CN110259410A - A kind of method that high-water-cut oil-producing well fixed tubular column realizes water blockoff - Google Patents

A kind of method that high-water-cut oil-producing well fixed tubular column realizes water blockoff Download PDF

Info

Publication number
CN110259410A
CN110259410A CN201910573586.3A CN201910573586A CN110259410A CN 110259410 A CN110259410 A CN 110259410A CN 201910573586 A CN201910573586 A CN 201910573586A CN 110259410 A CN110259410 A CN 110259410A
Authority
CN
China
Prior art keywords
slug
water
injection
oil
oil reservoir
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910573586.3A
Other languages
Chinese (zh)
Inventor
崔学章
蒋曙光
张伟
赵曦辉
都国景
孙青哲
贾成斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG DESHI PETROLEUM EQUIPMENT Co Ltd
Shandong Deshi Petroleum Engineering Group Co Ltd
Original Assignee
SHANDONG DESHI PETROLEUM EQUIPMENT Co Ltd
Shandong Deshi Petroleum Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG DESHI PETROLEUM EQUIPMENT Co Ltd, Shandong Deshi Petroleum Engineering Group Co Ltd filed Critical SHANDONG DESHI PETROLEUM EQUIPMENT Co Ltd
Priority to CN201910573586.3A priority Critical patent/CN110259410A/en
Publication of CN110259410A publication Critical patent/CN110259410A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

, the first slug the present invention relates to a kind of methods that water blockoff is realized in quarrying oil tech field, in particular to high-water-cut oil-producing well fixed tubular column, including the following steps: (1), various concentration constant flow injects in oil reservoir;(2), the second slug, preposed attributives are injected into oil reservoir deep;(3), third slug, blocking agent principal piece plug inject oil reservoir medium and deep portion;(4), the 4th slug, high-strength dose+crack agent, high-strength dose of injection pressure 6-10MPa;(5), after the completion of slug injection, the Injection Sections steadily puts such as which closes 5 days are fixed, then row opening well and making production.Operating cost is low, and later maintenance cost is low, and it is big that chemical agent involves space, is readily injected into target zone and plays a role.

Description

A kind of method that high-water-cut oil-producing well fixed tubular column realizes water blockoff
Technical field
The present invention relates to the sides that water blockoff is realized in quarrying oil tech field, in particular to a kind of high-water-cut oil-producing well fixed tubular column Method.
Background technique
Well water is one of oil extraction process of oil well important phenomenon, is generally existing in oilfield exploitation procedure ask Topic.In the case that well recovery later period or periphery water filling are more, water accounting is seriously affected and is adopted to 90% or more in oil well produced liquid Oily efficiency.Oilwell water shutoff refers to that use mechanical means or chemical method to carry out water blockoff processing to water logging oil well goes out to reduce oil well Water improves crude output.
Chemical water shutoff is to be injected into stratum High Permeability Interval using specific chemical agent as water shutoff agent, close by reducing The water phase permeability in well area achievees the purpose that reducing oil well produces water, increases crude output.The mechanism of action are as follows: rely on technique hand Section makes chemical plugging agent be selectively entered the higher middle less permeable layer of water saturation or water outlet crack, (main in residual resistive It is physical clogging) under effect, is formed in layer or in fracture hole and manually blocked, inhibit channelling, the coning of water, to make the expansion of displacement energy Greatly to the higher middle less permeable layer of oil saturation or crack duct, change the yield of longitudinal production profile and Fracture System Layout improves waterflood efficiency, so as to improve the development effectiveness of oil reservoir.
Non-selective chemical plugging: the prior art needs tripping in packer in operating tool string combination, isolates water blockoff purpose Layer, reinjects blocking agent.Suitable for blocking single water layer or high aquifer formation;But there are disadvantages, need tripping in packer, operating cost Height, later maintenance cost are high.Selective chemical water blockoff: selecting chemical agent appropriate, blocks water layer or changes between oil, water, rock Interfacial tension, reduce the water phase permeability of oil-water common-layer, oleic permeability influenced smaller, but there are disadvantage, chemical agents It is small to involve space, is difficult injection target zone and plays a role.
Summary of the invention
The technical problem to be solved by the present invention is to overcome the defects of above-mentioned technology, provide a kind of high-water-cut oil-producing well fixed tubular column The method for realizing water blockoff.
In order to solve the above technical problems, technical solution provided by the invention is that a kind of high-water-cut oil-producing well fixed tubular column realizes stifled The method of water, including the following steps:
(1), the first slug, various concentration constant flow inject in oil reservoir, 2~10MPa of injection pressure;
(2), the second slug, preposed attributives are injected into oil reservoir deep, 2~4MPa of injection pressure, and the second slug is located at first In slug;
(3), third slug, blocking agent principal piece plug inject oil reservoir medium and deep portion, 3~8MPa of injection pressure, and third slug is located at In second slug;
(4), the 4th slug, high-strength dose+crack agent, high-strength dose of injection pressure 6-10MPa;Crack agent injection pressure 12MPa More than, in fracture pressure hereinafter, injecting to greatest extent, the 4th slug is located in third slug for control.
(5), after the completion of slug injection, the Injection Sections steadily puts such as which closes 5 days are fixed, then row opening well and making production.
The advantages of the present invention over the prior art are that: operating cost is low, and later maintenance cost is low, and chemical agent involves sky Between it is big, be readily injected into target zone and play a role.
Detailed description of the invention
Fig. 1 is the structural schematic diagram for the method that a kind of high-water-cut oil-producing well fixed tubular column of the present invention realizes water blockoff.
It is as shown in the figure: 1, the first slug, the 2, second slug, 3, third slug, the 4, the 4th slug.
Specific embodiment
The method for realizing water blockoff to a kind of high-water-cut oil-producing well fixed tubular column of the present invention with reference to the accompanying drawing is done further detailed It describes in detail bright.
In conjunction with attached drawing 1, a kind of method that high-water-cut oil-producing well fixed tubular column realizes water blockoff, including the following steps:
(1), the first slug, various concentration constant flow inject in oil reservoir, 2~10MPa of injection pressure;Lab scale, first from low To the equipment of high concentration, technique, oil well and reservoir parameter matching test, foundation is provided for the feasible and perfect modification of subsequent schedule.
(2), the second slug, preposed attributives are injected into oil reservoir deep, 2~4MPa of injection pressure, and the second slug is located at first In slug;Controlling water reduces the selective forward position slug of oil flow resistance.Low pressure is injected into the deep in High water cut channel, prevents High water cut The deep water and potential source of main channel construct slug deep early period.
(3), third slug, blocking agent principal piece plug inject oil reservoir medium and deep portion, 3~8MPa of injection pressure, and third slug is located at In second slug;Middle pressure injection enters the netted high-drag of intelligence and residual resistance factor injecting system.Regulate and control near wellbore zone mobility, solves Heterogeneous predominant pathway problem in interlevel layer, improves hypotonic substratum utilization rate.
(4), the 4th slug, high-strength dose+crack agent, high-strength dose of injection pressure 6-10MPa;Crack agent injection pressure 12MPa More than, in fracture pressure hereinafter, injecting to greatest extent, the 4th slug is located in third slug for control.High intensity sealing seals It extends the expiration date;On the one hand the width for increasing profile control, further increases the flow resistance for altering layer, high permeability area liquid;Last high pressure Injection solves the problems, such as high-strength sealing slug push to oil reservoir deep with releasing it is hypotonic be adjusted, the Liquid output after raising measure.It realizes Purpose that is aqueous, improving pressure difference liquid measure and increasing oil drops.
Above four slugs, total injection rate 630m3, theoretical calculation water blockoff width is about 15m.In oil reservoir physical difference compared with Greatly, or there are microcrack etc., the developed width of water shutoff agent will be far longer than the 15m that theoretical calculation goes out, and a kind of irregular Shape.
(5), after the completion of slug injection, the Injection Sections steadily puts such as which closes 5 days are fixed, then row opening well and making production.
And when carrying out slug injection, in order to expand the area that medicament involves, plays the role of better, need to adopt Cavitation technique is shaken with waterpower.
The present invention and its embodiments have been described above, this description is no restricted, shown in the drawings Only one of embodiments of the present invention, actual structure is not limited to this.All in all if the ordinary skill of this field Personnel are enlightened by it, without departing from the spirit of the invention, are not inventively designed and the technical solution phase As frame mode and embodiment, be within the scope of protection of the invention.

Claims (1)

1. a kind of method that high-water-cut oil-producing well fixed tubular column realizes water blockoff, characterized in that it comprises the following steps:
(1), the first slug, various concentration constant flow inject in oil reservoir, 2~10MPa of injection pressure;
(2), the second slug, preposed attributives are injected into oil reservoir deep, 2~4MPa of injection pressure, and the second slug is located at the first slug It is interior;
(3), third slug, blocking agent principal piece plug inject oil reservoir medium and deep portion, 3~8MPa of injection pressure, and third slug is located at second In slug;
(4), the 4th slug, high-strength dose+crack agent, high-strength dose of injection pressure 6-10MPa;Agent injection pressure 12MPa or more is cracked, In fracture pressure hereinafter, injecting to greatest extent, the 4th slug is located in third slug for control.
(5), after the completion of slug injection, the Injection Sections steadily puts such as which closes 5 days are fixed, then row opening well and making production.
CN201910573586.3A 2019-06-28 2019-06-28 A kind of method that high-water-cut oil-producing well fixed tubular column realizes water blockoff Pending CN110259410A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910573586.3A CN110259410A (en) 2019-06-28 2019-06-28 A kind of method that high-water-cut oil-producing well fixed tubular column realizes water blockoff

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910573586.3A CN110259410A (en) 2019-06-28 2019-06-28 A kind of method that high-water-cut oil-producing well fixed tubular column realizes water blockoff

Publications (1)

Publication Number Publication Date
CN110259410A true CN110259410A (en) 2019-09-20

Family

ID=67922752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910573586.3A Pending CN110259410A (en) 2019-06-28 2019-06-28 A kind of method that high-water-cut oil-producing well fixed tubular column realizes water blockoff

Country Status (1)

Country Link
CN (1) CN110259410A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103498643A (en) * 2013-10-23 2014-01-08 天津亿利科能源科技发展股份有限公司 Composite slug deep water plugging method for oil pool with high water content
CN104060974A (en) * 2014-03-27 2014-09-24 上海井拓石油开发技术有限公司 Integrated technology of equal fluidity oil displacement and profile control
WO2015044220A2 (en) * 2013-09-30 2015-04-02 Mærsk Olie Og Gas A/S Multiphase fluid analysis
RU2570157C1 (en) * 2014-11-25 2015-12-10 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method for enhanced oil recovery for deposit penetrated by horizontal well
CN105298438B (en) * 2015-10-23 2017-12-22 克拉玛依新科澳石油天然气技术股份有限公司 More fine profile control methods in round polymer gel deep
CN107652953A (en) * 2017-09-13 2018-02-02 中国石油天然气股份有限公司 High-temperature-resistant high-salt-resistant slug type chemical water plugging agent
CN108533238A (en) * 2018-04-18 2018-09-14 中国石油天然气股份有限公司 Method for plugging dominant seepage channel after polymer flooding
CN109630066A (en) * 2019-02-27 2019-04-16 杨凌单色生物科技有限公司 The method of low-permeability oilfield high-water-cut oil-producing well water blockoff and acidification integration of operation

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015044220A2 (en) * 2013-09-30 2015-04-02 Mærsk Olie Og Gas A/S Multiphase fluid analysis
CN103498643A (en) * 2013-10-23 2014-01-08 天津亿利科能源科技发展股份有限公司 Composite slug deep water plugging method for oil pool with high water content
CN104060974A (en) * 2014-03-27 2014-09-24 上海井拓石油开发技术有限公司 Integrated technology of equal fluidity oil displacement and profile control
CN104060974B (en) * 2014-03-27 2016-08-24 上海井拓石油开发技术有限公司 Deng the mobility displacement of reservoir oil and profile control integrated technique
RU2570157C1 (en) * 2014-11-25 2015-12-10 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method for enhanced oil recovery for deposit penetrated by horizontal well
CN105298438B (en) * 2015-10-23 2017-12-22 克拉玛依新科澳石油天然气技术股份有限公司 More fine profile control methods in round polymer gel deep
CN107652953A (en) * 2017-09-13 2018-02-02 中国石油天然气股份有限公司 High-temperature-resistant high-salt-resistant slug type chemical water plugging agent
CN108533238A (en) * 2018-04-18 2018-09-14 中国石油天然气股份有限公司 Method for plugging dominant seepage channel after polymer flooding
CN109630066A (en) * 2019-02-27 2019-04-16 杨凌单色生物科技有限公司 The method of low-permeability oilfield high-water-cut oil-producing well water blockoff and acidification integration of operation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王刚: "不动管柱选择性化学堵水技术在低渗透油田的应用", 《内蒙古石油化工》 *

Similar Documents

Publication Publication Date Title
CN104563990B (en) One kind bores blanking integration and heat injection cooperative reinforcing coal bed gas extraction method
CN104790951B (en) Weaken the method and device away from the high-order tight roofs of 100 ~ 350m of coal seam
CA2620344C (en) Toe-to-heel waterflooding with progressive blockage of the toe region
RU2558058C1 (en) Interval hydraulic fracturing of carbonate formation in horizontal wellbore with bottom water
CN103470242B (en) A kind of oilfield horizontal well volume fracturing method
CN107269255B (en) Method and device for exploiting compact oil through inter-cluster oil displacement
RU2526062C1 (en) Multiple hydraulic fracturing of formation in well horizontal shaft
RU2490442C1 (en) Method for well completion
CN110424912A (en) Method, the row's of returning service unit and the completion structure of tubing string replacement filling layer are not changed
CN103306645B (en) Horizontal well the pressure of the drill splits completion tubular column and technique thereof
CN111472739A (en) Staged fracturing production-increasing transformation method for 3-inch semi-solid well completion shaft of sidetracking horizontal well
RU2570157C1 (en) Method for enhanced oil recovery for deposit penetrated by horizontal well
CN109630086A (en) A kind of energization refracturing process for old well
CN106050200B (en) It is a kind of to note pressure-air oxicracking flooding method to LOW PERMEABILITY RESERVOIR
RU2599156C1 (en) Method of interval treatment of bottom hole zone of horizontal well shaft
CN102767353A (en) Comprehensive mining technology of drowned well
RU2550638C1 (en) Hydraulic fracturing method for low-permeable formation with impermeable layer and water-bearing interlayer
CN202645526U (en) Jet flow sand blasting cracking device
RU2571964C1 (en) Hydrofracturing method for formation in well
CN110259410A (en) A kind of method that high-water-cut oil-producing well fixed tubular column realizes water blockoff
RU2740505C1 (en) Acid treatment method of open horizontal shaft of wells
CN205297495U (en) Sand blasting perforator
RU2599155C1 (en) Method of treatment of bottom-hole zone of the horizontal shafts of boreholes, opening carbonate collector
CN101949283A (en) Water reducing, de-plugging and yield increasing integrated process
RU2560018C1 (en) Water flow isolation technique in uncased horizontal borehole section of producing well

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190920