CN110260089A - Oil pipeline emergency repair is with quickly enclosing oily weir - Google Patents

Oil pipeline emergency repair is with quickly enclosing oily weir Download PDF

Info

Publication number
CN110260089A
CN110260089A CN201910659685.3A CN201910659685A CN110260089A CN 110260089 A CN110260089 A CN 110260089A CN 201910659685 A CN201910659685 A CN 201910659685A CN 110260089 A CN110260089 A CN 110260089A
Authority
CN
China
Prior art keywords
weir
oil
antiseepage film
emergency repair
quickly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910659685.3A
Other languages
Chinese (zh)
Inventor
杨柯
张海磊
李顺勇
刘玉展
李猛
曹品晶
陈洪兵
刘浩南
廖华扬
何东生
赵立泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd Southwest Pipeline Lancheng Chongqing Oil Transportation Branch Co
Original Assignee
Petrochina Co Ltd Southwest Pipeline Lancheng Chongqing Oil Transportation Branch Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd Southwest Pipeline Lancheng Chongqing Oil Transportation Branch Co filed Critical Petrochina Co Ltd Southwest Pipeline Lancheng Chongqing Oil Transportation Branch Co
Priority to CN201910659685.3A priority Critical patent/CN110260089A/en
Publication of CN110260089A publication Critical patent/CN110260089A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pipe Accessories (AREA)

Abstract

This programme provides a kind of oil pipeline emergency repair with quickly enclosing oily weir, including multiple weirs, the weir forms a polygon, it further include discharge equipment, the bottom of the weir is equipped with the first antiseepage film, the central integration of first antiseepage film has the second antiseepage film, and 5-10 ° of angle is formed between the second antiseepage film;The discharge equipment includes oil exit pipe, oil pump and at least two suckers, connecting rod is equipped between the sucker, the oil exit pipe is connected to oil pump, and the oil inlet of oil exit pipe is fixed in connecting rod, the weir is the weir of inflation, and the outside of the weir is equipped with supporting block.Compared with traditional weir, this programme can carry out that it is stopped to be diffused using the weight of Leakage Energy itself, meanwhile, weir by he inflate can rapid shaping, be able to satisfy quickly to be laid with and enclose the requirement on oily weir.

Description

Oil pipeline emergency repair is with quickly enclosing oily weir
Technical field
The invention belongs to pipeline fields, and in particular to a kind of oil pipeline emergency repair is with quickly enclosing oily weir.
Background technique
Oil pipeline, i.e., for transporting the pipeline of petroleum and oil product, entire controlling methodology of oil pipeline is mainly by petroleum pipeline Line, oil transportation station and other auxiliary phases close equipment composition, are that one of capital equipment of oil movement and storage industry and crude oil and petroleum produce The most important conveying equipment of product.
Inevitably, oil pipeline often will appear the case where leakage, and once leak, and timely rescue is handled Then seem most important.Under normal conditions, it is frequently necessary to scene laying in pipeline emergency repair and encloses oily weir.Enclose the common side in oily weir Method is formed a ring with sandbag or woven bag (dress soil), to stop the petroleum leaked out to bleed around.But laying is of long duration And a large amount of artificial and times are needed, it can not meet the demand of quick response.
Summary of the invention
The purpose of the present invention is to provide a kind of oil pipeline emergency repairs with oily weir is quickly enclosed, and is enclosed with meeting quickly to be laid with The requirement on oily weir.
In order to achieve the above object, this programme provides a kind of oil pipeline emergency repair with quickly enclosing oily weir, including multiple Weir, the weir form a polygon, further include discharge equipment, and the bottom of the weir is equipped with the first antiseepage film, described The central integration of first antiseepage film has the second antiseepage film, and 5-10 ° of angle is formed between the second antiseepage film;The row Oily device includes oil exit pipe, oil pump and at least two suckers, and connecting rod is equipped between the sucker, and the oil exit pipe and oil pump connect It is logical, and the oil inlet of oil exit pipe is fixed in connecting rod, the weir is the weir of inflation, and the outside of the weir is equipped with support Block.
The installation method of this programme: when petroleum pipeline leakage occurs for somewhere, repair personnel is then at the first time around pipeline Weir is put up at leakage, is then laid with the first antiseepage film and the second antiseepage film inside since weir, later by discharge equipment Sucker be fixed on oil film, regularly by weir oil extract out.
The principle of this programme: leak out oil can constantly toward surrounding spread, a part oil from the first antiseepage film to Surrounding is spread, which is mainly stopped by weir;Another part oil is between the first antiseepage film and the second antiseepage film to four Week diffusion, and the oil of this part then will receive the gravity of the oil above the first antiseepage film and it prevented to spread toward surrounding, and let out The amount of leakage is more, and blocking effect is also relatively more preferable.Compared with traditional weir, this programme can using the weight of Leakage Energy itself come Carry out that it is stopped to be diffused, meanwhile, weir by he inflate can rapid shaping, be able to satisfy quickly be laid with enclose wanting for oily weir It asks.
Further, the supporting block is fuel tank, and the fuel tank is connected to the oil discharge outlet of oil exit pipe.Using being arranged in discharge equipment Oil out is fixed, and gathers materials on the spot, and operates more convenient.
Further, the oil inlet of the oil exit pipe is equipped with strainer.Effectively it can prevent oil pump from blocking.
Further, the weir surrounds triangle or quadrangle.Triangle or quadrilateral structure are simple, are easier to take It builds, and stability is also relatively good.
Further, each second antiseepage film intersects overlapping.Complete sealing is formed between second antiseepage film, avoids letting out The leakage of the oil exposed from top to bottom.
Further, the side of each weir is equipped with the protrusion being fitted to each other and groove.After being inflated between each weir It is connected and fixed, it is easy to operate.
Further, the supporting block is removably arranged in weir.Replacement is facilitated to update, it is easy to operate.
Further, the supporting block is equipped with hook.Antiseepage film can carry hook on, conveniently take.
Detailed description of the invention
Fig. 1 is oil pipeline of the embodiment of the present invention emergency repair schematic diagram for quickly enclosing oily weir.
Fig. 2 is oil pipeline of the embodiment of the present invention emergency repair schematic diagram for quickly enclosing oily weir.
Fig. 3 is oil pipeline of the embodiment of the present invention emergency repair schematic diagram for quickly enclosing antiseepage film in oily weir.
Specific embodiment
It is further described below by specific embodiment:
Appended drawing reference in Figure of description includes: supporting block 10, weir 20, sucker 30, oil exit pipe 40, strainer 41, connecting rod 50, the first antiseepage film 60, the second antiseepage film 61.
As depicted in figs. 1 and 2, the oil pipeline emergency repair in the present embodiment includes four weirs 20 with oily weir is quickly enclosed It surrounds.The weir 20 of left and right is equipped with protrusion in side, and two upper and lower weirs 20 are then equipped with groove, and the two matching is connected to Weir 20 is then defined together.Weir 20 itself is made of high-intensitive plastics, inner hollow, can by inflated with nitrogen inward come It is formed.Certainly, matched Inflation plug etc is not just repeated well known to those skilled in the art.
The outside of weir 20, if there are four supporting blocks 10.Supporting block 10 is selected as common fuel tank, the fire-fighting of material routine Band material, it is oil-filled in supporting block 10 to carry out support to weir 20, it avoids weir 20 from kicking the beam and can not get up well Blocking effect.Supporting block 10 and weir 20 can be selected split type, be also possible to merge.The top of supporting block 10 also Setting hook, the fixed use of antiseepage film used in leakage point periphery.
The inside of weir 20 is set in total there are four antiseepage film, and each antiseepage film corresponds to a weir 20.Such as Fig. 1 and Fig. 3 institute Show, antiseepage film is divided into the first antiseepage film 60 and the second antiseepage film 61.By taking left side as an example, the left end of the first antiseepage film 60 is connection In the weir 20 on the left side, the lower section that the second antiseepage film 61 is connected to the first antiseepage film 60 is integrally formed with it, and big position approximate Position in the middle part of it is in 10 ° or so of appearance between the two.Other three antiseepage films also press this setting.Second antiseepage film 61 Middle part again is then all concentrated, is overlapped mutually, it is permeable from middle part to reduce the oil leaked.
In addition, as depicted in figs. 1 and 2, a discharge equipment is additionally provided in the first antiseepage film 60.Discharge equipment includes row Oil pipe 40, oil pump and four suckers 30, connecting rod 50 is equipped between sucker 30, and oil exit pipe 40 is connected to oil pump.Oil exit pipe 40 Oil inlet is fixed in connecting rod 50, and oil discharge outlet is connected to supporting block 10.Oil pump blocks in order to prevent, in the oil inlet of oil exit pipe 40 Mouth is equipped with strainer 41.Simultaneously, in order to guarantee the effect of pump oil, lobe pump is selected in general recommendations.
When petroleum pipeline leakage occurs for somewhere, repair personnel then puts up weir at pipe leakage at the first time 20, the first antiseepage film 60 and the second antiseepage film 61 are then laid with inside since weir 20, later by the sucker of discharge equipment 30 It is fixed on oil film, regularly extracts the oil in weir 20 out.
The oil leaked out can constantly be spread toward surrounding, and a part oil is spread from the first antiseepage film 60 to surrounding, should Part oil is mainly stopped by weir 20;Another part oil expands around between the first antiseepage film 60 and the second antiseepage film 61 It dissipates, and the oil of this part then will receive the gravity of the oil of 60 top of the first antiseepage film and it prevented to spread toward surrounding, and leak Amount it is more, blocking effect is also relatively more preferable.Compared with traditional weir 20, this programme can using the weight of Leakage Energy itself come Carry out that it is stopped to be diffused, meanwhile, weir 20 by he inflate can rapid shaping, be able to satisfy quickly be laid with enclose wanting for oily weir It asks.
It needs to illustrate in advance, in the present invention unless specifically defined or limited otherwise, term " installation ", " phase Even ", the terms such as " connection ", " fixation " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, Or it is integrally connected;It can be directly connected, the company inside two elements can also be can be indirectly connected through an intermediary It is logical.For the ordinary skill in the art, above-mentioned term in the present invention specific can be understood as the case may be Meaning.
What has been described above is only an embodiment of the present invention, and the common sense such as well known specific structure and characteristic are not made herein in scheme Excessive description.It, without departing from the structure of the invention, can be with it should be pointed out that for those skilled in the art Several modifications and improvements are made, these also should be considered as protection scope of the present invention, these all will not influence what the present invention was implemented Effect and patent practicability.The scope of protection required by this application should be based on the content of the claims, in specification The records such as specific embodiment can be used for explaining the content of claim.

Claims (7)

1. oil pipeline emergency repair forms a polygon, feature with oily weir, including multiple weirs, the weir is quickly enclosed It is: further includes discharge equipment, the bottom of the weir is equipped with the first antiseepage film, the central integration of first antiseepage film There is the second antiseepage film, and forms 5-10 ° of angle between the second antiseepage film;The discharge equipment include oil exit pipe, oil pump and At least two suckers are equipped with connecting rod between the sucker, and the oil exit pipe is connected to oil pump, and the oil inlet of oil exit pipe is fixed In connecting rod, the weir is the weir of inflation, and the outside of the weir is equipped with supporting block.
2. oil pipeline emergency repair according to claim 1 is with quickly enclosing oily weir, it is characterised in that: the supporting block is Fuel tank, the fuel tank are connected to the oil discharge outlet of oil exit pipe.
3. oil pipeline emergency repair according to claim 1 is with quickly enclosing oily weir, it is characterised in that: the oil exit pipe Oil inlet is equipped with strainer.
4. oil pipeline emergency repair according to claim 1 is with quickly enclosing oily weir, it is characterised in that: the weir surrounds Triangle or quadrangle.
5. oil pipeline emergency repair according to claim 1 is with quickly enclosing oily weir, it is characterised in that: the side of each weir Face is equipped with the protrusion being fitted to each other and groove.
6. oil pipeline emergency repair according to claim 1 is with quickly enclosing oily weir, it is characterised in that: the supporting block can The setting of disassembly is in weir.
7. oil pipeline emergency repair according to claim 1 is with quickly enclosing oily weir, it is characterised in that: in the supporting block Equipped with hook.
CN201910659685.3A 2019-07-22 2019-07-22 Oil pipeline emergency repair is with quickly enclosing oily weir Pending CN110260089A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910659685.3A CN110260089A (en) 2019-07-22 2019-07-22 Oil pipeline emergency repair is with quickly enclosing oily weir

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910659685.3A CN110260089A (en) 2019-07-22 2019-07-22 Oil pipeline emergency repair is with quickly enclosing oily weir

Publications (1)

Publication Number Publication Date
CN110260089A true CN110260089A (en) 2019-09-20

Family

ID=67927483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910659685.3A Pending CN110260089A (en) 2019-07-22 2019-07-22 Oil pipeline emergency repair is with quickly enclosing oily weir

Country Status (1)

Country Link
CN (1) CN110260089A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104100221A (en) * 2014-07-07 2014-10-15 彭诗涛 Recyclable environmental protection cofferdam of well site
CN104652386A (en) * 2013-11-22 2015-05-27 中国石油天然气股份有限公司 Water oil spilling emergent containment control method
CN106630214A (en) * 2015-11-03 2017-05-10 天津渤华成油田技术服务有限公司 Soft bag-type oil cofferdam with functions of pollution oil storage and deep treatment
CN106948352A (en) * 2016-01-06 2017-07-14 北京翔鲲水务建设有限公司 Front leg strut shaped steel antiseepage film cofferdam and its construction method
CN107964969A (en) * 2017-11-08 2018-04-27 北京翔鲲水务建设有限公司 Stake film is combined cofferdam and its construction method with soil
CN210372525U (en) * 2019-07-22 2020-04-21 中国石油天然气股份有限公司西南管道兰成渝输油分公司 Combined type rapid oil containment weir

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652386A (en) * 2013-11-22 2015-05-27 中国石油天然气股份有限公司 Water oil spilling emergent containment control method
CN104100221A (en) * 2014-07-07 2014-10-15 彭诗涛 Recyclable environmental protection cofferdam of well site
CN106630214A (en) * 2015-11-03 2017-05-10 天津渤华成油田技术服务有限公司 Soft bag-type oil cofferdam with functions of pollution oil storage and deep treatment
CN106948352A (en) * 2016-01-06 2017-07-14 北京翔鲲水务建设有限公司 Front leg strut shaped steel antiseepage film cofferdam and its construction method
CN107964969A (en) * 2017-11-08 2018-04-27 北京翔鲲水务建设有限公司 Stake film is combined cofferdam and its construction method with soil
CN210372525U (en) * 2019-07-22 2020-04-21 中国石油天然气股份有限公司西南管道兰成渝输油分公司 Combined type rapid oil containment weir

Similar Documents

Publication Publication Date Title
US20160238178A1 (en) Apparatus For Repairing A Pipe
CN206958424U (en) Buried pipe quick union
CN106718670B (en) A method of it is irrigated using buried irrigation pipe
CN110260089A (en) Oil pipeline emergency repair is with quickly enclosing oily weir
CN206468897U (en) A kind of deviation correcting device of push-bench
CN208446265U (en) A kind of mobile peace tears open, free adjustable type greenery patches sprinkling irrigation equipment
CN210372525U (en) Combined type rapid oil containment weir
CN103899840B (en) The method of construction that a kind of groundwater supply glass reinforced plastic sand pipe and fastener for connection are changed
CN105370953B (en) A kind of connector between tank and pump
US9297133B2 (en) Fluid fillable structure
CN105384048A (en) Pipeline lifting sling
CN201875431U (en) Steel pipeline squeezing interception device
CN107940125A (en) Piping lane and the piping lane assembly containing the piping lane
CN206890058U (en) A kind of chemical pipeline interface protector
CN109296866A (en) A kind of simple drainage pipeline prosthetic device and drainage pipeline restorative procedure
CN207714257U (en) Flexible anti-flood wall
CN206112391U (en) Environment -friendly is breathed out husband and is saved seal cover
CN104482244B (en) Formula fixing ball valve is filled on two way seal valve seat construction and ultralow temperature
CN208967313U (en) A kind of repair joint
CN108194729A (en) A kind of pipe connecting device
US10527217B2 (en) Launch system for underground gas main stop-off station
CN108131338A (en) A kind of high dismountable fuel tank of security performance
CN220377459U (en) Simple runner device for well chamber
KR101277187B1 (en) The calibration device for fluid blocking method
CN207121929U (en) A kind of concertina type inspection shaft

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination