switch is closed between node 12 and node 22, objective function is solved using genetic algorithm.Target letter σ in number1It is set as 0.9, σ2It is set as 0.1;Interconnection switch acts P in probability coefficent matrix P25=P29=0.6, P33=P18=0.5, P9 =P15=0.7, P21=P8=0.4, P12=P22Remaining element is 0 in=0.9, P;Choosing measuring point number is 5, initial population 5000,100 generation of the number of iterations.
Fitness is as shown in Figure 2 with the number of iterations change curve.It can be seen from the figure that optimal adaptation degree substantially 20~ In 30 generations, reached highest and tended towards stability, and optimal amount measuring point arrangement is shown in Table 1.
1 optimal amount measuring point arrangement situation of table
If taking no account of the influence of network topology structure variation, i.e. P is null matrix, and other conditions and parameter setting are constant, this When optimal amount measuring point arrangement be shown in Table 2.
Optimal amount measuring point arrangement situation when 2 P of table is null matrix
By Tables 1 and 2 comparison it is found that if taking no account of the influence of network topology structure variation, system observability degree will It reduces;I.e. in the biggish node installation measuring point of interconnection switch movement probability coefficent, due to the closure number phase of interconnection switch To more, system is easier to be in the state of high observability degree.
If only considering system observability degree, measurement matrix conditional number, i.e. σ are not considered1It is set as 1, σ2Be set as 0, other conditions and Parameter setting is constant, and optimal amount measuring point arrangement is shown in Table 3 at this time.
The optimal amount measuring point arrangement of 3, table consideration system observability degrees
As can be seen from Table 3, when only considering system observability degree, the measurement matrix condition of two kinds of optimal amount measuring point arrangements Number is different.When measuring point is 3,6,12,15,29, to current measurement at measuring point 3,15, there are 10% errors and errorless respectively Poor two kinds of situations are emulated, and for state estimation result as shown in table 4,5, the comparison of state estimation error is as shown in Figure 3.
Current measurement is without measurement error state estimated result at 4 measuring point 3,15 of table
Current measurement has 10% error in measurement state estimation result at 5 measuring point 3,15 of table
When measuring point is 2,6,9,12,29, to current measurement at measuring point 2,9, there are 10% errors and error free respectively Two kinds of situations are emulated, and for state estimation result as shown in table 6,7, the comparison of state estimation error is as shown in Figure 4.
Current measurement is without measurement error state estimated result at 6 measuring point 2,9 of table
Current measurement has 10% error in measurement state estimation result at 7 measuring point 2,9 of table
Comparison diagram 3, Fig. 4, it is apparent that when measuring point be 3,6,12,15,29 when, due to measurement matrix conditional number compared with Small, the state estimation error as caused by error in measurement is smaller;Compared to measuring point be 2,6,9,12,29 when, harmonic state estimation System observability degree is identical, but precision is higher.

Claims (3)

1. the Distribution Network Harmonics measuring point Optimal Configuration Method of a kind of meter and topologies change, which is characterized in that centainly supervising Under the premise of surveying terminal quantity, it is wavy to establish the system observability degree harmony comprehensively considered under network topology structure situation of change State estimation measures the Distribution Network Harmonics measuring point Optimal Allocation Model of Matrix condition number, can effectively improve system topology variation When Observable range, and ensure that harmonic state estimation precision.
2. the Distribution Network Harmonics measuring point Optimal Configuration Method of a kind of meter according to claim 1 and topologies change, It is characterized in that, the system observability degree harmony wave state estimator comprehensively considered under network topology structure variation surveys square The Distribution Network Harmonics measuring point Optimal Allocation Model of battle array conditional number specifically:
In formula, K is the rank matrix of k × 1, KiFor the system observability degree matrix under i-th kind of measurement scheme;H is harmonic state estimation amount Survey matrix, Cond (Hi) be i-th kind of measure configuration scheme measurement matrix conditional number;σ1、σ2For system observability degree and measure square The weight coefficient reciprocal of battle array conditional number.
3. the Distribution Network Harmonics measuring point Optimal Configuration Method of a kind of meter according to claim 1 and topologies change, It is characterized in that, the system observability degree that the consideration network topology structure changes acts probability coefficent by meter and interconnection switch Observability Analysis method obtain, the specific method is as follows:
Observability degree can be used to measure the quantity of the directly considerable node of system and indirect considerable node, i.e. system Observable model It encloses.Observability degree is divided into two kinds, respectively node observability degree and system observability degree in the present invention.Provide as follows: node can Observation degree refers in the case where system network topology variation, probability that node is observed.If node observability degree is 1, Title must considerable node;If node observability degree is 0, title must not considerable node;If node observability degree is 0~1, claim general The considerable node of rate.System observability degree refers to that ratio of the sum of each node observability degree with total node number, observability degree are 1 expression System must be completely considerable;Observability degree is that 0 expression system must be completely inconsiderable;Observability degree is 0~1 expression components of system as directed It is considerable.
When system network topology complexity, when node, number of branches are more, the judgement of system Observable range is complex. The incidence relation in complex electric network network between each node is described using the incidence matrix between node in the present invention.Between node Incidence matrix A is n × n rank symmetrical matrix, and wherein n is number of nodes, and matrix element is made of 0 or 1;Definition when two nodes by When one branch connection, claim two nodes associated with each other.If Aij=1, then it represents that i, j node are associated;If Aij=0, then it represents that i, J node is not associated with.
A) assume that distribution number of nodes is n, share k kind measuring point allocation plan, establish directly considerable node judgment matrix:
Fi=AXi
In formula, F is k × n matrix, FiFor the i-th row element of F, indicate through directly considerable node judgement, i-th kind of measuring point configuration side Each node ornamental under case.If Fij>=1, then i-th kind of measuring point allocation plan lower node j is directly considerable;If Fij=0, then i-th Kind measuring point allocation plan lower node j is not considerable.X is k × n rank matrix, XiFor the i-th row element of X, indicate that i-th kind of measuring point is matched Set scheme.If Xij=1, then it represents that under i-th kind of measuring point allocation plan, node j is equipped with harmonic wave measuring equipment;If Xij=0, then It indicates under i-th kind of measuring point allocation plan, node j does not have harmonic wave measuring equipment.
B) for the newly-increased direct considerable node m under i-th kind of measuring point allocation plan, if it injects node for anharmonic wave source, Indirect considerable node judgment matrix can then be established:
fi,m=Am-Xi
In formula, f is l × n rank matrix, and l is the newly-increased directly considerable node that anharmonic wave source injects under i-th kind of measuring point allocation plan Number;fi,mFor the corresponding row element of m node in the corresponding f matrix of i-th kind of measuring point allocation plan;AmFor incidence matrix m Row;XiFor i-th kind of measure configuration scheme.If fi,mIn, in addition to m column, an only column element is 1, then the corresponding node of the column is Indirect considerable node, FiIn the column add 1.
C) assume that node i is measuring point, and share 3 branches at node i, wherein one is interconnection branch, distribution typical case fortune Interconnection switch disconnects under row mode;If node i is measuring point, it can make 2 branches can to side gusset under typical mode of operation It sees;When power distribution network needs to be reconstructed, interconnection switch closure, 3 branches are considerable to side gusset at this time;According to scene just Often, interconnection switch, which acts probability system, at node i is shown to the adjustment experience of distribution network structure under maintenance or emergency operating mode Number is Pi, then node i observability degree is 1+P at this timei
It constructs interconnection switch and acts probability coefficent matrix P:
P=(P1 P2 … Pn)
P is 1 × n rank matrix, PiProbability coefficent is acted for interconnection switch at node i.
There is node observability degree matrix expression at this time:
Oi,j=Fi,j+Xi,j×Pj
In formula, O is k × n matrix, Oi,jIndicate the observability degree of i-th kind of measure configuration scheme lower node j.
System observability degree matrix are as follows:
In formula, K is the rank matrix of k × 1, KiFor the system observability degree matrix under i-th kind of measurement scheme.
CN201910534419.8A 2019-06-20 2019-06-20 Power distribution network harmonic measurement point optimal configuration method considering topological structure change Active CN110287449B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910534419.8A CN110287449B (en) 2019-06-20 2019-06-20 Power distribution network harmonic measurement point optimal configuration method considering topological structure change

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910534419.8A CN110287449B (en) 2019-06-20 2019-06-20 Power distribution network harmonic measurement point optimal configuration method considering topological structure change

Publications (2)

Publication Number Publication Date
CN110287449A true CN110287449A (en) 2019-09-27
CN110287449B CN110287449B (en) 2023-01-10

Family

ID=68005092

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910534419.8A Active CN110287449B (en) 2019-06-20 2019-06-20 Power distribution network harmonic measurement point optimal configuration method considering topological structure change

Country Status (1)

Country Link
CN (1) CN110287449B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111612225A (en) * 2020-05-08 2020-09-01 国网山西省电力公司电力科学研究院 Optimal configuration method of harmonic wave measuring device
CN112018760A (en) * 2020-08-27 2020-12-01 四川大学 Harmonic state estimation method based on asynchronous data

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103904653A (en) * 2014-04-23 2014-07-02 济南大学 Observability analyzing method in power grid harmonic state estimation
CN105184508A (en) * 2015-09-29 2015-12-23 东南大学 Harmonic measuring point optimal allocation method for distribution network
CN105259472A (en) * 2015-10-15 2016-01-20 广州供电局有限公司 Harmonic source positioning method of electric energy quality monitoring device, and electric energy quality monitoring device thereof
CN105958487A (en) * 2016-06-15 2016-09-21 山东大学 Power distribution network measurement configuration method considering various network structures

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103904653A (en) * 2014-04-23 2014-07-02 济南大学 Observability analyzing method in power grid harmonic state estimation
CN105184508A (en) * 2015-09-29 2015-12-23 东南大学 Harmonic measuring point optimal allocation method for distribution network
CN105259472A (en) * 2015-10-15 2016-01-20 广州供电局有限公司 Harmonic source positioning method of electric energy quality monitoring device, and electric energy quality monitoring device thereof
CN105958487A (en) * 2016-06-15 2016-09-21 山东大学 Power distribution network measurement configuration method considering various network structures

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
陆文钦等: "基于改进人工蜂群算法的配电网谐波量测点优化配置", 《电工技术》 *
韩美玉等: "考虑谐波状态估计精度的PMU优化配置研究", 《自动化与仪器仪表》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111612225A (en) * 2020-05-08 2020-09-01 国网山西省电力公司电力科学研究院 Optimal configuration method of harmonic wave measuring device
CN112018760A (en) * 2020-08-27 2020-12-01 四川大学 Harmonic state estimation method based on asynchronous data

Also Published As

Publication number Publication date
CN110287449B (en) 2023-01-10

Similar Documents

Publication Publication Date Title
Schenato et al. Bayesian linear state estimation using smart meters and pmus measurements in distribution grids
Zhang et al. Adaptive wide-area damping control scheme with stochastic subspace identification and signal time delay compensation
Ledva et al. Separating feeder demand into components using substation, feeder, and smart meter measurements
CN105548718A (en) System harmonic impedance calculation method based on mixed overall least square method
CN101685966A (en) Method for comprehensively analyzing low-frequency oscillation and system thereof
CN105046588B (en) A kind of calculation method of the improvement direct current Dynamic Optimal Power Flow Problem based on network loss iteration
CN102611102A (en) Power system partition modeling method based on actual measurement by aid of PMU (phasor measurement units)
CN106026086B (en) The method for dynamic estimation of operating status in a kind of power grid
CN110287449A (en) It is a kind of meter and topologies change Distribution Network Harmonics measuring point Optimal Configuration Method
CN106786608B (en) A kind of uncertain harmonic flow calculation method suitable for distributed generation resource access
CN106548021A (en) A kind of electronic mutual inductor error state appraisal procedure based on higher-dimension random matrix
CN106655152B (en) A kind of State Estimation for Distribution Network measuring characteristic based on AMI
CN109088407A (en) The State Estimation for Distribution Network of modeling is measured based on deepness belief network puppet
CN108054757A (en) A kind of embedded idle and voltage N-1 Close loop security check methods
CN106980044A (en) A kind of Harmonious Waves in Power Systems current estimation method for adapting to wind power integration
CN106372440B (en) A kind of adaptive robust state estimation method of the power distribution network of parallel computation and device
Hongjie et al. A simple method for power system stability analysis with multiple time delays
CN110568260B (en) Power transmission line harmonic parameter estimation method for power grid harmonic analysis
CN110289646B (en) Intelligent soft switch local control strategy optimization method based on meta-model
CN106953331A (en) A kind of Harmonic Power Flow of Power Systems algorithm for considering uncertain and three-phase imbalance
CN102087311A (en) Method for improving measurement accuracy of power mutual inductor
Chen et al. Decentralized state estimation for distribution systems using artificial neural network
Hua et al. Partially linear model for harmonic contribution determination
Liu et al. Distribution network topology error identification method based on D-PMU and branch state function
CN109873427A (en) A kind of random harmonic tidal current computing method based on Higher Order Cumulants

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant