CN110249660A - Method and apparatus for sending and receiving data in mobile communication system - Google Patents
Method and apparatus for sending and receiving data in mobile communication system Download PDFInfo
- Publication number
- CN110249660A CN110249660A CN201880009675.9A CN201880009675A CN110249660A CN 110249660 A CN110249660 A CN 110249660A CN 201880009675 A CN201880009675 A CN 201880009675A CN 110249660 A CN110249660 A CN 110249660A
- Authority
- CN
- China
- Prior art keywords
- gnb
- drx
- terminal
- band
- frequency band
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 175
- 238000010295 mobile communication Methods 0.000 title description 12
- 238000004891 communication Methods 0.000 claims abstract description 46
- 230000011664 signaling Effects 0.000 claims description 12
- 238000005516 engineering process Methods 0.000 abstract description 17
- 230000036541 health Effects 0.000 abstract description 2
- 239000000203 mixture Substances 0.000 abstract description 2
- 230000006855 networking Effects 0.000 abstract description 2
- 238000005259 measurement Methods 0.000 description 144
- 230000005540 biological transmission Effects 0.000 description 92
- 108091006146 Channels Proteins 0.000 description 59
- 238000012546 transfer Methods 0.000 description 54
- 230000008569 process Effects 0.000 description 37
- 238000013475 authorization Methods 0.000 description 32
- 230000008859 change Effects 0.000 description 27
- 238000012544 monitoring process Methods 0.000 description 27
- 230000000694 effects Effects 0.000 description 21
- 238000012790 confirmation Methods 0.000 description 20
- 238000009826 distribution Methods 0.000 description 17
- 230000006870 function Effects 0.000 description 15
- 230000004044 response Effects 0.000 description 12
- 238000003860 storage Methods 0.000 description 11
- 230000004913 activation Effects 0.000 description 9
- 230000008901 benefit Effects 0.000 description 6
- 238000001914 filtration Methods 0.000 description 6
- 230000001965 increasing effect Effects 0.000 description 6
- 238000007726 management method Methods 0.000 description 6
- 230000009467 reduction Effects 0.000 description 6
- 230000003044 adaptive effect Effects 0.000 description 5
- 238000012545 processing Methods 0.000 description 5
- 241000208340 Araliaceae Species 0.000 description 4
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 4
- 235000003140 Panax quinquefolius Nutrition 0.000 description 4
- 230000006399 behavior Effects 0.000 description 4
- 235000008434 ginseng Nutrition 0.000 description 4
- 230000008093 supporting effect Effects 0.000 description 4
- 230000007423 decrease Effects 0.000 description 3
- 238000009795 derivation Methods 0.000 description 3
- 230000009977 dual effect Effects 0.000 description 3
- 235000013399 edible fruits Nutrition 0.000 description 3
- 230000005484 gravity Effects 0.000 description 3
- 238000013507 mapping Methods 0.000 description 3
- 230000002085 persistent effect Effects 0.000 description 3
- 238000006116 polymerization reaction Methods 0.000 description 3
- 238000004364 calculation method Methods 0.000 description 2
- 125000004122 cyclic group Chemical group 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 230000008030 elimination Effects 0.000 description 2
- 238000003379 elimination reaction Methods 0.000 description 2
- 230000001976 improved effect Effects 0.000 description 2
- 230000001939 inductive effect Effects 0.000 description 2
- 230000007774 longterm Effects 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 238000013468 resource allocation Methods 0.000 description 2
- 230000000717 retained effect Effects 0.000 description 2
- 239000004065 semiconductor Substances 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 230000008054 signal transmission Effects 0.000 description 2
- 230000001360 synchronised effect Effects 0.000 description 2
- 206010048669 Terminal state Diseases 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000003213 activating effect Effects 0.000 description 1
- 230000002776 aggregation Effects 0.000 description 1
- 238000004220 aggregation Methods 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 239000012634 fragment Substances 0.000 description 1
- 230000004927 fusion Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 229910044991 metal oxide Inorganic materials 0.000 description 1
- 150000004706 metal oxides Chemical class 0.000 description 1
- 238000012806 monitoring device Methods 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 230000029058 respiratory gaseous exchange Effects 0.000 description 1
- 238000010187 selection method Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 230000007958 sleep Effects 0.000 description 1
- 230000026676 system process Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W36/00—Hand-off or reselection arrangements
- H04W36/0005—Control or signalling for completing the hand-off
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B7/00—Radio transmission systems, i.e. using radiation field
- H04B7/02—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
- H04B7/04—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
- H04B7/06—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station
- H04B7/0686—Hybrid systems, i.e. switching and simultaneous transmission
- H04B7/0695—Hybrid systems, i.e. switching and simultaneous transmission using beam selection
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B7/00—Radio transmission systems, i.e. using radiation field
- H04B7/02—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
- H04B7/04—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
- H04B7/08—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the receiving station
- H04B7/0868—Hybrid systems, i.e. switching and combining
- H04B7/088—Hybrid systems, i.e. switching and combining using beam selection
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W36/00—Hand-off or reselection arrangements
- H04W36/0005—Control or signalling for completing the hand-off
- H04W36/0055—Transmission or use of information for re-establishing the radio link
- H04W36/0058—Transmission of hand-off measurement information, e.g. measurement reports
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W36/00—Hand-off or reselection arrangements
- H04W36/08—Reselecting an access point
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
- H04W72/044—Wireless resource allocation based on the type of the allocated resource
- H04W72/0453—Resources in frequency domain, e.g. a carrier in FDMA
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B7/00—Radio transmission systems, i.e. using radiation field
- H04B7/02—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
- H04B7/04—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
- H04B7/06—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station
- H04B7/0613—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission
- H04B7/0615—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission of weighted versions of same signal
- H04B7/0619—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission of weighted versions of same signal using feedback from receiving side
- H04B7/0621—Feedback content
- H04B7/0626—Channel coefficients, e.g. channel state information [CSI]
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W36/00—Hand-off or reselection arrangements
- H04W36/0005—Control or signalling for completing the hand-off
- H04W36/0055—Transmission or use of information for re-establishing the radio link
- H04W36/0077—Transmission or use of information for re-establishing the radio link of access information of target access point
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
This disclosure relates to for that will support to be more than communication means and system that the 5th generation (5G) communication system and Internet of Things (IoT) technology of the more high data rate of forth generation (4G) system blend.The disclosure can be applied to the intelligent Service based on the 5G communication technology and IoT the relevant technologies, such as smart home, intelligent building, intelligent city, intelligent automobile, networking automobile, health care, digital education, intelligence retail, safety and security service.Present disclosure also relates to cell reselection operations.The method of terminal in wireless communication system may include: that the first scheduling information for being used for first band is received from base station, bandwidth is switched to first band according to the first scheduling information, starting is used for the timer of first band, and when the timer has lapsed, bandwidth is switched to second band.
Description
Technical field
This disclosure relates to mobile communication system.More specifically, this disclosure relates to the residence reselecting of terminal.
In addition, this disclosure relates to using the cell of the signal of beamforming transmission is passed through in the system based on beam forming
Measurement and mobile management operation.
In addition, this disclosure relates to a kind of for sending in radio resource control (radio resource
Control, RRC) terminal under connection status reference signal method.
In addition, a kind of this disclosure relates to method of the bandwidth for switching terminal in mobile communication system.
Background technique
In order to meet from forth generation (4G) communication system deployment since it is increased to wireless data service the needs of,
Through making great efforts to develop improved 5th generation (5G) or pre- 5G communication system.Therefore, 5G or pre- 5G communication system are also referred to as " super 4G net
Network " or " rear long term evolution (LTE) system ".5G communication system is considered as millimeter wave (mmWave) frequency band in higher frequency
Implement in (such as 60GHz frequency band), to realize higher data rate.In order to reduce propagation loss and the increasing of radio wave
Add transmission range, beam forming, extensive multiple-input and multiple-output (MIMO), Quan Wei MIMO (FD-MIMO), array antenna, simulation
Beam forming, extensive antenna technology are discussed in 5G communication system.In addition, in 5G communication system, just based on advanced
Small cell, cloud radio access network (RAN), super-intensive network, equipment are to equipment (D2D) communication, wireless backhaul, mobile network
Network, collaboration communication, cooperative multi-point (CoMP), receiving end interference elimination etc. are carried out for the improved exploitation of grid.In 5G system
In system, mixing frequency displacement key (FSK) and quadrature amplitude modulation (QAM) (FQAM) and sliding window supercomposed coding have been developed
(SWSC) as higher level code modulation (ACM) and filter bank multi-carrier (FBMC), non-orthogonal multiple (NOMA) and sparse
Code multiple access (SCMA) is used as advanced access technology.
With consumption information, connection network focusing on people is generated as the mankind, internet is developing now as object
It networks (Internet of things, IoT), in this Internet of Things, the distributed entities of such as things are not artificially being done
Information is exchanged and handled in the case where pre-.It has already appeared as combining IoT technology and big number by the connection with Cloud Server
According to all things on earth net (Internet of everything, IoE) of processing technique.With such as " sensing technology ", " wire/wireless
The technology essential factor of communication and network infrastructure ", " service interface technology " and " safe practice " has been IoT embodiment institute
Demand has studied sensor network, Machine To Machine (M2M) communication, machine type communication (MTC) etc. recently.It is such
IoT environment can provide by collecting and analyzing the data generated between the things of connection and create new valence for human lives
The intelligent Web technological service of value.By existing information technology (IT) and various industrial applications merge and combination, IoT can be answered
For multiple fields, including smart home, intelligent building, intelligent city, intelligent automobile or networking automobile, smart grid, medical treatment
Health care, intelligent appliance and advanced medical services.
It is consistent with this, have been carried out it is various trial with by 5G communication system applications in IoT network.For example, such as sensing
The technology of device network, MTC and M2M communication can be implemented by beam forming, MIMO and array antenna.As above-mentioned big number
The example of the fusion between 5G technology and IoT technology is also considered according to the application of the cloud RAN of processing technique.
Information above is only used as background information to provide, to help to understand the disclosure.Any determination is not made, without disconnected yet
Whether speech has any of above content to be likely to be suited for the prior art about the disclosure.
Summary of the invention
Technical problem
The present invention has been made to solve the problems, such as at least this and/or disadvantage, and has been provided at least the following advantages.
Technical solution
All aspects of this disclosure aim to solve the problem that at least the above problems and/or disadvantage, and provide at least the following advantages.Therefore,
An aspect of this disclosure is to provide a kind of method for by terminal preferentially gravity treatment specific cell, is enable to carry out
The rapid data of terminal sends and receives, and prevents from sending/receive the increase of the signaling overheads occurred in preparation process in data.
Another aspect of the present disclosure is to provide a kind of system, method and apparatus, is including one or more bases for use
Stand (BS) and the system based on beam forming of one or more terminal in cell executed by the signal of beamforming transmission
Measurement and mobile management operation.
Another aspect of the present disclosure is to provide a kind of send for the end in radio resource control (RRC) connection status
The method and apparatus of the reference signal at end.
Another aspect of the present invention is to provide a kind of by considering the power consumption of terminal in single carrier come inscribed in limited frequency band
The process of base station signal is received, and additionally provides a kind of base station and terminal flexibly and dynamically utilizes the side of whole system frequency band
Method.The method and process of power are saved in this flexible bandwidth system in addition, present disclose provides a kind of terminals.
According to one aspect of the disclosure, a kind of method of the terminal in wireless communication system is provided.This method comprises:
The first scheduling information for being used for first band is received from base station, and bandwidth is switched to by first band according to the first scheduling information, is opened
The timer in first band is employed, and bandwidth is switched to second band when the timer has lapsed.
According to another aspect of the present disclosure, a kind of method of the base station in wireless communication system is provided.This method comprises:
Terminal is sent by the first scheduling information for being used for first band, bandwidth is switched to by first band according to the first scheduling information,
Starting is used for the timer of first band, and bandwidth is switched to second band when the timer has lapsed.
According to another aspect of the present disclosure, the terminal in a kind of wireless communication system is provided.Terminal include: transceiver and
Controller is configured as receiving the first scheduling information for being used for first band from base station, is cut bandwidth according to the first scheduling information
First band is changed to, starting is used for the timer of first band, and bandwidth is switched to second band when the timer has lapsed.
According to another aspect of the present disclosure, the base station in a kind of wireless communication system is provided.Base station include: transceiver and
Controller, the first scheduling information for being configured as to be used for first band are sent to terminal, according to the first scheduling information by bandwidth
It is switched to first band, starting is used for the timer of first band, and bandwidth is switched to the second frequency when the timer has lapsed
Band.
Advantageous effect of the invention
According to another aspect of the present disclosure, terminal can be able to carry out rapid data transmission/received specific cell with gravity treatment,
To prevent sending/receive the increase for the signaling overheads that may occur in preparation process in data.
According to another aspect of the present disclosure, each base station can be by using with different beams region, coverage area, biography
Two or more wave beams in defeated period etc. are believed to send by two or more references that unlike signal create-rule generates
Number.
According to another aspect of the present disclosure, base station can be by sending the reference for the terminal in RRC connection status
Signal determines the wave beam of data to be used for transmission, and carries out data transmission/reception using identified wave beam.
According to another aspect of the present disclosure, the frequency band of all size can be used to control multiple terminals, to be in base station
Resource is equably used in the operational frequency bands of system.In addition, base station allows terminal to execute scheduling, modulation in the partial-band of configuration
(channel state is indicated with encoding scheme (modulation and coding scheme, MCS), channel status
Indication, CSI) report, measurement etc., to minimize scheduling in entire frequency band and transfer the reduction of performance.Moreover, such as
Connectivity problem occurs in such partial-band for fruit, then terminal can restore it in short delay.
By disclosing the detailed description of the various embodiments of the disclosure below in conjunction with attached drawing, other aspects of the disclosure,
Advantage and notable feature will become obvious those skilled in the art.
Detailed description of the invention
Pass through following description with reference to the accompanying drawings, above and other aspect, feature and the advantage of some embodiments of the disclosure
It will be apparent from, in which:
Fig. 1 is to show the user equipment according to an embodiment of the present disclosure after being transformed into an inactive mode from connection mode
(UE) figure of situation about being moved in the region radio access network (RAN);
Fig. 2 be show it is according to an embodiment of the present disclosure from efficient cell radio network temporary identifier (cell
Radio network temporary identifier, C-RNTI) g node B (gNB) receive downlink (DL) data
The figure of the operation of an inactive mode UE;
Fig. 3 be show it is according to an embodiment of the present disclosure by area cell radio network temporary identifier (area
Cell radio network temporary identifier, A-RNTI) from the region RAN all gNB receive DL data
An inactive mode UE operation figure;
Fig. 4 is to show according to an embodiment of the present invention receive by A-RNTI from all gNB in the region RAN to page letter
Number, execute 2 step random access channel (random access channel, RACH) and by A-RNTI from receive RACH it is leading
GNB receive DL data an inactive mode UE operation figure;
Fig. 5 is to show according to an embodiment of the present disclosure receive by A-RNTI from all gNB in the region RAN to page letter
Number, execute 4 step RACH and by A-RNTI from the behaviour for receiving the leading gNB of RACH and receiving an inactive mode UE of DL data
The figure of work;
Fig. 6 be show it is according to an embodiment of the present disclosure in the cell reselection of an inactive mode UE have effective C-RNTI
GNB and gNB without effective C-RNTI between difference figure;
Fig. 7 be show it is according to an embodiment of the present disclosure mobile from the gNB with effective C-RNTI in an inactive mode UE
To without effective C-RNTI gNB in the case where cell reselection operation figure;
Fig. 8 be show it is according to an embodiment of the present disclosure an inactive mode UE from without effective C-RNTI gNB move
Move the figure of the cell reselection operation in the case where the gNB with effective C-RNTI;
Fig. 9 be show it is according to an embodiment of the present disclosure an inactive mode UE from without effective C-RNTI gNB move
Move the figure of the cell reselection operation in the case where another gNB without effective C-RNTI;
Figure 10 be show it is according to an embodiment of the present disclosure mobile from the gNB with effective C-RNTI in an inactive mode UE
To the figure of the cell reselection operation in the case where another gNB with effective C-RNTI;
Figure 11 is to show the different type according to an embodiment of the present disclosure for sending by different frequency bands and having same period
Reference signal figure;
Figure 12 is to show the different type according to an embodiment of the present disclosure for sending by same frequency band and having same period
Reference signal figure;
Figure 13 is to show the different type according to an embodiment of the present disclosure for sending by same frequency band and having different cycles
Reference signal figure;
Figure 14 is to show terminal according to an embodiment of the present disclosure to calculate the measured value for sending the cell of different reference signals
Method figure;
Figure 15 is to show the reference that the Modulation recognition according to an embodiment of the present disclosure for that will measure is same type to believe
Number and by using measured value calculate cell typical value method figure;
Figure 16 is to show the reference signal according to an embodiment of the present disclosure by using all measurements to calculate cell generation
The figure of the method for tabular value;
Figure 17 is the figure for showing the method according to an embodiment of the present disclosure for being used to calculate cell typical value;
Figure 18 and Figure 19, which is shown, is transmitted by the base station to terminal and for calculating cell measurement according to the embodiment of the present disclosure
The example of the signal of value;
Figure 20 is to show the example according to an embodiment of the present disclosure including being transmitted by the base station to the signal of the weight of terminal
Figure;
Figure 21 is to show terminal according to an embodiment of the present disclosure to calculate by individual process from different reference signals
(RS) figure of the method for the cell typical value of each RS;
Figure 22 is to show according to an embodiment of the present disclosure to control mobility by using different types of reference signal
Change method figure;
Figure 23 shows according to an embodiment of the present disclosure each by the separate processes calculating for different types of RS
The typical value of RS, the method that a cell typical value is then determined by using above-mentioned typical value;
Figure 24 shows the RS according to an embodiment of the present disclosure for for same type for each wave beam measuring signal
Multiplied by equal weight and then the method for determining cell typical value;
Figure 25 shows according to an embodiment of the present disclosure for selecting certain amount of wave beam for different types of RS
Measuring signal, by the typical value of each RS multiplied by weight, to the method that exports cell typical value;
Figure 26 shows according to an embodiment of the present disclosure for selecting certain amount of wave beam for different types of RS
Measuring signal, by by each selected wave beam measuring signal calculated multiplied by weight the typical value of each RS type and pass through by
The method that the typical value of each RS type exports cell typical value multiplied by weight;
Figure 27 shows the wave beam according to an embodiment of the present disclosure for for different types of RS selection different number
Measuring signal and then the another method by the way that selected signal to be exported to cell typical value multiplied by different weights;
Figure 28 is to show according to an embodiment of the present disclosure be used for by measuring all wave beams for different types of RS
Signal exports the figure of the method for cell typical value multiplied by different weights;
Figure 29 is to show according to an embodiment of the present disclosure to control mobility by using different types of reference signal
The figure of the method for change;
Figure 30 is the figure for showing terminal according to an embodiment of the present disclosure;
Figure 31 is the figure for showing base station according to an embodiment of the present disclosure;
Figure 32 is to show the flow chart according to an embodiment of the present disclosure for being initially accessed operation;
Figure 33 is the flow chart for showing turning-over operation according to an embodiment of the present disclosure;
Figure 34 is the flow chart for showing operation according to an embodiment of the present disclosure;
Figure 35 to Figure 41 be show it is according to an embodiment of the present disclosure for determination will in hand-over for data send out
Send the flow chart with the various methods of received wave beam;
Figure 42 is the flow chart for showing random access operation according to an embodiment of the present disclosure;
Figure 43 to Figure 47 is to show to use in the random access procedure for determination according to various embodiments of the present disclosure
In the flow chart of the various methods of the wave beam of data transmission and reception;
Figure 48 is the figure for showing long term evolution according to an embodiment of the present disclosure (LTE) scalable bandwidth (BW) system;
Figure 49 is the feature for showing the flexible BW system of the new radio (NR) of the 5th generation (5G) according to an embodiment of the present disclosure
Figure;
Figure 50 is the various frequency band splitting schemes shown in the flexible BW system of 5G NR according to an embodiment of the present disclosure
Figure;
Figure 51 be show it is according to an embodiment of the present disclosure from frequency band/across frequency band scheduling operation figure;
Figure 52 to Figure 54 be show according to various embodiments of the present disclosure by physical layer control signal carry out BW extension
With the exemplary figure of reduction operation;
Figure 55 to Figure 58 be show according to various embodiments of the present disclosure by physical layer and radio resource control
(RRC) control signal carries out the exemplary figure of BW extension and reduction operation;
Figure 59 and Figure 60 is that the connection mode for adaptive BW that shows according to various embodiments of the present disclosure is discontinuous
Receive the exemplary figure of (connected mode discontinuous reception, C-DRX) operation;
Figure 61 is to show the discontinuous reception according to an embodiment of the present disclosure for broadband and narrowband
The exemplary figure of (discontinuous reception, DRX) setting;
Figure 62 and Figure 63 be show according to various embodiments of the present disclosure for the DRX setting of broadband and narrowband and preferential
The exemplary figure of grade rule;
Figure 64 is the flow chart for showing the operation of terminal according to an embodiment of the present disclosure;
Figure 65 shows according to an embodiment of the present disclosure for transmission time interval (transmit time
Interval, TTI) change DRX operation;
Figure 66 be show it is according to an embodiment of the present disclosure based on control channel monitoring period and transmitting continuous time come
Determine the exemplary figure of TTI value;
Figure 67 to Figure 71 is the figure for showing the frequency band handover operation based on timer according to various embodiments of the present disclosure;
Figure 72 is the figure for showing the configuration of terminal according to an embodiment of the present disclosure;And
Figure 73 is the figure for showing the configuration of base station according to an embodiment of the present disclosure.
Throughout the drawings, it should be noted that identical appended drawing reference is for describing the same or similar element, feature and knot
Structure.
Specific embodiment
The disclosure being described below to help comprehensive understanding to be defined by the claims and their equivalents for referring to attached drawing is provided
Various embodiments.It includes various details to help to understand, but these are considered only as illustratively.Therefore, this field
Skilled artisan will realize that in the case where not departing from the scope of the present disclosure and spirit, it can be to described herein various
Embodiment makes various changes and modifications.In addition, for clarity and conciseness, it is convenient to omit the description to known function and structure.
The term and word used in the following description and claims is not limited to dictionary meanings, but is only made by inventor
With enabling to clear and consistently understand the disclosure.Therefore, it will be apparent to one skilled in the art that mentioning
Be for illustration purposes only for being described below for various embodiments of the disclosure, rather than for limiting by appended claims and its
The purpose for the disclosure that equivalent limits.
It should be understood that unless the context clearly determines otherwise, otherwise singular " one ", "one" and "the" include plural number
Indicant.Thus, for example, including the reference to surface as one or more to the reference of " assembly surface ".
By the embodiment being below with reference to the accompanying drawings described in detail, the advantages of the disclosure and feature and the mode for realizing them
It will become obvious.However, the disclosure can be embodied in many different forms, and should not be construed as being limited to herein
The embodiment of elaboration.On the contrary, thesing embodiments are provided so that the disclosure is detailed and complete, and will be the model of the disclosure
It encloses and is fully conveyed to those skilled in the art.The disclosure is limited solely by the scope of the following claims.It is identical in the entire disclosure
Appended drawing reference refers to identical element.
<first embodiment>
In the new radio (NR) currently just discussed in third generation partner program (3GPP), in addition to being drilled for a long time
Into except connection mode defined in (LTE) and idle mode, the introducing of an inactive mode is also determined.The spy of an inactive mode
Seeking peace, it is as follows to require.
Radio access network (RAN) and signaling and resource use in core network (CN) should be minimized.
The required time that data are transmitted under an inactive mode should be minimized.Here it is possible to be maintained at user equipment (UE)
An inactive mode or be in connection mode while execute data transmission.
It should support the paging by RAN and the existing paging of the CN by LTE.
Define the notification area (hereinafter, the region RAN) based on RAN.In the region RAN, UE is in not location updating
In the case of move.G node B (gNB) in the region RAN maintains access layer (access stratum, AS) context of UE.
According to above-mentioned requirements, an inactive mode UE be should be able to execute for rapid data transmission/received operation.Operation
First is that cell reselection.Substantially, such as in above-mentioned requirements, an inactive mode UE is moved without position more in the region RAN
Newly.However, if an inactive mode UE executes cell reselection by operation identical with the idle mode UE in existing LTE,
Then in view of rapid data transmission/reception, this may be inappropriate.
Fig. 1 is to show the UE according to an embodiment of the present disclosure after being transformed into an inactive mode to move in the region RAN
The case where figure.
With reference to Fig. 1, the environment of the disclosure is shown.This environment shown in Fig. 1 or in the case of, RAN notification area by
Multiple gNB are formed, these gNB are classified as have Cell Radio Network Temporary Identity effective for an inactive mode UE symbol
(C-RNTI) the gNB 110 and gNB 120 without effective C-RNTI.An inactive mode UE is free in RAN notification area
It is mobile.
In the case of figure 1, have been coupled to the gNB 110 with C-RNTI UE be transformed into from connection mode it is inactive
Then mode moves freely in the region RAN.
In Fig. 1, the gNB 110 that service is finally provided to UE determines according to an inactive mode for the AS context for maintaining UE
Justice is come the C-RNTI that maintains UE to use.Therefore, if an inactive mode UE sends data to gNB 110 and receives from gNB 110
Data need not then reconfigure C-RNTI.
On the other hand, even if gNB 120 belongs to the region RAN of UE, gNB 120 does not have the C- of an inactive mode UE yet
RNTI.Therefore, as an inactive mode UE with gNB 120 rather than when the gNB 110 of the C-RNTI with UE is communicated, when in RAN
When moving in region, gNB 120 needs to distribute the process of C-RNTI to UE.This can increase the data transmission of an inactive mode UE
With received delay.
In 3 gpp, discussing that the data transmission/received independent radio net for an inactive mode UE is interim
The introducing of identifier (RNTI).In the disclosure, this is referred to as region RNTI (A-RNTI).A-RNTI is designed to allow
The identifier that all UE in the region RAN are a uniquely assigned.Because the region RAN includes multiple cells, A-RNTI have than
The C-RNTI that the UE being designed to allow in cell is a uniquely assigned bigger expense.
Following Fig. 2 to Fig. 5, which is shown, according to an embodiment of the present disclosure receives DL data from gNB in the region RAN
The operation of an inactive mode UE.
Fig. 2 is to show the gNB according to an embodiment of the present disclosure from effective C-RNTI to receive downlink (DL) number
According to an inactive mode UE operation figure.
With reference to Fig. 2, because there is gNB C-RNTI, gNB can send number by using C-RNTI in operation S210
According to.
Fig. 3 to Fig. 5 is to show the gNB according to an embodiment of the present disclosure for not maintaining C-RNTI from the region RAN to receive DL
The figure of the operation of an inactive mode UE of data.
It shows with reference to Fig. 3, Fig. 3 in operation S310, belongs to all gNB in the region RAN by using A-RNTI for DL number
According to being sent to an inactive mode UE.Because UE is in most cases actually adjacent with a gNB, in the region RAN
It is the inefficient utilization to resource that all gNB, which send DL data by using unique A-RNTI,.
Fig. 4 and Fig. 5 be show it is according to an embodiment of the present disclosure by executing 2 steps or 4 step random access channel (RACH)
It identifies adjacent gNB and receives the figure of the operation of an inactive mode UE of DL data from adjacent gNB.
Firstly, being sought in operation S410 or S510, all gNB for belonging to the region RAN by using the A-RNTI of UE to execute
It exhales.Then, 2 steps or 4 step RACH are executed in response to the UE of paging, and via RACH message 1 (S420) or RACH message 3
(S520) it includes A-RNTI in paging signal that notice gNB:UE, which corresponds to,.Receive the message gNB recognize it is inactive
Near mode UE is located at, and send DL data.The operation leads to expense, because all gNB in the region RAN send paging letter
Number.In addition, other expenses occur during UE has to carry out 2 steps or 4 step RACH are operated.
Referring to figs. 2 to Fig. 5, when gNB has effective C-RNTI, data transmission/reception of an inactive mode UE has most
Small delay and the signaling for needing least UE and gNB.Therefore, an inactive mode UE is rested on for a long time as far as possible
It imitates and is advantageous around the gNB of C-RNTI.This aspect should be reflected in the cell reselection operation of an inactive mode UE.The disclosure
Propose the cell selection behaviour that a kind of permission an inactive mode UE is rested on as long as possible around the gNB with effective C-RNTI
Make.
Firstly, the cell reselection operation that the UE in LTE will be described.In LTE, the cell reselection of idle mode UE is referred to
By UE selection persistent district, system information is obtained, maintenance synchronizes and receives the operation of paging signal.In order to understand cell reselection
Operation, it is necessary to understand cell selection operation.Cell selection includes measuring and inducing (inducing) following Srxlev and check
Whether Srxlev is greater than zero operation (details is identical as LTE standard, therefore thereof will be omitted).Here, Srxlev by
Qrxlevmeas, Qrxlevmin, Qrxlevminoffset and Pcompensation composition.Qrxlevmeas is surveyed corresponding to UE
Reference Signal Received Power (RSRP) value of amount, and others Qrxlevmin, Qrxlevminoffset and
Pcompensation is the parameter that gNB is notified by system information, radio resource control (RRC) message etc. to UE.
[table 1]
Based on the concept of above-mentioned suitable cell, i.e. Srxlev > 0, cell reselection is executed by following operation in LTE.
Firstly, UE measures the signal strength of current persistent district (i.e. serving cell) and neighboring community, Rs and Rn is then exported.Here,
Qmeas, s and Qmeas, n respectively indicate the signal strength (RSRP) of serving cell and neighboring community.In addition, Qhyst, s and
Qoffset, n are that gNB is supplied to UE to prevent the parameter of frequent cell reselection.After the signal strength of measurement cell, UE exists
Selection has the cell of highest Rs or Rn in cell of the Srxlev greater than zero, then the executive resident in selected cell.Such as
The current persistent district of fruit and the cell newly selected are different from each other, then this means that UE executes cell reselection.
[table 2]
Above description is the cell reselection process of the idle mode UE in LTE.Meanwhile it is contemplated that is newly introduced in NR is non-
In activity pattern, in view of rapid data transmission/reception of an inactive mode UE, UE is rested on for a long time as far as possible to be had effectively
It is advantageous in the cell of C-RNTI.It sends/connects in consideration of it, proposing and being suitable for the rapid data of an inactive mode UE
The cell reselection operation of receipts.In the disclosure, term " cell " can be used interchangeably with base station, gNB or e node B (eNB), be owned
These all have the same meaning.
The present disclosure proposes a kind of method, for by cell reselection to gNB application additional offset but regardless of some
Cell is serving cell or neighboring community, to allow an inactive mode UE most in the gNB with C-RNTI effective to UE
It may stop for a long time.
Fig. 6 is the figure for showing the residence reselecting of an inactive mode UE according to an embodiment of the present disclosure.
With reference to Fig. 6, for having the gNB 610 of effective C-RNTI for an inactive mode UE, UE is in cell reselection
Addition additional offset QC-RNTI is simultaneously applied to ranking cells.On the other hand, for not having for an inactive mode UE's
The gNB 620 of effective C-RNTI, UE execute ranking cells without additional offset.
Basic cell reselection operation is same as described above.In the case where gNB has effective C-RNTI of an inactive mode UE,
As shown in fig. 6, UE can apply additional offset (herein referred as QC-RNTI).According to the disclosure, for not having for inactive
The gNB of effective C-RNTI of mode UE, UE do not apply additional offset (QC-RNTI).Such as according to the cell reselection equation of the disclosure
Under.
[table 3]
Alternatively, as follows according to the cell reselection equation of the disclosure.
[table 4]
An inactive mode UE executes cell reselection according to above-mentioned equation in as shown in Figure 7 to 9 following three kinds
Operation.
Fig. 7 be show it is according to an embodiment of the present disclosure mobile from the gNB with effective C-RNTI in an inactive mode UE
To without effective C-RNTI gNB in the case where cell reselection operation figure.
With reference to Fig. 7, it is assumed that UE is currently resident on the gNB 710 with effective C-RNTI.According to the disclosure, in view of quick
Data transmission/reception, UE are retained in current service cell (that is, gNB 710 with effective C-RNTI) for a long time as far as possible
In be advantageous.Therefore, when exporting the Rs of current service cell in the sequencer procedure for cell reselection, in addition to Qmeas,
Except s and Qhyst, s, UE also adds QC-RNTI, s.
However, UE is not applied and is removed because the gNB 720 that UE is being moved to does not have effective C-RNTI for UE
Qmeas, n and Qoffset, any additional offset except n.In the example, an inactive mode UE export in this way Rs and
Rn, and they are compared to execute final cell reselection.
[table 5]
Fig. 8 be show it is according to an embodiment of the present disclosure an inactive mode UE from without effective C-RNTI gNB move
Move the figure of the cell reselection operation in the case where the gNB with effective C-RNTI.
With reference to Fig. 8, it is assumed that UE is currently resident on the gNB 820 of no effective C-RNTI.According to the disclosure, in view of quick
Data transmission/reception, UE be retained in for a long time in neighboring community the gNB 810 of effective C-RNTI (that is, with) as far as possible and
It is not to be advantageous in current service cell (that is, the gNB 820 for not having effective C-RNTI).Therefore, when for cell
When exporting the Rs of current service cell in the sequencer procedure of gravity treatment, UE is not applied except Qmeas, s and Qhyst, any attached except s
Biasing is moved.
However, because the gNB 810 that is being moved to of UE does not have effective C-RNTI for UE, in addition to Qmeas,
N and Qoffset, s, except n, UE also adds QC-RNTI, n.In the example, an inactive mode UE export in this way Rs and
Rn, and they are compared to execute final cell reselection.
[table 6]
Fig. 9 be show it is according to an embodiment of the present disclosure an inactive mode UE from without effective C-RNTI gNB move
Move the figure of the cell reselection operation in the case where another gNB without effective C-RNTI.
With reference to Fig. 9, it is assumed that UE is currently resident on the gNB 920 without effective C-RNTI.When with C-RNTI's
When executing cell reselection between gNB and gNB without C-RNTI, the disclosure generates the effect different from conventional method.Therefore,
In the case where Fig. 9, cell reselection operation is similar to traditional operation.That is, when for the collated of cell reselection
When exporting the Rs of current service cell in journey, UE is not applied except Qmeas, s and Qhyst, any additional offset except s.In addition,
When exporting the Rn of neighboring community, UE is not applied except Qmeas, n and Qhyst, any additional offset except n.It is non-in the example
Activity pattern UE exports Rs and Rn in this way, and they are compared to execute final cell reselection.
[table 7]
Figure 10 be show it is according to an embodiment of the present disclosure mobile from the gNB with effective C-RNTI in an inactive mode UE
To the figure of the cell reselection operation in the case where another gNB with effective C-RNTI.
In executing cooperation transmission/received environment, multiple base stations can have C-RNTI.In this case, when
When for exporting the Rs of current service cell in the sequencer procedure of cell reselection, UE can also using in addition to Qmeas, s and
Additional offset except Qhyst, s.In addition, when exporting the Rn of neighboring community, UE can also using in addition to Qmeas, n and
Additional offset except Qoffset, s, n.In the example, an inactive mode UE exports Rs and Rn in this way, and by they
It is compared to execute final cell reselection.
[table 8]
A kind of method is proposed in the disclosure, for when an inactive mode UE executes cell reselection, by having
The gNB application additional offset of effective C-RNTI, allows UE to stop for a long time as far as possible in the gNB with effective C-RNTI.
Although in the disclosure illustratively using the gNB with effective C-RNTI, the disclosure can extend to any base station.This
In, this base station includes following example.
Example 1: macrocell
Example 2: home cell (HeNB)
Example 3: the specific cell of UE is distributed to by system information or RRC signaling by base station
Example 4: the cell of specific frequency (such as 6GHz, or lower or higher) is used
Example 5: the cell installed by particular operator and operated
Therefore, when the application disclosure, UE can preferentially execute the cell reselection of cell as described above.
<second embodiment>
With the appearance of smart phone, the flow of smart phone exponentially increases, and to smart phone battery durable
The increased demand of time is also constantly increasing.This means that needing effective power saving (power saving) technology, therefore need
The battery saving mode of terminal is wanted to operate.Various technologies have been proposed and had standardized, have allowed terminal more frequently in power saving mould
It is operated under formula and quickly re-establishes network connection.
In order to realize that higher message transmission rate, the 5th generation (5G) communication system consider in hyperfrequency (mmWave) frequency band
The implementation of (for example, such as 60GHz frequency band).In order to avoid radio wave path loss and increase radio wave at SHF band
Transmitting range, such as beam forming, extensive multiple-input and multiple-output (MIMO), Quan Weidu MIMO (FD-MIMO), array day
The various technologies of line, analog beam forming and extensive antenna are discussed in 5G communication system.
In addition, in order to improve the network of 5G communication system, in advanced small cell, cloud radio access network (cloud
RAN), super-intensive network, equipment are to equipment (D2D) communication, wireless backhaul, mobile network, collaboration communication, cooperative multi-point
(CoMP), it receives interference elimination etc. and has carried out technological development.
In addition, developing mixing frequency displacement key and quadrature amplitude modulation (FQAM) and sliding window in 5G communication system
Supercomposed coding (SWSC) as higher level code modulate (ACM) scheme, and also developed filter bank multi-carrier (FBMC), it is non-just
Multiple access (NOMA) and Sparse Code multiple access (SCMA) is handed over to be used as advanced access technology.
In a communications system, terminal needs the residence reselecting under initial cell selection method and idle mode, with choosing
Select best base station access.In addition, in connection mode, terminal should execute provided for radio resources management (RRM) measurement, to execute
It transfers to be moved to better cell.In order to select cell and compare the performance of cell, each terminal should be able to be observed or be counted
Calculate the measured value for representing each cell or the value derived from measured value.To achieve it, different base stations makes in LTE
Retain orthogonal resource in shared frequency band with omni-beam, and sends the cell specific reference signal of each cell.Terminal measurement
The signal, to know the Reference Signal Received Power (RSRP) of each cell.
In addition, needing different base station using the same of different beams in the next generation communication system for considering beam forming
When cell and wave beam specific reference signals and terminal are sent on different resource by using the multiple waves sent in the cell
The measured value of beam exports the various methods of the typical value corresponding to some cell.
In addition, when base station uses two or more wave beams with different beams region, coverage area, transmission cycle etc.
When sending the reference signal of two or more seed types generated by unlike signal create-rule, not yet studied for exporting
The method of typical value corresponding to some cell.
This disclosure relates to Next-Generation Wireless Communication Systems, and including one or more more particularly, to use is used for
Cell is executed by the signal of beamforming transmission in the system based on beam forming of a base station and one or more terminals
System, the method and apparatus of measurement and mobile management operation.
In addition, this disclosure relates to for being carried out in the wireless system with the base station for respectively using mutiple antennas and terminal
Wave beam measurement, wave beam measurement report and the process for transferring beginning.
Present disclose provides a kind of for wave beam measurement entity (that is, terminal) by having respectively using mutiple antennas
Observation is used (especially in system and environment using the beam forming of mutiple antennas) in the wireless communication of base station and terminal
Wave beam is exported with the beam information of measurement using the method for the typical value of entity (that is, base station), and is additionally provided for leading to
Cross using derived from wave beam send using the typical value of entity the trigger condition of wave beam measurement report.
Present disclose provides (especially make in the wireless communication with the base station for respectively using mutiple antennas and terminal
In system and environment with the beam forming of mutiple antennas), wave beam is real by using being measured by wave beam using entity (that is, base station)
The beam measurement of body report or wave beam using entity typical value, whether meet specified conditions etc., will be used to add wave beam survey
The signal of amount is sent to the trigger condition of wave beam measurement entity (that is, terminal).
Present disclose provides a kind of processes, wherein using by the beam measurement of wave beam measurement entity (that is, terminal) report
Or wave beam using entity (that is, base station) typical value, whether meet specified conditions etc., wave beam measures real using entity and with wave beam
The related adjacent beams of the report of body exchange information using entity (that is, adjacent base station), so that adjacent beams be enable to use entity
It is enough have respectively using in the wireless communication of the base station of mutiple antennas and terminal (especially the wave beam using mutiple antennas at
In the system and environment of shape) send the signal measured for adding wave beam.
<method for sending and receiving two or more different types of reference signals>
Figure 11 to Figure 13 be show according to various embodiments of the present disclosure for sending different types of reference signal
The figure of method.
With reference to Figure 11, as shown in appended drawing reference 1100, can be had in same time resource using different frequency bands transmission
The different types of reference signal (RS) of same period.
With reference to Figure 12, alternatively, as shown in appended drawing reference 1200, same frequency band can be used in different time resource
Send the different types of RS with same period.
With reference to Figure 13, alternatively, as shown in appended drawing reference 1300, same frequency band can be used in different time resource
Send the different types of RS with different cycles.
Furthermore, it is possible to be had on identical or different time and frequency resource using identical or different sequence to send
The different types of reference signal of different cycles.
<methods of terminal calculating cell measurements>
Signal with different beams characteristic is dramatically different in terms of received signal strength and transmission performance.For example, when eventually
End is when same position receives signal, and compared with narrow beam, broad beam has lower RSRP and lower received signal quality
(channel quality indicator (CQI), Reference Signal Received Quality (RSRQ), signal-to-noise ratio (SINR), signal noise ratio
(SNR)), because power is dispersion.
Like this, when the different reference signals with different beams characteristic are by (multiple) base station, (multiple) day in cell
When line or (multiple) transfer point are sent, terminal can measure different reference signals.In this case, reference signal measured value
It can show the relative different according to beam feature as described above.
Figure 14 is to show the survey according to an embodiment of the present disclosure for calculating for terminal and sending the cell of different reference signals
The figure of the method for magnitude.
With reference to Figure 14, terminal can receive in operation S1410 and measure all reference signals.Then, S1420 is being operated,
Received reference signal can be classified as the reference signal (RS) of same type by terminal.For example, terminal can distinguish synchronous letter
Number (synchronization signal, SS), cell specific reference signal (RS) and the specific RS of wave beam.In addition, terminal can be with
Signal and other signaling zones with identical sequence create-rule and function are separated.
Then, using the measured value of the reference signal of classification, terminal can calculate cell typical value in operation S1430.
Hereafter, using cell typical value, terminal can be surveyed in the cell or execution RRM of operation S1440 selection idle mode
Amount.
Figure 15 is to show the reference signal according to an embodiment of the present disclosure for being used to for measuring signal being classified as same type
And the figure of the method for cell typical value is calculated by using measured value.
With reference to Figure 15, terminal can by type classify to received signal.Then, terminal can be by using classification
Calculated cell typical value is used for idle mode cell choosing to calculate cell typical value 1500 by the measured value of signal
Select, connection mode RRM measurement etc..
It is calculated in the presence of the measurement result by using the same type signal sent on wave beam with the same characteristics
The various methods of cell typical value.For example, can be to measured value summation, average, weighted sum or weighted average.Measured value can
To be the value obtained by scanning base station beam and terminal beams to measurement result application L1 filtering or L3 filtering.Such case
Under, such as summation, average, weighted sum, weighting can be passed through before and after L1 is filtered or before and after L3 filtering
Measured value is calculated as single value by average method, be may then pass through subsequent process and is obtained cell typical value.Furthermore, it is possible to needle
Measured value is measured to (beam pair), for identical base station beam or for identical terminal beams to each wave beam.
These methods can equally function as the side by calculating cell typical value using only a kind of type signal according to this patent
Method.
Figure 16 is to show the reference signal according to an embodiment of the present disclosure by using all measurements to calculate cell generation
The figure of the method for tabular value.
With reference to Figure 16, can by with optimum signal intensity wave beam, N number of wave beam with good signal intensity,
Or all wave beams are such as summed, are averaged, weighted sum or average weighted method 1610 calculate cell typical value
1600.In this case, measured value can be calculated for each wave beam, and can be used above-mentioned for calculating cell typical value
Method.
Figure 17 is the figure for showing the method according to an embodiment of the present disclosure for being used to calculate cell typical value.
With reference to Figure 17, terminal can identify the type of the reference signal of classification, select one or more reference signal types,
And calculate cell typical value.
Specifically, terminal can select reference signal Class1 in operation 1710, and wrap by using in selected type
The measured value of the reference signal sent on the various wave beams included calculates cell typical value 1700.Of course, it is possible to using above-mentioned logical
The method for calculating cell typical value is crossed using only including the wave beam in the reference signal of same type.
With reference to Figure 17, terminal may be had determined for selecting certain types of ginseng in the system for including terminal and base station
It examines signal and calculates the rule of the typical value of respective cell.Therefore, terminal and base station can be known in advance it is this rule without
Specific information exchange and signal transmission.It can be determined by considering one or more of following example and be used to select with reference to letter
Number this rule:
If observing and measuring the certain types of reference signal wave beam being prioritized in a standard, terminal can be only sharp
Cell typical value is calculated with the certain types of reference signal wave beam.For example, when measuring wave beam specific reference signals (wave beam
RS adds RS, and beam forming demodulates RS (DM-RS), Channel state indicators (CSI)-RS (CSI-RS) etc.) when, terminal can be with
It calculates by indicating cell typical value using only corresponding reference signal type.
Alternatively, if observing and measuring the reference signal type with the beam angle more narrower than other types,
Then terminal can be prioritized the reference signal type that (prioritize) has most narrow beam width, and by the way that the ginseng is used only
Signal type is examined to calculate cell typical value.
Alternatively, if observing and measuring the reference signal type with beam angle more broader than other types,
Then terminal can be prioritized the reference signal type with most wide beamwidth, and by using only the reference signal type come
Calculate cell typical value.
Alternatively, if observing and measuring the reference signal type more frequently sent than other types, terminal
It can be prioritized the reference signal type of most frequent transmission, and represented by calculating cell using only the reference signal type
Value.
Alternatively, if observing and measuring the reference signal type more sparsely sent than other types, terminal
It can be prioritized the reference signal type of most sparse transmission, and represented by calculating cell using only the reference signal type
Value.
Alternatively, if observing and measuring the reference signal class sent in coverage area more broader than other types
Type, then terminal can be prioritized the reference signal type sent in most wide coverage area, and by the way that the reference signal is used only
Type calculates cell typical value.
Alternatively, if observing and measuring the reference signal class sent in coverage area more smaller than other types
Type, then terminal can be prioritized the reference signal type sent in smallest coverage, and by the way that the reference signal is used only
Type calculates cell typical value.
In another embodiment, terminal can be propped up by Jin Shiyong by different base station (that is, serving BS and target BS)
The reference signal held manages mobility.
It is determined accordingly in addition, base station can send some signal and participate in (configuration) to allow terminal to select specific type
Reference signal.
Figure 18 and Figure 19 show it is according to an embodiment of the present disclosure be transmitted by the base station to terminal and for calculate cell survey
The example of the signal of magnitude.
With reference to Figure 18, the signal for being transmitted by the base station to terminal may include preferred reference signal Class1 810 and about passing through
The information 1820 of the method for cell typical value is determined using reference signal.For example, the information 1820 may include being used to determine
The quantity (for example, 1, K, whole) of the wave beam of cell typical value, instruction are for selecting the index of the method for wave beam (for example, being choosing
Select any wave beam or optimum beam), the type of equation for calculating cell typical value is (for example, summation, average and right
K different wave beams are weighted summation with different weights) etc..
The index about the method for calculating cell typical value can be known in advance in base station and terminal, such as following table 9
It is shown.In the case where weighted sum, base station should send corresponding weight, as shown in figure 20.
The derivation index that [table 9] is used in the base station transmission signal by terminal measurement cell typical value (is surveyed for cell-level
The derivation of amount indexes)
[table 9]
Derivation method | Index |
Summation | 0 |
It is average | 1 |
Weighted sum | 2 |
With reference to Figure 19, alternatively, the signal for being transmitted by the base station to terminal may include the rope of preferred reference signal type
Draw 1910,1920 and 1930 and about the method that cell typical value is determined by using reference signal information 1940,1950
With 1960.For example, the information 1820 may include being used to determine the quantity of the wave beam of cell typical value (for example, 1, K, complete
Portion), instruction is for selecting the index (for example, being any wave beam of selection or optimum beam), small for calculating of the method for wave beam
The type of the equation of area's typical value is (for example, summing, being averaged and be weighted to K different wave beams with different weights and asked
With) etc..The index of each reference signal type can be known in advance in base station and terminal, as shown in Table 10 below.
[table 10] is used for reference signal index (the RS rope for cell-level measurement by terminal UE measurement cell typical value
Draw)
It includes in a part of some RRC information, as media access control that the information, which can be used as information element,
(medium access control, MAC) control element (control element, CE) includes the one of some MAC message
It is included in some PHY message in part or as physics (PHY) element.
Figure 20 is to show the example according to an embodiment of the present disclosure including being transmitted by the base station to the signal of the weight of terminal
Figure.
With reference to Figure 20, signal may include preferred reference signal type 2010, the quantity 2020 of wave beam to be used and
About the information for determining the method 2030 of cell typical value.Furthermore, it is possible to further comprise above in Figure 18 and Figure 19
Any information of description.In addition, if the method for determining cell typical value is weighted average or weighted sum, then base station can
To send terminal for each weight 2040.
Figure 21 shows terminal according to an embodiment of the present disclosure and calculates each RS from different RS by individual process
The figure of the method for cell typical value.
With reference to Figure 21, terminal can calculate the cell typical value of each RS by individual process, without mixing or selecting
It selects from the received different beams metrical information of different type RS.In this case, the filtering of different type RS and cell represent
Being worth calculation equation can be identical or different.
If different filtering and cell typical value calculation equation are used for different types of RS, base station can be by the information
Terminal is sent to execute filtering and cell typical value and calculate.
Figure 22 is to show according to an embodiment of the present disclosure to control mobility by using different types of reference signal
Change method figure.
With reference to Figure 22, UE (that is, terminal) can be in the measurement result of operation S2210 report reference signal Class1.
Based on measurement result, gNB (that is, base station) can determine the need for sending reference signal type in operation S2220
2。
If it is determined that needing to send reference signal type 2, then gNB can send reference signal type 2 in operation S2230
To UE.Then, it can receive the measurement result of reference signal type 2 in operation S2240, gNB.
Movement is determined the need for based on measurement result in operation S2250, gNB and sexually revises (transfer etc.).If necessary,
GNB can be sexually revised in operation S2260 request or instruction movement.
At this point, gNB can be according to the above method or the method that will be described below by using passing through different types of ginseng
The value of signal measurement is examined to determine cell typical value, movement is then determined the need for by using typical value and is sexually revised.
Figure 23 to Figure 28 shows various embodiments according to various embodiments of the present disclosure, wherein with optimum performance
Sequence is the wave beam measuring signal that different types of reference signal (RS) selects different number (N1, N2 ..., Nk), is then passed through
Selected signal is exported into cell typical value multiplied by different weights.The weight can be positive number or negative, and can be big
In or less than 1.
With reference to Figure 23, the typical value 2310 for calculating each RS by separate processes for different types of RS is shown
The method of a cell typical value is determined with 2320, then by using above-mentioned typical value.With reference to Figure 23, UE can pass through by
Cell typical value is determined multiplied by weight for each RS measured value determined.
With reference to Figure 24, show each wave beam measuring signal for the RS for same type multiplied by equal weight
2410, the method for cell typical value 2420 is then determined.On the other hand, for different types of RS, different power can be applied
Weight (weight 1 and weight 2).However, weight 1 and weight 2 can be identical value.
With reference to Figure 25, show for selecting certain amount of wave beam measuring signal for different types of RS, will be each
The typical value of RS is multiplied by weight, the method to export cell typical value.With reference to Figure 25, UE can be respectively additional RS and free time
Mode RS selects N1 optimum beam 2510 and N2 optimum beam 2520, then determines 2530 He of typical value of each RS
2540.In addition, UE can be by calculating cell typical value 2550 applied to the typical value of each RS for weight.
With reference to Figure 26, show for for different types of RS select certain amount of wave beam measuring signal, pass through by
Each selected wave beam measuring signal calculates the typical value of each RS type multiplied by weight and by by the generation of each RS type
The method that tabular value exports cell typical value multiplied by weight.In this case, the weight applied to each wave beam measuring signal can
With different from each other or equal.
It is respectively that additional RS and idle mode RS selects N1 optimum beam 2610 and N2 optimum beam with reference to Figure 26, UE
2620, each selected wave beam measuring signal is determined into typical value multiplied by corresponding weight 2630 or 2640, and for each RS type
2650 or 2660.Then, UE can calculate cell typical value 2670 by the way that weight to be applied to the typical value of each RS type.
Figure 27 is shown according to the embodiment of the present disclosure for surveying for the wave beam of different types of RS selection different number
Amount signal and then the another method by the way that selected signal to be exported to cell typical value multiplied by different weights.
With reference to Figure 27, UE can be respectively that additional RS and idle mode RS selects N1 optimum beam 2710 and N2 a best
Wave beam 2720, and by each selected wave beam measuring signal multiplied by corresponding weight 2730 or 2740.Then, using this as a result,
UE can calculate cell typical value 2770.In this case, the weight applied to each wave beam measuring signal can be different from each other
Or it is equal.
Figure 28 is to show according to an embodiment of the present disclosure be used for by measuring all wave beams for different types of RS
Signal exports the figure of the method for cell typical value multiplied by different weights.
With reference to Figure 28, UE can multiply each of all wave beam measuring signals for being used to add RS and idle mode RS
With corresponding weight 2810 or 2820.Then, using this as a result, UE can calculate cell typical value 2830.In this case, it answers
Weight for each wave beam measuring signal can be different from each other or equal.
Figure 29 is to show according to an embodiment of the present disclosure to control mobility by using different types of reference signal
The figure of the method for change.
With reference to Figure 29, UE can be received in operation S2910 and S2920 from each of the first gNB and the 2nd base station gNB
Then reference signal Class1 is reported measurement result to the first gNB in operation S2930.
Based on measurement result, the first gNB can determine the need for sending reference signal type 2 in operation S2940.If
It is determine that it is necessary to then reference signal type 2 can be requested to the 2nd gNB in operation S2950, the first gNB.
Therefore, it can be appreciated that the necessity for sending reference signal type 2 in operation S2960, the 2nd gNB.Then, it is grasping
Make S2970 and S2975, each of the first gNB and the 2nd gNB can send UE for reference signal type 2.Therefore, UE
The first gNB can be sent by the measurement result of reference signal type 2 in operation S2980.Then, operation S2985, first
GNB can determine the need for changing mobility based on measurement result.If necessary, the first gNB can operate S2990 to UE
It sends for the mobile request or instruction sexually revised.
<using the measurement report trigger event of the measured value of different RS>
[event NR1]
[event NR2]
Following table is divided into several pages, shows the description of event NR3.
[event NR3]
[event NR4]
Following table is divided into several pages, shows the description of event NR5.
[event NR5]
Following table is divided into several pages, shows the description of event NR6.
[event NR6]
Following table is divided into several pages, shows the description of event NR7.
[event NR7]
Figure 30 is the figure for showing terminal according to an embodiment of the present disclosure.
With reference to Figure 30, terminal 3000 may include transceiver 3010 and the controller for sending and receiving signal
3030。
Terminal 3000 can be sent and/or be received signal, information, message etc. by transceiver 3010.For example, when illustrating
When defining controller in book, it may be said that " controller can be circuit, specific integrated circuit or at least one processor ".
Controller 3030 can control the integrated operation of terminal 3000.Controller 3030 may include at least one processing
Device.Controller 3030 can control the operation of the terminal described in embodiment of the disclosure.For example, controller 3030 can be controlled
Make the signal stream in above-mentioned flow chart.
Figure 31 is the figure for showing base station according to an embodiment of the present disclosure.
With reference to Figure 31, base station 3100 may include transceiver 3110 and the controller for sending and receiving signal
3130.For example, when being defined in controller, it may be said that " controller can be circuit, specific integrated circuit or at least
One processor ".
Base station 3100 can be sent and/or be received signal, information, message etc. by transceiver 3110.
Controller 3130 can control the integrated operation of base station 3100.Controller 3130 may include at least one processing
Device.Controller 3130 can control the operation of the base station described in embodiment of the disclosure.For example, controller 3130 can be controlled
Make the signal stream in above-mentioned flow chart.
<3rd embodiment>
Meanwhile in the reference signal (hereinafter referred to idle mode RS) for both idle mode UE and connection mode UE
In the case where coexisting with the reference signal (hereinafter referred to connection mode RS) for being only used for connection mode UE, UE can pass through the free time
Mode RS executes RRM measurement, and then (a) requests connection mode RS in reasonable time, or (b) when gNB is in reasonable time
When sending connection mode RS, connection mode RS measurement result is reported to gNB.Present disclose provides relevant operations.
Figure 32 is to show the flow chart according to an embodiment of the present disclosure for being initially accessed operation.
With reference to Figure 32, in RRC connection establishment process, the present disclosure proposes a kind of methods, about (a) when UE requests gNB
When sending connection mode RS, (b) when gNB sends connection mode RS, and (c) when the connection mode RS that gNB is UE measures report
When accusing distribution resource.The operation that the disclosure proposes is based on Figure 32.
That is, random access procedure shown in the operation S3210 to S3260 based on Figure 32 and RRC connection procedure,
UE can request to send connection mode RS, and gNB can send connection mode RS and report for the connection mode RS of UE measurement
Accuse distribution resource.Details will be described below.
<request connection mode RS>
GNB can be requested to send connection mould by leading classification when sending random access preamble in operation S3220, UE
Formula RS.
For this purpose, random access preamble is classified as two groups.If UE sends the random access preamble for belonging to a group,
GNB learns the request to connection mode RS.If UE transmission belongs to another group of random access preamble, gNB learns not right
The request of connection mode RS.
In the case where requesting connection mode RS, UE continuously executes physical downlink control channel (PDCCH) blind
Decoding is to know about the resource for sending connection mode RS by gNB and for sending correlation measurements report by UE
The distribution information of resource.
Alternatively, when operating S3240 transmission RRC connection request message, UE can will be indicated in above-mentioned message
The bit for sending the request of connection mode RS is set as 1, to request gNB to send connection mode RS.
If corresponding bit, which is arranged to 0, gNB, learns that UE does not request to send connection mode RS.
Alternatively, when operate S3260 send RRC connection setup complete message when, UE can in above-mentioned message incite somebody to action
Indicate that the bit for sending the request of connection mode RS is set as 1, to request gNB to send connection mode RS.
<distribution of connection mode RS resource>
When operating S3230 transmission accidental access response message, gNB is distributed in above-mentioned message for sending connection mould
The resource of formula RS.
Alternatively, when operation S3250 sends RRC connection and establishes message, gNB is distributed in above-mentioned message for sending out
Send the resource of connection mode RS.
Here, the resource of distribution is time/frequency resource, and resource block index can be expressed as etc..
Alternatively, gNB is distributed by individual signal (for example, PDCCH down link control information (DCI)) for sending out
Send the resource of connection mode RS.
<distribution of connection mode RS measurement feedback resource>
When operating S3230 transmission accidental access response message, gNB is distributed in above-mentioned message for reporting connection mould
The resource of formula RS measurement result.
Alternatively, when operation S3250 sends RRC connection and establishes message, gNB is distributed in above-mentioned message for reporting
Accuse the resource of connection mode RS measurement result.
Alternatively, gNB is distributed by individual signal (for example, PDCCH DCI) for reporting that connection mode RS is measured
As a result resource.
<feedback of connection mode RS measurement result>
When operating S3240 transmission RRC connection request message, UE can be inserted into above-mentioned message about connection mode
The information of RS measurement result.
Here, connection mode RS measurement result includes N number of with highest signal strength after connection mode RS measurement
Beam index and corresponding signal strength (RSRP or RSRQ).Here, N can be arranged by gNB by RRC information etc..
Alternatively, when operating S3260 transmission RRC connection setup complete message, UE can be surveyed connection mode RS
Result information is measured to be inserted into above-mentioned message.
Alternatively, UE is by individual signal, for example, physical uplink control channel (PUCCH), physical uplink chain
Channel (PUSCH) etc. is shared on road, sends gNB for the mode RS measurement result information of connection.
Figure 33 is the flow chart for showing turning-over operation according to an embodiment of the present disclosure.
Referring to Figure 33, in hand-over, the present disclosure proposes a kind of methods, about (a) when UE request gNB sends connection
When mode RS, (b) when gNB sends connection mode RS, and (c) when gNB distribution is used for the connection mode RS measurement report of UE
Resource when.The operation that the disclosure proposes is based on Figure 33.
That is, hand-over shown in the S3310 to S3370 based on Figure 33, UE can request to send connection mode
RS, and gNB can send connection mode RS and distribute resource for the connection mode RS measurement report of UE.Details will retouch below
It states.
<request connection mode RS>
When operating S3320 transmission measurement report, UE will indicate to send the request of connection mode RS in above-mentioned message
Bit be set as 1, so as to request gNB send connection mode RS.It can initiate to move in operation S3330, source gNB and target gNB
It hands over and requests and respond.
Alternatively, when operating S3350 transmission random access preamble, UE requests gNB to send by leading classification
Connection mode RS.
Alternatively, when operation S3370 sends RRC connection reconfiguration and sets completion message, UE will refer in above-mentioned message
Show that the bit for the request for sending connection mode RS is set as 1, to request gNB to send connection mode RS.
<distribution of connection mode RS resource>
When operation S3340 sends RRC connection reconfiguration and sets (or mobility control information or handover commands) message, gNB
The resource for sending connection mode RS is distributed in above-mentioned message.
Alternatively, when operating S3360 transmission accidental access response message, gNB is distributed in above-mentioned message and is used for
Send the resource of connection mode RS.
Alternatively, gNB distributes the money for sending connection mode RS by individual signal (for example, PDCCH DCI)
Source.
<distribution of connection mode RS measurement feedback resource>
When operation S3340 sends RRC connection reconfiguration and sets (or mobility control information or handover commands) message, gNB
The resource for reporting connection mode RS measurement result is distributed in above-mentioned message.
Alternatively, when operating S3360 transmission accidental access response message, gNB is distributed in above-mentioned message and is used for
Report the connection mode RS resource of operation measurement result.
Alternatively, gNB is distributed by individual signal (for example, PDCCH DCI) for reporting that connection mode RS is measured
As a result resource.
<feedback of connection mode RS measurement result>
When operation S3370 sends RRC connection reconfiguration and sets completion message, UE inserts connection mode RS measurement result information
Enter in above-mentioned message.
Alternatively, UE is via individual signal (for example, PUCCH, PUSCH etc.) by connection mode RS measurement result information
It is sent to gNB.
According to another example, the operation that the disclosure proposes is based on Figure 34.
Figure 34 is the flow chart for showing operation according to an embodiment of the present disclosure.
With reference to Figure 34, can be connect with request source gNB from target gNB in the operation S3410, UE for sending RRC connection foundation request
It absorbs and adds RS.Source gNB can send the request dispatched for additional RS to target gNB in operation S3420, and can operate
S3430 receives response.It establishes and requests accordingly, in response to RRC connection, source gNB can send response to UE in operation S3440 and disappear
Breath.Message may include the scheduling information for additional RS.At this point, additional RS may refer to such as CSI-RS.
Therefore, UE can receive RS from source gNB and target gNB in operation S3450 and S3460.
The present disclosure contemplates the systems that gNB is used together synchronization signal (SS) and CSI-RS.Here, SS may include main same
Walk signal (primary synchronization signal, PSS) and secondary synchronization signal (secondary
Synchronization signal, SSS).In addition, SS can correspond to cell signal specific, and CSI-RS can be it is small
Area's signal specific, UE signal specific or UE group signal specific.
GNB is initially accessed the present disclosure contemplates UE or is executed from the case where the transfer of service gNB to target gNB.In addition, this
It is open to consider the case where gNB is using SS signal when determining that UE is to execute to be initially accessed or transfer.
In this case, the present disclosure proposes to be promptly used for from the gNB of initial access or handover target gNB reception
The UE of the distribution of the wave beam of data communication is operated.In general, the wave beam for sending SS can be relatively wide wave beam, to reduce wave beam
Time needed for scanning or any other reason.However, for sending CSI-RS or the wave beam of data can be relatively narrow wave
Beam, to obtain high beam forming gain.Therefore, it is to execute that gNB or UE can be determined by the SS sent in broad beam
It is initially accessed or transfers, and UE can will be used to count by receiving CSI-RS from the gNB or target gNB accessed to identify
According to the narrow beam of communication.
In addition, what SS can be considered as sending always is always on because not knowing when UE will access gNB
(always-on) signal.Be always on signal however, CSI-RS can be or be not, depending on transmit needed for time and
The expense of frequency resource.The disclosure assumes that SS is to be always on signal and CSI-RS is not to be always on signal.That is false
If gNB may determine whether to send CSI-RS.
The disclosure assumes that SS is sent by relatively wide wave beam, and CSI-RS is sent by relatively narrow wave beam.It can be with
It is established according to the antenna pattern of gNB for the broad beam of SS transmission and is closed for the mapping between the narrow beam of CSI-RS transmission
System.Disclosure hypothesis establishes this relationship.Example is as shown in the table.
[table 11]
The hypothesis considered in the disclosure is as above.However, the present disclosure is not limited to the above contents, and can make together wherein
Summarized in the case where the initial access and transfer in the system of two kinds of RS.
Figure 35 to Figure 41 be show according to the embodiment of the present disclosure sent for data in hand-over for determining and
The flow chart of the various methods of received wave beam;
With reference to Figure 35, the operation of the disclosure will be described in the case where UE is executed from the transfer of service gNB to target gNB.
1. referring to Figure 35, service gNB provides measurement configuration information to UE in operation S3510.
A. here, measurement configuration information includes frequency, the measurement report trigger condition etc. to be measured by UE.
2.UE executes measurement based on from service gNB received measurement configuration information.
A. here, signal strength or quality of the UE measurement from the service gNB and target gNB SS sent.
B. in the disclosure, it is assumed that each gNB sends SS while multiple wave beams that scanning is pointed in different directions.Cause
This, UE can distinguish the SS sent by different beams by time for receiving SS and frequency resource.
3. if detect that the signal strength of target gNB is greater than service by the comparison of signal strength in operation S3520
Any event of the signal strength of gNB then sends service gNB for measurement report in operation S3540, UE.
A. in order to send measurement report, UE can send to service gNB in operation S3530 and receive scheduling from service gNB
Request (scheduling request, SR), buffer state reports (buffer status report, BSR), uplink
(UL) authorization etc..
Although B. for example describing A3 event, identical principle can be applied to other events.
4. service gNB sends Handoff Request to target gNB in operation S3550 to hold when receiving measurement report from UE
Row admission control.
A. if target gNB can receive UE, target gNB sends to service gNB in operation S3550 and is directed to Handoff Request
Confirmation (ACK), and information needed for UE access target gNB is provided.
The information needed for B.UE access target gNB includes for the dedicated random of UE and target gNB simultaneous uplink
Access lead (random access preamble, RAP), and between UE and target gNB data send/it is received
Necessary C-RNTI.
5. handover commands are sent to UE in operation S3560, service gNB, with information needed for providing UE access target gNB.
Here, handover commands may include by Handoff Request ACK from the received dedicated RAP and C-RNTI of target gNB.
6. UE sends target gNB for RAP in operation S3570 based on the information for including in handover commands.
A. this be UE be used to control for execute and the transmission (TX) that transmits/receives of the uplink of target gNB periodically and
The operation of power.
7. target gNB sends random access response (random to UE in operation S3580 after receiving RAP from UE
Access response, RAR).
A. after receiving RAP, target gNB notifies TX periodically and power adjustment rank by RAR to UE, and if
It needs, request UE sends RAP again.After the uplink synchronisation, target gNB is in operation S3580 distribution uplink (UL)
Authorization allows UE to send transfer confirmation.
8. the UE with uplink synchronisation is in operation S3590 reception RAR and by including that the UL authorization in RAR will move
Confirmation is handed over to be sent to target gNB.
A. in this way, UE completes the transfer from service gNB to target gNB.
Above-mentioned turning-over operation is designed for gNB using only the case where a RS.This is not suitable for examining in the disclosure
The case where worry, that is, determine whether that executing transfer is based on the SS sent in broad beam but real data transmission/reception use
The case where narrow beam.It is not applicable be completed because while transferring, but UE still can not determination to be used to send to target gNB data and
The narrow beam of data is received from target gNB.
In the disclosure, UE determines whether to execute transfer by measuring the SS sent in broad beam, is then transferring
Measurement to the CSI-RS sent on narrow beam is executed during process, so as to find as early as possible to be used together with target gNB it is narrow
Wave beam.Hereinafter, various embodiments will be described.
[transfer: proposing 1]
With reference to Figure 36, by the embodiment of description [transfer: proposing 1].
1. providing measurement configuration information to UE in operation S3610, service gNB.
2.UE executes measurement based on from service gNB received measurement configuration information.
A. here, signal strength or quality of the UE measurement from the service gNB and target gNB SS sent.
3. if detecting that the signal strength of target gNB is greater than service gNB by the comparison of signal strength in operation S3620
Signal strength any event, then operation S3640, UE by measurement report be sent to service gNB.
4. service gNB sends Handoff Request to target gNB in operation S3650 to hold when receiving measurement report from UE
Row admission control.
5. handover commands are sent to UE in operation S3660, service gNB, with information needed for providing UE access target gNB.
6. UE sends target gNB for RAP in operation S3670 based on the information for including in handover commands.
Here, target gNB can receive the RAP of UE while scanning the broad beam for sending SS.In such case
Under, target gNB storage is for receiving the broad beam of the RAP of UE and using it in next step.If target gNB passes through multiple width
Wave beam receives the RAP of UE, then target gNB storage has the broad beam of highest signal strength and uses it in next step.
7. target gNB sends RAR to UE in operation S3680 after receiving RAP from UE.
A. after receiving RAP, target gNB notifies TX periodically and power adjustment rank by RAR to UE, and if
It needs, request UE sends RAP again.After the uplink synchronisation, target gNB distributes UL authorization, and UE is sent
Transfer confirmation.
B. in addition, in the disclosure, CSI-RS configuration information 3600 and RAR are sent collectively to UE by target gNB.It will be whole
The details of CSI-RS configuration information is described after a operation description.
8. target gNB is sent in operation S3690 by multiple narrow beams corresponding with the broad beam for receiving RAP
CSI-RS。
9. being based on CSI-RS configuration information, UE measures the signal strength or quality for the CSI-RS that target gNB is sent.
10. operation S3691, with uplink synchronisation UE receive RAR and by include in RAR UL authorization will
It transfers confirmation and is sent to target gNB.
A. when sending transfer confirmation, UE also sends the feedback 3601 of the measurement result for CSI-RS.At this point, UE is utilized
The UL authorization for including in RAR.
In this way, UE completes the transfer from service gNB to target gNB.
11. the CSI-RS based on UE is fed back, target gNB operation S3692 selection will by narrow beam that UE is used and by its
It notifies to UE.
In the disclosure, target gNB provides CSI-RS configuration information to UE.CSI-RS used in LTE is similarly to match
Confidence breath.In addition, target gNB needs to notify the beam information for sending CSI-RS to UE.Therefore, target gNB can be
Insertion is for receiving the SS beam information of RAP in CSI-RS configuration information, or corresponding CSI-RS beam information can be inserted.
Table 11 and following table 12 show the example of CSI-RS configuration information comprising antenna port information, time and frequency resource
Information, sub-frame information, power information, the wide SS beam information for receiving RAP, the narrow SS wave beam letter that be used to send CSI-RS
Breath, CSI-RS transmission period and CSI-RS configure effective time.
[table 12]
Following table 13 to table 16 is shown for determining the CSI-RS in CSI-RS configuration information used in the disclosure
Transmission cycle, offset and resource location method.It can determine that CSI-RS is passed according to CSI-RS configuration information and below table
Defeated period, offset, resource location and power information (p-C).
[table 13] CSI reference signal sub-frame configuration
[table 14] is for normal cyclic prefix from CSI reference signal configuration to the mapping of (k', l')
Note: ns'=nsmod 2.The configuration 0-19 of normal sub-frames can be used for frame structure Class1,2 and 3.Configure 20-31
Configuration with special subframe can only be used to frame structure type 2.
[table 15] is for extended cyclic prefix slave CSI reference signal configuration to the mapping of (k', l').
Note: ns'=nsmod 2.The configuration 0-15 of normal sub-frames can be used for frame structure Class1 and type 2.Configure 16-
27 and the configuration of special subframe can only be used to frame structure type 2.
[table 16]
In addition, in the disclosure, the feedback 3601 of the measurement result for CSI-RS is sent target gNB by UE.Below
Table 17 show the feedback content of UE.
[table 17]
[transfer: proposing 2]
With reference to Figure 37, by the embodiment of description [transfer: proposing 2].
1. providing measurement configuration information to UE in operation S3710, service gNB.
2.UE executes measurement based on from service gNB received measurement configuration information.
A. here, signal strength or quality of the UE measurement from the service gNB and target gNB SS sent.
3. if detect that the signal strength of target gNB is greater than service gNB by the comparison of signal strength in operation S3720
Signal strength any event, then operation S3740, UE by measurement report be sent to service gNB.
4. service gNB sends Handoff Request to target gNB in operation S3750 to hold when receiving measurement report from UE
Row admission control.
5. handover commands are sent to UE in operation S3760, service gNB, with information needed for providing UE access target gNB.
6. UE sends target gNB for RAP in operation S3770 based on the information for including in handover commands.
Here, target gNB can receive the RAP of UE while scanning the broad beam for sending SS.In such case
Under, target gNB storage is for receiving the broad beam of the RAP of UE and using it in next step.If target gNB passes through multiple width
Wave beam receives the RAP of UE, then target gNB storage has the broad beam of highest signal strength and uses it in next step.
7. sending UE for RAR in operation S3780, target gNB after receiving RAP from UE.
A. after receiving RAP, target gNB notifies TX periodically and power adjustment rank by RAR to UE, and if
It needs, request UE sends RAP again.After the uplink synchronisation, target gNB distributes UL authorization, and UE is sent
Transfer confirmation.
B. in addition, in the disclosure, CSI-RS configuration information 3700 and RAR are sent collectively to UE by target gNB.CSI-RS
The details of configuration information is as described above.
8. target gNB is sent in operation S3790 by multiple narrow beams corresponding with the broad beam for receiving RAP
CSI-RS。
9. being based on CSI-RS configuration information, UE measures the signal strength or quality for the CSI-RS that target gNB is sent.
10. with uplink synchronisation UE operation S3791 receive RAR and by include in RAR UL authorization will
It transfers confirmation and is sent to target gNB.
A. in this way, UE completes the transfer from service gNB to target gNB.
11. the UL authorization in operation S3792, target gNB to UE distribution for the feedback of CSI-RS measurement result.
12. using distributed UL to authorize in operation S3793, UE, sending target for the feedback of CSI-RS measurement result
gNB。
13. the CSI-RS based on UE is fed back, target gNB operation S3794 selection will by narrow beam that UE is used and by its
It notifies to UE.
[transfer: proposing 3]
Referring to Figure 38, by the embodiment of description [transfer: proposing 3].
1. providing measurement configuration information to UE in operation S3810, service gNB.
2.UE executes measurement based on from service gNB received measurement configuration information.
A. here, signal strength or quality of the UE measurement from the service gNB and target gNB SS sent.
3. if detect that the signal strength of target gNB is greater than service gNB by the comparison of signal strength in operation S3820
Signal strength any event, then operation S3840, UE by measurement report be sent to service gNB.
4. service gNB sends Handoff Request to target gNB in operation S3850 to hold when receiving measurement report from UE
Row admission control.
A. in the disclosure, service gNB will include that information in measurement report is transmitted to target gNB.The information includes
The SS beam index and corresponding signal strength of the target gNB of UE measurement.
B. in addition, target gNB determines that CSI-RS is configured based on from the service received measurement report of gNB, then pass through transfer
Request ACK passes it to service gNB.
5. handover commands are sent to UE in operation S3860, service gNB, with information needed for providing UE access target gNB.
A. in addition, in the disclosure, CSI-RS configuration information 3800 and handover commands are sent collectively to UE by service gNB.
The details of CSI-RS configuration information is as described above.
6. UE sends target gNB for RAP in operation S3870 based on the information for including in handover commands.
Here, target gNB can receive the RAP of UE while scanning the broad beam for sending SS.In such case
Under, target gNB storage is for receiving the broad beam of the RAP of UE and using it in next step.If target gNB passes through multiple width
Wave beam receives the RAP of UE, then target gNB storage has the broad beam of highest signal strength and uses it in next step.
7. target gNB sends RAR to UE in operation S3880 after receiving RAP from UE.
A. after receiving RAP, target gNB notifies TX periodically and power adjustment rank by RAR to UE, and if
It needs, request UE sends RAP again.After the uplink synchronisation, target gNB distributes UL authorization, and UE is sent
Transfer confirmation.
B. in addition, in the disclosure, CSI-RS configuration information 3600 and RAR are sent collectively to UE by target gNB.It will be whole
The details of CSI-RS configuration information is described after a operation description.
8. target gNB is sent in operation S3890 by multiple narrow beams corresponding with the broad beam for receiving RAP
CSI-RS。
9. being based on CSI-RS configuration information, UE measures the signal strength or quality for the CSI-RS that target gNB is sent.
10. with uplink synchronisation UE operation S3891 receive RAR and by include in RAR UL authorization will
It transfers confirmation and is sent to target gNB.
A. when sending transfer confirmation, UE also sends the feedback 3801 of the measurement result for CSI-RS.At this point, UE is utilized
The UL authorization for including in RAR.
In this way, UE completes the transfer from service gNB to target gNB.
11. the CSI-RS based on UE is fed back, target gNB operation S3892 selection will by narrow beam that UE is used and by its
It notifies to UE.
[transfer: proposing 4]
With reference to Figure 39, by the embodiment of description [transfer: proposing 4].
1. providing measurement configuration information to UE in operation S3910, service gNB.
2.UE executes measurement based on from service gNB received measurement configuration information.
A. here, signal strength or quality of the UE measurement from the service gNB and target gNB SS sent.
3. if detect that the signal strength of target gNB is greater than service gNB by the comparison of signal strength in operation S3920
Signal strength up to one offset any event, then operation S3940, UE by measurement report be sent to service gNB.
4. service gNB sends Handoff Request to target gNB in operation S3950 to hold when receiving measurement report from UE
Row admission control.
A. in the disclosure, service gNB will include that information in measurement report is transmitted to target gNB.The information includes
The SS beam index and corresponding signal strength of the target gNB of UE measurement.
B. in addition, target gNB determines that CSI-RS is configured based on from the service received measurement report of gNB, then pass through transfer
Request ACK passes it to service gNB.
5. handover commands are sent to UE in operation S3960, service gNB, with information needed for providing UE access target gNB.
A. in addition, in the disclosure, CSI-RS configuration information 3900 and handover commands are sent collectively to UE by service gNB.
The details of CSI-RS configuration information is as described above.
6. target gNB operation S3970 by with measure by UE and be comprised in measurement report with highest signal
The corresponding multiple narrow beams of the broad beam of intensity send CSI-RS.
7. being based on CSI-RS configuration information, UE measures the signal strength or quality for the CSI-RS that target gNB is sent.
8. UE sends target gNB for RAP in operation S3980 based on the information for including in handover commands.
9. target gNB sends UE for RAR in operation S3990 after receiving RAP from UE.
A. after receiving RAP, target gNB notifies TX periodically and power adjustment rank by RAR to UE, and if
It needs, request UE sends RAP again.After the uplink synchronisation, target gNB distributes UL authorization, and UE is sent
Transfer confirmation.
10. with uplink synchronisation UE operation S3991 receive RAR and by include in RAR UL authorization will
It transfers confirmation and is sent to target gNB.
A. when sending transfer confirmation, UE also sends the feedback 3901 of the measurement result for CSI-RS.At this point, UE is utilized
The UL authorization for including in RAR.
In this way, UE completes the transfer from service gNB to target gNB.
11. the CSI-RS based on UE is fed back, target gNB operation S3992 selection will by narrow beam that UE is used and by its
It notifies to UE.
[transfer: proposing 5]
With reference to Figure 40, by the embodiment of description [transfer: proposing 5].
1. providing measurement configuration information to UE in operation S4010, service gNB.
2.UE executes measurement based on from service gNB received measurement configuration information.
A. here, signal strength or quality of the UE measurement from the service gNB and target gNB SS sent.
3. if detect that the signal strength of target gNB is greater than service gNB by the comparison of signal strength in operation S4020
Signal strength up to one offset any event, then operation S4040, UE by measurement report be sent to service gNB.
4. sending Handoff Request to target gNB in operation S4050, service gNB when receiving measurement report from UE to hold
Row admission control.
A. in the disclosure, service gNB will include that information in measurement report is transmitted to target gNB.The information includes
The SS beam index and corresponding signal strength of the target gNB of UE measurement.
B. in addition, target gNB determines that CSI-RS is configured based on from the service received measurement report of gNB, then pass through transfer
Request ACK passes it to service gNB.
5. handover commands are sent to UE in operation S4060, service gNB, with information needed for providing UE access target gNB.
A. in addition, in the disclosure, CSI-RS configuration information 4000 and handover commands are sent collectively to UE by service gNB.
The details of CSI-RS configuration information is as described above.
6. UE sends target gNB for RAP in operation S4070 based on the information for including in handover commands.
Here, target gNB can receive the RAP of UE while scanning the broad beam for sending SS.In such case
Under, target gNB storage is for receiving the broad beam of the RAP of UE and using it in next step.If target gNB passes through multiple width
Wave beam receives the RAP of UE, then target gNB storage has the broad beam of highest signal strength and uses it in next step.
7. sending UE for RAR in operation S4080, target gNB after receiving RAP from UE.
A. after receiving RAP, target gNB notifies TX periodically and power adjustment rank by RAR to UE, and if
It needs, request UE sends RAP again.After the uplink synchronisation, target gNB distributes UL authorization, and UE is sent
Transfer confirmation.
B. in addition, in the disclosure, RAR includes the indicator 4001 for being used to indicate UE and carrying out CSI-RS measurement.
8. if include that CSI-RS measurement instruction indicator in RAR is arranged to 1, target gNB is in operation S4090
CSI-RS is sent by multiple narrow beams corresponding with the broad beam for receiving RAP.
A. if including that CSI-RS measurement instruction indicator in RAR is arranged to 0, target gNB does not send CSI-
RS。
9. in addition, being based on if the CSI-RS measurement instruction indicator for including in RAR is arranged to 1, UE and transferring life
The CSI-RS configuration information sent together is enabled to measure by the signal strength or quality of the target gNB CSI-RS sent.
A. it is not executed and CSI-RS measurement if the CSI-RS measurement instruction indicator for including in RAR is arranged to 0, UE
Related operation, because target gNB does not send CSI-RS.
10. with uplink synchronisation UE operation S4091 receive RAR and by include in RAR UL authorization will
It transfers confirmation and is sent to target gNB.
A. when sending transfer confirmation, UE also sends the feedback 4002 of the measurement result for CSI-RS.At this point, UE is utilized
The UL authorization for including in RAR.
B. in this way, UE completes the transfer from service gNB to target gNB.
11. the CSI-RS based on UE is fed back, target gNB operation S4092 selection will by narrow beam that UE is used and by its
It notifies to UE.
[transfer: proposing 6]
With reference to Figure 41, by the embodiment of description [transfer: proposing 6].
1. providing measurement configuration information to UE in operation S4110, service gNB.
2.UE executes measurement based on from service gNB received measurement configuration information.
A. here, signal strength or quality of the UE measurement from the service gNB and target gNB SS sent.
3. if detect that the signal strength of target gNB is greater than service gNB by the comparison of signal strength in operation S4120
Signal strength up to one offset any event, then operation S4140, UE by measurement report be sent to service gNB.
4. service gNB sends Handoff Request to target gNB in operation S4150 to hold when receiving measurement report from UE
Row admission control.
A. in the disclosure, service gNB will include that information in measurement report is transmitted to target gNB.The information includes
The SS beam index and corresponding signal strength of the target gNB of UE measurement.
B. in addition, target gNB determines that CSI-RS is configured based on from the service received measurement report of gNB, then pass through transfer
Request ACK passes it to service gNB.
5. handover commands are sent to UE in operation S4160, service gNB, with information needed for providing UE access target gNB.
A. in addition, in the disclosure, CSI-RS configuration information 4100 and handover commands are sent collectively to UE by service gNB.
The details of CSI-RS configuration information is as described above.
6. UE sends target gNB for RAP in operation S4170 based on the information for including in handover commands.
Here, target gNB can receive the RAP of UE while scanning the broad beam for sending SS.In such case
Under, target gNB storage is for receiving the broad beam of the RAP of UE and using it in next step.If target gNB passes through multiple width
Wave beam receives the RAP of UE, then target gNB storage has the broad beam of highest signal strength and uses it in next step.
7. sending UE for RAR in operation S4180, target gNB after receiving RAP from UE.
A. after receiving RAP, target gNB notifies TX periodically and power adjustment rank by RAR to UE, and if
It needs, request UE sends RAP again.After the uplink synchronisation, target gNB distributes UL authorization, and UE is sent
Transfer confirmation.
B. in addition, in the disclosure, using RAR, target gNB can indicate that UE is only measured and specify in CSI-RS configuration
The subset 4101 of CSI-RS transmission resource.
C. here, target gNB can be limited in the information for including in CSI-RS is configured by RAR and be sent CSI-RS
Antenna port, and by the limitation notification to UE.For example, even if four antenna ends of the CSI-RS configuration instruction being previously sent
Mouthful, target gNB can also will use only two antenna ports to UE notice by RAR and send CSI-RS.
D. in addition, even if M SS wave beam of the CSI-RS configuration instruction being previously sent or CSI-RS beam set, target gNB
CSI-RS can also will be sent only for a SS wave beam of N (< M) or CSI-RS beam set to UE notice by RAR.
E. in addition, even if the M resource block of CSI-RS configuration instruction being previously sent, target gNB can also be by RAR to UE
Notice will use only N (< M) a resource block to send CSI-RS.
F. in addition, target gNB can also pass through even if the CSI-RS configuration instruction M subframe being previously sent is as the period
RAR notifies that actually CSI-RS will be sent with the period of N (< M) a subframe to UE.
G. in the disclosure, CSI-RS configuration information is sent together with handover commands.At this point, target gNB is based on measurement report
The signal strength for the target gNB for including in announcement determines that CSI-RS is configured, and sends it to UE.However, UE is receiving shifting
It hands over and sends target gNB for uplink RAP after ordering, target gNB is more accurately identified opposite with SS wave beam
The CSI-RS beam set answered is with the transmission for CSI-RS.Therefore, in the disclosure, target gNB can be used CSI-RS and match
A part for the CSI-RS transmission resource for including in confidence breath, to send CSI-RS wave corresponding with RAP reception SS wave beam
Constriction closes.
8. target gNB is sent in operation S4190 by multiple narrow beams corresponding with the broad beam for receiving RAP
CSI-RS。
Here it is possible to be used only in a part for the CSI-RS transmission resource specified in CSI-RS configuration to send CSI-
RS, as indicated in RAR to UE.
9.UE is based on including CSI-RS subset information 4101 in RAR and the CSI-RS sent together with handover commands
Configuration information is measured by the signal strength or quality of the target gNB CSI-RS sent.
10. with uplink synchronisation UE operation S4191 receive RAR and by include in RAR UL authorization will
It transfers confirmation and is sent to target gNB.
A. when sending transfer confirmation, UE also sends the feedback 4102 of the measurement result for CSI-RS.At this point, UE is utilized
The UL authorization for including in RAR.
In this way, UE completes the transfer from service gNB to target gNB.
11. the CSI-RS based on UE is fed back, target gNB operation S4192 selection will by narrow beam that UE is used and by its
It notifies to UE.
Next, the operation that the disclosure will be described in the case where idle mode UE is initially accessed gNB.It is initially accessed operation
It is as follows.
[initial access]
Figure 42 is the flow chart for showing random access operation according to an embodiment of the present disclosure.
With reference to Figure 42, description is initially accessed operation.
1. UE measures each wave by the gNB SS sent by TX beam scanning when executing reception (RX) beam scanning
The signal strength or quality of beam.
2. UE is sent in operation S4210 to one or more gNB wave beams with maximum signal when measuring SS
RAP。
3., in operation S4220, gNB is by using the one or more with maximum signal when receiving RAP
RAR is sent UE by gNB wave beam.
A.RAR is authorized comprising UL, and UE is allowed to send RRC connection request.
4. UE is authorized by the inclusion of the UL in RAR in operation S4230 and is sent out RRC connection request after receiving RAR
It is sent to gNB.
5. gNB sends RRC connection to UE in operation S4240 and establishes after receiving RRC connection request from UE.
6. UE sends RRC connection to gNB in operation S4250 and establishes completion after receiving RRC connection foundation from gNB.
A. in this way, UE completes the initial access to gNB.
Because aforesaid operations are identical as initial access operation defined in LTE, retouching in detail to each message is omitted
It states.Initial access operation is designed to the case where gNB is using only a RS.This is not suitable for the feelings considered in the disclosure
Condition, that is, determine whether to execute be initially accessed be based on the SS sent in broad beam but real data transmission/reception use it is narrow
The case where wave beam.It is not applicable be completed because while being initially accessed, but UE can not still can determine that be used to send to gNB data and
The narrow beam of data is received from gNB.
In the disclosure, UE determines whether to execute initial access by measuring the SS sent in broad beam, then exists
The measurement to the CSI-RS sent on narrow beam is executed during initial access process, will be made together with gNB to find as early as possible
Narrow beam.Hereinafter, various embodiments will be described.
Figure 43 to Figure 47 is that the determination that is used for shown according to various embodiments of the present disclosure is used in the random access procedure
In the flow chart of the various methods of the wave beam of data transmission and reception.
[be initially accessed: proposing 1]
With reference to Figure 43, by the embodiment of description [be initially accessed: proposing 1].
1. when executing RX beam scanning, the letter of each wave beam for the SS that UE measurement is sent by gNB by TX beam scanning
Number intensity or quality.
2. UE is sent in operation S4310 to one or more gNB wave beams with maximum signal when measuring SS
RAP。
3., in operation S4320, gNB is by using the one or more with maximum signal when receiving RAP
RAR is sent UE by gNB wave beam.
A.RAR is authorized comprising UL, and UE is allowed to send RRC connection request.
B. in addition, in the disclosure, CSI-RS configuration information 4300 and RAR are sent collectively to UE.CSI-RS configuration information
Details it is as described above.
4.gNB operation S4330 by it is corresponding with the broad beam for receiving RAP or with for receiving RAP's
There are the corresponding multiple narrow beams of wave beam of maximum signal to send CSI-RS in broad beam.
5. being based on CSI-RS configuration information, UE measures the signal strength or quality by the gNB CSI-RS sent.
6. UE is authorized by the inclusion of the UL in RAR in operation S4340 and is sent out RRC connection request after receiving RAR
It is sent to gNB.
A. when sending RRC connection request, UE also sends the feedback 4301 of CSI-RS measurement result.
7. gNB sends RRC connection to UE in operation S4350 and establishes after receiving RRC connection request from UE.
Here it is possible to using including having in the narrow beam in CSI-RS feedback and the broad beam for sending RAR
The wave beam of maximum signal is established to send RRC connection.
8. UE sends RRC connection to gNB in operation S4360 and establishes completion after receiving RRC connection foundation from gNB.
A. in this way, UE completes the initial access to gNB.
[be initially accessed: proposing 2]
With reference to Figure 44, by the embodiment of description [be initially accessed: proposing 2].
1. when executing RX beam scanning, the letter of each wave beam for the SS that UE measurement is sent by gNB by TX beam scanning
Number intensity or quality.
2. UE is sent in operation S4410 to one or more gNB wave beams with maximum signal when measuring SS
RAP。
3., in operation S4420, gNB is by using the one or more with maximum signal when receiving RAP
RAR is sent UE by gNB wave beam.
A.RAR is authorized comprising UL, and UE is allowed to send RRC connection request.
B. in addition, in the disclosure, CSI-RS configuration information 4400 and RAR are sent collectively to UE.CSI-RS configuration information
Details it is as described above.
4.gNB operation S4430 by it is corresponding with the broad beam for receiving RAP or with for receiving RAP's
There are the corresponding multiple narrow beams of wave beam of maximum signal to send CSI-RS in broad beam.
5. being based on CSI-RS configuration information, UE measures the signal strength or quality by the gNB CSI-RS sent.
6. UE is authorized by the inclusion of the UL in RAR in operation S4440 and is sent out RRC connection request after receiving RAR
It is sent to gNB.
7. gNB sends RRC connection to UE in operation S4450 and establishes after receiving RRC connection request from UE.
8. UE sends RRC connection to gNB in operation S4460 and establishes completion after receiving RRC connection foundation from gNB.
A. when sending RRC connection foundation completion, UE also sends the feedback 4401 of CSI-RS measurement result.
B. in this way, UE completes the initial access to gNB.
[be initially accessed: proposing 3]
With reference to Figure 45, by the embodiment of description [be initially accessed: proposing 3].
1. when executing RX beam scanning, the letter of each wave beam for the SS that UE measurement is sent by gNB by TX beam scanning
Number intensity or quality.
2. UE is sent in operation S4510 to one or more gNB wave beams with maximum signal when measuring SS
RAP。
3., in operation S4520, gNB is by using the one or more with maximum signal when receiving RAP
RAR is sent UE by gNB wave beam.
A.RAR is authorized comprising UL, and UE is allowed to send RRC connection request.
B. in addition, in the disclosure, CSI-RS configuration information 4500 and RAR are sent collectively to UE.CSI-RS configuration information
Details it is as described above.
4.gNB operation S4530 by it is corresponding with the broad beam for receiving RAP or with for receiving RAP's
There are the corresponding multiple narrow beams of wave beam of maximum signal to send CSI-RS in broad beam.
5. being based on CSI-RS configuration information, UE measures the signal strength or quality by the gNB CSI-RS sent.
6. UE is authorized by the inclusion of the UL in RAR in operation S4540 and is sent out RRC connection request after receiving RAR
It is sent to gNB.
7. gNB sends RRC connection to UE in operation S4550 and establishes after receiving RRC connection request from UE.
8. UE sends RRC connection to gNB in operation S4560 and establishes completion after receiving RRC connection foundation from gNB.
A. in this way, UE completes the initial access to gNB.
9.gNB distributes the UL authorization fed back for receiving CSI-RS to UE, and UE passes through the UL of distribution in operation S4570
The feedback of CSI-RS measurement result is sent gNB by authorization.
[be initially accessed: proposing 4]
With reference to Figure 46, by the embodiment of description [be initially accessed: proposing 4].
1. when executing RX beam scanning, the letter of each wave beam for the SS that UE measurement is sent by gNB by TX beam scanning
Number intensity or quality.
2. UE is sent in operation S4610 to one or more gNB wave beams with maximum signal when measuring SS
RAP。
3., in operation S4620, gNB is by using the one or more with maximum signal when receiving RAP
RAR is sent UE by gNB wave beam.
A.RAR is authorized comprising UL, and UE is allowed to send RRC connection request.
4. UE is authorized by the inclusion of the UL in RAR in operation S4630 and is sent out RRC connection request after receiving RAR
It is sent to gNB.
5. gNB sends RRC connection to UE in operation S4640 and establishes after receiving RRC connection request from UE.
A. in addition, in the disclosure, CSI-RS configuration information 4600 and RAR are sent collectively to UE.CSI-RS configuration information
Details it is as described above.
6.gNB operation S4650 by it is corresponding with the broad beam for receiving RAP or with for receiving RAP's
There are the corresponding multiple narrow beams of wave beam of maximum signal to send CSI-RS in broad beam.
7. being based on CSI-RS configuration information, UE measures the signal strength or quality by the gNB CSI-RS sent.
8. UE sends RRC connection to gNB in operation S4660 and establishes completion after receiving RRC connection foundation from gNB.
A. when sending RRC connection foundation completion, UE also sends the feedback 4601 of CSI-RS measurement result.
B. in this way, UE completes the initial access to gNB.
[be initially accessed: proposing 5]
With reference to Figure 47, by the embodiment of description [be initially accessed: proposing 5].
1. when executing RX beam scanning, the letter of each wave beam for the SS that UE measurement is sent by gNB by TX beam scanning
Number intensity or quality.
2. UE is sent in operation S4710 to one or more gNB wave beams with maximum signal when measuring SS
RAP。
3., in operation S4720, gNB is by using the one or more with maximum signal when receiving RAP
RAR is sent UE by gNB wave beam.
A.RAR is authorized comprising UL, and UE is allowed to send RRC connection request.
4. UE is authorized by the inclusion of the UL in RAR in operation S4730 and is sent out RRC connection request after receiving RAR
It is sent to gNB.
5. gNB sends RRC connection to UE in operation S4740 and establishes after receiving RRC connection request from UE.
A. in addition, in the disclosure, CSI-RS configuration information 4700 and RAR are sent collectively to UE.CSI-RS configuration information
Details it is as described above.
6.gNB operation S4750 by it is corresponding with the broad beam for receiving RAP or with for receiving RAP's
There are the corresponding multiple narrow beams of wave beam of maximum signal to send CSI-RS in broad beam.
7. being based on CSI-RS configuration information, UE measures the signal strength or quality by the gNB CSI-RS sent.
8. UE sends RRC connection to gNB in operation S4760 and establishes completion after receiving RRC connection foundation from gNB.
A. in this way, UE completes the initial access to gNB.
9.gNB distributes the UL authorization fed back for receiving CSI-RS to UE, and UE passes through the UL of distribution in operation S4770
The feedback 4701 of CSI-RS measurement result is sent gNB by authorization.
<fourth embodiment>
In LTE system, in order to support broadband, have been incorporated into for handling multiple component carrier (component together
Carrier, CC) such as carrier wave polymerization (carrier aggregation, CA) and dual link (dual connectivity,
DC multi-carrier scheme).In the case where 20MHz CC, the polymerization up to 32 CC can support the bandwidth of 640MHz.However, such as
Fruit supports the ultra wide band (for example, 1GHz) in the new radio of 5G (NR) system using the scheme of such as LTE CA, then terminal is wanted
The combined quantity of the CC used is exponentially increased, and the size of the capability report executed by terminal also increases.Therefore, eventually
End is had no option, can only the only operation in limited CC is combined.In addition, the quantity with CC in CA increases, the reception of terminal is multiple
The control complexity of miscellaneous degree and base station also increases.However, although CA or DC there are such problems, CA or DC use resource
Aspect has greater flexibility than single carrier wave.This is because auxiliary (SCell) addition/release allows to change extending bandwidth,
And it is cross-carrier to dispatch the resource transmission/reception for allowing to dispatch other CC.
In addition, 5G system defines high-effect operation, main target is the power efficiency by terminal and base station network
[bit/J] improves more than 1000 times.For this reason, it is necessary to the size of the operational frequency bands of controlling terminal, to solve to be drawn by broadband transmission
A possibility that extra power consumption risen, this is essential for the operation of SHF band (mmW).
The present disclosure proposes the operation schemes of terminal and base station, for realizing 3GPP RAN 5G system information (system
Information, SI) in the efficiency Key Performance Indicator (key performance indicator, KPI) that is just discussing.Specifically
Ground, this disclosure relates to which the layer 1/2 of terminal and base station in mobile communication system operates.More specifically, this disclosure relates to a kind of use
The power consumption of terminal is reduced in the operational frequency bands of the change terminal when base station expectation carries out ultra-broadband signal transmission/reception with terminal
Method and apparatus.
The present disclosure proposes a kind of ultra wide band transmission/received sides of controlling and setting in 5G mobile communication system
Method.Specifically, consider the method for scheduling, transfer and power saving in ultra wide band.In 5G mobile communication system, it is desirable that supporting
Such as enhanced mobile broadband (enhanced mobile broadband, eMBB), super reliable and low latency communicate (ultra
Reliable and low latency communication, URLLC) and enhanced machine type communication (enhanced
Machine type communication, eMTC) various services (or fragment (slice)).This can with as the 4th
Generation (4G) mobile communication system LTE in support voice over internet protocol (voice over Internet protocol,
VoIP) and in the identical context of (best effort, BE) service of doing one's best understand.In addition, it is expected that in 5G mobile communication system
Various numerologies (numerology) will be supported in system.Especially because the difference of subcarrier spacing or Transmission Time Interval (TTI)
It is different.Therefore, it is desirable to support the TTI of various length in 5G mobile communication system.With the LTE phase for only supporting a kind of TTI (1ms)
Than this is one of the notable feature of 5G mobile communication system.If 5G mobile communication system supports the 1ms TTI than LTE to be so short that
More TTI (for example, 0.1ms), then it is expected that this needs the URLLC of short delaing time to support is very big help.In the disclosure,
Numerology is used as and the terms with identical meanings such as subcarrier spacing, subframe lengths, symbol/sequence length.Moreover, terminal
Different bandwidth (BW) can be configured in different numerology regions.Base station be also referred to as such as gNB, eNB, NB and
The various terms of BS.Terminal is also referred to as the various terms of such as UE, MS and STA.
Figure 48 is the figure for showing the scalable BW system of LTE according to an embodiment of the present disclosure.
Figure 49 is the figure for showing the feature of the flexible BW system of 5G NR according to an embodiment of the present disclosure.
With reference to Figure 48, in order to support various BW, LTE to have been incorporated into the concept of scalable BW.According to Figure 48, LTE system
Support the terminal with the identical various BW (for example, 5/10/20MHz) of centre frequency.For example, if the first UE 4810 is supported
5MHz and the 2nd UE 4820 support 10MHz, then LTE base station properly configures control channel and sends control signal, so that two
A UE can receive control signal.However, when total available bandwidth when base station is very big, i.e., in ultra wide band, this method pole
The earth limits the resource that the terminal with relatively small frequency band can be used.For example, when the 3rd UE 4830 operation is available in base station
When the edge of frequency band, which may not distinctively receive the control signal of base station.
With reference to Figure 49, in 5G NR communication system, it should operational frequency bands can be configured flexibly.That is, passing through
It obtains configured access BW 4900 according to synchronous signal receiver and SI to be successfully established after RRC connects, terminal can be in base station
Control under that operational frequency bands (or operation BW) from relatively narrow frequency band (or narrow BW) 4910 are switched to relatively wide frequency band is (or wide
BW)4920.Using wide frequency band, terminal can receive the control signal of base station to help to improve control signal performance, or
Data transmission/reception (DL or UL) can be executed to improve resource efficiency.
Moreover, terminal should be able to send and receive important control signal in 5G NR communication system, even if so as to
The connection with base station can be also maintained in some frequency band that existing scalable BW system is not supported.In the case where LTE, by means of
Signaling radio bearer (signaling radio bearer, SRB) sends such important control signal via PCell.This
Outside, it in PCell, sends and receives for the scheduling and hybrid automatic repeat-request (HARQ) mistake in PCell and SCell itself
The control signal of journey.In LTE, each of PCell or SCell can be an independent cell.For each cell,
Need individual MAC entity and corresponding link circuit self-adapting and HARQ entity.However, in 5G NR carrier wave communication system, it is whole
A frequency band corresponds to a cell.It is connect in addition, should substantially provide for terminal access, connection foundation/maintenance and data are sent/
The function of the PCell of receipts.
Meanwhile even if base station operation is in ultra wide band, due to limited embodiment and complexity, terminal also only can be whole
Transmission/reception is executed in a part of a frequency band.In order to make terminal in the frequency band for being greater than maximum available bandwidth (that is, the BW allowed)
Middle operation, it is necessary to operate in a time division manner.In order to be easier to manage, ultra wide band can be divided into suitable size by base station
Frequency band or subband (sub-band), and instruction terminal performed various functions in special frequency band (for example, control signal send/
Reception, data-signal transmission/reception, RS, measurement, scheduling, link circuit self-adapting, Modulation and Coding Scheme (MCS), HARQ etc.).And
And terminal can judge based on frequency band and receive the structure of control channel and reference signal.
Figure 50 is the various frequency band splitting schemes shown in the flexible BW system of 5G NR according to an embodiment of the present disclosure
Figure.
With reference to Figure 50, in situation A, since fixed frequency band configures, UE1 5000 only can be in a part of available band
Rather than it is operated in entire available band.
In situation B, UE2 5010 may be not supported in frequency band 4, be matched because maximum available bandwidth is less than by base station
The bandwidth 5011 for the frequency band 4 set.
If minimizing bands unit as shown in situation C, the UE 5020 with various bandwidth can be supported, because of UE
Frequency band to be used is indicated by a branch of small frequency band.But too many frequency band may result in expense increase.
Therefore, as in situation D, it is useful for freely configuring the scheme of frequency band size.
In order to solve the above problems when entire frequency band is divided into the frequency band of terminal by base station, the present disclosure contemplates a kind of sides
Case, wherein base station is that each terminal configures different size of frequency band, and frequency band can be expressed as with same size by system
Subband combination.Moreover, not being to execute independent scheduling, link circuit self-adapting, MCS and HARQ in the subband that divides in view of system
Process, but a scheduling, link circuit self-adapting, MCS and HARQ procedure will be executed in the frequency band configured in view of terminal.
The structure of physical layer control channel should be designed to scalable for one or more subbands in a frequency band.This meaning
Can support with can by the multiple of the subband at least frequency band indicate frequency band terminal.Frequency band as a branch of subband
Size by between terminal and base station channel characteristics, numerology, control subband size and minimum packet size at least one
A determination.Terminal is directed to one MAC function collection (scheduling, MCS, HARQ etc.) of a service execution.
The function that the system structure that can be proposed by the disclosure provides can be considered as follows.
The control of every frequency band/RS/CSI report/HARQ feedback configuration
From frequency band/across frequency band scheduling
It is used for transmission the frequency band polymerization of single transmission block
Across frequency band HARQ is retransmitted
- RRM measurement
Utilize the power saving of adaptive BW
[control of every frequency band/RS/CSI report/HARQ feedback configuration]
When configuring frequency band, base station can by indicate basic unit (RB or sub-band) multiple come to terminal notification frequency
The range (that is, beginning, size or centre frequency and bandwidth) of band.Because the location and range of frequency band are network systems at it
A part of one carrier wave of middle operation, so base station can frequency shift (FS) by the centre frequency of entire carrier frequency band and band
Width to configure frequency band to terminal.Alternatively, base station can pass through the centre frequency where synchronization signal that terminal detects
Frequency shift (FS) and bandwidth to configure frequency band to terminal.Meanwhile the centre frequency of carrier frequency band that terminal is learned can be always
The centre frequency for the synchronization signal that terminal detects, can be connected to the synchronization signal detected as terminal SI indicated by
The center frequency information of carrier wave is identical, or the centre frequency letter for the carrier wave that base station indicates in establishment process can be connect with RRC
Manner of breathing is same.Frequency range is interpreted as band system band by terminal.Therefore, even if being assigned with the frequency band of different range, terminal should also be set
It counts into and signal is received according to identical reception rule.
For example, beginning and the size of the frequency band of terminal configuration should be based upon to determine the reference signal sent by base station
(RS) or the position of control channel.In addition, should be based upon terminal configuration frequency band beginning and size sent out to determine by terminal
The position of the CSI report or HARQ feedback sent.Meanwhile when configuring multiple frequency bands, base station can also be to be directed to for terminal configuration
Multiple frequency bands share HARQ procedure and are still directed to each band separation HARQ procedure.
The frequency band for being configured to terminal monitors is referred to as main band (primary band, p frequency band).Terminal can not removed
Monitoring is executed in resource area except p frequency band, unless there are any and p band separation control/configurations.
It can selectively be operated auxiliary frequency band (secondary band, s frequency band) according to by the configuration of p frequency band, and p
Frequency band and s frequency band can be known respectively as the first radio frequency (RF) frequency band and the 2nd RF frequency band.Furthermore, it is possible to by RRC information or
P frequency band is activated to active state from the frequency band candidate that at least one or more is configured by MAC CE or DCI.Furthermore, it is possible to logical
It crosses RRC information or MAC CE or DCI and s frequency band is activated to active state from the frequency band candidate that at least one or more is configured.
Similarly, base station can deactivate one by sending deactivated signal or message to terminal via RRC information or MAC CE or DCI
Or multiple frequency bands make it from active state to inactive state.In the disclosure, active band is used as similar contain with p frequency band
Justice, but p frequency band needs the combination of DL frequency band and UL frequency band in configuration.Therefore, p frequency band is active band, but all activities
Frequency band is not always p frequency band.In addition, p frequency band is not deactivated, in addition to individual frequency band handoff procedure.In time division duplex (TDD)
In the case of, the frequency location of DL frequency band and UL frequency band can be identical in p frequency band.
P band configurations include at least one DL frequency band and one or more UL frequency band, and base station can be matched with instruction terminal
Set p frequency band.When terminal includes the UE capability report of RF information to base station report, base station can match for each of terminal difference RF
Set p frequency band.
Hereinafter, behaviour associated with the frequency band switching in single or multiple active bands/activation instruction will be described
Make.
Terminal can monitor the frequency band of one or more configurations simultaneously according to RF condition.Therefore, have in terms of scalability
Benefit, the frequency band of base station indicate jointly to be applied to terminal under the conditions of different RF.However, base station is needed through terminal
Other RF conditions of terminal are known in advance in capability report.Otherwise, sharp from frequency band #1 to frequency band #2 when being issued for some terminal
When instruction living, a possibility that there are faulty operations because can not can know that frequency band #1 whether due to terminal RF limitation and stopped
With.
When the terminal operated in single-unit activity frequency band receives frequency band activation instruction from base station, terminal is switched to instruction
Frequency band and deactivate previous frequency band.When the terminal operated in multiple active bands receives frequency band activation instruction from base station
When, terminal activates the frequency band of instruction and maintains the use of the frequency band.
However, being possible to faulty operation occur by the band configurations that the capability report of terminal carries out.Therefore, base station should
It is capable of the maximum quantity of the active band of configurating terminal and explicitly indicates that deactivating for frequency band.
Activation/disabling operation rule for frequency band can be pre-configured with according to one of following two method, or can be with
By base station/network configuration.In addition, the operation can also be equally applicable to other than the activation instruction of the independent frequency band of base station
Frequency band switching/activation and across frequency band scheduling instruction together there is a situation where.
Although a) being configured with multiple active bands, each active band is only switched into other and deactivates frequency band.Therefore, only
It can change the quantity of active band with RRC.
B) multiple active bands are configured with, and make activation/deactivated instruction for each frequency band.Because can change movable frequency
The quantity of band, so base station should be operated so as to be no more than the maximum quantity of the active band of terminal and deactivate all frequencies
Band.If base station instruction is more than maximum activity frequency band, terminal can operation be initial 1) to deactivate in active band previous
The frequency band of activation, 2) frequency band minimum by the sequence of band index deactivate the frequency band finally activated, 3) is deactivated, 4) matched according to base station
The priority for the frequency band set deactivates lowest band or 5) deactivates some frequency band arbitrarily determined by terminal.Moreover, deactivated frequency
Band, which can be configured as, excludes p frequency band.
Hereinafter, description is used to determine to include resetting (retuning) when activating frequency band by DCI or MAC CE
The process of the transfer point of delay.
The RF readjustment time can change according to the relationship between switch of frequency band and the active band switching condition of terminal.Base
Standing can be configured to terminal by RRC a frequency band (for example, p frequency band) being switched to another frequency based on the capability report of terminal
With the required time.If terminal does not meet the configuration, terminal can refuse the frequency band switching of each frequency band.
Base station by DCI indicate frequency band switching in the case where, 1) terminal can be considered from by RRC configure
Switching delay time when DCI receiving time (subframe/time slot/small time slot) is completed to switching.Therefore, terminal can be based on DCI
In include frequency band mark (ID), in the frequency band activated after the switching delay time that Cong Cong DCI receiving time starts most
Fast effectively control channel monitors control channel.Alternatively, 2) can include in DCI from DCI receiving time (subframe/time slot/
Mini time slot) to switching complete when switching delay time k and frequency band ID.Therefore, terminal can be according to the determination of the value of k
Control channel is monitored from most fast effectively control channel after time.
In the case where base station indicates frequency band switching by MAC CE, 1) terminal can be based on the frequency band for including in MAC CE
ID, by the switching time for considering to have configured by RRC, from from for the MAC CE received HARQ ACK success time
Most fast effectively control in the frequency band activated after switching delay time when (subframe/time slot/mini time slot) is completed to switching
Channel monitoring control channel.Alternatively, 2) the switching delay time configured by RRC can be considered in terminal.Terminal can
With determined based on frequency band ID, the Cong Cong MAC for including in MAC CE frequency band switching and to PHY send instruction time (subframe/when
Gap/mini time slot) it is monitored to the most fast effectively control channel in the frequency band of activation after switching delay time when switching completion
Control channel.It alternatively, 3) can include that successfully time (when subframe/time slot/mini is received from MAC CE in MAC CE
Gap) to switching complete when switching delay time k and frequency band ID.Therefore, terminal can be from when receiving successfully from MAC CE
Between most fast effectively control in the frequency band that activates after the switching delay time of (subframe/time slot/mini time slot) when being completed to switching
Channel monitoring control channel processed.It alternatively, 4) can include receiving successful HARQ from for MAC CE in MAC CE
Switching delay time k and frequency band ID when the transmission time (subframe/time slot/mini time slot) of ACK is completed to switching.Therefore,
Terminal can be from from the transmission time (subframe/time slot/mini time slot) of successful HARQ ACK be received for MAC CE to cutting
Change the most fast effectively control channel monitoring control channel in the frequency band activated after switching delay time when completion.Terminal follows
At least one of aforesaid operations.
[from frequency band/across frequency band scheduling]
Figure 51 be show it is according to an embodiment of the present disclosure from frequency band/across frequency band scheduling operation figure.
With reference to Figure 51, by the control subband 5110,5130 and 5150 in p frequency band, base station can be dispatched in same sub-band
Data channel 5120, the control channel 5160 in data channel 5140 or other subbands in other subbands.
Base station can be controlled by the control subband in the p frequency band configured for each terminal is believed by the control of terminal
Transmission/reception of the signal of road or data channel.Base station can be by referring to from frequency band data dispatch or across frequency band data dispatch
Show downlink (DL) or uplink (UL) data transmission/receiving area.Moreover, base station can be dispatched by controlling from frequency band
To indicate the position of the control subband in same frequency band or the change of size.Moreover, base station can be dispatched by across frequency band control
To indicate position or the size of the additional control sub-band in other frequency bands.
If the position or size, terminal by first control subband instruction the second control subband check whether while supervising
Depending on the first control subband and the second control subband.If it is, terminal can receive signal by two control subbands simultaneously.It is no
Then, it means that terminal only monitors the first control subband.Therefore, it in order to monitor the second control subband, needs for a certain amount of
The delay that RF is resetted.
In general, UL scheduling in the case where, base station can by control the scheduled length of delay of subband instruction terminal (for example,
4ms) or individual length of delay.
In the system that the disclosure is considered, wherein may require bandwidth change across frequency band scheduling, even if DL dispatch
In the case where, it is also desirable to the individually specific sub-frame followed by instruction in time, and be used under data transmission/received physics
Ink Shared Channel (PDSCH) is normally indicated in subframe identical with PDCCH.
This is because when the position sudden change of used frequency band, need for resetting RF and base band (BB) circuit
Handle the time.That is, it is contemplated that terminal capability report in include available band information and caused by the control of base station
Terminal service band variation degree, base station answer instruction terminal after the transmission of control signal delay time for configuring it
After send and receive DL signal.Delay time may include in each control signal or base station can be in the ability of terminal
Negotiate and is pre-configured at least one delay time value during connecting establishment process.Because postponing complete in the service band of terminal
Than partly overlapping in the service band of terminal and only bandwidth changes in the case that is bigger in the case where change, so base station passes through
Each control signal sends delay time or sends the index of two or more length of delays by controlling signal, so that terminal can
Operation is received to execute DL after an appropriate delay.
Meanwhile base station can execute terminal in DL and UL with the asymmetric p frequency band of different frequency bands (position, size)
Configuration.However, because major control function is smoothly operated in p frequency band when supporting both DL and UL, even if distribution
P frequency band is also interpreted as one by different frequency bands, terminal.
[adaptive BW method and power saving program]
LTE system provides battery saving mode (PSM) and discontinuous receive (DRX) to reduce power consumption.PSM refer to only executing with
Track area update (tracking area update, TAU) or routing region updating (routing area update, RAU) are simultaneously
And the state of paging is not received from base station.This is nearly similar to power off, but terminal is not needed to be re-attached to network or be built again
Vertical packet data network (packet datanetwork, PDN) connection, because it is still registered in a network.
DRX points are idle mode DRX and connection mode DRX.According to idle mode DRX (that is, free time-DRX), idle mode
UE does not receive the signal of base station, in addition to the period (paging frame number and paging occasion) for periodically monitoring paging signal.
In this case, it is connect because terminal does not have with the RRC of network, network does not have the contextual information of terminal.Terminal
It is considered as being registered in mobility management entity (mobility management entity, MME) and resides in tracking area
In domain list (tracking area list, TAL).Connection mode DRX the purpose is to reduce work as each DL of connection mode terminal
Subframe monitors caused power consumption when control signal (PDCCH) of base station.If terminal arbitrarily skips the monitoring of DL subframe, base station
It is difficult to controlling terminal as needed.Therefore, base station and terminal should be executed in the DL subframe in predetermined position base station transmission and
The reception of terminal.
The DRX operation of LTE connection is as follows.Base station can establish request message or the request of RRC connection reconstruction by RRC connection
Message configures the DRX relevant parameter in RRC parameter.DRX relevant parameter includes that such as DRX recycles (cycle), unlatching continues
Time timer (on-duration timer) and inactivity timer (inactivity timer).The instruction of DRX circulation is eventually
End repeats the length of the single duration of ON and OFF, and opens the length that the duration is opened in duration timer instruction
Degree.Duration timer can be recycled and opened from DRX calculate the length for closing the duration.These parameters are single with subframe
Position indicates.The DL on PDCCH that terminal monitors base station during what is indicated by unlatching duration timer opens the duration
Signal, and not in the DL signal closed on the PDCCH for monitoring base station in the duration.If terminal success in some subframe
DL signal is received, then inactivity timer is since the subframe.Terminal should monitor the DL signal on the PDCCH of base station, directly
Until inactivity timer expires.After last time is properly received DL signal, if reached and inactivity timer
The corresponding subframe of expiration time and the subframe, which belong to, closes the duration, then terminal does not monitor DL signal.
Specifically, it depends on DRX to recycle, C-DRX can be classified as short DRX and long DRX.According to the activity of DL signal,
Terminal is always switched to short DRX in each subframe, then switches to long DRX, and switch again at the end of long DRX circulation
The state operated to no DRX.In order to configure the operation, the repetition time of short DRX circulation is indicated using short DRX cycle timer
Number.In the case where long DRX, terminal is switched to sleep state after DRX one long circulation.Base station can pass through MAC order
Element (command element, CE) indicates the beginning of short DRX or long DRX, so that terminal switches back into short DRX or maintains long DRX
State.Exceptionally, in the DL HARQ packet retransmissions present for being defined as HARQ two-way time (round trip time, RTT), eventually
End should monitor DL signal but regardless of DRX.In addition, if expectation UL HARQ packet retransmissions present, then terminal should be configured as DRX
Monitoring DL controls signal, i.e. UL authorization in the duration of retransmission timer.
According to LTE, short DRX is expressed as follows:
[(SFN*10)+subframe numbers] modulo (shortDRX-Cycle)=(drxStartOffset) modulo
(shortDRX-Cycle)
According to LTE, long DRX is expressed as follows:
[(SFN*10)+subframe numbers] modulo (longDRX-Cycle)=drxStartOffset
When LTE connection mode DRX (C-DRX) is applied to 5G NR, similar equation can be used.
If LTE C-DRX is applied to 5G NR, the terminal for receiving high-speed data service will be supervised opening in the duration
Depending on the broadband DL signal of base station, and it will not be in close and monitor DL signal in the duration.However, the spy for the business of depending on
Property, it is not necessary to every subframe receives broadband DL signal.For example, in the case where flowing service, using in periodical large capacity information
In only send the encoding scheme of image change information.Therefore, in 5G NR communication system, it should adaptively change by terminal
The size of the bandwidth (BW) of the resource of monitoring.
Figure 52 to Figure 54 be show according to various embodiments of the present disclosure by physical layer control signal carry out BW extension
With the exemplary figure of reduction operation.
If executing the variable BW control in L1 layers (i.e. physical layers), the operation as shown in Figure 52 to Figure 55 is can
Can.In order to save power, it is reasonable that terminal, which lies substantially in narrow BW state, and if it is required, then is switched to wide BW.
With reference to Figure 52, therefore, terminal monitors in RRC connection establishment step controls subband by the narrowband that L1 is provided
(control sub-band, CSB) (CSB#1) 5210, and if receiving the L1 signal 5230 that instruction BW extends from base station,
Then monitor that broadband controls subband (CSB#2) 5220 in specific sub-frame.
Determined according at least one of the following receive BW extended instruction control signal time point with go to
Interval between the subframe of the switching of CSB#2: a) fixed intervals, b) by the interval of RRC parameter configuration, c) matched by L1 control signal
The interval set, d) according to the BW ability information of terminal report and the computable interval of present terminal state and e) to be switched
Whether the centre frequency of BW is overlapped.
On the other hand, when terminal continuously requests a large number of services, should frequently send BW extended instruction control signal, and
In the worst case, due to the limitation of switching delay, the half of subframe can be serviced in narrowband.In addition, frequent BW and RF
Switching may cause terminal load and additional power consumption.
With reference to Figure 53, shows and further use BW diminution instruction control letter when BW extended instruction control signal is used only
Number come the example that solves the problems, such as.
According to the operation, terminal monitors CBS#1 5310 switches band when receiving BW extended instruction control signal 5330
It is wide to monitor CSB#2 5320, and maintain the mode.Then, when by CSB#2 5340 receive BW reduce instruction control signal
When 5360, terminal switches bandwidth to monitor CSB#1 5350.However, if failing to receive BW extension or reducing instruction control letter
Number, then this method may cause the mistake in terminal operation.
For example, although base station sends BW extended instruction control signal 5330 and is sent by the CSB#2 5320 of instruction subframe
For data transmission/received control signal (DCI), but terminal is likely not to have received BW extended instruction control signal
5330.Due to monitoring CSB#1, terminal does not receive the DCI sent by CSB#2 5320.In this case, even if terminal
It is successfully received BW extension instruction control signal 5330 or terminal fails to receive BW extension instruction control signal 5330, base
It stands and does not also know whether terminal fails to receive the DCI sent by CSB#2 5320.
Moreover, if terminal fails to receive DL letter within a certain period of time due to monitoring the mismatch of frequency band (i.e. CSB)
Number, then terminal may be operative to DRX closing or cause problem in HARQ timeline.
It is operated according to shown in Figure 54 and Figure 55, L1 letter can be reduced by reducing instruction control signal without using BW
Number receive mistake problem.That is, terminal can be only during the specific duration after BW extension in broadband (CSB#
2) operation, then returnes to narrowband (CSB#1) in.
With reference to Figure 54, base station controls signal 5430 by BW extended instruction also in CBS#1 5410 and is used for terminal notification
Monitor the duration 5440 of the position CSB#2 and CSB#2 5420.
On the other hand, it is contemplated that the capacity and performance of L1 signal, base station can be by RRC parameter rather than L1 signals come pre-
It is first configured to maintain the Duration Information in broadband.However, compared with the case where using L1 signal, first pass through in advance RRC into
Dynamic control can be limited in the case where row configuration.Therefore, when using RRC parameter, timer may be it is useful, it is such as existing
DRX inactivity timer, rather than fixed duration.
Figure 55 to Figure 58 be show according to various embodiments of the present disclosure by physical layer and radio resource control
(RRC) control signal carries out the exemplary figure of BW extension and reduction operation.
With reference to Figure 55, the CSB#2 that terminal monitors are indicated by the BW extended instruction control signal 5530 in CBS#1 5510, so
Afterwards due to failing to start the timer 5540 that RRC is configured from next 5520 subframe of CSB#2 reception DL signal.If timer
It is expired without after 3 subframes and receives DL signal, then terminal returns to the narrowband CSB#1 in next subframe.It can change
Become the starting time of timer.
If timer value be set to it is small, even if the control signal of base station is actually sent to terminal, terminal
May due to channel quality deterioration and base station signal cannot be continuously received.In this case, it may occur however that frequency band mismatch,
Middle base station sends signal in broadband, and terminal attempts to receive signal in narrowband.It base station can be from the feedback or tune for working as terminal
Start timer when the UL signal of degree does not reach or when the event for not having UL signal to reach meets specified criteria.When base station
When timer expires, base station sends base station signal by narrowband control channel (i.e. CSB#1).It, can be pre- in order to support the operation
First determine the position of the unlatching duration of the narrowband control channel of terminal.That is, the beginning of the operation in broadband can be with
Control channel depending on L1/MAC signal, and in narrowband is received the DRX for operating and can following and being determined based on system time and followed
Ring, such as traditional DRX are operated.When broadband inactivity timer expires according to the inactive of the control channel in broadband, eventually
It resets to narrowband and duration reception control channel is opened according to the DRX of configuration in end.
On the other hand, according to circumstances, inactive explanation can differently be applied.
With reference to Figure 56, terminal extends instruction control signal 5620 in response to BW and is switched to broadband 5610, then in next son
The BW that base station is received in frame reduces instruction control signal 5630.This is because base station has determined that there is no sent by broadband
Business.
Even if terminal monitors narrowband CSB#1, the inactivity timer 5650 that RRC can also be maintained to configure is without expiring.
That is, in the state that terminal does not receive DL resource allocation control signal in broadband (i.e. CSB#2), in response to base station
Control signal or some terminal operation for switching between broadband and narrowband of rule can influence inactivity timer.Terminal can
Only to stop timer after receiving DL resource allocation control signal by the CSB#2 in broadband.
It is a kind of operation with reference to shown in Figure 57, wherein after the starting of timer 5710, when the BW in terminal switches the phase
Between when being successfully received base station signal by broadband CSB#2 5730 timer expire, and when not received in subsequent subframe
Second timer 5720 starts when to DL signal.
With reference to Figure 58, in order to avoid the complex operations as shown in Figure 56 and Figure 57, according to embodiment, base station can be in terminal
Broadband switching after pass through the mode 5810 that switches between broadband and narrowband of RRC configuration.Such as in other embodiments, base station
Signal 5820 can be controlled by L1 or RRC signal designation terminal carries out the first narrowband switching.When being controlled with RRC, it should base
Position is determined in SFN (system frame number, System Frame Number) and subframe.If BW switching is not urgent, can use
MAC command element (CE) replaces L1 and controls signal.In this case, MAC CE should include absolute location information rather than phase
To interval information.
BW switching mode can be configured as the absolute position relative to SFN and subframe, or be configured as relative to
Utilize the position of the specified position of L1 control signal.In addition, the effective subframe of mode can be limited to open duration phase with DRX
Corresponding subframe or DRX cycle timer expire before subframe.In addition, base station can be switched by MAC CE with instruction terminal
To which BW.
When base station is using physical layer signal or RRC control signal designation BW handover operation, for dynamic setting, pass through L1
Control signal is configured can be configured prior to controlling signal by RRC.However, it is contemplated that believing since multiple L1 are controlled
Number and be difficult to the case where carrying out stable terminal operation, in the subframe with predetermined position (period deviates) pass through RRC control
Signal is configured always before controlling signal by L1 and being configured.
Meanwhile independently of the BW control operation carried out by physical layer signal, the C-DRX of LTE can be modified, that is, is connected
DRX operation, with associated with BW control.Can be individually operated using the method for C-DRX, or can with pass through physical layer signal
The operation of control BW operates together.Detail is described below with reference to Figure 59.
Figure 59 and Figure 60 is the connection mode DRX (C- for adaptive BW shown according to various embodiments of the present disclosure
DRX) the exemplary figure operated.
It is configured according to LTE DRX, a DRX circulation, which is divided into, opens the duration and close the duration.Similarly,
With reference to Figure 59, a DRX circulation can be divided into broadband and open duration 5910, narrowband unlatching duration 5920 by base station
With the closing duration 5930.For the program, base station only needs the attached of each frequency band into terminal notification DRX configuration information
The unlatching Duration Information added.However, then terminal may need considerably long if there is the various frequency band sizes being gradually reduced
Time can just be transformed into completely closed state.
With reference to Figure 60, according to another embodiment, terminal can operate in the specific DRX circulation of frequency band, wherein for supervising
It can be configured differently in time depending on the duration of broadband and narrowband.It is similarly to certain when being needed in short DRX circulation
The operation being switched to when the circulation of quantity in the LTE C-DRX of long DRX circulation.Therefore, base station can be according to the frequency band to be switched
(DRX circulation, unlatching duration, DRX cycle timer etc.) 6010 to 6060 configuration informations, and frequency band are recycled according to DRX
Switching law may include in C-DRX configuration.For example, this can with the sequence of frequency band #1, frequency band #2, frequency band #3 etc. or
The sequence of CSB#1, CSB#2, CSB#3 etc. indicates.
Alternatively, according to embodiment, the sequence of frequency band switching can entrust to physical layer completely.In this case,
Terminal is controlled signal according to L1 and is determined BW and CSB with public DRX circulation and the operation of DRX cycle timer.Terminal can be
Inquiry will change into the BW of L1 before one DRX cycle timer expires.
Alternatively, in RRC connection foundation or RRC connection reestablishment procedure, terminal can request L1 that multiple BW are arranged
(CSB) and its sequentially.At the end of a DRX cycle timer expires or DRX is recycled, terminal switches BW (CSB) according to sequence.
If terminal reconfigures control signal according to the BW of base station or extends BW, BW again according to condition preconfigured in terminal
(CSB) switch in order from the BW of extension again.When the DRX circulation of the minimum BW (CSB) after all BW (CSB) have switched
Or DRX cycle timer, when expiring, terminal a) is switched to long DRX, while keeping minimum BW (CSB), b) by switch to independent
The BW (CSB) of the long DRX of configuration is switched to long DRX or c) it is switched to idle DRX.
On the other hand, in the case where not introducing new C-DRX configuration, can maintain existing LTE C-DRX configuration and
Operation, and be arranged using additional L1 to control BW and change operation.According to embodiment, the C-DRX configuration to be controlled by RRC is phase
With, but base station can be configured to by using L1 signal open the duration in carry out BW switching information (BW,
SRB, number of sub frames etc.).According to another embodiment, base station can be configured by using L1 signal is encountering short DRX circulation every time
When just reduce, for BW switching information (BW, SRB etc.).According to yet another embodiment, base station can be come by using L1 signal
Configuration is connected to the BW of short DRX circulation and is connected to the BW of long DRX circulation.
The different parameters for having for BW in a DRX configuration are assumed in the operation of the modification of C-DRX.On the one hand, BW
Different DRX configurations are possibly used for more free DRX configuration.In this case, terminal should check multiple DRX in the same time
It is operated while configuration, and it is necessary to determine which DRX configuration has priority according to pre-defined rule, to prevent mixing
The operation confused according to multiple DRX configuration.
Figure 61 is to show the exemplary figure according to an embodiment of the present disclosure for the DRX of broadband and narrowband setting.
With reference to Figure 61, thus it is shown that the shape of broadband DRX 6110 and 6115 and narrowband DRX 6120 and 6125 is respectively configured
State.Terminal receives the DRX configuration of two frequency bands, and must comply with one in two DRX configurations for clashing behaviour
The subframe of work.If emphasizing power consumption, terminal may prefer to narrowband DRX configuration rather than broadband DRX is configured.
Figure 62 and Figure 63 is to show DRX setting according to various embodiments of the present disclosure and for the preferential of broadband and narrowband
The exemplary figure of grade rule.
With reference to Figure 62, a kind of operation is shown, wherein opening 6210 He of duration when being configured with broadband in a subframe
When both duration 6220 are opened in narrowband, terminal follows narrowband and opens duration configuration 6210 and by configuring narrowband CSB#
1 monitors DL signal.
With reference to Figure 63, on the other hand, in the prior situation of volume of transmitted data, Figure 63 shows a kind of operation, wherein
When being configured with the broadband unlatching duration 6310 in a subframe and both duration 6320 are opened in narrowband, terminal is followed
It opens duration configuration 6310 and monitors DL signal by switch to broadband CSB#2 in broadband.In order to support such as Figure 62 and figure
The configuration of difference shown in 63, base station can also configure the precedence information between the DRX of frequency band by RRC to terminal.
If being not received by DL signal in for each frequency band and the DRX of its operation configuration, terminal starts not
Active time.If being provided with the inactivity timer of each frequency band, terminal a) can be somebody's turn to do being not received by correspond to
When the DL signal of frequency band, starts the inactivity timer of corresponding frequency band or b) frequency band can be corresponded to being not received by
DL signal when, start the inactivity timer of each frequency band.
If being single value regardless of frequency band will be inactive timer setting, can will be used to determine that DRX is inactive
Condition be determined as at least one of the following: 1) only when be not received by all frequency bands (CSB of all configurations) DL letter
Number when start inactivity timer or 2) only when frequency band (CSB) that is not received by with according to priority selects corresponding DL signal
Shi Qidong inactivity timer.
In the disclosure, about DRX operate and the type for the DL signal to be monitored in a standard determine or can be by base
It stands configuration.The DL signal that should not be monitored is operated about DRX if received, it may be considered that being not received by DRX operation
DL signal.
The BW proposed in the disclosure is adaptively and during power saving, it is also necessary to will be configured to the one or more of scheduling
Frequency band configuration associated with DRX process.
According to the various embodiments of proposition, thus it is possible to vary allocation plan associated with DRX process.Each embodiment is main
It is classified as follows, and the configuration of DRX procedure correlation can change according to this classification.
A. the L1/MAC signal of base station is depended on from the timing that frequency band 1 is switched to frequency band 2 in terminal, and is cut from frequency band 2
Change to the timing of frequency band 1 also in compliance with base station L1/MAC signal in the case where:
Because frequency band ID is included in L1/MAC signal, configured with individual DRX not related.That is no matter
How is frequency band, and DRX can be operated jointly.However, base station can be with when the reception mistake of L1/MAC signal of base station occurs
It is configured to the special frequency band (for example, frequency band 1) of rollback (fallback) operation.At this point, base station can include in DRX configuration
Rollback frequency band.
B. the L1/MAC signal of base station is depended on from the timing that frequency band 1 is switched to frequency band 2 in terminal, and is cut from frequency band 2
Change to frequency band 1 timing follow inactivity timer in the case where:
When terminal is switched to frequency band 2 from frequency band 1, configuration frequency band 2 associated with DRX is not needed.However, working as from frequency band
2 when being switched to frequency band 1, and DRX is configured to operate in frequency band 1 by base station, because it follows timer.Be switched to frequency band 2 it
Terminal should follow the inactivity timer of frequency band 2 afterwards, and can be configured to be operated according to one of the following by base station:
1) be used in conjunction with the inactivity timer of DRX, 2) using being inactivity timer that frequency band 2 is separately configured, 3) using having contracting
Put the inactivity timer of the DRX of value or 4) using the inactivity timer with scale value being separately configured for frequency band 1.Contracting
Putting value can be by DRX configuration or individual configuration instruction.
C. from frequency band 1 to frequency band 2 switching depend on base station L1/MAC signal (but control channel receive timing be
Be separately configured), and the switching from frequency band 2 to frequency band 1 also depend on base station L1/MAC signal (but control channel receive
Timing is separately configured) in the case where:
In this case, the DRX circulation of band sharing should be configured and open the DRX circulation of duration or each frequency band
With the unlatching duration.In the case where band sharing, individual band configurations are not needed for DRX configuration.If it is each
Band configurations DRX then executes configuration at least one of by the following method: 1) by the quantity Matching of DRX configuration and frequency band
And indicate the frequency band in each DRX configuration, and 2) one DRX of setting configure and indicates to include holding in DRX configuration for unlatching
The continuous time and close the duration operation frequency band, 3) one DRX of setting configure and indicate DRX configure in include short DRX
Circulation and long DRX circulation each of frequency band or 4) be arranged a DRX configure and indicate include DRX configure in
For opening the frequency band of each of duration, short DRX circulation and long DRX circulation.
In setting proposed by the present invention and in the process, the layer 2 of terminal may not be needed to know the physical location of frequency band and big
It is small.That is, the physical message of frequency band is invisible at layer 2, but logical place and size can be set.Layer 2 can be with base
Control channel or transmission channel are constructed in logic frequency band location/size information.It is operated in addition, terminal can be managed for DRX
List in BW information and according to index display it.
In the example proposed in the disclosure, it has been assumed that most of terminals cannot monitor narrowband and broadband BW simultaneously.But
It is that, according to the ability of terminal, can monitor narrowband and broadband BW simultaneously in some cases.
Meanwhile it the BW that is provided by L1 signal and can be different according to the maximum BW of the terminal of terminal capability.Therefore,
When receiving multiple BW specific DRX configuration, terminal can be specific in one or more BW in the maximum BW of terminal capability
DRX configuration the unlatching duration in operate simultaneously.The DRX configuration of the maximum BW more than terminal capability is excluded from monitoring
Open the duration.For the operation, the priority of the specific DRX configuration of BW can be allocated to terminal by base station.
Figure 64 is the flow chart for showing the operation of terminal according to an embodiment of the present disclosure.
With reference to Figure 64, during RRC connection establishment process S6410, terminal is in operation S6420 and S6430 request and from object
Manage the information for the position that layer is obtained about operation BW or control subband (CSB).
In operation S6440, based on acquired information, or by reporting acquired information to base station, terminal from
Base station receives the DRX configuration or the configuration of the parameter for every BW in DRX of every BW.
When connecting completion, terminal starts the operation for short DRX in C-DRX.In operation S6450, terminal is to each
Subframe executes PDCCH monitoring to receive the control signal of base station.Then, in operation S6460, terminal determines that the reception of DL signal is
No success.
If the reception success of DL signal, terminal are consecutively carried out PDCCH monitoring.Under certain conditions, it is understood that there may be
Such situation: although successfully having carried out PDCCH monitoring, L1 control or RRC control under monitored another BW or
CSB。
If the result as PDCCH monitoring does not receive DL signal, terminal updates DRX parameter in operation S6465, all
Such as inactivity timer and DRX cycle timer.If due to meeting inactivity timer or BW switching timing in operation 6470
The condition of device and need to carry out BW switching, then terminal operation S6475 check whether it meets short DRX termination condition.Condition example
Such as correspond to the case where PDCCH monitoring fails at minimum BW and the BW further reduced is therefore not present or short DRX is followed
The case where ring timer expires.
If being unsatisfactory for short DRX termination condition in operation 6470, terminal reduces BW in operation S6480 and restarts
Short DRX operation.
If meeting short DRX termination condition, terminal starts long DRX in operation S6485.Long DRX operation is with minimum or matches
The BW set is executed, and is generally similar to LTE long DRX operation.In operation S6490, terminal monitors PDCCH according to long DRX.If
It is unsuccessfully received DL signal in operation S6491, then terminal determines whether to meet long DRX termination condition in operation S6492.If
Meet long DRX termination condition, then in operation S6493, terminal is switched to idle mode.
For the method for determining the inactive condition in wide BWP to be separately provided:
The BW of the disclosure is adaptive or handover operation is different from SCell addition/release in existing CA, as described below.?
In CA, PCell is activated always, and terminal monitors PCell.However, in the case where BW switching, even if in any frequency band
Mobile, terminal should also be sent to base station and the control signal from base station reception such as RRC signal and MAC CE.Therefore, even if
Terminal is switched to another frequency band (frequency band 2) from a frequency band (frequency band 1) and does not have data service in frequency band 2, and terminal can also
Signal is controlled to receive the RRC/MAC of base station.However, the RRC/MAC for receiving base station in the frequency band 2 as narrowband controls signal
It will affect the power consumption of terminal.Therefore, when determining inactive in frequency band 2, terminal can be operated by the following: 1) not
The control channel activity of the RRC/MAC for being used to only send base station control signal is reflected in inactivity timer operation, 2) only
The dispatching distribution that will be less than some Physical Resource Block (PRB) is reflected in non-active timer operation, and 3) when in a certain continue
In when receiving base station signal (or a certain amount of transmission) of a certain number, be reflected in inactivity timer operation, 4) only
Specific DCI format is reflected in inactivity timer operation or 5) by the independent instruction of base station and determines whether to reflect
In inactivity timer operation.
Dual timer setting:
The above description is that the timer operations for being switched to narrowband from broadband.Being switched to broadband from narrowband can be by base
The DCI/MAC signal designation stood.However, terminal should be switched to from broadband when mistake occurs when receiving DCI/MAC signal
Narrowband is to retract.However, base station can be arranged differently than timer value, because the requirement of two kinds of situations may be different.?
That is terminal starts timer # when receiving the DCI/MAC signal for being switched to broadband from narrowband during monitoring
1.If terminal does not also receive base station letter until timer #1 expires while executing frequency band handover operation in broadband
Number, then terminal returns to narrowband.
On the other hand, success receives base station signal in broadband and is then not received by after the unlatching duration terminates
The terminal of base station signal starts timer #2.When timer #2 expires, terminal is switched to narrowband.Generally, it is advantageous to timing
The value of device #1 is shorter than the value of timer #2, because of fast fallback in case of mistakes.
Figure 65 shows the DRX operation according to an embodiment of the present disclosure changed for TTI.
With reference to Figure 65, the time needed for transmission time interval (TTI) refers to the one or more transmission blocks (TB) of transmission, and
It is typically used as the Elementary Time Unit for executing scheduling and HARQ operation in MAC.Terminal is preparatory in initial access process
TTI information is received, or default TTI and BW information is received by SI.
For example, basic TTI can be set by the normal TTI that length is 1ms.In addition, during random access procedure or
After completion is established in RRC connection, terminal can receive additional TTI and BW information by RRC information.For example, can will be attached
TTI is added to be set as the short TTI that length is 0.5ms.
For expressing the parameter of DRX operation in LTE to indicate as unit of subframe.With reference to the normal TTI situation of Figure 65
6510, it can be seen that the unlatching duration is indicated that DRX circulation is indicated by 6ms by 2ms.
When DRX parameter expression scheme identical with LTE is imported directly 5G, TTI is arranged to short TTI, such as short TTI feelings
Shown in condition A 6520, and terminal monitors PDCCH during the unlatching duration that identical DRX recycles the 2ms in (6ms).Though
So in normal TTI, the number of PDCCH monitoring is twice, but in short TTI feelings in same unlatching duration (2ms)
In condition A, TTI length is reduced to half, therefore the number of PDCCH monitoring increases to four times.However, due to not remaining identical
PDCCH monitoring machine meeting, it is thus possible to increase the power consumption of terminal.
In short TTI situation B 6530, according to reduced TTI, the unlatching duration is reduced to 1ms from 2ms, and
The number of PDCCH monitoring is also reduced to twice within a unlatching duration.However, because of the TTI according to reduction, DRX is followed
Ring is also reduced to 3ms from 6ms, monitors so four PDCCH still are arranged for the time identical with normal TTI situation.Therefore,
Between short TTI situation A 6520 and short TTI situation B 6530, the power consumption of terminal is constant.
Therefore, the present disclosure proposes following methods.That is, in DRX parameter, timing relevant to PDCCH monitoring
Device (opening duration, inactivity timer etc.) is indicated by TTI, and other parameters are indicated by subframe.
With reference to short TTI situation C 6540, compared with normal TTI, the unlatching duration is reduced to 1ms from 2ms, and
The number of PDCCH monitoring also remains twice within a unlatching duration.In addition, in DRX circulation 6ms, with normal TTI
It compares, the number of PDCCH monitoring remains twice.In detail, open the duration, inactivity timer,
ULRetransmissionTimer, StartOffset etc. can be indicated by TTI, and DRX circulation, shortCycleTimer etc.
It can be indicated by subframe.
TTI length can be set by SI or RRC, but for the ease of dynamic dispatching, can be held in physical layer L1
The additional TTI of row or PDCCH resource setting.However, if TTI length be arranged according to additional TTI/PDCCH resource and dynamically
Change, then may postpone when recalculating the timer on L2 layer.When scheduling/HARQ operation occurs in short TTI,
The delay may cause problem.Therefore, the present disclosure proposes it is a kind of not by according to L1 signal and TTI that dynamic changes include
Method in the calculating of MAC timer.According to embodiment, MAC is not included in by the variation in the specific time length of RRC setting
During timer calculates, and the variation for being longer than specific time length may include in the calculating of MAC timer.
According to embodiment, RRC information can be arranged to terminal to define the length of the TTI of specific timer in base station.For example,
The unlatching duration can be set to shortest TTI (0.25ms), and inactivity timer can be set to shorter TTI
(0.5ms), and DRX circulation can be set to normal TTI (1.0ms).Furthermore, it is possible to preassign some ginsengs in a standard
Number.For example, the length for the mini time slot being arranged in L1 can be depended on by opening the duration, and it can specify DRX circulation
To follow the length for the time slot being arranged in L1.
According to embodiment, some parameters needed for DRX process can temporally unit be fixed, and other parameters can be set
To change chronomere according to numerology.Base station can fix DRX circulation, shortCycleTimer etc. as unit of subframe.It opens
Opening duration, inactivity timer, ULRetransmissionTimer and StartOffset can be with [time slot, when mini
Gap] be that unit indicates, and by the control channel for using which unit that can be arranged according to base station, frequency band, the index in DCI and
Any combination of TTI determines.For example, opening duration value if terminal receives control channel in the frequency band 1 of eMBB
4 are considered as 4 time slots, and if terminal receives control channel in the frequency band 2 of URLLC, when identical unlatching continues
Between value 4 be understood to 4 mini time slots.
Figure 66 be show it is according to an embodiment of the present disclosure based on control channel monitoring period and transmitting continuous time come
Determine the exemplary figure of TTI value.
It according to circumstances can differently be determined with reference to Figure 66 according to control channel monitoring period and transmitting continuous time
The value of TTI.
In situation (a) 6610 and (b) 6620 in Figure 66, data channel only is distributed within the control channel observation period,
So that the transmission cycle of scheduling is equal to control channel and observes the period.Therefore, TTI is equal to the control channel observation period.However, scheming
Under 66 the case where (c) 6630, the transmitting continuous time is indicated as being longer than the control channel observation period, so that the transmission cycle of scheduling
It is fuzzy.
This can change according to the control of base station.If base station has transmission longer than the control channel observation period
Instruction terminal is on the transmission block of duration so as not to observe the control channel of overlapping, then TTI is equal to indicated transmitting continuous
Time.However, base station can if base station instruction terminal observation control channel even during the transmitting continuous time observes the period
Periodic scheduling terminal is observed with every control channel.Therefore, in this case, TTI is identical as the control channel observation period.
About the specific embodiment based on the operation of timer switch of frequency band as shown in Figure 54, Figure 55, Figure 56 and Figure 60
It is described below.The timer can be new timer, such as frequency band switching timer or frequency band validity timer, or
It can be existing timer, such as DRX inactivity timer or the short cycle timer of DRX.
Figure 67 is the figure for showing the frequency band handover operation based on timer according to various embodiments of the present disclosure.
[embodiment 4-1]
With reference to Figure 67, embodiment 4-1 shows the operating process for supporting situation A 6710.
MAC entity, which can be configured as, has the function of DRX, and the PDCCH for controlling UE by RRC is monitored.If in UE
DRX is configured when in RRC_CONNECTED state, then MAC entity can be operated according to described DRX and discontinuously be monitored
PDCCH.When being operated using DRX, MAC entity should be according to particular requirement by being monitored in specific time using special frequency band
PDCCH.For at least one of following parameter of DRX operative configuration: drx_BandIndex, onDurationTimer, drx-
InactivityTimer、drx-RetransmissionTimer、drx-ULRetransmissionTimer、longDRX-
Cycle、drxStartOffset、drxShortCycleTimer、shortDRX-Cycle。
Drx_BandIndex relevant to frequency band may include DRX configuration in, or can be used in RRC connection (weigh
The index of the frequency band of default or main band is configured as in the band configurations for including in configuration process newly) to define, without
It is included in DRX configuration.
For example, it can be expressed as drx_BandIndex=defaultBandIndex or drx_BandIndex=
primaryBandIndex。
If being configured with DRX circulation, the MAC entity of UE operates within the activity time in a case where:
As onDurationTimer, drx-InactivityTimer, drx-RetransmissionTimer, drx-
When at least one of ULRetransmissionTimer and mac-ContentionResolutionTimer are currently running,
When scheduling request (scheduling request, SR) is sent to PUCCH and hangs up,
When the UL authorization that can occur to retransmit for not sent HARQ, and
When for after receiving RAR, when the first time transmission on PDCCH generates control signal.
If being configured with DRX, the MAC entity of UE each subframe (time slot, symbol or by the time of RRC setting it is single
Position) in execute following operation.
When receiving DRX order MAC CE or long DRX order MAC CE,
Stop onDurationTimer and drx-Inactivity Timer.
When drx-Inactivity Timer expires or receives DRX order MAC CE,
If ■ is configured with short DRX circulation, (again) starting drxShortCycleTimer is simultaneously recycled using short DRX.
If short DRX circulation is not configured in ■, recycled using long DRX.
When drxShortCycleTimer expires, recycled using long DRX.
When drxShortCycleTimer is not yet due and receives long DRX order MAC CE,
Stop drxShortCycleTimer and is recycled using long DRX.
When short DRX, which is used, in UE recycles and meet following equation according to current SFN and subframe value, starting
onDurationTimer。
■ [(SFN*10)+subframe numbers] modulo (shortDRX-Cycle)=(drxStartOffset) modulo
(shortDRX-Cycle)。
When long DRX, which is used, in UE recycles and meet following equation according to current SFN and subframe value, starting
onDurationTimer。
■ [(SFN*10)+subframe numbers] modulo (longDRX-Cycle)=drxStartOffset.
The MAC entity of UE the activity time there are the subframe of PDCCH (or time slot, symbol or by RRC be arranged time
Unit) in and in the frequency band indicated by drx_BandIndex monitor PDCCH.If PDCCH indicates that DL is passed in the burst
It is defeated, or distributed if being provided with DL in the burst, UE starting is used for the HARQ RTT timer of corresponding HARQ procedure, and
Stop the drx-RetransmissionTimer for being used for identical HARQ procedure.
If PDCCH indicates that UL is transmitted in the burst, or authorizes if being provided with UL in the burst, UE starting
The UL HARQ RTT timer of HARQ procedure for the subframe finally retransmitted including corresponding PUSCH transmission.In addition, UE
Stop the DRX_ULRetransmissionTimer for being used for identical HARQ procedure.
If the new transmission of PDCCH instruction, UE (again) start drx-InactivityTimer.
[embodiment 4-2]
Embodiment 4-2 shows a case that support the operating process of B 6720 in Figure 67.
MAC entity, which can be configured as, has the function of DRX, and the PDCCH for controlling UE by RRC is monitored.If in UE
DRX is configured when in RRC_CONNECTED state, then MAC entity can be operated according to described DRX and discontinuously be monitored
PDCCH.When being operated using DRX, MAC entity should be according to particular requirement by being monitored in specific time using special frequency band
PDCCH.For at least one of following parameter of DRX operative configuration: onDurationTimer, drx-
InactivityTimer、drx-RetransmissionTimer、drx-ULRetransmissionTimer、longDRX-
Cycle、drxStartOffset、drx_BandIndex_longDRX-Cycle、drxShortCycleTimer、shortDRX-
Cycle。
Drx_BandIndex_longDRX-Cycle relevant to frequency band may include that or can use in DRX configuration
The index of the frequency band of default or main band is configured as in the band configurations for including in RRC connection (again) configuration process
It defines, without being included in DRX configuration.
For example, it can be expressed as drx_BandIndex_longDRX-Cycle=defaultBandIndex, or
Drx_BandIndex_longDRX-Cycle=primaryBandIndex.
If being configured with DRX circulation, the MAC entity of UE operates within the activity time in a case where:
As onDurationTimer, drx-InactivityTimer, drx-RetransmissionTimer, drx-
When at least one of ULRetransmissionTimer and mac-ContentionResolutionTimer are currently running,
When scheduling request (SR) is sent to PUCCH and hangs up,
When the UL authorization that can occur to retransmit for not sent HARQ, and
When for after receiving RAR, when the first time transmission on PDCCH generates control signal.
If being configured with DRX, the MAC entity of UE each subframe (time slot, symbol or by the time of RRC setting it is single
Position) in execute following operation.
When receiving DRX order MAC CE or long DRX order MAC CE,
Stop onDurationTimer and drx-Inactivity Timer.
When drx-Inactivity Timer expires or receives DRX order MAC CE,
If ■ is configured with short DRX circulation, (again) starting drxShortCycleTimer is simultaneously recycled using short DRX.
If short DRX circulation is not configured in ■, recycled using long DRX.
When drxShortCycleTimer expires, recycled using long DRX.
When drxShortCycleTimer is not yet due and receives long DRX order MAC CE,
Stop drxShortCycleTimer and is recycled using long DRX.
When short DRX, which is used, in UE recycles and meet following equation according to current SFN and subframe value, starting
onDurationTimer。
■ [(SFN*10)+subframe numbers] modulo (shortDRX-Cycle)=(drxStartOffset) modulo
(shortDRX-Cycle)。
When long DRX, which is used, in UE recycles and meet following equation according to current SFN and subframe value, starting
onDurationTimer。
■ [(SFN*10)+subframe numbers] modulo (longDRX-Cycle)=drxStartOffset.
The MAC entity of UE within the activity time there are the subframe of PDCCH (or time slot, symbol or by RRC setting when
Between unit) in monitor PDCCH, and if use long DRX circulation if drx_BandIndex_longDRX-Cycle instruction
PDCCH is monitored in frequency band.If PDCCH indicates that DL is transmitted in the burst, or distributes if being provided with DL in the burst,
Then UE starting is used for the HARQ RTT timer of corresponding HARQ procedure, and stops the drx- for being used for identical HARQ procedure
RetransmissionTimer。
If PDCCH indicates that UL is transmitted in the burst, or authorizes if being provided with UL in the burst, UE starting
The UL HARQ RTT timer of HARQ procedure for the subframe finally retransmitted including corresponding PUSCH transmission.In addition, UE
Stop the DRX_ULRetransmissionTimer for being used for identical HARQ procedure.
If the new transmission of PDCCH instruction, UE (again) start drx-InactivityTimer.
[embodiment 4-3]
Embodiment 4-3 shows a case that support the operating process of both A 6710 and situation B 6720 in Figure 67.
MAC entity, which can be configured as, has the function of DRX, and the PDCCH for controlling UE by RRC is monitored.If in UE
DRX is configured when in RRC_CONNECTED state, then MAC entity can be operated according to described DRX and discontinuously be monitored
PDCCH.When being operated using DRX, MAC entity should be according to particular requirement by being monitored in specific time using special frequency band
PDCCH.For at least one of following parameter of DRX operative configuration: onDurationTimer, drx-
InactivityTimer、drx-RetransmissionTimer、drx-ULRetransmissionTimer、longDRX-
Cycle、drxStartOffset、drx_BandIndex_longDRX-Cycle、drxShortCycleTimer、shortDRX-
Cycle、drx_BandIndex_shortDRX-Cycle。
Drx_BandIndex_longDRX-Cycle or drx_BandIndex_shortDRX-Cycle relevant to frequency band
May include DRX configuration in, or can be used in RRC connection (again) configuration process in include band configurations in be configured
It is defined for the index of the frequency band of default or main band, without being included in DRX configuration.
For example, it can be expressed as drx_BandIndex_shortDRX-Cycle=defaultBandIndex, or
Drx_BandIndex_longDRX-Cycle=primaryBandIndex.
If being configured with DRX circulation, the MAC entity of UE operates within the activity time in a case where:
As onDurationTimer, drx-InactivityTimer, drx-RetransmissionTimer, drx-
When at least one of ULRetransmissionTimer and mac-ContentionResolutionTimer are currently running,
When scheduling request (SR) is sent to PUCCH and hangs up,
When the UL authorization that can occur to retransmit for not sent HARQ, and
When for after receiving RAR, when the first time transmission on PDCCH generates control signal.
If being configured with DRX, the MAC entity of UE each subframe (time slot, symbol or by the time of RRC setting it is single
Position) in execute following operation.
When receiving DRX order MAC CE or long DRX order MAC CE,
Stop onDurationTimer and drx-Inactivity Timer.
When drx-Inactivity Timer expires or receives DRX order MAC CE,
If ■ is configured with short DRX circulation, (again) starting drxShortCycleTimer is simultaneously recycled using short DRX.
If short DRX circulation is not configured in ■, recycled using long DRX.
When drxShortCycleTimer expires, recycled using long DRX.
When drxShortCycleTimer is not yet due and receives long DRX order MAC CE,
Stop drxShortCycleTimer and is recycled using long DRX.
When short DRX, which is used, in UE recycles and meet following equation according to current SFN and subframe value, starting
onDurationTimer。
■ [(SFN*10)+subframe numbers] modulo (shortDRX-Cycle)=(drxStartOffset) modulo
(shortDRX-Cycle)。
When long DRX, which is used, in UE recycles and meet following equation according to current SFN and subframe value, starting
onDurationTimer。
■ [(SFN*10)+subframe numbers] modulo (longDRX-Cycle)=drxStartOffset.
The MAC entity of UE within the activity time there are the subframe of PDCCH (or time slot, symbol or by RRC setting when
Between unit) in monitor PDCCH, and if recycled using short DRX, refer to by drx_BandIndex_shortDRX-Cycle
PDCCH is monitored in the frequency band shown, or if recycled using long DRX, is referred to by drx_BandIndex_longDRX-Cycle
PDCCH is monitored in the frequency band shown.If PDCCH indicates that DL is transmitted in the burst, or if is provided with DL in the burst
Distribution, then UE starting is used for the HARQ RTT timer of corresponding HARQ procedure, and stops the drx- for being used for identical HARQ procedure
RetransmissionTimer。
If PDCCH indicates that UL is transmitted in the burst, or authorizes if being provided with UL in the burst, UE starting
The UL HARQ RTT timer of HARQ procedure for the subframe finally retransmitted including corresponding PUSCH transmission.In addition, UE
Stop the DRX_ULRetransmissionTimer for being used for identical HARQ procedure.
If the new transmission of PDCCH instruction, UE (again) start drx-InactivityTimer.
[embodiment 4-4]
Embodiment 4-4 shows a case that support the operating process of B 6720 in Figure 67.
MAC entity, which can be configured as, has the function of DRX, and the PDCCH for controlling UE by RRC is monitored.If in UE
DRX is configured when in RRC_CONNECTED state, then MAC entity can be operated according to described DRX and discontinuously be monitored
PDCCH.When being operated using DRX, MAC entity should be according to particular requirement by being monitored in specific time using special frequency band
PDCCH.For at least one of following parameter of DRX operative configuration: onDurationTimer, drx-
InactivityTimer、drx-RetransmissionTimer、drx-ULRetransmissionTimer、longDRX-
Cycle、drxStartOffset、drx_BandIndex_longDRX-Cycle、drxShortCycleTimer、shortDRX-
Cycle。
Drx_BandIndex_longDRX-Cycle relevant to frequency band may include that or can use in DRX configuration
The index of the frequency band of default or main band is configured as in the band configurations for including in RRC connection (again) configuration process
It defines, without being included in DRX configuration.
For example, it can be expressed as drx_BandIndex_longDRX-Cycle=defaultBandIndex or drx_
BandIndex_longDRX-Cycle=primaryBandIndex.
If being configured with DRX circulation, the MAC entity of UE operates within the activity time in a case where:
As onDurationTimer, drx-InactivityTimer, drx-RetransmissionTimer, drx-
When at least one of ULRetransmissionTimer and mac-ContentionResolutionTimer are currently running,
When scheduling request (SR) is sent to PUCCH and hangs up,
When the UL authorization that can occur to retransmit for not sent HARQ, and
When for after receiving RAR, when the first time transmission on PDCCH generates control signal.
If being configured with DRX, the MAC entity of UE each subframe (time slot, symbol or by the time of RRC setting it is single
Position) in execute following operation.
When receiving DRX order MAC CE or long DRX order MAC CE,
Stop onDurationTimer and drx-Inactivity Timer.
When drx-Inactivity Timer expires or receives DRX order MAC CE,
If ■ is configured with short DRX circulation, (again) starting drxShortCycleTimer is simultaneously recycled using short DRX.
If short DRX circulation is not configured in ■, is recycled and used by drx_BandIndex_longDRX- using long DRX
The frequency band of Cycle instruction.
When drxShortCycleTimer expires, is recycled and used by drx_BandIndex_ using long DRX
The frequency band of longDRX-Cycle instruction.
When drxShortCycleTimer is not yet due and receives long DRX order MAC CE
Stop drxShortCycleTimer, is recycled using long DRX, and use is by drx_BandIndex_longDRX-
The frequency band of Cycle instruction.
When short DRX, which is used, in UE recycles and meet following equation according to current SFN and subframe value, starting
onDurationTimer。
■ [(SFN*10)+subframe numbers] modulo (shortDRX-Cycle)=(drxStartOffset) modulo
(shortDRX-Cycle)。
When long DRX, which is used, in UE recycles and meet following equation according to current SFN and subframe value, starting
onDurationTimer。
■ [(SFN*10)+subframe numbers] modulo (longDRX-Cycle)=drxStartOffset.
The MAC entity of UE within the activity time there are the subframe of PDCCH (or time slot, symbol or by RRC setting when
Between unit) in monitor PDCCH.If PDCCH indicates that DL is transmitted in the burst, or if in the burst provided with DL points
Match, then UE starting is used for the HARQ RTT timer of corresponding HARQ procedure, and stops the drx- for being used for identical HARQ procedure
RetransmissionTimer。
If PDCCH indicates that UL is transmitted in the burst, or authorizes if being provided with UL in the burst, UE starting
The UL HARQ RTT timer of HARQ procedure for the subframe finally retransmitted including corresponding PUSCH transmission.In addition, UE
Stop the DRX_ULRetransmissionTimer for being used for identical HARQ procedure.
If the new transmission of PDCCH instruction, UE (again) start drx-InactivityTimer.
[embodiment 4-5]
Embodiment 4-5 shows a case that support the operating process of A 6710 and situation B 6720 in Figure 67.
MAC entity, which can be configured as, has the function of DRX, and the PDCCH for controlling UE by RRC is monitored.If in UE
DRX is configured when in RRC_CONNECTED state, then MAC entity can be operated according to described DRX and discontinuously be monitored
PDCCH.When being operated using DRX, MAC entity should be according to particular requirement by being monitored in specific time using special frequency band
PDCCH.For at least one of following parameter of DRX operative configuration: onDurationTimer, drx-
InactivityTimer、drx-RetransmissionTimer、drx-ULRetransmissionTimer、longDRX-
Cycle、drxStartOffset、drx_BandIndex_longDRX-Cycle、drxShortCycleTimer、shortDRX-
Cycle、drx_BandIndex_shortDRX-Cycle。
Drx_BandIndex_longDRX-Cycle or drx_BandIndex_shortDRX- relevant to frequency band
Cycle may include DRX configuration in, or can be used in RRC connection (again) configuration process in include band configurations in
The index of the frequency band of default or main band is configured as to define, without being included in DRX configuration.For example, it can be with
It is expressed as drx_BandIndex_shortDRX-Cycle=defaultBandIndex or drx_BandIndex_
LongDRX-Cycle=primaryBandIndex.
If being configured with DRX circulation, the MAC entity of UE operates within the activity time in a case where:
As onDurationTimer, drx-InactivityTimer, drx-RetransmissionTimer, drx-
When at least one of ULRetransmissionTimer and mac-ContentionResolutionTimer are currently running,
When scheduling request (SR) is sent to PUCCH and hangs up,
When the UL authorization that can occur to retransmit for not sent HARQ, and
When for after receiving RAR, when the first time transmission on PDCCH generates control signal.
If being configured with DRX, the MAC entity of UE each subframe (time slot, symbol or by the time of RRC setting it is single
Position) in execute following operation.
When receiving DRX order MAC CE or long DRX order MAC CE,
Stop onDurationTimer and drx-Inactivity Timer.
When drx-Inactivity Timer expires or receives DRX order MAC CE,
If ■ is configured with short DRX circulation, (again) starting drxShortCycleTimer is recycled using short DRX, and
Use the frequency band indicated by drx_BandIndex_shortDRX-Cycle.
If short DRX circulation is not configured in ■, recycled using long DRX, and use is by drx_BandIndex_longDRX-
The frequency band of Cycle instruction.
It when drxShortCycleTimer expires, is recycled using long DRX, and use is by drx_BandIndex_
The frequency band of longDRX-Cycle instruction.
When drxShortCycleTimer is not yet due and receives long DRX order MAC CE,
Stop drxShortCycleTimer, is recycled using long DRX, and use is by drx_BandIndex_longDRX-
The frequency band of Cycle instruction.
When short DRX, which is used, in UE recycles and meet following equation according to current SFN and subframe value, starting
onDurationTimer。
■ [(SFN*10)+subframe numbers] modulo (shortDRX-Cycle)=(drxStartOffset) modulo
(shortDRX-Cycle)。
When long DRX, which is used, in UE recycles and meet following equation according to current SFN and subframe value, starting
onDurationTimer。
■ [(SFN*10)+subframe numbers] modulo (longDRX-Cycle)=drxStartOffset.
The MAC entity of UE within the activity time there are the subframe of PDCCH (or time slot, symbol or by RRC setting when
Between unit) in monitor PDCCH.If PDCCH indicates that DL is transmitted in the burst, or if in the burst provided with DL points
Match, then UE starting is used for the HARQ RTT timer of corresponding HARQ procedure, and stops the drx- for being used for identical HARQ procedure
RetransmissionTimer。
If PDCCH indicates that UL is transmitted in the burst, or authorizes if being provided with UL in the burst, UE starting
The UL HARQ RTT timer of HARQ procedure for the subframe finally retransmitted including corresponding PUSCH transmission.In addition, UE
Stop the DRX_ULRetransmissionTimer for being used for identical HARQ procedure.
If the new transmission of PDCCH instruction, UE (again) start drx-InactivityTimer.
[embodiment 4-6]
Embodiment 4-6 shows a case that support the operating process of C 6730 in Figure 67.
MAC entity, which can be configured as, has the function of DRX, and the PDCCH for controlling UE by RRC is monitored.If in UE
DRX is configured when in RRC_CONNECTED state, then MAC entity can be operated according to described DRX and discontinuously be monitored
PDCCH.When being operated using DRX, MAC entity should be monitored in specific time using special frequency band according to particular requirement
PDCCH.For at least one of following parameter of DRX operative configuration: drx_BandIndex, onDurationTimer, drx-
InactivityTimer、drx-RetransmissionTimer、drx-ULRetransmissionTimer、longDRX-
Cycle、drxStartOffset、drxShortCycleTimer、shortDRX-Cycle。
Drx_BandIndex relevant to frequency band may include DRX configuration in, or can be used in RRC connection (weigh
The index of the frequency band of default or main band is configured as in the band configurations for including in configuration process newly) to define, without
It is included in DRX configuration.
For example, it can be expressed as drx_BandIndex=defaultBandIndex or drx_BandIndex=
primaryBandIndex。
If being configured with DRX circulation, the MAC entity of UE operates within the activity time in a case where:
As onDurationTimer, drx-InactivityTimer, drx-RetransmissionTimer, drx-
When at least one of ULRetransmissionTimer and mac-ContentionResolutionTimer are currently running,
When scheduling request (SR) is sent to PUCCH and hangs up,
When the UL authorization that can occur to retransmit for not sent HARQ, and
When for after receiving RAR, when the first time transmission on PDCCH generates control signal.
If being configured with DRX, the MAC entity of UE each subframe (time slot, symbol or by the time of RRC setting it is single
Position) in execute following operation.
When receiving DRX order MAC CE or long DRX order MAC CE,
Stop onDurationTimer and drx-Inactivity Timer.
When current active frequency band is not equal to the frequency band indicated by drx_BandIndex;
If ■ drx-Inactivity Timer expires,
◆ using the frequency band indicated by drx_BandIndex, and
◆ (again) start drx-InactivityTimer.
When current active frequency band is equal to the frequency band indicated by drx_BandIndex;
If ■ drx-Inactivity Timer expires or if receiving DRX order MAC CE,
◆ if it is configured with short DRX circulation, (again) starting drxShortCycleTimer is simultaneously recycled using short DRX.
◆ if short DRX circulation is not configured, is recycled using long DRX.
If ■ drxShortCycleTimer expires, recycled using long DRX.
If ■ drxShortCycleTimer is not yet due, and if receiving long DRX order MACCE,
Stop drxShortCycleTimer and is recycled using long DRX.
■ when UE is used short DRX recycles and meets following equation according to current SFN and subframe value when, starting
onDurationTimer。
◆ [(SFN*10)+subframe numbers] modulo (shortDRX-Cycle)=(drxStartOffset) modulo
(shortDRX-Cycle)。
■ when UE is used long DRX recycles and meets following equation according to current SFN and subframe value when, starting
onDurationTimer。
◆ [(SFN*10)+subframe numbers] modulo (longDRX-Cycle)=drxStartOffset.
The MAC entity of UE within the activity time there are the subframe of PDCCH (or time slot, symbol or by RRC setting when
Between unit) in monitor PDCCH.If PDCCH indicates that DL is transmitted in the burst, or if in the burst provided with DL points
Match, then UE starting is used for the HARQ RTT timer of corresponding HARQ procedure, and stops the drx- for being used for identical HARQ procedure
RetransmissionTimer。
If PDCCH indicates that UL is transmitted in the burst, or authorizes if being provided with UL in the burst, UE starting
The UL HARQ RTT timer of HARQ procedure for the subframe finally retransmitted including corresponding PUSCH transmission.In addition, UE
Stop the DRX_ULRetransmissionTimer for being used for identical HARQ procedure.
If the new transmission of PDCCH instruction, UE (again) start drx-InactivityTimer.
In the interband handover operation based on timer of the disclosure, UE can be determined due to fixed according to one of following methods
When device expire and the frequency band that is moved to.
1) in the case where being switched to frequency band 2 from frequency band 1, frequency band 1 is returned since timer expires.
2) frequency band of every timer setting for switching
3) since timer expires, previous band is returned
4) since timer expires, the frequency band of given priority is returned
The interband handover operation based on timer of the disclosure is as follows.
Figure 68 is the figure for showing the frequency band handover operation according to an embodiment of the present disclosure based on timer.
With reference to Figure 68, when meeting the condition of specified criteria or base station configuration, terminal is used for one in operation S6810 triggering
The timer of frequency band.Some operating characteristics of timer, for example, timer increase/reduce the time, timer increase/reduced value,
It can be previously given with timer maturity value or be configured by base station.
Whether met according to condition, terminal can star timer, or increase or decrease timer value.When timer
When current value reaches the maturity value of timer, in operation S6820, terminal is switched to another frequency band from present band (first band)
(second band).In addition, terminal stops the timer operation for being used for first band.
The second band that terminal will be switched to can be provided in advance or be configured by base station.
Figure 69 is the figure for showing another frequency band handover operation based on timer according to an embodiment of the present disclosure.
With reference to Figure 69, when operation S6910 terminal receives the instruction of the scheduling to first band from base station, terminal is being grasped
Make the timer that S6920 triggering is used for first band.According to pre-defined rule, timer increases or decreases a certain amount of time.
Then, in operation S6930, terminal determines whether timer expires.It is also connect again even if timer is not yet due
The scheduling instruction to first band is received, then terminal restarting is used for the timer of first band.
When timer value reaches given timer maturity value, in operation S6940, terminal is switched to the from first band
Two frequency bands.In addition, terminal stops the timer operation for being used for first band.
Figure 70 is the figure for showing the another frequency band handover operation based on timer according to an embodiment of the present disclosure.
With reference to Figure 70, when the instruction for being switched to first band from current operating band is received from base station in operation S7010
When, terminal is used for the timer of first band in operation S7020 triggering.According to pre-defined rule, timer is increased or decreased centainly
The time of amount.
Then, in operation S7030, terminal determines whether timer expires.It is also connect again even if timer is not yet due
The scheduling instruction to first band is received, then terminal restarting is used for the timer of first band.
When timer value reaches given timer maturity value, in operation S7040, terminal is switched to the from first band
Two frequency bands.In addition, terminal stops the timer operation for being used for first band.
Figure 71 is the figure for showing the another frequency band handover operation based on timer according to an embodiment of the present disclosure.
With reference to Figure 71, when operation S7110 receives the instruction for being switched to first band from base station, terminal is being operated
S7120 triggering is used for the timer of first band.
If the terminal operated in the first frequency band is not received by given time for the first frequency in operation S7130
The scheduling of band indicates, then in operation S7140, terminal continues the timer for first band so that timer value according to
Pre-defined rule increases or decreases specified rate.
Even if the not yet due scheduling instruction also received to first band of timer for first band, then terminal
Restarting is used for the timer of first band.When operation S7150 timer value reaches given timer maturity value,
S7160 is operated, terminal is switched to second band from first band.In addition, terminal stops the timer operation for being used for first band.
Figure 72 is the figure for showing the configuration of terminal according to an embodiment of the present disclosure.
With reference to Figure 72, terminal may include the transceiver 7210 for sending/receiving signal to/from any other equipment,
And the controller 7220 of all operations for controlling terminal.In the disclosure, controller 7220 can be defined as circuit,
Specific integrated circuit or at least one processor.
Controller 7220 can execute aforesaid operations according to various embodiments of the present disclosure, including BW controller 7221,
DRX controller 7222 and system time controller 7223.For example, controller 7220 can control the signal stream between each piece
To execute the operation according to above-mentioned first to fourth embodiment.However, controller 7220 and transceiver 7110 are not necessarily embodied as
Individual device, and individual unit can be embodied as in the form of one single chip.
Figure 73 is the figure for showing the configuration of base station according to an embodiment of the present disclosure.
With reference to Figure 73, base station may include transceiver 7310, controller 7320 and memory 7330 (that is, storage equipment).
In the disclosure, controller can be defined as circuit, specific integrated circuit or at least one processor.
Transceiver 7310 can send and receive signal.Controller 7320 can control first to fourth according to the disclosure
The integrated operation of the base station of embodiment.For example, controller 7320 can control the signal stream between each piece to execute according to upper
State the operation of first to fourth embodiment.
It should be noted that being described above and structure, process, operation, the function etc. being shown in the accompanying drawings are not intended to be limited to the disclosure
Range.The realization of the disclosure is necessary that is should not be construed as the element for being described or showing.
The memory devices of storage program code are provided by the random component being equipped with into base station or terminal, may be implemented
The aforesaid operations of base station and terminal.That is the controller of base station or terminal can be by by processor or central processing unit
(CPU) program code that is stored in memory devices is read and executed to execute aforesaid operations.
Various assemblies, module of entity described herein, base station or terminal etc. can be in hardware circuits (for example, based on mutual
Mend metal-oxide semiconductor (MOS) (CMOS) logic circuit), firmware, software, or combinations thereof in realize.In one example, may be used
Various electrical structures and method are realized to use such as transistor, logic gate and customize the circuit of semiconductor.
Meanwhile in the attached drawing for showing disclosed method, the sequence of description not necessarily corresponds to the sequence executed, and
It can change or be performed in parallel the relationship of sequence.
In addition it is shown that the attached drawing of disclosed method can be omitted some elements and only including one within the scope of the disclosure
A little elements.
Furthermore, it is possible to combine and execute above-described embodiment of the disclosure, or can only combine within the scope of this disclosure
With execution some components.
Although the disclosure has shown and described in the various embodiments by reference to the disclosure, those skilled in the art will
Understand, it, can be in the case where not departing from the spirit and scope of the present disclosure as defined by the following claims and their equivalents
It carries out various changes of form and details wherein.
Claims (15)
1. a kind of method of the terminal in wireless communication system, which comprises
The first scheduling information for being used for first band is received from base station;
Bandwidth is switched to first band according to the first scheduling information;
Starting is used for the timer of first band;And
When the timer has lapsed, bandwidth is switched to second band.
2. the method for claim 1, wherein being matched by the first scheduling information or radio resource control (RRC) signaling
Set the value of timer.
3. the method as described in claim 1, further includes:
Timer is restarted when receiving the second scheduling information before the timer expires or receiving data by first band.
4. the method for claim 1, wherein second band includes the bandwidth before bandwidth is switched to first band
Or at least one of bandwidth.
5. a kind of method of the base station in wireless communication system, which comprises
The first scheduling information for being used for first band is sent to terminal;
Bandwidth is switched to first band according to the first scheduling information;
Starting is used for the timer of first band;And
When the timer has lapsed, bandwidth is switched to second band.
6. method as claimed in claim 5, wherein matched by the first scheduling information or radio resource control (RRC) signaling
Set the value of timer.
7. method as claimed in claim 5, further includes:
Timer is restarted when receiving the second scheduling information before the timer expires or receiving data by first band.
8. method as claimed in claim 5, wherein second band includes the bandwidth before bandwidth is changed into first band
Or at least one of bandwidth.
9. the terminal in a kind of wireless communication system, the terminal include:
Transceiver;And
Controller is configured as:
The first scheduling information for being used for first band is received from base station,
Bandwidth is switched to first band according to the first scheduling information,
Starting is used for the timer of first band, and
Bandwidth is switched to second band when the timer has lapsed.
10. terminal as claimed in claim 9, wherein matched by the first scheduling information or radio resource control (RRC) signaling
Set the value of timer.
11. terminal as claimed in claim 9, wherein controller is also configured to that ought be received before the timer expires
Two scheduling informations or while receiving data by first band, restart timer.
12. terminal as claimed in claim 9, wherein second band includes the band before bandwidth is switched to first band
At least one of wide or bandwidth.
13. the base station in a kind of wireless communication system, the base station include:
Transceiver;And
Controller is configured as:
The first scheduling information for being used for first band is sent to terminal,
Bandwidth is switched to first band according to the first scheduling information,
Starting is used for the timer of first band, and
Bandwidth is switched to second band when the timer has lapsed.
14. base station as claimed in claim 13, wherein pass through the first scheduling information or radio resource control (RRC) signaling
Configure the value of timer.
15. base station according to claim 13, wherein controller is also configured to receive before the timer expires
Timer is restarted when receiving data to the second scheduling information or by first band,
Wherein, second band includes changing by bandwidth to the bandwidth or at least one of bandwidth before first band.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310915416.5A CN116915300A (en) | 2017-02-02 | 2018-02-02 | Method and apparatus for transmitting and receiving data in mobile communication system |
Applications Claiming Priority (9)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20170015211 | 2017-02-02 | ||
KR10-2017-0015211 | 2017-02-02 | ||
KR20170037174 | 2017-03-23 | ||
KR10-2017-0037174 | 2017-03-23 | ||
KR1020170101921A KR20180090177A (en) | 2017-02-02 | 2017-08-10 | Cell reselection method based on ue information in mobile communication systems |
KR10-2017-0101921 | 2017-08-10 | ||
KR10-2017-0125589 | 2017-09-27 | ||
KR1020170125589A KR20180090178A (en) | 2017-02-02 | 2017-09-27 | Cell reselection method based on ue information in mobile communication systems |
PCT/KR2018/001456 WO2018143727A1 (en) | 2017-02-02 | 2018-02-02 | Method and apparatus for transmitting and receiving data in mobile communication system |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310915416.5A Division CN116915300A (en) | 2017-02-02 | 2018-02-02 | Method and apparatus for transmitting and receiving data in mobile communication system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110249660A true CN110249660A (en) | 2019-09-17 |
CN110249660B CN110249660B (en) | 2023-07-21 |
Family
ID=63229629
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201880009675.9A Active CN110249660B (en) | 2017-02-02 | 2018-02-02 | Method and apparatus for transmitting and receiving data in mobile communication system |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP3563606A4 (en) |
KR (3) | KR20180090177A (en) |
CN (1) | CN110249660B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111432487A (en) * | 2020-02-13 | 2020-07-17 | 华为技术有限公司 | Frequency band information reporting method and related equipment |
CN112217549A (en) * | 2020-10-14 | 2021-01-12 | 西安电子科技大学 | Integrated multi-user detection method and system based on signal virtual processing |
CN113508634A (en) * | 2020-02-07 | 2021-10-15 | 三星电子株式会社 | Method and apparatus for random access preamble group selection in wireless communication system |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3641439A4 (en) * | 2017-06-16 | 2021-01-06 | Beijing Xiaomi Mobile Software Co., Ltd. | Method and device for transmitting information |
KR20200127536A (en) | 2019-05-02 | 2020-11-11 | 삼성전자주식회사 | Method and apparatus for power saving of user equipment in wireless communication system |
US11134460B2 (en) * | 2019-06-18 | 2021-09-28 | Commscope Technologies Llc | Synchronizing a cloud radio access network to a network time protocol reference clock |
KR20210025973A (en) | 2019-08-28 | 2021-03-10 | 삼성전자주식회사 | Electronic device for providing dual connectivy and method for operating thereof |
WO2021125627A1 (en) | 2019-12-16 | 2021-06-24 | Samsung Electronics Co., Ltd. | Method and apparatus for releasing pusch resources assigned for random access in wireless communication system |
EP4070615B1 (en) | 2020-01-10 | 2024-05-15 | Samsung Electronics Co., Ltd. | Apparatus and method of random access procedure |
CN115088377A (en) * | 2020-02-12 | 2022-09-20 | 三星电子株式会社 | Method and apparatus for random access procedure in wireless communication system |
US11871394B2 (en) * | 2020-11-25 | 2024-01-09 | Qualcomm Incorporated | Techniques for indicating preferred beams in dual-connectivity/carrier-aggregation (DC-CA) systems based on default operating frequency mismatch |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102047637A (en) * | 2008-06-06 | 2011-05-04 | 艾利森电话股份有限公司 | A method and a user equipment for reserving bandwidth |
CN104067678A (en) * | 2012-12-27 | 2014-09-24 | 松下电器产业株式会社 | Frequency band transfer control method and radio communication apparatus |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8081978B2 (en) * | 2007-02-02 | 2011-12-20 | Reseach In Motion Limited | Bandwidth-based cell selection in a cellular network |
KR101763749B1 (en) * | 2011-03-28 | 2017-08-14 | 삼성전자 주식회사 | Method for changing frequency of radio data system and apparatus using the same |
US20140071939A1 (en) * | 2012-09-12 | 2014-03-13 | Qualcomm Incorporated | Intra frequency cell reselection in td-scdma |
-
2017
- 2017-08-10 KR KR1020170101921A patent/KR20180090177A/en unknown
- 2017-09-27 KR KR1020170125589A patent/KR20180090178A/en unknown
-
2018
- 2018-02-02 KR KR1020197022882A patent/KR102420813B1/en active IP Right Grant
- 2018-02-02 EP EP18747277.4A patent/EP3563606A4/en not_active Ceased
- 2018-02-02 CN CN201880009675.9A patent/CN110249660B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102047637A (en) * | 2008-06-06 | 2011-05-04 | 艾利森电话股份有限公司 | A method and a user equipment for reserving bandwidth |
CN104067678A (en) * | 2012-12-27 | 2014-09-24 | 松下电器产业株式会社 | Frequency band transfer control method and radio communication apparatus |
Non-Patent Citations (2)
Title |
---|
HUAWEI, HISILICON: ""Mechanisms of bandwidth adaptation for control and data reception in single-carrier and multi-carrier cases"", 《3GPP TSG RAN WG1 MEETING #87,R1-1611655》 * |
HUAWEI, HISILICON: ""Mechanisms of bandwidth adaptation"", 《3GPP TSG RAN WG1 NR AD HOC MEETING,R1-1700011》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113508634A (en) * | 2020-02-07 | 2021-10-15 | 三星电子株式会社 | Method and apparatus for random access preamble group selection in wireless communication system |
CN113508634B (en) * | 2020-02-07 | 2024-04-26 | 三星电子株式会社 | Method and apparatus for random access preamble group selection in a wireless communication system |
CN111432487A (en) * | 2020-02-13 | 2020-07-17 | 华为技术有限公司 | Frequency band information reporting method and related equipment |
CN111432487B (en) * | 2020-02-13 | 2021-02-23 | 华为技术有限公司 | Frequency band information reporting method and related equipment |
US12114398B2 (en) | 2020-02-13 | 2024-10-08 | Huawei Technologies Co., Ltd. | Method for reporting band information and related device |
CN112217549A (en) * | 2020-10-14 | 2021-01-12 | 西安电子科技大学 | Integrated multi-user detection method and system based on signal virtual processing |
CN112217549B (en) * | 2020-10-14 | 2021-08-20 | 西安电子科技大学 | Integrated multi-user detection method and system based on signal virtual processing |
Also Published As
Publication number | Publication date |
---|---|
KR20180090177A (en) | 2018-08-10 |
KR20190105035A (en) | 2019-09-11 |
KR102420813B1 (en) | 2022-07-15 |
EP3563606A4 (en) | 2019-11-20 |
CN110249660B (en) | 2023-07-21 |
KR20180090178A (en) | 2018-08-10 |
EP3563606A1 (en) | 2019-11-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110249660A (en) | Method and apparatus for sending and receiving data in mobile communication system | |
US20230397066A1 (en) | Method and apparatus for transmitting and receiving data in mobile communication system | |
TWI805766B (en) | Supporting scheduling plan indications | |
EP3589016B1 (en) | Power headroom reporting of user equipment in dual connectivity | |
CN115515257B (en) | Techniques and apparatus for user equipment mobility in multi-connectivity mode | |
CN111656850B (en) | Low latency operation | |
CN112771924B (en) | Measurement gap configuration and coordination | |
CN113647143B (en) | User equipment dual active protocol stack handover | |
US12004031B2 (en) | UE and base station in mobile communication system and operating method therefor | |
CN104823473B (en) | The method and apparatus for supporting control plane and user plane in a wireless communication system | |
CN105191389B (en) | The method and apparatus for sending and receiving data using multiple carrier waves in mobile communication system | |
CN110235511A (en) | For managing the technology of the dual link in uplink | |
CN109792352A (en) | PRACH and/or SRS switching enhancing | |
CN108496393A (en) | More PRB for narrowband systems are operated | |
CN110383901A (en) | For using wake-up signal to carry out the technology and equipment of control channel monitoring | |
TWI759404B (en) | Method, apparatus, and computer-readable medium for tracking reference signal configuration design | |
CN109479204A (en) | Semi-persistent measuring reference signals (MRS) configuration | |
TW201828629A (en) | Methods and apparatuses for indication of transmission preemption based on a hybrid automatic repeat request configuration | |
TW201830911A (en) | Techniques and apparatuses for multiple transmission of synchronization signal blocks in new radio | |
TW201824799A (en) | Techniques and apparatuses for configuring transmission of corresponding uplink control information in new radio | |
TW201836383A (en) | Techniques and apparatuses for reducing inter-cell interference with low-latency traffic in new radio | |
CN107925524A (en) | The method for determining the pattern of the operation for wireless terminal | |
JP2022534992A (en) | Enhanced user equipment capability exchange during enhanced make-before-break handover | |
US20230042702A1 (en) | Method and apparatus for providing heat generation related information of terminal in mobile communication system supporting multiple connections | |
CN112567862B (en) | Conflict handling for physical uplink channel repetition |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |