CN110273684A - Method plasma U formula abatement thick and hard roof and leave the compound strong mine pressure of coal column - Google Patents

Method plasma U formula abatement thick and hard roof and leave the compound strong mine pressure of coal column Download PDF

Info

Publication number
CN110273684A
CN110273684A CN201910511261.2A CN201910511261A CN110273684A CN 110273684 A CN110273684 A CN 110273684A CN 201910511261 A CN201910511261 A CN 201910511261A CN 110273684 A CN110273684 A CN 110273684A
Authority
CN
China
Prior art keywords
formula
plasma
drilling well
water
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910511261.2A
Other languages
Chinese (zh)
Other versions
CN110273684B (en
Inventor
冯国瑞
毋皓田
白锦文
杜云楼
李泽
杨文博
卫会汝
牛小红
康立勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan University of Technology
Original Assignee
Taiyuan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan University of Technology filed Critical Taiyuan University of Technology
Priority to CN201910511261.2A priority Critical patent/CN110273684B/en
Publication of CN110273684A publication Critical patent/CN110273684A/en
Application granted granted Critical
Publication of CN110273684B publication Critical patent/CN110273684B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C37/00Other methods or devices for dislodging with or without loading
    • E21C37/16Other methods or devices for dislodging with or without loading by fire-setting or by similar methods based on a heat effect
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C37/00Other methods or devices for dislodging with or without loading
    • E21C37/18Other methods or devices for dislodging with or without loading by electricity
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Plasma Technology (AREA)

Abstract

The invention discloses a kind of methods plasma U formula abatement thick and hard roof and leave the compound strong mine pressure of coal column, interionic strong movements moment is made full use of to generate high temperature, the characteristic of high pressure, " U formula " drilling well is drilled through on ground, " U formula " drilling well number is L/d, L is the working face of coal seam length that underlies, d is wells spacing, " U formula " drilling well is divided into the left vertical section of " U formula " drilling well, " U formula " drilling well horizontal segment and the right vertical section three parts of " U formula " drilling well, two vertical sections in left and right, which are each passed through two residual exploiting fields, to be left coal column arrival and underlies coal seam thick and hard roof, horizontal segment is parallel with advance of the face direction in the coal seam thick and hard roof that underlies.One well double-purpose, two-way operation, to underliing coal seam thick and hard roof and residual exploiting field leaves coal column and carries out presplitting, forming shock wave makes thick and hard roof and residual exploiting field leave coal column generation crack and extends, achieve the purpose that cutting down thick and hard roof and residual exploiting field leaves the compound strong mine pressure of coal column, to realize coal mine lasting exploit, keep the safety in production.

Description

Method plasma U formula abatement thick and hard roof and leave the compound strong mine pressure of coal column
Technical field
The present invention relates to a kind of methods plasma U formula abatement thick and hard roof and leave the compound strong mine pressure of coal column, belong to Coal mining technology field.
Background technique
China's coal-mine mostly uses working from top down method, i.e., first adopts and adopt coal seam of underliing after covering coal seam.Underlie seam mining When, can by interlayer thick and hard roof and on cover residual exploiting field and leave coal column group, influenced coal work by compound strong mine pressure.
Compound strong mine pressure is mainly derived from :(a) thick and hard roof: due to natural geological conditions, the coal seam of underliing in many mining areas The thick and hard roof that there are thickness is big, intensity is high, joint fissure agensis, integrality are good;(b) coal column is left in residual exploiting field: new China The coal winning technology in initial stage of founding China falls behind relatively, for the safety in production of the stability, safeguard work face of guarantee country rock, can stay and set Part pillar overlying rock;In the recovery process of modern high mechanization, by constructing and other mining conditions are limited, Staying for part coal column is set unavoidably;When using barrier system coal-mining method, part coal column can leave and not adopt.This is resulted in coal seam After exploitation, residual exploiting field, which has, largely leaves coal column.
When exploitation by thick and hard roof and residual exploiting field leave the compound strong mine pressure influence of coal column underlied coal seam when, will cause work Make face mine pressure to show strongly, working face wall caving is serious, and goaf top plate is caving acutely and with loud noise, and force piece pressure increases Add obviously, hydraulic support pushed down, the destruction of tunnel individual prop also happen occasionally, and first/periodic weighting step of stope thick and hard roof Away from also will increase, and gather a large amount of energy, when stope thick and hard roof suddenly across falling when, the energy of accumulation will abrupt release go out Come, to cause violent dynamic impact problem disaster, causes equipment damage, casualties seriously endangers mine safety production.
The prediction and preventing and controlling that compound strong mine pressure caused by coal column is left in thick and hard roof and residual exploiting field are more difficult, currently The control method of the compound strong mine pressure of the working face of coal seam that underlies for leaving coal column influence for thick and hard roof and residual exploiting field has: a, passive Control methods: (1) direction of extraction, the arrangement orientation of the working face of coal seam that underlies are adjusted, to avoid the concentration that coal column is left in residual exploiting field Stress influence area, but working face is still influenced by thick and hard roof pressure, is not tackled the problem at its root;(2) reinforce the coal that underlies The supporting of layer working face, but when Face Ground Pressure Behavior is strong, it is difficult to guarantee by the technical measures of simple strengthening supporting Safety in production, and support cost is high;(3) working face of coal seam that underlies that coal column is influenced is being left by thick and hard roof and residual exploiting field, It stays and sets bigger coal column, but cause the significant wastage of coal resources;B, active control: (1) in thick and hard roof and residual exploiting field It leaves and carries out explosion in coal column, but construction work amount is big, it is quick-fried to be easy initiation gas particularly with highly gassy mine for poor controllability Fried, there are security risks;(2) coal column is left using hydrofracturing thick and hard roof and residual exploiting field, but consumes a large amount of water resource, And the chemical reagent during fracturing in high pressure fracture liquid is easy pollution subsurface environment.By the control method of the above compound strong mine pressure As can be seen that passive control methods effect is bad, do not solve the problems, such as really;Active control job location mostly in working face or In tunnel, coal work is influenced, and fracturing thick and hard roof respectively and residual exploiting field is needed to leave coal column, complex steps.Therefore, need Find a kind of high-efficient, easy to control, good abatement thick and hard roof of effect and method that the compound strong mine pressure of coal column is left in residual exploiting field Carry out the safety in production in safeguard work face.
Plasma state is that one kind is different from solid-state, liquid and gaseous state of aggregation, when certain liquid are excited by outside energy Liquid phase plasma is generated, the characteristic of high temperature, high pressure is generated using interionic strong movements moment, forming shock wave produces rock mass Raw crack simultaneously extends.It has been widely used in oil/gas drilling, exploitation at present, and the cutting of metal orients broken sillar.However The technology of the compound strong mine pressure of plasma abatement (is especially cut down in plasma ground " U formula " thick in technical field of coal exploitation Resist plate stubbornly and the compound strong mine pressure aspect of coal column left in residual exploiting field) application it is seldom.
Summary of the invention
The present invention is intended to provide to leave coal column compound strong for a kind of plasma ground " U formula " abatement thick and hard roof and residual exploiting field The method of mine pressure, it is not only high-efficient, easy to control, effect is good, strong flexibility, it is dustless, without making an uproar, can be to avoid the disadvantage of preceding method And deficiency.If working seam leaves coal column group and interlayer thick and hard roof by above covering residual exploiting field, and residual exploiting field is left in coal column group It is stable there are two, when coal column is left at 40 meters~200 meters of interval, " U formula " drilling well can be selected, carries out two-way work from ground Industry achievees the purpose that cut down thick and hard roof and leaves the compound strong mine pressure of coal column.
The present invention makes full use of interionic strong movements moment to generate the characteristic of high temperature, high pressure, drills through " U formula " on ground Drilling well, " U formula " drilling well number are L/d, and L is the working face of coal seam length that underlies, and d is wells spacing, and " U formula " drilling well is divided into " U The left vertical section of formula " drilling well, " U formula " drilling well horizontal segment and the right vertical section three parts of " U formula " drilling well, two vertical sections in left and right are worn respectively It crosses two residual exploiting fields and leaves coal column arrival and underlie coal seam thick and hard roof, horizontal segment pushes away in the coal seam thick and hard roof that underlies with working face It is parallel into direction.One well double-purpose, two-way operation are formed to coal seam thick and hard roof is underlied and residual exploiting field leaves coal column and carries out presplitting Shock wave makes thick and hard roof and residual exploiting field leave coal column generation crack and extends, and reaches abatement thick and hard roof and coal is left in residual exploiting field The purpose of the compound strong mine pressure of column is kept the safety in production to realize coal mine lasting exploit.
The present invention provides a kind of method plasma U formula abatement thick and hard roof and leave the compound strong mine pressure of coal column, tools Body the following steps are included:
Step 1: passing through high-tension cable for plasma pulse controller, plasma generator, electrode securing device, liquid phase The connection of discharge plasma electrode;Plasma pulse controller is connect by conducting wire with data collecting instrument;It is transmitted by signal Line connects data collecting instrument, signal amplifier, demodulation probe;By dual-purpose water pipe by water tank, high-pressure pump, cooler, etc. Plasma generator connects to form complete loops, the cooling control valve control switch of plasma generator;It will by dual-purpose water pipe High-pressure pump, pressure gauge, high-pressure water nozzle connection, high-pressure water nozzle control valve control switch;And it is connected with ground power supply system;
Step 2: determine that coal column is left on ground and residual exploiting field, the position for the coal seam thick and hard roof that underlies and distance relation, in residual exploiting field It leaves the ground right above coal column and drills through " U formula " drilling well, " U formula " drilling well number is L/d, and L is the working face of coal seam length that underlies, D is wells spacing, and " U formula " drilling well is divided into the left vertical section of " U formula " drilling well, " U formula " drilling well horizontal segment and the right vertical section of " U formula " drilling well Three parts, two vertical sections in left and right, which are each passed through two residual exploiting fields, to be left coal column arrival and underlies coal seam thick and hard roof, and horizontal segment exists The coal seam thick and hard roof that underlies is interior parallel with advance of the face direction, and is controlling the intersection of two vertical sections and horizontal segment all Directive wheel is installed, first " U formula " drilling well is known as " U formula " plasma fracturing drilling well, and second " U formula " drilling well is known as " U Formula " detection drilling well;Ground above " U formula " drilling well or so two vertical sections, a set of first step connection of each setting in left and right etc. The device of the compound strong mine pressure of coal column is left in gas ions ground " U formula " abatement thick and hard roof and residual exploiting field, and two covering devices are bored in " U formula " Construction procedure is identical at left and right sides of well, therefore only does side explanation;
Step 3: by dual-purpose water pipe, high-pressure water nozzle, high-tension cable, electrode securing device, discharge in water plasma electrode, Across " U formula " plasma fracturing drilling well vertical section, " U formula " the plasma fracturing that second step drills through is arranged in through directive wheel and is bored In front of the drilling well packer of well horizontal segment initial position, and make the drilling well packer of the flat section of " U formula " plasma fracturing Drilling Water Expansion shut-in well, synchronous signal transmission line, demodulation probe pass through " U formula " detection drilling well vertical section and are arranged in second step brill through directive wheel The initial position of " U formula " the detection drilling well horizontal segment taken;
Step 4: opening high-pressure water nozzle control valve, the water in water tank by dual-purpose water pipe through high-pressure pump, penetrate by high-pressure water nozzle Enter in the flat section of " U formula " plasma fracturing Drilling Water, observed by pressure gauge, when water is full of " U formula " plasma fracturing drilling well When inside horizontal segment, high-pressure water nozzle control valve is closed;
Step 5: opening plasma generator, alternating current passes through plasma generator, high-tension cable, the firm dress of electrode Set-discharge in water plasma electrode electric discharge after, electric energy is rapidly converted into impact energy, water-filled " U formula " plasma fracturing Pressure in drilling well horizontal segment increases sharply, and the original crack for the coal seam thick and hard roof that makes to underlie starts to extend and generate new split Gap;Demodulation probe receives the signal of discharge in water plasma electrode sending simultaneously, passes through signal transmssion line, signal amplifier Data collecting instrument is passed to, and analyzes the reflection configuration delay time spread spectrum scenarios received, coal seam thick and hard roof is split to underliing Gap developmental state is analyzed, and operates plasma pulse controller so as to adjust discharge frequency, until " U formula " plasma-induced The thick and hard roof split around drilling well horizontal segment realizes fracturing;Close plasma generator;
Step 6: mobile high-voltage cable, electrode securing device, discharge in water plasma electrode and dual-purpose water pipe, spraying water with high pressure The residual exploiting field of head and demodulation probe to " U formula " plasma fracturing drilling well vertical section is left near coal column, " U formula " plasma Residual exploiting field in fracturing drilling well vertical section leaves coal column roof and floor and is mounted on drilling well packer, and synchronizing moving signal transmits Line, demodulation probe repeat the 4th step, the 5th step, until the residual exploiting field near " U formula " plasma fracturing drilling well vertical section is left Coal column realizes fracturing;Close plasma generator;
Step 7: recycling high-tension cable, electrode securing device, discharge in water plasma electrode and dual-purpose water pipe, spraying water with high pressure Head and demodulation probe, then open plasma generator cools down control valve, and the water of water tank is by dual-purpose water pipe through high pressure Pump, cooler, plasma generator return to water tank, after plasma generator cools down, close plasma Body generator cools down control valve, finally blocks " U formula " plasma fracturing drilling well;
Step 8: by " U formula " detection drilling well as next " U formula " plasma fracturing drilling well, adjacent non-presplitting " U formula " is bored Well repeats third step to the 7th step, until all " U formula " drilling wells that second step drills through are attached as next " U formula " detection drilling well The completion of coal column whole fracturing is left in close thick and hard roof and residual exploiting field.
In above scheme, in second step, the spacing d of " U formula " drilling well is 6~10 meters;The diameter of " U formula " drilling well is that do is 155mm~335mm.
In above scheme, in second step, the angle a range on " U formula " drilling well or so vertical section and ground is in 75o~90o.
In above scheme, in second step, " U formula " drilling well level section is located at the intersection of thick and hard roof and overlying rock.
In above scheme, in third step, drilling well packer is located at 5~10 meters in front of directive wheel of plasma fracturing drilling well In horizontal segment.
In above scheme, in third step, drilling well packer operating pressure is 30MPa~55MPa.
In above scheme, in third step, self-sealing, compression or combined type drilling packer is can be selected in drilling well packer.
In above scheme, in the 4th step, suitable electricity can be added in the flat section of " U formula " plasma fracturing Drilling Water of water-filling Electrolyte solution, the electrolyte solution are NaOH solution).
In above scheme, in the 5th step, discharge in water plasma electrode discharge voltage is 100kV~220kV, electric discharge frequency Rate is 100Hz~600Hz.
The plasma U formula that the present invention provides a kind of for implementing the above method, which cuts down thick and hard roof and leaves coal column, answers Close the device of strong mine pressure, including plasma generator, plasma pulse controller, high-tension cable, electrode securing device, liquid Phase discharge plasma electrode, data collecting instrument, signal amplifier, signal transmssion line, demodulation probe, water tank, high-pressure pump are cold But device, pressure gauge, dual-purpose water pipe, high-pressure water nozzle, the cooling control valve of plasma generator, high-pressure water nozzle control valve;
Plasma pulse controller, plasma generator, electrode securing device, discharge in water plasma electrode pass through height Voltage cable connection;Electric energy is passed through high-tension cable, electrode securing device, discharge in water plasma electrode by plasma generator It is discharged, medium and high voltage cable is responsible for transmitting electric energy, and electrode securing device guarantees discharge in water plasma electrode Normal work;
Plasma pulse controller, data collecting instrument, signal amplifier, demodulation probe pass sequentially through signal transmssion line connection; Demodulation probe is responsible for receiving across coal/rock mass waveform signal, and Wave data is transferred to signal by signal transmssion line and is put Big device after Wave data is amplified processing by signal amplifier, is finally transferred to data collecting instrument, and data collecting instrument will obtain Wave data analyzed, judge coal/rock mass fracturing effect;
Water tank, cooler, plasma generator, by dual-purpose water pipe connects to form complete loops high-pressure pump, by it is equal from Daughter generator cools down control valve T1Control switch;High-pressure pump is cooling through cooler again by dual-purpose water pipe by the water of water tank Afterwards, it is transported to plasma generator, plasma generator cools down, and avoid plasma generator from overheating, and nothing Method uses;High-pressure pump, pressure gauge, high-pressure water nozzle are connected by dual-purpose water pipe, pass through high-pressure water nozzle control valve T2Control is opened It closes;The water of water tank is transported to high-pressure water nozzle by dual-purpose water pipe by high-pressure pump, is sprayed finally by high-pressure water nozzle.
Beneficial effects of the present invention:
The present invention makes full use of interionic strong movements moment to generate the characteristic of high temperature, high pressure, and forming shock wave produces rock mass Raw crack simultaneously extends, and drills through " U formula " drilling well, a well double-purpose, two-way operation, to coal seam thick and hard roof and the residual exploiting field of underliing on ground Leave coal column and carry out presplitting, be not limited by a space, not under the influence of coal seam coal work, it is easy to operate, method is simple, dustless, nothing It makes an uproar.And plasma ground " U formula " abatement thick and hard roof and residual exploiting field leave the compound strong mine pressure of coal column method it is high-efficient, easy Control, effect is good, strong flexibility, reduces thick and hard roof and leaves the integrality of coal column, reaches abatement thick and hard roof and residual adopts Area leaves the purpose of the compound strong mine pressure of coal column, the method for leaving the compound strong mine pressure of coal column with existing abatement thick and hard roof and residual exploiting field Compared to being the transformation of a kind of " extensive style " to " fine formula ", coal mine lasting exploit is realized, is kept the safety in production.
Detailed description of the invention
Fig. 1 is that plasma ground " U formula " cuts down thick and hard roof and residual exploiting field and leave the device of the compound strong mine pressure of coal column and show It is intended to;
Fig. 2 is " U formula " plasma that plasma ground " U formula " cuts down thick and hard roof and the compound strong mine pressure of coal column is left in residual exploiting field Body fracturing drilling well working condition section schematic diagram;
Fig. 3 is " U formula " the detection brill that plasma ground " U formula " cuts down thick and hard roof and the compound strong mine pressure of coal column is left in residual exploiting field Well working condition section schematic diagram;
" U formula " the drilling well arrangement of the compound strong mine pressure of coal column is left in Fig. 4 plasma ground " U formula " abatement thick and hard roof and residual exploiting field Stereoscopic schematic diagram.
In figure: 1-plasma generator;2-plasma pulse controllers;3-high-tension cables;4-electrodes are firm Device;5-discharge in water plasma electrodes;6-data collecting instruments;7-signal amplifiers;8-signal transmssion lines;9-inspections Wave probe;10-water tanks;11-high-pressure pumps;12-coolers;13-pressure gauges;14-dual-purpose water pipes;15-high pressure water jets Head;16-conducting wires;17-drilling well packers;18-directive wheels;19-" U formula " plasma fracturing drilling wells;191-" U formulas " etc. Gas ions fracturing drilling well vertical section;192-flat the sections of " U formula " plasma fracturing Drilling Water;20-" U formula " detection drilling wells;201— " U formula " detection drilling well vertical section;202-" U formula " detection drilling well horizontal segments;21-underlie coal seam;Leave coal column in 22-residual exploiting fields; 23-underlie coal seam thick and hard roof;24-ground;25-" U formula " drilling wells;The left vertical section of 25a-" U formula " drilling well;25b-" U formula " The right vertical section of drilling well;25c-" U formula " drilling well horizontal segment;D-wells spacing;Do-drilling well diameter;L-underlies working face of coal seam Length;The cooling control valve of T1-plasma generator;T2-high-pressure water nozzle control valve.
Specific embodiment
The present invention is further illustrated below by embodiment, but is not limited to following embodiment.
Embodiment 1:
As shown in Figure 1, a kind of plasma U formula cuts down thick and hard roof and leaves the device of the compound strong mine pressure of coal column, specifically include:
Plasma generator 1, plasma pulse controller 2, high-tension cable 3, electrode securing device 4, discharge in water etc. from Daughter electrode 5, data collecting instrument 6, signal amplifier 7, signal transmssion line 8, demodulation probe 9, water tank 10, high-pressure pump 11 are cold But device 12, pressure gauge 13, dual-purpose water pipe 14, high-pressure water nozzle 15, the cooling control valve T1 of plasma generator, high-pressure water nozzle Control valve T2.
Plasma pulse controller, plasma generator, electrode securing device, discharge in water plasma electrode are logical Cross high-tension cable connection;Electric energy is passed through high-tension cable, electrode securing device, discharge in water plasma by plasma generator Electrode is discharged, and medium and high voltage cable is responsible for transmitting electric energy, and electrode securing device guarantees discharge in water plasma The normal work of electrode;
Plasma pulse controller, data collecting instrument, signal amplifier, demodulation probe pass sequentially through signal transmssion line connection; Demodulation probe is responsible for receiving across coal/rock mass waveform signal, and Wave data is transferred to signal by signal transmssion line and is put Big device after Wave data is amplified processing by signal amplifier, is finally transferred to data collecting instrument, and data collecting instrument will obtain Wave data analyzed, judge coal/rock mass fracturing effect;
Water tank, cooler, plasma generator, by dual-purpose water pipe connects to form complete loops high-pressure pump, by it is equal from Daughter generator cools down control valve T1Control switch;High-pressure pump is cooling through cooler again by dual-purpose water pipe by the water of water tank Afterwards, it is transported to plasma generator, plasma generator cools down, and avoid plasma generator from overheating, and nothing Method uses;High-pressure pump, pressure gauge, high-pressure water nozzle are connected by dual-purpose water pipe, pass through high-pressure water nozzle control valve T2Control is opened It closes;The water of water tank is transported to high-pressure water nozzle by dual-purpose water pipe by high-pressure pump, is sprayed finally by high-pressure water nozzle.It is described Dual-purpose water pipe can both play the role of cooling plasma generator;The note in the drilling of plasma fracturing can also be played The effect of water.
In the present invention, ground or so of the above-mentioned apparatus above " U formula " drilling well or so two vertical sections is respectively arranged a set of.
As shown in Fig. 2 ~ 4, when coal seam 21 of underliing is exploited, it will receive residual exploiting field and leave coal column 22 and the coal seam thick and hard roof that underlies The influence of 23 compound strong mine pressures, specific embodiments of the present invention will be described in further detail with reference to the accompanying drawing.
A kind of method that the compound strong mine pressure of coal column is left in plasma ground " U formula " abatement thick and hard roof and residual exploiting field, tool Body the following steps are included:
Step 1: by high-tension cable 3 by plasma pulse controller 2, plasma generator 1, electrode securing device 4, Discharge in water plasma electrode 5 connects;Plasma pulse controller 2 is connect by conducting wire 16 with data collecting instrument 6;Pass through Signal transmssion line 8 connects data collecting instrument 6, signal amplifier 7, demodulation probe 9;By dual-purpose water pipe 14 by water tank 10, High-pressure pump 11, cooler 12, the connection of plasma generator 1 form complete loops, the cooling control valve control of plasma generator System switch;By dual-purpose water pipe 14 by high-pressure pump 11, pressure gauge 13, high-pressure water nozzle 15 is connected, high-pressure water nozzle control valve control System switch;And it is connected with ground power supply system;
Step 2: determine that coal column 22 is left with residual exploiting field in ground 24, the position for the coal seam thick and hard roof 23 that underlies and distance relation, The ground 24 that residual exploiting field leaves right above coal column 22 drills through " U formula " drilling well 25, and 25 numbers of " U formula " drilling well are L/d, and (L is to underlie Working face of coal seam length, d are wells spacing), the spacing d of " U formula " drilling well 25 is 8 meters;The diameter of " U formula " drilling well 25 is that do is 275mm, " U formula " drilling well 25 divide for " U formula " drilling well left vertical section 25a, " U formula " drilling well horizontal segment 25c and " U formula " drilling well right side vertically Section 25b three parts, the left vertical section 25a of " U formula " drilling well and the right vertical section 25b of " U formula " drilling well and angle a on ground are 90o, " U The left vertical section 25a of formula " the drilling well and right vertical section 25b of " U formula " drilling well leaves coal column 22 across two residual exploiting fields and reaches coal seam of underliing Thick and hard roof 23, " U formula " drilling well horizontal segment 25c are located at the intersection of coal seam thick and hard roof 23 and overlying rock of underliing, and underlie 22 advance of the face direction of coal seam is parallel, and in " U formula " drilling well left vertical section 25a and the right vertical section 25b of " U formula " drilling well and " U Intersection's installation of formula " drilling well horizontal segment 25c has directive wheel 18, and first " U formula " drilling well 25 is known as " U formula " plasma-induced Drilling well 19 is split, second " U formula " drilling well 25 is known as " U formula " detection drilling well 20;In 25 or so two vertical section 25a of " U formula " drilling well, Thick and hard roof and residual exploiting field are cut down in ground 24 above 25b, the plasma ground " U formula " for preparing the connection of two sets of first steps respectively The device of the compound strong mine pressure of coal column is left, two covering devices construction procedure at left and right sides of " U formula " drilling well is identical, therefore only does side and say It is bright;
Step 3: by dual-purpose water pipe 14, high-pressure water nozzle 15, high-tension cable 3, electrode securing device 4, discharge in water plasma Electrode 5 passes through " U formula " plasma fracturing drilling well vertical section 191, is arranged in " the U formula " etc. that second step drills through through directive wheel 18 5 meters in front of the drilling well packer of 192 initial position of gas ions fracturing drilling well horizontal segment, and make " U formula " plasma fracturing drilling well The expansion shut-in well of drilling well packer 17 (operating pressure 40Mpa~50Mpa) of horizontal segment 192, synchronous signal transmission line 8, detection are visited First 9, which pass through " U formula " detection drilling well vertical section 201, is arranged in " U formula " detection drilling well horizontal segment that second step drills through through directive wheel 18 202 initial position;
Step 4: opening high-pressure water nozzle control valve, the water in water tank 10 is by dual-purpose water pipe 14 through high-pressure pump 11, high pressure water Spray head 15 is injected in the flat section 192 of " U formula " plasma fracturing Drilling Water, is observed by pressure gauge 13, when water full of " U formula " etc. from When daughter fracturing drilling well 192 inside of horizontal segment, high-pressure water nozzle control valve is closed;
Step 5: opening plasma generator 1,180KV/320Hz passes through plasma generator 1, high-tension cable 3, electrode Securing device 4, after discharge in water plasma electrode 5 discharges, electric energy is rapidly converted into impact energy, water-filled " U formula " etc. from Pressure in daughter fracturing drilling well horizontal segment 192 increases sharply, and the original crack for the coal seam thick and hard roof 23 that makes to underlie starts to extend And generate new crack;Demodulation probe 9 receives the signal of the sending of discharge in water plasma electrode 5 simultaneously, is passed by signal Defeated line 8, signal amplifier 7 passes to data collecting instrument 6, and analyzes the reflection configuration delay time spread spectrum scenarios received, under The fractured situation of volt coal seam thick and hard roof 23 is analyzed, and operates plasma pulse controller 2 so as to adjust electric discharge frequency Rate (100Hz~600Hz), until the thick and hard roof 23 around the flat section 192 of " U formula " plasma fracturing Drilling Water realizes fracturing;
Step 6: plasma generator 1 is closed, mobile high-voltage cable 3, electrode securing device 4, discharge in water plasma electricity Pole 5 and dual-purpose water pipe 14, high pressure spray head 15 and demodulation probe 9 arrive the residual of " U formula " plasma fracturing drilling well vertical section 191 Exploiting field is left near coal column 22, and it is equal that 22 roof and floor of coal column is left in the residual exploiting field in " U formula " plasma fracturing drilling well vertical section 191 Drilling well packer 17, and synchronizing moving signal transmssion line 8, demodulation probe 9 are installed, the 4th step, the 5th step, until " U are repeated It leaves coal column 22 and realizes fracturing in residual exploiting field near formula " plasma fracturing drilling well vertical section 191;
Step 7: plasma generator 1 is closed, recycling high-tension cable 3, electrode securing device 4, discharge in water plasma electricity Pole 5 and dual-purpose water pipe 14, high pressure spray head 15 and demodulation probe 9, then the cooling control valve of open plasma generator, is stored up The water of water pot 10 is by dual-purpose water pipe 14 through high-pressure pump 11, and cooler 12, plasma generator 1 returns to water tank 10, reciprocity After plasma generator 1 cools down, the cooling control valve of plasma generator is closed, " U formula " plasma is finally blocked Body fracturing drilling well 19;
Step 8: regarding " U formula " detection drilling well 20 as next " U formula " plasma fracturing drilling well 19, adjacent non-presplitting " U Formula " drilling well repeats third step to the 7th step, until all " U formulas " that second step drills through as next " U formula " detection drilling well 20 Thick and hard roof 23 and residual exploiting field near drilling well are left the whole fracturings of coal column 22 and are completed.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in skill of the invention Art essence and principle within, any modification, equivalent replacement, improvement and so on, should be included in protection scope of the present invention it It is interior.

Claims (10)

1. a kind of method plasma U formula abatement thick and hard roof and leave the compound strong mine pressure of coal column, it is characterised in that: this method For: working seam leaves coal column group and interlayer thick and hard roof by above covering residual exploiting field, and residual exploiting field is left in coal column group and existed The case where when two stable, coal column is left at 40 meters~200 meters of interval;Specifically includes the following steps:
Step 1: passing through high-tension cable for plasma pulse controller, plasma generator, electrode securing device, liquid phase The connection of discharge plasma electrode;Plasma pulse controller is connect by conducting wire with data collecting instrument;It is transmitted by signal Line connects data collecting instrument, signal amplifier, demodulation probe;By dual-purpose water pipe by water tank, high-pressure pump, cooler, etc. Plasma generator connects to form complete loops, the cooling control valve control switch of plasma generator;It will by dual-purpose water pipe High-pressure pump, pressure gauge, high-pressure water nozzle connection, high-pressure water nozzle control valve control switch;And it is connected with ground power supply system;
Step 2: determine that coal column is left on ground and residual exploiting field, the position for the coal seam thick and hard roof that underlies and distance relation, in residual exploiting field It leaves the ground right above coal column and drills through " U formula " drilling well, " U formula " drilling well number is L/d, and L is the working face of coal seam length that underlies, D is wells spacing, and " U formula " drilling well is divided into the left vertical section of " U formula " drilling well, " U formula " drilling well horizontal segment and the right vertical section of " U formula " drilling well Three parts, two vertical sections in left and right, which are each passed through two residual exploiting fields, to be left coal column arrival and underlies coal seam thick and hard roof, and horizontal segment exists The coal seam thick and hard roof that underlies is interior parallel with advance of the face direction, and is controlling the intersection of two vertical sections and horizontal segment all Directive wheel is installed, first " U formula " drilling well is known as " U formula " plasma fracturing drilling well, and second " U formula " drilling well is known as " U Formula " detection drilling well;Ground above " U formula " drilling well or so two vertical sections, a set of first step connection of each setting in left and right etc. The device of the compound strong mine pressure of coal column is left in gas ions ground " U formula " abatement thick and hard roof and residual exploiting field, and two covering devices are bored in " U formula " Construction procedure is identical at left and right sides of well, therefore only does side explanation;
Step 3: by dual-purpose water pipe, high-pressure water nozzle, high-tension cable, electrode securing device, discharge in water plasma electrode, Across " U formula " plasma fracturing drilling well vertical section, " U formula " the plasma fracturing that second step drills through is arranged in through directive wheel and is bored In front of the drilling well packer of well horizontal segment initial position, and make the drilling well packer of the flat section of " U formula " plasma fracturing Drilling Water Expansion shut-in well, synchronous signal transmission line, demodulation probe pass through " U formula " detection drilling well vertical section and are arranged in second step brill through directive wheel The initial position of " U formula " the detection drilling well horizontal segment taken;
Step 4: opening high-pressure water nozzle control valve, the water in water tank by dual-purpose water pipe through high-pressure pump, penetrate by high-pressure water nozzle Enter in the flat section of " U formula " plasma fracturing Drilling Water, observed by pressure gauge, when water is full of " U formula " plasma fracturing drilling well When inside horizontal segment, high-pressure water nozzle control valve is closed;
Step 5: opening plasma generator, alternating current passes through plasma generator, high-tension cable, the firm dress of electrode Set-discharge in water plasma electrode electric discharge after, electric energy is rapidly converted into impact energy, water-filled " U formula " plasma fracturing Pressure in drilling well horizontal segment increases sharply, and the original crack for the coal seam thick and hard roof that makes to underlie starts to extend and generate new split Gap;Demodulation probe receives the signal of discharge in water plasma electrode sending simultaneously, passes through signal transmssion line, signal amplifier Data collecting instrument is passed to, and analyzes the reflection configuration delay time spread spectrum scenarios received, coal seam thick and hard roof is split to underliing Gap developmental state is analyzed, and operates plasma pulse controller so as to adjust discharge frequency, until " U formula " plasma-induced The thick and hard roof split around drilling well horizontal segment realizes fracturing;Close plasma generator;
Step 6: mobile high-voltage cable, electrode securing device, discharge in water plasma electrode and dual-purpose water pipe, spraying water with high pressure The residual exploiting field of head and demodulation probe to " U formula " plasma fracturing drilling well vertical section is left near coal column, " U formula " plasma Residual exploiting field in fracturing drilling well vertical section leaves coal column roof and floor and is mounted on drilling well packer, and synchronizing moving signal transmits Line, demodulation probe repeat the 4th step, the 5th step, until the residual exploiting field near " U formula " plasma fracturing drilling well vertical section is left Coal column realizes fracturing;Close plasma generator;
Step 7: recycling high-tension cable, electrode securing device, discharge in water plasma electrode and dual-purpose water pipe, spraying water with high pressure Head and demodulation probe, then open plasma generator cools down control valve, and the water of water tank is by dual-purpose water pipe through high pressure Pump, cooler, plasma generator return to water tank, after plasma generator cools down, close plasma Body generator cools down control valve, finally blocks " U formula " plasma fracturing drilling well;
Step 8: by " U formula " detection drilling well as next " U formula " plasma fracturing drilling well, adjacent non-presplitting " U formula " is bored Well repeats third step to the 7th step, until all " U formula " drilling wells that second step drills through are attached as next " U formula " detection drilling well The completion of coal column whole fracturing is left in close thick and hard roof and residual exploiting field.
2. the method according to claim 1 plasma U formula abatement thick and hard roof and leave the compound strong mine pressure of coal column, Be characterized in that: in second step, the spacing d of " U formula " drilling well is 6~10 meters;The diameter of " U formula " drilling well be do be 155mm~ 335mm。
3. the method according to claim 1 plasma U formula abatement thick and hard roof and leave the compound strong mine pressure of coal column, Be characterized in that: in second step, the angle a range on " U formula " drilling well or so vertical section and ground is in 75o~90o.
4. the method according to claim 1 plasma U formula abatement thick and hard roof and leave the compound strong mine pressure of coal column, Be characterized in that: in second step, " U formula " drilling well level section is located at the intersection of thick and hard roof and overlying rock.
5. the method according to claim 1 plasma U formula abatement thick and hard roof and leave the compound strong mine pressure of coal column, Be characterized in that: in third step, drilling well packer is located in front of directive wheel in 5~10 meters of the flat section of plasma fracturing Drilling Water.
6. the method according to claim 1 plasma U formula abatement thick and hard roof and leave the compound strong mine pressure of coal column, Be characterized in that: in third step, drilling well packer operating pressure is 30MPa~55MPa.
7. the method according to claim 1 plasma U formula abatement thick and hard roof and leave the compound strong mine pressure of coal column, Be characterized in that: in third step, self-sealing, compression or combined type drilling packer is can be selected in drilling well packer.
8. the method according to claim 1 plasma U formula abatement thick and hard roof and leave the compound strong mine pressure of coal column, It is characterized in that: in the 4th step, electrolyte solution, the electrolysis is added in the flat section of " U formula " plasma fracturing Drilling Water of water-filling Matter solution is NaOH solution.
9. the method according to claim 1 plasma U formula abatement thick and hard roof and leave the compound strong mine pressure of coal column, Be characterized in that: in the 5th step, discharge in water plasma electrode discharge voltage is 100kV~220kV, discharge frequency 100Hz ~600Hz.
10. one kind is for implementing the plasma U formula abatement thick and hard roof of any one of claim 1 ~ 9 the method and leaving coal The device of the compound strong mine pressure of column, it is characterised in that: including plasma generator, plasma pulse controller, high-tension cable, Electrode securing device, discharge in water plasma electrode, data collecting instrument, signal amplifier, signal transmssion line, demodulation probe, Water tank, high-pressure pump, cooler, pressure gauge, dual-purpose water pipe, high-pressure water nozzle, the cooling control valve of plasma generator, high pressure Sprinkler head control valve;
Plasma pulse controller, plasma generator, electrode securing device, discharge in water plasma electrode pass through height Voltage cable connection;Electric energy is passed through high-tension cable, electrode securing device, discharge in water plasma electrode by plasma generator It is discharged, medium and high voltage cable is responsible for transmitting electric energy, and electrode securing device guarantees discharge in water plasma electrode Normal work;
Plasma pulse controller, data collecting instrument, signal amplifier, demodulation probe pass sequentially through signal transmssion line connection; Demodulation probe is responsible for receiving across coal/rock mass waveform signal, and Wave data is transferred to signal by signal transmssion line and is put Big device after Wave data is amplified processing by signal amplifier, is finally transferred to data collecting instrument, and data collecting instrument will obtain Wave data analyzed, judge coal/rock mass fracturing effect;
Water tank, cooler, plasma generator, by dual-purpose water pipe connects to form complete loops high-pressure pump, by it is equal from Daughter generator cools down control valve T1Control switch;High-pressure pump is cooling through cooler again by dual-purpose water pipe by the water of water tank Afterwards, it is transported to plasma generator, plasma generator cools down, and avoid plasma generator from overheating, and nothing Method uses;High-pressure pump, pressure gauge, high-pressure water nozzle are connected by dual-purpose water pipe, pass through high-pressure water nozzle control valve T2Control is opened It closes;The water of water tank is transported to high-pressure water nozzle by dual-purpose water pipe by high-pressure pump, is sprayed finally by high-pressure water nozzle.
CN201910511261.2A 2019-06-13 2019-06-13 Method for reducing composite strong mine pressure of thick hard top plate and left coal pillar in plasma U-type manner Active CN110273684B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910511261.2A CN110273684B (en) 2019-06-13 2019-06-13 Method for reducing composite strong mine pressure of thick hard top plate and left coal pillar in plasma U-type manner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910511261.2A CN110273684B (en) 2019-06-13 2019-06-13 Method for reducing composite strong mine pressure of thick hard top plate and left coal pillar in plasma U-type manner

Publications (2)

Publication Number Publication Date
CN110273684A true CN110273684A (en) 2019-09-24
CN110273684B CN110273684B (en) 2021-01-29

Family

ID=67962132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910511261.2A Active CN110273684B (en) 2019-06-13 2019-06-13 Method for reducing composite strong mine pressure of thick hard top plate and left coal pillar in plasma U-type manner

Country Status (1)

Country Link
CN (1) CN110273684B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114198100A (en) * 2021-12-03 2022-03-18 太原理工大学 Rock drilling high-temperature thermal cracking axial directional pre-splitting equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5896938A (en) * 1995-12-01 1999-04-27 Tetra Corporation Portable electrohydraulic mining drill
US20130255936A1 (en) * 2012-03-29 2013-10-03 Shell Oil Company Electrofracturing formations
CN106285608A (en) * 2016-10-28 2017-01-04 中国矿业大学 A kind of coal bed gas well pulse-knocking fracturing seepage increasing method
CN106499366A (en) * 2016-11-01 2017-03-15 中国矿业大学 A kind of coal bed gas enhanced recovery method that microwave is mutually cooperateed with ultrasound wave
CN106761646A (en) * 2016-12-30 2017-05-31 北京百恒达石油技术有限公司 Shock wave makes seam apparatus and system
CN108278940A (en) * 2018-01-24 2018-07-13 中国矿业大学 High stress tunnel country rock liquid phase plasma unloading pressure by blasting method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5896938A (en) * 1995-12-01 1999-04-27 Tetra Corporation Portable electrohydraulic mining drill
US20130255936A1 (en) * 2012-03-29 2013-10-03 Shell Oil Company Electrofracturing formations
CN106285608A (en) * 2016-10-28 2017-01-04 中国矿业大学 A kind of coal bed gas well pulse-knocking fracturing seepage increasing method
CN106499366A (en) * 2016-11-01 2017-03-15 中国矿业大学 A kind of coal bed gas enhanced recovery method that microwave is mutually cooperateed with ultrasound wave
CN106761646A (en) * 2016-12-30 2017-05-31 北京百恒达石油技术有限公司 Shock wave makes seam apparatus and system
CN108278940A (en) * 2018-01-24 2018-07-13 中国矿业大学 High stress tunnel country rock liquid phase plasma unloading pressure by blasting method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114198100A (en) * 2021-12-03 2022-03-18 太原理工大学 Rock drilling high-temperature thermal cracking axial directional pre-splitting equipment
CN114198100B (en) * 2021-12-03 2023-06-20 太原理工大学 Rock drilling high-temperature thermal cracking axial directional pre-cracking equipment

Also Published As

Publication number Publication date
CN110273684B (en) 2021-01-29

Similar Documents

Publication Publication Date Title
CN108894787B (en) Leave the pressure break release method of ore pillar stress concentration in Overburden gob area
CN109736805A (en) A kind of method of the modified release watershed management bump of thick-layer tight roof
CN108678747B (en) A kind of method and apparatus of pulsed water fracturing control Top coal caving characteristic
WO2018201706A1 (en) Method for efficient gas drainage in coal roadway strips and regional outburst elimination through staged fracturing with long borehole floor beddings
CN110388206A (en) A kind of method and apparatus that coal column is left in the residual exploiting field of plasma uplink fracturing
CN102654049B (en) Porous linear control hydraulic fracturing method
CN106869966B (en) A kind of method for blocking of absciss layer water supply source
CN112780340B (en) Method for preventing rock burst in advance in underground coal mine area
CN105545307A (en) Method for over-pit and under-pit cooperative control of roofs of far and near fields of extra-large stoping space
CN110344827B (en) Method and device for exploiting thick hard roof strong mine pressure by plasma weakening underlying coal seam
CN111827878B (en) Method for quickly and accurately probing hidden water inrush channel of coal seam floor
CN110273685A (en) Method microwave heating H formula abatement thick and hard roof and leave the compound strong mine pressure of coal column
CN110173295A (en) A method of utilizing concordant directional drilling mash gas extraction and fire extinguishing
CN105804786A (en) Method for layer penetrating, drilling, pressing punching and permeability improving of soft coal seam floor
CN110056353A (en) The method of tight roof horizontal well water-jet staged fracturing in coal mine roadway
CN110344828A (en) Method plasma L formula abatement thick and hard roof and leave the compound strong mine pressure of coal column
CN109779634B (en) Method for determining position of fractured hard top plate of coal mine ground vertical well
CN110273684A (en) Method plasma U formula abatement thick and hard roof and leave the compound strong mine pressure of coal column
CN108590737A (en) A kind of efficient method for implanting of hypotonicity spontaneous fire seam retardant
CN110388205A (en) Method microwave heating L formula abatement thick and hard roof and leave the compound strong mine pressure of coal column
CN110374596A (en) Method plasma H formula abatement thick and hard roof and leave the compound strong mine pressure of coal column
CN110388207A (en) Method microwave heating abatement thick and hard roof and leave the compound strong mine pressure of coal column
CN110388208A (en) Plasma abatement thick and hard roof and the method for leaving the compound strong mine pressure of coal column
CN109826629B (en) Coal mine ground fracturing hard roof process selection method
CN113090264B (en) Horizontal deep borehole CO for hard coal seam and hard rock stratum 2 Fracturing safety roof control method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Cui Boqiang

Inventor after: Kang Lixun

Inventor after: Feng Guorui

Inventor after: Shaotian

Inventor after: Bai Jinwen

Inventor after: Du Yunlou

Inventor after: Li Ze

Inventor after: Yang Wenbo

Inventor after: Wei Huiru

Inventor after: Niu Xiaohong

Inventor before: Feng Guorui

Inventor before: Shaotian

Inventor before: Bai Jinwen

Inventor before: Du Yunlou

Inventor before: Li Ze

Inventor before: Yang Wenbo

Inventor before: Wei Huiru

Inventor before: Niu Xiaohong

Inventor before: Kang Lixun

GR01 Patent grant
GR01 Patent grant