CN110262412A - A kind of equipment O&M method and system for building energy consumption monitoring system - Google Patents

A kind of equipment O&M method and system for building energy consumption monitoring system Download PDF

Info

Publication number
CN110262412A
CN110262412A CN201910437497.6A CN201910437497A CN110262412A CN 110262412 A CN110262412 A CN 110262412A CN 201910437497 A CN201910437497 A CN 201910437497A CN 110262412 A CN110262412 A CN 110262412A
Authority
CN
China
Prior art keywords
maintenance
equipment
energy consumption
repairment
inspection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910437497.6A
Other languages
Chinese (zh)
Inventor
唐振忠
何影
易检长
欧阳前武
任中俊
张文统
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN SECOM TECHNOLOGY COLTD
Original Assignee
SHENZHEN SECOM TECHNOLOGY COLTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN SECOM TECHNOLOGY COLTD filed Critical SHENZHEN SECOM TECHNOLOGY COLTD
Priority to CN201910437497.6A priority Critical patent/CN110262412A/en
Publication of CN110262412A publication Critical patent/CN110262412A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/4183Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by data acquisition, e.g. workpiece identification
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/31From computer integrated manufacturing till monitoring
    • G05B2219/31457Factory remote control, monitoring through internet

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of equipment O&M method and system for building energy consumption monitoring system, quickly identification is abnormal automatically and work order task is reported in generation for repairment by big data analysis and pattern-recognition by the present invention, abnormal site to be treated can be quickly positioned based on work order task operation maintenance personnel is reported for repairment, improves abnormality processing efficiency;Operation management personnel can also be uploaded to reporting the processing evaluation information of work order task for repairment to runing control centre, form PDCA closed loop management, overcome to exist in the prior art and artificial verify equipment fault or abnormal lead to O&M inefficiency, the online rate of monitoring building not can guarantee, and O&M relies on paper form, the technical issues of being easily lost improves the O&M efficiency to building energy consumption monitoring system, guarantees the online rate of monitoring building.

Description

A kind of equipment O&M method and system for building energy consumption monitoring system
Technical field
It is especially a kind of to monitor the equipment O&M method of system for building energy consumption and be the present invention relates to O&M field System.
Background technique
Up to now, government offices, China office building and the construction demonstration of large public building energy-consumption monitoring system have been covered National 33 provinces (autonomous region, municipality directly under the Central Government, cities specifically designated in the state plan) are covered.The operation and maintenance of energy consumption monitoring equipment mainly include day Often inspection, troublshooting and processing, live inspection, big number is checked and corrective maintenance.But each City-level in the investigation discovery whole nation is public The generally existing reconstruction of building energy consumption monitoring system sets, gently runs, tuple amount, lightweight, weight official use, light civilian phenomenon, system Equipment operation maintenance relies on boostrap under type using traditional merely, and it is as follows that there are main problems:
1, equipment go offline by it is artificial periodically/irregularly verify, equipment fault can not real-time perception, lead to O&M low efficiency Under;
2, maintenance work is easily lost mainly by paper form and makes a report on lack of standardization, the retrospect of shortage whole process and evaluation machine System;
3, the monitoring online rate of building is relatively low and unstable, and the quality of data is difficult to guarantee, and whole O&M effect is difficult to comprehensively objective Quantizing examination.
Summary of the invention
The present invention is directed to solve at least some of the technical problems in related technologies.For this purpose, of the invention One purpose is to provide a kind of equipment O&M method and system for building energy consumption monitoring system, improves O&M efficiency, guarantees Monitor the online rate of building.
The technical scheme adopted by the invention is that:
In a first aspect, the present invention provides a kind of equipment operational system for building energy consumption monitoring system, including operation control Center, region operation system, data storage analytical database and field monitoring equipment processed, the field monitoring equipment is for acquiring The energy consumption data of building, the field monitoring equipment are connect by technology of Internet of things with the region operation system, the region Operation system is connect with the operation control centre, and the operation control centre connect with data storage analytical database; The equipment operational system is for executing following methods:
The operation control centre carries out big data analysis according to the energy consumption data of the building and pattern-recognition is known automatically Work order task is reported in abnormal and generation for repairment, and the work order task of reporting for repairment includes exception information and abnormal scene;
The operation maintenance personnel of the region operation system reports work order task for repairment described in receiving;
Work order task is reported for repairment described in the operation maintenance personnel processing and processing is reported to complete information to the operation control centre;
The operation management personnel that the operation control centre receives the region operation system is appointed for the work order of reporting for repairment The processing evaluation information of business.
Further, the field monitoring equipment includes energy consumption data acquisition device and environment data acquisition device.
Further, the field monitoring device configuration has two dimensional code, and the information that the two dimensional code carries includes implementor name Title, specifications and models, brand name, manufacturer, comes into operation the time and place is built in specific infield at device numbering It is at least one.
Further, the operation control centre is also used to be counted more than the buildings of preset times to reporting number for repairment.
Further, the equipment operational system is also used to execute following methods:
The operation control centre appoints according to default equipment routing inspection template and default patrol plan timing push inspection work order Business, the patrol worker single task includes inspection device information and inspection location information;
The operation maintenance personnel receives the patrol worker single task, and progress APP, which takes pictures to register, behind arrival inspection place uploads label To picture to the operation control centre;
The operation maintenance personnel carries out uploading recording table for check after equipment routing inspection, the recording table for check include monitoring time, At least one of inspection device, operation maintenance personnel, inspection place;
The operation control centre receives the operation management personnel for the inspection evaluation letter of the patrol worker single task Breath.
Further, the equipment operational system is also used to execute following methods:
The operation control centre appoints according to default corrective maintenance template and default maintenance project timing push maintenance work order Business, maintenance worker's single task include maintenance facility information and maintenance location information;
The operation maintenance personnel receives maintenance worker's single task, and progress APP, which takes pictures to register, behind arrival maintenance place uploads label To picture to the operation control centre;
The operation maintenance personnel carries out uploading emm message table after corrective maintenance, the emm message table include service time, At least one of maintenance facility, operation maintenance personnel, maintenance place;
The operation control centre receives the operation management personnel for the maintenance evaluation letter of maintenance worker's single task Breath.
Second aspect, the present invention provide a kind of equipment O&M method for building energy consumption monitoring system, comprising:
Utilize the energy consumption data of technology of Internet of things acquisition building;
Big data analysis is carried out according to the energy consumption data of the building and pattern-recognition automatic identification is abnormal and generation is reported for repairment Work order task, the work order task of reporting for repairment includes exception information and abnormal scene;
Operation maintenance personnel reports work order task for repairment described in receiving;
Work order task is reported for repairment described in the operation maintenance personnel processing and processing is reported to complete information;
Operation management personnel is received for the processing evaluation information for reporting work order task for repairment.
Further, the equipment O&M method further include:
It is counted to building of the number more than preset times is reported for repairment.
Further, the equipment O&M method further include:
According to default equipment routing inspection template and default patrol plan timing push patrol worker single task, the inspection work order is appointed Business includes inspection device information and inspection location information;
The operation maintenance personnel receives the patrol worker single task, and progress APP, which takes pictures to register, behind arrival inspection place uploads label To picture;
The operation maintenance personnel carries out uploading recording table for check after equipment routing inspection, the recording table for check include monitoring time, At least one of inspection device, operation maintenance personnel, inspection place;
Receive the inspection evaluation information that the operation management personnel is directed to the patrol worker single task.
Further, the equipment O&M method further include:
According to default corrective maintenance template and default maintenance project timing push maintenance worker's single task, the maintenance work order is appointed Business includes maintenance facility information and maintenance location information;
The operation maintenance personnel receives maintenance worker's single task, and progress APP, which takes pictures to register, behind arrival maintenance place uploads label To picture;
The operation maintenance personnel carries out uploading emm message table after corrective maintenance, the emm message table include service time, At least one of maintenance facility, operation maintenance personnel, maintenance place;
Receive the maintenance evaluation information that the operation management personnel is directed to maintenance worker's single task.
The beneficial effects of the present invention are:
Quickly identification is abnormal automatically and work order task is reported in generation for repairment by big data analysis and pattern-recognition by the present invention, is based on Abnormal site to be treated can quickly be positioned by reporting work order task operation maintenance personnel for repairment, improve abnormality processing efficiency;O&M Administrative staff can also upload to the processing evaluation information for reporting work order task for repairment to control centre is runed, and form PDCA closed loop management, Overcome and artificial verification equipment fault exists in the prior art or leads to O&M inefficiency extremely, the online rate for monitoring building can not Guarantee, and O&M relies on paper form, the technical issues of being easily lost, improve the O&M efficiency to building energy consumption monitoring system, Guarantee the online rate of monitoring building.
Detailed description of the invention
Fig. 1 is the structural representation in the present invention for a kind of embodiment of the equipment operational system of building energy consumption monitoring system Figure;
Fig. 2 is the region operation system and operation control in the present invention for the equipment operational system of building energy consumption monitoring system A kind of functional structure chart of the embodiment at center processed;
Fig. 3 is the operation control centre and region fortune in the present invention for the equipment operational system of building energy consumption monitoring system A kind of organization chart of embodiment of battalion's system;
Fig. 4 is a kind of reality in the present invention for the maintenance standard process of the equipment operational system of building energy consumption monitoring system Apply the flow diagram of example;
Fig. 5 is a kind of reality in the present invention for the inspection normal process of the equipment operational system of building energy consumption monitoring system Apply the flow diagram of example;
Fig. 6 is a kind of reality in the present invention for the maintenance standard process of the equipment operational system of building energy consumption monitoring system Apply the flow diagram of example;
Fig. 7 is to report the one of number for repairment for statistics building in the equipment operational system of building energy consumption monitoring system in the present invention The bar shaped statistical chart of kind embodiment;
Fig. 8 is the process signal in the present invention for a kind of embodiment of the equipment O&M method of building energy consumption monitoring system Figure.
Specific embodiment
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase Mutually combination.
Embodiment 1
With reference to a kind of embodiment that Fig. 1, Fig. 1 are in the present invention for the equipment operational system of building energy consumption monitoring system Structural schematic diagram;Equipment operational system for building energy consumption monitoring system includes field monitoring equipment, region operation system, fortune It seeks control centre and data stores analytical database, field monitoring equipment is used to acquire the energy consumption data of building, building energy consumption prison Examining system is existing system, and building energy consumption monitoring system includes field monitoring equipment, and field monitoring equipment passes through Internet of Things skill Art is connect with region operation system, and region operation system is connect with operation control centre, operation control centre and data storage point Database connection is analysed, the data of field monitoring equipment acquisition are stored in data storage analytical database;Wherein, in the present embodiment Equipment operational system can be used for managing the equipment maintenance works of multiple regions, each region setting is both provided with corresponding area Domain operation system and field monitoring equipment, region operation system are controlled by operation control centre to complete the building energy consumption of one's respective area The maintenance work of monitoring system.For example, operation control centre is arranged in general headquarters, such as Beijing, and region operation system is arranged each It saves, such as Guangdong Province, Hunan Province and Henan Province;It is also possible to run control centre's setting in provincial capital, and region operation is System is arranged in prefecture-level city.
Referring next to the region operation that Fig. 2, Fig. 2 are in the present invention for the equipment operational system of building energy consumption monitoring system The functional structure chart of system and a kind of embodiment of operation control centre;Running on region operation system and operation control centre has System software, the main functional modules of system software include operation homepage module, troublshooting module, inspection management module, big Number checks module, data analysis module, user management module and assets management module.Wherein inspection management module includes inspection mark Quasi-mode block, patrol worker single module, inspection formwork module;It includes that big number checks standard module, big number checks work that big number, which checks module, Single module, big number check formwork module;Data analysis module includes failure analysis module, inspection analysis module, big number check point Analyse module;User management module includes user list module, role management module and authority management module;Assets management module packet Include device management module and inventory management module.System software includes the end H5 (page end) and the end App.It is this with reference to Fig. 3, Fig. 3 A kind of reality in invention for the operation control centre and region operation system of the equipment operational system of building energy consumption monitoring system Apply the organization chart of example;The function of operation control centre includes runing the general headquarters operation personnel formulation O&M standard of control centre System and daily operation management, industry specialists remote assistance, operation general manager to each region maintenance work overall situation control, O&M cost, amount of energy saving accounting etc.;And the Organizational structure installation of region operation system has and executes system under O&M project manager and line System, the major responsibility of O&M project manager include region operation personnel management, the scheduling of local projects maintenance work, to items The emergency resources of mesh emergency event are deployed and the remote assistance of difficult and complicated cases, personnel are arranged an order according to class and grade and performance appraisal, to local items Mesh maintenance work overall situation control, O&M cost, income analysis etc.;Finally, executing system under line is provided with O&M teams and groups group Long and operation maintenance personnel, responsibility include carried out according to general headquarters and region specified value specification daily O&M operation, asset of equipments and Operational safety guarantee management etc..Region operation system is provided with operation management personnel and operation maintenance personnel, such as O&M project manager and The a length of operation management personnel of O&M teams and groups group.Run the staff of control centre, O&M project manager, O&M teams and groups group leader and Operation maintenance personnel is run on intelligent terminal (such as computer or mobile phone) and operating system software is to realize above-mentioned function and responsibility, Only the permission of their system software is different.It may be said that operation control centre includes the operation end of general headquarters operation personnel The operator terminal at end and operation general manager, region operation system includes the operator terminal of O&M project manager, O&M teams and groups group leader Operator terminal and operation maintenance personnel operator terminal, the work such as operation maintenance personnel is responsible for repairing, report for repairment, inspection, above-mentioned operator terminal Permission for the intelligent terminals such as mobile phone and computer, the system software of the operator terminal of different personnel is different.
Equipment operational system for building energy consumption monitoring system takes the mode that O&M executes under scheduling supervision, line on line To realize one-stop O&M trusteeship service.In the present embodiment, equipment operational system also provides a kind of equipment O&M normal process, if It includes maintenance standard process, maintenance standard process, inspection normal process, alarm criteria process etc. that received shipment, which ties up normal process,.Equipment Operational system carries out equipment O&M according to equipment O&M normal process.Wherein, maintenance standard process includes:
The energy consumption data for the building that operation control centre acquires according to field monitoring equipment carries out big data analysis and mode Identification, abnormal with automatic identification and generate and report work order task for repairment, reporting work order task for repairment includes exception information and abnormal scene, Operation control centre reports work order task for repairment by system software announcement;
The operation maintenance personnel of region operation system reports work order task for repairment using operator terminal and system software reception;
Processing is reported to complete letter after work order task is reported in operation maintenance personnel processing for repairment and using operator terminal and system software Breath extremely operation control centre;
The operation management personnel of region operation system uploads to be directed to using operator terminal and system software reports work order task for repairment Processing evaluation information to runing control centre;
The operation management personnel of operation control centre receiving area operation system is directed to the processing evaluation for reporting work order task for repairment Information is to realize subsequent personnel performance's assessment mode.
Quickly identification is abnormal automatically and work order task is reported in generation for repairment by big data analysis and pattern-recognition by the present invention, is based on Abnormal site to be treated can quickly be positioned by reporting work order task operation maintenance personnel for repairment, improve abnormality processing efficiency, be promoted Maintenance work efficiency and monitoring system operation and maintenance informationization and intelligent level;Operation management personnel can also be uploaded to reporting work for repairment The processing evaluation information of single task forms PDCA closed loop management, overcomes and artificial nucleus exist in the prior art to control centre is runed Looking into equipment fault or exception leads to O&M inefficiency, and the online rate for monitoring building not can guarantee, and O&M relies on paper form, The technical issues of being easily lost improves the O&M efficiency to building energy consumption monitoring system, guarantees the online rate and number of monitoring building According to accuracy rate.
In the present embodiment, field monitoring equipment includes that energy consumption data acquisition device, environment data acquisition device and data are adopted Storage and (wired or wireless) network communication device.Energy consumption data acquisition device includes but is not limited to control cabinet and metering device, Metering device includes electric energy meter, water meter and cold (heat) scale;Environment data acquisition device includes but is not limited to Temperature Humidity Sensor With CO2 sensor.Each field monitoring equipment is also configured with two dimensional code, and the information that two dimensional code carries includes device name, equipment Number, specifications and models, brand name, manufacturer, come into operation the time and place build in specific infield at least one Kind, in the present embodiment, above-mentioned all information is carried in two dimensional code.Region operation system passes through device management module and scene Monitoring device carries out information exchange and communication (utilizing technology of Internet of things, i.e. configuration two dimensional code and network communication), and runs control Center is connect with region operation system, then runs the available information carried to two dimensional code of control centre, then report work order for repairment and appoint The content of business includes the information that two dimensional code carries, i.e., abnormal scene is obtained by the information that two dimensional code carries, live fortune Dimension personnel can quickly identify, position the field monitoring equipment reported for repairment and needed repairing in work order task.And data storage analysis data Library can be the one or two of public Cloud Server or local server.
Further, reporting work order task for repairment includes exception information and abnormal scene, wherein exception information includes equipment Exception information and energy consumption exception information, device exception information include the information of warping apparatus, two configured according to warping apparatus Dimension code is known that warping apparatus site, namely abnormal scene;And energy consumption exception information includes causing energy consumption abnormal Warping apparatus information, according to field monitoring equipment acquire data can analyze to obtain the warping apparatus for causing energy consumption exception Information warping apparatus site is similarly known that according to the two dimensional code that warping apparatus is configured, namely abnormal spot Point.Referring to figure 3. and Fig. 4, Fig. 4 are the maintenance standard stream for monitoring the equipment operational system of system in the present invention for building energy consumption A kind of flow diagram of embodiment of journey;The formation for reporting work order task for repairment has system automatic identification and artificially two kinds of ways of discovery Diameter, wherein the first forming feature, operation control centre are based on the technical treatments field monitorings such as pattern-recognition and big data analysis The acquisition data of equipment are with the failures such as automatic identification equipment or energy consumption exception, such as mutual inductor damage, electric energy meter current reverse phase, electric energy Table voltage phase shortage, electric energy meter damage, cold meter damage, the damage of network communication failure, collector and system data are not parsed, are parsed Data exception etc., operation control centre are automatic in the form of reporting work order task for repairment 4G/GPRS mobile network after registering automatically It is pushed to the mobile phone A pp terminal of corresponding region field service personnel.Second of forming feature, patrol officer is (i.e. on line and under line Report personnel for repairment) find the problem after, as electric energy meter address typing mistake, branch no-load voltage ratio typing mistake, subitem expression formula configuration error, Mutual inductor is mounted on frequency converter leading-out terminal, single-phase electric meter voltage and current is derived from that not isopen, transformer monitoring be complete, emergency bypass Electric energy meter etc. is not installed, is manually pushed from system page end or mobile phone APP terminal by 4G/GPRS mobile network and reports work for repairment Single task, system page end or mobile phone APP terminal will report work order task for repairment and be uploaded to operation control centre, and operation control centre is again Issue report for repairment work order task to corresponding region field service personnel's (i.e. operation maintenance personnel) mobile phone APP terminal;Live O&M people Member can active competition for orders acquisition report work order task for repairment, can also be by after O&M teams and groups group leader 15 minutes or by O&M project manager 30 minutes Afterwards worksheet processing and passively obtain work order task;Receiving reports the operation maintenance personnel of work order task for repairment before the deadline, as reached in 4h Live simultaneously processing equipment or the energy consumption exception of registering of being taken pictures using APP, and disposition is made a report on and the information that completes in mobile phone A pp terminal (i.e. information is completed in processing, processing complete information include take pictures the remark information for staying the picture of card, remarks to repair and typing this The consumable information etc. of secondary maintenance).If abnormal conditions handle quantity or different time normal abnormal conditions processing technique difficulty beyond scene The tolerance range of O&M people can apply for that subdispatch calls other area peoples to repair or technical support;Report personnel, fortune for repairment Dimension teams and groups group leader or O&M project manager receive completion information after within defined time such as 4h, can by phone, wechat, The end App handles quality to this reporting work order task for repairment of the task and customer satisfaction situation is tracked and evaluated, and forms PDCA Closed loop is managed, to ensure that the efficient execution of maintenance work, to work order task is not reported for repairment by service evaluation, is returned original Operation maintenance personnel rebuild.Wherein, need O&M project manager confirm repair after the completion of just can Push Service evaluate to report Personnel are repaired, when O&M project manager not can confirm that maintenance is completed, can confirm that maintenance is by call-on back by phone maintenance personal No completion, O&M project manager confirms that maintenance is completed then system software meeting Push Service and evaluated to the personnel of reporting for repairment, so as to report people for repairment Member reports work order task for repairment to this and makes an appraisal.
It further, is patrolling for the equipment operational system of building energy consumption monitoring system in the present invention with reference to Fig. 5, Fig. 5 Examine a kind of flow diagram of embodiment of normal process;Inspection normal process includes:
The staff of operation control centre pre-establishes inspection standard, including default equipment routing inspection template and default inspection Plan;Operation control centre generates according to default equipment routing inspection template and default patrol plan self-timing and pushes inspection work order Task, patrol worker single task include inspection device information and inspection location information;
Operation maintenance personnel receives patrol worker single task using operator terminal, reaches and carries out APP behind the scene of inspection place and take pictures label Picture is registered to runing control centre to upload;Wherein, operation maintenance personnel can obtain patrol worker by the autonomous competition for orders of system software Single task can also passively receive patrol worker single task by O&M teams and groups group leader or O&M project manager worksheet processing;
Then operation maintenance personnel uploads recording table for check after carrying out equipment routing inspection in system software, and so far, inspection completion is patrolled Examining record sheet includes at least one of monitoring time, inspection device, operation maintenance personnel, inspection place;In the present embodiment, inspection note Record table includes above all of information;
Operation management personnel is evaluated by treatment process of the system software to this patrol worker single task, i.e. inspection is commented Valence information;
It is subsequent to realize for the inspection evaluation information of patrol worker single task to run control centre's reception operation management personnel Performance assessment job.
Wherein, it during carrying out equipment routing inspection, if it find that equipment breaks down, can be reported for repairment manually by above-mentioned Process carry out manually push report work order task for repairment.
Further, with reference to the guarantor that Fig. 6, Fig. 6 are in the present invention for the equipment operational system of building energy consumption monitoring system Support a kind of flow diagram of embodiment of normal process;Maintenance standard process includes:
The staff of operation control centre pre-establishes maintenance standard, including default corrective maintenance template and default maintenance Plan;Operation control centre, which generates according to default corrective maintenance template and the timing of default maintenance project and pushes maintenance work order, to appoint Business, maintenance worker's single task include maintenance facility information and maintenance location information;
Operation maintenance personnel receives maintenance worker's single task using operator terminal, reaches and carries out APP behind the scene of maintenance place and take pictures label Picture is registered to runing control centre to upload;Wherein, operation maintenance personnel can obtain maintenance worker by the autonomous competition for orders of system software Single task can also passively receive maintenance worker's single task by O&M teams and groups group leader or O&M project manager worksheet processing;
Then operation maintenance personnel uploads emm message table after carrying out corrective maintenance in system software, and emm message table includes protecting Support at least one of time, maintenance facility, operation maintenance personnel, maintenance place;In the present embodiment, emm message table includes the above institute Some information;
Operation management personnel carries out audit evaluation by treatment process of the system software to this maintenance worker's single task, that is, protects Support evaluation information;
It is subsequent to realize for the maintenance evaluation information of maintenance worker's single task to run control centre's reception operation management personnel Performance assessment job.
Further, operation control centre is also used to through failure analysis module be more than that preset times are built to number is reported for repairment Build and counted, for answer during equipment operation maintenance emphasis carry out troubleshooting and corrective maintenance building decision provide according to According to.In the present embodiment, preset times are 3 times, are the equipment fortune in the present invention for building energy consumption monitoring system with reference to Fig. 7, Fig. 7 The bar shaped statistical chart that statistics building in system reports a kind of embodiment of number for repairment is maintained, is carried out to the building that number is more than 3 times is reported for repairment After statistics, available different buildings report number statistical conditions schematic diagram for repairment, wherein office building 1 reports number for repairment most It is more, the building that emphasis carries out troubleshooting and corrective maintenance can be set to.
The present embodiment is by merging the technologies such as Internet of Things (IoT), big data analysis and mobile Internet, realization pair The equipment maintenance work of building energy consumption monitoring system is controlled, and not only may be implemented to judge abnormal automatic identification, but also Make live operation maintenance personnel that can quickly identify, position and repair using two dimensional code, maintain field monitoring equipment, O&M project manager Or the personnel of reporting for repairment can form PDCA and close by the way that task processing quality and customer satisfaction situation are tracked and evaluated on line Endless tube reason, promotes O&M efficiency, and with reference to the following table 1, single failure is reported for repairment reduces 30.4% with the processing time on year-on-year basis;It can realize simultaneously To the process standards management such as maintenance, maintenance, inspection and alarm, O&M efficiency can further be promoted by standardizing process, be guaranteed The online rate of system monitoring building and big number check accuracy rate, reference table 1, and the equipment operational system of the present embodiment makes monitoring The online rate of building and big number check accuracy rate and increase by 4.7% and 4.3% respectively on year-on-year basis, monitor the efficiency and matter of maintenance work Amount, monitoring system operation and maintenance informationization and intelligent level are obviously improved.
Table 1 2017 years, monitoring architectural traditions in 2018 and novel operation and maintenance mode comparative situation summary sheet
Embodiment 2
Embodiment 2 is provided based on embodiment 1, embodiment 2 provides a kind of equipment O&M for building energy consumption monitoring system Method is the stream in the present invention for a kind of embodiment of the equipment O&M method of building energy consumption monitoring system with reference to Fig. 8, Fig. 8 Journey schematic diagram, the equipment O&M method for building energy consumption monitoring system include:
Utilize the energy consumption data of technology of Internet of things acquisition building;
Big data analysis is carried out according to the energy consumption data of building and pattern-recognition automatic identification is abnormal and work order is reported in generation for repairment Task, reporting work order task for repairment includes exception information and abnormal scene;
Work order task is reported in operation maintenance personnel reception for repairment;
Operation maintenance personnel processing reports work order task for repairment and processing is reported to complete information;
Operation management personnel is uploaded for the processing evaluation information for reporting work order task for repairment;
It receives operation management personnel and is directed to the processing evaluation information for reporting work order task for repairment to realize subsequent personnel performance's examination Work.
Further, equipment O&M method further include:
According to default equipment routing inspection template and default patrol plan timing push patrol worker single task, patrol worker single task packet Include inspection device information and inspection place;
Operation maintenance personnel receives patrol worker single task, reaches and carries out take pictures upload of registering of APP behind inspection place and register picture;
Operation maintenance personnel uploads recording table for check after carrying out equipment routing inspection, recording table for check include monitoring time, inspection device, At least one of operation maintenance personnel, inspection place;
Operation management personnel uploads the inspection evaluation information for being directed to patrol worker single task;
Operation management personnel is received for the inspection evaluation information of patrol worker single task to realize subsequent performance assessment job.
Further, equipment O&M method further include:
According to default corrective maintenance template and default maintenance project timing push maintenance worker's single task, maintenance worker's single task packet Include maintenance facility information and maintenance place;
Operation maintenance personnel receives maintenance worker's single task, reaches and carries out take pictures upload of registering of APP behind maintenance place and register picture;
Operation maintenance personnel carry out corrective maintenance after upload emm message table, emm message table include service time, maintenance facility, At least one of operation maintenance personnel, maintenance place;
Operation management personnel uploads the inspection evaluation information for being directed to maintenance worker's single task;
Operation management personnel is received for the maintenance evaluation information of maintenance worker's single task to realize subsequent performance assessment job.
Finally, equipment O&M method further include:
It is counted to building of the number more than preset times is reported for repairment.
The specific descriptions of equipment O&M method for building energy consumption monitoring system are no longer gone to live in the household of one's in-laws on getting married referring to the description of embodiment 1 It states.
It is to be illustrated to preferable implementation of the invention, but the invention is not limited to the implementation above Example, those skilled in the art can also make various equivalent variations on the premise of without prejudice to spirit of the invention or replace It changes, these equivalent deformations or replacement are all included in the scope defined by the claims of the present application.

Claims (10)

1. a kind of equipment operational system for building energy consumption monitoring system, which is characterized in that including runing control centre, region Operation system, data storage analytical database and field monitoring equipment, the field monitoring equipment are used to acquire the energy consumption of building Data, the field monitoring equipment are connect by technology of Internet of things with the region operation system, the region operation system and The operation control centre connection, the operation control centre connect with data storage analytical database;The equipment fortune System is maintained for executing following methods:
The operation control centre carries out big data analysis according to the energy consumption data of the building and pattern-recognition automatic identification is different Often and work order task of reporting for repairment is generated, the work order task of reporting for repairment includes exception information and abnormal scene;
The operation maintenance personnel of the region operation system reports work order task for repairment described in receiving;
Work order task is reported for repairment described in the operation maintenance personnel processing and processing is reported to complete information to the operation control centre;
The operation management personnel that the operation control centre receives the region operation system reports work order task for repairment for described Handle evaluation information.
2. the equipment operational system according to claim 1 for building energy consumption monitoring system, which is characterized in that described existing Field monitoring device includes energy consumption data acquisition device and environment data acquisition device.
3. the equipment operational system according to claim 1 for building energy consumption monitoring system, which is characterized in that described existing Field monitoring device is configured with two dimensional code, and the information that the two dimensional code carries includes device name, device numbering, specifications and models, product Board title, manufacturer come into operation at least one of time and place specific infield of building.
4. the equipment operational system according to claim 1 for building energy consumption monitoring system, which is characterized in that the fortune Control centre, battalion is also used to be counted more than the buildings of preset times to reporting number for repairment.
5. the equipment operational system according to any one of claims 1 to 4 for building energy consumption monitoring system, feature exist In the equipment operational system is also used to execute following methods:
The operation control centre is according to default equipment routing inspection template and default patrol plan timing push patrol worker single task, institute Stating patrol worker single task includes inspection device information and inspection location information;
The operation maintenance personnel receives the patrol worker single task, reaches and carries out take pictures upload of registering of APP behind inspection place and register figure Piece is to the operation control centre;
The operation maintenance personnel uploads recording table for check after carrying out equipment routing inspection, and the recording table for check includes monitoring time, inspection At least one of equipment, operation maintenance personnel, inspection place;
The operation control centre receives the inspection evaluation information that the operation management personnel is directed to the patrol worker single task.
6. the equipment operational system according to any one of claims 1 to 4 for building energy consumption monitoring system, feature exist In the equipment operational system is also used to execute following methods:
The operation control centre is according to default corrective maintenance template and default maintenance project timing push maintenance worker's single task, institute Stating maintenance worker's single task includes maintenance facility information and maintenance location information;
The operation maintenance personnel receives maintenance worker's single task, reaches and carries out take pictures upload of registering of APP behind maintenance place and register figure Piece is to the operation control centre;
The operation maintenance personnel uploads emm message table after carrying out corrective maintenance, and the emm message table includes service time, maintenance At least one of equipment, operation maintenance personnel, maintenance place;
The operation control centre receives the maintenance evaluation information that the operation management personnel is directed to maintenance worker's single task.
7. a kind of equipment O&M method for building energy consumption monitoring system characterized by comprising
Utilize the energy consumption data of technology of Internet of things acquisition building;
Big data analysis is carried out according to the energy consumption data of the building and pattern-recognition automatic identification is abnormal and work order is reported in generation for repairment Task, the work order task of reporting for repairment includes exception information and abnormal scene;
Operation maintenance personnel reports work order task for repairment described in receiving;
Work order task is reported for repairment described in the operation maintenance personnel processing and processing is reported to complete information;
Operation management personnel is received for the processing evaluation information for reporting work order task for repairment.
8. the equipment O&M method according to claim 7 for building energy consumption monitoring system, which is characterized in that described to set Received shipment ties up method further include:
It is counted to building of the number more than preset times is reported for repairment.
9. the equipment O&M method according to claim 7 or 8 for building energy consumption monitoring system, which is characterized in that institute State equipment O&M method further include:
According to default equipment routing inspection template and default patrol plan timing push patrol worker single task, the patrol worker single task packet Include inspection device information and inspection location information;
The operation maintenance personnel receives the patrol worker single task, reaches and carries out take pictures upload of registering of APP behind inspection place and register figure Piece;
The operation maintenance personnel uploads recording table for check after carrying out equipment routing inspection, and the recording table for check includes monitoring time, inspection At least one of equipment, operation maintenance personnel, inspection place;
Receive the inspection evaluation information that the operation management personnel is directed to the patrol worker single task.
10. the equipment O&M method according to claim 7 or 8 for building energy consumption monitoring system, which is characterized in that institute State equipment O&M method further include:
According to default corrective maintenance template and default maintenance project timing push maintenance worker's single task, maintenance worker's single task packet Include maintenance facility information and maintenance location information;
The operation maintenance personnel receives maintenance worker's single task, reaches and carries out take pictures upload of registering of APP behind maintenance place and register figure Piece;
The operation maintenance personnel uploads emm message table after carrying out corrective maintenance, and the emm message table includes service time, maintenance At least one of equipment, operation maintenance personnel, maintenance place;
Receive the maintenance evaluation information that the operation management personnel is directed to maintenance worker's single task.
CN201910437497.6A 2019-05-24 2019-05-24 A kind of equipment O&M method and system for building energy consumption monitoring system Pending CN110262412A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910437497.6A CN110262412A (en) 2019-05-24 2019-05-24 A kind of equipment O&M method and system for building energy consumption monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910437497.6A CN110262412A (en) 2019-05-24 2019-05-24 A kind of equipment O&M method and system for building energy consumption monitoring system

Publications (1)

Publication Number Publication Date
CN110262412A true CN110262412A (en) 2019-09-20

Family

ID=67915282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910437497.6A Pending CN110262412A (en) 2019-05-24 2019-05-24 A kind of equipment O&M method and system for building energy consumption monitoring system

Country Status (1)

Country Link
CN (1) CN110262412A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111445073A (en) * 2020-03-26 2020-07-24 珠海格力电器股份有限公司 Equipment operation and maintenance management method and device, storage medium and terminal
CN114356913A (en) * 2021-12-15 2022-04-15 联奕科技股份有限公司 Micro-service link operation and maintenance system and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180182179A1 (en) * 2016-12-22 2018-06-28 Infostandard Sdn. Bhd. Comprehensive system and method for real-time monitoring and management of security patrolling operations
CN108649703A (en) * 2018-07-12 2018-10-12 贵州电网有限责任公司 One kind is based on big data distribution O&M and breakdown repair system and operation method
CN109086895A (en) * 2018-07-06 2018-12-25 山东中瑞新能源科技有限公司 A kind of operation management system and method for heating ventilation air-conditioning system
CN109242276A (en) * 2018-08-21 2019-01-18 国网江苏省电力有限公司泰州供电分公司 Logistics equipment malfunction monitoring operation management system
CN109447290A (en) * 2018-11-21 2019-03-08 国网浙江电动汽车服务有限公司 A kind of charging station intelligent fault O&M method
CN109709940A (en) * 2019-01-22 2019-05-03 浙江魔云物联科技有限公司 A kind of real-time O&M resource sharing system and its O&M method based on Internet of Things

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180182179A1 (en) * 2016-12-22 2018-06-28 Infostandard Sdn. Bhd. Comprehensive system and method for real-time monitoring and management of security patrolling operations
CN109086895A (en) * 2018-07-06 2018-12-25 山东中瑞新能源科技有限公司 A kind of operation management system and method for heating ventilation air-conditioning system
CN108649703A (en) * 2018-07-12 2018-10-12 贵州电网有限责任公司 One kind is based on big data distribution O&M and breakdown repair system and operation method
CN109242276A (en) * 2018-08-21 2019-01-18 国网江苏省电力有限公司泰州供电分公司 Logistics equipment malfunction monitoring operation management system
CN109447290A (en) * 2018-11-21 2019-03-08 国网浙江电动汽车服务有限公司 A kind of charging station intelligent fault O&M method
CN109709940A (en) * 2019-01-22 2019-05-03 浙江魔云物联科技有限公司 A kind of real-time O&M resource sharing system and its O&M method based on Internet of Things

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111445073A (en) * 2020-03-26 2020-07-24 珠海格力电器股份有限公司 Equipment operation and maintenance management method and device, storage medium and terminal
CN111445073B (en) * 2020-03-26 2022-05-17 珠海格力电器股份有限公司 Equipment operation and maintenance management method and device, storage medium and terminal
CN114356913A (en) * 2021-12-15 2022-04-15 联奕科技股份有限公司 Micro-service link operation and maintenance system and method

Similar Documents

Publication Publication Date Title
CN206921161U (en) It is a kind of to include inspection management and defect processing and the intelligent inspection system of examination
CN110276530A (en) A kind of intelligent engineering operation and maintenance supervising method
CN104361445B (en) Labour's real-time management system and management method
CN103325153B (en) A kind of method for inspecting and cruising inspection system
CN201131037Y (en) Management system for polling base station
CN105825337A (en) Intelligent inspection system for 500KV substation communication device
CN108010155A (en) A kind of safety inspection and the system and method for hidden danger management
CN111639885A (en) Agricultural sewage management system and management method
CN108492034B (en) Oil field oil recovery production management system
CN106251033A (en) A kind of intelligent substation operation management system
CN109784788A (en) A kind of intelligent comprehensive patrol checking server, terminal and system
CN110400040A (en) A kind of quick transmission system of management and running information based on mobile Internet
CN113283683A (en) Post qualification management method and system
CN108206586A (en) A kind of power circuit intelligence O&M examination and repair system
CN111612646A (en) Networked intelligent secondary operation and maintenance system
CN107730647A (en) A kind of smart mobile phone cruising inspection system and its method for inspecting based on SCADA
CN107798489A (en) A kind of electric network operation site safety management method based on wechat platform
CN106384312A (en) Tour group service management platform
CN109447286A (en) A kind of power transformation O&M Intelligent mobile job platform based on Internet of Things
CN110262412A (en) A kind of equipment O&M method and system for building energy consumption monitoring system
CN102566531A (en) Monitoring and early warning system for service life of equipment
CN104331766A (en) Automatic health management based integrated service system
CN107295311A (en) The operation management system of video monitoring platform
CN109064140A (en) Internet of things equipment operation management system
CN106780153A (en) It is a kind of in real time multi-functional back brake, patrol and examine operation note system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190920