CN110258456A - A kind of dam body and its seamless Waterproof Construction Technique of contrary sequence method - Google Patents

A kind of dam body and its seamless Waterproof Construction Technique of contrary sequence method Download PDF

Info

Publication number
CN110258456A
CN110258456A CN201910661039.0A CN201910661039A CN110258456A CN 110258456 A CN110258456 A CN 110258456A CN 201910661039 A CN201910661039 A CN 201910661039A CN 110258456 A CN110258456 A CN 110258456A
Authority
CN
China
Prior art keywords
dam body
muscle
dam
inorganic compounding
horizontal bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910661039.0A
Other languages
Chinese (zh)
Inventor
杨树东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910661039.0A priority Critical patent/CN110258456A/en
Publication of CN110258456A publication Critical patent/CN110258456A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages

Abstract

The present invention provides a kind of dam body and its seamless Waterproof Construction Technique of contrary sequence method, the upstream face of the dam body is laid with composite concrete splash guard, form individual dam body waterproof protective layer, it is equipped with inorganic compounding muscle in composite concrete splash guard, is equipped with inorganic compounding muscle inside dam body and in the pile foundation of dam body foundation.Inorganic compounding muscle is the Basalt fiber composite rib of hollow tubular.The seamless Waterproof Construction Technique of the contrary sequence method of above-mentioned dam body includes the following steps: the combination installation of inorganic compounding muscle;The arrangement of inorganic compounding muscle;The construction of dam body;Dam body carries out compound cement perfusion after completing main structure.The present invention is the seamless construction of liquid, so seam problems are not present, while can repair crack and the defect of concrete body under pressure, solves seal leakage problem.

Description

A kind of dam body and its seamless Waterproof Construction Technique of contrary sequence method
Technical field
The present invention relates to dam construction technical field more particularly to the seamless waterproof construction works of a kind of dam body and its contrary sequence method Skill.
Background technique
Domestic recent decades industry and construction industry rapid development, the slag left of digging up mine every year, because Tailings Dam leak is asked Topic brings countless life and property loss and civil disputation, and seriously destroys ecological environment.
The relation factor of dam body leak mainly has, dam body waterproof quality, material joints processing, dam structure stability and dam Body water suction etc. will cause dam concrete structure basis facial cleft seam, corrosive media is for coagulation if the processing of these factors is bad The problems such as corrosivity of soil and internal reinforcing bar is destroyed, and gravelly soil rolls dam body piping, causes to leak.The above problem causes dam body anti- Water disabler, so that the shortening of dam structure life cycle and dam body function and dam structure be caused to be affected safely.
Summary of the invention
Present invention seek to address that the deficiencies in the prior art, and a kind of dam body with good waterproof effect is provided, and The seamless Waterproof Construction Technique of the contrary sequence method of the dam body.
To achieve the above object, using following technical scheme: a kind of dam body, the upstream face of the dam body are laid with compound the present invention Concrete water-proof plate, is equipped with inorganic compounding muscle in composite concrete splash guard, inside dam body and in the pile foundation of dam body foundation Equipped with inorganic compounding muscle.
Further, inorganic compounding muscle is the Basalt fiber composite rib of hollow tubular.
Further, the inorganic compounding muscle inside dam body and in the pile foundation of dam body foundation is arranged to stereo grid shaped, including The several layers horizontal bar being arranged from top to bottom, and the several layers vertical bar being arranged from dam body upstream face to back side.
Further, it is pierced by the vertical bar of dam body top surface, the vertical bar of two sides is slip casting muscle, and the vertical bar at middle part is to change Slip casting muscle is learned, compound cement is perfused in slip casting muscle, aqueous polymeric gel agent material is perfused in chemical grouting muscle.Herein " middle part " refers to: from dam body upstream face to the middle part of back side extending direction on dam body top surface.
Further, for horizontal bar close to the closed at one end of dam body upstream face, the one end for being pierced by dam body back side is grouting port, Uniformly distributed by several circle permeable holes on horizontal bar, every circle permeable hole includes several permeable holes, is equipped with several leakages in horizontal bar and passes Sensor.
Further, leakage sensors are from horizontal bar closed end to grouting port spaced set.
Further, the spacing of the permeable hole of adjacent turn is 0.5 meter -1 meter on horizontal bar.
Further, the spacing between adjacent upper layer and lower layer horizontal bar is 0.5 meter -5 meters.
Further, the spacing between the two neighboring horizontal bar of same level layer is 1 meter -2 meters.
Further, the spacing between two layers adjacent of vertical bar is 1 meter -2 meters.
Further, dam body is any one of concrete dam, rubble dam and the compound earth dam of rubble.
Further, a minor dam is equipped on front side of the upstream face of dam body.
The present invention also provides the seamless Waterproof Construction Techniques of the contrary sequence method of above-mentioned dam body, include the following steps:
The combination installation of inorganic compounding muscle is carried out according to design;
The arrangement of inorganic compounding muscle is carried out according to different dam bodys;
The construction of dam body carries out seamless waterproof layer simultaneously on dam structure basis to ground floor designed elevation and applies Work;
Dam body carries out compound cement perfusion after completing main structure, and aqueous polymeric gel agent is perfused in chemical grouting muscle Material finally forms a jointless waterproof composite water-proof curtain layer inside dam structure;
Once aqueous high-molecular gel material then is perfused from the grouting port of horizontal bar and carries out it was found that water leakage situation occurs in dam body It repairs.
The beneficial effects of the present invention are: present invention construction is not influenced by ambient temperature, speed of application is fast, greatly shortens waterproof Construction period.Due to being the seamless construction of liquid, so seam problems are not present, while coagulation can be repaired under pressure The crack of soil structured body and defect solve seal leakage problem.
Detailed description of the invention
Fig. 1 is dam structure schematic diagram of the invention;
Fig. 2 is the structural schematic diagram of the horizontal bar in the present invention;
In figure: 1- dam body;2- composite concrete splash guard;3- inorganic compounding muscle;3.1- vertical bar;3.1.1- slip casting muscle; 3.1.2- chemical grouting muscle;3.2- horizontal bar;3.2.1- permeable hole;4- minor dam;
It is described in detail below with reference to the embodiment of the present invention referring to attached drawing.
Specific embodiment
Below with reference to embodiment, the invention will be further described:
A kind of dam body, the upstream face of the dam body 1 are laid with composite concrete splash guard 2, are all provided in composite concrete splash guard 2 There is inorganic composite reinforcing 3, form individual dam body waterproof protective layer, solves dam concrete structure basis face crack problem, dam body 1 Inorganic compounding muscle 3 is equipped in internal and 1 basis of dam body pile foundation.
Further, inorganic compounding muscle 3 is the Basalt fiber composite rib of hollow tubular.Basalt fibre and carbon fiber, The high technical fibres such as aramid fiber, ultra high molecular weight polyethylene fiber (UHMWPE) are compared, in addition to having the characteristics that high-intensitive, high-modulus Outside, basalt fibre also has good good heat-resisting quantity, anti-oxidant, anti-radiation, thermal acoustic insulation, filterability, incompressible intensity and cuts The excellent properties such as shearing stress is high, is adapted under various environment to use, and cost performance is good, is a kind of pure natural inorganic non-metallic material Material, instead of common metal reinforcing bar used in the prior art, can solve the problems, such as corrosive medium when crack occurs.
Further, the inorganic compounding muscle 3 in the pile foundation on 1 basis of 1 inside of dam body and dam body is arranged to stereo grid shaped, packet Include the several layers horizontal bar 3.2 being arranged from top to bottom, and the several layers vertical bar being arranged from 1 upstream face of dam body to back side 3.1.Stereo grid shaped inorganic compounding muscle 3 and composite concrete cooperation greatly strengthen 1 overall structural strength of dam body, also help In the progress of concreting work.
Further, it is pierced by the vertical bar 3.1 of 1 top surface of dam body, the vertical bar 3.1 of two sides is slip casting muscle 3.1.1, middle part Vertical bar 3.1 be chemical grouting muscle 3.1.2, compound cement is perfused in slip casting muscle 3.1.1, is filled in chemical grouting muscle 3.1.2 Water filling property high-molecular gel agent material." middle part " herein refers to: prolonging on 1 top surface of dam body from 1 upstream face of dam body to back side Stretch the middle part in direction.Aqueous high molecular gelling agent material is in fluid state before perfusion, after cement slurry has poured, by In the contraction of cement slurry, it may appear that pore, there are also the various gaps being invisible to the naked eye, and aqueous high-molecular gel material is perfused Afterwards, under pressure, aqueous high molecular gel rubber material enters inside the gap in cement and pore, forms a solid bullet Property body, system sealing, to form the composite waterproof system of an entirety, water shielding in the outside of 1 waterproof protective layer of dam body, Downstream will not be penetrated by dam body 1.Slip casting muscle 3.1.1 and chemical grouting muscle 3.1.2 is that 1 main structure construction of dam body is good The contrary sequence method done later creates seamless waterproof system.
Further, horizontal bar 3.2 is pierced by one end of 1 back side of dam body close to the closed at one end of 1 upstream face of dam body as note Mouth is starched, is evenly distributed on horizontal bar 3.2 by several circle permeable hole 3.2.1, the aperture of permeable hole 3.2.1 allows water and aqueous high molecular solidifying Glue material by while stop concrete particle pass through, not only guaranteed the realization of pervious function, but avoid construction when concrete with With entering in horizontal bar 3.2, every circle permeable hole 3.2.1 includes several permeable hole 3.2.1, is equipped with several infiltrations in horizontal bar 3.2 Leak sensor, leakage sensors and dam monitoring system are wirelessly connected, so as to remotely monitor dam body 1 whether leak, meanwhile, water The grouting port of flat muscle 3.2 also observe that dam body 1 whether leak, once discovery dam body 1 there is water leakage situation, then from horizontal bar 3.2 grouting port is perfused aqueous high-molecular gel material and is repaired.Therefore, horizontal bar 3.2 be 1 structure construction of dam body it is good with Afterwards, if there is seepy question during 1 use of dam body, the contrary sequence method done repairs seamless waterproof system.
Further, leakage sensors are from 3.2 closed end of horizontal bar to grouting port spaced set.
Further, the leakage inspection of Panasonic Panasonic EX-F71/EX-F70/EX-F60 series can be selected in leakage sensors Survey sensor.
Further, the spacing of the permeable hole 3.2.1 of adjacent turn is 0.5 meter -1 meter on horizontal bar 3.2.To guarantee to possible The reliability of 1 water leakage situation of the dam body monitoring of generation.According to construction condition, which can choose 0.5 meter, 1 meter, 0.8 Other numerical value in rice or aforementioned spacing range.
Further, the spacing between adjacent upper layer and lower layer horizontal bar 3.2 is 0.5 meter -5 meters.According to site operation item Part, the spacing can choose other numerical value in 0.5 meter, 5 meters, 3 meters or aforementioned spacing range.
Further, the spacing between the two neighboring horizontal bar 3.2 of same level layer is 1 meter -2 meters.It is applied according to scene Work condition, the spacing can choose other numerical value in 1 meter, 2 meters, 1.5 meters or aforementioned spacing range.
Further, the spacing between adjacent two layers of vertical bar 3.1 is 1 meter -2 meters.According to construction condition, between being somebody's turn to do Away from the other numerical value that can choose in 1 meter, 2 meters, 1.5 meters or aforementioned spacing range.
Further, dam body 1 is any one of concrete dam, rubble dam and the compound earth dam of rubble.Structure and work of the invention Skill is suitable for a variety of dam body forms, and adaptability is good, to have great popularization value.
Further, a minor dam 4 is equipped on front side of the upstream face of dam body 1.
The seamless Waterproof Construction Technique of the contrary sequence method of above-mentioned dam body, includes the following steps:
The combination installation of inorganic compounding muscle 3 is carried out according to design;
The arrangement of inorganic compounding muscle 3 is carried out according to different dam bodys 1;
The construction of dam body 1 carries out seamless waterproof layer simultaneously in 1 structure basis of dam body to ground floor designed elevation and applies Work, i.e. progress 1 structure construction of dam body is simultaneously according to the pre-buried inorganic compounding muscle 3 of design requirement;
After dam body 1 completes main structure, compound cement is perfused into slip casting muscle 3.1.1, is filled in chemical grouting muscle 3.1.2 Water filling property high-molecular gel agent material finally forms a jointless waterproof composite water-proof curtain in 1 inside configuration of dam body Layer, reaches the design requirement of 1 no seepage and no leakage of dam body, solves the problems, such as 1 piping of dam body;
Once aqueous high-molecular gel material then is perfused from the grouting port of horizontal bar 3.2 it was found that water leakage situation occurs in dam body 1 It is repaired.
The present invention is exemplarily described above, it is clear that present invention specific implementation is not subject to the restrictions described above, As long as using the various improvement that the inventive concept and technical scheme of the present invention carry out, or not improved directly apply to other fields It closes, it is within the scope of the present invention.

Claims (10)

1. a kind of dam body, which is characterized in that the upstream face of the dam body (1) is laid with composite concrete splash guard (2), composite concrete It is equipped in splash guard (2) inorganic compounding muscle (3), is equipped with inorganic compounding in the pile foundation on dam body (1) inside and dam body (1) basis Muscle (3).
2. dam body according to claim 1, which is characterized in that inorganic compounding muscle (3) is the basalt fibre of hollow tubular Composite reinforcing.
3. dam body according to claim 2, which is characterized in that the nothing in the pile foundation on dam body (1) inside and dam body (1) basis Machine composite reinforcing (3) be arranged to it is stereo grid shaped, including the several layers horizontal bar (3.2) being arranged from top to bottom, and from dam body (1) The several layers vertical bar (3.1) that upstream face is arranged to back side.
4. dam body according to claim 3, which is characterized in that it is pierced by the vertical bar (3.1) of 1 top surface of dam body, two sides Vertical bar (3.1) is slip casting muscle (3.1.1), and the vertical bar (3.1) at middle part is chemical grouting muscle (3.1.2), in slip casting muscle Compound cement is perfused in (3.1.1), the aqueous polymeric gel agent material of perfusion in chemical grouting muscle (3.1.2).
5. dam body according to claim 4, which is characterized in that an end seal of the horizontal bar (3.2) close to dam body (1) upstream face It closes, the one end for being pierced by dam body (1) back side is grouting port, is evenly distributed with by several circle permeable holes (3.2.1), often on horizontal bar (3.2) Enclosing permeable hole (3.2.1) includes several permeable holes (3.2.1), is equipped with several leakage sensors in horizontal bar (3.2).
6. dam body according to claim 5, which is characterized in that the permeable hole (3.2.1) of adjacent turn on horizontal bar (3.2) Spacing is 0.5 meter -1 meter.
7. dam body according to claim 3, which is characterized in that the spacing between adjacent upper layer and lower layer horizontal bar (3.2) It is 0.5 meter -5 meters.
8. dam body according to claim 3, which is characterized in that between the two neighboring horizontal bar (3.2) of same level layer Spacing be 1 meter -2 meters.
9. dam body according to claim 3, which is characterized in that the spacing between adjacent two layers of vertical bar (3.1) is 1 - 2 meters of rice.
10. a kind of seamless Waterproof Construction Technique of contrary sequence method of dam body according to claim 5, which is characterized in that including such as Lower step:
The combination installation of inorganic compounding muscle (3) is carried out according to design;
The arrangement of inorganic compounding muscle (3) is carried out according to different dam bodys (1);
The construction of dam body (1) carries out seamless waterproof layer simultaneously in dam body (1) structure basis to ground floor designed elevation and applies Work, i.e. progress dam body (1) structure construction is simultaneously according to the pre-buried inorganic compounding muscle (3) of design requirement;
After dam body (1) completes main structure, to being perfused compound cement in slip casting muscle (3.1.1), in chemical grouting muscle (3.1.2) Aqueous polymeric gel agent material is perfused, finally forms a jointless waterproof composite water-proof in dam body (1) inside configuration Curtain layer;
Once aqueous high-molecular gel material then is perfused from the grouting port of horizontal bar (3.2) it was found that water leakage situation occurs in dam body (1) It is repaired.
CN201910661039.0A 2019-07-22 2019-07-22 A kind of dam body and its seamless Waterproof Construction Technique of contrary sequence method Pending CN110258456A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910661039.0A CN110258456A (en) 2019-07-22 2019-07-22 A kind of dam body and its seamless Waterproof Construction Technique of contrary sequence method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910661039.0A CN110258456A (en) 2019-07-22 2019-07-22 A kind of dam body and its seamless Waterproof Construction Technique of contrary sequence method

Publications (1)

Publication Number Publication Date
CN110258456A true CN110258456A (en) 2019-09-20

Family

ID=67927586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910661039.0A Pending CN110258456A (en) 2019-07-22 2019-07-22 A kind of dam body and its seamless Waterproof Construction Technique of contrary sequence method

Country Status (1)

Country Link
CN (1) CN110258456A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114105551A (en) * 2020-08-28 2022-03-01 首钢水城钢铁(集团)有限责任公司 Basalt fiber composite rib reinforced light wallboard and preparation method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1075520A (en) * 1992-11-21 1993-08-25 林国强 Anti-leakage plate of dam
CN102605750A (en) * 2012-01-11 2012-07-25 河海大学 Grouting reinforcement and earthquake resisting method for earth and rockfill dam
KR20130058134A (en) * 2011-11-25 2013-06-04 지에스건설 주식회사 Method for constructing face slab of concrete face rockfill dam
CN104131535A (en) * 2014-07-07 2014-11-05 河海大学 High-polymer composite reinforced earth stone dam anti-seismic structure and construction method thereof
CN107059801A (en) * 2017-05-16 2017-08-18 佛山科学技术学院 A kind of stainless steel reinforced concrete dam
CN107288141A (en) * 2017-08-10 2017-10-24 江苏光跃节能科技有限责任公司 A kind of contrary sequence method seamless flexible water construction technology
CN109083682A (en) * 2018-08-28 2018-12-25 辽宁工程技术大学 A kind of construction method of mine working antiseepage high intensity fire dam
CN210368864U (en) * 2019-07-22 2020-04-21 杨树东 Dam body

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1075520A (en) * 1992-11-21 1993-08-25 林国强 Anti-leakage plate of dam
KR20130058134A (en) * 2011-11-25 2013-06-04 지에스건설 주식회사 Method for constructing face slab of concrete face rockfill dam
CN102605750A (en) * 2012-01-11 2012-07-25 河海大学 Grouting reinforcement and earthquake resisting method for earth and rockfill dam
CN104131535A (en) * 2014-07-07 2014-11-05 河海大学 High-polymer composite reinforced earth stone dam anti-seismic structure and construction method thereof
CN107059801A (en) * 2017-05-16 2017-08-18 佛山科学技术学院 A kind of stainless steel reinforced concrete dam
CN107288141A (en) * 2017-08-10 2017-10-24 江苏光跃节能科技有限责任公司 A kind of contrary sequence method seamless flexible water construction technology
CN109083682A (en) * 2018-08-28 2018-12-25 辽宁工程技术大学 A kind of construction method of mine working antiseepage high intensity fire dam
CN210368864U (en) * 2019-07-22 2020-04-21 杨树东 Dam body

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
何建新等: "热固性树脂基复合材料预浸料使用手册", 中国建材工业出版社, pages: 381 - 382 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114105551A (en) * 2020-08-28 2022-03-01 首钢水城钢铁(集团)有限责任公司 Basalt fiber composite rib reinforced light wallboard and preparation method thereof

Similar Documents

Publication Publication Date Title
Wu et al. Leaking behavior of shield tunnels under the Huangpu River of Shanghai with induced hazards
CN111485922B (en) Method for treating water leakage, block falling and slurry turning of ELF railway tunnel
CN110645440A (en) Trenchless repairing device and method for large-diameter concrete drain pipe disjointing
Zhang et al. An incident of water and soil gushing in a metro tunnel due to high water pressure in sandy silt
CN101413261A (en) Double-layer low-position vacuum preload consolidation device and soft soil foundation reinforcing method
CN206143827U (en) Underground works crack repairing structure
CN105464194A (en) Water proofing and leak repairing construction method for sewage pipe network below underground water level
CN111395263B (en) Leakage treatment method for roller compacted concrete dam body
CN201305846Y (en) Double-layer low- order vacuum prepressing reinforcing device
Li et al. Seepage field distribution and water inflow laws of tunnels in water-rich regions
CN210163948U (en) Construction system for pouring post-cast strip of basement roof
CN110258456A (en) A kind of dam body and its seamless Waterproof Construction Technique of contrary sequence method
Shen et al. Experimental investigation of the failure of shield grease seals under the influence of environmental factors: A case study
CN202139571U (en) Plant protective river foundation structure
CN201424658Y (en) Water leakage detection of underground continuous wall groove seams and block repair device
CN108153988B (en) Method for determining design parameters of deep horizontal water-stop curtain of foundation pit of strongly permeable stratum
Yuan et al. Experimental study on influencing factors associated with a new tunnel waterproofing for improved impermeability
CN210368864U (en) Dam body
CN113818904B (en) Pipe jacking construction method for penetrating through leakage area of existing sewage pipe
CN215977337U (en) Composite sandwich liner barrier type impervious wall
CN211477787U (en) Soft disturbed belt manual sample preparation device
CN203924150U (en) EPR deformation joint is repaired water-stopping structure
CN107288141A (en) A kind of contrary sequence method seamless flexible water construction technology
CN112924105A (en) Device and method for waterproof detection of joint of comprehensive pipe gallery
CN209654797U (en) A kind of Directional Drilling isolated tube flange sealer for anti-piping

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination