CN110258612A - A kind of monoblock type installation more pile foundation structure systems of offshore wind farm - Google Patents

A kind of monoblock type installation more pile foundation structure systems of offshore wind farm Download PDF

Info

Publication number
CN110258612A
CN110258612A CN201910574568.7A CN201910574568A CN110258612A CN 110258612 A CN110258612 A CN 110258612A CN 201910574568 A CN201910574568 A CN 201910574568A CN 110258612 A CN110258612 A CN 110258612A
Authority
CN
China
Prior art keywords
tubular pole
pile foundation
cover board
cushion cap
coaming plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910574568.7A
Other languages
Chinese (zh)
Other versions
CN110258612B (en
Inventor
王宇航
邓然
周绪红
杨庆山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Original Assignee
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University filed Critical Chongqing University
Priority to CN201910574568.7A priority Critical patent/CN110258612B/en
Publication of CN110258612A publication Critical patent/CN110258612A/en
Application granted granted Critical
Publication of CN110258612B publication Critical patent/CN110258612B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)
  • Wind Motors (AREA)

Abstract

The invention discloses a kind of monoblock types to install the more pile foundation structure systems of offshore wind farm, is related to wind power generation field.The system includes buoyancy module cushion cap, tubular pole, peg, concrete etc..The buoyancy module cushion cap is prefabricated by the welding of tower linkage section, cover board, bottom plate, coaming plate and triangle ribbed stiffener, and hollow steel pipe or concrete filled steel tube can be used in the section form of tubular pole.After the completion of tube pile construction, buoyancy module cushion cap and top blower can integrally float haul to scene, carry out quick-assembling with tubular pole.The system uses the preferably more pile foundation forms of bearing capacity, rigidity and overall stability, and buoyancy module cushion cap and tubular pole can shift to an earlier date prefabrication, and scene is directly assembled, construction is simple and high-efficient, and can complete machine haul, reduce operation on the sea difficulty, have wide future in engineering applications.

Description

A kind of monoblock type installation more pile foundation structure systems of offshore wind farm
Technical field
The present invention relates to wind power generation fields.
Background technique
China's offshore wind speed is abundant, and for offshore wind farm compared with land, wind turbine power generation amount is higher, and operation is more stable, and not Land occupation resource, therefore offshore wind farm is the important development direction in China's wind power new energy future.
With the continuous promotion of offshore wind farm installed power, single-pile foundation is compared, more pile foundations are steady in the rigidity of structure, entirety In terms of qualitative and piling construction advantageously.The cushion cap of current more pile foundations mostly uses reinforced concrete pile cap, concrete cast-in-situ The scale of construction is larger, and construction is inconvenient, while concrete bearing platform and its coagulation easily occurs under Fatigue Load with steel-pipe pile junction Soil cracking, it is unfavorable to foundation bearing capacity and durability.
Operation on the sea environment is severe with respect to offshore, and uncontrollable factor is more.According to conventional construction method, need top wind Mechanism member decomposes and is transported to scene in batches, then successively carries out foundation construction and blower lifting, increase the process of operation on the sea with Difficulty influences construction speed and quality.
In summary, develop a kind of bearing capacity height, reliable in quality, it is easy for construction, whole drag can be carried out with top blower Fortune and installation novel more pile foundation structure systems, be very it is necessary to.
Summary of the invention
The invention discloses a kind of monoblock types to install the more pile foundation structure systems of offshore wind farm, is related to wind power generation field. The system includes buoyancy module cushion cap, tubular pole, peg, concrete etc..The buoyancy module cushion cap by tower linkage section, cover board, bottom plate, enclose Plate and the welding of triangle ribbed stiffener are prefabricated, and hollow steel pipe or concrete filled steel tube can be used in the section form of tubular pole.The system uses The preferably more pile foundation forms of bearing capacity, rigidity and overall stability, component can shift to an earlier date prefabrication, and scene is directly assembled, Construction is simple and high-efficient, and complete machine floating haul and installation can be carried out with top blower, operation on the sea difficulty is reduced, is had wide Wealthy future in engineering applications.
Technical scheme is as follows:
A kind of monoblock type installation more pile foundation structure systems of offshore wind farm, the system include buoyancy module cushion cap, tubular pole, tower company Connect section, cover board, bottom plate, coaming plate, triangle ribbed stiffener, grout hole, reserved stake holes, peg, concrete, pile cap decking, circumferential steel Muscle.
Buoyancy module cushion cap is by tower linkage section, cover board, bottom plate, coaming plate and triangle ribbed stiffener is prefabricated forms;Tower linkage section Using steel tube section, side wall and coaming plate are welded, and bottom and cover board weld;Placing concrete in tower linkage section;Cover board four Week welds with coaming plate, encloses upper chamber;Bottom plate surrounding and coaming plate weld, and enclose lower cavity;Upper chamber and lower part The height ratio of cavity is 2:1;In upper chamber, it is uniformly arranged multiple tracks triangle ribbed stiffener, it is necessary in tubular pole corresponding position Triangle ribbed stiffener is set, and three sides of triangle ribbed stiffener are welded with tower linkage section, coaming plate and cover board respectively.
The section form of tubular pole use hollow steel pipe, inside preparatory placing concrete may be selected;Tubular pole upper side one Determine prewelding peg in altitude range;Within the scope of the certain altitude of tubular pole upper end, it is uniformly arranged multilayer circumferential reinforcement;The setting of tubular pole top Pile cap decking, the diameter of pile cap decking are greater than the diameter of tubular pole, and preformed hole in plate is used for casting concrete;It can be according to top lotus Carry size, selection 4~8 root canal piles of setting.
Two symmetrical grout holes are set on cover board and coaming plate, are convenient for from the external second pouring coagulation into lower cavity Soil.Reserved stake holes identical with tubular pole quantity is set on bottom plate;Tubular pole is assembled by reserved stake holes and buoyancy module cushion cap, then in lower part Second pouring concrete completes assembly in cavity.
The present invention has the advantages that compared with the existing technology
(1) buoyancy module formula cushion cap is used, it is easy to assembly with prefabricated tubular pile while meeting bearing capacity, and can realize and top The whole floating haul of blower;
(2) basic components are prefabricated in the factory in advance, it is ensured that and precision quality, scene only need secondary cast-in-place a small amount of concrete, Offshore construction process is greatly reduced, and can guarantee that buoyancy module cushion cap is connect reliably with tubular pole;
(3) blower can be completed to lift in offshore, and be mounted on buoyancy module cushion cap, then be transported to scene and carry out monoblock type installation, Work progress convenience and high-efficiency.
Detailed description of the invention
Fig. 1 is whole elevation (a-a sectional view) and buoyancy module cushion cap organigram of the invention;
Fig. 2 is b-b cross-sectional view and cover plate construction schematic diagram of the invention;
Fig. 3 is c-c cross-sectional view and board structure schematic diagram of the invention;
Fig. 4 is d-d cross-sectional view of the invention;
Fig. 5 is the pile cap decking detail of construction of the invention;
In figure: 1- buoyancy module cushion cap, 2- tubular pole, 3- tower linkage section, 4- cover board, 5- bottom plate, 6- coaming plate, 7- triangle are put more energy into Rib, 8- grout hole, 9- reserve stake holes, 10- peg, 11- concrete, 12- pile cap decking, 13- circumferential reinforcement.
Specific embodiment
Below in conjunction with attached drawing, the invention will be further described.
As shown in Figure 1, a kind of monoblock type installs the more pile foundation structure systems of offshore wind farm, which includes buoyancy module cushion cap (1), tubular pole (2), tower linkage section (3), cover board (4), bottom plate (5), coaming plate (6), triangle ribbed stiffener (7), peg (10), mixed Solidifying soil (11), circumferential reinforcement (13);Buoyancy module cushion cap (1) is by tower linkage section (3), cover board (4), bottom plate (5), coaming plate (6) and three Angular ribbed stiffener (7) is prefabricated to be formed;Tower linkage section (3) uses steel tube section, and side wall and coaming plate (6) are welded, bottom with Cover board (4) welding;Placing concrete (11) in tower linkage section (3);Cover board (4) surrounding and coaming plate (6) are welded, and top is enclosed Cavity;Bottom plate (5) surrounding and coaming plate (6) are welded, and lower cavity is enclosed;The height ratio of upper chamber and lower cavity is 2: 1;In upper chamber, it is uniformly arranged multiple tracks triangle ribbed stiffener (7), three sides of triangle ribbed stiffener (7) connect with tower respectively Connect section (3), coaming plate (6) and cover board (4) welding.
As shown in Fig. 2, triangle ribbed stiffener (7) is evenly arranged around cushion cap center, in tubular pole (2), corresponding position must be set Set triangle ribbed stiffener (7);Two symmetrical grout holes (8) are set on cover board (4) and coaming plate (6), are convenient for from outside down Second pouring concrete (11) in portion's cavity.
As shown in figure 3, reserved stake holes (9) identical with tubular pole (2) quantity is arranged on bottom plate (5).
As shown in figure 4, the section form of tubular pole (2) uses hollow steel pipe;Within the scope of tubular pole (2) upper side certain altitude Prewelding peg (10);Within the scope of the certain altitude of tubular pole (2) upper end, it is uniformly arranged multilayer circumferential reinforcement (13);It can be according to top lotus Carry size, selection setting 4~8 root canal piles (2);Tubular pole (2) is inserted into buoyancy module cushion cap (1) by reserved stake holes (9), then in lower chamber Second pouring concrete (11) completes assembly in body.
As shown in figure 5, may be selected preparatory placing concrete (11) inside tubular pole (2), pile cap decking is arranged in tubular pole (2) top (12), the diameter of pile cap decking (12) is greater than the diameter of tubular pole (2), and preformed hole in plate is used for casting concrete (11).
The invention proposes a kind of monoblock types to install the more pile foundation structure systems of offshore wind farm.The system using bearing capacity, Rigidity and the preferably more pile foundation forms of overall stability, component can shift to an earlier date prefabrication, and scene is directly assembled, construction is simple And it is high-efficient, and complete machine floating haul and installation can be carried out with top blower, operation on the sea difficulty is reduced, there is wide engineering Application prospect.
The above is only the preferred embodiments of the invention, but the invention is not limited to above-mentioned specific implementations Scheme.One skilled in the relevant art without departing from the principle of the present invention, can also make several modifications, supplement Or use similar fashion substitution instead, these should also be regarded as protection scope of the present invention.
Although being used more herein: 1- buoyancy module cushion cap, 2- tubular pole, 3- tower linkage section, 4- cover board, 5- bottom plate, 6- Coaming plate, 7- triangle ribbed stiffener, 8- grout hole, 9- reserve stake holes, 10- peg, 11- concrete, 12- pile cap decking, 13- circumferential direction The terms such as reinforcing bar, but a possibility that be not precluded using other terms.The use of these items is only for more easily describe The essence of the invention with explanation, being construed as any additional limitation all is disagreed with spirit of the invention.

Claims (5)

1. a kind of monoblock type installs the more pile foundation structure systems of offshore wind farm, it is related to wind power generation field;The system includes buoyancy module Cushion cap (1), tubular pole (2), tower linkage section (3), cover board (4), bottom plate (5), coaming plate (6), triangle ribbed stiffener (7), grout hole (8), stake holes (9), peg (10), concrete (11), pile cap decking (12), circumferential reinforcement (13) are reserved.
2. monoblock type according to claim 1 installs the more pile foundation structure systems of offshore wind farm, it is characterised in that: described Buoyancy module cushion cap (1) is by tower linkage section (3), cover board (4), bottom plate (5), coaming plate (6) and triangle ribbed stiffener (7) is prefabricated forms; Tower linkage section (3) uses steel tube section, and side wall and coaming plate (6) are welded, and bottom and cover board (4) are welded;Tower linkage section (3) placing concrete (11) in;Cover board (4) surrounding and coaming plate (6) are welded, and upper chamber is enclosed;Bottom plate (5) surrounding and coaming plate (6) it welds, encloses lower cavity;The height ratio of upper chamber and lower cavity is 2:1;In upper chamber, uniformly set Multiple tracks triangle ribbed stiffener (7) is set, corresponding position must be provided with triangle ribbed stiffener (7), triangle ribbed stiffener in tubular pole (2) (7) it is welded respectively with tower linkage section (3), coaming plate (6) and cover board (4) on three sides.
3. monoblock type according to claim 1 installs the more pile foundation structure systems of offshore wind farm, it is characterised in that: tubular pole (2) section form use hollow steel pipe, inside preparatory placing concrete (11) may be selected;Tubular pole (2) upper side is certain Prewelding peg (10) in altitude range;Within the scope of the certain altitude of tubular pole (2) upper end, it is uniformly arranged multilayer circumferential reinforcement (13);Pipe Stake (2) top setting pile cap decking (12), the diameter of pile cap decking (12) are greater than the diameter of tubular pole (2), and preformed hole in plate is used for Casting concrete (11);Setting 4~8 root canal piles (2) can be selected according to upper load size.
4. monoblock type according to claim 1 installs the more pile foundation structure systems of offshore wind farm, it is characterised in that: in cover board (4) and on coaming plate (6) two symmetrical grout holes (8) are set, are convenient for from the external second pouring concrete into lower cavity (11)。
5. monoblock type according to claim 1 installs the more pile foundation structure systems of offshore wind farm, it is characterised in that: bottom plate (5) reserved stake holes (9) identical with tubular pole (2) quantity is set on;Tubular pole (2) is spelled by reserved stake holes (9) and buoyancy module cushion cap (1) Dress, then second pouring concrete (11) completes assembly in lower cavity.
CN201910574568.7A 2019-06-28 2019-06-28 Integral type offshore wind power multi-pile foundation structure system Active CN110258612B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910574568.7A CN110258612B (en) 2019-06-28 2019-06-28 Integral type offshore wind power multi-pile foundation structure system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910574568.7A CN110258612B (en) 2019-06-28 2019-06-28 Integral type offshore wind power multi-pile foundation structure system

Publications (2)

Publication Number Publication Date
CN110258612A true CN110258612A (en) 2019-09-20
CN110258612B CN110258612B (en) 2024-03-22

Family

ID=67922926

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910574568.7A Active CN110258612B (en) 2019-06-28 2019-06-28 Integral type offshore wind power multi-pile foundation structure system

Country Status (1)

Country Link
CN (1) CN110258612B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113833005A (en) * 2021-08-24 2021-12-24 哈尔滨工业大学 Steel-solid waste concrete combined bearing platform with composite structure and construction method thereof

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005194792A (en) * 2004-01-08 2005-07-21 Ishikawajima Harima Heavy Ind Co Ltd Foundation for ocean wind power generating device, and installation method of ocean wind power generating device
JP2006291641A (en) * 2005-04-14 2006-10-26 Kajima Corp Pile foundation structure and its construction method
JP2010280301A (en) * 2009-06-04 2010-12-16 Shimizu Corp Floating structural for offshore facility and method of constructing offshore facility
CN103225300A (en) * 2013-04-18 2013-07-31 贵州建工集团第二建筑工程有限责任公司 Process and equipment for reinforcing and strengthening concrete filling pile
CN103556651A (en) * 2013-11-20 2014-02-05 天津港航工程有限公司 Precast concrete jacket type offshore wind turbine foundation
CN103912006A (en) * 2014-03-14 2014-07-09 中国水电顾问集团西北勘测设计研究院有限公司 Assembled multi-pile foundation structure and construction method thereof
CN104452798A (en) * 2014-11-18 2015-03-25 江苏金海新能源科技有限公司 Offshore wind turbine foundation structure and equipment and construction method of offshore wind turbine foundation equipment
CN205152976U (en) * 2015-11-17 2016-04-13 中国电建集团华东勘测设计研究院有限公司 Marine precast concrete cushion cap wind turbine foundation
CN206143795U (en) * 2016-08-31 2017-05-03 沧州晟实伟业机械设备制造有限公司 Wind turbine foundation template
CN108755738A (en) * 2018-07-18 2018-11-06 中国电建集团中南勘测设计研究院有限公司 A kind of sea high-rise pile cap blower foundation and its construction method
CN109281332A (en) * 2018-11-06 2019-01-29 重庆大学 A kind of wind-power tower foundation ring rib beam type basis based on composite structure
CN210827534U (en) * 2019-06-28 2020-06-23 重庆大学 Integral installation offshore wind power multi-pile foundation structure system

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005194792A (en) * 2004-01-08 2005-07-21 Ishikawajima Harima Heavy Ind Co Ltd Foundation for ocean wind power generating device, and installation method of ocean wind power generating device
JP2006291641A (en) * 2005-04-14 2006-10-26 Kajima Corp Pile foundation structure and its construction method
JP2010280301A (en) * 2009-06-04 2010-12-16 Shimizu Corp Floating structural for offshore facility and method of constructing offshore facility
CN103225300A (en) * 2013-04-18 2013-07-31 贵州建工集团第二建筑工程有限责任公司 Process and equipment for reinforcing and strengthening concrete filling pile
CN103556651A (en) * 2013-11-20 2014-02-05 天津港航工程有限公司 Precast concrete jacket type offshore wind turbine foundation
CN103912006A (en) * 2014-03-14 2014-07-09 中国水电顾问集团西北勘测设计研究院有限公司 Assembled multi-pile foundation structure and construction method thereof
CN104452798A (en) * 2014-11-18 2015-03-25 江苏金海新能源科技有限公司 Offshore wind turbine foundation structure and equipment and construction method of offshore wind turbine foundation equipment
CN205152976U (en) * 2015-11-17 2016-04-13 中国电建集团华东勘测设计研究院有限公司 Marine precast concrete cushion cap wind turbine foundation
CN206143795U (en) * 2016-08-31 2017-05-03 沧州晟实伟业机械设备制造有限公司 Wind turbine foundation template
CN108755738A (en) * 2018-07-18 2018-11-06 中国电建集团中南勘测设计研究院有限公司 A kind of sea high-rise pile cap blower foundation and its construction method
CN109281332A (en) * 2018-11-06 2019-01-29 重庆大学 A kind of wind-power tower foundation ring rib beam type basis based on composite structure
CN210827534U (en) * 2019-06-28 2020-06-23 重庆大学 Integral installation offshore wind power multi-pile foundation structure system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
金鑫;熊海洋;夏宗朝;何玉林;杜静;: "漂浮特性对风力发电机载荷的影响", 南昌大学学报(工科版), no. 02 *
黄炳南;: "海上风电基础大直径嵌岩桩施工技术", 中国港湾建设, no. 08 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113833005A (en) * 2021-08-24 2021-12-24 哈尔滨工业大学 Steel-solid waste concrete combined bearing platform with composite structure and construction method thereof

Also Published As

Publication number Publication date
CN110258612B (en) 2024-03-22

Similar Documents

Publication Publication Date Title
US20220074160A1 (en) Pile-cylinder-truss composite offshore wind turbine foundation and construction process thereof
CN104389318B (en) Reinforced concrete-steel structure hybrid gravity foundation for offshore wind power and construction method thereof
CN205152976U (en) Marine precast concrete cushion cap wind turbine foundation
CN102373711A (en) Base structure for off-shore wind turbines and method for building the same
CN103225304B (en) A kind of marine foundation supporting structure and construction method thereof
CN106930313B (en) Offshore wind power engineering pile barrel combined foundation and construction method thereof
CN110453714B (en) Offshore wind power jacket gravity type cylindrical foundation structure and construction method thereof
CN110055995A (en) A kind of offshore power generator foundation structure and its construction method
CN105863042A (en) All-steel structure building and construction method thereof
CN105544575A (en) Underwater bottom sealing concrete construction method using steel truss for reinforcement
CN106013212A (en) Offshore wind turbine tower foundation structure and installation method
CN112900472A (en) High-strength grouting pipe joint jacket foundation for offshore wind power and construction method thereof
CN110439018A (en) A kind of new plug-in steel cylinder wind power foundation
CN109024661A (en) Foundation of wind-driven generator unit hardened system
CN110258612A (en) A kind of monoblock type installation more pile foundation structure systems of offshore wind farm
CN113357093B (en) Accurate installation method and structure for butt joint of split jacket foundation and upper module of large offshore electrical platform
CN113047330A (en) Assembled high-rise pile cap for offshore wind power
NL2028088A (en) Concrete connector body for an offshore wind turbine.
GB2505192A (en) A pile sleeve connection for a monopole foundation
CN210827534U (en) Integral installation offshore wind power multi-pile foundation structure system
CN213390202U (en) Combined type polygonal tubular structure fan foundation
CN208088290U (en) Organizational pile foundation structure
CN210288441U (en) Precast concrete cofferdam
CN113356263A (en) Jacket-pile grouting connection structure
CN208472751U (en) Offshore wind turbine prestressing force gravity type foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination