A kind of steam and dry iron device
Technical field
The present invention relates to the technical fields of electric iron, more particularly, to a kind of steam and dry iron device.
Background technique
As the improvement of people's living standards, the more and more exquisite details worn the clothes of people, such as clothes are smooth.Steam electricity
Iron arrangement is the tool of a kind of smooth clothes and cloth, and steam and dry iron device is when in use, simple and convenient, deep by people
Like.
In the prior art, be distributed with vaporium on the bottom plate of steam and dry iron device, vaporium be divided into single vaporium or
Two vaporiums of person, steam is by vaporium, then passes through steam hole, to carry out ironing to clothing.
Prior art among the above has the following deficiencies: that steam heats from water tank and is transmitted to steaming by air inlet pipe
In steam chest, the steam in vaporium is sprayed from steam hole again, due to including droplet from the steam generated in water tank, from
And cause the steam of ejection from steam hole not fine and smooth enough, there is room for improvement.
Summary of the invention
The object of the present invention is to provide a kind of steam and dry iron devices, improve the whole path of vaporium, reduce steam
In droplet, improve the drying property of steam, improve ironing effect.
Foregoing invention purpose of the invention has the technical scheme that
A kind of steam and dry iron device, including electric iron component and the base assembly being connect with electric iron component;
The electric iron component includes:
Aluminum soleplate is placed on base assembly and for ironing clothes;
Heat-generating pipe is set on aluminum soleplate and for generating heat;
First vaporium, is set on aluminum soleplate;
Second vaporium is set on aluminum soleplate and is located in the first vaporium;
Steam hole is set on the first vaporium;
Decoration hole is set on aluminum soleplate and is distributed in steam hole side;
Vaporization plate is set on aluminum soleplate and for separating the first vaporium and the second vaporium;
Air intake is set on vaporization plate and for inputting for steam;
Seat is vaporized, is set on vaporization plate and for connecting the first vaporium and the second vaporium;
Bottom plate gasket is set on vaporization seat and closes vaporization chamber for covering;
Steam channel cover board is set on vaporization seat and for fixing bottom plate gasket;
Heat-insulating base is set on aluminum soleplate;
Ceramics pole is set between aluminum soleplate and heat-insulating base and for heat-insulated;
Cooling fin is fixed by bolts on heat-insulating base;
Vaporization chamber is provided on the vaporization seat, be provided on the vaporization plate interconnected with vaporization chamber and with the first steam
The through-hole that room, the second vaporium interconnect;
It is located in the second vaporium on the aluminum soleplate and is provided with inlet channel corresponding with air intake, is also set on the heat-insulating base
It is equipped with the first mounting groove for cooling fin installation.
By using above-mentioned technical proposal, steam hole on aluminum soleplate for going out steam, and decoration hole coordinating with steam rapid heat cycle hole into
It exercises and uses, more beautiful, heat-generating pipe is for being heated, so that the temperature of aluminum soleplate be improved, and carries out to steam
Heating and heat preservation, the first vaporium and the second vaporium are disconnected from each other, are interconnected by the through-hole on vaporization seat, thus
The path of steam integrally passed through is improved, to improve drying property, and bottom plate gasket and steam are threaded a pipe cover board, will be vaporized
Vaporization chamber on seat is sealed, practical.
The present invention is further arranged to: second vaporium includes:
First passage is interconnected with inlet channel;
Second channel is interconnected with first passage;
Third channel is interconnected with second channel;
Be provided with reinforcing rod between the first passage and second channel, second channel and third channel, the first passage with
Arc baffles are provided between third channel, the arc baffles are protruded to from third channel to first passage direction;
It is located on second channel on the aluminum soleplate and is provided with partition, the first sealing ring, the aluminium is provided on the aluminum soleplate
The mounting base for bolt installation is provided on bottom plate, vaporization plate, first that sealing ring installation is provided on the vaporization plate is close
Sealing groove;
It is additionally provided with the second sealing ring on the bottom plate gasket, for the installation of the second sealing ring is provided on the vaporization seat
Two seal grooves;
It is located in third channel on the vaporization plate and is additionally provided with siphunculus corresponding with through-hole, is also set on the steam channel cover board
It is equipped with the lid side that cooperation is contradicted with the lateral wall of vaporization seat;
The side of aluminum soleplate is provided with the first connecting column on the vaporization plate, be additionally provided on the steam channel cover board with
The attachment base of first connecting column cooperation insertion, first connecting column and attachment base are fixed by bolt.
By using above-mentioned technical proposal, by the setting of first passage, second channel, third channel, to improve
Whole path length, be expelled directly out steam will not, and to improve the time of heating, the drying property of steam is improved,
The setting of reinforcing rod improves the mobility to steam, and arc baffles drain steam, to improve the circulation of steam
Property, by the first sealing ring, cooperate the setting of the first seal groove, so that whole leakproofness is improved, the first connecting column and company
The use of joint chair, to improve whole stability.
The present invention is further arranged to: the electric iron component further include:
Shell is held, is set on heat-insulating base;
Ornamental strip is set to and holds on shell;
Lampshade lower cover, is connected on ornamental strip;
Lampshade upper cover is set on ornamental strip and is arranged in lampshade lower cover;
Housing afterwards is set on heat-insulating base and for fixing heat shield and holding shell;
Back shroud is set on rear housing;
Line sheath is articulated between heat-insulating base and rear housing and wears for line;
The first mounting ring is provided on the ornamental strip, it is described to hold the installation being provided on shell with the first mounting ring cooperation
, it is provided with the first buckle on lid under the lampshade, the first card slot for the first buckle clamping is provided on the ornamental strip;
It is additionally provided with the connection sheet for being inserted in rear housing on the heat-insulating base, is additionally provided on the back shroud through bolt with after
The connecting plate of housing connection is additionally provided with the limit chamber placed for line sheath limit on housing after described;
The pin joint seat worn for line is provided on the line sheath, it is described to hold the pivot joint being provided on shell with pin joint seat pivot joint
Piece;
On the gripping shell also on be provided with the second buckle, be provided on the heat-insulating base for second buckle clamping second card
Slot.
By using above-mentioned technical proposal, by holding the ornamental strip on shell, lampshade upper cover, lampshade lower cover, thus into
Row is fixed, while also more beautiful, and the setting of rear housing cooperation back shroud improves entirety so that line sheath is fixed
Stability, the setting of the first mounting ring is coupled the use of seat, to improve the stabilization for holding shell and ornamental strip
Property, first first card slot that is clasped improve the stability of ornamental strip Yu lampshade lower cover, and connection sheet mating connection plate improves
Overall stability, the setting of pin joint seat, is skimmed and the use of pin-jointing piece improves line sheath so that line sheath is fixed
Stability, the second setting for being clasped the second card slot, improves the stability held between shell and heat-insulating base.
The present invention is further arranged to: the electric iron component further include:
Upper cover plate is set to and holds on shell;
Microswitch is set to and holds on shell;
Lower lock block is articulated in and holds on shell and work in coordination with microswitch;
Button is set on gripping shell and cooperates with lower by block to trigger microswitch and be arranged in upper cover plate;
Front shroud is connected on upper cover plate and is clamped limit for button;
It is provided with lock on the front shroud, the locked groove for latching snapping is provided on the upper cover plate, is gone back on the front shroud
Several third buckles are provided with, the third card slot for third buckle clamping is provided on the upper cover plate;
It is provided with the second fastener that the first fastener and the first fastener are arranged in correspondence with each other on the button, is set on the front shroud
It is equipped with the first strip limited mutually with the first fastener, the second card limited mutually with the second fastener is provided on the front shroud
Item;
Several snap rings are provided on the upper cover plate, it is described to hold the 4th buckle for being provided on shell and being clamped mutually with snap ring,
The 5th buckle is additionally provided on the upper cover plate, it is described to hold the 5th card slot being provided on shell with the 5th buckle clamping.
By using above-mentioned technical proposal, by the setting of upper cover plate, to be fixed shell is held, hand is improved
Comfort when portion is held, microswitch cooperates the use of lower lock block and button, thus sensitiveer, by lever far from into
Row fix, improve whole sensitivity, front shroud limits button, the setting of snap fit locked groove, by front shroud with
Upper cover plate is fixed, and third buckle is clamped mutually with third card slot, and it is steady to improve connection of the upper cover plate between front shroud
Qualitative, the first fastener cooperates the first strip, and the second fastener cooperates the second strip, limits button mutually with front shroud, the
The cooperation of five buckles and the 5th card slot, to further improve the stability between front shroud and upper cover plate.
The present invention is further arranged to: the base assembly includes:
Chassis is placed in plane;
Boiler is set on chassis and for generating steam;
Sewage pipe is set on boiler and for draining;
Solenoid valve is set on boiler and for controlling water route on-off;
Bracket is integrally formed on boiler and is inclined to set;
Locating rack, is set on chassis and boiler of feeding is installed;
Positioning column is set on locating rack and fixes with support assorted;
First mounting post, is integrally formed on chassis;
Resilient cushion is set on locating rack and is sheathed in the first mounting post and is fixed by bolt;
Second mounting ring is set on locating rack and installs for resilient cushion;
First threaded post is set in the first mounting post and wears fixation with connection frame;
Connection frame is set on resilient cushion;
Lower cover slip is set between positioning column and bracket;
Butterworth Hatch lasso, is sheathed on sewage pipe;
Fixed frame is cleaned, is set on chassis and is threadedly engaged with Butterworth Hatch lasso;
Copper plug member is cleaned, is threadedly engaged on sewage pipe;
Sealing ring is sheathed in cleaning copper plug member and for sealing;
Cleaning plug is set in cleaning copper plug member and holds for hand, and is arranged on pedestal;
Electromagnetic pump is set on locating rack;
Connector, for Motionless electromagnetic pump and locating rack;
Clamping frame is symmetrically disposed on the two sides on chassis;
The bracket tilts upward distribution from sewage pipe to boiler direction, is provided on the resilient cushion and is clamped for second mounting ring
Annular groove, be provided with the perforation worn for screw thread on the connection frame;
It is additionally provided with lower mounting disc on the lower cover slip, is provided with reinforcing rib, the positioning column in the lower mounting disc in annular
On be provided with the second mounting groove for lower mounting disc and reinforcing rib installation, be additionally provided on the lower cover slip and be inserted on bracket
Upper mounting disc, the side on the bracket far from lower cover slip are additionally provided with the upper cover plate with cradle fits;
It is provided with the mounting hole for electromagnetic pump installation on the connector, the first limited block, the are additionally provided on the connector
Two limited blocks are additionally provided with the limiting slot fixed for the first limited block, the sliding of the second limited block on the locating rack.
By using above-mentioned technical proposal, boiler is arranged on chassis for heating, and boiler is tilted by locating rack
Setting so that convenient cleared up by sewage pipe, then cooperates resilient cushion, to improve whole buffer capacity, sewage pipe
When not cleaning, it can be sealed by cleaning copper plug member, to guarantee the ability of sealing.
The present invention is further arranged to: the base assembly further include:
Control circuit board is installed on chassis;
Outer housing, is set on chassis and water feeding tank is installed;
Water tank is set on outer housing and for water storage;
Mounting cylinder is integrally formed on outer housing and for button point part, pressure spring, position-arresting disk, fixed lid installation;
Button point part, is arranged in mounting cylinder and is clamped limit mutually with clamping groove;
Position-arresting disk slides cooperation with mounting cylinder and is wholely set with button point part and installs for pressure spring;
Pressure spring is set between position-arresting disk and fixed lid and drives button point part pop-up;
Fixed lid, is fixedly connected with mounting cylinder;
Water inlet sealing element, is set on water tank;
Inlet valve is set on outer housing and seals with water inlet sealing element cooperation;
It is provided with the clamping groove for button point part clamping on the water tank, limit installation block is provided on the water tank, it is described outer
The limit installation slot for block installation is mounted is provided on shell, the outer housing, which protrudes above, is provided with square, the water tank
On be provided with square groove for square installation, the installation cavity for pressure spring installation is provided on the position-arresting disk, the fixation covers
Also annular is provided with installation lines.
By using above-mentioned technical proposal, water tank is detachably connected with outer housing, is facilitated and add water, button point part cooperation limit
To be engaged by clamping mutually to the clamping groove on water tank, activity is more smooth for position disk, pressure spring, fixed lid, water inlet sealing
Water tank is then sealed and is connected to inlet valve and controlled by part, and the setting of square and square groove further improves water tank
Stability when placement.
The present invention is further arranged to: the water tank includes:
Upper plate cooperates with outer housing and is clamped;
Lower plate is fixedly connected with upper plate and cooperates with outer housing and fixes;
Handle is set on upper plate and holds for hand;
Card is set on handle;
Fixinig plate is set on upper plate and is inserted into for card and fixes;
6th buckle, is set on handle;
6th card slot is set on upper plate and is engaged by clamping for the 6th buckle;
Locating cover is set on lower plate and sets and interconnect with the external world;
Float is set to itself in locating cover and is used for sensed water level;
Trunnion is set to the two sides of locating cover;
Second threaded post is set on lower plate and is coupled with trunnion;
It is additionally provided with sliding shoe on the locating cover, the sliding groove for sliding shoe sliding, the positioning are provided on the float
Be additionally provided with the sliding item contradicted with float on cover, be additionally provided with into water column on the upper plate, it is described enter water column on also set up
Have a blasthole, it is described enter water column side wall on be additionally provided with into sink.
By using above-mentioned technical proposal, by the setting of upper plate and lower plate, stored to be detected to water, handle
Setting, convenient to pick and place to water tank, card cooperates fixinig plate, so that one end of handle is fixed, the 6th is clasped
The other end of handle is fixed for the use of 6th card slot, improves whole stability, the cooperation of locating cover and float,
To check the water level in water tank, the cooperation of sliding shoe and sliding groove enters water column and blasthole, the cooperation for entering sink,
To improve whole fluency.
The present invention is further arranged to: the base assembly further include:
Upper cover, setting with outer housing on;
Elastic slice is set on lid and for connecting and fixing water tank;
Toggle, rotation are connected on lid and for locking electric iron component;
Bottom liner is set on lid and for installing toggle;
Heat insulating mattress is set on lid and contradicts connection with electric iron component;
It is provided with the wears groove worn for elastic slice on the outer housing, the third being clamped mutually with elastic slice is provided on the upper plate
Limited block is provided with the second mounting post on the upper lid, and the elastic slice is fixedly connected by bolt with the second mounting post, and described
It is additionally provided with locating piece in two mounting posts, the location hole for locating piece installation limit is provided on the elastic slice;
It is provided with slide block on the toggle, is provided with half slot for slide block rotary dial on the upper lid, on the toggle
It is additionally provided with the taking-up slot that power supply iron assemblies take out.
Elastic slice to be installed by the setting of upper cover by using above-mentioned technical proposal, elastic slice is used to fix water tank,
So that fixed effect is improved, and toggle and the setting for taking out slot, being fixed electric iron component or taking out, using flexible,
Bottom liner installs toggle, and the setting of heat insulating mattress, will improve heat-insulated effect, to improve whole heat-insulated energy
Power, the setting of slide block cooperate the use of half slot, facilitate and operated.
The present invention is further arranged to: the base assembly further include:
Operation circuit plate, is set on lid;
Panel connects and fixes with upper cover and cooperates with operation circuit plate;
Cramp, be set on panel and with upper cover sliding and position limitation;
It is additionally provided with clamping block on the heat insulating mattress, the blocked hole for clamping block clamping is provided on the upper lid;
It is additionally provided with several 7th buckles on the panel, the 7th card being engaged by clamping with the 7th buckle is provided on the upper lid
Item is also symmetrically arranged with hook, the fastener for being arranged and being clasped on the upper lid on the panel.
By using above-mentioned technical proposal, the setting of panel, the use of compounding practice circuit board is improved and is integrally used
Safety, the setting of clamping block cooperate the setting of blocked hole, improve the mounting stability of upper cover and panel, hook and fastener
Setting, to further improve the mounting stability of upper cover and panel.
The present invention is further arranged to: the buckle with the cooperation of electric iron component, the buckle are additionally provided on the upper lid
On be provided with the second connecting column, third connecting column, be provided on the upper lid for the second connecting column sliding slippage slot, it is described on
The connecting hole being provided with for the insertion of third connecting column is covered, was additionally provided on the buckle close to the side of electric iron component
Cross protrusion.
By using above-mentioned technical proposal, by the setting of buckle, to improve the ability of protection, reduction is directly connect
Touching, and the setting of the second connecting column cooperation slippage slot, improve whole installation effectiveness, without being directly aligned, install cleverer
Living, connecting hole cooperates the use of third connecting column, improves the fastness of buckle and upper cover.
In conclusion advantageous effects of the invention are as follows:
1. improving the whole path of vaporium, the droplet in steam is reduced, improves the drying property of steam, improves ironing effect;
2. improving whole safety in utilization using more flexible.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of steam and dry iron device.
Fig. 2 is the scheme of installation one of aluminum soleplate.
Fig. 3 is the scheme of installation two of aluminum soleplate.
Fig. 4 is the scheme of installation one for holding shell.
Fig. 5 is the scheme of installation two for holding shell.
Fig. 6 is the scheme of installation of upper cover plate.
Fig. 7 is the perspective view of the explosion of upper cover plate.
Fig. 8 is the perspective view of the explosion one of boiler.
Fig. 9 is the perspective view of the explosion two of boiler.
Figure 10 is the scheme of installation one of locating rack.
Figure 11 is the scheme of installation two of locating rack.
Figure 12 is the scheme of installation one of outer housing.
Figure 13 is the scheme of installation two of outer housing.
Figure 14 is the perspective view of the explosion three of outer housing.
Figure 15 is the perspective view of the explosion of water tank.
Figure 16 is the perspective view of the explosion one of upper cover.
Figure 17 is the perspective view of the explosion two of upper cover.
Figure 18 is the scheme of installation of upper cover.
In figure, 1, electric iron component;1001, aluminum soleplate;10011, decoration hole;10011, the first vaporium;100111, it steams
Steam vent;10012, the second vaporium;100121, first passage;100122, second channel;1001221, partition;100123,
Triple channel;100124, reinforcing rod;100125, arc baffles;10013, inlet channel;10014, the first sealing ring;10015,
Mounting base;1002, heat-generating pipe;1003, vaporization plate;10031, air intake;10032, seat is vaporized;100321, vaporization chamber;
100322, the second seal groove;10033, through-hole;10034, siphunculus;10035, the first connecting column;10036, the first seal groove;
1004, bottom plate gasket;10041, the second sealing ring;1005, steam channel cover board;10051, Gai Bian;10052, attachment base;
1006, heat-insulating base;10061, the first mounting groove;10062, connection sheet;10063, the second card slot;1007, ceramics pole;1008, it dissipates
Backing;111, shell is held;1111, mounting base;1112, pin-jointing piece;1113, the second buckle;1114, the 4th buckle;1115,
Five card slots;112, ornamental strip;1121, the first mounting ring;1122, the first card slot;113, lampshade lower cover;1131, the first buckle;
114, lampshade upper cover;115, rear housing;1151, limit chamber;116, back shroud;1161, connecting plate;117, line sheath;1171, pivot
Joint chair;121, upper cover plate;1211, locked groove;1212, third card slot;1213, snap ring;1214, the 5th buckle;122, microswitch;
123, lower lock block;124, button;1241, the first fastener;1242, the second fastener;125, front shroud;1251, it latches;1252,
Three buckles;1253, the first strip;1254, the second strip;2, base assembly;2001, chassis;20011, the first mounting post;
20012, the first threaded post;20013, clamping frame;2002, boiler;20021, sewage pipe;20022, bracket;2003, solenoid valve;
2004, locating rack;20041, positioning column;20042, second mounting ring;20043, the second mounting groove;20044, limiting slot;2005,
Resilient cushion;20051, connection frame;20052, annular groove;20053, it perforates;2006, lower cover slip;20061, lower mounting disc;20062, add
Strengthening tendons;20063, upper mounting disc;2007, Butterworth Hatch lasso;2008, fixed frame is cleaned;2009, copper plug member is cleaned;2010, it seals
Circle;2011, cleaning plug;2012, electromagnetic pump;2013, connector;20131, mounting hole;20132, the first limited block;20133,
Two limited blocks;2014, upper cover plate;2101, control circuit board;2102, outer housing;21021, mounting cylinder;21022, it is mounted
Slot;21023, square;21024, wears groove;2103, water tank;21031, clamping groove;21032, block is mounted;21033, side
Slot;2104, button point part;21041, position-arresting disk;21042, cavity is installed;2105, pressure spring;2106, fixed lid;21061, line is installed
Road;2107, water inlet sealing element;2108, inlet valve;21034, upper plate;210341, fixinig plate;210342, the 6th card slot;
210343, enter water column;210344, blasthole;210345, enter sink;210346, third limited block;21035, lower plate;
210351, locating cover;210352, float;210353, trunnion;210354, the second threaded post;210355, sliding shoe;210356,
Sliding groove;210357, item is slid;2109, handle;21091, card;21092, the 6th buckle;2201, upper cover;22011, second
Mounting post;22012, locating piece;22013, half slot;22014, blocked hole;22015, the 7th strip;22016, fastener;22017,
Slippage slot;22018, connecting hole;2202, elastic slice;22021, location hole;2203, toggle;22031, slide block;22032, it takes out
Slot;2204, bottom liner;2205, heat insulating mattress;22051, clamping block;2301, operation circuit plate;2302, panel;23021, the 7th card
Button;23022, hook;2303, cramp;2401, buckle;24011, the second connecting column;24012, third connecting column;24013, mistake
Cross protrusion.
Specific embodiment
Below in conjunction with attached drawing 1-18, invention is further described in detail.
It is a kind of steam and dry iron device disclosed by the invention, including the pedestal group being placed on shown in referring to Fig.1
Part 2, pedestal gradually on be additionally provided with electric iron component 1 for ironing clothes, connect between base assembly 2 and electric iron component 1
It connects, and base assembly 2 is electrically connected with city, the steam generated on base assembly 2 is transmitted on electric iron component 1 by pipeline, pipe
Road is rubber hose, is not shown.
Referring to Fig. 2, shown in 3, it is provided with the first vaporium 10011 and the second vaporium 10012 on aluminum soleplate 1001, second
Vaporium 10012 is located in the first steam, and have in the second vaporium 10012 first passage 100121, second channel 100122,
Third channel 100123, first passage 100121, second channel 100122, third channel 100123 interconnect, first passage
Reinforcing rod is provided between 100121 and second channel 100122, between second channel 100122 and third channel 100123
100124, and partition 1001221 is additionally provided in second channel 100122, first passage 100121 and third channel 100123 it
Between separated by arc baffles 100125, while inlet channel 10013, inlet channel are additionally provided on aluminum soleplate 1001
10013 interconnect with first passage 100121.
Heat-generating pipe 1002 is additionally provided on aluminum soleplate 1001, to be heated.On aluminum soleplate 1001 also on be provided with
The steam hole 100111 that first vaporium 10011 interconnects, and also proximated on aluminum soleplate 1001 on the side of steam hole 100111
It is additionally provided with decoration hole 10011.
It is provided with the first sealing ring 10014 on aluminum soleplate 1001, and is provided on vaporization plate 1003 and the first sealing ring
First seal groove 10036 of 10014 cooperation sealings.Mounting base is provided on vaporization plate 1003 and aluminum soleplate 1001
111110015, it is fixed by bolt between mounting base 111110015.
It has been wholely set vaporization seat 10032 on vaporization plate 1003, has vaporized and is provided with vaporization chamber 100321 in seat 10032 and leads to
Hole 10033, for the first vaporium 10011 of connection and the second vaporium 10012.Bottom plate is additionally provided on vaporization plate 1003
Gasket 1004 is provided with the second sealing ring 10041 on bottom plate gasket 1004, and vaporizes and be provided on seat 10032 and second
The second seal groove 100322 that sealing ring 10041 cooperates.
The first connecting column 10035 is wholely set on vaporization plate 1003, the first connecting column 10035 is provided with several.And vapour
Change and be additionally provided with steam channel cover board 1005 for pressing bottom plate gasket 1004 on plate 1003, on steam channel cover board 1005
It has been wholely set and has cooperated corresponding attachment base 10052, attachment base 10052 and the first connecting column 10035 with the first connecting column 10035
It is fixed by bolt, and is additionally provided with cover board on steam channel cover board 1005, the lateral wall of cover board and vaporization seat 10032 is mutual
Inconsistent sealing.
Air intake 10031 is wholely set on vaporization plate 1003, air intake 10031 enters for steam, and vaporization plate 1003
On be additionally provided with siphunculus 10034, siphunculus 10034 is located in third channel 100123.
It is additionally provided with heat-insulating base 1006 on aluminum soleplate 1001, is provided with ceramics pole between heat-insulating base 1006 and aluminum soleplate 1001
1007, bolt is arranged in ceramics pole 1007 to be fixed between heat-insulating base 1006 and aluminum soleplate 1001.Heat-insulating base 1006
On be additionally provided with cooling fin 1008, be additionally provided on heat-insulating base 1006 for cooling fin 1008 install the first mounting groove 10061, dissipate
Backing 1008 is fixed by bolts on heat-insulating base 1006.
It referring to shown in Fig. 4,5, is additionally provided on heat-insulating base 1006 and holds shell 111, held and be provided with lampshade on shell 111
Upper cover 2201114, lampshade lower cover 113, ornamental strip 112, lampshade upper cover 2201114 are installed on ornamental strip 112 and are arranged in lamp
Cover lower cover 113.It is provided with several first buckles 1131 on lampshade lower cover 113, and is provided on ornamental strip 112 for the first buckle
1131 the first card slots 1122 being engaged by clamping, the first mounting ring 1121 is provided on ornamental strip 112, is held and is arranged on shell 111
There is the mounting base 111110015 cooperated with the first mounting ring 1121.
It holds and is additionally provided with rear housing 115, back shroud 116 on shell 111, rear housing 115 is for fixing heat shield and holding
Hold shell 111.It holds and has been wholely set pin-jointing piece 1112 on shell 111, and hold and be arranged between shell 111 and back shroud 116
Wired sheath 117, poling in line sheath 117 lead to steam in pipe, while can also wear electric power connection line, line sheath 117
On be provided with the pin joint seat 1171 worn for line, hold the pin-jointing piece 1112 for being provided on shell 111 and being pivotally connected with pin joint seat 1171.
It is provided with the connection sheet 10062 for being inserted in rear housing 115 on heat-insulating base 1006, is additionally provided on back shroud 116 logical
The connecting plate 1161 that bolt is connect with rear housing 115 is crossed, the limit placed for the limit of line sheath 117 is additionally provided on rear housing 115
Position chamber 1151, hold shell 111 on also on be provided with the second buckle 1113, be provided on heat-insulating base 1006 for second buckle 1113
Second card slot 10063 of clamping.
Referring to Fig. 6, shown in 7, hold and microswitch 122 be installed on shell 111, hold be articulated on shell 111 with it is micro-
The lower lock block 123 that dynamic switch 122 is worked in coordination holds and is fixed with 2201 plate 121 of upper cover on shell 111, on 2201 plate 121 of upper cover
The button 124 contradicted with the other end of lower lock block 123 is installed, and button 124 is pushed to trigger microswitch 122.
It is provided with several snap rings 1213 on 2201 plate 121 of upper cover, holds to be provided on shell 111 and block mutually with snap ring 1213
The 4th buckle 1114 connect, the 5th buckle 1214 is additionally provided on 2201 plate 121 of upper cover, is held and is provided on shell 111 and the
5th card slot 1115 of five buckles, 1214 clamping.
2201 plate 121 of upper cover is additionally provided with front shroud 125, and lock 1251,2201 plate of upper cover are provided on front shroud 125
It is provided with the locked groove 1211 for latching 1251 snappings on 121, several third buckles 1252, upper cover are additionally provided on front shroud 125
The third card slot 1212 for 1252 clamping of third buckle is provided on 2201 plates 121.
And one end on button 124 is provided with the first fastener 1241, the other end of button 124 is provided with and the first fastener
1241 the second fasteners 1242 being arranged in correspondence with each other are provided with first limited mutually with the first fastener 1241 on front shroud 125
Strip 1253 is provided with the second strip 1254 limited mutually with the second fastener 1242 on front shroud 125, to realize button
124 slide up and down pressing.
Referring to shown in Fig. 8,9, boiler 2002 has been wholely set sewage pipe on boiler 2002 for heating to generate steam
20021, the solenoid valve 2003 gone out for controlling steam is additionally provided on boiler 2002.Cleaning is arranged on sewage pipe 20021
Muzzle circle 2007, cleaning fixed frame 2008, Butterworth Hatch lasso 2007 and cleaning fixed frame 2008 are threadedly engaged fixation.
It is arranged with sealing ring 2010 in cleaning copper plug member 2009, so that leakproofness is improved, sewage pipe 20021 and cleaning copper plug
Part 2009 is threadedly engaged to be fixed, and cleans in copper plug member 2009 and be provided with cleaning plug 2011, passes through rotation cleaning plug
2011, to be rotated to cleaning copper plug member 2009.
Referring to Fig.1 shown in 0,11, boiler 2002 is placed on chassis 2001, has also been wholely set bracket on boiler 2002
20022, and locating rack 2004 is provided on chassis 2001, the first several mounting posts 20011 is wholely set on chassis 2001,
The first threaded post 20012 has been wholely set in first mounting post 20011.Supply lines is also symmetrically arranged on chassis 2001 to be pressed from both sides
The clamping frame 20013 held.
It is provided with second mounting ring 20042 on locating rack 2004, and is connected with resilient cushion in second mounting ring 20042
2005, the annular groove 20052 being clamped for second mounting ring 20042, also upper setting on resilient cushion 2005 are provided on resilient cushion 2005
There is the connection frame 20051 set up with the first mounting post 20011, is provided with the perforation worn for bolt column on connection frame 20051
20053, connection frame 20051 is fixed with bolt column by bolt.
Electromagnetic pump 2012 is additionally provided on locating rack 2004, the two sides of electromagnetic pump 2012 are provided with connector 2013, connection
It is provided with the mounting hole 20131 installed for electromagnetic pump 2012 on part 2013, is additionally provided with the first limited block on connector 2013
20132, the second limited block 20133 is additionally provided on locating rack 2004 sliding for the first limited block 20132, the second limited block 20133
Move fixed limiting slot 20044.
Positioning column 20041 has also been wholely set on locating rack 2004, positioning column 20041 is inclined to set, bracket 20022 from
Sewage pipe 20021 to 2002 direction of boiler tilts upward distribution, thus make boiler 2002 to 20021 direction of sewage pipe diagonally downward
11 ° of settings, are provided with lower cover slip 2006, lower installation are additionally provided on lower cover slip 2006 between bracket 20022 and positioning column 20041
Disk 20061 is provided with reinforcing rib 20062 in annular in lower mounting disc 20061, is provided on positioning column 20041 for lower mounting disc
20061 the second mounting grooves 20043 installed with reinforcing rib 20062, are additionally provided on lower cover slip 2006 and are inserted on bracket 20022
Upper mounting disc 20063, the side on bracket 20022 far from lower cover slip 2006 is additionally provided with the upper cover being bonded with bracket 20022
2201 2014, upper cover 2,201 2014, bracket 20022, lower cover slip 2006, positioning column 20041 are fixed by bolt.
Referring to Fig.1 shown in 2-15, it is additionally provided with outer housing 2102 on chassis 2001, and is additionally provided with control on chassis 2001
Circuit board 2101, to control electronic component.Chassis 2001 is fixed with outer housing 2102 by bolt, outer housing 2102
On be provided with button point a part 2104, and be provided on water tank 2103 with button point part 2104 contradict clamping a clamping groove 21031.
It has been wholely set mounting cylinder 21021 on outer housing 2102, button point part 2104, limit are placed in mounting cylinder 21021
Disk 21041, pressure spring 2105, fixed lid 2106, button point part 2104 are arranged in outer housing 2102, have been wholely set on button point part 2104
Position-arresting disk 21041 is provided with the installation cavity 21042 installed for pressure spring 2105, and the both ends of pressure spring 2105 on position-arresting disk 21041
It is contradicted respectively with the fixed lid 2106 of installation cavity 21042, annular is provided with the peace fixed with mounting cylinder 21021 on fixed lid 2106
Fill lines 21061.
Be provided on water tank 2103 into water sealing element 2107, outer housing 2102 be provided with water inlet sealing element 2107 cooperate it is close
The inlet valve 2108 of envelope.It is provided on water tank 2103 and block 21032 is mounted, be provided on outer housing 2102 for block is mounted
The limit installation slot 21022 of 21032 installations, outer housing 2102, which protrudes above, is provided with square 21023, is provided with confession on water tank 2103
The square groove 21033 that square 21023 is installed.
Water tank 2103 include upper plate 21034, lower plate 21035, handle 2109, card 21091, fixinig plate 210341,
6th buckle the 21092, the 6th card slot 210342, locating cover 210351, float 210352, trunnion 210353, the second threaded post
210354。
Upper plate 21034 and lower plate 21035 are fixed by ultrasonic bonding, are provided with handle on upper plate 21034
Hand 2109, the 6th buckle 21092 and card 21091 are provided on handle 2109, and card 21091 is distinguished with the 6th buckle 21092
It is set to two sides.And the 6th card slot 210342 being engaged by clamping for the 6th buckle 21092 is provided on upper plate 21034, upper bottom
The fixinig plate 210341 of the insertion cooperation of card 21091 is provided on plate 21034, and handle 2109 passes through again with upper plate 21034
Bolt is reinforced.
It is additionally provided on upper plate 21034 into water column 210343, enters and be additionally provided with blasthole 210344 on water column 210343,
The rounded setting of blasthole 210344, enters and is additionally provided on the side wall of water column 210343 into sink 210345, enter sink 210345
It is set to side and is arranged in rectangle.
Float 210352 is provided on lower plate 21035, float 210352 is installed in locating cover 210351, locating cover
210351 interconnect with the external world, and the two sides of locating cover 210351 are provided with trunnion 210353, one on lower plate 21035
It is provided with the second threaded post 210354 cooperated with trunnion 210353, is passed through between the second threaded post 210354 and trunnion 210353
Bolt is fixed.
Sliding shoe 210355 is additionally provided on locating cover 210351, sliding shoe 210355 is provided with one piece, and float
It is provided with the sliding groove 210356 slid for sliding shoe 210355 on 210352, is additionally provided on locating cover 210351 and float
The 210352 sliding items 210357 contradicted, sliding item 210357 are provided with several.
Referring to Fig.1 shown in 6-18, it is additionally provided with upper cover 2201 on outer housing 2102, is provided with elastic slice in upper cover 2201
2202, and the second mounting post 22011 is provided in upper cover 2201, locating piece has been wholely set in the second mounting post 22011
22012, and be provided on elastic slice 2202 for locating piece 22012 install location hole 22021, elastic slice 2202 be bolted to
In second mounting post 22011.Referring to Fig. 7, the wears groove 21024 worn for elastic slice 2202, upper plate are provided on outer housing 2102
The third limited block 210346 being clamped mutually with elastic slice 2202 is provided on 21034.
The toggle 2203 for locking electric iron component 1 is additionally provided in upper cover 2201, toggle 2203 is rotationally connected with
On lid 2201, it has been wholely set slide block 22031 on toggle 2203, power supply iron assemblies 1 are additionally provided on toggle 2203 and are taken out
Taking-up slot 22032, be provided with half slot 22013 for 22031 rotary dial of slide block in upper cover 2201, in upper cover 2201 also on
It is provided with the bottom liner 2204 for fixing toggle 2203, is fixed between bottom liner 2204 and upper cover 2201 by bolt.
It is additionally provided with heat insulating mattress 2205 in upper cover 2201, clamping block 22051, upper cover have been wholely set on heat insulating mattress 2205
The blocked hole 22014 being clamped for clamping block 22051 is provided on 2201.
Operation circuit plate 2301 is also equipped in upper cover 2201, operation circuit plate 2301 is fixed by bolts in panel 2302
On, it is additionally provided with several 7th buckles 23021 on panel 2302, is provided in upper cover 2201 and matches with 23021 clamping of the 7th buckle
The 7th strip 22015 closed.It is also symmetrically arranged with the cramp 2303 with 2201 snapping of upper cover on panel 2302, is gone back on panel 2302
It is symmetrically arranged with hook 23022, the fastener 22016 for being arranged and being clasped in upper cover 2201.
It is additionally provided with the buckle 2401 cooperated with electric iron component 1 in upper cover 2201, is provided with the second company on buckle 2401
Column 24011 and third connecting column 24012 are connect, the second connecting column 24011 is fixed with third connecting column 24012 by bolt.
And the slippage slot 22017 for the sliding of the second connecting column 24011 is provided in upper cover 2201, it has been provided in upper cover 2201 for third
The connecting hole 22018 that connecting column 24012 is inserted into, the side on buckle 2401 close to electric iron component 1 are additionally provided with transition protrusion
24013。
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this
Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it
It is interior.