CN110262412A - A kind of equipment O&M method and system for building energy consumption monitoring system - Google Patents
A kind of equipment O&M method and system for building energy consumption monitoring system Download PDFInfo
- Publication number
- CN110262412A CN110262412A CN201910437497.6A CN201910437497A CN110262412A CN 110262412 A CN110262412 A CN 110262412A CN 201910437497 A CN201910437497 A CN 201910437497A CN 110262412 A CN110262412 A CN 110262412A
- Authority
- CN
- China
- Prior art keywords
- maintenance
- equipment
- energy consumption
- repairment
- inspection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 85
- 238000005265 energy consumption Methods 0.000 title claims abstract description 70
- 238000000034 method Methods 0.000 title claims abstract description 54
- 238000012423 maintenance Methods 0.000 claims abstract description 180
- 238000012545 processing Methods 0.000 claims abstract description 35
- 238000011156 evaluation Methods 0.000 claims abstract description 29
- 230000002159 abnormal effect Effects 0.000 claims abstract description 26
- 238000007405 data analysis Methods 0.000 claims abstract description 13
- 238000003909 pattern recognition Methods 0.000 claims abstract description 9
- 238000007689 inspection Methods 0.000 claims description 72
- 238000007726 management method Methods 0.000 claims description 44
- 238000005516 engineering process Methods 0.000 claims description 8
- 238000013500 data storage Methods 0.000 claims description 7
- 238000012806 monitoring device Methods 0.000 claims description 4
- 230000005856 abnormality Effects 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 9
- 238000004458 analytical method Methods 0.000 description 6
- 238000004891 communication Methods 0.000 description 4
- 238000011282 treatment Methods 0.000 description 3
- 238000009415 formwork Methods 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 230000008520 organization Effects 0.000 description 2
- 238000013024 troubleshooting Methods 0.000 description 2
- 238000012550 audit Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000000052 comparative effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000008447 perception Effects 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/4183—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by data acquisition, e.g. workpiece identification
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/31—From computer integrated manufacturing till monitoring
- G05B2219/31457—Factory remote control, monitoring through internet
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of equipment O&M method and system for building energy consumption monitoring system, quickly identification is abnormal automatically and work order task is reported in generation for repairment by big data analysis and pattern-recognition by the present invention, abnormal site to be treated can be quickly positioned based on work order task operation maintenance personnel is reported for repairment, improves abnormality processing efficiency;Operation management personnel can also be uploaded to reporting the processing evaluation information of work order task for repairment to runing control centre, form PDCA closed loop management, overcome to exist in the prior art and artificial verify equipment fault or abnormal lead to O&M inefficiency, the online rate of monitoring building not can guarantee, and O&M relies on paper form, the technical issues of being easily lost improves the O&M efficiency to building energy consumption monitoring system, guarantees the online rate of monitoring building.
Description
Technical field
It is especially a kind of to monitor the equipment O&M method of system for building energy consumption and be the present invention relates to O&M field
System.
Background technique
Up to now, government offices, China office building and the construction demonstration of large public building energy-consumption monitoring system have been covered
National 33 provinces (autonomous region, municipality directly under the Central Government, cities specifically designated in the state plan) are covered.The operation and maintenance of energy consumption monitoring equipment mainly include day
Often inspection, troublshooting and processing, live inspection, big number is checked and corrective maintenance.But each City-level in the investigation discovery whole nation is public
The generally existing reconstruction of building energy consumption monitoring system sets, gently runs, tuple amount, lightweight, weight official use, light civilian phenomenon, system
Equipment operation maintenance relies on boostrap under type using traditional merely, and it is as follows that there are main problems:
1, equipment go offline by it is artificial periodically/irregularly verify, equipment fault can not real-time perception, lead to O&M low efficiency
Under;
2, maintenance work is easily lost mainly by paper form and makes a report on lack of standardization, the retrospect of shortage whole process and evaluation machine
System;
3, the monitoring online rate of building is relatively low and unstable, and the quality of data is difficult to guarantee, and whole O&M effect is difficult to comprehensively objective
Quantizing examination.
Summary of the invention
The present invention is directed to solve at least some of the technical problems in related technologies.For this purpose, of the invention
One purpose is to provide a kind of equipment O&M method and system for building energy consumption monitoring system, improves O&M efficiency, guarantees
Monitor the online rate of building.
The technical scheme adopted by the invention is that:
In a first aspect, the present invention provides a kind of equipment operational system for building energy consumption monitoring system, including operation control
Center, region operation system, data storage analytical database and field monitoring equipment processed, the field monitoring equipment is for acquiring
The energy consumption data of building, the field monitoring equipment are connect by technology of Internet of things with the region operation system, the region
Operation system is connect with the operation control centre, and the operation control centre connect with data storage analytical database;
The equipment operational system is for executing following methods:
The operation control centre carries out big data analysis according to the energy consumption data of the building and pattern-recognition is known automatically
Work order task is reported in abnormal and generation for repairment, and the work order task of reporting for repairment includes exception information and abnormal scene;
The operation maintenance personnel of the region operation system reports work order task for repairment described in receiving;
Work order task is reported for repairment described in the operation maintenance personnel processing and processing is reported to complete information to the operation control centre;
The operation management personnel that the operation control centre receives the region operation system is appointed for the work order of reporting for repairment
The processing evaluation information of business.
Further, the field monitoring equipment includes energy consumption data acquisition device and environment data acquisition device.
Further, the field monitoring device configuration has two dimensional code, and the information that the two dimensional code carries includes implementor name
Title, specifications and models, brand name, manufacturer, comes into operation the time and place is built in specific infield at device numbering
It is at least one.
Further, the operation control centre is also used to be counted more than the buildings of preset times to reporting number for repairment.
Further, the equipment operational system is also used to execute following methods:
The operation control centre appoints according to default equipment routing inspection template and default patrol plan timing push inspection work order
Business, the patrol worker single task includes inspection device information and inspection location information;
The operation maintenance personnel receives the patrol worker single task, and progress APP, which takes pictures to register, behind arrival inspection place uploads label
To picture to the operation control centre;
The operation maintenance personnel carries out uploading recording table for check after equipment routing inspection, the recording table for check include monitoring time,
At least one of inspection device, operation maintenance personnel, inspection place;
The operation control centre receives the operation management personnel for the inspection evaluation letter of the patrol worker single task
Breath.
Further, the equipment operational system is also used to execute following methods:
The operation control centre appoints according to default corrective maintenance template and default maintenance project timing push maintenance work order
Business, maintenance worker's single task include maintenance facility information and maintenance location information;
The operation maintenance personnel receives maintenance worker's single task, and progress APP, which takes pictures to register, behind arrival maintenance place uploads label
To picture to the operation control centre;
The operation maintenance personnel carries out uploading emm message table after corrective maintenance, the emm message table include service time,
At least one of maintenance facility, operation maintenance personnel, maintenance place;
The operation control centre receives the operation management personnel for the maintenance evaluation letter of maintenance worker's single task
Breath.
Second aspect, the present invention provide a kind of equipment O&M method for building energy consumption monitoring system, comprising:
Utilize the energy consumption data of technology of Internet of things acquisition building;
Big data analysis is carried out according to the energy consumption data of the building and pattern-recognition automatic identification is abnormal and generation is reported for repairment
Work order task, the work order task of reporting for repairment includes exception information and abnormal scene;
Operation maintenance personnel reports work order task for repairment described in receiving;
Work order task is reported for repairment described in the operation maintenance personnel processing and processing is reported to complete information;
Operation management personnel is received for the processing evaluation information for reporting work order task for repairment.
Further, the equipment O&M method further include:
It is counted to building of the number more than preset times is reported for repairment.
Further, the equipment O&M method further include:
According to default equipment routing inspection template and default patrol plan timing push patrol worker single task, the inspection work order is appointed
Business includes inspection device information and inspection location information;
The operation maintenance personnel receives the patrol worker single task, and progress APP, which takes pictures to register, behind arrival inspection place uploads label
To picture;
The operation maintenance personnel carries out uploading recording table for check after equipment routing inspection, the recording table for check include monitoring time,
At least one of inspection device, operation maintenance personnel, inspection place;
Receive the inspection evaluation information that the operation management personnel is directed to the patrol worker single task.
Further, the equipment O&M method further include:
According to default corrective maintenance template and default maintenance project timing push maintenance worker's single task, the maintenance work order is appointed
Business includes maintenance facility information and maintenance location information;
The operation maintenance personnel receives maintenance worker's single task, and progress APP, which takes pictures to register, behind arrival maintenance place uploads label
To picture;
The operation maintenance personnel carries out uploading emm message table after corrective maintenance, the emm message table include service time,
At least one of maintenance facility, operation maintenance personnel, maintenance place;
Receive the maintenance evaluation information that the operation management personnel is directed to maintenance worker's single task.
The beneficial effects of the present invention are:
Quickly identification is abnormal automatically and work order task is reported in generation for repairment by big data analysis and pattern-recognition by the present invention, is based on
Abnormal site to be treated can quickly be positioned by reporting work order task operation maintenance personnel for repairment, improve abnormality processing efficiency;O&M
Administrative staff can also upload to the processing evaluation information for reporting work order task for repairment to control centre is runed, and form PDCA closed loop management,
Overcome and artificial verification equipment fault exists in the prior art or leads to O&M inefficiency extremely, the online rate for monitoring building can not
Guarantee, and O&M relies on paper form, the technical issues of being easily lost, improve the O&M efficiency to building energy consumption monitoring system,
Guarantee the online rate of monitoring building.
Detailed description of the invention
Fig. 1 is the structural representation in the present invention for a kind of embodiment of the equipment operational system of building energy consumption monitoring system
Figure;
Fig. 2 is the region operation system and operation control in the present invention for the equipment operational system of building energy consumption monitoring system
A kind of functional structure chart of the embodiment at center processed;
Fig. 3 is the operation control centre and region fortune in the present invention for the equipment operational system of building energy consumption monitoring system
A kind of organization chart of embodiment of battalion's system;
Fig. 4 is a kind of reality in the present invention for the maintenance standard process of the equipment operational system of building energy consumption monitoring system
Apply the flow diagram of example;
Fig. 5 is a kind of reality in the present invention for the inspection normal process of the equipment operational system of building energy consumption monitoring system
Apply the flow diagram of example;
Fig. 6 is a kind of reality in the present invention for the maintenance standard process of the equipment operational system of building energy consumption monitoring system
Apply the flow diagram of example;
Fig. 7 is to report the one of number for repairment for statistics building in the equipment operational system of building energy consumption monitoring system in the present invention
The bar shaped statistical chart of kind embodiment;
Fig. 8 is the process signal in the present invention for a kind of embodiment of the equipment O&M method of building energy consumption monitoring system
Figure.
Specific embodiment
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase
Mutually combination.
Embodiment 1
With reference to a kind of embodiment that Fig. 1, Fig. 1 are in the present invention for the equipment operational system of building energy consumption monitoring system
Structural schematic diagram;Equipment operational system for building energy consumption monitoring system includes field monitoring equipment, region operation system, fortune
It seeks control centre and data stores analytical database, field monitoring equipment is used to acquire the energy consumption data of building, building energy consumption prison
Examining system is existing system, and building energy consumption monitoring system includes field monitoring equipment, and field monitoring equipment passes through Internet of Things skill
Art is connect with region operation system, and region operation system is connect with operation control centre, operation control centre and data storage point
Database connection is analysed, the data of field monitoring equipment acquisition are stored in data storage analytical database;Wherein, in the present embodiment
Equipment operational system can be used for managing the equipment maintenance works of multiple regions, each region setting is both provided with corresponding area
Domain operation system and field monitoring equipment, region operation system are controlled by operation control centre to complete the building energy consumption of one's respective area
The maintenance work of monitoring system.For example, operation control centre is arranged in general headquarters, such as Beijing, and region operation system is arranged each
It saves, such as Guangdong Province, Hunan Province and Henan Province;It is also possible to run control centre's setting in provincial capital, and region operation is
System is arranged in prefecture-level city.
Referring next to the region operation that Fig. 2, Fig. 2 are in the present invention for the equipment operational system of building energy consumption monitoring system
The functional structure chart of system and a kind of embodiment of operation control centre;Running on region operation system and operation control centre has
System software, the main functional modules of system software include operation homepage module, troublshooting module, inspection management module, big
Number checks module, data analysis module, user management module and assets management module.Wherein inspection management module includes inspection mark
Quasi-mode block, patrol worker single module, inspection formwork module;It includes that big number checks standard module, big number checks work that big number, which checks module,
Single module, big number check formwork module;Data analysis module includes failure analysis module, inspection analysis module, big number check point
Analyse module;User management module includes user list module, role management module and authority management module;Assets management module packet
Include device management module and inventory management module.System software includes the end H5 (page end) and the end App.It is this with reference to Fig. 3, Fig. 3
A kind of reality in invention for the operation control centre and region operation system of the equipment operational system of building energy consumption monitoring system
Apply the organization chart of example;The function of operation control centre includes runing the general headquarters operation personnel formulation O&M standard of control centre
System and daily operation management, industry specialists remote assistance, operation general manager to each region maintenance work overall situation control,
O&M cost, amount of energy saving accounting etc.;And the Organizational structure installation of region operation system has and executes system under O&M project manager and line
System, the major responsibility of O&M project manager include region operation personnel management, the scheduling of local projects maintenance work, to items
The emergency resources of mesh emergency event are deployed and the remote assistance of difficult and complicated cases, personnel are arranged an order according to class and grade and performance appraisal, to local items
Mesh maintenance work overall situation control, O&M cost, income analysis etc.;Finally, executing system under line is provided with O&M teams and groups group
Long and operation maintenance personnel, responsibility include carried out according to general headquarters and region specified value specification daily O&M operation, asset of equipments and
Operational safety guarantee management etc..Region operation system is provided with operation management personnel and operation maintenance personnel, such as O&M project manager and
The a length of operation management personnel of O&M teams and groups group.Run the staff of control centre, O&M project manager, O&M teams and groups group leader and
Operation maintenance personnel is run on intelligent terminal (such as computer or mobile phone) and operating system software is to realize above-mentioned function and responsibility,
Only the permission of their system software is different.It may be said that operation control centre includes the operation end of general headquarters operation personnel
The operator terminal at end and operation general manager, region operation system includes the operator terminal of O&M project manager, O&M teams and groups group leader
Operator terminal and operation maintenance personnel operator terminal, the work such as operation maintenance personnel is responsible for repairing, report for repairment, inspection, above-mentioned operator terminal
Permission for the intelligent terminals such as mobile phone and computer, the system software of the operator terminal of different personnel is different.
Equipment operational system for building energy consumption monitoring system takes the mode that O&M executes under scheduling supervision, line on line
To realize one-stop O&M trusteeship service.In the present embodiment, equipment operational system also provides a kind of equipment O&M normal process, if
It includes maintenance standard process, maintenance standard process, inspection normal process, alarm criteria process etc. that received shipment, which ties up normal process,.Equipment
Operational system carries out equipment O&M according to equipment O&M normal process.Wherein, maintenance standard process includes:
The energy consumption data for the building that operation control centre acquires according to field monitoring equipment carries out big data analysis and mode
Identification, abnormal with automatic identification and generate and report work order task for repairment, reporting work order task for repairment includes exception information and abnormal scene,
Operation control centre reports work order task for repairment by system software announcement;
The operation maintenance personnel of region operation system reports work order task for repairment using operator terminal and system software reception;
Processing is reported to complete letter after work order task is reported in operation maintenance personnel processing for repairment and using operator terminal and system software
Breath extremely operation control centre;
The operation management personnel of region operation system uploads to be directed to using operator terminal and system software reports work order task for repairment
Processing evaluation information to runing control centre;
The operation management personnel of operation control centre receiving area operation system is directed to the processing evaluation for reporting work order task for repairment
Information is to realize subsequent personnel performance's assessment mode.
Quickly identification is abnormal automatically and work order task is reported in generation for repairment by big data analysis and pattern-recognition by the present invention, is based on
Abnormal site to be treated can quickly be positioned by reporting work order task operation maintenance personnel for repairment, improve abnormality processing efficiency, be promoted
Maintenance work efficiency and monitoring system operation and maintenance informationization and intelligent level;Operation management personnel can also be uploaded to reporting work for repairment
The processing evaluation information of single task forms PDCA closed loop management, overcomes and artificial nucleus exist in the prior art to control centre is runed
Looking into equipment fault or exception leads to O&M inefficiency, and the online rate for monitoring building not can guarantee, and O&M relies on paper form,
The technical issues of being easily lost improves the O&M efficiency to building energy consumption monitoring system, guarantees the online rate and number of monitoring building
According to accuracy rate.
In the present embodiment, field monitoring equipment includes that energy consumption data acquisition device, environment data acquisition device and data are adopted
Storage and (wired or wireless) network communication device.Energy consumption data acquisition device includes but is not limited to control cabinet and metering device,
Metering device includes electric energy meter, water meter and cold (heat) scale;Environment data acquisition device includes but is not limited to Temperature Humidity Sensor
With CO2 sensor.Each field monitoring equipment is also configured with two dimensional code, and the information that two dimensional code carries includes device name, equipment
Number, specifications and models, brand name, manufacturer, come into operation the time and place build in specific infield at least one
Kind, in the present embodiment, above-mentioned all information is carried in two dimensional code.Region operation system passes through device management module and scene
Monitoring device carries out information exchange and communication (utilizing technology of Internet of things, i.e. configuration two dimensional code and network communication), and runs control
Center is connect with region operation system, then runs the available information carried to two dimensional code of control centre, then report work order for repairment and appoint
The content of business includes the information that two dimensional code carries, i.e., abnormal scene is obtained by the information that two dimensional code carries, live fortune
Dimension personnel can quickly identify, position the field monitoring equipment reported for repairment and needed repairing in work order task.And data storage analysis data
Library can be the one or two of public Cloud Server or local server.
Further, reporting work order task for repairment includes exception information and abnormal scene, wherein exception information includes equipment
Exception information and energy consumption exception information, device exception information include the information of warping apparatus, two configured according to warping apparatus
Dimension code is known that warping apparatus site, namely abnormal scene;And energy consumption exception information includes causing energy consumption abnormal
Warping apparatus information, according to field monitoring equipment acquire data can analyze to obtain the warping apparatus for causing energy consumption exception
Information warping apparatus site is similarly known that according to the two dimensional code that warping apparatus is configured, namely abnormal spot
Point.Referring to figure 3. and Fig. 4, Fig. 4 are the maintenance standard stream for monitoring the equipment operational system of system in the present invention for building energy consumption
A kind of flow diagram of embodiment of journey;The formation for reporting work order task for repairment has system automatic identification and artificially two kinds of ways of discovery
Diameter, wherein the first forming feature, operation control centre are based on the technical treatments field monitorings such as pattern-recognition and big data analysis
The acquisition data of equipment are with the failures such as automatic identification equipment or energy consumption exception, such as mutual inductor damage, electric energy meter current reverse phase, electric energy
Table voltage phase shortage, electric energy meter damage, cold meter damage, the damage of network communication failure, collector and system data are not parsed, are parsed
Data exception etc., operation control centre are automatic in the form of reporting work order task for repairment 4G/GPRS mobile network after registering automatically
It is pushed to the mobile phone A pp terminal of corresponding region field service personnel.Second of forming feature, patrol officer is (i.e. on line and under line
Report personnel for repairment) find the problem after, as electric energy meter address typing mistake, branch no-load voltage ratio typing mistake, subitem expression formula configuration error,
Mutual inductor is mounted on frequency converter leading-out terminal, single-phase electric meter voltage and current is derived from that not isopen, transformer monitoring be complete, emergency bypass
Electric energy meter etc. is not installed, is manually pushed from system page end or mobile phone APP terminal by 4G/GPRS mobile network and reports work for repairment
Single task, system page end or mobile phone APP terminal will report work order task for repairment and be uploaded to operation control centre, and operation control centre is again
Issue report for repairment work order task to corresponding region field service personnel's (i.e. operation maintenance personnel) mobile phone APP terminal;Live O&M people
Member can active competition for orders acquisition report work order task for repairment, can also be by after O&M teams and groups group leader 15 minutes or by O&M project manager 30 minutes
Afterwards worksheet processing and passively obtain work order task;Receiving reports the operation maintenance personnel of work order task for repairment before the deadline, as reached in 4h
Live simultaneously processing equipment or the energy consumption exception of registering of being taken pictures using APP, and disposition is made a report on and the information that completes in mobile phone A pp terminal
(i.e. information is completed in processing, processing complete information include take pictures the remark information for staying the picture of card, remarks to repair and typing this
The consumable information etc. of secondary maintenance).If abnormal conditions handle quantity or different time normal abnormal conditions processing technique difficulty beyond scene
The tolerance range of O&M people can apply for that subdispatch calls other area peoples to repair or technical support;Report personnel, fortune for repairment
Dimension teams and groups group leader or O&M project manager receive completion information after within defined time such as 4h, can by phone, wechat,
The end App handles quality to this reporting work order task for repairment of the task and customer satisfaction situation is tracked and evaluated, and forms PDCA
Closed loop is managed, to ensure that the efficient execution of maintenance work, to work order task is not reported for repairment by service evaluation, is returned original
Operation maintenance personnel rebuild.Wherein, need O&M project manager confirm repair after the completion of just can Push Service evaluate to report
Personnel are repaired, when O&M project manager not can confirm that maintenance is completed, can confirm that maintenance is by call-on back by phone maintenance personal
No completion, O&M project manager confirms that maintenance is completed then system software meeting Push Service and evaluated to the personnel of reporting for repairment, so as to report people for repairment
Member reports work order task for repairment to this and makes an appraisal.
It further, is patrolling for the equipment operational system of building energy consumption monitoring system in the present invention with reference to Fig. 5, Fig. 5
Examine a kind of flow diagram of embodiment of normal process;Inspection normal process includes:
The staff of operation control centre pre-establishes inspection standard, including default equipment routing inspection template and default inspection
Plan;Operation control centre generates according to default equipment routing inspection template and default patrol plan self-timing and pushes inspection work order
Task, patrol worker single task include inspection device information and inspection location information;
Operation maintenance personnel receives patrol worker single task using operator terminal, reaches and carries out APP behind the scene of inspection place and take pictures label
Picture is registered to runing control centre to upload;Wherein, operation maintenance personnel can obtain patrol worker by the autonomous competition for orders of system software
Single task can also passively receive patrol worker single task by O&M teams and groups group leader or O&M project manager worksheet processing;
Then operation maintenance personnel uploads recording table for check after carrying out equipment routing inspection in system software, and so far, inspection completion is patrolled
Examining record sheet includes at least one of monitoring time, inspection device, operation maintenance personnel, inspection place;In the present embodiment, inspection note
Record table includes above all of information;
Operation management personnel is evaluated by treatment process of the system software to this patrol worker single task, i.e. inspection is commented
Valence information;
It is subsequent to realize for the inspection evaluation information of patrol worker single task to run control centre's reception operation management personnel
Performance assessment job.
Wherein, it during carrying out equipment routing inspection, if it find that equipment breaks down, can be reported for repairment manually by above-mentioned
Process carry out manually push report work order task for repairment.
Further, with reference to the guarantor that Fig. 6, Fig. 6 are in the present invention for the equipment operational system of building energy consumption monitoring system
Support a kind of flow diagram of embodiment of normal process;Maintenance standard process includes:
The staff of operation control centre pre-establishes maintenance standard, including default corrective maintenance template and default maintenance
Plan;Operation control centre, which generates according to default corrective maintenance template and the timing of default maintenance project and pushes maintenance work order, to appoint
Business, maintenance worker's single task include maintenance facility information and maintenance location information;
Operation maintenance personnel receives maintenance worker's single task using operator terminal, reaches and carries out APP behind the scene of maintenance place and take pictures label
Picture is registered to runing control centre to upload;Wherein, operation maintenance personnel can obtain maintenance worker by the autonomous competition for orders of system software
Single task can also passively receive maintenance worker's single task by O&M teams and groups group leader or O&M project manager worksheet processing;
Then operation maintenance personnel uploads emm message table after carrying out corrective maintenance in system software, and emm message table includes protecting
Support at least one of time, maintenance facility, operation maintenance personnel, maintenance place;In the present embodiment, emm message table includes the above institute
Some information;
Operation management personnel carries out audit evaluation by treatment process of the system software to this maintenance worker's single task, that is, protects
Support evaluation information;
It is subsequent to realize for the maintenance evaluation information of maintenance worker's single task to run control centre's reception operation management personnel
Performance assessment job.
Further, operation control centre is also used to through failure analysis module be more than that preset times are built to number is reported for repairment
Build and counted, for answer during equipment operation maintenance emphasis carry out troubleshooting and corrective maintenance building decision provide according to
According to.In the present embodiment, preset times are 3 times, are the equipment fortune in the present invention for building energy consumption monitoring system with reference to Fig. 7, Fig. 7
The bar shaped statistical chart that statistics building in system reports a kind of embodiment of number for repairment is maintained, is carried out to the building that number is more than 3 times is reported for repairment
After statistics, available different buildings report number statistical conditions schematic diagram for repairment, wherein office building 1 reports number for repairment most
It is more, the building that emphasis carries out troubleshooting and corrective maintenance can be set to.
The present embodiment is by merging the technologies such as Internet of Things (IoT), big data analysis and mobile Internet, realization pair
The equipment maintenance work of building energy consumption monitoring system is controlled, and not only may be implemented to judge abnormal automatic identification, but also
Make live operation maintenance personnel that can quickly identify, position and repair using two dimensional code, maintain field monitoring equipment, O&M project manager
Or the personnel of reporting for repairment can form PDCA and close by the way that task processing quality and customer satisfaction situation are tracked and evaluated on line
Endless tube reason, promotes O&M efficiency, and with reference to the following table 1, single failure is reported for repairment reduces 30.4% with the processing time on year-on-year basis;It can realize simultaneously
To the process standards management such as maintenance, maintenance, inspection and alarm, O&M efficiency can further be promoted by standardizing process, be guaranteed
The online rate of system monitoring building and big number check accuracy rate, reference table 1, and the equipment operational system of the present embodiment makes monitoring
The online rate of building and big number check accuracy rate and increase by 4.7% and 4.3% respectively on year-on-year basis, monitor the efficiency and matter of maintenance work
Amount, monitoring system operation and maintenance informationization and intelligent level are obviously improved.
Table 1 2017 years, monitoring architectural traditions in 2018 and novel operation and maintenance mode comparative situation summary sheet
Embodiment 2
Embodiment 2 is provided based on embodiment 1, embodiment 2 provides a kind of equipment O&M for building energy consumption monitoring system
Method is the stream in the present invention for a kind of embodiment of the equipment O&M method of building energy consumption monitoring system with reference to Fig. 8, Fig. 8
Journey schematic diagram, the equipment O&M method for building energy consumption monitoring system include:
Utilize the energy consumption data of technology of Internet of things acquisition building;
Big data analysis is carried out according to the energy consumption data of building and pattern-recognition automatic identification is abnormal and work order is reported in generation for repairment
Task, reporting work order task for repairment includes exception information and abnormal scene;
Work order task is reported in operation maintenance personnel reception for repairment;
Operation maintenance personnel processing reports work order task for repairment and processing is reported to complete information;
Operation management personnel is uploaded for the processing evaluation information for reporting work order task for repairment;
It receives operation management personnel and is directed to the processing evaluation information for reporting work order task for repairment to realize subsequent personnel performance's examination
Work.
Further, equipment O&M method further include:
According to default equipment routing inspection template and default patrol plan timing push patrol worker single task, patrol worker single task packet
Include inspection device information and inspection place;
Operation maintenance personnel receives patrol worker single task, reaches and carries out take pictures upload of registering of APP behind inspection place and register picture;
Operation maintenance personnel uploads recording table for check after carrying out equipment routing inspection, recording table for check include monitoring time, inspection device,
At least one of operation maintenance personnel, inspection place;
Operation management personnel uploads the inspection evaluation information for being directed to patrol worker single task;
Operation management personnel is received for the inspection evaluation information of patrol worker single task to realize subsequent performance assessment job.
Further, equipment O&M method further include:
According to default corrective maintenance template and default maintenance project timing push maintenance worker's single task, maintenance worker's single task packet
Include maintenance facility information and maintenance place;
Operation maintenance personnel receives maintenance worker's single task, reaches and carries out take pictures upload of registering of APP behind maintenance place and register picture;
Operation maintenance personnel carry out corrective maintenance after upload emm message table, emm message table include service time, maintenance facility,
At least one of operation maintenance personnel, maintenance place;
Operation management personnel uploads the inspection evaluation information for being directed to maintenance worker's single task;
Operation management personnel is received for the maintenance evaluation information of maintenance worker's single task to realize subsequent performance assessment job.
Finally, equipment O&M method further include:
It is counted to building of the number more than preset times is reported for repairment.
The specific descriptions of equipment O&M method for building energy consumption monitoring system are no longer gone to live in the household of one's in-laws on getting married referring to the description of embodiment 1
It states.
It is to be illustrated to preferable implementation of the invention, but the invention is not limited to the implementation above
Example, those skilled in the art can also make various equivalent variations on the premise of without prejudice to spirit of the invention or replace
It changes, these equivalent deformations or replacement are all included in the scope defined by the claims of the present application.
Claims (10)
1. a kind of equipment operational system for building energy consumption monitoring system, which is characterized in that including runing control centre, region
Operation system, data storage analytical database and field monitoring equipment, the field monitoring equipment are used to acquire the energy consumption of building
Data, the field monitoring equipment are connect by technology of Internet of things with the region operation system, the region operation system and
The operation control centre connection, the operation control centre connect with data storage analytical database;The equipment fortune
System is maintained for executing following methods:
The operation control centre carries out big data analysis according to the energy consumption data of the building and pattern-recognition automatic identification is different
Often and work order task of reporting for repairment is generated, the work order task of reporting for repairment includes exception information and abnormal scene;
The operation maintenance personnel of the region operation system reports work order task for repairment described in receiving;
Work order task is reported for repairment described in the operation maintenance personnel processing and processing is reported to complete information to the operation control centre;
The operation management personnel that the operation control centre receives the region operation system reports work order task for repairment for described
Handle evaluation information.
2. the equipment operational system according to claim 1 for building energy consumption monitoring system, which is characterized in that described existing
Field monitoring device includes energy consumption data acquisition device and environment data acquisition device.
3. the equipment operational system according to claim 1 for building energy consumption monitoring system, which is characterized in that described existing
Field monitoring device is configured with two dimensional code, and the information that the two dimensional code carries includes device name, device numbering, specifications and models, product
Board title, manufacturer come into operation at least one of time and place specific infield of building.
4. the equipment operational system according to claim 1 for building energy consumption monitoring system, which is characterized in that the fortune
Control centre, battalion is also used to be counted more than the buildings of preset times to reporting number for repairment.
5. the equipment operational system according to any one of claims 1 to 4 for building energy consumption monitoring system, feature exist
In the equipment operational system is also used to execute following methods:
The operation control centre is according to default equipment routing inspection template and default patrol plan timing push patrol worker single task, institute
Stating patrol worker single task includes inspection device information and inspection location information;
The operation maintenance personnel receives the patrol worker single task, reaches and carries out take pictures upload of registering of APP behind inspection place and register figure
Piece is to the operation control centre;
The operation maintenance personnel uploads recording table for check after carrying out equipment routing inspection, and the recording table for check includes monitoring time, inspection
At least one of equipment, operation maintenance personnel, inspection place;
The operation control centre receives the inspection evaluation information that the operation management personnel is directed to the patrol worker single task.
6. the equipment operational system according to any one of claims 1 to 4 for building energy consumption monitoring system, feature exist
In the equipment operational system is also used to execute following methods:
The operation control centre is according to default corrective maintenance template and default maintenance project timing push maintenance worker's single task, institute
Stating maintenance worker's single task includes maintenance facility information and maintenance location information;
The operation maintenance personnel receives maintenance worker's single task, reaches and carries out take pictures upload of registering of APP behind maintenance place and register figure
Piece is to the operation control centre;
The operation maintenance personnel uploads emm message table after carrying out corrective maintenance, and the emm message table includes service time, maintenance
At least one of equipment, operation maintenance personnel, maintenance place;
The operation control centre receives the maintenance evaluation information that the operation management personnel is directed to maintenance worker's single task.
7. a kind of equipment O&M method for building energy consumption monitoring system characterized by comprising
Utilize the energy consumption data of technology of Internet of things acquisition building;
Big data analysis is carried out according to the energy consumption data of the building and pattern-recognition automatic identification is abnormal and work order is reported in generation for repairment
Task, the work order task of reporting for repairment includes exception information and abnormal scene;
Operation maintenance personnel reports work order task for repairment described in receiving;
Work order task is reported for repairment described in the operation maintenance personnel processing and processing is reported to complete information;
Operation management personnel is received for the processing evaluation information for reporting work order task for repairment.
8. the equipment O&M method according to claim 7 for building energy consumption monitoring system, which is characterized in that described to set
Received shipment ties up method further include:
It is counted to building of the number more than preset times is reported for repairment.
9. the equipment O&M method according to claim 7 or 8 for building energy consumption monitoring system, which is characterized in that institute
State equipment O&M method further include:
According to default equipment routing inspection template and default patrol plan timing push patrol worker single task, the patrol worker single task packet
Include inspection device information and inspection location information;
The operation maintenance personnel receives the patrol worker single task, reaches and carries out take pictures upload of registering of APP behind inspection place and register figure
Piece;
The operation maintenance personnel uploads recording table for check after carrying out equipment routing inspection, and the recording table for check includes monitoring time, inspection
At least one of equipment, operation maintenance personnel, inspection place;
Receive the inspection evaluation information that the operation management personnel is directed to the patrol worker single task.
10. the equipment O&M method according to claim 7 or 8 for building energy consumption monitoring system, which is characterized in that institute
State equipment O&M method further include:
According to default corrective maintenance template and default maintenance project timing push maintenance worker's single task, maintenance worker's single task packet
Include maintenance facility information and maintenance location information;
The operation maintenance personnel receives maintenance worker's single task, reaches and carries out take pictures upload of registering of APP behind maintenance place and register figure
Piece;
The operation maintenance personnel uploads emm message table after carrying out corrective maintenance, and the emm message table includes service time, maintenance
At least one of equipment, operation maintenance personnel, maintenance place;
Receive the maintenance evaluation information that the operation management personnel is directed to maintenance worker's single task.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910437497.6A CN110262412A (en) | 2019-05-24 | 2019-05-24 | A kind of equipment O&M method and system for building energy consumption monitoring system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910437497.6A CN110262412A (en) | 2019-05-24 | 2019-05-24 | A kind of equipment O&M method and system for building energy consumption monitoring system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110262412A true CN110262412A (en) | 2019-09-20 |
Family
ID=67915282
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910437497.6A Pending CN110262412A (en) | 2019-05-24 | 2019-05-24 | A kind of equipment O&M method and system for building energy consumption monitoring system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110262412A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111445073A (en) * | 2020-03-26 | 2020-07-24 | 珠海格力电器股份有限公司 | Equipment operation and maintenance management method and device, storage medium and terminal |
CN114356913A (en) * | 2021-12-15 | 2022-04-15 | 联奕科技股份有限公司 | Micro-service link operation and maintenance system and method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20180182179A1 (en) * | 2016-12-22 | 2018-06-28 | Infostandard Sdn. Bhd. | Comprehensive system and method for real-time monitoring and management of security patrolling operations |
CN108649703A (en) * | 2018-07-12 | 2018-10-12 | 贵州电网有限责任公司 | One kind is based on big data distribution O&M and breakdown repair system and operation method |
CN109086895A (en) * | 2018-07-06 | 2018-12-25 | 山东中瑞新能源科技有限公司 | A kind of operation management system and method for heating ventilation air-conditioning system |
CN109242276A (en) * | 2018-08-21 | 2019-01-18 | 国网江苏省电力有限公司泰州供电分公司 | Logistics equipment malfunction monitoring operation management system |
CN109447290A (en) * | 2018-11-21 | 2019-03-08 | 国网浙江电动汽车服务有限公司 | A kind of charging station intelligent fault O&M method |
CN109709940A (en) * | 2019-01-22 | 2019-05-03 | 浙江魔云物联科技有限公司 | A kind of real-time O&M resource sharing system and its O&M method based on Internet of Things |
-
2019
- 2019-05-24 CN CN201910437497.6A patent/CN110262412A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20180182179A1 (en) * | 2016-12-22 | 2018-06-28 | Infostandard Sdn. Bhd. | Comprehensive system and method for real-time monitoring and management of security patrolling operations |
CN109086895A (en) * | 2018-07-06 | 2018-12-25 | 山东中瑞新能源科技有限公司 | A kind of operation management system and method for heating ventilation air-conditioning system |
CN108649703A (en) * | 2018-07-12 | 2018-10-12 | 贵州电网有限责任公司 | One kind is based on big data distribution O&M and breakdown repair system and operation method |
CN109242276A (en) * | 2018-08-21 | 2019-01-18 | 国网江苏省电力有限公司泰州供电分公司 | Logistics equipment malfunction monitoring operation management system |
CN109447290A (en) * | 2018-11-21 | 2019-03-08 | 国网浙江电动汽车服务有限公司 | A kind of charging station intelligent fault O&M method |
CN109709940A (en) * | 2019-01-22 | 2019-05-03 | 浙江魔云物联科技有限公司 | A kind of real-time O&M resource sharing system and its O&M method based on Internet of Things |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111445073A (en) * | 2020-03-26 | 2020-07-24 | 珠海格力电器股份有限公司 | Equipment operation and maintenance management method and device, storage medium and terminal |
CN111445073B (en) * | 2020-03-26 | 2022-05-17 | 珠海格力电器股份有限公司 | Equipment operation and maintenance management method and device, storage medium and terminal |
CN114356913A (en) * | 2021-12-15 | 2022-04-15 | 联奕科技股份有限公司 | Micro-service link operation and maintenance system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206921161U (en) | It is a kind of to include inspection management and defect processing and the intelligent inspection system of examination | |
CN110276530A (en) | A kind of intelligent engineering operation and maintenance supervising method | |
CN104361445B (en) | Labour's real-time management system and management method | |
CN103325153B (en) | A kind of method for inspecting and cruising inspection system | |
CN201131037Y (en) | Management system for polling base station | |
CN105825337A (en) | Intelligent inspection system for 500KV substation communication device | |
CN108010155A (en) | A kind of safety inspection and the system and method for hidden danger management | |
CN111639885A (en) | Agricultural sewage management system and management method | |
CN108492034B (en) | Oil field oil recovery production management system | |
CN106251033A (en) | A kind of intelligent substation operation management system | |
CN109784788A (en) | A kind of intelligent comprehensive patrol checking server, terminal and system | |
CN110400040A (en) | A kind of quick transmission system of management and running information based on mobile Internet | |
CN113283683A (en) | Post qualification management method and system | |
CN108206586A (en) | A kind of power circuit intelligence O&M examination and repair system | |
CN111612646A (en) | Networked intelligent secondary operation and maintenance system | |
CN107730647A (en) | A kind of smart mobile phone cruising inspection system and its method for inspecting based on SCADA | |
CN107798489A (en) | A kind of electric network operation site safety management method based on wechat platform | |
CN106384312A (en) | Tour group service management platform | |
CN109447286A (en) | A kind of power transformation O&M Intelligent mobile job platform based on Internet of Things | |
CN110262412A (en) | A kind of equipment O&M method and system for building energy consumption monitoring system | |
CN102566531A (en) | Monitoring and early warning system for service life of equipment | |
CN104331766A (en) | Automatic health management based integrated service system | |
CN107295311A (en) | The operation management system of video monitoring platform | |
CN109064140A (en) | Internet of things equipment operation management system | |
CN106780153A (en) | It is a kind of in real time multi-functional back brake, patrol and examine operation note system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190920 |