CN110273380A - Steel box-girder incremental launching construction direction across bridge double rollers guide position limiter and push construction method - Google Patents

Steel box-girder incremental launching construction direction across bridge double rollers guide position limiter and push construction method Download PDF

Info

Publication number
CN110273380A
CN110273380A CN201910572530.6A CN201910572530A CN110273380A CN 110273380 A CN110273380 A CN 110273380A CN 201910572530 A CN201910572530 A CN 201910572530A CN 110273380 A CN110273380 A CN 110273380A
Authority
CN
China
Prior art keywords
steel box
girder
incremental launching
screw
brace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910572530.6A
Other languages
Chinese (zh)
Inventor
张富生
周斌
白宾
王绍义
王兴阔
张景伟
王明月
翟海明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Luqiao Group Co Ltd
Original Assignee
Shandong Luqiao Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Luqiao Group Co Ltd filed Critical Shandong Luqiao Group Co Ltd
Priority to CN201910572530.6A priority Critical patent/CN110273380A/en
Publication of CN110273380A publication Critical patent/CN110273380A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The present invention provides a kind of steel box-girder incremental launching construction direction across bridge double rollers guide position limiter and push construction method, can not only carry out the guiding and limit of direction across bridge to the steel box-girder in incremental launching construction, and structure it is simple, it is safe and reliable, convenient for having level curve steel box-girder incremental launching construction.Steel box-girder incremental launching construction direction across bridge double rollers guide position limiter is symmetricly set on steel box-girder two sides comprising frame body, top-pushing mechanism and two adjustable guide wheels;Top-pushing mechanism is arranged on the inside of frame body, for driving steel box-girder to vertically move, adjustable guide wheel prolongs vertical bridge to arrangement, it is disposed side by side on frame body, each adjustable guide wheel includes idler wheel, turning rolls and two screw-nut components, idler wheel is arranged on turning rolls, and turning rolls is connected on frame body by screw-nut component.

Description

Steel box-girder incremental launching construction direction across bridge double rollers guide position limiter and push construction method
Technical field
The present invention relates to a kind of steel box-girder incremental launching construction direction across bridge double rollers guide position limiter and push construction method, belong to In steel structure bridge technical field of construction.
Background technique
Steel box-girder is the common structure type of Large Span Bridges, is commonly used on the biggish bridge of span.High with intensity, Structure is light, industrialized production degree height, Yi Xiufu, the advantages that can be recycled, and steel box-girder is more and more widely used.
Existing steel box-girder installation method has bracket installation, free cantilever erection and three kinds of pushing installation, wherein steel box girder incremental launching method It refers to steel box-girder using the incremental launching device of profession through temporary rest pier or long rails from assembly position pushing tow to installation site Construction method, this method be suitable for the biggish cross-section continuous bridge of span, especially under bridge the mountain valley of environment complexity with have across Line is open to traffic the engineering of demand.
The guide and limit mechanism of incremental launching construction generally uses deflector apron/block or utilizes reaction frame and thousand in the prior art Jin top is laterally adjusted, and is increased the incremental launching construction resistance of steel box-girder longitudinal direction, is needed to be equipped with the pipe bending cylinder of high thrust, to steel Box beam has side knock, has not only increased construction cost but also has reduced construction efficiency.
Summary of the invention
The present invention provides a kind of steel box-girder incremental launching construction direction across bridge double rollers guide position limiter and push construction method, Can not only carry out the guiding and limit of direction across bridge to the steel box-girder in incremental launching construction, and structure it is simple, it is safe and reliable, convenient for tool There is level curve steel box-girder incremental launching construction.
The present invention to achieve the above object, is achieved through the following technical solutions:
A kind of steel box-girder incremental launching construction direction across bridge double rollers guide position limiter, steel box-girder incremental launching construction direction across bridge double rollers guiding Limiting device is symmetricly set on steel box-girder two sides comprising frame body, top-pushing mechanism and two adjustable guide wheels;Top-pushing mechanism setting exists On the inside of frame body, for driving steel box-girder to vertically move, top-pushing mechanism includes pushing tow stringer, pushing tow cylinder and seat is mounted, and is limited Mounting base is arranged on pushing tow stringer and has mounting groove, and pushing tow stringer is two I-beams arranged side by side, pushing tow cylinder one end position In in the mounting groove that seat is mounted, the other end is connected as one with steel box-girder;Adjustable guide wheel prolongs vertical bridge to arrangement, sets side by side It sets on frame body, each adjustable guide wheel includes idler wheel, turning rolls and two screw-nut components, and idler wheel is arranged in turning rolls On, turning rolls is connected on frame body by screw-nut component.
The steel box-girder incremental launching construction direction across bridge double rollers guide position limiter preferred embodiment, frame body include the first brace, Upright bar and the second brace, the first brace and the second brace are located at upright bar two sides, and first brace one end is connect with upright bar, the other end with The connection of pushing tow stringer and second brace one end are connect with upright bar, and the other end is connect with crossbeam.
The steel box-girder incremental launching construction direction across bridge double rollers guide position limiter preferred embodiment, turning rolls include upper plate, under In installation board ends, idler wheel connects turning rolls, screw-nut by pin shaft for plate and mounting plate, upper plate and the setting of lower plate parallel interval The screw rod of component passes through upright bar and the screw of screw-nut component connects on a mounting board through pedestal.
It is a kind of to carry out steel box-girder incremental launching construction using the steel box-girder incremental launching construction direction across bridge double rollers guide position limiter Method, comprising the following steps:
1) laying crossbeam is set up on the support of interim tubular pole;
2) top-pushing mechanism is laid on crossbeam;
3) upright bar 2 is arranged on crossbeam, and the first brace and the second brace are welded and fixed with crossbeam and pushing tow stringer respectively, and composition is steady Solid triangular structure;
4) adjustable guide wheel is assembled into one, the screw-nut component of side is installed, positioning welding then is carried out to frame body;
5) setting-out is carried out according to steel box-girder level curve line style, measures the corresponding position of steel box-girder bottom edge Yu the device, Screw rod length is adjusted according to this position, and is fixed screw rod position with screw, idler wheel outer rim is made to be bonded steel box-girder bottom edge;
6) when steel box-girder longitudinal direction pushing tow, control steel box-girder sets interior movement in two sides repacking, to realize level curve control.
The present invention has the advantages that
1, structure is simple, safe and reliable: generally tripod form, simple and stable structure, safe and reliable;
2, construction efficiency is high: limit guiding process is changed to rolling friction by traditional sliding friction, reduces the construction of pushing tow process Resistance improves the construction efficiency of steel box-girder pushing installation;
3, side knock is small: lateral pushing need to be carried out with reaction frame and jack by being generally laterally adjusted to steel box-girder, construction Horizontal force is big, causes to be mutated big stress to steel box-girder, the present apparatus can be such that steel box-girder realizes gradually during longitudinal pushing tow Lateral adjustments can avoid traditional construction mode and adversely affect caused by steel box-girder itself;
4, be convenient for level curve incremental launching construction: the present apparatus is designed using double rollers, can more effectively be fitted construction level curve, Be conducive to steel box-girder level curve incremental launching construction;
5, adaptability is high: the invention device is adapted to the incremental launching construction of different radius of horizontal curve steel box-girders.
Detailed description of the invention
Attached drawing is used to provide further understanding of the present invention, and constitutes part of specification, with reality of the invention It applies example to be used to explain the present invention together, not be construed as limiting the invention.
Fig. 1 is cross-sectional view of the present invention;
Fig. 2 is partial enlarged view one of the present invention;
Wherein, 1. second brace;2. upright bar;3. the first brace;4. screw rod;5. screw;6. turning rolls;7. pin shaft;8. Idler wheel;9. pushing tow stringer;10. pushing tow cylinder;11. seat is mounted;I. frame body;II. top-pushing mechanism;III. adjustable to lead Wheel;6-1. upper plate;6-2. lower plate;6-3. mounting plate.
Specific embodiment
Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings, it should be understood that preferred reality described herein Apply example only for the purpose of illustrating and explaining the present invention and is not intended to limit the present invention.
With reference to Fig. 1, a kind of steel box-girder incremental launching construction direction across bridge double rollers guide position limiter, steel box-girder incremental launching construction cross-bridges Be symmetricly set on the two sides steel box-girder a to double rollers guide position limiter comprising frame body I, top-pushing mechanism II and more than one can Adjust guide wheel III;Top-pushing mechanism II is arranged on the inside of frame body I, and for driving steel box-girder to vertically move, adjustable guide wheel III prolongs vertical Bridge is disposed side by side on frame body I to arrangement, and each adjustable guide wheel includes idler wheel 8, turning rolls 6 and two screw-nut components, Idler wheel 8 is arranged on turning rolls 6, and turning rolls 6 is connected on frame body I by screw-nut component.
In the present embodiment, top-pushing mechanism includes pushing tow stringer 9, pushing tow cylinder 10 and seat 11 is mounted, and seat 11 is mounted It is welded on pushing tow stringer 9 and has mounting groove, pushing tow stringer 9 is two I-beams arranged side by side, and 10 one end of pushing tow cylinder is located at It is mounted in the mounting groove of seat 11, the other end is connected as one with steel box-girder.
In the present embodiment, frame body includes the first brace 3, upright bar 2 and the second brace 1, the first brace 3 and the second brace 1 In 2 two sides of upright bar, 3 one end of the first brace is connect with upright bar 2, the other end connect with pushing tow stringer 9 and 1 one end of the second brace with Upright bar 2 connects, and the other end is connect with crossbeam, and overall structure is triangle, is improved while keeping self structure stability Lateral rigidity can be effective against the lateral force generated in steel box-girder incremental launching construction.
In the present embodiment, turning rolls includes upper plate 6-1, lower plate 6-2 and mounting plate 6-3, and upper plate 6-1 is parallel with lower plate 6-2 Be arranged at intervals on the both ends mounting plate 6-3, idler wheel 8 connects turning rolls 6 by pin shaft 7, mounting plate 6-3 connect simultaneously upper plate 6-1 with Lower plate 6-2, the screw rod 4 of screw-nut component passes through upright bar and the screw 5 of screw-nut component is connected to mounting plate through pedestal 12 On, idler wheel 8 can rotate on pin shaft 7, for being oriented to and being limited to steel box-girder.
It is a kind of to carry out steel box-girder incremental launching construction using the steel box-girder incremental launching construction direction across bridge double rollers guide position limiter Method, comprising the following steps:
1) it is set up on interim tubular pole support c and is laid with crossbeam b;
2) top-pushing mechanism is laid on crossbeam;
3) upright bar 2 is arranged on crossbeam, and the first brace 3 and the second brace 1 are welded and fixed with crossbeam and pushing tow stringer respectively, composition Firm triangular structure;
4) adjustable guide wheel is assembled into one, the screw-nut component of side is installed, positioning welding then is carried out to frame body;
5) setting-out is carried out according to steel box-girder level curve line style, measures the corresponding position of steel box-girder bottom edge Yu the device, Screw rod length is adjusted according to this position, and is fixed screw rod position with screw, 8 outer rim of idler wheel is made to be bonded steel box-girder bottom edge;
6) when steel box-girder longitudinal direction pushing tow, control steel box-girder sets interior movement in two sides repacking, to realize level curve control.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features. All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention Within protection scope.

Claims (4)

1. a kind of steel box-girder incremental launching construction direction across bridge double rollers guide position limiter, it is characterised in that: steel box-girder incremental launching construction is horizontal Bridge is symmetricly set on steel box-girder two sides to double rollers guide position limiter comprising frame body, top-pushing mechanism and two adjustable guide wheels; Top-pushing mechanism is arranged on the inside of frame body, and for driving steel box-girder to vertically move, top-pushing mechanism includes pushing tow stringer (9), pushing tow cylinder (10) and seat (11) are mounted, seat (11) is mounted and is arranged on pushing tow stringer (9) and there is mounting groove, pushing tow stringer It (9) is two I-beams arranged side by side, pushing tow cylinder (10) one end is located in the mounting groove that seat (11) are mounted, the other end and steel Box beam is connected as one;Adjustable guide wheel prolongs vertical bridge to arrangement, is disposed side by side on frame body, and each adjustable guide wheel includes idler wheel (8), turning rolls (6) and two screw-nut components, idler wheel (8) are arranged on turning rolls (6), and turning rolls (6) passes through lead screw silk Female component is connected on frame body.
2. steel box-girder incremental launching construction direction across bridge double rollers guide position limiter according to claim 1, it is characterised in that: frame body Including the first brace (3), upright bar (2) and the second brace (1), the first brace (3) and the second brace (1) are located at upright bar (2) two sides, First brace (3) one end is connect with upright bar (2), and the other end is connect with pushing tow stringer (9) and the second brace (1) one end and upright bar (2) it connects, the other end is connect with crossbeam.
3. steel box-girder incremental launching construction direction across bridge double rollers guide position limiter according to claim 1, it is characterised in that: idler wheel Frame includes upper plate, lower plate and mounting plate, and in installation board ends, idler wheel (8) passes through pin shaft (7) for upper plate and the setting of lower plate parallel interval It connects turning rolls (6), the screw rod of screw-nut component passes through upright bar and the screw of screw-nut component is connected to installation through pedestal On plate.
4. it is a kind of using any one of claims 1 to 33 steel box-girder incremental launching construction direction across bridge double rollers guide position limiter into The method of row steel box-girder incremental launching construction, it is characterised in that the following steps are included:
1) laying crossbeam is set up on the support of interim tubular pole;
2) top-pushing mechanism is laid on crossbeam;
3) upright bar (2) is arranged on crossbeam, and the first brace (3) and the second brace (1) are solid with crossbeam and the welding of pushing tow stringer respectively It is fixed, form firm triangular structure;
4) adjustable guide wheel is assembled into one, the screw-nut component of side is installed, positioning welding then is carried out to frame body;
5) setting-out is carried out according to steel box-girder level curve line style, measures the corresponding position of steel box-girder bottom edge Yu the device, Screw rod length is adjusted according to this position, and is fixed screw rod position with screw, idler wheel (8) outer rim is made to be bonded steel box-girder bottom plate side Edge;
6) when steel box-girder longitudinal direction pushing tow, control steel box-girder sets interior movement in two sides repacking, to realize level curve control.
CN201910572530.6A 2019-06-28 2019-06-28 Steel box-girder incremental launching construction direction across bridge double rollers guide position limiter and push construction method Pending CN110273380A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910572530.6A CN110273380A (en) 2019-06-28 2019-06-28 Steel box-girder incremental launching construction direction across bridge double rollers guide position limiter and push construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910572530.6A CN110273380A (en) 2019-06-28 2019-06-28 Steel box-girder incremental launching construction direction across bridge double rollers guide position limiter and push construction method

Publications (1)

Publication Number Publication Date
CN110273380A true CN110273380A (en) 2019-09-24

Family

ID=67963642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910572530.6A Pending CN110273380A (en) 2019-06-28 2019-06-28 Steel box-girder incremental launching construction direction across bridge double rollers guide position limiter and push construction method

Country Status (1)

Country Link
CN (1) CN110273380A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809532A (en) * 2020-08-03 2020-10-23 中铁二十三局集团第二工程有限公司 Construction method for controlling displacement of pushing temporary pier stud
CN116289631A (en) * 2023-05-06 2023-06-23 合肥城建投资控股有限公司 Step-by-step pushing construction device for steel box girder

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202116986U (en) * 2011-05-25 2012-01-18 中铁电气化局集团有限公司 Pushing beam guiding and deviation rectifying device
CN203498761U (en) * 2013-09-16 2014-03-26 中铁十七局集团第二工程有限公司 Lateral position-specified and deviation rectifying device for box girder pushing
JP2015169015A (en) * 2014-03-07 2015-09-28 鹿島建設株式会社 Sending-out method
CN207700059U (en) * 2016-06-17 2018-08-07 贵州路桥集团有限公司 Stride pushing tow deviation correcting device
CN207891753U (en) * 2018-02-07 2018-09-21 陕西华山路桥集团有限公司 A kind of bridge successively incremeantal launching method device
CN208803384U (en) * 2018-06-08 2019-04-30 南京工大桥隧与轨道交通研究院有限公司 A kind of Universal wheel type horizontal limit devices for the construction of bridge incremental launching method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202116986U (en) * 2011-05-25 2012-01-18 中铁电气化局集团有限公司 Pushing beam guiding and deviation rectifying device
CN203498761U (en) * 2013-09-16 2014-03-26 中铁十七局集团第二工程有限公司 Lateral position-specified and deviation rectifying device for box girder pushing
JP2015169015A (en) * 2014-03-07 2015-09-28 鹿島建設株式会社 Sending-out method
CN207700059U (en) * 2016-06-17 2018-08-07 贵州路桥集团有限公司 Stride pushing tow deviation correcting device
CN207891753U (en) * 2018-02-07 2018-09-21 陕西华山路桥集团有限公司 A kind of bridge successively incremeantal launching method device
CN208803384U (en) * 2018-06-08 2019-04-30 南京工大桥隧与轨道交通研究院有限公司 A kind of Universal wheel type horizontal limit devices for the construction of bridge incremental launching method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809532A (en) * 2020-08-03 2020-10-23 中铁二十三局集团第二工程有限公司 Construction method for controlling displacement of pushing temporary pier stud
CN116289631A (en) * 2023-05-06 2023-06-23 合肥城建投资控股有限公司 Step-by-step pushing construction device for steel box girder
CN116289631B (en) * 2023-05-06 2023-08-11 合肥城建投资控股有限公司 Step-by-step pushing construction device for steel box girder

Similar Documents

Publication Publication Date Title
CN103541308B (en) Variable cross-section cantilever bridge box girder self-locking synchronization pushing system and construction method
CN201574358U (en) Walking type translation thruster
WO2021003903A1 (en) Stepping-type multipoint incremental launching construction device and incremental launching construction method for steel box girder
CN205443941U (en) Suspension bridge pushing device and top push away system
CN103711986B (en) The pushing tow system of factory law tube coupling prefabricated construction and pushing method
CN110761201B (en) Steel approach bridge pushing equipment and construction method adopting same
CN110273380A (en) Steel box-girder incremental launching construction direction across bridge double rollers guide position limiter and push construction method
CN209907228U (en) Steel beam pushing and guiding device
CN109958066A (en) Steel box-girder incremental launching construction limiting and guiding device and limit construction method
CN208362933U (en) A kind of straddle type monorail rail tracks beam body erection construction falsework
CN112064793A (en) Assembled steel structure building beam column connecting and mounting system and connecting and mounting process
CN212744023U (en) Assembling trolley for lower assembling section of assembled station pile anchor system
CN205576749U (en) Pontic roof beam structure promotes and rackwork
JP5260709B2 (en) Bridge girder delivery method
CN215052151U (en) Temporary supporting device for bridge construction
CN113668881A (en) Curved surface beam combined jig frame and assembling method
CN113699887A (en) Polygonal steel arch rib assembling and positioning device and using method thereof
CN206706591U (en) A kind of horizontal splicing apparatus for packaged type bridges precast pier template
CN210507166U (en) Steel box girder stepping type multi-point pushing construction device
CN104120657B (en) Follow-up beam face suspension cable guy rope hand-hole guiding device and construction method
JP4861892B2 (en) Gap widening adjusting device and jack for widening adjustment used in the gage widening adjusting device
CN210766423U (en) Diagonal web member bracket trolley with adjustable inclination angle
CN207469096U (en) A kind of CFST X-type arch arch springing steel pipe positioning device
CN210140772U (en) Steel box girder pushing construction limiting and guiding device
CN201347525Y (en) Deck two-dimensional track plate adjustment device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190924

WD01 Invention patent application deemed withdrawn after publication