CN110258575A - A kind of basement process reinforcement structure - Google Patents
A kind of basement process reinforcement structure Download PDFInfo
- Publication number
- CN110258575A CN110258575A CN201910377381.8A CN201910377381A CN110258575A CN 110258575 A CN110258575 A CN 110258575A CN 201910377381 A CN201910377381 A CN 201910377381A CN 110258575 A CN110258575 A CN 110258575A
- Authority
- CN
- China
- Prior art keywords
- mounting plate
- fixedly connected
- lateral wall
- rubber bag
- mounting groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The invention discloses a kind of basement process reinforcement structure, including the first mounting plate and the second mounting plate, first mounting plate and the opposite side of the second mounting plate offer the first mounting groove and the second mounting groove respectively;The inner sidewall of first mounting groove is fixedly connected with rubber bag and U-shaped board.When the present invention uses, the first bindiny mechanism can be passed through, the effect of second bindiny mechanism so that adjust between the first mounting plate and the second mounting plate apart from when and adjust the use length of rubber bag, water or silt consume excessively after thus being avoided that, then the sealing of rubber bag opening is realized by compressing mechanism, then water or silt are constantly filled into rubber bag by feed inlet, then constantly filling ground water or silt will prop up rubber bag, then prop up ground rubber bag and will enter between two support plates in gap, to avoid soil from flowing outwardly from the gap between two support plates, to play the effect of reinforcement to support plate.
Description
Technical field
The present invention relates to Architectural Equipment technical field more particularly to a kind of basement process reinforcement structures.
Background technique
Ground is subject to that a part of soil body of superstructure load influence.Currently, ground has been dug on building sites
The soil wall on the inside of ground is supported by support plate later, so that the accident collapsed is avoided to occur, but it is two neighboring
Gap between support plate is difficult to be compensated for, in this way at rainy day, since the impact of rainwater easily causes the mud of ground side
Soil is flowed downward out along rainwater between two neighboring support plate, and flow outwardly along rainwater will for the soil at support plate rear
Cause support plate rear to loosen, support plate can not be made steadily to support the soil progress at rear, and then cause to cave in
The problem of.
Summary of the invention
The purpose of the present invention is to solve problems of the prior art, and a kind of basement process proposed reinforces knot
Structure.
To achieve the goals above, present invention employs following technical solutions:
A kind of basement process reinforcement structure, including the first mounting plate and the second mounting plate, first mounting plate and second
The opposite side of mounting plate offers the first mounting groove and the second mounting groove respectively;The inner sidewall of first mounting groove is fixed to be connected
It is connected to rubber bag and U-shaped board, and the rubber bag is located in U-shaped board, the inner sidewall of first mounting groove is equipped with feeding mechanism;
The inner sidewall of second mounting groove is rotatably connected to the first rotating shaft being vertically arranged, and the first rotating shaft passes through the first connection machine
Structure is connect with U-shaped board one end lateral wall, is equipped with the second shaft in second mounting groove, the both ends of the U-shaped board be equipped with
The corresponding first sliding mouth of second shaft, second shaft are sequentially connected by the second bindiny mechanism and first rotating shaft, and described the
The end of two shafts is fixedly connected by fixed mechanism with the inner sidewall of the second mounting groove, the first rotating shaft and the second shaft
Lateral wall is fixedly connected to admission extinguisher, and the rubber bag is respectively fixedly connected with far from the two sides of first mounting plate one end and is storing
On the lateral wall of cylinder, second mounting plate is equipped with and compresses mechanism.
Preferably, the feeding mechanism includes feed inlet, and the lateral wall of first mounting plate is threaded with thread bush,
The lateral wall of first mounting plate offers thread groove in a ring corresponding with thread bush, and the thread bush is far from the first peace
One end of loading board is fixedly connected with mounting disc, and the mounting disc is fixedly connected with handle, the installation far from one end of thread bush
Disk is fixedly connected with cylindrical sealing-plug far from one end of handle, and the sealing-plug is located in opening.
Preferably, first bindiny mechanism includes the first gear being fixedly attached on first rotating shaft lateral wall, the U
One end of template is fixedly connected with rack gear engaged with the first gear.
Preferably, second bindiny mechanism includes being fixedly attached to second gear on first rotating shaft lateral wall, and described the
The lateral wall fixing sleeve of two shafts is connected to the third gear engaged with second gear.
Preferably, the fixed mechanism includes the fixed disk for being rotatably connected on the second roller end, spiral shell in the fixed disk
Line is connected with multiple first in command's bolts, and the inner sidewall of second mounting groove offers multiple corresponding with first in command's bolt
First thread groove.
Preferably, the mechanism that compresses includes the threaded rod being threaded on the second mounting plate lateral wall, the screw thread
One end of bar is fixedly connected with handle, and multiple second handle bolts are threaded on the handle, second mounting plate
Lateral wall offers multiple the second thread grooves corresponding with second handle bolt arranged in a ring, and the threaded rod is far from handle
One end through the second mounting plate and be rotatably connected to and compress plate, and corresponding with threaded rod second is offered in the U-shaped board
Sliding mouth, described to compress plate and be fixedly connected to limited block far from the side both ends of threaded rod, two limited blocks are located at rubber
The two sides of bag, the inner sidewall of second mounting groove offer limiting slot corresponding with limited block.
Preferably, the lateral wall of the sealing-plug is fixedly connected with rubber sealant.
Preferably, the inner sidewall of second mounting groove offers turn trough corresponding with first rotating shaft end, the turn trough
Inner sidewall be fixedly connected with bearing, the lateral wall of the first rotating shaft is fixedly connected with the inner sidewall of bearing.
The invention has the benefit that
In use, can be by the effect of the first bindiny mechanism, the second bindiny mechanism so that adjusting the first mounting plate and the
The use length of rubber bag is adjusted when the distance between two mounting plates, water or silt consume excessively after thus being avoided that, connect
By compress mechanism realize rubber bag opening sealing, then by feed inlet constantly filled into rubber bag water or
Silt, then constantly filling ground water or silt will prop up rubber bag, then two supports will be entered by propping up ground rubber bag
Between plate in gap, so that soil be avoided to flow outwardly from the gap between two support plates, thus support plate is played plus
Strong effect.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of basement process reinforcement structure proposed by the present invention;
Fig. 2 is the enlarged drawing in Fig. 1 at B;
Fig. 3 be in Fig. 1 A-A to diagram;
Fig. 4 is the enlarged drawing in Fig. 1 at C;
Fig. 5 is the schematic diagram of internal structure of the second mounting plate in a kind of basement process reinforcement structure proposed by the present invention;
Fig. 6 is the second mounting plate and the connection structure for compressing mechanism in a kind of basement process reinforcement structure proposed by the present invention
Schematic diagram;
Fig. 7 is a kind of positive structure schematic of basement process reinforcement structure proposed by the present invention;
Fig. 8 is that the connection structure of second mounting plate and U-shaped board is shown in a kind of basement process reinforcement structure proposed by the present invention
It is intended to;
Fig. 9 is the overlooking structure diagram of U-shaped board in a kind of basement process reinforcement structure proposed by the present invention;
Figure 10 is the side structure schematic diagram of U-shaped board in a kind of basement process reinforcement structure proposed by the present invention.
In figure: 1 first mounting plate, 2 second mounting plates, 3 rubber bags, 4 U-shaped boards, 5 feeding mechanisms, 51 thread bush, 52 peaces
Sabot, 53 handles, 54 sealing-plugs, 6 first rotating shafts, 7 first bindiny mechanisms, 71 first gears, 72 rack gears, 8 second shafts, 9
Two bindiny mechanisms, 91 second gears, 92 third gears, 10 admission extinguishers, 11 compress mechanism, 111 threaded rods, 112 handles, 113 support
Pressing plate, 114 limited blocks, 115 second handle bolts, 12 fixed mechanisms, 121 fixed disks, 122 first in command's bolts, 13 first are slided
Mouth, 14 second sliding mouths.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
In the description of the present invention, it is to be understood that, term " on ", "lower", "front", "rear", "left", "right", "top",
The orientation or positional relationship of the instructions such as "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, merely to just
In description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with
Specific orientation construction and operation, therefore be not considered as limiting the invention.
Referring to Fig.1-10, a kind of basement process reinforcement structure, including the first mounting plate 1 and the second mounting plate 2, the first installation
Plate 1 and the opposite side of the second mounting plate 2 offer the first mounting groove and the second mounting groove respectively.
Wherein, the inner sidewall of the first mounting groove is fixedly connected with rubber bag 3 and U-shaped board 4, and rubber bag 3 is located at U-shaped board 4
Interior, the inner sidewall of the first mounting groove is equipped with feeding mechanism 5;
It should be understood that 1, feeding mechanism 5 includes feed inlet, the lateral wall of the first mounting plate 1 is threaded with screw thread
Set 51, the lateral wall of the first mounting plate 1 offers thread groove in a ring corresponding with thread bush 51, and thread bush 51 is far from first
One end of mounting plate 1 is fixedly connected with mounting disc 52, and mounting disc 52 is fixedly connected with handle 53 far from one end of thread bush 51, peace
Sabot 52 is fixedly connected with cylindrical sealing-plug 54 far from one end of handle 53, and sealing-plug 54 is located in opening, logical in this way
The effect for crossing feeding mechanism 5 enters in rubber bag 3 convenient for external water or mud, i.e. the rear feeding convenient for charging and charging
The leakproofness of mouth;2, the lateral wall of sealing-plug 54 is fixedly connected with rubber sealant, in this way guarantee feed inlet and sealing-plug 54 it
Between leakproofness.
Wherein, the inner sidewall of the second mounting groove is rotatably connected to the first rotating shaft 6 being vertically arranged, and first rotating shaft 6 passes through the
One bindiny mechanism 7 connect with 4 one end lateral wall of U-shaped board, the second shaft 8 is equipped in the second mounting groove, the both ends of U-shaped board 4 are all provided with
There is the corresponding with the second shaft 8 first sliding mouth 13, the second shaft 8 is sequentially connected by the second bindiny mechanism 9 with first rotating shaft 6,
The end of second shaft 8 is fixedly connected by fixed mechanism 12 with the inner sidewall of the second mounting groove, first rotating shaft 6 and the second shaft
8 lateral wall is fixedly connected to admission extinguisher 10, and rubber bag 3 is respectively fixedly connected with far from the two sides of 1 one end of the first mounting plate
On the lateral wall of admission extinguisher 10, the second mounting plate 2 is equipped with and compresses mechanism 11;
It should be understood that the 1, first bindiny mechanism 7 includes the first gear being fixedly attached on 6 lateral wall of first rotating shaft
71, one end of U-shaped board 4 is fixedly connected with the rack gear 72 engaged with first gear 71, passes through the effect of the first bindiny mechanism 7 in this way
So that the sliding of U-shaped board 4 can drive the rotation of first gear 71, and then drive the rotation of first rotating shaft 6;
2, the second bindiny mechanism 9 includes being fixedly attached to second gear 91 on 6 lateral wall of first rotating shaft, the second shaft 8
Lateral wall fixing sleeve is connected to the third gear 92 engaged with second gear 91, and such first rotating shaft 6 passes through the second bindiny mechanism 9
Effect drives the second shaft 8 to rotate backward, because second shaft 8 and first rotating shaft 6 pass through the second gear 91 of engagement and the
Transmission is realized in the effect of three gears 92, and then admission extinguisher 10 will realize the effect rolled to rubber bag 3;
3, fixed mechanism 12 includes the fixed disk 121 for being rotatably connected on 8 end of the second shaft, and screw thread connects in fixed disk 121
Multiple first in command's bolts 122 are connected to, the inner sidewall of the second mounting groove offers multiple corresponding with first in command's bolt 122
One thread groove, is convenient for the rotation of the second shaft 8 by the effect of fixed mechanism 12 in this way, while can realize the shifting of the second shaft 8
It is dynamic, that is, fixed disk 121 is moved, can realize the openings of sizes of control rubber bag 3 by mobile second shaft 8 in this way, and then be convenient for
Material in rubber bag 3 is taken out, it will not be because of the water or dry mud in the openings of sizes inconvenience rubber bag 3 of rubber bag 3
Soil takes out;
4, compressing mechanism 11 includes the threaded rod 111 being threaded on 2 lateral wall of the second mounting plate, threaded rod 111
One end is fixedly connected with handle 112, is threaded with multiple second handle bolts 115 on handle 112, the second mounting plate 2 it is outer
Side wall offers multiple second thread grooves corresponding with second handle bolt 115 arranged in a ring, and threaded rod 111 is far from handle
112 one end, which is run through the second mounting plate 2 and is rotatably connected to, compresses plate 113, and offers in U-shaped board 4 corresponding with threaded rod 111
The second sliding mouth 14, compress plate 113 far from the side both ends of threaded rod 111 and be fixedly connected to limited block 114, two limited blocks
114 are located at the two sides of rubber bag 3, and the inner sidewall of the second mounting groove offers limiting slot corresponding with limited block 114, passes through in this way
The effect of compacting is realized in the effect for compressing mechanism 11 to 3 open end of rubber bag, i.e., travels forward so that compressing plate 113, thus will
Rubber bag 3, which is pressed on, to be compressed between plate 113 and the inner sidewall of the second mounting groove, then realizes the sealing of 3 opening of rubber bag, then make
The water and soil obtained in when rubber bag 3 uses will not overflow outward;
5, the inner sidewall of the second mounting groove offers turn trough corresponding with 6 end of first rotating shaft, and the inner sidewall of turn trough is fixed
It is connected with bearing, the lateral wall of first rotating shaft 6 is fixedly connected with the inner sidewall of bearing, is convenient for the rotation of first rotating shaft 6 in this way.
It is in the present invention use process is as follows:
In use, the first mounting plate 1 of the present apparatus and the second mounting plate 2 are passed through multiple bolts and setscrew etc. respectively
It is fixedly connected on the lateral wall of two adjacent support plates, and operator can be according between two support plates before this
Distance and adjust the distance between the first mounting plate 1 and the second mounting plate 2 so that rubber bag 3 can be according to two support plates
The distance between and complete self-control, can adjust what rubber bag 3 used according to the distance between two support plates in this way
First mounting plate 1 is first fixed therein in a support plate by effective length, then mobile second mounting plate 2, then due to first
Mounting plate 1 is fixed, then U-shaped board 4 is caused to be stablized, and when the movement of the second mounting plate 2, first rotating shaft 6 will pass through first gear 71
Rotation is realized in effect with rack gear 72, and then first rotating shaft 6 drives the second shaft 8 anti-by second gear 91 and second gear 92
To rotation, then with the rotation that the rotation of first rotating shaft 6 and the second shaft 8 will make two admission extinguishers 10 reversed, and it is reversed
The admission extinguisher 10 of rotation will realize the effect of winding to the opening of rubber bag 3, in this way mobile second mounting plate 2 with it is another
Effective use scope of rubber bag 3 is adjusted when the installation site of a support plate, after the completion of adjusting, operator passes through handle
112 drive the rotation of threaded rods 111, travel forward so that compressing plate 113, and what is travelled forward compresses plate 113 and will make
The opening of rubber bag 3 is extruded, guarantee the stabilization of threaded rod 111 finally by first in command's bolt 122 is tightened, then squeeze
Rubber bag 3 after pressure will realize closure, consequently facilitating backward rubber bag 3 in filling water body or soil.
Then operator fills water body or silt from feed inlet into rubber bag 3, then enters in rubber bag 3
Water or silt will constantly prop up rubber bag 3, and wherein rubber bag 3 is arranged close to the side of the first mounting plate 1 at opening,
And opening is fixedly connected with the inner sidewall of the first mounting groove, middle charging aperture is located in rubber bag 3 is open, and 3 ground of rubber bag
Back and upper and lower two sides have the limit of U-shaped board 4 movable, and 3 two sides of rubber bag pass through the first mounting plate 1 respectively and compress plate
113 effect can not move, then the water or silt constantly filled will make rubber bag 3 prop up forward, and 3 front of rubber bag
For the gap between two support plates, then the rubber bag 3 previously propped up constantly will fill and make up two support plates it
Between, it is flowed outwardly to place soil between two support plates, to avoid the stability of ground.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its
Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.
Claims (8)
1. a kind of basement process reinforcement structure, including the first mounting plate (1) and the second mounting plate (2), which is characterized in that described
One mounting plate (1) and the opposite side of the second mounting plate (2) offer the first mounting groove and the second mounting groove respectively;
The inner sidewall of first mounting groove is fixedly connected with rubber bag (3) and U-shaped board (4), and the rubber bag (3) is located at U
In template (4), the inner sidewall of first mounting groove is equipped with feeding mechanism (5);
The inner sidewall of second mounting groove is rotatably connected to the first rotating shaft (6) being vertically arranged, and the first rotating shaft (6) passes through
First bindiny mechanism (7) connect with U-shaped board (4) one end lateral wall, is equipped with the second shaft (8) in second mounting groove, the U
The both ends of template (4) are equipped with corresponding with the second shaft (8) first sliding mouth (13), and second shaft (8) connects by second
Connection mechanism (9) and first rotating shaft (6) are sequentially connected, and the end of second shaft (8) passes through fixed mechanism (12) and the second peace
The inner sidewall of tankage is fixedly connected, and the lateral wall of the first rotating shaft (6) and the second shaft (8) is fixedly connected to admission extinguisher
(10), the rubber bag (3) is respectively fixedly connected with the lateral wall in admission extinguisher (10) far from the two sides of the first mounting plate (1) one end
On, second mounting plate (2) is equipped with and compresses mechanism (11).
2. a kind of basement process reinforcement structure according to claim 1, which is characterized in that the feeding mechanism (5) includes
The lateral wall of feed inlet, first mounting plate (1) is threaded with thread bush (51), the outside of first mounting plate (1)
Wall offers thread groove in a ring corresponding with thread bush (51), the thread bush (51) far from the first mounting plate (1) one
End is fixedly connected with mounting disc (52), and the mounting disc (52) is fixedly connected with handle (53) far from the one end of thread bush (51),
The mounting disc (52) is fixedly connected with cylindrical sealing-plug (54) far from the one end of handle (53), the sealing-plug (54)
In opening.
3. a kind of basement process reinforcement structure according to claim 1, which is characterized in that first bindiny mechanism (7)
Including the first gear (71) being fixedly attached on first rotating shaft (6) lateral wall, one end of the U-shaped board (4) is fixedly connected with
The rack gear (72) engaged with first gear (71).
4. a kind of basement process reinforcement structure according to claim 1, which is characterized in that second bindiny mechanism (9)
Including being fixedly attached to second gear (91) on first rotating shaft (6) lateral wall, the lateral wall of second shaft (8) is fixedly attached
There is the third gear (92) engaged with second gear (91).
5. a kind of basement process reinforcement structure according to claim 1, which is characterized in that the fixed mechanism (12) includes
It is rotatably connected on the fixed disk (121) of the second shaft (8) end, is threaded with multiple first on the fixed disk (121)
Hand bolt (122), the inner sidewall of second mounting groove offer multiple the first screw threads corresponding with first in command's bolt (122)
Slot.
6. a kind of basement process reinforcement structure according to claim 1, which is characterized in that the mechanism (11) that compresses includes
One end of the threaded rod (111) being threaded on the second mounting plate (2) lateral wall, the threaded rod (111) is fixedly connected with
Handle (112) is threaded with multiple second handle bolts (115) on the handle (112), second mounting plate (2)
Lateral wall offers multiple the second thread grooves corresponding with second handle bolt (115) arranged in a ring, the threaded rod
(111) one end far from handle (112) is run through the second mounting plate (2) and is rotatably connected to and compresses plate (113), and the U-shaped board
(4) second sliding mouth (14) corresponding with threaded rod (111) are offered on, compress plate (113) far from threaded rod (111) one
Side both ends are fixedly connected to limited block (114), and two limited blocks (114) are located at the two sides of rubber bag (3), and described second
The inner sidewall of mounting groove offers limiting slot corresponding with limited block (114).
7. a kind of basement process reinforcement structure according to claim 2, which is characterized in that the outside of the sealing-plug (54)
Wall is fixedly connected with rubber sealant.
8. a kind of basement process reinforcement structure according to claim 1, which is characterized in that the inside of second mounting groove
Wall offers turn trough corresponding with first rotating shaft (6) end, and the inner sidewall of the turn trough is fixedly connected with bearing, and described first turn
The lateral wall of axis (6) is fixedly connected with the inner sidewall of bearing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910377381.8A CN110258575B (en) | 2019-05-05 | 2019-05-05 | Additional strengthening is handled to ground |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910377381.8A CN110258575B (en) | 2019-05-05 | 2019-05-05 | Additional strengthening is handled to ground |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110258575A true CN110258575A (en) | 2019-09-20 |
CN110258575B CN110258575B (en) | 2021-02-02 |
Family
ID=67914358
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910377381.8A Active CN110258575B (en) | 2019-05-05 | 2019-05-05 | Additional strengthening is handled to ground |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110258575B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112177009A (en) * | 2020-08-17 | 2021-01-05 | 东阳市鼎元建设有限公司 | A foundation ditch enclosure device for road construction |
CN114197441A (en) * | 2021-12-31 | 2022-03-18 | 青岛地质工程勘察院(青岛地质勘查开发局) | Additional strengthening is handled to ground |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0841876A (en) * | 1994-07-29 | 1996-02-13 | Showa Alum Corp | Timbering frame for landslide protection wall |
JPH11280073A (en) * | 1998-03-27 | 1999-10-12 | Nsp Corp | Cut beam support |
CN101890734A (en) * | 2010-07-09 | 2010-11-24 | 林秀椿 | Belt cutting machine |
CN207665912U (en) * | 2018-01-31 | 2018-07-31 | 河南华炬生物工程有限公司 | A kind of sausage auxiliary material feed device |
CN207828983U (en) * | 2018-01-02 | 2018-09-07 | 徐朝 | For subway, the deep basal pit gib system of road construction |
CN207862946U (en) * | 2018-01-22 | 2018-09-14 | 伊智恩 | A kind of ground excavation collapse structure |
-
2019
- 2019-05-05 CN CN201910377381.8A patent/CN110258575B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0841876A (en) * | 1994-07-29 | 1996-02-13 | Showa Alum Corp | Timbering frame for landslide protection wall |
JPH11280073A (en) * | 1998-03-27 | 1999-10-12 | Nsp Corp | Cut beam support |
CN101890734A (en) * | 2010-07-09 | 2010-11-24 | 林秀椿 | Belt cutting machine |
CN207828983U (en) * | 2018-01-02 | 2018-09-07 | 徐朝 | For subway, the deep basal pit gib system of road construction |
CN207862946U (en) * | 2018-01-22 | 2018-09-14 | 伊智恩 | A kind of ground excavation collapse structure |
CN207665912U (en) * | 2018-01-31 | 2018-07-31 | 河南华炬生物工程有限公司 | A kind of sausage auxiliary material feed device |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112177009A (en) * | 2020-08-17 | 2021-01-05 | 东阳市鼎元建设有限公司 | A foundation ditch enclosure device for road construction |
CN112177009B (en) * | 2020-08-17 | 2021-12-21 | 东阳市鼎元建设有限公司 | A foundation ditch enclosure device for road construction |
CN114197441A (en) * | 2021-12-31 | 2022-03-18 | 青岛地质工程勘察院(青岛地质勘查开发局) | Additional strengthening is handled to ground |
Also Published As
Publication number | Publication date |
---|---|
CN110258575B (en) | 2021-02-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110258575A (en) | A kind of basement process reinforcement structure | |
CN107135724A (en) | A kind of electric fertilizer applicator | |
CN206142284U (en) | Automatic discharge groove is carried to resin | |
CN107899861B (en) | A kind of waterproof coiled material tyre cloth bituminizing mechanism | |
CN209621334U (en) | One kind being used for coal mine tunnel suspension device | |
CN206911537U (en) | A kind of civil engineering work waste treatment device | |
CN115535368A (en) | Processing device and processing method capable of reducing raise dust for cement raw materials | |
CN107905227A (en) | A kind of intelligentized civil engineering piling machine | |
CN208121989U (en) | A kind of tandem, assembled architecture wall | |
CN212772301U (en) | Slip casting device is used in construction of municipal administration road bridge | |
CN208585816U (en) | A kind of asphalt water-proof coiled material production line doffer | |
CN207526127U (en) | A kind of anti-blockage type hopper for building | |
CN207240296U (en) | Waterproof roll cutter device | |
CN108798099A (en) | A kind of flexible sun-shading mechanism for intelligent outdoor parking space | |
CN206536650U (en) | A kind of mixer for mixing plant | |
CN207014545U (en) | Concrete mixer cleaning device | |
CN209582610U (en) | A kind of multi-functional transport vehicle for gardens | |
CN207538033U (en) | A kind of gib anchor pole | |
CN207514224U (en) | A kind of fast opening and closing mechanism of pressure vessel | |
CN211811300U (en) | A former feed bin for producing refractory material | |
CN111335809A (en) | Drilling equipment for processing bridge pile foundation | |
CN205766771U (en) | A kind of scalable distributing appts of bricks maker | |
CN220504538U (en) | Cement pouring equipment for building construction | |
CN114991131B (en) | Bidirectional stirring grouting screw pile | |
CN207480915U (en) | A kind of concrete tank material-receiving device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20210112 Address after: 471000 room 2402, building 1, 248 Kaiyuan Avenue, Luolong District, Luoyang City, Henan Province Applicant after: Henan Xinda Construction Group Co.,Ltd. Applicant after: Shi Baobao Address before: No.89 Youxie street, Pingfang District, Harbin City, Heilongjiang Province Applicant before: Chen Shu |
|
GR01 | Patent grant | ||
GR01 | Patent grant |