CN110258498A - A kind of construction method of large area field direct shear test equipment - Google Patents

A kind of construction method of large area field direct shear test equipment Download PDF

Info

Publication number
CN110258498A
CN110258498A CN201910560548.4A CN201910560548A CN110258498A CN 110258498 A CN110258498 A CN 110258498A CN 201910560548 A CN201910560548 A CN 201910560548A CN 110258498 A CN110258498 A CN 110258498A
Authority
CN
China
Prior art keywords
sample
test
earth pillar
soil
earth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910560548.4A
Other languages
Chinese (zh)
Inventor
刘进波
马德翠
李耀家
巫燕
邓安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Metallurgical Construction Engineering Quality Co Ltd
CREEC Chengdu Survey Design and Research Co Ltd
Original Assignee
Sichuan Metallurgical Construction Engineering Quality Co Ltd
CREEC Chengdu Survey Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Metallurgical Construction Engineering Quality Co Ltd, CREEC Chengdu Survey Design and Research Co Ltd filed Critical Sichuan Metallurgical Construction Engineering Quality Co Ltd
Priority to CN201910560548.4A priority Critical patent/CN110258498A/en
Publication of CN110258498A publication Critical patent/CN110258498A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • E02D1/02Investigation of foundation soil in situ before construction work
    • E02D1/022Investigation of foundation soil in situ before construction work by investigating mechanical properties of the soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Soil Sciences (AREA)
  • Analytical Chemistry (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a kind of construction methods of large area field direct shear test equipment, belong to construction test field.Successively the following steps are included: the multiple test locations of selection excavate and test pits and reserve the low bank of earth between fields;The severe and moisture content that sample soil is drafted before measurement test, prepare earth pillar sample since one end of the reserved low bank of earth between fields;Shearing force box is pressed into earth pillar sample bottom end;Direct shear test equipment is installed and soil body sample is classified and applies Normal stress, after Normal stress reaches maximum value, the Normal stress during entire test is remained unchanged;After pre-add Normal stress reaches stable, tangential shearing stress is applied to the soil body sample, the present invention can more meet native state compared with laboratory test, the test result obtained is more in line with the technical requirements of Practical Project, the present invention gives full play to the potential on basis and Rock And Soil or improves the safety of engineering design simultaneously, realizes the high efficiency of iron tower of power transmission line foundation.

Description

A kind of construction method of large area field direct shear test equipment
Technical field
The present invention relates to construction test fields, and in particular to a kind of construction method of large area field direct shear test equipment.
Background technique
In the evaluation of foundation bearing capacity, soil-slope and subgrade stability, the Shear Strength Index of Rock And Soil is most important Mechanics parameter.As the Rock And Soil of structure foundation, if generate sliding or part cut up area's development cause it is excessive or uneven Even foundation deformation can all cause the destruction of superstructure or influence its normal use.The test site of existing direct shear test is big Part is laboratory test, and the undisturbed of laboratory test is usually to be obtained at the scene with sleeve, is then pressed into sample with jack In shearing force box, or lower sleeve is first unloaded, be then placed in shearing force box, the undisturbed that this mode obtains easily is disturbed, cannot be complete The virtual condition for reflecting the live soil body indoors in shear history, if volume change occurs for sample, can generate at its contact point Frictional force, and the frictional force can not in test measure, so that direct stress and practical additional direct stress on shear surface It is inconsistent, affect the correct test of soil strength.
Summary of the invention
In view of the deficiencies of the prior art, the present invention proposes a kind of construction method of large area field direct shear test equipment, Specific technical solution is as follows:
A kind of construction method of large area field direct shear test equipment, successively the following steps are included:
(S1): selecting multiple test locations, test pits according to test depth excavation, and the reserved low bank of earth between fields;
(S2): taking undisturbed soil sample as sample soil is drafted beside the low bank of earth between fields in testing pits, sample soil is drafted before measurement test Severe and moisture content, earth pillar sample is prepared since one end of the reserved low bank of earth between fields;
(S3): shearing force box is pressed into earth pillar sample bottom end, after shearing force box cutting edge portion reaches shearing force position to be measured, then It modifies the top surface of earth pillar sample and makes it beyond shearing force box upper limb 8mm-12mm;
(S4): installation direct shear test equipment, and soil body sample is classified and applies Normal stress, when Normal stress reaches predetermined Maximum value after, the Normal stress during entire test remains unchanged;
(S5): after pre-add Normal stress reaches stable, i.e., tangential shearing stress being applied to the soil body sample, until test carries out Loading environment is terminated to meeting to standardize;
(S6): other earth pillar samples being classified and apply Normal stress, and to the Normal stress that each earth pillar sample applies Maximum value equal difference be incremented by;
(S7): soil sample and preservation after taking test, the severe and natural moisture content of the soil sample after measurement test.
The present invention directly tests at the scene, therefore can more meet native state compared with laboratory test, the examination obtained Test the technical requirements that result is more in line with Practical Project, at the same the ground ground horizontal shear coefficient of present invention test actual measurement and It is compared referring to local experience and related specifications recommendation, the degree of safety of the foundation pile in engineering design is checked, to previous base Stake horizontal force design carries out security evaluation and finds its inner link and rule by being concluded, being analyzed to test result, summarized Rule, so as to when the mountain area on steep mound carries out power transmission line iron tower foundation design, for different mima type microrelief landforms and formation lithology, It proposes accurate foundation pile horizontal applied force design parameter, give full play to the potential on basis and Rock And Soil or improves engineering design Safety, realize iron tower of power transmission line foundation high efficiency.
Preferably, the side of earth pillar sample described in step (S2) is vertical by shear surface with earth pillar sample.
The present invention by the way that the side of earth pillar sample is vertical by shear surface with earth pillar sample, avoid the present invention because of inertia or Bias load-bearing caused by the reasons such as dislocation is mobile and influence test result.
Preferably, the length of earth pillar sample described in step (S2) be 760mm-800mm, width 760mm-800mm, The spacing of adjacent earth pillar sample need to meet its 1.5 times that are greater than earth pillar sample minimum side length.
The present invention avoids adjacent earth pillar sample in test process by the way that there are enough spacing between adjacent earth pillar sample In interfere and test structure impacted, and then reduce test error.
Preferably, step (S2) if in there is defect in earth pillar sample preparation, filled up using original soil or Extra-fine sand Defect.
There is the defects of concave surface, unfilled corner by being filled up in earth pillar sample preparation with original soil or Extra-fine sand in the present invention, protects The integrality of earth pillar sample during the test is demonstrate,proved, earth pillar sample is avoided to result in its mechanical property because of the defects of concave surface, unfilled corner It can reduce.
Preferably, the gap in step (S3) between shearing force box and earth pillar sample is tamped using Extra-fine sand, earth pillar sample Cracking at shear surface should be the 1/3~1/4 of the minimum grain size of Extra-fine sand.
It is thin that the present invention passes through the powder being arranged between shearing force box and sample and for filling gap between shearing force box and sample Layer of sand avoids the gap between shearing force box and sample from impacting test, reduces test error.
Preferably, in earth pillar specimen surface sanding, hitting reality before installation direct shear test equipment in step (S4) and smoothing out It is whole to shearing force box surface.
The present invention keeps rolling skateboard bottom parallel with box top is sheared by thin sand, avoids eccentric load-bearing.
Preferably, terminated in step (S5) loading environment include soil body sample with deformation increases and shear stress no longer increases Add, soil body sample is shear-deformable reaches 35mm-70mm.
The invention has the following advantages:
The present invention directly tests at the scene, therefore can more meet native state compared with laboratory test, the examination obtained Test the technical requirements that result is more in line with Practical Project, at the same the ground ground horizontal shear coefficient of present invention test actual measurement and It is compared referring to local experience and related specifications recommendation, the degree of safety of the foundation pile in engineering design is checked, to previous base Stake horizontal force design carries out security evaluation and finds its inner link and rule by being concluded, being analyzed to test result, summarized Rule, so as to when the mountain area on steep mound carries out power transmission line iron tower foundation design, for different mima type microrelief landforms and formation lithology, It proposes accurate foundation pile horizontal applied force design parameter, give full play to the potential on basis and Rock And Soil or improves engineering design Safety, realize iron tower of power transmission line foundation high efficiency.
Detailed description of the invention
Fig. 1 is the structural schematic diagram tested pits in the present invention;
Fig. 2 is the structural schematic diagram for the direct shear test equipment that the present invention is tested;
Fig. 3 is the partial enlarged view in Fig. 2 at A.
In figure: 1- is tested pits;2- earth pillar sample;3- shearing force box;4- rolls slide plate;5- normal direction jack;6- counterforce device;7- Press steel plate;The tangential jack of 8-;9- back seat steel plate;10- sedimentometer;11- horizontal displacement instrument.
Specific embodiment
The principle and features of the present invention will be described below with reference to the accompanying drawings, and the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the invention.
Embodiment 1
Referring to Fig. 1 to Fig. 3;The present invention carry out direct shear test direct shear test equipment include from shearing force box 3 from bottom to up according to Rolling slide plate 4, normal direction jack 5, the counterforce device 6 of secondary setting;The back seat steel plate 9 of crater wall is set, is arranged in back seat steel plate 9 On tangential jack 8 and the press steel plate 7 that is arranged between tangential jack 8 and shearing force box 3;On the rolling slide plate 4 Equipped with two groups of sedimentometers 10, the shearing force box 3 is equipped with horizontal displacement instrument 11 far from tangential 8 side of jack.First with shearing Installation rolls slide plate 4 on the earth pillar sample 2 of box 3, and normal direction jack 5 is installed on the top for rolling slide plate 4, in normal direction jack 5 Normal direction strain gauge is installed, normal stress sensor receives the active force of normal direction jack 5 and transmitting acts on instead on piston Power device 6, counterforce device 6 use earth anchor girder steel formula, and first installation girder steel passes through earth anchor again and is screwed into soil, further reinforcing steel beam; Then the solid wood of muti-piece 0.9cm-1.1cm is set in the side of shearing force box 3 installation press steel plate 7 and in press 7 bottom of steel plate pad, Tangential jack 8 is installed, the force application center of tangential jack 8 is made to be directed at shear surface and is located on sample middle line, and tangential thousand Back seat steel plate 9 is installed between jin top 8 and 1 wall of testing pits, and the gap between back seat steel plate 9 and experimental tank wall is tamped;It then will amount The sedimentometer 10 for surveying 2 normal deformation of earth pillar sample be mounted on roll slide plate 4 two it is diagonal on, the shearing of earth pillar sample 2 will be measured and become The horizontal displacement instrument 11 of shape is mounted on the other side of 3 stress surface of shearing force box.
The reaction force position of counterforce device 6,5 force application center of normal direction jack, is rolled and is slided 10 measuring center of sedimentometer 4 center of plate, 2 center of earth pillar sample should be maintained on same central axes, and vertical with predetermined shear surface.The present invention passes through will be anti- The reaction force position of power device 6,5 force application center of normal direction jack, rolls 4 center of slide plate, soil at 10 measuring center of sedimentometer 2 center of column sample should be maintained on same central axes, and vertical with predetermined shear surface, and the present invention is avoided to move because of inertia or dislocation Bias load-bearing caused by the reasons such as dynamic and influence test result.
A kind of construction method of large area field direct shear test equipment, successively the following steps are included:
(S1): selecting multiple test locations, test pits according to test depth excavation, and the reserved low bank of earth between fields;
Specifically: the multiple test locations of selection, which are excavated, tests pits 1, and 1 working face dimensions length of testing pits is 5000mm, and width is 2000mm.Stop full-face tunneling to from when requiring test depth 315mm when testing pits 1 excavation, reserves a wide 800mm, high 315mm The low bank of earth between fields to make earth pillar sample 2;
(S2): taking undisturbed soil sample as sample soil is drafted beside the low bank of earth between fields in testing pits, sample soil is drafted before measurement test Severe and moisture content, earth pillar sample is prepared since one end of the reserved low bank of earth between fields;
Specifically: stopping taking undisturbed soil sample beside sample in drafting in 1 of testing pits after full-face tunneling, take back laboratory and survey The severe and natural moisture content that sample soil is drafted before fixed test, prepare earth pillar sample 2 since one end of the reserved low bank of earth between fields, first will be pre- It stays the top surface rough hewing of the low bank of earth between fields to keep it parallel with the shear surface for drafting sample, then the reserved low bank of earth between fields is cut into three earth pillar samples 2;The side of the earth pillar sample 2 is vertical by shear surface with earth pillar sample 2.
The present invention avoids the present invention because of inertia by the way that the side of earth pillar sample 2 is vertical by shear surface with earth pillar sample 2 Or bias load-bearing caused by the reasons such as dislocation is mobile and influence test result.The length of the earth pillar sample 2 is 780mm, width Its 1.5 times greater than the minimum side length of earth pillar sample 2 need to be met for the spacing of 780mm, adjacent earth pillar sample 2.The present invention by There are enough spacing between adjacent earth pillar sample 2, adjacent earth pillar sample 2 is avoided to interfere during the test and to test Structure impacts, and then improves test error.
(S3): shearing force box is pressed into earth pillar sample bottom end, after shearing force box cutting edge portion reaches shearing force position to be measured, then It modifies the top surface of earth pillar sample and makes it beyond shearing force box upper limb 8mm-12mm;
Specifically: shearing force box 3 being sleeved on 2 upper end of earth pillar sample and cuts earth pillar sample 2 with native knife essence is cut, cuts process in essence In shearing force box 3 pressed into 2 bottom end of earth pillar sample simultaneously, after 3 cutting edge portion of shearing force box reaches predetermined position, refinish earth pillar examination The top surface of sample 2 simultaneously makes it beyond 3 upper limb 10mm of shearing force box;
(S4): installation direct shear test equipment, and soil body sample is classified and applies Normal stress, when Normal stress reaches maximum After value, the Normal stress during entire test is remained unchanged;
Specifically: after installation direct shear test equipment, Normal stress is applied to a soil body sample classification, point 5 grades of applications, often Grade 30kPa maximum Normal stress is 150kPa.Classification is further applied load to after predetermined pressure, and every 10min measures a sedimentometer Reading.Think stable when interior soil body sample variation per minute is less than 0.05mm, then applies next stage load.Work as Normal stress After reaching maximum value, the Normal stress during entire test should be remained unchanged;
(S5): after pre-add Normal stress reaches stable, i.e., tangential shearing stress being applied to the soil body sample, until test carries out Loading environment is terminated to meeting to standardize;
Specifically: after pre-add Normal stress reaches stable, i.e., tangential shearing stress, control tangential thousand being applied to the soil body sample Jin top 8 makes continuously applying for its thrust-neutral, and every 20s estimates a secondary shear stress and shear-deformable during the test, until Test proceeds to satisfaction specification and terminates loading environment, terminate loading environment include soil body sample with deformation increases and shear stress not It is further added by or soil body sample is shear-deformable reaches 35mm-70mm.
(S6): other earth pillar samples being classified and apply Normal stress, and the maximum value of Normal stress is gradually incremented by;
Specifically: to other direct shear tests of two earth pillar samples 2 under different vertical load action, one of normal direction 5 grades of load point, every grade of 40kPa, maximum Normal stress 200kPa apply;Another Normal stress point 5 grades, every grade of 50kPa, maximum Normal stress 250kPa applies.
(S7): soil sampling simultaneously saves, and takes back the severe and natural moisture content of soil sample after laboratory's measurement test.
Counterforce device 6 plays reversed supporting role to normal direction jack 5 in the present invention, to rolling after the starting of normal direction jack 5 Slide plate 4 and earth pillar sample 2 apply normal pressure, and tangential pressure jack is using 1 crater wall of testing pits as counter-force pedestal, and tangential thousand Jin top 8 is on the central point that the point of application on shearing force box 3 is placed in shearing force box 3.The forced direction of tangential jack 8 passes through soil 2 preshearing face center of column sample, tangential jack 8 apply pressure to shearing force box 3 and carry out shearing test to earth pillar sample 2.Simultaneously Sedimentometer 10 and horizontal displacement instrument 11 are respectively observed the displacement of 2 normal direction of earth pillar sample and horizontal direction.The present invention be What scene was directly tested, therefore can more meet native state compared with laboratory test, the test result obtained is more in line with reality The technical requirements of engineering.The present invention is with the ground ground horizontal shear coefficient of test actual measurement and referring to local experience and related specifications Recommendation compares, and checks the degree of safety of the foundation pile in engineering design, carries out safety to previous foundation pile horizontal force design and comments Estimate, by being concluded, being analyzed to test result, summarized, its inner link and rule is found, to carry out in the mountain area on steep mound When power transmission line iron tower foundation designs, for different mima type microrelief landforms and formation lithology, propose that accurate foundation pile is horizontal Active force design parameter gives full play to the potential on basis and Rock And Soil or improves the safety of engineering design, realizes transmission line of electricity The high efficiency of steel tower foundation.
Embodiment 2
The construction method of the large area field direct shear test equipment of the present embodiment is substantially the same manner as Example 1, and difference is, Step (S2) if in there is the defects of concave surface, unfilled corner in 2 preparation process of earth pillar sample, need to be filled up with original soil or Extra-fine sand.This hair It is bright the defects of concave surface, unfilled corner occur by being filled up in 2 preparation process of earth pillar sample with original soil or Extra-fine sand, guarantee earth pillar sample 2 Integrality during the test avoids earth pillar sample 2 from resulting in the reduction of its mechanical property because of the defects of concave surface, unfilled corner.
Embodiment 3
The construction method of the large area field direct shear test equipment of the present embodiment is substantially the same manner as Example 1, and difference is, Gap in step (S3) between shearing force box 3 and earth pillar sample 2 is tamped using Extra-fine sand, can be to gap during tamping near Box wall tap vibration, inject Extra-fine sand slowly, cracking at 2 shear surface of earth pillar sample should be the 1/3~1/ of minimum grain size 4.The present invention passes through the fine sand layer being arranged between shearing force box 3 and sample and for filling gap between shearing force box 3 and sample, It avoids the gap between shearing force box 3 and sample from impacting test, reduces test error.
Embodiment 4
The construction method of the large area field direct shear test equipment of the present embodiment is substantially the same manner as Example 1, and difference is, Before installation rolls slide plate 4 in step (S4), in 2 surface sanding of earth pillar sample, hits reality and smooth out whole to shearing force box surface;Simultaneously 5 piston of normal direction jack should reserve enough strokes.The present invention is rolled between 4 bottom surface of slide plate and sample top surface by being arranged in Thin sand keeps rolling 4 bottom surface of slide plate parallel with 3 top surface of shearing force box, avoids eccentric load-bearing.5 piston of normal direction jack is pre- simultaneously Stay enough strokes to avoid stroke forms insufficient and leads to test failure.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (7)

1. a kind of construction method of large area field direct shear test equipment, which is characterized in that successively the following steps are included:
(S1): selecting multiple test locations, test pits according to test depth excavation, and the reserved low bank of earth between fields;
(S2): taking undisturbed soil sample as sample soil is drafted beside the low bank of earth between fields in testing pits, the weight of sample soil is drafted before measurement test Degree and moisture content, prepare earth pillar sample since one end of the reserved low bank of earth between fields;
(S3): shearing force box being pressed into earth pillar sample bottom end, after shearing force box cutting edge portion reaches shearing force position to be measured, is refinished The top surface of earth pillar sample simultaneously makes it beyond shearing force box upper limb 8mm-12mm;
(S4): installation direct shear test equipment, and to soil body sample be classified apply Normal stress, when Normal stress reach it is scheduled most After big value, the Normal stress during entire test is remained unchanged;
(S5): tangential shearing stress being applied to the soil body sample, terminates loading environment until test proceeds to satisfaction specification;
(S6): other earth pillar samples being classified and apply Normal stress, and most to the Normal stress of each earth pillar sample application Big value equal difference is incremented by;
(S7): soil sample and preservation after taking test, the severe and natural moisture content of the soil sample after measurement test.
2. the construction method of large area field direct shear test equipment according to claim 1, which is characterized in that step (S2) Described in earth pillar sample side it is vertical by shear surface with earth pillar sample.
3. the construction method of large area field direct shear test equipment according to claim 1, which is characterized in that step (S2) Described in the length of earth pillar sample be 760mm-800mm, width 760mm-800mm, the spacing of adjacent earth pillar sample is greater than soil 1.5 times of column sample minimum side length.
4. the construction method of large area field direct shear test equipment according to claim 1, which is characterized in that step (S2) There is defect in earth pillar sample preparation in if, defect is filled up using original soil or Extra-fine sand.
5. the construction method of large area field direct shear test equipment according to claim 1, which is characterized in that step (S3) Gap between middle shearing force box and earth pillar sample is tamped with Extra-fine sand, and cracking at earth pillar sample shear surface should be Extra-fine sand most The 1/3~1/4 of small particle.
6. the construction method of large area field direct shear test equipment according to claim 1, which is characterized in that step (S4) Before middle installation direct shear test equipment, in earth pillar specimen surface sanding, hits reality and smooth out whole to shearing force box surface.
7. the construction method of large area field direct shear test equipment according to claim 1, which is characterized in that step (S5) Middle termination loading environment include soil body sample with deformation increases and shear stress is not further added by or soil body sample is shear-deformable reaches 35mm-70mm。
CN201910560548.4A 2019-06-26 2019-06-26 A kind of construction method of large area field direct shear test equipment Pending CN110258498A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910560548.4A CN110258498A (en) 2019-06-26 2019-06-26 A kind of construction method of large area field direct shear test equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910560548.4A CN110258498A (en) 2019-06-26 2019-06-26 A kind of construction method of large area field direct shear test equipment

Publications (1)

Publication Number Publication Date
CN110258498A true CN110258498A (en) 2019-09-20

Family

ID=67921741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910560548.4A Pending CN110258498A (en) 2019-06-26 2019-06-26 A kind of construction method of large area field direct shear test equipment

Country Status (1)

Country Link
CN (1) CN110258498A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07279148A (en) * 1994-02-28 1995-10-24 Maeda Corp Method for equal volume shearing test
JPH10325788A (en) * 1997-05-26 1998-12-08 Fujita Corp Apparatus and method for test of shear strength of bedrock in original position
US20150033842A1 (en) * 2013-08-05 2015-02-05 The United States Department of Transportation, Federal Highway Administration In-Situ Scour Testing Device
CN204330502U (en) * 2014-11-26 2015-05-13 广东天信电力工程检测有限公司 A kind of novel Rock And Soil in-situ direct shear test device
CN105806721A (en) * 2016-05-31 2016-07-27 中国地质大学(武汉) Large rock-soil mass in-situ direct shear testing apparatus
CN108562501A (en) * 2018-03-06 2018-09-21 长安大学 One kind being suitable for Rock And Soil in-situ direct shear test device and method in tunnel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07279148A (en) * 1994-02-28 1995-10-24 Maeda Corp Method for equal volume shearing test
JPH10325788A (en) * 1997-05-26 1998-12-08 Fujita Corp Apparatus and method for test of shear strength of bedrock in original position
US20150033842A1 (en) * 2013-08-05 2015-02-05 The United States Department of Transportation, Federal Highway Administration In-Situ Scour Testing Device
CN204330502U (en) * 2014-11-26 2015-05-13 广东天信电力工程检测有限公司 A kind of novel Rock And Soil in-situ direct shear test device
CN105806721A (en) * 2016-05-31 2016-07-27 中国地质大学(武汉) Large rock-soil mass in-situ direct shear testing apparatus
CN108562501A (en) * 2018-03-06 2018-09-21 长安大学 One kind being suitable for Rock And Soil in-situ direct shear test device and method in tunnel

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中华人民共和国建设部: "《岩土工程勘察规范(GB_50021-2001(2009))》", 1 March 2002, 中国计划出版社 *
中国化学工程南京岩土工程公司: "《岩土体现场直剪试验规程(HGT_20693-2006)》", 1 April 2007, 中国计划出版社 *

Similar Documents

Publication Publication Date Title
CN204575465U (en) Portable soft layer in-situ direct shear tester
CN103556659A (en) Self-elevating offshore platform-based pile penetration quality dynamic-evaluation method
Le Kouby et al. Subgrade improvement method for existing railway lines–an experimental and numerical study
Lukiantchuki et al. Energy ratio (ER) for the standard penetration test based on measured field tests
US7931424B2 (en) Apparatus and method for producing soil columns
Shaban et al. Performance characterization of unsaturated granular soils using static and dynamic plate load test
CN110258498A (en) A kind of construction method of large area field direct shear test equipment
Cooke Influence of residual installation forces on the stress transfer and settlement underworking loads of jacked and bored piles in cohesive soils
LU503300A1 (en) Method for predicting the anti-sliding stability of the shore retaining wall by high-pressure grouting
Radampola Evaluation and modelling performance of capping layer in rail track substructure
Wyroslak Establishing relationships between parameters of the controlled compaction soil by using various in-situ tests
Jarushi et al. Prediction of High Pile Rebound with Fines Content and Uncorrected Blow Counts from Standard Penetration Test
Mansur et al. Pile-Loading Tests, Morganza Floodway Control Structure
Krishna et al. Effect of compressive load on oblique pull-out capacity of model piles in sand
CN101660987B (en) Heavy hammer and low fall dynamic detection method for heavy tamping or impact rolling and filling of rockfill body
Hanzawa et al. Stability analysis and field behaviour of earth fills on an alluvial marine clay
Manjón et al. Static and Dynamic Load Tests of Driven Precast Piles
RE Comparison of results of series pile load test in accordance with ASTM and Kazakhstan standards
Beim et al. Dynamic testing of enlarged base Franki piles
Bustamante et al. Comparative study on the load bearing capacity of driven steel H piles in a layered marl
Long et al. Measured and predicted capacity of H-piles
Vipulanandan et al. Load displacement behavior of ACIP piles in cohesive soils
Cherian Load Test on Barrette in Multi-Layered Soil
Prasad Bearing capacity of soil
Ahn et al. Behaviour of vertically and horizontally loaded pile and adjacent ground affected by tunneling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 610056 Wuye 107 Shuanglin Road, Chengdu City, Sichuan Province

Applicant after: Sichuan Metallurgical Construction Engineering Quality Inspection Co.,Ltd.

Applicant after: CHENGDU SURVEYING GEOTECHNICAL RESEARCH INSTITUTE Co.,Ltd. OF MCC

Address before: 610056 Wuye 107 Shuanglin Road, Chengdu City, Sichuan Province

Applicant before: Sichuan Metallurgical Construction Engineering Quality Co.,Ltd.

Applicant before: CHENGDU SURVEYING GEOTECHNICAL RESEARCH INSTITUTE Co.,Ltd. OF MCC

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20190920

RJ01 Rejection of invention patent application after publication