CN110258193A - A kind of durable flexible structure and construction method for punishing high-speed rail roadbed water-protected enclosure layer - Google Patents

A kind of durable flexible structure and construction method for punishing high-speed rail roadbed water-protected enclosure layer Download PDF

Info

Publication number
CN110258193A
CN110258193A CN201910599651.XA CN201910599651A CN110258193A CN 110258193 A CN110258193 A CN 110258193A CN 201910599651 A CN201910599651 A CN 201910599651A CN 110258193 A CN110258193 A CN 110258193A
Authority
CN
China
Prior art keywords
layer
speed rail
protected enclosure
punishing
flexible structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910599651.XA
Other languages
Chinese (zh)
Other versions
CN110258193B (en
Inventor
陈先华
杨军
赵国堂
蔡德钩
徐刚
杨国涛
楼梁伟
石越峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Railway Engineering Research Institute of CARS
Original Assignee
Southeast University
Railway Engineering Research Institute of CARS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University, Railway Engineering Research Institute of CARS filed Critical Southeast University
Priority to CN201910599651.XA priority Critical patent/CN110258193B/en
Publication of CN110258193A publication Critical patent/CN110258193A/en
Application granted granted Critical
Publication of CN110258193B publication Critical patent/CN110258193B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Railway Tracks (AREA)

Abstract

The present invention relates to a kind of durable flexible structure for punishing high-speed rail roadbed water-protected enclosure layer, including protective layer, the protective layer includes being successively arranged flexible punishment layer, elastomeric isolation layer and tar sand waterproof layer from inside to outside;Construction method includes: former concrete surface cleaning, sprays flexible punishment layer, dispenses rubber scraps and forms elastomeric isolation layer, the jolt ramming tar sand that paves forms weatherability waterproof layer;High-speed rail roadbed water-protected enclosure layer concrete dusting punishment protective layer of the invention is punished especially suitable for the fiber concrete dusting of extremely frigid zones, has many advantages, such as good climate adaptability and excellent durability, and construction technology is simple and quick, good economy performance.

Description

A kind of durable flexible structure and construction method for punishing high-speed rail roadbed water-protected enclosure layer
Technical field
The present invention relates to railway bed water-protected enclosure layer concrete dusting Treating technology field, especially a kind of punishment Han Qu The durable flexible structure and construction method of high-speed rail roadbed water-protected enclosure layer.
Background technique
Water-protected enclosure layer is to guarantee that high-speed rail roadbed is steady for a long time as the important barrier for preventing rainwater and surface water from entering roadbed Qualitative key components.Existing high-speed railway subgrade water-protected enclosure layer mostly uses the cement concrete scheme of adding of fiber. Due to uncontrollable factor during the design feature and site operation of high-speed iron roadbed water-protected enclosure layer, area's high-speed railway subgrade of trembling with fear Length of the fiber concrete water-protected enclosure layer in severe factors such as natural conditions and vibration such as extremely frigid zones multigelation, high speed wind erosions Under phase comprehensive function, occur the diseases such as serious cracking, peeling and dusting in Practical Project successively, this not only affects waterproofing protection Function, the long-time stability and route ride comfort to roadbed are unfavorable, and peel off and fall grain with concrete caused by dusting comprehensive function Phenomenon also brings potential security risk to the train of high-speed cruising.
For the disease of the high-speed rail water-protected enclosure floor of cold area's high-speed railway fiber concrete, take in engineering with cement base Rigid recovery scenario based on material or polymer cement mortar and the plural layers based on the high molecular materials such as polyurethane apply Layer class recovery scenario.The basic ideas of above scheme are mainly designed with " reinforcement "+" waterproof " purpose, their project cost It is higher, and technique is more complex, it is difficult to adapt to the requirement of high-speed railway skylight point construction.From the engineering practice of existing line It sees, no matter its practical repairing effect or durability fail to attain the results expected.It is exposed from these recovery projects Problem is seen, be difficult to ensure using the crack resistance of the rigid material recovery scenario itself of thin layer with frost resistance, and is cohered with substrate It is difficult to ensure, easily forms hollowing and is quickly invalidated;And it is good because having between polyurethanes Coating Materials and concrete Bond strength, but the broken ability of its anti-Le is poor, the shrinking percentage of material at low temperature, it can be by bottom concrete drawing crack in contraction process Fragment is formed, the destruction of basilar fibers concrete is exacerbated, and the fragment peeled off easily brings bigger security risk.Therefore, it seeks A kind of more simple process is sought, is easy to construct and the roadbed water-protected enclosure layer recovery scenario of durable economy is that China has opened operation Cold area's high-speed railway Important Project demand.
Summary of the invention
The present invention provides a kind of durable flexible structures and construction method for punishing high-speed rail roadbed water-protected enclosure layer, can be effective Solve existing cold area's high-speed railway subgrade water-protected enclosure floor fiber concrete cracking, pulverizing problem, and protective layer construction work Skill is simple and construction is time-consuming short, realizes the quick reparation to fiber concrete water-protected enclosure layer, farthest reduces maintenance and supports Nurse makees the influence to high-speed railway operation, it can also be used to the reparation and punishment of the high-speed rail roadbed water-protected enclosure layer in other areas.
The present invention uses the skill of " base's densification and interface water-proof binding "+" elastomeric isolation "+" Weatherproof flexible waterproof layer " Art thinking is coated in the fiber concrete of reparation first using the big feature of the voidage of water-protected enclosure layer dusting concrete Gypseous slow breaking emulsified asphalt lotion;Then it dispenses rubber scraps and forms elastomeric isolation layer;Last Manual jolt ramming changes Property tar sand formed Weatherproof flexible waterproof layer.
To achieve the above object, The technical solution adopted by the invention is as follows:
A kind of durable flexible structure and construction method for punishing high-speed rail roadbed water-protected enclosure layer, including protective layer, the protective layer Including being successively arranged flexible punishment layer, elastomeric isolation layer and tar sand waterproof layer from inside to outside.
As an improvement of the present invention, the spread quantity of the flexible punishment layer is 1.2-2.8kg/m2;It is described elasticity every The spread quantity of absciss layer is 2-5kg/ m2;The tar sand waterproof layer with a thickness of 2-3cm.
As an improvement of the present invention, system is blended with saturation gypsum solution for A grades of asphalt in the flexible punishment layer The emulsified asphalt obtained doubles as water-proof tack coat.
As an improvement of the present invention, the solid content of the emulsified asphalt is 50-65%.
As an improvement of the present invention, the A grade asphalt that the A grades of asphalt is No. 90-130, and 10 DEG C Ductility is not less than 45 DEG C not less than 45cm, softening point.
As an improvement of the present invention, the elastomeric isolation layer is that the 3-5mm rubber that waste tire rubber is rolled into is broken Bits.
As an improvement of the present invention, the tar sand waterproof layer is made of lime stone mineral aggregate and modified emulsifying asphalt, The mass ratio of the lime stone mineral aggregate and modified emulsifying asphalt is 100:7-12.
As an improvement of the present invention, the size of the lime stone mineral aggregate is to appoint in 0-3mm, 3-5mm and 5-10mm The one or more of combination of meaning, meets Department of Transportation's professional standard specification.
As an improvement of the present invention, the modified emulsifying asphalt is modified pitch emulsification, be can be prepared by.
As an improvement of the present invention, the solid content of the modified emulsifying asphalt is 50-65%.
As an improvement of the present invention, a kind of construction party of durable flexible structure that punishing high-speed rail roadbed water-protected enclosure layer Method, construction procedure are as follows: former concrete surface cleaning sprays flexible punishment layer, dispenses rubber scraps and forms elastomeric isolation layer, booth It spreads jolt ramming tar sand and forms tar sand waterproof layer.
As an improvement of the present invention, the present invention provides above-mentioned water-protected enclosure layer concrete dusting punishment protective layers Construction method, detailed step is as follows:
(1) former concrete surface cleaning.The fiber concrete for removing obvious dusting and loosening, with hair dryer the impurity of cleaning Purging is clean, with emulsified asphalt to the crack of fiber concrete and its with carry out Seal treatment at track plates base seam, then Leveling is carried out to basal plane with the modified pitch sand mixed in advance.
(2) it is coated with gypseous slow breaking emulsified asphalt lotion.Gypsum will be contained using method that is mechanical or manually spraying Emulsified asphalt mixed solution be equably coated on the fiber concrete surface after tying, dosage 1.2-2.8kg/m2, to cream Change and forms flexible punishment layer after pitch is demulsified completely.
(3) it dispenses rubber scraps and forms elastomeric isolation layer.Flexible punishment layer surface after complete demulsification dispenses partial size and exists The rubber scraps that the waste tire rubber of 2-5mm is rolled into, dosage 2-5kg/m2So as to form elastomeric isolation layer, to realize The water-protected enclosure layer of original damage and being isolated for upper layer reduce the influence of original water-protected enclosure layer and substrate vibration.
(4) modified emulsifying asphalt sand carries out basal plane repairing.The modified pitch sand mixed in advance is uniformly spread by gridding method It onto construction surface, is raked with rake, above cover water imbibition geotextiles and then uses plate compactor or roller compaction, this layer of thickness control is in 2- 3cm。
Due to using the above technology, the present invention compared with the prior art, is had the advantage that as follows:
1. the structure of quick punishment high-speed rail roadbed fiber concrete water-protected enclosure layer disease of the invention have good weatherability, The advantages that water resistant damages, is low temperature resistant, can bear high-frequency vibration load, and durability is good, and construction technology is simple and construction is time-consuming short, it can Achieve the purpose that quickly to repair.
2. the present invention repairs waterproof protective layer basal plane using 2-3cm modified pitch sand, it is levelling to avoid conventional slurry filling The separation that the repair layer structure of layer+thin layer waterproof layer occurs under the effect of dynamic load high-frequency vibration and adverse circumstances collective effect is peeled off Problem.
3. elastomeric isolation layer is arranged, it can be achieved that original in the present invention between original fiber concrete and new modified pitch sand There is the isolation of water-protected enclosure layer disease, maximumlly reduce the influence of original confining bed and substrate vibration to modified pitch sand, To be beneficial to prolong its service life.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of durable flexible structure for punishing high-speed rail roadbed water-protected enclosure layer;
In figure: 1, flexible punishment layer, 2, elastomeric isolation layer, 3, weather-proof tar sand waterproof layer.
Specific embodiment
With reference to embodiment, the present invention is furture elucidated.
Embodiment 1:
A kind of durable flexible structure for punishing high-speed rail roadbed water-protected enclosure layer, the structure are successively arranged flexible punishment from inside to outside Layer 1, elastomeric isolation layer 2 and weather-proof tar sand waterproof layer 3.
Wherein, flexible punishment floor 1 is solid as made from 10 DEG C of ductility 52cm, No. 90 A grades of asphalt that softening point is 48 DEG C The emulsified asphalt that content is 65% is blended with saturation gypsum solution, mechanical spread, spread quantity 1.2kg/m2
The 3-4mm rubber scraps that elastomeric isolation layer 2 is rolled by the waste tire rubber of truck is manually dispensed in flexibility Punish 1 surface of layer, spreading amount 3kg/m2
Weather-proof tar sand waterproof layer 3, including lime stone mineral aggregate, the modified emulsifying asphalt matched according to mass ratio for 100:7, stone Material is limestone, and gradation is listed in table 1.Modified emulsifying asphalt be performance be PG64-34 the emulsification of SBR modified pitch (solid content is 65%) it obtains, dosage 8.0%.
1 mineral aggregate gradation of table
Screen size (mm) 9.5 4.75 2.36 1.18 0.6 0.3 0.15 0.075
Pass through percentage 100 84.2 67.6 54.5 36.5 24.5 12.4 6.0
A kind of construction method of durable flexible structure that punishing high-speed rail roadbed water-protected enclosure layer sequentially includes the following steps:
(1) fiber concrete of obvious dusting and loosening is removed, it is with hair dryer that the impurities purging of cleaning is clean, it is dripped with emulsification Blueness to the crack of fiber concrete and its with Seal treatment is carried out at track plates base seam, then with the modification mixed in advance Tar sand carries out leveling to basal plane;
(2) the flexible punishment layer 1 of coating.Saturation gypsum solution is mixed with emulsified asphalt in the way of machinery sprinkling or artificial smearing Close solution equably spraying fiber concrete layer surface, dosage 1.2kg/m after cleaning is levelling2, pitch to be emulsified is completely broken Flexible punishment layer 1 is formed after cream, whether uniformly to go through flexible punishment layer 1, and secondary treatment is carried out to uneven place.
(3) it dispenses rubber scraps and forms elastomeric isolation layer 2.It is manually spread on flexible punishment 1 surface of layer after complete demulsification The rubber scraps that cloth partial size 3-4mm waste tire rubber is rolled into, dosage 3kg/m2So as to form elastomeric isolation layer 2.
(4) it paves and is compacted modified emulsifying asphalt sand.The modified emulsifying asphalt sand mixed in advance is uniformly spread to construction surface On, it is raked with rake, middle section roller compaction, both sides are tamped respectively, this layer of thickness control is in 2cm.
Embodiment 2:
A kind of durable flexible structure for punishing high-speed rail roadbed water-protected enclosure layer, the structure are successively arranged flexible punishment from inside to outside Layer 1, elastomeric isolation layer 2 and weather-proof tar sand waterproof layer 3.
Wherein, the flexible punishment floor 1 is by 10 DEG C of ductilities not less than 60cm, No. 130 asphalt that softening point is 42 DEG C The emulsified asphalt and the saturation artificial roller coating of gypsum solution that solid content obtained is 50%, spread quantity 2.8kg/m2
4-5mm rubber scraps that the elastomeric isolation layer 2 is rolled by the waste tire rubber of truck manually dispensed in Flexibility punishment 1 surface of layer, spreading amount 4kg/m2
The weather-proof tar sand waterproof layer 3, limestone mineral aggregate, modified emulsifying including matching according to mass ratio 10:1 drip Blueness, mineral aggregate gradation are listed in table 2.Modified emulsifying asphalt is the modified emulsifying asphalt (solid content 50%) of PG70-28, and dosage is 10%。
2 building stones gradation of table
Screen size (mm) 9.5 4.75 2.36 1.18 0.6 0.3 0.15 0.075
Pass through percentage 100 90.2 65.5 52.5 33.5 22.5 16.5 10.6
A kind of construction method of durable flexible structure that punishing high-speed rail roadbed water-protected enclosure layer sequentially includes the following steps:
(1) fiber concrete of obvious dusting and loosening is removed, it is with hair dryer that the impurities purging of cleaning is clean, it is dripped with emulsification Blueness to the crack of fiber concrete and its with Seal treatment is carried out at track plates base seam, then with the modification mixed in advance Tar sand carries out leveling to basal plane;
(2) the flexible punishment layer 1 of coating.Saturation gypsum solution is mixed with emulsified asphalt in the way of machinery sprinkling or artificial smearing Close solution equably spraying fiber concrete layer surface, dosage 2.8kg/m after cleaning is levelling2, pitch to be emulsified is completely broken Flexible punishment layer 1 is formed after cream, whether uniformly to go through flexible punishment layer 1, and secondary treatment is carried out to uneven place.
(3) it dispenses rubber scraps and forms elastomeric isolation layer 2.It is manually spread on flexible punishment 1 surface of layer after complete demulsification The rubber scraps that the waste tire rubber of cloth partial size 4-5mm is rolled into, dosage 4kg/m2So as to form elastomeric isolation layer 2.
(4) it paves and is compacted modified emulsifying asphalt sand.The modified emulsifying asphalt sand mixed in advance is uniformly spread to construction surface On, it is raked with rake, middle section roller compaction, both sides are tamped respectively, this layer of thickness control is in 3cm.
Above-described embodiment is only the preferred technical solution of the present invention, and is not construed as limitation of the invention, the present invention Protection scope should with claim record technical solution, including claim record technical solution in technical characteristic etc. It is protection scope with alternative, i.e., equivalent replacement within this range is improved, also within protection scope of the present invention.

Claims (10)

1. a kind of durable flexible structure for punishing high-speed rail roadbed water-protected enclosure layer, it is characterised in that: including protective layer, the protection Layer includes being successively arranged flexible punishment layer, elastomeric isolation layer and tar sand waterproof layer from inside to outside.
2. a kind of durable flexible structure for punishing high-speed rail roadbed water-protected enclosure layer according to claim 1, it is characterised in that: The spread quantity of the flexible punishment layer is 1.2-2.8kg/m2;The spread quantity of the elastomeric isolation layer is 2-5kg/ m2;The drip Green sand waterproof layer with a thickness of 2-3cm.
3. a kind of durable flexible structure for punishing high-speed rail roadbed water-protected enclosure layer according to claim 1, it is characterised in that: The flexible punishment layer is emulsified asphalt made from A grades of asphalt are blended with saturation gypsum solution.
4. a kind of durable flexible structure for punishing high-speed rail roadbed water-protected enclosure layer according to claim 2, it is characterised in that: The solid content of the emulsified asphalt is 50-65%;The A grade asphalt that the A grades of asphalt is No. 90-130.
5. a kind of durable flexible structure for punishing high-speed rail roadbed water-protected enclosure layer according to claim 1, it is characterised in that: The elastomeric isolation layer is the 3-5mm rubber scraps that rubber is rolled into.
6. a kind of durable flexible structure for punishing high-speed rail roadbed water-protected enclosure layer according to claim 1, it is characterised in that: The tar sand waterproof layer is made of lime stone mineral aggregate and modified emulsifying asphalt, the lime stone mineral aggregate and modified emulsifying asphalt Mass ratio is 100:7-12.
7. a kind of durable flexible structure for punishing high-speed rail roadbed water-protected enclosure layer according to claim 6, it is characterised in that: The size of the lime stone mineral aggregate is any one in 0-3mm, 3-5mm and 5-10mm or above combination.
8. a kind of durable flexible structure for punishing high-speed rail roadbed water-protected enclosure layer according to claim 6, it is characterised in that: The modified emulsifying asphalt is that after modified pitch is emulsified, can be prepared by.
9. a kind of durable flexible structure for punishing high-speed rail roadbed water-protected enclosure layer according to claim 8, it is characterised in that: The solid content of the modified emulsifying asphalt is 50-65%.
10. a kind of construction party for the durable flexible structure of punishment high-speed rail roadbed water-protected enclosure layer described in claim 1-9 Method, which is characterized in that construction procedure is as follows: former concrete surface cleaning sprays flexible punishment layer, dispenses rubber scraps and form bullet Sexual isolation layer, the jolt ramming tar sand that paves form tar sand waterproof layer.
CN201910599651.XA 2019-07-04 2019-07-04 Durable and flexible structure for treating waterproof sealing layer of high-speed railway foundation and construction method Active CN110258193B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910599651.XA CN110258193B (en) 2019-07-04 2019-07-04 Durable and flexible structure for treating waterproof sealing layer of high-speed railway foundation and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910599651.XA CN110258193B (en) 2019-07-04 2019-07-04 Durable and flexible structure for treating waterproof sealing layer of high-speed railway foundation and construction method

Publications (2)

Publication Number Publication Date
CN110258193A true CN110258193A (en) 2019-09-20
CN110258193B CN110258193B (en) 2024-04-16

Family

ID=67924415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910599651.XA Active CN110258193B (en) 2019-07-04 2019-07-04 Durable and flexible structure for treating waterproof sealing layer of high-speed railway foundation and construction method

Country Status (1)

Country Link
CN (1) CN110258193B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101187193A (en) * 2007-12-06 2008-05-28 武汉理工大学 Half-flexible water drainage skid-free noise-reducing road surface pavement structure
CN201459524U (en) * 2009-06-22 2010-05-12 中铁二院工程集团有限责任公司 Structure of vibration absorbing type ballastless track subgrade bed
CN104278598A (en) * 2014-09-22 2015-01-14 东南大学 Self-compacting bituminous concrete waterproof seal and construction method thereof
CN105714621A (en) * 2016-01-27 2016-06-29 东南大学 Ballastless track-structured waterproof vibration-reducing flexible protecting structure and paving method thereof
CN211645779U (en) * 2019-07-04 2020-10-09 东南大学 Durable flexible structure for treating waterproof sealing layer of high-speed railway foundation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101187193A (en) * 2007-12-06 2008-05-28 武汉理工大学 Half-flexible water drainage skid-free noise-reducing road surface pavement structure
CN201459524U (en) * 2009-06-22 2010-05-12 中铁二院工程集团有限责任公司 Structure of vibration absorbing type ballastless track subgrade bed
CN104278598A (en) * 2014-09-22 2015-01-14 东南大学 Self-compacting bituminous concrete waterproof seal and construction method thereof
CN105714621A (en) * 2016-01-27 2016-06-29 东南大学 Ballastless track-structured waterproof vibration-reducing flexible protecting structure and paving method thereof
CN211645779U (en) * 2019-07-04 2020-10-09 东南大学 Durable flexible structure for treating waterproof sealing layer of high-speed railway foundation

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
朱久红;: "徐州站宽枕轨道基床病害的分析与整治", 路基工程, no. 03 *
朱久红;: "徐州站宽枕轨道基床病害的分析与整治", 路基工程, no. 03, 20 June 2011 (2011-06-20) *

Also Published As

Publication number Publication date
CN110258193B (en) 2024-04-16

Similar Documents

Publication Publication Date Title
CN102433817B (en) Composite waterproof adhesive layer and preparation method thereof
CN101982610A (en) Hot-distribution rubber bituminous pavement and construction method thereof
CN103726444B (en) A kind of multiple field super thick lightweight bridge deck pavement structure and paving method
CN104264570B (en) Emulsified bitumen slurry mixture penetrated asphalt pavement construction technique
CN103882788B (en) Based on the method for constructing roadway of the modification roller compacted concrete surface layer of enzyme soil cured substrate layer
CN110409251A (en) A kind of dewatering and noise reduction pavement construction method
CN107386028A (en) Road three-hybrid system cold in place recycling engineering method
CN107354834A (en) The construction technique and reinforced structure complex in Civil Aviation Airport field road
CN103924495A (en) Small and medium-sized steel bridge deck pavement system and implementation method
CN103696366B (en) Pavement structure and pavement method of combined steel bridge deck
CN207846123U (en) Reinforced structure complex
CN213625024U (en) Cold regeneration road surface structure of emulsified asphalt
CN112301826B (en) Emulsified asphalt cold-recycling pavement structure and rapid curing method for pavement
CN103233405B (en) Old-new bituminous pavement binder course and application thereof
CN103774518A (en) Fiber reinforced bituminous pavement stress absorbing layer and construction method thereof
CN110258193A (en) A kind of durable flexible structure and construction method for punishing high-speed rail roadbed water-protected enclosure layer
CN211645779U (en) Durable flexible structure for treating waterproof sealing layer of high-speed railway foundation
CN110820466A (en) Quick repairing method for cement concrete pavement
CN113250010B (en) Large-particle-size asphalt macadam flexible ballast bed and construction method thereof
CN114016430B (en) Asphalt concrete bridge deck pavement method
CN113250078B (en) Flexible waterproof protection structure for railway steel bridge deck and construction method thereof
CN205711601U (en) A kind of super viscous wearing course paving structure of cement pavement enhancement mode
CN115045163A (en) Steel fiber self-compacting cement and application thereof, highway pavement and construction method thereof
CN114182595A (en) Construction method of long-life asphalt road
CN108301321B (en) Anticoagulant ice thin layer deck installation structure of permanent seal cooling lightweight and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant