CN110259250A - A kind of open loop tower - Google Patents
A kind of open loop tower Download PDFInfo
- Publication number
- CN110259250A CN110259250A CN201910602077.9A CN201910602077A CN110259250A CN 110259250 A CN110259250 A CN 110259250A CN 201910602077 A CN201910602077 A CN 201910602077A CN 110259250 A CN110259250 A CN 110259250A
- Authority
- CN
- China
- Prior art keywords
- arm
- cross
- conducting wire
- wire cross
- shaft tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 claims description 11
- 230000005611 electricity Effects 0.000 abstract description 7
- 230000005540 biological transmission Effects 0.000 abstract description 6
- 230000009466 transformation Effects 0.000 abstract description 3
- 239000002689 soil Substances 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 6
- 238000010276 construction Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/08—Structures made of specified materials of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/24—Cross arms
Abstract
The present invention relates to electric power line pole tower fields, especially a kind of open loop tower, including shaft tower ontology, it is characterized by: being provided with ground wire cross-arm, the first conducting wire cross-arm, the second conducting wire cross-arm and privates cross-arm, the ground wire cross-arm, the first conducting wire cross-arm, the second conducting wire cross-arm and privates cross-arm arrangement in Y-shape from top to bottom along shaft tower ontology.Distinctive feature of the invention is: carrying out only needing newly-built 1 base shaft tower when π connects transformation to transmission line of electricity, is not only putting into small also can be reduced and occupy soil.
Description
Technical field
The present invention relates to electric power line pole tower field, especially a kind of open loop tower.
Background technique
With in the stepping up of urbanization degree, Modernized City Construction accelerated development, Industry Development Area, enterprise changes
Enlarging and newly-built, the increase of electricity consumption and load density cause layouting for substation increasingly close.In order to improve the rack of power grid
Structure, promotes the reliability and security of power grid, and 110kV voltage class transmission line of electricity list π, double π are using extremely wide, for electricity
π route is by a relatively simple for cable road, finds suitable open loop point position, transition joint is made, for overhead line
Generally there are these three patterns of the double π of single receipt π, double back list π, double back on road.In current transmission line of electricity, π technology generally uses 2-3 base
Terminal shaft tower is achieved, and list π will form a triangular form sometimes after the completion of double back transmission line is implemented, and double π situations are according to opening
The position difference of circling point will form two line corridors, though technical solution is more mature, on the ground that land resource is more nervous
Area, newly-built 2-3 base shaft tower not only put into big and occupy large amount of land resources.
Summary of the invention
The purpose of the present invention is to provide a kind of open loop towers, are carrying out only needing newly-built 1 base shaft when π connects transformation to transmission line of electricity
Tower not only puts into small also can be reduced and occupies soil.
Realizing the technical solution of the object of the invention is: a kind of open loop tower, including shaft tower ontology, it is characterised in that: along shaft tower
Ontology is provided with ground wire cross-arm, the first conducting wire cross-arm, the second conducting wire cross-arm and privates cross-arm, the ground wire from top to bottom
Cross-arm, the first conducting wire cross-arm, the second conducting wire cross-arm and privates cross-arm arrangement in Y-shape.
And ground wire cross-arm, the first conducting wire cross-arm, the second conducting wire cross-arm and the privates cross-arm by three with shaft tower
Ontology is that the cross-arm body of center of circle arrangement in Y-shape forms, and the cross-arm body is connect by two connectors with shaft tower ontology.
And two connectors are the stiffened panels of a pair of of parallel arrangement, described stiffened panel one end and shaft tower ontology connect
It connects the other end to extend to outside shaft tower ontology, the inside of the stiffened panel and the two sides of cross-arm body all have a series of corresponding
Installation hole location, there is bolt to pass through from above-mentioned installation hole location and connect stiffened panel with cross-arm body.
And described outwardly extending one end of cross-arm body is equipped with strain insulator-string thread gripping-board and jumper string thread gripping-board.
And the lateral length of the second conducting wire cross-arm is greater than the lateral length of first, privates cross-arm, and it is described
Ground wire cross-arm lateral length less than the first, lateral length of privates cross-arm.
The present invention has the advantages that comparing conventional open-loop carrying out only creating 1 base shaft tower when π connects transformation to transmission line of electricity
Scheme reduces 1 base of shaft tower, reduces the project amount of shaft tower and basis, and has saved line corridor channel, saves construction investment.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of open loop tower;
Fig. 2 is the top view of open loop tower;
Fig. 3 is open loop tower partial structural diagram;
Fig. 4 is the structural schematic diagram of cross-arm body;
Fig. 5 is the structural schematic diagram of cross-arm body;
Fig. 6 connects modification scheme schematic diagram using the π of open loop tower;
Fig. 7 is that prior art π connects modification scheme schematic diagram.
Specific embodiment
Referring to Fig. 1~7, below with reference to embodiment, the present invention will be further described.
The present invention relates to electric power line pole tower field, especially a kind of open loop tower, including shaft tower ontology 1, it is characterised in that:
It is provided with ground wire cross-arm 2, the first conducting wire cross-arm 3, the second conducting wire cross-arm 4 and privates cross-arm from top to bottom along shaft tower ontology 1
5, the ground wire cross-arm 1, the first conducting wire cross-arm 2, the second conducting wire cross-arm 3 and the arrangement in Y-shape of privates cross-arm 4.
The unilateral open loop that 1 base shaft tower is achieved that route has only been created using the design scheme, has compared conventional open-loop scheme
1 base of shaft tower is reduced, the project amount of shaft tower and basis is reduced, and has saved line corridor channel, saves construction investment.
And ground wire cross-arm 1, the first conducting wire cross-arm 2, the second conducting wire cross-arm 3 and the privates cross-arm 4 is by three
Root is formed with the cross-arm body 7 that shaft tower ontology 1 is center of circle arrangement in Y-shape, and the cross-arm body 7 passes through two connectors and bar
Tower ontology 1 connects.
Cross-arm body 7 is connect by two connectors with shaft tower ontology 1, stabilized structure.
Further technical solution can be the stiffened panel 6 that two connectors are a pair of of parallel arrangements, and described adds
6 one end of gusset connect the other end with shaft tower ontology 1 and extends to outside shaft tower ontology 1, the inside of the stiffened panel 6 and cross-arm body
7 two sides all have a series of corresponding installation hole locations, have bolt to pass through from above-mentioned installation hole location and by stiffened panel 6 and horizontal
Ontology 7 is carried on a shoulder pole to connect.
The inside of stiffened panel 6 and the two sides of cross-arm body 7 all have a series of corresponding installation hole locations, and when installation will be horizontal
The installation hole location for carrying on a shoulder pole 7 two sides of ontology is aligned with the installation hole location of two stiffened panels, 6 inside, has bolt to pass through from above-mentioned installation hole location
And it connects.
And described outwardly extending one end of cross-arm body 7 is equipped with strain insulator-string thread gripping-board 8 and jumper string thread gripping-board 9.
Strain insulator-string thread gripping-board 8 and jumper string thread gripping-board 9 are for hanging fitting.
The lateral length that further technical solution is also possible to the second conducting wire cross-arm 3, which is greater than first, third, leads
The lateral length of the lateral length of line cross-arm 2,4, the ground wire cross-arm 1 is long less than the transverse direction of first, privates cross-arm 2,4
Degree.
The lateral length of second conducting wire cross-arm 3 is greater than the lateral length of first, privates cross-arm 2,4, the ground wire
The lateral length of cross-arm 1 can satisfy ground wire to the shielding angle of conducting wire less than the lateral length of first, privates cross-arm 2,4
tan-1(horizontal distance/vertical range between grounded-line) is not more than 10 ° (110kV route), prevents ice-shedding from causing up and down
Wire spacing is insufficient, while being also able to satisfy the minimum water between the upper and lower level adjacent wires of the Ice Area 10mm or between ground wire and adjacent wires
Flat offset distance, 110kV route are not less than 0.5 meter, and 220kV route is not less than 1.0 meters.
Embodiment one,
As shown in fig. 6, A transformer substation side conducting wire and D substation side conducting wire jumper connection are formed 110kVDA route, by C substation
Side conducting wire and D substation side conducting wire jumper connection form 110kVDC route, by A transformer substation side conducting wire and B substation side conducting wire
Jumper connection restores 110kVAB route.Realize the unilateral side open loop of 110kVAC route.
The present invention is on the same day with regard to same subject application utility model patent.
Claims (5)
1. a kind of open loop tower, including shaft tower ontology, it is characterised in that: be provided with ground wire cross-arm, from top to bottom along shaft tower ontology
One conducting wire cross-arm, the second conducting wire cross-arm and privates cross-arm, the ground wire cross-arm, the first conducting wire cross-arm, the second conducting wire are horizontal
Load and privates cross-arm arrangement in Y-shape.
2. a kind of open loop tower according to claim 1, it is characterised in that: the ground wire cross-arm, the first conducting wire cross-arm,
Two conducting wire cross-arms and privates cross-arm are formed by three by the cross-arm body of center of circle arrangement in Y-shape of shaft tower ontology, institute
The cross-arm body stated is connect by two connectors with shaft tower ontology.
3. a kind of open loop tower according to claim 2, it is characterised in that: two connectors are a pair of of parallel arrangements
Stiffened panel, described stiffened panel one end connect the other end with shaft tower ontology and extend to outside shaft tower ontology, the stiffened panel it is interior
Side and the two sides of cross-arm body all have a series of corresponding installation hole locations, have bolt to pass through and incite somebody to action from above-mentioned installation hole location
Stiffened panel is connect with cross-arm body.
4. a kind of open loop tower according to claim 2, it is characterised in that: on the outwardly extending one end of the cross-arm body
Equipped with strain insulator-string thread gripping-board and jumper string thread gripping-board.
5. a kind of open loop tower according to claim 1, it is characterised in that: the lateral length of the second conducting wire cross-arm is big
In the first, lateral length of privates cross-arm, the lateral length of the ground wire cross-arm is less than first, privates cross-arm
Lateral length.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910602077.9A CN110259250A (en) | 2019-07-05 | 2019-07-05 | A kind of open loop tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910602077.9A CN110259250A (en) | 2019-07-05 | 2019-07-05 | A kind of open loop tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110259250A true CN110259250A (en) | 2019-09-20 |
Family
ID=67924519
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910602077.9A Pending CN110259250A (en) | 2019-07-05 | 2019-07-05 | A kind of open loop tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110259250A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102312605A (en) * | 2011-04-07 | 2012-01-11 | 济南巨能铁塔制造有限公司 | Square cross arm |
CN107386758A (en) * | 2017-06-21 | 2017-11-24 | 国核电力规划设计研究院有限公司 | A kind of double back transmission line cut-offs steel pipe tower and system |
CN210888265U (en) * | 2019-07-05 | 2020-06-30 | 荆州市荆力工程设计咨询有限责任公司 | Open loop tower |
-
2019
- 2019-07-05 CN CN201910602077.9A patent/CN110259250A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102312605A (en) * | 2011-04-07 | 2012-01-11 | 济南巨能铁塔制造有限公司 | Square cross arm |
CN107386758A (en) * | 2017-06-21 | 2017-11-24 | 国核电力规划设计研究院有限公司 | A kind of double back transmission line cut-offs steel pipe tower and system |
CN210888265U (en) * | 2019-07-05 | 2020-06-30 | 荆州市荆力工程设计咨询有限责任公司 | Open loop tower |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202520040U (en) | Bifurcated pole tower for realizing double-T connection of double circuit power transmission line | |
CN202970091U (en) | 220-kilovolt same-rod two-circuit tower head full composite material steel pipe rod | |
CN201406865Y (en) | 66KV overhead transmission line double-circuit horizontal crossing tower | |
CN204691375U (en) | The narrow base steel tube tower of a kind of 220kV tetra-return cable terminal | |
CN207847235U (en) | No ground pole DC transmission line line pole tower | |
CN209924555U (en) | 220kV single-loop strain drill crossing tower | |
CN110259250A (en) | A kind of open loop tower | |
CN207260730U (en) | A kind of double loop cable termination tower | |
CN207813168U (en) | Singly cut-off π sections towers in double loop | |
CN203205717U (en) | Compact 220kV outdoor GIS power distribution equipment | |
CN203514924U (en) | Single-circuit T-connection iron tower of 35 kV electric transmission line | |
CN108005458A (en) | Singly cut-off π sections towers in double loop | |
CN201307742Y (en) | Horizontally through-type iron tower of 66KV overhead lines | |
CN210888265U (en) | Open loop tower | |
CN205604822U (en) | Two loop cable terminals electric power steel pipe pole structure | |
CN204850641U (en) | Single -column steel pipe pole | |
CN208251779U (en) | A kind of exchange double back transmission line tangent tower | |
CN204343772U (en) | Narrow base cable shoe steel tube tower under four return cable | |
CN202949190U (en) | Shielding line for inhibiting ground composite field intensity below high-voltage direct current lines | |
CN203113869U (en) | Tower combination pattern for multi-circuit extra-high voltage direct current transmission line paralleling | |
CN202227763U (en) | Tower in compact structure | |
CN206071191U (en) | Bore and get over tower in 110kV common-tower double-returns road | |
CN205206456U (en) | Two backcrossing of tight type of excelling in is flowed with four times steel pipe towers in tower | |
CN205012746U (en) | Last style of calligraphy of 35kV cluster tangent tower | |
CN202202609U (en) | Butterfly type through iron tower of overhead power transmission line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200727 Address after: No.48-16, Jinlong Road, Jinsha District, Jingzhou City, Hubei Province Applicant after: JINGZHOU JINGLI ENGINEERING DESIGN CONSULTING Co.,Ltd. Applicant after: JINGZHOU POWER SUPPLY COMPANY OF STATE GRID HUBEI ELECTRIC POWER Co.,Ltd. Address before: 434000 No. 48-16 Jinlong Road, Jinsha District, Jingzhou City, Hubei Province Applicant before: JINGZHOU JINGLI ENGINEERING DESIGN CONSULTING Co.,Ltd. |