CN110258921A - Steel and concrete combined beam - Google Patents
Steel and concrete combined beam Download PDFInfo
- Publication number
- CN110258921A CN110258921A CN201910661897.5A CN201910661897A CN110258921A CN 110258921 A CN110258921 A CN 110258921A CN 201910661897 A CN201910661897 A CN 201910661897A CN 110258921 A CN110258921 A CN 110258921A
- Authority
- CN
- China
- Prior art keywords
- steel
- rib
- short
- fixed
- ribs
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/29—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
- E04C3/293—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Composite Materials (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
The invention relates to the field of precast beams, in particular to a steel and concrete composite beam which comprises two long ribs, wherein a plurality of short ribs are fixedly connected between the two long ribs, a plurality of steel plate grooves are fixedly arranged on the short ribs, the steel plate grooves are arranged along the length direction of the beam, the side surfaces of adjacent steel plate grooves are fixedly connected, vertical connecting seats are fixed at two ends of each long rib, the connecting seats are used for connecting floor slabs, the two connecting seats at the same end of the beam are fixedly connected through square steel, the square steel and the long ribs are respectively positioned at two opposite sides of the connecting seats, and reinforcing ribs are fixedly connected with the bottom surfaces of the square steel and the side surfaces of the connecting seats; the steel bar is horizontally arranged in the square steel in a penetrating mode, the steel bar penetrates through the two ends of the steel plate groove along the length direction of the beam, a plurality of sleeves are arranged on the side face, back to the steel plate groove, of the square steel in a clinging mode, each sleeve is internally provided with one steel bar, and the steel bars are fixedly connected with the sleeves. The steel structure and the concrete structure are matched, so that the steel and concrete combined beam has the advantage of strong end part pushing resistance.
Description
Technical field
The present invention relates to precast beam fields, more particularly, to a kind of steel, concrete combination beam.
Background technique
T plate is the solidifying native bearing carrier of precast reinforced rolling of plate, beam combination, by roomy panel and two narrow and high ribs
Composition, panel is both the compressive region of transverse bearing structure and longitudinal load-bearing rib.Compressive region section is larger, and natural axis is close
Or entering panel, tension main reinforcement has the biggish arm of force.So T plate has good structural mechanical property, specific power transmission
Level, succinct geometry are the bearing carriers of a kind of large span, big area coverage.Prestressing force T plate span is up to 20 meters
More than, up to 30 meters or more if with high-strength lightweight concrete.
But the most fatal problem of T plate, which is exactly that end is anti-, pushes away that performance is poor, and prestress steel is almost nil in end pulling force, and grain
The lateral pressures such as library, garage are big, and anti-to plate end to push away more demanding, therefore T plate is unable to reach requirement.
Summary of the invention
The object of the present invention is to provide a kind of steel, concrete combination beam, have the advantages that anti-to push away performance strong for end.
Foregoing invention purpose of the invention has the technical scheme that a kind of steel, concrete combination beam,
Long rib including two along the setting of beam length direction is fixedly connected with several short ribs between two root long ribs, and fixation is set on the short rib
There are several steel tanks, steel tank is arranged along beam length direction, and the side of adjacent steel tank is fixedly connected, and the both ends of long rib are fixed
There is vertical attachment base, for connecting floor, two attachment bases positioned at beam the same end are fixedly connected attachment base by square steel, side
Steel and long rib are located at the opposite sides of attachment base, and square steel bottom surface and attachment base side are fixedly connected with ribs;In square steel
Level wears several reinforcing bars, and reinforcing bar runs through the both ends of steel tank along the length direction of beam, and square steel is back on the side of steel tank
It is close to be equipped with several sleeves, wears a reinforcing bar in every sleeve, reinforcing bar is fixedly connected with sleeve;Every reinforcing bar is located in square steel
Part be cased with casing, the both ends of casing and square steel inner wall are seamlessly connected, and pour slightly expanded concrete layer in square steel.
By using above-mentioned technical proposal, reinforcing bar is forcibly positioned on beam by steel tank, and square steel can only be along reinforcing bar
Length direction movement, but the reinforcement of the blocking of attachment base and ribs is not easy square steel along the length side of reinforcing bar by postponing
To movement, so square steel tends to be pushed into deformation, and slightly expanded concrete layer is poured in square steel deform square steel can not, that
Thrust is conducted to long rib, so that long rib is tended to bending deformation, but several steel tanks and short rib are equivalent to the reinforcement bone of long rib
Frame, so long rib is also not easy bending deformation.To sum up, above-mentioned steel, concrete combination beam have the advantages that anti-to push away performance strong for end.
Preferably, straight-bar is horizontally fixed between two attachment bases at same root long rib both ends.
By using above-mentioned technical proposal, an attachment base is propped up at the both ends of straight-bar respectively, strengthens long rib, makes long rib not
Flexible deformation.
Preferably, several brackets are fixed on the long rib, cradle top is fixed with U-shaped board, and straight-bar is located in U-shaped board,
The width of straight-bar and the width fits of U-shaped board.
By using above-mentioned technical proposal, U-shaped board limits straight-bar, prevents straight-bar from being bent to the width direction of beam, mentions
The high support effect of straight-bar.
Preferably, section of the steel tank along beam width direction is T-shaped, and upper and lower two layers of steel is worn in every steel tank
Muscle, top bars quantity are three, and lower layer's number of steel bars is one.
By using above-mentioned technical proposal, the multistory reinforced connective stability for improving steel tank and reinforcing bar is also improved
The connective stability of square steel and reinforcing bar.
Preferably, the attachment base includes the first I-steel being vertically arranged, and the grooves on two sides of the first I-steel is interior from upper
Several transverse slats are horizontally fixed under;Short rib includes the first short rib and the second short rib, and the first short rib is located at the both ends of long rib, and first
The end of short rib is inserted into the groove of the first I-steel side and is welded and fixed.
By using above-mentioned technical proposal, the structural strength of attachment base and long rib is improved.
Preferably, the long rib includes the second I-steel, is fixed vertically from left to right in the outside groove of the second I-steel
There are several risers, the end of the second short rib is inserted into the second I-steel inboard groove.
By using above-mentioned technical proposal, the working strength of long rib is improved.
Preferably, the described second short rib is C-type steel, and the upper and lower two sides of the second short rib are equipped with notch, and it is short that notch passes to second
The end of rib, the bottom surface of notch and the inner wall of the second I-steel inboard groove are smooth, and the second short rib is welded and fixed with long rib.
By using above-mentioned technical proposal, the structural strength of the second short rib Yu long rib junction is improved.
Preferably, several angle steel are fixedly connected between two root long ribs, an angle steel, phase is set between every adjacent two short ribs
Adjacent two angle steel surround " eight " font.
By using above-mentioned technical proposal, the compressive property of beam width direction two sides is improved.
In conclusion advantageous effects of the invention are as follows:
1. by the cooperation of steel construction and concrete structure, the steel, concrete combination beam is made to have end is anti-to push away strong excellent of performance
Point;
2. improving the compressive property of beam width direction two sides by the way that short rib is designed to " eight " font.
Detailed description of the invention
Fig. 1 is the side view of a kind of steel in embodiment, concrete combination beam;
Fig. 2 is the perspective view of Fig. 1;
Fig. 3 is the bottom substance schematic diagram of Fig. 1;
Fig. 4 is the structural schematic diagram of steel tank;
Fig. 5 is the portion A enlarged drawing in Fig. 2;
Fig. 6 is the portion B enlarged drawing in Fig. 1;
Fig. 7 is the connection schematic diagram of the second I-steel and the second short rib.
In figure, 1, long rib;2, short rib;21, the first short rib;22, the second short rib;22a, notch;3, steel tank;4, it connects
Seat;5, ribs;6, reinforcing bar;7, sleeve;8, straight-bar;9, bracket;10, U-shaped board;11, the first I-steel;12, transverse slat;13, side
Steel;14, angle steel;15, the second I-steel;16, riser;17, casing;18, slightly expanded concrete layer.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment: Fig. 1 is a kind of steel disclosed by the invention, concrete combination beam, as shown in Figure 1 and Figure 2, including two mutually
Parallel long rib 1, length direction, that is, beam length direction of long rib 1 are vertically connected with several short ribs 2 between two root long ribs 1
(see figure 3).
As shown in Fig. 2, long rib 1 is welded to form by horizontal the second I-steel 15 and several risers 16, several risers 16 exist
It is arranged evenly and at intervals from left to right in the outside groove of second I-steel 15.Length direction on short rib 2 along beam is fixed with
The side of several steel tanks 3, adjacent steel tank 3 is welded and fixed.
As shown in figure 4, section of the steel tank 3 along beam width direction is T-shaped, upper and lower two layers of steel is worn in every steel tank 3
Muscle 6,6 quantity of top bars are three, and 6 quantity of lower layer's reinforcing bar is one, and reinforcing bar 6 is arranged along the length direction of beam, multistory reinforced 6
Improve the connective stability of steel tank 3 Yu reinforcing bar 6.
As shown in Fig. 2, the both ends of long rib 1 are respectively and fixedly provided with vertical attachment base 4, have at the top of attachment base 4 for connecting building
The connector of plate.Attachment base 4 is welded to form by the first vertical I-steel 11 and several transverse slats 12, and several transverse slats 12 are in the first work
It is arranged evenly and at intervals from top to bottom in the grooves on two sides of word steel 11.Two attachment bases 4 positioned at beam the same end pass through square steel 13
It is fixedly connected, square steel 13 is located at the opposite sides of attachment base 4, the fixed company in 13 bottom surface of square steel and 4 side of attachment base with long rib 1
It is connected to ribs 5.The horizontal square steel 13 for running through beam both ends of the reinforcing bar 6 being pierced by from 3 both ends of steel tank, square steel 13 is back to steel tank 3
Side tighten several sleeve 7(that are sticked and see Fig. 5), wear a reinforcing bar 6 in every sleeve 7, reinforcing bar 6 and sleeve 7 is fixed connects
It connects.Every reinforcing bar 6, which is located at the part in square steel 13 and is cased with casing 17(, sees Fig. 6), the both ends of casing 17 and the inner wall of square steel 13
It is seamlessly connected, pours slightly expanded concrete layer 18 in square steel 13.
It is horizontally fixed with straight-bar 8 as shown in Fig. 2, being located between two attachment bases 4 at same 1 both ends of root long rib, on long rib 1
Several brackets 9 are fixed with along length direction, U-shaped board 10 is fixed at the top of bracket 9, straight-bar 8 is located in U-shaped board 10, straight-bar 8
Width and U-shaped board 10 width fits.U-shaped board 10 limits straight-bar 8, prevents straight-bar 8 from being bent to the width direction of beam, mentions
The high support effect of straight-bar 8.
As shown in figure 3, several angle steel 14 are fixedly connected between two root long ribs 1, per arrangement one between adjacent two short ribs 2
Angle steel 14, adjacent two angle steel 14 surround " eight " font, improve the compressive property of beam width direction two sides.Short rib 2 includes two
The short rib 21 of root first and several second short ribs 22, two first short ribs 21 are fixed on the both ends of long rib 1, the end of the second short rib 22
Portion is inserted into the inboard groove of the second I-steel 15 and is welded and fixed.
As shown in fig. 7, the second short rib 22 is C-type steel, the upper and lower two sides of the second short rib 22 are equipped with notch 22a, notch 22a
The end of the second short rib 22 is passed to, the bottom surface of notch 22a and the inner wall of 15 inboard groove of the second I-steel are smooth, the second short rib 22
End insertion 15 side of the second I-steel groove in and be welded and fixed.
A kind of steel provided in this embodiment, concrete combination beam have end is anti-to push away the strong reason of performance are as follows: steel tank the last 3
Property processed reinforcing bar 6 is positioned on beam, and square steel 13 can only be moved along the length direction of reinforcing bar 6, but the blocking of attachment base 4 with
The reinforcement of ribs 5 makes square steel 13 be not easy to move along the length direction of reinforcing bar 6 by postponing, so square steel 13 tends to be pushed into
Deformation, and slightly expanded concrete layer 18 is poured in square steel 13 deform square steel 13 can not, then thrust is conducted to long rib 1
On, so that long rib 1 is tended to bending deformation, but several steel tanks 3 and short rib 2 are equivalent to the reinforcement skeleton of long rib 1, so long rib 1
It is not easy bending deformation.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this
Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it
It is interior.
Claims (8)
1. a kind of steel, concrete combination beam, long rib (1) including two along the setting of beam length direction is solid between two root long ribs (1)
Surely several short ribs (2) are connected, it is characterised in that: be fixed with several steel tanks (3) on the short rib (2), steel tank (3) is along beam
Length direction setting, the side of adjacent steel tank (3) are fixedly connected, and the both ends of long rib (1) are respectively and fixedly provided with vertical attachment base
(4), attachment base (4) is for connecting floor, and two attachment bases (4) positioned at beam the same end are fixedly connected by square steel (13), side
Steel (13) and long rib (1) are located at the opposite sides of attachment base (4), the fixed company in square steel (13) bottom surface and attachment base (4) side
It is connected to ribs (5);Level wears several reinforcing bars (6) in square steel (13), and reinforcing bar (6) runs through steel tank along the length direction of beam
(3) both ends, square steel (13) tightens to be sticked back to the side of steel tank (3) to be had several sleeves (7), is worn in every sleeve (7)
A piece reinforcing bar (6), reinforcing bar (6) are fixedly connected with sleeve (7);The part that every reinforcing bar (6) is located in square steel (13) is cased with
It manages (17), the both ends of casing (17) and square steel (13) inner wall are seamlessly connected, and pour slightly expanded concrete layer (18) in square steel (13).
2. a kind of steel according to claim 1, concrete combination beam, it is characterised in that: be located at same root long rib (1) both ends
Two attachment bases (4) between be horizontally fixed with straight-bar (8).
3. a kind of steel according to claim 2, concrete combination beam, it is characterised in that: the long rib (1) if on be fixed with
Heavenly Stems and Earthly Branches frame (9), bracket (9) top are fixed with U-shaped board (10), and straight-bar (8) is located in U-shaped board (10), the width and U of straight-bar (8)
The width fits of template (10).
4. a kind of steel according to claim 1, concrete combination beam, it is characterised in that: the steel tank (3) is along beam width
The section in direction is T-shaped, and upper and lower two layers of reinforcing bar (6) is worn in every steel tank (3), and top bars (6) quantity is three, under
Layer reinforcing bar (6) quantity is one.
5. a kind of steel according to claim 1, concrete combination beam, it is characterised in that: the attachment base (4) includes vertical
The first I-steel (11) being arranged is horizontally fixed with several transverse slats in the grooves on two sides of the first I-steel (11) from top to bottom
(12);Short rib (2) includes the first short rib (21) and the second short rib (22), and the first short rib (21) is located at the both ends of long rib (1), and first
In the groove of end insertion the first I-steel (11) side of short rib (21) and it is welded and fixed.
6. a kind of steel according to claim 5, concrete combination beam, it is characterised in that: the long rib (1) includes the second work
Word steel (15) is vertically fixed several risers (16) in the outside groove of the second I-steel (15), the second short rib from left to right
(22) in end insertion the second I-steel (15) inboard groove.
7. a kind of steel according to claim 6, concrete combination beam, it is characterised in that: the second short rib (22) is c-type
The upper and lower two sides of steel, the second short rib (22) are equipped with notch (22a), and notch (22a) passes to the end of the second short rib (22), notch
The bottom surface of (22a) and the inner wall of the second I-steel (15) inboard groove are smooth, and the second short rib (22) is welded and fixed with long rib (1).
8. a kind of steel according to claim 1, concrete combination beam, it is characterised in that: fixed between two root long ribs (1) to connect
Several angle steel (14) are connect, an angle steel (14) are set between every adjacent two short rib (2), adjacent two angle steel (14) surround " eight "
Font.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910661897.5A CN110258921B (en) | 2019-07-22 | 2019-07-22 | Steel and concrete combined beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910661897.5A CN110258921B (en) | 2019-07-22 | 2019-07-22 | Steel and concrete combined beam |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110258921A true CN110258921A (en) | 2019-09-20 |
CN110258921B CN110258921B (en) | 2021-03-02 |
Family
ID=67927720
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910661897.5A Active CN110258921B (en) | 2019-07-22 | 2019-07-22 | Steel and concrete combined beam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110258921B (en) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2107375A5 (en) * | 1970-09-11 | 1972-05-05 | Concrete Ltd | |
GB2219019A (en) * | 1988-05-26 | 1989-11-29 | Shimizu Construction Co Ltd | Prestressed girder |
CN1480605A (en) * | 2002-09-04 | 2004-03-10 | 朴在满 | PSSC combined beam |
KR100427405B1 (en) * | 2001-03-07 | 2004-04-17 | 박재만 | Pssc complex girder |
CN201433507Y (en) * | 2009-06-17 | 2010-03-31 | 中国电子工程设计院 | Honeycomb beam and steel building frame |
CN203174882U (en) * | 2013-04-25 | 2013-09-04 | 陈天夫 | Shock resistant composite beam for housing building |
CN203547017U (en) * | 2013-10-22 | 2014-04-16 | 湖北弘毅建设有限公司 | Long-span pre-stressing I-shaped steel reinforced concrete superposed beam |
CN104018582A (en) * | 2013-09-13 | 2014-09-03 | 柳忠林 | Prestressed concrete beams and slabs with flexural steel bars at upper portions and frame structure system |
CN207110166U (en) * | 2017-06-02 | 2018-03-16 | 北京中清恒业科技开发有限公司 | A kind of prefabricated PC close rib building roof composite plate |
CN207484827U (en) * | 2017-11-28 | 2018-06-12 | 苏州毅远住宅科技有限公司 | A kind of efficiently measuring body roof truss beam precast concrete |
CN111155714A (en) * | 2020-01-20 | 2020-05-15 | 河北工业大学 | Prefabricated steel pipe bundle part prestressed concrete beam and construction method thereof |
-
2019
- 2019-07-22 CN CN201910661897.5A patent/CN110258921B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2107375A5 (en) * | 1970-09-11 | 1972-05-05 | Concrete Ltd | |
GB2219019A (en) * | 1988-05-26 | 1989-11-29 | Shimizu Construction Co Ltd | Prestressed girder |
KR100427405B1 (en) * | 2001-03-07 | 2004-04-17 | 박재만 | Pssc complex girder |
CN1480605A (en) * | 2002-09-04 | 2004-03-10 | 朴在满 | PSSC combined beam |
CN201433507Y (en) * | 2009-06-17 | 2010-03-31 | 中国电子工程设计院 | Honeycomb beam and steel building frame |
CN203174882U (en) * | 2013-04-25 | 2013-09-04 | 陈天夫 | Shock resistant composite beam for housing building |
CN104018582A (en) * | 2013-09-13 | 2014-09-03 | 柳忠林 | Prestressed concrete beams and slabs with flexural steel bars at upper portions and frame structure system |
CN203547017U (en) * | 2013-10-22 | 2014-04-16 | 湖北弘毅建设有限公司 | Long-span pre-stressing I-shaped steel reinforced concrete superposed beam |
CN207110166U (en) * | 2017-06-02 | 2018-03-16 | 北京中清恒业科技开发有限公司 | A kind of prefabricated PC close rib building roof composite plate |
CN207484827U (en) * | 2017-11-28 | 2018-06-12 | 苏州毅远住宅科技有限公司 | A kind of efficiently measuring body roof truss beam precast concrete |
CN111155714A (en) * | 2020-01-20 | 2020-05-15 | 河北工业大学 | Prefabricated steel pipe bundle part prestressed concrete beam and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN110258921B (en) | 2021-03-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204225273U (en) | A kind of large-span prestressed groove type plate of upper bands bending steel muscle and frame construction | |
CN205875473U (en) | Built -in location prefab reinforced concrete shear wall | |
JP2006226054A (en) | Aseismic reinforcing method for existing reinforced concrete building with rigid frame structure | |
CN217517829U (en) | Connecting structure for building prefabricated floor and roof board | |
KR20040079917A (en) | Doubly prestressed roof-ceiling construction with grid flat-soffit for extremely large spans | |
CN111794421B (en) | Prefabricated concrete floor assembling method | |
CN110258921A (en) | Steel and concrete combined beam | |
KR101770988B1 (en) | Reforcing panel for concrete structure and reinforcing method using the same | |
CN205557901U (en) | Release of stress antidetonation, Wall masonry structure of preventing ftractureing | |
CN208981823U (en) | A kind of reinforced column enlarging section reinforces vertical muscle in the connection for meeting Liang Chu | |
CN110158772A (en) | A kind of assembled wall-light steel frame mixing house connecting structure | |
CN116006187A (en) | Method for expanding tunnel excavation step distance | |
CN215406527U (en) | Frame structure additional building system with column bottom tie beam | |
Schneider et al. | The design and construction of concrete-filled steel tube column frames | |
KR100301305B1 (en) | Composite floor structure of high-rise building and its construction method | |
CN211548369U (en) | Assembled reinforced concrete beam structure | |
CN113445623A (en) | Frame structure additional building system with column bottom tie beam | |
CN103590593B (en) | A kind of assembled architecture bracing frame | |
CN106284753B (en) | The connection structure of steel construction and precast slab | |
KR20090003572A (en) | Composite floor structure for sump system | |
CN218091337U (en) | Structure of encorbelmenting based on architectural design | |
KR102438445B1 (en) | Reinforcing material with enlarged head and the reinforcing method using the same | |
CN218843565U (en) | Precast concrete stair with anti-seismic structure | |
KR20190070032A (en) | Composite deck plate for adhering z-shaped latticed bar, and manufacturing method for the same | |
CN220538880U (en) | Construction structure for solving effective connection of wood structure and brick wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220511 Address after: 214000 No.9, Fangqian Fangxing Road, Xinwu District, Wuxi City, Jiangsu Province Patentee after: Jiangsu xinsuyang Construction Co.,Ltd. Address before: 214000 No.9, Fangqian Fangxing Road, Xinwu District, Wuxi City, Jiangsu Province Patentee before: Jiangsu Suyang Construction Co.,Ltd. |