CN110258721A - A kind of method of supplying water of combined type secondary water-supply water storage apparatus - Google Patents
A kind of method of supplying water of combined type secondary water-supply water storage apparatus Download PDFInfo
- Publication number
- CN110258721A CN110258721A CN201910527056.5A CN201910527056A CN110258721A CN 110258721 A CN110258721 A CN 110258721A CN 201910527056 A CN201910527056 A CN 201910527056A CN 110258721 A CN110258721 A CN 110258721A
- Authority
- CN
- China
- Prior art keywords
- water
- period
- formula
- day
- indicate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 786
- 238000003860 storage Methods 0.000 title claims abstract description 80
- 238000000034 method Methods 0.000 title claims abstract description 57
- 239000008400 supply water Substances 0.000 title claims abstract description 23
- 238000004364 calculation method Methods 0.000 claims description 46
- 238000011897 real-time detection Methods 0.000 claims description 29
- 238000001514 detection method Methods 0.000 claims description 16
- 230000005540 biological transmission Effects 0.000 claims description 10
- 230000000717 retained effect Effects 0.000 claims description 7
- 238000009736 wetting Methods 0.000 claims description 2
- 239000008399 tap water Substances 0.000 abstract description 39
- 235000020679 tap water Nutrition 0.000 abstract description 39
- 230000002906 microbiologic effect Effects 0.000 abstract description 5
- 238000012545 processing Methods 0.000 description 10
- 238000006243 chemical reaction Methods 0.000 description 7
- 238000013500 data storage Methods 0.000 description 7
- 230000008859 change Effects 0.000 description 6
- ZAMOUSCENKQFHK-UHFFFAOYSA-N Chlorine atom Chemical compound [Cl] ZAMOUSCENKQFHK-UHFFFAOYSA-N 0.000 description 5
- 229910052801 chlorine Inorganic materials 0.000 description 5
- 239000000460 chlorine Substances 0.000 description 5
- GWEVSGVZZGPLCZ-UHFFFAOYSA-N Titan oxide Chemical compound O=[Ti]=O GWEVSGVZZGPLCZ-UHFFFAOYSA-N 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 210000000352 storage cell Anatomy 0.000 description 4
- 238000005660 chlorination reaction Methods 0.000 description 3
- 238000005265 energy consumption Methods 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 230000000153 supplemental effect Effects 0.000 description 3
- NAXKFVIRJICPAO-LHNWDKRHSA-N [(1R,3S,4R,6R,7R,9S,10S,12R,13S,15S,16R,18S,19S,21S,22S,24S,25S,27S,28R,30R,31R,33S,34S,36R,37R,39R,40S,42R,44R,46S,48S,50R,52S,54S,56S)-46,48,50,52,54,56-hexakis(hydroxymethyl)-2,8,14,20,26,32,38,43,45,47,49,51,53,55-tetradecaoxa-5,11,17,23,29,35,41-heptathiapentadecacyclo[37.3.2.23,7.29,13.215,19.221,25.227,31.233,37.04,6.010,12.016,18.022,24.028,30.034,36.040,42]hexapentacontan-44-yl]methanol Chemical group OC[C@H]1O[C@H]2O[C@H]3[C@H](CO)O[C@H](O[C@H]4[C@H](CO)O[C@H](O[C@@H]5[C@@H](CO)O[C@H](O[C@H]6[C@H](CO)O[C@H](O[C@H]7[C@H](CO)O[C@@H](O[C@H]8[C@H](CO)O[C@@H](O[C@@H]1[C@@H]1S[C@@H]21)[C@@H]1S[C@H]81)[C@H]1S[C@@H]71)[C@H]1S[C@H]61)[C@H]1S[C@@H]51)[C@H]1S[C@@H]41)[C@H]1S[C@H]31 NAXKFVIRJICPAO-LHNWDKRHSA-N 0.000 description 2
- 125000001309 chloro group Chemical group Cl* 0.000 description 2
- 235000020188 drinking water Nutrition 0.000 description 2
- 239000003651 drinking water Substances 0.000 description 2
- 230000008676 import Effects 0.000 description 2
- 244000005700 microbiome Species 0.000 description 2
- 238000004659 sterilization and disinfection Methods 0.000 description 2
- 239000010936 titanium Substances 0.000 description 2
- 239000004408 titanium dioxide Substances 0.000 description 2
- PEDCQBHIVMGVHV-UHFFFAOYSA-N Glycerine Chemical compound OCC(O)CO PEDCQBHIVMGVHV-UHFFFAOYSA-N 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 238000000151 deposition Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000004069 differentiation Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- JEGUKCSWCFPDGT-UHFFFAOYSA-N h2o hydrate Chemical compound O.O JEGUKCSWCFPDGT-UHFFFAOYSA-N 0.000 description 1
- 230000002045 lasting effect Effects 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 239000003643 water by type Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B11/00—Arrangements or adaptations of tanks for water supply
- E03B11/10—Arrangements or adaptations of tanks for water supply for public or like main water supply
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B7/00—Water main or service pipe systems
- E03B7/07—Arrangement of devices, e.g. filters, flow controls, measuring devices, siphons or valves, in the pipe systems
- E03B7/072—Arrangement of flowmeters
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B7/00—Water main or service pipe systems
- E03B7/07—Arrangement of devices, e.g. filters, flow controls, measuring devices, siphons or valves, in the pipe systems
- E03B7/078—Combined units with different devices; Arrangement of different devices with respect to each other
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Structural Engineering (AREA)
- Flow Control (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of method of supplying water of combined type secondary water-supply water storage apparatus, comprising the following steps: Step 1: calculate high water tank at one day theory rate of discharge A in different time periods;Step 2: calculating theory of the high water tank in one day different time sections start time in the given residence time retains water A;Step 3: calculate high water tank at one day it is in different time periods theory inlet flow rate and amendment inlet flow rate A;Step 4: calculating the specific moment for the closing that the water pump opened was needed in one day different time sections;Step 5: calculate lower water box at one day amendment inlet flow rate B in different time periods;Step 6: calculating the specific moment that the automatic valve opened needed to close in one day different time sections.The present invention can solve the problems, such as that the residence time to tap water in water storage apparatus carries out quantitative control, reduce microbiological indicator exceeded risk caused by the residence time is long in water storage apparatus because of tap water to higher/lower cistern quantitative water supply.
Description
Technical field
The present invention relates to public supply mains secondary system water supply field more particularly to a kind of combined type secondary water-supply water storages
The method of supplying water of equipment.
Background technique
The disinfection overwhelming majority of China's urban life drinking water (being commonly called as tap water) is using chlorination method at present.Chlorine disappears
The outstanding advantages of malicious method are that chlorine residue has lasting disinfection, and when chlorine residue is meant with chlorination, chlorination is contacted after a certain period of time,
Remaining chlorine dose in water.Passage of the residual chlorine concentration in public supply mains system at any time can gradually decay, and supply in city
Enough residual chlorine concentrations are kept in pipe network system it is ensured that the microorganism in tap water is controlled in acceptability limit.
Secondary water-supply refers to that when civilian be more than the public confession in cities and towns with requirement of the industrial building Drinking Water to hydraulic pressure, water
When water or self-built facility water supply network ability, user or personal way of supplying water are supplied through pipeline by the facilities such as storing, pressurizeing.
Secondary water-supply facility mainly includes water storage apparatus, pressurized equipment and pipeline three parts.Tap water secondary water-supply water storage apparatus (with
Lower abbreviation water storage apparatus) in can stay for some time, residual chlorine concentration may decay to very low water if the residence time is too long
It is flat, the effect for effectively killing microorganism in water is not had, causes the microbiological indicator of tap water in water storage apparatus exceeded.Therefore to the greatest extent
Residence time of the amount reduction tap water in water storage apparatus has great significance.
The mode that water storage apparatus is used has following three kinds.The first: water storage apparatus be mounted on skyscraper roof or
Intermediate floor, the tap water in public supply mains system are set by the water storage that the water in pump house is pumped to roof or intermediate floor
It is standby, then naturally flow in user family again;Second: water storage apparatus is mounted in pump house, in public supply mains system from
Water is flow to first in the water storage apparatus in pump house, is then sent in high-level user man by variable frequency pump direct weighting;Third
Kind: water storage apparatus, which is mounted at two, forms combined type water supply, is mounted in pump house at one, the roof of skyscraper is mounted at one
Or intermediate floor, the tap water in public supply mains system are flow to first in the water storage apparatus in pump house, then by pump house
Water be pumped to the water storage apparatus of roof or intermediate floor, then naturally flow in user family again.It is mounted on skyscraper roof
Or this water storage apparatus of intermediate floor is also known as high water tank, this water storage apparatus being mounted in pump house is also known as lower water box.
The third above-mentioned secondary water-supply mode, tap water are that the pressure of public supply mains system is leaned on to flow into lower water box,
It send by water pump to high water tank.For high water tank, according to standard GB/T 50015-2003 (version in 2009) " building water supply
Drainage Design specification " in the 3.8.3 articles of regulation: " when the domestic water system that building is adjusted using high water tank, water pump
Max water yield is no less than maximum hourly consumption ", it need to consider that its metered flow is greater than high water tank when selecting water pump
Maximum hourly consumption.For lower water box, it is generally the case that inflow can be greater than water consumption per hour per hour, but
The water use peak phase, at this moment the water reservation of lower water box was with regard to body then it is possible that inflow is less than water consumption per hour per hour
Reveal and.The high water tank of this secondary water-supply mode may only one, it is also possible to have multiple.This secondary water-supply mode,
Since tap water will stop in two water storage apparatus of height, it is easier to it is too long tap water residence time in water storage apparatus occur
The case where, it is exceeded so as to cause there is microbiological indicator, it is therefore desirable to while to tap water in two water storage apparatus of height
Residence time is controlled.
Water storage apparatus inlet flow rate refers to the flow of a certain moment tap water of water storage apparatus entrance, and for high water tank, it is big
It is small to be determined by water pump;It is determined for its size of lower water box by the pressure and water inlet pipe caliber of tap water in public supply mains system
It is fixed.Water storage apparatus rate of discharge refers to the flow of a certain moment tap water in water storage apparatus exit, for its size of high water tank by
The use regimen condition of the serviced user of high water tank determines;All high water tank imports supplied water for its size of lower water box by it
The sum of flow determines.Water storage apparatus retains the total volume that water refers to a certain moment tap water in water storage apparatus, and water storage apparatus retains
The number of water and the size of water storage apparatus rate of discharge determine residence time of the tap water in water storage apparatus.At present for
The control that water storage apparatus retains water is realized by the altitude valve in water storage apparatus, when the water in water storage apparatus
When position decrease beyond preset value, altitude valve is opened and water supply start, when water level rises to preset height, water level control
Valve closes and stops supplying water, and this control method absolutely not considers the problems of tap water residence time in water storage apparatus.
At present it has been proposed that adjust water pump according to the size of actual used water amount to the water supply of water storage apparatus, be specifically exactly with
The water supply for increasing water pump when water is big, the water supply of water pump is reduced in water consumption hour, and this method of supplying water mainly can solve
Guarantee to supply water when water consumption is big sufficient, the problem of water consumption hour minimization waste and water pump are lost.But this confession
Water method due to the quantitative relationship without specially considering water storage apparatus residence time that retains water and tap water in water storage apparatus,
Therefore water can not be retained come quantitative calculating according to the given residence time, also just can not quantifies calculating according to the given residence time
To the water supply of water storage apparatus, the result is that quantitative control can not be carried out to residence time of the tap water in water storage apparatus, here
The given residence time refer in order to guarantee tap water quality a period of time length given by man safely, when this period starts
The water that retains carved all flows out water storage apparatus after this period.So far, how tap water is stopped in water storage apparatus
Staying the time to carry out quantitative control is still the problem not solved.
In order to solve the above-mentioned technical problem, Chinese patent notification number is the prior art of CN105442670B at 2017 9
Disclose within 1st a kind of building water supply pipeline circulatory system and method for secondary water-supply water quality guarantee the moon, which includes building
Build water supply register one's residence pipe, promotion or water storage device, flow measurement or detection device, counter flow controller, building water supply standpipe, building family
Interior conduit and tap, return pipe, ultraviolet/titanium dioxide sterilizer, return flow solenoid valve, non-return valve.When just commonly using water, municipal administration is certainly
Water is sent to building family through register one's residence pipe, promotion or water storage device, flow measurement or detection device, building water supply standpipe of building water supply
Interior conduit and tap.The patent is when the hydraulic detention time of the tap water of secondary water-supply reaches 2 hours or more, building water supply
Water in standpipe is registered one's residence pipe or water storage device by back flowing back into building water supply after return pipe and ultraviolet/titanium dioxide sterilizer
It is interior, after being mixed with fresh tap water again by secondary water supply system for users to use, make the life of tap water in secondary water supply system
Object safety and chemical safety are protected.But in actual use, this processing mode still cannot be to originally
Residence time of the water in water storage apparatus carries out quantitative control, and changes larger, energy consumption, maintenance cost and operation to existing equipment
Cost is all especially high.
Summary of the invention
It is an object of the invention to overcome the above-mentioned problems in the prior art, a kind of combined type secondary water-supply storage is provided
The method of supplying water of wetting system, the present invention can solve and exist to tap water respectively to high water tank and lower water box quantitative water supply
Residence time in water storage apparatus carries out the problem of quantitative control, reduces stop in water storage apparatus because of tap water to the maximum extent
The risk that microbiological indicator is exceeded caused by overlong time is stayed, while to the change very little of existing equipment, it is easy to implement and real
Energy consumption, maintenance cost and operating cost when border is run is all very low.
To achieve the above object, The technical solution adopted by the invention is as follows:
A kind of method of supplying water of combined type secondary water-supply water storage apparatus, it is characterised in that: the combined type secondary water-supply
Water storage apparatus includes a lower water box and an at least high water tank, automatic valve is equipped in lower water box water inlet end, each high
Position water tank water intake end is equipped with water pump;
The method of supplying water the following steps are included:
Step 1: it is in different time periods at one day to calculate high water tank according to the historical data of several days rates of discharge recently
Theoretical rate of discharge A;
Step 2: calculating in the given residence time high water tank at one day according to obtained theoretical rate of discharge A
The theory of different time sections start time retains water A;
Step 3: retaining water A according to obtained theoretical rate of discharge A and theory, high water tank is calculated in one day difference
The theoretical inlet flow rate and amendment inlet flow rate A of period;
Step 4: whether being opened according to amendment inlet flow rate A to water pump transmission at the beginning of one day different time sections
It to the control signal instruction of high-level tank water, supplies water if necessary to open, then calculate the water pump after opening needs in the period
The specific moment to be closed, and switched off the pump according to calculated result and stop supplying water, the water supply of the period high water tank is completed, according to
This circulation completes high water tank water supply in one day;
Step 5: the theoretical rate of discharge B of lower water box is calculated according to the theoretical inlet flow rate of high water tank, according to theory
Rate of discharge B calculates theory of the lower water box in one day different time sections start time in the given residence time and retains water
B is measured, water B is retained according to obtained theoretical rate of discharge B and theory, retains water in conjunction with what real-time detection obtained lower water box
B, calculating lower water box amendment inlet flow rate B in different time periods at one day;
Step 6: at the beginning of one day different time sections according to amendment inlet flow rate B to automatic valve send whether
The control signal instruction to supply water to lower water box is opened, is supplied water if necessary to open, then calculates the automatic valve after opening at this
Period needs the specific moment closed, and closes automatic valve according to calculated result and stop supplying water, and completes the period low level
The water supply of water tank, circulation completes lower water box water supply in one day according to this.
In the step 3 high water tank at one day amendment inlet flow rate A in different time periods by theoretical rate of discharge A and
Theory, which retains water A combination real-time detection and obtains the water A that retains of high water tank, to be calculated.
The calculation method of theoretical rate of discharge A in the step 1 are as follows: be divided into N number of period for one day, indicated with i
Ordinal number in different time periods in one day, the high water tank rate of discharge that detection in continuous E days obtains of taking over are calculated,
Then:
Wherein, in formula (1)Indicate the obtained high water tank rate of discharge of detection, d indicates the suitable of one section of continuous date
Ordinal number, d/i indicate that the date is the i period of d that day, and the abbreviation d/i period, c indicates the high water tank measured in the d/i period
The ordinal number of rate of discharge, Ad/iIndicate the total number of the high water tank rate of discharge measured in the d/i period,It indicates
D/i period all arithmetic averages for detecting obtained high water tank rate of discharge;In formula (2)Indicate the i being calculated
The theoretical rate of discharge A of period all is calculated for continuous E days in the i periodArithmetic average.
The theoretical calculation method for retaining water A in the step 2 are as follows: the total duration that one day is indicated with M, it is average by one day
It is divided into N number of period, M/N indicates the duration of each period, indicate ordinal number in different time periods in one day with i, then:
M in formula (5)iIt is calculated by following formula (6) formula:
Wherein, W in formula (3)1It indicates that high water tank is minimum and retains water, the setting of this parameter is to guarantee user base
Required with water, β be setting minimum amount of water coefficient,It flows out within high water tank one day to be calculated according to historical data total
The average value of water;
In formula (4)Indicate the continuous n since period iiThe sum of a period high water tank outflow water maximum value,
The setting of this parameter is to guarantee that the tap water in high water tank is at least able to satisfy user and use niA period;Mod is to ask
Remaining operator;((i+a-2) mod N+1) indicates period (i+a-1), indicates it is to meet period expression in this way
Requirement of the formula (i+a-1) no more than period sum N;It indicates in same period (i
+ a-1) in ownIn maximum value;
In formula (5)Indicate the continuous m since period iiThe sum of a period high water tank theory outflow water;
T in formula (6)iIndicate the given residence time in i start time period;
W in formula (7)a/iIndicate that the high water tank obtained by calculation in the given residence time starts in the i period
The theory at moment retains water A, and max { } is the operator of maximizing.
The calculation method of theoretical inlet flow rate and amendment inlet flow rate A are respectively as follows: in the step 3
Wherein, formula (8), in formula (9),Indicate theoretical inlet flow rate of the high water tank being calculated in the i period,
For the calculating to lower water box theory rate of discharge, j indicates the ordinal number of high water tank;Indicate high water tank in the i time
Amendment the inlet flow rate A, W of sectionb/iThe high water tank for indicating that real-time detection obtains retains water in i start time period,
Wa/(i mod N+1)Theory for high water tank obtained by calculation in (i+1) start time period retains water A, with (i
Mod N+1) indicate that (i+1) is the requirement in order to meet period expression formula (i+1) no more than period sum N.
The step 4 include water pump open method and calculate open water pump the period need close it is specific
The method at moment, is respectively as follows:
The open method of water pump are as follows: at the beginning of one day different time sections, work as Vi 2When equal to 0, sent not to water pump
The control signal instruction to high-level tank water is opened, V is worked asi 2When not equal to 0, sends and opened to high-level tank water to water pump
Control signal instruction;
The method for calculating the specific moment that the water pump opened is closed in period needs are as follows:
Wherein, t in formula (10)iIndicate the specific moment that water pump needs to close in the i period, R indicates the specified stream of water pump
Amount.
The calculation method of theoretical rate of discharge B in the step 5 are as follows:
Wherein, V in formula (11)i d1Indicate that theoretical rate of discharge B of the lower water box in the i period, g indicate high water tank
Total number.
The theoretical calculation method for retaining water B in the step 5 are as follows:
M in formula (13)iIt is calculated by following formula (14) formula:
Wherein, W in formula (12)d1It indicates that lower water box is minimum and retains water, the setting of this parameter is to guarantee user's base
Plinth is required with water, and δ is the minimum amount of water coefficient of setting,It is low to be calculated according to lower water box theory rate of discharge
The average value of the water tank one day outflow total Water in position;
In formula (13)Indicate the continuous m since period iiThe sum of a period lower water box theory outflow water;
T in formula (14)i dIndicate the given residence time in i start time period;
In formula (15)Indicate that the lower water box obtained by calculation in the given residence time is opened in the i period
The theory at moment beginning retains water B, and max { } is the operator of maximizing.
The calculation method of inlet flow rate B is corrected in the step 5 are as follows:
Wherein, V in formula (16)i d2Indicate the lower water box being calculated in the amendment inlet flow rate B of i period;Table
Show the water that retains of lower water box that real-time detection obtains in i start time period, the same formula of calculation method (10);Theory for lower water box obtained by calculation in (i+1) start time period retains water B, with (i
Mod N+1) indicate that (i+1) is the requirement in order to meet period expression formula (i+1) no more than period sum N.
The step 6 includes that the open method of automatic valve and the automatic valve of calculating unlatching need to close in the period
The method at the specific moment closed, is respectively as follows:
The open method of automatic valve are as follows: at the beginning of one day different time sections, work as Vi 2When equal to 0, to automatic valve
Door sends the control signal instruction for being not turned on and supplying water to lower water box, works as Vi 2When not equal to 0, sends and opened to low to automatic valve
The control signal instruction of position cistern water supply;
The method for calculating the specific moment that the automatic valve opened is closed in period needs are as follows: automatic valve is opened
Afterwards, the inlet flow rate for entering lower water box is detected by flowmeter, every detection obtains an inlet flow rate data and just calculates
The water supply of the primary period, and calculated water supply is compared with the theoretical water supply of the period, if
Calculated water supply is greater than or equal to theoretical water supply before the period terminates, then it is automatic to issue control signal instruction closing
Valve stops supplying water, and stops calculating and comparing at the end of the period, then:
And
Wherein, in formula (17)Indicate water supply of the lower water box in the i period,Indicate that real-time detection obtains
The inlet flow rate in the i period of lower water box, r are the obtained lower water box of real-time detection in i period inlet flow rate data
Ordinal number, h indicates lower water box that real-time detection has obtained in the total number of i period inlet flow rate data, and t indicates stream
Meter provides a lower water box inlet flow rate data at interval of the t time;
W in formula (18)i d5Indicate lower water box in the theoretical water supply of i period;
In formula (20)Indicate the specific moment that automatic valve needs to close in the i period, h0Indicate occur for the first timeWhen h numerical value.
Using the present invention has the advantages that
The present invention be specifically used for include lower water box and high water tank combined type secondary water-supply mode, it is existing right to change
In the control method for retaining water, by finding the quantitative pass for retaining water and tap water between the residence time in water storage apparatus
System realizes and retains water according to the given residence time come quantitative calculating, then the watermeter calculated that retains calculates inlet flow rate, presses
When calculated inlet flow rate can be achieved with the stop to tap water in water storage apparatus to high water tank and lower water box water supply
Between carry out quantitative control.Solve the problems, such as that the residence time to tap water in water storage apparatus carries out quantitative control, maximum limit
Reduce to degree because tap water the residence time is too long in water storage apparatus caused by the exceeded risk of microbiological indicator, while it is right
The change of existing equipment is small, easy to implement, and energy consumption, maintenance cost and the operating cost when actual motion are all very low.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the embodiment of the present invention 1.
Fig. 2 is the functional schematic of the embodiment of the present invention 1.
Fig. 3 is the theoretical rate of discharge A for the high water tank A being calculated in the embodiment of the present invention 2 in one day different time
The variation diagram of section.
Fig. 4 is the theoretical rate of discharge A for the high water tank B being calculated in the embodiment of the present invention 2 in one day different time
The variation diagram of section.
Fig. 5 is the lower water box theory being calculated in the embodiment of the present invention 2 according to the theoretical rate of discharge A of high water tank
Rate of discharge B was in one day variation diagram in different time periods.
In the figure, it is marked as 1, intelligent controller, 2, automatic valve, 3, flowmeter C, 4, lower water box, 5, water-level gauge C, 6,
Flowmeter D, 7, water pump A, 8, water pump B, 9, high water tank A, 10, water-level gauge A, 11, flowmeter A, 12, high water tank B, 13, water
Position meter B, 14, flowmeter B, 15, external forced controller, 16 data acquisition units, 17, data storage cell, 18, data processing
Unit, 19, control unit.
Specific embodiment
Embodiment 1
Present embodiments provide a kind of method of supplying water of combined type secondary water-supply water storage apparatus, the secondary confession of the combined type
Water water storage apparatus includes control system, a lower water box 4 and an at least high water tank, is equipped with stream in the water inlet end of lower water box 4
Meter and automatic valve 2 are provided with flowmeter in the water outlet of lower water box 4 and the water outlet of each high water tank, low
Water detection device is provided in the water tank 4 of position and in each high water tank;Water pump is equipped in the water inlet end of each high water tank;
The control system includes external forced controller 15 and intelligent controller 1, intelligent controller 1 include data acquisition unit 16,
Data storage cell 17, data processing unit 18 and control unit 19, data acquisition unit 16 are detected with all waters respectively
Equipment and the wired or wireless connection of all flowmeters, data storage cell 17 respectively with data acquisition unit 16, data processing
Unit 18 and control unit 19 connect, control unit 19 respectively with data processing unit 16, external forced controller 15, water pump and
Automatic valve connection.Wherein, there are many conventional selections for water detection device, it is preferred to use water-level gauge;Flowmeter, water-level gauge, water
Pump and automatic valve are existing commercially available conventional products, and intelligent controller 1 is made of PLC and industrial personal computer, and PLC is mainly used for data
It acquires and is instructed to being issued for water controlling equipment, industrial personal computer is mainly used for the other functions such as data storage, calculating, transmission.PLC
It is Siemens (Siemens) S7-200 SMART, industrial personal computer is Advantech IPC610, and external forced controller can be long-range
The PC machine of control.
For ease of description, the present embodiment preferably includes two high water tanks, as shown in Figure 1, and for the ease of differentiation, general
Two high water tanks are set to high water tank A9 and high water tank B12, water pump are set to water pump A7 and water pump B8, by water
Position meter is set to water-level gauge A10, water-level gauge B13 and water-level gauge C5, and flowmeter is set to flowmeter A11, flowmeter
B14, flowmeter C3 and flowmeter D6.Specifically, flowmeter A and flowmeter B are respectively arranged in high water tank A and high water tank B
Exit, flowmeter C and flowmeter D be respectively arranged in entrance and the exit of lower water box 4, and each flowmeter is per minute
Obtain a data on flows, unit m3/ h, and by real-time data transmission to intelligent controller 1;Water-level gauge A10 and water-level gauge
B13 is respectively arranged in the inside of high water tank A9 and high water tank B12, and water-level gauge C5 is installed on the inside of lower water box 4, water level
Meter is a kind of water detection device, and each water-level gauge obtains a waterlevel data, unit cm per minute, and data are passed in real time
Defeated to arrive intelligent controller 1, waterlevel data is converted to automatically and retains water accordingly by the data processing unit 18 of intelligent controller 1
Data, unit m3;Water pump A7 and water pump B8 is parallel with one another to be installed in pump house after the outlet of lower water box 4, and intelligence can be received
The control signal instruction of " unlatching " or " closing " that controller 1 is sent simultaneously switchs corresponding water pump by control signal instruction;Automatic valve
Door 2 is installed on before flowmeter C3, can be received the control signal instruction of " unlatching " or " closing " of the transmission of intelligent controller 1 and be pressed
It controls signal instruction and switchs automatic valve 2;Intelligent controller 1 is mounted on outside secondary water-supply facility, and intelligent controller 1 has data
Acquisition, data processing, receives data and instruction, the function of sending data and instruction at data storage, specific as shown in Figure 2;It is external
It forces controller 15 to be located at outside secondary water-supply facility, refers to for sending software upgrading edition data to intelligent controller 1 and upgrading
It enables, sends the various supplemental characteristics for needing artificially to be arranged and its change parameter instruction to intelligent controller 1, receive intelligent controller
All data and alarm signal data of 1 storage issue mandatory " unlatching " or " closing " designated equipment to intelligent controller 1
Control signal instruction.
In the present embodiment, the data acquisition function of intelligent controller is by the data acquisition unit in intelligent controller
It realizes, data acquisition unit acquires the data on flows of each water storage apparatus by wired or wireless transmission mode in real time and retains
Water data.
The data storage function of intelligent controller is to realize that data are deposited by the data storage cell in intelligent controller
Storage unit can store the data on flows of the real-time collected each water storage apparatus of data acquisition unit with water data are retained
Get off, the calculated result of data processing unit can be stored, the control signal that can control unit received or be issued
Instruction stores, and can store the software upgrading edition data and upgrade command that control unit receives, and can incite somebody to action
The supplemental characteristic and its change parameter instruction that the various needs that control unit receives artificially are arranged store.
The reception data and command function of intelligent controller are realized by the control unit in intelligent controller, control
Unit passes through wired mode at the scene, and the software upgrading that external forced controller is sent is received by wireless transmission method long-range
Edition data and upgrade command, the various supplemental characteristics for needing artificially to be arranged and its change parameter instruction, " unlatching " or " closing "
The control signal instruction of designated equipment.
The transmission data and command function of intelligent controller are realized by the control unit in intelligent controller, control
Unit passes through wired or wireless biography according to the rule being previously set or the control signal instruction for receiving external forced controller
Defeated mode sends the control signal instruction of " unlatching " or " closing " to designated equipment, regular to external forced according to what is be previously set
Controller sends all data and alarm signal data of intelligent controller storage.
The data processing function of intelligent controller is realized by the data processing unit in intelligent controller, at data
Reason unit can be carried out following calculating: 1) data conversion: the data received are stored multiplied by a coefficient, including Conversion of measurement unit with
And water storage apparatus waterlevel data is converted into water storage apparatus and retains water data;2) high water tank is calculated in one day different time sections
Theoretical rate of discharge;3) the calculating reason of high water tank in one day different time sections start time in the given residence time
By retaining water;4) calculate high water tank at one day it is in different time periods theory inlet flow rate and amendment inlet flow rate;5) it calculates
The specific moment that water pump needed to close in one day different time sections;6) lower water box is calculated to go out in one day theory in different time periods
Mouth flow;7) it calculates theory of the lower water box in one day different time sections start time in the given residence time and retains water
Amount;8) calculate lower water box at one day amendment inlet flow rate in different time periods;9) calculate open automatic valve at one day not
The specific moment closed is needed with the period.
Specifically, the method for supplying water the following steps are included:
Step 1: it is in different time periods at one day to calculate high water tank according to the historical data of several days rates of discharge recently
Theoretical rate of discharge A;Specifically high-order water can be calculated by intelligent controller according to the historical data of nearest 20-40 days rates of discharge
Case theory rate of discharge in different time periods at one day.
In this step, the calculation method of theoretical rate of discharge A are as follows: be divided into N number of period for one day, indicate one with i
Ordinal number in different time periods in it, the high water tank rate of discharge that detection in continuous E days obtains of taking over are calculated, then:
Wherein, in formula (1)Indicate the obtained high water tank rate of discharge of detection, d indicates the suitable of one section of continuous date
Ordinal number, d/i indicate that the date is the i period of d that day, and the abbreviation d/i period, c indicates the high water tank measured in the d/i period
The ordinal number of rate of discharge, Ad/iIndicate the total number of the high water tank rate of discharge measured in the d/i period,It indicates
D/i period all arithmetic averages for detecting obtained high water tank rate of discharge;In formula (2)Indicate the i being calculated
The theoretical rate of discharge A of period all is calculated for continuous E days in the i periodArithmetic average, embody
High water tank rate of discharge was in one day changing rule in different time periods.
Step 2: calculating the height when giving the residence time according to obtained theoretical rate of discharge A by intelligent controller
Theory of the position water tank in one day different time sections start time retains water A.
In this step, theory retains the calculation method of water A are as follows: one day is divided by the total duration that one day is indicated with M
N number of period, M/N indicate the duration of each period, indicate ordinal number in different time periods in one day with i,With's
Meaning is the same, then:
M in formula (5)iIt is calculated by following formula (6) formula:
Wherein, W in formula (3)1It indicates that high water tank is minimum and retains water, the setting of this parameter is to guarantee user base
Required with water, β be setting minimum amount of water coefficient,It flows out within high water tank one day to be calculated according to historical data total
The average value of water;
In formula (4)Indicate the continuous n since period iiThe sum of a period high water tank outflow water maximum value,
The setting of this parameter is to guarantee that the tap water in high water tank is at least able to satisfy user and use niA period;Mod is to ask
Remaining operator;() i+a-2) mod N+1) indicate period (i+a-1), it indicates to be to meet time segment table in this way
Up to formula) i+a-1) the no more than requirement of period sum N;It indicates in the same time
Section) i+a-1) in ownIn maximum value;
In formula (5)Indicate the continuous m since period iiThe sum of a period high water tank theory outflow water,
Theory outflow water refers to according to the outflow water being calculated with period theory rate of discharge.
T in formula (6)iIndicate in the given residence time of i start time period, refer in order to guarantee water quality safety artificially to
Fixed a period of time length, at the beginning of being the i period at the beginning of this period, in depositing for i start time period
Water is stayed all to flow out high water tank after this period, the given residence time is the key that realize that quantitative calculate retains water
Parameter is determined that high water tank retains water by the given residence time, it is ensured that the tap water in high water tank stops given
It stays and all flows out high water tank within the scope of the normal variation of time, for convenience of calculation, set TiIt is the integer of period duration
Times.
W in formula (7)a/iIndicate that the high water tank obtained by calculation in the given residence time starts in the i period
The theory at moment retains water A, and it is to be different from actually detected obtained high water tank and retain that theory here, which retains water A,
Water and refer in particular to retain water by the high water tank being calculated above;Max { } is the operator of maximizing.
Step 3: retaining water A according to obtained theoretical rate of discharge A and theory, high water tank is calculated in one day difference
The theoretical inlet flow rate and amendment inlet flow rate A of period;High water tank at one day amendment inlet flow rate A in different time periods by
Theoretical rate of discharge A and it is theoretical retain water A combination real-time detection and obtain the water A that retains of high water tank be calculated.Specifically
, intelligent controller calculates high water tank in one day difference after being calculated theoretical rate of discharge A and theory retains water A
The theoretical inlet flow rate of period;It was deposited in one day different time sections start time according to obtained theoretical rate of discharge A and theory
Water A is stayed, water A is retained in conjunction with what water-level gauge real-time detection obtained high water tank, calculates high water tank in one day different time
The amendment inlet flow rate A of section.
In this step, the calculation method of theoretical inlet flow rate and amendment inlet flow rate A are respectively as follows:
Wherein, formula (8), in formula (9), Vi 3/jIndicate theoretical inlet flow rate of the high water tank being calculated in the i period,
For the calculating to lower water box theory rate of discharge, j indicates the ordinal number of high water tank;Vi 2Indicate high water tank in the i time
The amendment inlet flow rate A of section, for calculating to the runing time of the water pump of high-level tank water;Wb/iIt indicates real-time detection and turns
The high water tank got in return retains water, W i start time perioda/(i mod N+1)For high-order water obtained by calculation
Theory of the case in (i+1) start time period retains water A, is to meet the period with (i mod N+1) expression (i+1)
Requirement of the expression formula (i+1) no more than period sum N.
W in formula (9)b/iIt is calculated by following formula:
Wb/i=α × H
H is waterlevel data in formula, is obtained by the water-level gauge real-time detection being mounted in high water tank, acquires one per minute
A data;α is conversion coefficient, retains water data for waterlevel data to be converted into, is exactly the sectional area of water storage apparatus, only
It needs to consider unit, therefore is conversion coefficient divided by 100 by the sectional area of water storage apparatus.
Step 4: at the beginning of one day different time sections from intelligent controller according to amendment inlet flow rate A to water pump
The control signal instruction whether opened to high-level tank water is sent, supplies water, is then calculated by intelligent controller if necessary to open
The specific moment that water pump after unlatching needed to close in the period, and switched off the pump according to calculated result and stop supplying water, it completes
The water supply of the period high water tank, circulation completes high water tank water supply in one day according to this.
This step includes the specific moment that the open method of water pump and the water pump of calculating unlatching needed to close in the period
Method, be respectively as follows:
The open method of water pump are as follows: at the beginning of one day different time sections, work as Vi 2When equal to 0, by intelligent controller
The control signal instruction being not turned on to high-level tank water is sent to water pump, works as Vi 2When not equal to 0, intelligent controller is sent out to water pump
Send the control signal instruction opened to high-level tank water.
The method for calculating the specific moment that the water pump opened is closed in period needs are as follows:
Wherein, t in formula (10)iIndicate the specific moment that water pump needs to close in the i period, R indicates the specified stream of water pump
Amount.
Step 5: the theoretical rate of discharge B of lower water box is calculated according to the theoretical inlet flow rate of high water tank, according to theory
Rate of discharge B calculates theory of the lower water box in one day different time sections start time in the given residence time and retains water
B is measured, water B is retained according to obtained theoretical rate of discharge B and theory, retains water in conjunction with what real-time detection obtained lower water box
B calculated inlet flow rate of the lower water box in the period at the beginning of one day each period, calculates low level water according to this
Case amendment inlet flow rate B in different time periods at one day.
In this step, the calculation method of theoretical rate of discharge B are as follows:
Wherein, V in formula (11)i d1Indicate lower water box in theoretical the rate of discharge B, V of i periodi 3/jMeaning it is the same, g
Indicate the total number of high water tank.
In this step, theory retains the calculation method of water B are as follows: one day is divided by the total duration that one day is indicated with M
N number of period, M/N indicate the duration of each period, indicate ordinal number in different time periods, V in one day with ii d1Meaning it is same
Before, then:
M in formula (13)iIt is calculated by following formula (14) formula:
Wherein, W in formula (12)d1It indicates that lower water box is minimum and retains water, the setting of this parameter is to guarantee user's base
Plinth is required with water, and δ is the minimum amount of water coefficient of setting,It is low to be calculated according to lower water box theory rate of discharge
The average value of the water tank one day outflow total Water in position.
In formula (13)Indicate the continuous m since period iiThe sum of a period lower water box theory outflow water,
Theory outflow water refers to according to the outflow water being calculated with period theory rate of discharge.
T in formula (14)i dIt indicates to refer in the given residence time of i start time period in order to guarantee that water quality safety is artificial
Given a period of time length, at the beginning of being the i period at the beginning of this period, in i start time period
It retains water and all flows out lower water box after this period, the given residence time is to realize the quantitative pass for calculating and retaining water
Bond parameter is determined that lower water box retains water by the given residence time, it is ensured that the tap water in lower water box is given
Lower water box is all flowed out within the scope of the normal variation of residence time, for convenience of calculation, sets Ti dIt is the whole of period duration
Several times.
In formula (15)Indicate that the lower water box obtained by calculation in the given residence time is opened in the i period
The theory at moment beginning retains water B, and max { } is the operator of maximizing.
In this step, the calculation method of inlet flow rate B is corrected are as follows: one day is divided by the total duration that one day is indicated with M
N number of period, M/N indicate the duration of each period, indicate ordinal number in different time periods, mod, V in one day with ii d1WithMeaning it is the same, then:
Wherein, V in formula (16)i d2Indicate the lower water box being calculated in the amendment inlet flow rate B of i period;Table
Show the water that retains of lower water box that real-time detection obtains in i start time period, the same formula of calculation method (10);Theory for lower water box obtained by calculation in (i+1) start time period retains water B, with (i
Mod N+1) indicate that (i+1) is the requirement in order to meet period expression formula (i+1) no more than period sum N.
Step 6: at the beginning of one day different time sections from intelligent controller according to amendment inlet flow rate B to automatic
Valve sends the control signal instruction whether opened and supplied water to lower water box, supplies water if necessary to open, then intelligent controller meter
The specific moment that the automatic valve after opening needed to close in the period is calculated, and automatic valve is closed according to calculated result and is stopped
It supplies water, completes the water supply of the period lower water box, circulation completes lower water box water supply in one day according to this.
This step includes that the open method of automatic valve and the automatic valve of calculating unlatching need to close in the period
The method at specific moment, is respectively as follows:
The open method of automatic valve are as follows: at the beginning of one day different time sections, work as Vi 2When equal to 0, by intelligently controlling
Device processed sends the control signal instruction for being not turned on and supplying water to lower water box to automatic valve, works as Vi 2When not equal to 0, intelligent controller
The control signal instruction opened and supplied water to lower water box is sent to automatic valve;
The method for calculating the specific moment that the automatic valve opened is closed in period needs are as follows: automatic valve is opened
Afterwards, the inlet flow rate for entering lower water box is detected by flowmeter, every detection obtains an inlet flow rate data just by intelligence
It can control the water supply that device calculates the primary period, and by the theoretical water supply of calculated water supply and the period
It compares, if calculated water supply is greater than or equal to theoretical water supply, intelligent controller hair before the period terminates
Control signal instruction closes automatic valve and stops supplying water out, stops calculating and comparing at the end of the period, then:
And
Wherein, M indicates one day total duration in formula, and N indicates to be divided into N number of period for one day, when M/N indicates each
Between section duration, i indicate one day in ordinal number in different time periods;In formula (17)Indicate lower water box in the i period
Water supply,Indicate that real-time detection obtains the inlet flow rate in the i period of lower water box, r obtains low for real-time detection
Position water tank is in the ordinal number of i period inlet flow rate data, and the h expression lower water box that real-time detection has obtained is in the i period
The total number of inlet flow rate data, t indicate that flowmeter provides a lower water box inlet flow rate data at interval of the t time, it is desirable that t
It to be much smaller than the duration of period, and period duration is the integral multiple of t.
W in formula (18)i d5Indicate lower water box in the theoretical water supply of i period.
In formula (20)Indicate the specific moment that automatic valve needs to close in the i period, h0Indicate occur for the first timeWhen h numerical value.
It further says, when water pump is in close state, intelligent controller control unit issues " unlatching " control letter
Number instruction rule be: 1) high water tank corresponding for water pump, at the beginning of each period, as calculated Vi 2Greatly
When zero;2) when receiving the control signal instruction of " unlatching " water pump sent from external forced controller.
It further says, when water pump is in the open state, intelligent controller control unit issues " closing " control letter
Number instruction rule be: 1) high water tank corresponding for water pump, as calculated tiWhen not being " not closing ", then in tiMoment
It switches off the pump;2) when receiving the control signal instruction of " closing " water pump sent from external forced controller.
It further says, when automatic valve is in close state, intelligent controller control unit issues " unlatching " control
The rule of signal instruction processed is: 1) at the beginning of lower water box each period, as the V of calculatingi d2When greater than zero;2) it connects
When receiving the control signal instruction of " unlatching " automatic valve sent from external forced controller.
It further says, when automatic valve is in the open state, can control device control unit and issue " closing " control
The rule of signal instruction is: if 1) calculated before some period of lower water box terminatesThen existMoment closes automatic
Valve;2) when receiving the control signal instruction of " closing " automatic valve sent from external forced controller.
Embodiment 2
On the basis of embodiment 1, the present embodiment combines specific data to be further described, and sets certain high water tank A's
Volume is 4 × 3 × 3=36m3, then being converted to waterlevel data and retaining the conversion coefficient of water is 0.12;The appearance of high water tank B
Product is 4 × 3.5 × 3=42m3, then being converted to waterlevel data and retaining the conversion coefficient of water is 0.14, the volume of lower water box
For 6 × 4 × 3=72m3, then being converted to waterlevel data and retaining the conversion coefficient of water is 0.24;Wb/iWithIt is respectively logical
Cross real-time detection and the water that retains of the high water tank and lower water box that are converted in i start time period, unit m3。
Therefore,
For high water tank A:Wb/i=0.12 × H
For high water tank B:Wb/i=0.14 × H
For lower water box:
Wherein, H is waterlevel data in formula, is obtained by the water-level gauge real-time detection being mounted in water storage apparatus, per minute
Acquire a data, unit cm.
Specifically, in the step 1 theoretical rate of discharge A calculation method are as follows: be divided into 24 times for one day
Section, indicates ordinal number in different time periods in one day with i, takes over continuous 30 days and detects obtained high water tank rate of discharge
It is calculated, then:
Wherein, in formula (1)The high water tank rate of discharge that detection obtains is indicated, by being mounted on high water tank outlet
The flowmeter real-time detection at place obtains, and acquires a data, unit m per minute3/ h, d indicate the sequence on one section of continuous date
Number, d/i indicate that the date is the i period of d that day, and the abbreviation d/i period, c expression goes out in the high water tank that the d/i period measures
The ordinal number of mouth flow, Ad/iIndicate the total number of the high water tank rate of discharge measured in the d/i period, in the present embodiment
The total number for the high water tank rate of discharge that each period measures is 60,It indicates all to detect in the d/i period
The arithmetic average of the high water tank rate of discharge arrived, unit m3/h;In formula (2)Indicate the i period being calculated
Theoretical rate of discharge A all is calculated for continuous 30 days in the i periodArithmetic average, embody high water tank
Rate of discharge was in one day changing rule in different time periods.The calculated result of high water tank A as shown in figure 3, high water tank B meter
It is as shown in Figure 4 to calculate result.
The theoretical calculation method for retaining water A in the step 2 are as follows: one day total duration is for 24 hours, by one day average mark
At 24 periods, the when a length of 1h of each period indicates ordinal number in different time periods in one day with i,With's
Meaning is the same, then:
For high water tank A:
W in formula (3)1It indicates that high water tank is minimum and retains water, unit m3, the setting of this parameter is to guarantee user
It is most basic to be required with water, minimum amount of water coefficient is set as 0.07, is flowed according to high water tank one day that historical data is calculated
The average value of total Water is 121m out3。
In formula (4)Indicate the sum of continuous 2 period high water tanks outflow water maximum value since period i,
Indicate that the tap water in high water tank is at least able to satisfy user and uses 2 periods;Mod is complementation operator;((i+a-2)mod
24+1) period (i+a-1) is indicated, when expression is to meet period expression formula (i+a-1) no more than in this way
Between section sum 24 requirement;It indicates in same period ((i+a-2) mod 24+1)
It is allIn maximum value.
Wherein numerical value 3 is calculated by following formula:
mi=3/1=3 (6)
In formula (5)Indicate the sum of continuous 3 periods high water tank theory outflow water since period i;If
The given residence time of fixed each period is 3h, and the given residence time refers to guarantee one section given by man of water quality safety
Time span at the beginning of being the i period at the beginning of this period, retains water warp in i start time period
High water tank is all flowed out after spending this period, the given residence time is to realize the quantitative key parameter for calculating and retaining water, is pressed
The given residence time determines that high water tank retains water, it is ensured that the tap water in high water tank is in the given residence time
High water tank is all flowed out within the scope of normal variation.
W in formula (7)a/iIndicate the high water tank obtained by calculation in the case where the given residence time is 3h in i
Between the theory of section start time retain water A, it is to be different from an actually detected obtained high position that theory here, which retains water A,
Water tank retains water and refers in particular to retain water by the high water tank being calculated above;Max { } is the operator of maximizing.
Following table is that the present embodiment calculates high water tank A W some day1、And Wa/iAs a result, shadow region table
Show that the subfield value is used;
For high water tank B:
Wa/iCalculating with calculate high water tank A when it is identical.
Following table is that the present embodiment calculates high water tank B W some day1、And Wa/iAs a result, shadow region table
Show that the subfield value is used.
The calculation method of theoretical inlet flow rate and amendment inlet flow rate A are respectively as follows: high water tank A and height in the step 3
The calculation method of position water tank B is just the same, and one day total duration is for 24 hours, to be divided into 24 periods, each time for one day
The when a length of 1h of section, indicates ordinal number in different time periods, mod, W in one day with ia/i、Wb/iWithMeaning it is the same, then:
Wherein, formula (8), V in formula (9)i 3/jIndicate theoretical inlet flow rate of the high water tank being calculated in the i period,
For the calculating to lower water box theory rate of discharge, j indicates the ordinal number of high water tank, unit m3/h;Vi 2It indicates to calculate
Amendment inlet flow rate A of the obtained high water tank in the i period, for calculating to the specific of the water pump closing of high-level tank water
Moment, unit m3/h;Wa/(i mod 24+1)For high water tank obtained by calculation (i+1) start time period theory
Retain water A, unit m3, it is to meet period expression formula (i+1) no more than with (i mod 24+1) expression (i+1)
The requirement of period sum 24.
The open method of water pump in the step 4 are as follows: at the beginning of one day different time sections, work as Vi 2When equal to 0,
The control signal instruction being not turned on to high-level tank water is sent from intelligent controller to water pump, works as Vi 2When not equal to 0, intelligence is controlled
Device processed sends the control signal instruction opened to high-level tank water to water pump.
The method at the specific moment that the water pump of unlatching needed to close in the period is calculated in the step 4 are as follows: one day
Total duration is 1440min, will be divided within one day 24 periods, and the when a length of 60min of each period is indicated one day with i
In ordinal number in different time periods, then:
For water pump A:
For water pump B:
Wherein, t in formula (10)iThe specific moment that expression water pump needs to close in the i period, unit min, water pump A's
Metered flow is 12m3/ h, the metered flow of water pump B are 15m3/h。
Following table is the present embodiment calculated high water tank A and high water tank B in theoretical inlet flow rate in different time periods
Vi 2And the specific moment t that water pump A and water pump B needs to close in different time sectionsi:
The calculation method of theoretical rate of discharge B in the step 5 are as follows:
Vi d1=Vi 3/1+Vi 3/2 (11)
Wherein, V in formula (11)i d1Indicate lower water box in theoretical the rate of discharge B, V of i periodi 3/1It is calculated
Theoretical inlet flow rate of the high water tank A in the i period, Vi 3/2For the high water tank B that is calculated the i period theoretical import
Flow;The calculated result of lower water box theory rate of discharge B is as shown in Figure 5.
The theoretical calculation method for retaining water B in the step 5 are as follows: one day total duration is for 24 hours, by one day average mark
At 24 periods, the when a length of 1h of each period indicates ordinal number in different time periods, V in one day with ii d1Meaning it is same
Before, then:
W in formula (12)d1It indicates that lower water box is minimum and retains water, unit m3, the setting of this parameter is to guarantee to use
Family is most basic to be required with water, is set minimum amount of water coefficient as 0.07, is calculated according to lower water box theory rate of discharge
The average value of lower water box one day outflow total Water is 275m3。
Wherein numerical value 3 is calculated by following formula:
mi=3/1=3 (14)
In formula (13)Indicate the sum of continuous 3 periods lower water box theory outflow water since period i;If
The given residence time of fixed each period is 3h, and the given residence time refers to guarantee one section given by man of water quality safety
Time span at the beginning of being the i period at the beginning of this period, retains water warp in i start time period
Lower water box is all flowed out after spending this period, the given residence time is to realize the quantitative key parameter for calculating and retaining water, is pressed
The given residence time retains water to determine, it is ensured that normal variation of the tap water in lower water box in the given residence time
Lower water box is all flowed out in range.
In formula (15)Indicate the lower water box obtained by calculation in the case where the given residence time is 3h in i
The theory of start time period retains water B, theory here retain water B be in order to be different from it is actually detected obtain it is low
Position water tank retains water and refers in particular to retain water by what is be calculated above;Max { } is the operator of maximizing.
Following table is that the present embodiment calculates W lower water box some dayd1、WithAs a result, shadow region indicates the area
Domain numerical value is used.
The calculation method of inlet flow rate B is corrected in the step 5 are as follows: one day total duration is for 24 hours, by one day average mark
At 24 periods, the when a length of 1h of each period indicates ordinal number in different time periods, mod, V in one day with ii d1WithMeaning it is the same, then:
Wherein, V in formula (16)i d2Indicate the lower water box being calculated in the amendment inlet flow rate B of i period;Table
Show that the lower water box that real-time detection obtains retains water in i start time period;For by calculating
To lower water box exist) i+1) theory of start time period retains water B, with) i mod 24+1) indicate) i+1) be for
Meet period expression formula) i+1) no more than the requirement of period sum 24.
The open method of automatic valve in the step 6 are as follows: at the beginning of one day different time sections, work as Vi 2Equal to 0
When, the control signal instruction for being not turned on and supplying water to lower water box is sent from intelligent controller to automatic valve, works as Vi 2Not equal to 0
When, intelligent controller sends the control signal instruction opened and supplied water to lower water box to automatic valve.
The method at the specific moment that the automatic valve of unlatching needed to close in the period is calculated in the step 6 are as follows: one
It total duration is 1440min, will be divided within one day 24 periods, and the when a length of 60min of each period is indicated with i
Ordinal number in different time periods in one day;When automatic valve open after, by flowmeter to enter lower water box inlet flow rate into
Row detection, every detection obtain the water supply that an inlet flow rate data are just calculated the primary period by intelligent controller, and
Calculated water supply is compared with the theoretical water supply of the period, if calculated before the period terminates supplied
Water is greater than or equal to theoretical water supply, then intelligent controller issues control signal instruction closing automatic valve and stops supplying water,
Stop calculating and comparing at the end of the period, then:
Wherein, in formula (17)Indicate the water supply in the i period, unit m3,Indicate that real-time detection obtains
Inlet flow rate of the lower water box in the i period, unit m3/ h, r be the obtained lower water box of real-time detection the i period into
The ordinal number of mouth data on flows, the h expression lower water box that real-time detection has obtained is in the total a of i period inlet flow rate data
Number, inlet flow meter provide a lower water box inlet flow rate data at interval of 1min;W in formula (18)i d5Indicate that lower water box exists
The theoretical water supply of i period, unit m3;Formula (20)Indicate the specific moment that automatic valve needs to close in the i period,
Unit is min, h0Indicate occur for the first timeWhen h numerical value;Mod and Vi d2Meaning it is the same.
In the present embodiment, when water pump is in close state, intelligent controller control unit issues " unlatching " and controls signal
The rule of instruction is: 1) high water tank corresponding for water pump, at the beginning of each period, as calculated Vi 2It is greater than
When zero;2) when receiving the control signal instruction of " unlatching " water pump sent from external forced controller.
In the present embodiment, when water pump is in the open state, intelligent controller control unit issues " closing " and controls signal
The rule of instruction is: 1) high water tank corresponding for water pump, as calculated tiWhen not being " not closing ", then in tiMoment closes
Close water pump;2) when receiving the control signal instruction of " closing " water pump sent from external forced controller.
In the present embodiment, when automatic valve is in close state, intelligent controller control unit issues " unlatching " control
The rule of signal instruction is: 1) at the beginning of lower water box each period, when the lower water box of calculating corrects inlet flow
AmountWhen greater than zero;2) when receiving the control signal instruction of " unlatching " automatic valve sent from external forced controller.
In the present embodiment, when automatic valve is in the open state, intelligent controller control unit issues " closing " control
The rule of signal instruction is: if 1) calculated before some period of lower water box terminatesThen existMoment closes automatic
Valve;2) when receiving the control signal instruction of " closing " automatic valve sent from external forced controller.
In the present embodiment, for high water tank and its water pump, due in calculated V of each periodi d2Zero is all larger than,
Therefore the control signal that intelligent controller control unit issues " unlatching " corresponding water pump at the beginning of each period refers to
It enables, due to calculated tiIt is not " not closing ", therefore in water pump operation to tiWhen the moment, " closing " corresponding water pump is issued
Control signal instruction.
In the present embodiment, for lower water box and its automatic valve, due in calculated V of each periodi d2It is all larger than
Zero, therefore intelligent controller control unit issues the control signal of " unlatching " automatic valve at the beginning of each period
Instruction;In the period 13~14, due to terminating lower water box to the period, water supply is both less than the period lower water box
Theoretical water supply, therefore cannot calculateNamely automatic valve is all kept it turning in the entire period;Section knot at other times
It can be calculated before beamTherefore in these periodsMoment, intelligent controller control unit issue " closing " automatic valve
The control signal instruction of door, following table are that lower water box theoretical water supply, actual water supply and automatic valve in different time periods close
The specific moment closed, "/" indicate that automatic valve is not closed.
Claims (10)
1. a kind of method of supplying water of combined type secondary water-supply water storage apparatus, it is characterised in that: the combined type secondary water-supply storage
Wetting system includes a lower water box and an at least high water tank, automatic valve is equipped in lower water box water inlet end, in each high position
Water tank water intake end is equipped with water pump;
The method of supplying water the following steps are included:
Step 1: calculating high water tank in one day theory in different time periods according to the historical data of several days rates of discharge recently
Rate of discharge A;
Step 2: calculating in the given residence time high water tank in one day difference according to obtained theoretical rate of discharge A
The theory of start time period retains water A;
Step 3: retaining water A according to obtained theoretical rate of discharge A and theory, high water tank is calculated in one day different time
The theoretical inlet flow rate and amendment inlet flow rate A of section;
Step 4: whether being opened to water pump transmission to height at the beginning of one day different time sections according to amendment inlet flow rate A
The control signal instruction of position cistern water supply, supplies water if necessary to open, then calculates the water pump after opening and need to close in the period
The specific moment closed, and switched off the pump according to calculated result and stop supplying water, the water supply of the period high water tank is completed, is followed according to this
Ring completes high water tank water supply in one day;
Step 5: calculating the theoretical rate of discharge B of lower water box according to the theoretical inlet flow rate of high water tank, exported according to theory
Flow B calculates theory of the lower water box in one day different time sections start time in the given residence time and retains water B,
Water B is retained according to obtained theoretical rate of discharge B and theory, retains water B in conjunction with what real-time detection obtained lower water box, meter
Calculation lower water box amendment inlet flow rate B in different time periods at one day;
Step 6: whether being opened according to amendment inlet flow rate B to automatic valve transmission at the beginning of one day different time sections
The control signal instruction to supply water to lower water box, supplies water if necessary to open, then calculates the automatic valve after opening in the time
Section needs the specific moment closed, and closes automatic valve according to calculated result and stop supplying water, and completes the period lower water box
Water supply, according to this circulation complete lower water box water supply in one day.
2. a kind of method of supplying water of combined type secondary water-supply water storage apparatus according to claim 1, it is characterised in that: described
At one day, amendment inlet flow rate A in different time periods by theoretical rate of discharge A and theory retained water A to high water tank in step 3
It is calculated in conjunction with the water A that retains that real-time detection obtains high water tank.
3. a kind of method of supplying water of combined type secondary water-supply water storage apparatus according to claim 2, it is characterised in that: described
The calculation method of theoretical rate of discharge A in step 1 are as follows: N number of period was divided by one day, when indicating different in one day with i
Between section ordinal number, take over and detect within continuous E days obtained high water tank rate of discharge and calculated, then:
Wherein, in formula (1)Indicate that the high water tank rate of discharge that detection obtains, d indicate the ordinal number on one section of continuous date,
D/i indicates that the date is the i period of d that day, and the abbreviation d/i period, c is indicated in the high water tank outlet that the d/i period measures
The ordinal number of flow, Ad/iIndicate the total number of the high water tank rate of discharge measured in the d/i period,It indicates in d/i
Between section is all detects the obtained arithmetic averages of high water tank rate of discharge;In formula (2)Indicate the i period being calculated
Theoretical rate of discharge A, all be calculated in the i period within continuous E daysArithmetic average.
4. a kind of method of supplying water of combined type secondary water-supply water storage apparatus according to claim 3, it is characterised in that: described
The theoretical calculation method for retaining water A in step 2 are as follows: the total duration that one day is indicated with M was divided into N number of time for one day
Section, M/N indicates the duration of each period, indicates ordinal number in different time periods in one day with i, then:
M in formula (5)iIt is calculated by following formula (6) formula:
Wherein, W in formula (3)1It indicating that high water tank is minimum and retains water, β is the minimum amount of water coefficient of setting,For according to history
The average value for the high water tank one day outflow total Water that data are calculated;
In formula (4)Indicate the continuous n since period iiThe sum of a period high water tank outflow water maximum value;mod
It is complementation operator;((i+a-2) mod N+1) indicates period (i+a-1), indicates to be to meet the period in this way
Requirement of the expression formula (i+a-1) no more than period sum N;It indicates in the same time
Own in section (i+a-1)In maximum value;
In formula (5)Indicate the continuous m since period iiThe sum of a period high water tank theory outflow water;
T in formula (6)iIndicate the given residence time in i start time period;
W in formula (7)a/iIndicate the high water tank obtained by calculation in the given residence time in i start time period
Theory retain water A, max { } is the operator of maximizing.
5. a kind of method of supplying water of combined type secondary water-supply water storage apparatus according to claim 4, it is characterised in that: described
The calculation method of theoretical inlet flow rate and amendment inlet flow rate A are respectively as follows: in step 3
Wherein, formula (8), in formula (9), Vi 3/jIndicate that the high water tank being calculated in the theoretical inlet flow rate of i period, is used for
Calculating to lower water box theory rate of discharge, j indicate the ordinal number of high water tank;Vi 2Indicate high water tank in the i period
Correct inlet flow rate A, Wb/iThe high water tank for indicating that real-time detection obtains retains water in i start time period,
Wa/(imodN+1)Theory for high water tank obtained by calculation in (i+1) start time period retains water A, with (i mod
N+1) indicate that (i+1) is the requirement in order to meet period expression formula (i+1) no more than period sum N.
6. a kind of method of supplying water of combined type secondary water-supply water storage apparatus according to claim 5, it is characterised in that: described
Step 4 includes the method at the specific moment that the open method of water pump and the water pump of calculating unlatching are closed in period needs, point
Not are as follows:
The open method of water pump are as follows: at the beginning of one day different time sections, work as Vi 2When equal to 0, it is not turned on to water pump transmission
To the control signal instruction of high-level tank water, work as Vi 2When not equal to 0, the control opened to high-level tank water is sent to water pump
Signal instruction;
The method for calculating the specific moment that the water pump opened is closed in period needs are as follows:
Wherein, t in formula (10)iIndicate the specific moment that water pump needs to close in the i period, R indicates the metered flow of water pump.
7. a kind of method of supplying water of combined type secondary water-supply water storage apparatus according to claim 5, it is characterised in that: described
The calculation method of theoretical rate of discharge B in step 5 are as follows:
Wherein, V in formula (11)i d1Indicate that theoretical rate of discharge B of the lower water box in the i period, g indicate total of high water tank
Number.
8. a kind of method of supplying water of combined type secondary water-supply water storage apparatus according to claim 7, it is characterised in that: described
The theoretical calculation method for retaining water B in step 5 are as follows:
M in formula (13)iIt is calculated by following formula (14) formula:
Wherein, W in formula (12)d1It indicating that lower water box is minimum and retains water, δ is the minimum amount of water coefficient of setting,For according to low
The average value for the lower water box one day outflow total Water that position water tank theory rate of discharge is calculated;
In formula (13)Indicate the continuous m since period iiThe sum of a period lower water box theory outflow water;
In formula (14)Indicate the given residence time in i start time period;
In formula (15)Indicate the lower water box obtained by calculation in the given residence time when the i period starts
The theory at quarter retains water B, and max { } is the operator of maximizing.
9. a kind of method of supplying water of combined type secondary water-supply water storage apparatus according to claim 8, it is characterised in that: described
The calculation method of inlet flow rate B is corrected in step 5 are as follows:
Wherein, V in formula (16)i d2Indicate the lower water box being calculated in the amendment inlet flow rate B of i period;Indicate real
When the water that retains in i start time period of the lower water box that detects, the same formula of calculation method (10);
Theory for lower water box obtained by calculation in (i+1) start time period retains water B, with (i mod N+1) table
Showing (i+1) is to meet period expression formula (i+1) no more than requirement of period sum N.
10. a kind of method of supplying water of combined type secondary water-supply water storage apparatus according to claim 9, it is characterised in that: institute
State step 6 include automatic valve open method and calculate open automatic valve the period need close it is specific when
The method at quarter, is respectively as follows:
The open method of automatic valve are as follows: at the beginning of one day different time sections, work as Vi 2When equal to 0, sent out to automatic valve
The control signal instruction for being not turned on and supplying water to lower water box is sent, V is worked asi 2When not equal to 0, sends and opened to low level water to automatic valve
The control signal instruction that case supplies water;
The method for calculating the specific moment that the automatic valve opened is closed in period needs are as follows: after automatic valve is opened, by
Flowmeter detects the inlet flow rate for entering lower water box, and every detection obtains an inlet flow rate data and just calculates primary be somebody's turn to do
The water supply of period, and calculated water supply is compared with the theoretical water supply of the period, if in the time
Calculated water supply is greater than or equal to theoretical water supply before section terminates, then issues control signal instruction and close automatic valve and stop
It only supplies water, stops calculating and comparing at the end of the period, then:
Wherein, in formula (17)Indicate water supply of the lower water box in the i period,Indicate that real-time detection obtains low level
The inlet flow rate in the i period of water tank, r are the obtained lower water box of real-time detection in the suitable of i period inlet flow rate data
Ordinal number, total number of the h expression lower water box that real-time detection has obtained in i period inlet flow rate data, t expression flowmeter
A lower water box inlet flow rate data are provided at interval of the t time;
W in formula (18)i d5Indicate lower water box in the theoretical water supply of i period;
In formula (20)Indicate the specific moment that automatic valve needs to close in the i period, hbIndicate occur for the first timeWhen h numerical value.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910527056.5A CN110258721B (en) | 2019-06-18 | 2019-06-18 | Water supply method for combined secondary water supply and storage equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910527056.5A CN110258721B (en) | 2019-06-18 | 2019-06-18 | Water supply method for combined secondary water supply and storage equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110258721A true CN110258721A (en) | 2019-09-20 |
CN110258721B CN110258721B (en) | 2020-01-31 |
Family
ID=67919011
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910527056.5A Active CN110258721B (en) | 2019-06-18 | 2019-06-18 | Water supply method for combined secondary water supply and storage equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110258721B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112526956A (en) * | 2021-02-18 | 2021-03-19 | 广州汇图计算机信息技术有限公司 | Intelligent building integrated management system |
CN112667953A (en) * | 2020-12-15 | 2021-04-16 | 重庆昕晟环保科技有限公司 | Combined water supply method for secondary water supply high-level water tank and low-level water tank |
CN112666990A (en) * | 2020-12-15 | 2021-04-16 | 重庆昕晟环保科技有限公司 | Water supply method for secondary water supply tank of newly-built building |
CN113404125A (en) * | 2021-07-30 | 2021-09-17 | 海盐县三地自来水有限公司 | Water plant energy saving method and system based on closed-loop control of flow of water supply booster pump station |
CN114991257A (en) * | 2022-05-13 | 2022-09-02 | 河海大学 | Movable quality-based water supply device based on brackish water source and water supply method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009041333A (en) * | 2007-08-10 | 2009-02-26 | Kajima Corp | Water supply system and water supplying method |
CN105068567A (en) * | 2015-06-19 | 2015-11-18 | 苏州华控清源系统科技股份有限公司 | Water supply network regulation and storage method based on water tank |
CN105373092A (en) * | 2015-01-28 | 2016-03-02 | 太平洋水处理工程有限公司 | Intelligent control system special for water plant and control method thereof |
CN105756140A (en) * | 2016-04-14 | 2016-07-13 | 苏州华控清源系统科技股份有限公司 | Municipal water tank regulating and storing system and regulating and storing method thereof |
CN108166569A (en) * | 2018-01-08 | 2018-06-15 | 上海上源泵业制造有限公司 | Inlet controller of cistern and water tank water intake control method |
CN109269589A (en) * | 2018-11-10 | 2019-01-25 | 薛金山 | A kind of water volume in water tank calculating system and its calculation method with liquid level regulation |
-
2019
- 2019-06-18 CN CN201910527056.5A patent/CN110258721B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009041333A (en) * | 2007-08-10 | 2009-02-26 | Kajima Corp | Water supply system and water supplying method |
CN105373092A (en) * | 2015-01-28 | 2016-03-02 | 太平洋水处理工程有限公司 | Intelligent control system special for water plant and control method thereof |
CN105068567A (en) * | 2015-06-19 | 2015-11-18 | 苏州华控清源系统科技股份有限公司 | Water supply network regulation and storage method based on water tank |
CN105756140A (en) * | 2016-04-14 | 2016-07-13 | 苏州华控清源系统科技股份有限公司 | Municipal water tank regulating and storing system and regulating and storing method thereof |
CN108166569A (en) * | 2018-01-08 | 2018-06-15 | 上海上源泵业制造有限公司 | Inlet controller of cistern and water tank water intake control method |
CN109269589A (en) * | 2018-11-10 | 2019-01-25 | 薛金山 | A kind of water volume in water tank calculating system and its calculation method with liquid level regulation |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112667953A (en) * | 2020-12-15 | 2021-04-16 | 重庆昕晟环保科技有限公司 | Combined water supply method for secondary water supply high-level water tank and low-level water tank |
CN112666990A (en) * | 2020-12-15 | 2021-04-16 | 重庆昕晟环保科技有限公司 | Water supply method for secondary water supply tank of newly-built building |
CN112667953B (en) * | 2020-12-15 | 2023-07-07 | 重庆昕晟环保科技有限公司 | Combined water supply method for secondary water supply high-level water tank and low-level water tank |
CN112526956A (en) * | 2021-02-18 | 2021-03-19 | 广州汇图计算机信息技术有限公司 | Intelligent building integrated management system |
CN112526956B (en) * | 2021-02-18 | 2021-05-04 | 广州汇图计算机信息技术有限公司 | Intelligent building integrated management system |
CN113404125A (en) * | 2021-07-30 | 2021-09-17 | 海盐县三地自来水有限公司 | Water plant energy saving method and system based on closed-loop control of flow of water supply booster pump station |
CN114991257A (en) * | 2022-05-13 | 2022-09-02 | 河海大学 | Movable quality-based water supply device based on brackish water source and water supply method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN110258721B (en) | 2020-01-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110258721A (en) | A kind of method of supplying water of combined type secondary water-supply water storage apparatus | |
CN110258723A (en) | A kind of quantitative water supply method of secondary water-supply water storage apparatus | |
CN110258722A (en) | A kind of method of supplying water of the secondary water-supply water storage apparatus of variable volume | |
CN110264067A (en) | A kind of calculation method of secondary water-supply water storage apparatus inlet flow rate | |
US7993600B2 (en) | Salt dispensing system | |
US20130180928A1 (en) | Personal Water Conservation System | |
CN205892901U (en) | Can store non -potable water's among reverse osmosis water purification machine device | |
CN109928483B (en) | It is a kind of based on intelligent algorithm automatically control secondary water-supply add chlorination system | |
US20100187185A1 (en) | pH balancing system | |
CN106567427A (en) | Regulation and control device for water supply flows in peak period of water supply factory and method of regulation and control device | |
CN105442670A (en) | Building water supply pipeline circulation system and method for secondary water supply quality guarantee | |
JP2010535956A (en) | Water saving system for home installation | |
US20230075157A1 (en) | Indoor Grey Water Purification and Reuse Device, System and Method for Public Buildings | |
CN204849933U (en) | Automatic modularization drainage reuse of reclaimed water device | |
US11365532B2 (en) | Automated device for saving shower water | |
CN109896591A (en) | Self-adaptive intelligent control water purifying device | |
CN104266341B (en) | A kind of electric heater for safeguarding that water quality is fresh and the fresh maintaining method of inner bag water | |
CN109928457B (en) | A kind of secondary water-supply ultraviolet catalytic oxidation decontamination system of intelligent control | |
CN204715451U (en) | Intelligent silent pipe network Pressure-superposed water supply equipment | |
CN107604974A (en) | A kind of non-negative pressure frequency-changing water supply device | |
CN204456281U (en) | A kind of non-negative pressure method of water supply pipe network pressurizing current stabilizing controller | |
CN112666990B (en) | Water supply method for secondary water supply tank of newly-built building | |
CN113277603B (en) | Water quality safety management control system of newly-built building secondary water supply water tank | |
CN112667953B (en) | Combined water supply method for secondary water supply high-level water tank and low-level water tank | |
CN112663721B (en) | Intelligent water supply method of secondary water supply tank |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |