CN110273504A - A kind of finished product formula dome facing Fast Installation structure - Google Patents

A kind of finished product formula dome facing Fast Installation structure Download PDF

Info

Publication number
CN110273504A
CN110273504A CN201910572606.5A CN201910572606A CN110273504A CN 110273504 A CN110273504 A CN 110273504A CN 201910572606 A CN201910572606 A CN 201910572606A CN 110273504 A CN110273504 A CN 110273504A
Authority
CN
China
Prior art keywords
finished product
product formula
fast installation
installation structure
edge strip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910572606.5A
Other languages
Chinese (zh)
Inventor
张凯
顾敬
薛木林
杨历
蒲海宾
顾启力
张培亮
马雷
谢峰
沈志强
刘小超
谢宁宁
陆晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Gold Mantis Construction Decoration Co Ltd
Original Assignee
Suzhou Gold Mantis Construction Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Gold Mantis Construction Decoration Co Ltd filed Critical Suzhou Gold Mantis Construction Decoration Co Ltd
Priority to CN201910572606.5A priority Critical patent/CN110273504A/en
Publication of CN110273504A publication Critical patent/CN110273504A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/04Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
    • E04B9/0407Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like being stiff and curved
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction
    • E04B9/20Means for suspending the supporting construction adjustable
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/22Connection of slabs, panels, sheets or the like to the supporting construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The present invention provides a kind of finished product formula dome facing Fast Installation structures, it includes the arc ceiling board for being installed on top surface base, the end of arc ceiling board is connected with the first edge strip, adjusting rod is hinged on first edge strip, the end of adjusting rod is articulated on the second edge strip, and the second edge strip is installed in the base of top surface.The fine tuning operation in dome facing installation process may be implemented in the present invention compared to the prior art, and then improves the precision of installation.

Description

A kind of finished product formula dome facing Fast Installation structure
Technical field
The present invention relates to a kind of dome facing mounting structures, in particular to a kind of finished product formula hemispherical cresting Face Fast Installation structure.
Background technique
Assembled decoration is a kind of in recent years emerging decoration construction form.Assembled is decorated as its name suggests, is that will decorate Required each component component realizes that production is completed in factory, then transports decoration scene and is combined installation, Traditional decoration scene is eliminated to operations such as measurement, the cuttings of each component component, is constructed more simple and convenient, it can be greatly The construction efficiency at decoration scene is improved, and construction site is more clean and tidy and beautiful, will not generate excessive ornament materials rubbish, It is a kind of more environmentally protective decoration construction form.
In the installation in current cresting face, dome facing is a kind of structure and all more special cresting face of shape, It needs to be pre-positioned installation site and angle when installation, otherwise the later period is difficult to be adjusted, but the installation in some cresting faces In the process, it may be desirable to some places are finely adjusted, otherwise installation accuracy is difficult to ensure.
Summary of the invention
In consideration of it, hemispherical may be implemented the present invention provides a kind of finished product formula dome facing Fast Installation structure Fine tuning operation in the installation process of cresting face, and then improve the precision of installation.
For this purpose, the present invention provides a kind of finished product formula dome facing Fast Installation structures comprising be installed on top surface The arc ceiling board of base, the end of arc ceiling board are connected with the first edge strip, adjusting rod, adjusting rod are hinged on the first edge strip End be articulated on the second edge strip, the second edge strip is installed in the base of top surface.
Further, above-mentioned first edge strip is connected on the end of arc ceiling board.
Further, above-mentioned first edge strip is v-shaped structure, internal to form taper card slot.
Further, elastic insert is provided between the slot bottom of above-mentioned taper card slot and the end of arc ceiling board.
Further, above-mentioned second edge strip is installed on a sliding rail, and sliding rail is fixedly installed in the base of top surface.
Further, the cross section of above-mentioned second edge strip is in U-shape.
Further, above-mentioned adjusting rod includes two body of rod units being mutually rotatablely connected.
Further, it is attached between above-mentioned two bodies of rod unit by rotatable parts.
Further, above-mentioned rotatable parts are ball axis.
Further, it is fixedly connected with T-type gag lever post in above-mentioned top surface base, has and resists arc furred ceiling back Arc-shaped end plate.
A kind of finished product formula dome facing Fast Installation structure provided by the present invention, mainly be provided with the first edge strip, Second edge strip and adjusting rod, arc ceiling board are connected to top surface base by the first edge strip, and the first edge strip is connected to adjusting rod, adjust Pole end is articulated on the second edge strip, and the second edge strip is mounted in the base of top surface.
By the setting of above structure, since adjusting rod is two body of rod units mutually rotated, two body of rod units pass through ball Axis can be rotated mutually, and the installation of the second side block is on the slide rail, can pass through the second side block when cambered surface base needs to be finely adjusted Cambered surface base is transferred in mutual cooperation with adjusting rod, so as to realize the fine tuning operation in dome facing installation process, And then improve the precision of installation.
Detailed description of the invention
By reading the following detailed description of the preferred embodiment, various other advantages and benefits are common for this field Technical staff will become clear.The drawings are only for the purpose of illustrating a preferred embodiment, and is not considered as to the present invention Limitation.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 is a kind of finished product formula dome facing Fast Installation structural schematic diagram provided in an embodiment of the present invention.
Fig. 2 be in a kind of finished product formula dome facing Fast Installation structure provided in an embodiment of the present invention second edge strip with The installation diagram schematic diagram of sliding rail.
Fig. 3 is the first edge strip in a kind of finished product formula dome facing Fast Installation structure provided in an embodiment of the present invention Structural schematic diagram.
Fig. 4 is the knot of gag lever post in a kind of finished product formula dome facing Fast Installation structure provided in an embodiment of the present invention Structure schematic diagram.
Specific embodiment
Exemplary embodiments of the present disclosure are described in more detail below with reference to accompanying drawings.Although showing the disclosure in attached drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure It is fully disclosed to those skilled in the art.
Embodiment one:
Referring to Fig. 1 to Fig. 4, a kind of finished product formula dome facing that the offer of the embodiment of the present invention one is shown in figure is quick Mounting structure comprising be installed on the arc ceiling board 2 of top surface base 1, the end of arc ceiling board 2 is connected with the first edge strip 21, adjusting rod 22 is hinged on the first edge strip 21, and the end of adjusting rod 22 is articulated on the second edge strip 23, the installation of the second edge strip 23 In in top surface base 1.
Referring to Fig. 1 to Fig. 4, the second edge strip 23 is installed on a sliding rail 231, and sliding rail 231 is fixedly installed in top surface base 1 On, the cross section of the second edge strip 23 is in U-shape, and adjusting rod 22 includes two body of rod units 221 being mutually rotatablely connected, two body of rod units It is attached between 221 by rotatable parts 222, rotatable parts 222 are ball axis.
A kind of finished product formula dome facing Fast Installation structure provided by the present embodiment is mainly provided with the first side Item, the second edge strip and adjusting rod, arc ceiling board are connected to top surface base by the first edge strip, and the first edge strip is connected to adjusting Bar adjusts boom end and is articulated on the second edge strip, and the second edge strip is mounted in the base of top surface.By the setting of above structure, Multiple parallel adjusting rods are arranged with top surface base in arc ceiling board, and the both ends of adjusting rod are hinged in two edges, further, Adjusting rod is two body of rod units being mutually rotatablely connected, and two body of rod units are led to by ball axis connection, adjustable different angle The angle for overregulating adjusting rod realizes the gradually molding of top surface moulding, so as to realize in dome facing installation process Operation is finely tuned, and then improves the precision of installation.
Embodiment two:
Referring to Fig. 1 to Fig. 4, it is quick that a kind of finished product formula dome facing provided by Embodiment 2 of the present invention is shown in figure Mounting structure, the present embodiment are also further made that following as improved technical side on the basis of the various embodiments described above Case: the first edge strip 21 is v-shaped structure, and internal to form taper card slot 211, the end of arc ceiling board 2 is connected to the first edge strip Taper card slot 211 in, by the setting of above structure, convenient for the disassembly of arc ceiling board, while card slot is taper, is conducive to Arc ceiling board is more firm.
Embodiment three:
Referring to Fig. 1 to Fig. 4, a kind of finished product formula dome facing that the offer of the embodiment of the present invention three is shown in figure is quick Mounting structure, the present embodiment are also further made that following as improved technical side on the basis of the various embodiments described above Case: it is provided with elastic insert between the slot bottom of taper card slot 211 and the end of arc ceiling board 2, can be increased between the two Frictional force, it is not easy to loosen, structure is more stable, while using the elasticity of spring, colliding in arc ceiling board and the first edge strip When serious, elastic insert can play the role of buffering, and arc ceiling board is protected not to be damaged.
Example IV:
Referring to Fig. 1 to Fig. 4, a kind of finished product formula dome facing that the offer of the embodiment of the present invention four is shown in figure is quick Mounting structure, the present embodiment are also further made that following as improved technical side on the basis of the various embodiments described above Case: being fixedly connected with T-type gag lever post 11 in top surface base 1, has the arc-shaped end plate 12 for resisting 2 back side of arc ceiling board, can Support protection arc ceiling board, while arc-shaped end plate are played the role of in fracture when preventing arc ceiling board to be under pressure excessive It can more preferably be contacted with arc ceiling board, and can preferably disperse the pressure that arc ceiling board is subject to.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to include these modifications and variations.

Claims (10)

1. a kind of finished product formula dome facing Fast Installation structure, which is characterized in that the arc including being installed on top surface base (1) The end of shape ceiling board (2), the arc ceiling board (2) is connected with the first edge strip (21), hinged on first edge strip (21) Have adjusting rod (22), the end of the adjusting rod (22) is articulated on the second edge strip (23), and second edge strip (23) is installed on On the top surface base (1).
2. a kind of finished product formula dome facing Fast Installation structure according to claim 1, which is characterized in that described One edge strip (21) is connected on the end of the arc ceiling board (2).
3. a kind of finished product formula dome facing Fast Installation structure according to claim 1 or 2, which is characterized in that institute Stating the first edge strip (21) is v-shaped structure, internal to form taper card slot (211).
4. a kind of finished product formula dome facing Fast Installation structure according to claim 3, which is characterized in that the cone Elastic insert (212) are provided between the slot bottom of shape card slot (211) and the end of the arc ceiling board (2).
5. a kind of finished product formula dome facing Fast Installation structure according to claim 1, which is characterized in that described Two edge strips (23) are installed on a sliding rail (231), and the sliding rail (231) is fixedly installed on the top surface base (1).
6. a kind of finished product formula dome facing Fast Installation structure according to claim 5, which is characterized in that described The cross section of two edge strips (23) is in U-shape.
7. a kind of finished product formula dome facing Fast Installation structure according to claim 1, which is characterized in that the tune Pole (22) includes two body of rod units (221) being mutually rotatablely connected.
8. a kind of finished product formula dome facing Fast Installation structure according to claim 7, which is characterized in that described two It is attached between body of rod unit (221) by rotatable parts (222).
9. a kind of finished product formula dome facing Fast Installation structure according to claim 8, which is characterized in that described turn Dynamic component (222) is ball axis.
10. a kind of finished product formula dome facing Fast Installation structure according to claim 1, which is characterized in that described It is fixedly connected with T-type gag lever post (11) in top surface base (1), there is the arc end for resisting arc ceiling board (2) back side Plate (12).
CN201910572606.5A 2019-06-27 2019-06-27 A kind of finished product formula dome facing Fast Installation structure Withdrawn CN110273504A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910572606.5A CN110273504A (en) 2019-06-27 2019-06-27 A kind of finished product formula dome facing Fast Installation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910572606.5A CN110273504A (en) 2019-06-27 2019-06-27 A kind of finished product formula dome facing Fast Installation structure

Publications (1)

Publication Number Publication Date
CN110273504A true CN110273504A (en) 2019-09-24

Family

ID=67963113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910572606.5A Withdrawn CN110273504A (en) 2019-06-27 2019-06-27 A kind of finished product formula dome facing Fast Installation structure

Country Status (1)

Country Link
CN (1) CN110273504A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323318A (en) * 2021-05-26 2021-08-31 苏州金螳螂建筑装饰股份有限公司 Integrated design structure of large-area arc stainless steel embedded wood decoration wall surface

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323318A (en) * 2021-05-26 2021-08-31 苏州金螳螂建筑装饰股份有限公司 Integrated design structure of large-area arc stainless steel embedded wood decoration wall surface

Similar Documents

Publication Publication Date Title
CN110273504A (en) A kind of finished product formula dome facing Fast Installation structure
CN110242000A (en) A kind of assembled wall surface keel structure of levelling
CN110453827A (en) A kind of levelling supporting element on assembled dragon scleroseptum wall ground
GB587448A (en) Improvements relating to the design and construction of jigs and fixtures
WO2008108148A1 (en) Precision positioning apparatus
CN204599747U (en) A kind of height-adjustable dual crossing folding table
CN203954628U (en) Portable pingpong rack
CN210421768U (en) Quick assembly disassembly's finished product decoration layer mounting structure
CN203724782U (en) Multi-direction adjusted starting block
TW200626778A (en) Support
CN207624358U (en) A kind of Novel piano key
CN203399804U (en) Solid wood jointed table
CN216740988U (en) Novel municipal garden construction fast-assembling protection device
CN204409974U (en) Multi-functional desk
CN204403764U (en) A kind of alloy-steel casting
CN209458250U (en) A kind of rotatable bayonet unit of novel simple fast assembling-disassembling
CN109864473A (en) A kind of combination Suresh Kumar outdoor furniture
CN203809448U (en) Vertical column connection device and vertical advertising board with same
CN203555387U (en) Novel combined-type handle
CN207395701U (en) A kind of measurement fixture for profilometer
CN204838738U (en) Adjustable functional mattress
CN220167268U (en) Novel grid furred ceiling structure of connection stability
CN204616615U (en) A kind of mobile flusher on garden landscape engineering
CN108898923A (en) A kind of senior middle school physics teaching display board
CN214344208U (en) Leg pressing device for dance training

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20190924

WW01 Invention patent application withdrawn after publication