CN110242250A CN201910667770.4A CN201910667770A CN110242250A CN 110242250 A CN110242250 A CN 110242250A CN 201910667770 A CN201910667770 A CN 201910667770A CN 110242250 A CN110242250 A CN 110242250A
Authority
CN
China
Prior art keywords
ball valve
valve
gas
well
rotation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910667770.4A
Other languages
Chinese (zh)
Other versions
CN110242250B (en
Inventor
薛岗
王登海
郑欣
胡建国
刘银春
杨光
葛涛
赵一农
卢鹏飞
尉加盛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
Xian Changqing Technology Engineering Co Ltd
Original Assignee
Xian Changqing Technology Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Changqing Technology Engineering Co Ltd filed Critical Xian Changqing Technology Engineering Co Ltd
Priority to CN201910667770.4A priority Critical patent/CN110242250B/en
Publication of CN110242250A publication Critical patent/CN110242250A/en
Application granted granted Critical
Publication of CN110242250B publication Critical patent/CN110242250B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/08Valve arrangements for boreholes or wells in wells responsive to flow or pressure of the fluid obtained
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/16Control means therefor being outside the borehole
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B2200/00Special features related to earth drilling for obtaining oil, gas or water
    • E21B2200/04Ball valves

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Taps Or Cocks (AREA)

Abstract

The invention belongs to gas field cluster well field field of measuring techniques, and in particular to gas collecting apparatus and system are measured in a kind of field rotation of gas field cluster well.The present invention makes full use of multi-path rotation flowing valve, the measurement flow switching for realizing different gas wells, 1 flowmeter, which is only arranged, can meet the measuring requirement of all gas wells, it can be achieved that long-range rotation metering switching, the high-low pressure emergency cut-off of each well and the outer defeated remote shutdown in entire well site, process is simple, and equipment is few, it can be achieved that unattended, long-range control, artificial execute-in-place and management point are greatly reduced, construction investment is reduced, meets the requirement of gas well fine-grained management.

Description

Gas collecting apparatus and system are measured in a kind of field rotation of gas field cluster well
Technical field
The invention belongs to gas field cluster well field field of measuring techniques, and in particular to a kind of gas field cluster well field rotation metering collection Device of air and system.
Background technique
Currently, the ancient times natural gas well developed in a manner of " downhole choke ", more and more building using cluster well field If mode.Gas well quantity in cluster well field, at maximum up to 23 mouthfuls at present, usually all at 2 mouthfuls or more.Each cluster well field mainly uses The mode that individual well measures respectively, each well are respectively provided with a flowmeter, and process is complicated, and equipment and valve pipe fitting be more, scene peace Fill heavy workload;Or total amount all the way is arranged in entire well site, not can be carried out the metering respectively of every implication well, it is even more impossible to grasp to produce Liquid measure is not able to satisfy live fine-grained management and simplifies the requirement of technique, low cost development.
Such as certain gas field block development & construction use H2, H4, C1H2, C1H4, C1H5, C1H6, C2H2, C2H5, 12 kinds of well clumps such as C3H3, C4H3, C9H5.Integrated intelligent flowmeter is arranged in each well site, measures to individual well natural gas, clump formula 2~4 mouthfuls of wells share 1 flowmeter in well, can not grasp the specific gas production of every mouthful of individual well, it is even more impossible to grasp Liquid output.
Summary of the invention
The present invention provides a kind of gas field cluster well field rotation metering gas collecting apparatus and system, and it is an object of the present invention to provide a kind of energy Enough meet the requirement individually measured to each well, and simplified well site technology process can be optimized, with adapt to gas well waterout management, The demand of fine-grained management.
To achieve the above object, the technical solution adopted by the present invention is that:
Gas collecting apparatus is measured in a kind of field rotation of gas field cluster well, including
Multi-path rotation flowing valve, multi-path rotation flowing valve are provided with multiple input ports and two output ports, institute The multi-path rotation flowing valve stated is using electronic multi-path rotation flowing valve;
Valve group, valve group is at least arranged two groups and the output end of each valve group is different defeated from multi-path rotation flowing valve respectively Inbound port connection;
Metering units, the input terminal of metering units are connect with an output port of multi-path rotation flowing valve;
Outer defeated unit, the input terminal of outer defeated unit is connect with the another output mouth of multi-path rotation flowing valve, outer defeated The output end of unit is connected on the pipeline of metering system output;
Control unit, control unit are connect with multi-path rotation flowing valve, metering units and valve group electric signal.
It further include the 6th ball valve;The input terminal of 6th ball valve is connected on the pipeline that metering units are connected with outer defeated unit, 6th ball valve is using electrical ball valve;6th ball valve is connect with control unit electric signal.
The input terminal of 6th ball valve is also connected with the 5th ball valve, and the 5th ball valve is using electric ball Valve;5th ball valve is connect with control unit electric signal.
The valve group includes the urgent block valve of well site high-low pressure, check-valves and the first ball valve, the check-valves connection Between the urgent block valve of well site high-low pressure and the first ball valve, the output end and multi-path rotation flowing valve of first ball valve Input port connection;The input terminal of the urgent block valve of well site high-low pressure is connect with gas well christmas tree.
First ball valve is using manually or electrically ball valve;Electronic first ball valve and control unit electric signal connect It connects.
The metering units include the second ball valve, third ball valve and flowmeter;The flowmeter is connected to the second ball Between valve and third ball valve;The input terminal of second ball valve is connect with the output port of multi-path rotation flowing valve;It is described The output end of third ball valve connect with the output end of the 6th ball valve;Second ball valve and third ball valve is using electronic Ball valve;Second ball valve and third ball valve are connect with control unit electric signal.
The flowmeter uses single-phase meter or multi-phase flowmeter.
The outer defeated unit output end is connected with the 4th ball valve, and the 4th ball valve is using electrical ball valve;The Four ball valves are connect with control unit electric signal.
It further include the 6th ball valve;The input terminal of 6th ball valve is connected on the pipeline that metering units are connected with outer defeated unit, 6th ball valve is using electrical ball valve;6th ball valve is connect with control unit electric signal;The valve group includes well site height It compresses anxious block valve, check-valves and the first ball valve, the check-valves and is connected to the urgent block valve of well site high-low pressure and the first ball Between valve, the output end of first ball valve is connect with the input port of multi-path rotation flowing valve;First ball valve Using electrical ball valve;Electronic first ball valve is connect with control unit electric signal;The metering units include the second ball valve, Third ball valve and flowmeter;The flowmeter is connected between the second ball valve and third ball valve;Second ball valve it is defeated Enter end to connect with the output port of multi-path rotation flowing valve;The output end of the third ball valve and the output end of the 6th ball valve Connection;Second ball valve and third ball valve is using electrical ball valve;Second ball valve and third ball valve and control unit electricity Signal connection;The flowmeter uses single-phase or multi-phase flowmeter;The outer defeated unit output end is connected with the 4th ball valve, 4th ball valve is using electrical ball valve;4th ball valve is connect with control unit electric signal;6th ball valve Input terminal is also connected with the 5th ball valve, and the 5th ball valve is using electrical ball valve;5th ball valve and control unit telecommunications Number connection.
Gas gathering system, including a kind of gas field cluster well field rotation metering gas collection dress are measured in a kind of field rotation of gas field cluster well It sets;The input terminal of valve group and the output end of gas well christmas tree of a kind of gas field cluster well field rotation metering gas collecting apparatus connect It connects, a kind of field rotation of gas field cluster well is measured defeated flow line outside the output end and well site of the 6th ball valve of gas collecting apparatus and connected; The group number of the valve group setting is matched with the well head number of gas field cluster well.
The utility model has the advantages that
The present invention makes full use of multi-path rotation flowing valve, realizes the measurement flow switching of different gas wells, 1 stream is only arranged Meter can meet the measuring requirement of all gas wells, can be realized long-range rotation metering switching;The high-low pressure of each well is urgent The outer defeated remote shutdown of cutting and entire well site, process is simple, and equipment is few, it can be achieved that unattended, and long-range control greatly reduces Artificial execute-in-place and management point, reduce construction investment, meet the requirement of gas well fine-grained management.
The above description is only an overview of the technical scheme of the present invention, in order to better understand technology hand of the invention Section, and can be implemented in accordance with the contents of the specification, and with presently preferred embodiments of the present invention and attached drawing be cooperated to be described in detail such as below Afterwards.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is structural schematic diagram of the present invention by taking 3 well formula cluster wells as an example;
Fig. 2 is well site metering gas collection technique flow diagram of the present invention by taking 3 well formula cluster wells as an example.
In figure: 1- the first gas well christmas tree;2- the second gas well christmas tree;3- third gas well christmas tree;4- multi-path rotation Flowing valve;5- metering units;Defeated unit outside 6-;The urgent block valve of the well site 7- high-low pressure;8- check-valves;The first ball valve of 9-;10- Two ball valves;11- third ball valve;The 4th ball valve of 12-;The 5th ball valve of 13-;14 the 6th ball valves;15- flowmeter;16- valve group.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiment is only a part of the embodiments of the present invention, instead of all the embodiments.Base Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts it is all its His embodiment, shall fall within the protection scope of the present invention.
Embodiment one:
Gas collecting apparatus, a kind of field rotation of gas field cluster well are measured in a kind of gas field cluster well field rotation according to shown in Fig. 1-2 Gas collecting apparatus is measured, including
Multi-path rotation flowing valve 4, multi-path rotation flowing valve 4 are provided with multiple input ports and two output ports, The multi-path rotation flowing valve 4 is using electronic multi-path rotation flowing valve;
Valve group 16, valve group 16 be at least arranged the output end of two groups and each valve group respectively with multi-path rotation flowing valve 4 Different input port connections;
Metering units 5, the input terminal of metering units 5 are connect with an output port of multi-path rotation flowing valve 4;
Outer defeated unit 6, the input terminal of outer defeated unit 6 are connect with the another output mouth of multi-path rotation flowing valve 4, outside The output end of defeated unit 6 is connected on the pipeline of the output of metering units 5;
Control unit, control unit are connect with multi-path rotation flowing valve 4, metering units 5 and 16 electric signal of valve group.
It preferably further include the 6th ball valve 14;The input terminal of 6th ball valve 14 is connected to metering units 5 and outer defeated unit 6 On the pipeline of connection, the 6th ball valve 14 is using electrical ball valve;6th ball valve 14 is connect with control unit electric signal.
In actual use, each gas well passes through the access multi-path rotation flowing valve 4 of valve group 16, multi-path rotation circulation first 4 internal structure of valve is divided into metering pipeline chamber and production pipeline chamber, makes full use of valve internal structure to realize needs after gas well access The gas well of metering enters production pipeline chamber after individually entering metering pipeline chamber and the mixing of remaining gas well, exports connection meter in measurement chamber Unit 5 is measured, production pipeline chamber connects outer defeated unit 6, and final two-way is defeated into well site flow line through the 6th ball valve 14 after converging Toward downstream yard.Control unit realizes that different gas wells respectively enter metering pipeline by remotely controlling multi-path rotation flowing valve 4 Chamber and production pipeline chamber;Control unit realizes the long-range of entire cluster well field flow line by remotely controlling the 6th ball valve 14 Emergency cut-off.Control unit in the present embodiment is completed by using the computer of the prior art.
The road 2-14 can be arranged according to the actual conditions of different well site well numbers in 4 import of multi-path rotation flowing valve, meet 2-14 The rotation of implication well, which is measured, to be needed, and the outlet of multi-path rotation flowing valve 4 is only 2 tunnels, meets two kinds of needs of metering and production;Valve Front and back is equipped with truncation ball valve, truncation when convenient for maintenance of valve and replacement.
The present invention makes full use of multi-path rotation flowing valve 4, realizes the measurement flow switching of different gas wells, is only arranged 1 Flowmeter can meet the measuring requirement of all gas wells, can be realized long-range rotation metering switching;The high-low pressure of each well is urgent The outer defeated remote shutdown of cutting and entire well site, process is simple, and equipment is few, it can be achieved that unattended, and long-range control greatly reduces Artificial execute-in-place and management point, reduce construction investment, meet the requirement of gas well fine-grained management.
Embodiment two:
Gas collecting apparatus is measured in a kind of gas field cluster well field rotation according to shown in Fig. 1-2, exists with one difference of embodiment In: the valve group 16 includes the urgent block valve 7 of well site high-low pressure, check-valves 8 and the first ball valve 9, and the check-valves 8 connects Between the urgent block valve 7 of well site high-low pressure and the first ball valve 9, the output end of first ball valve 9 and the change of current of multi-path wheel The input port of port valve 4 connects;The input terminal of the urgent block valve 7 of the well site high-low pressure is connect with gas well christmas tree.
In actual use, check-valves 8 is arranged in 4 inlet line ball valve upstream of multi-path rotation flowing valve, it is therefore an objective to anti- Only other gas well pipelines reversely flow into the road pipeline by the import of multi-path rotation flowing valve.
The urgent block valve 7 of high-low pressure is arranged in 8 inlet line upstream of check-valves, it is therefore an objective to which it is more than low for preventing upstream and downstream pressure Automatic emergency cutting is realized when the high-low pressure force value of setting, reaches closing gas well, protects the purpose of downstream line and equipment.
First ball valve 9 is arranged in 4 inlet line upstream of 8 outlet line downstream of check-valves and multi-path rotation flowing valve, fills Divide the open and close production status of gas well belonging to realizing.
It is for the safety and continuous stability, the urgent block valve 7 of high-low pressure and upstream line design pressure of guarantee production 25MPa, valve downstream and pipeline designs pressure are 6.3MPa.
Embodiment three:
Gas collecting apparatus is measured in a kind of gas field cluster well field rotation according to Fig.2, with embodiment two the difference is that: First ball valve 9 is using manually or electrically ball valve;Electronic first ball valve 9 is connect with control unit electric signal.
In actual use, when the first ball valve 9 is with using manual ball valve, can the affiliated gas well of manual switch, realize manual The open and close production status of gas well is controlled on the spot;It can be realized long-range control when the first ball valve 9 is using electrical ball valve;Specifically adopt With manual or electrical ball valve, it can according to need, choose at random.
Example IV:
Gas collecting apparatus is measured in a kind of gas field cluster well field rotation according to shown in Fig. 1-2, exists with one difference of embodiment In: the metering units 5 include the second ball valve 10, third ball valve 11 and flowmeter 15;The flowmeter 15 is connected to Between two ball valves 10 and third ball valve 11;The input terminal of second ball valve 10 and the output end of multi-path rotation flowing valve 4 Mouth connection;The output end of the third ball valve 11 is connect with the output end of the 6th ball valve 14;Second ball valve 10 and Three ball valves 11 are using electrical ball valve;Second ball valve 10 and third ball valve are connect with control unit electric signal.
In actual use, metering units 5 use the technical program, can be realized all gas well yield meterings in well site, Meet the daily production management data recording of gas well, the formulation of water pumping gas production measure and fining analysis to require.
Embodiment five:
Gas collecting apparatus is measured in a kind of gas field cluster well field rotation according to Fig.2, with example IV the difference is that: The flowmeter 15 uses single-phase meter or multi-phase flowmeter.
In actual use, single-phase flowmeter or multi-phase flowmeter, when selecting single-phase flowmeter, energy may be selected in flowmeter 15 Enough requirements for meeting live moisture metering, select multi-phase flowmeter then to meet gas-liquid two-phase measuring requirement simultaneously.
When metering units 5 use single-phase measurement timing, the yield that can be realized gas well gas production is measured, and single-phase measurement can Meet the gas production measuring requirement of the gas well little to Liquid output;Using polyphase meter meter, it can be realized gas well and produce gas and produce liquid The metering respectively of amount, and meet to the Liquid output of the biggish gas well of Liquid output and the measuring requirement of gas production.
In actual use, the concrete model of flowmeter can be selected according to engineering is practical, and such as hole can be selected in single-phase flowmeter Flowmeter, intelligent vortex precession flowmeter etc., inscription degree moisture orifice flowmeter, Haimo multiphase flow meter can be selected in multi-phase flowmeter Deng.
Embodiment six:
Gas collecting apparatus is measured in a kind of gas field cluster well field rotation according to shown in Fig. 1-2, exists with one difference of embodiment In: outer defeated 6 output end of unit is connected with the 4th ball valve 12, and the 4th ball valve 12 is using electrical ball valve;The Four ball valves 12 are connect with control unit electric signal.
In actual use, the 4th ball valve 12 uses electrical ball valve, can realize that outer defeated unit 6 is produced by control unit With the control of closing, manpower is saved.
Embodiment seven:
Gas collecting apparatus is measured in a kind of gas field cluster well field rotation according to shown in Fig. 1-2, exists with one difference of embodiment In: the input terminal of the 6th ball valve 14 is also connected with the 5th ball valve 13, and the 5th ball valve 13 is using electric ball Valve;5th ball valve 13 is connect with control unit electric signal.
In actual use, the 5th ball valve 13 is the access valve that reserved upstream well site pipeline carrys out gas, by with the 5th ball The control unit of 13 electric signal of valve connection realizes that gas is carried out in upstream well site under the handling situations of not getting angry in well site carrys out gas with this well site Gas production main pipe in downstream is transported to after mixing.
Embodiment eight:
Gas collecting apparatus is measured in a kind of gas field cluster well field rotation according to shown in Fig. 1-2, exists with one difference of embodiment In: it further include the 6th ball valve 14;The input terminal of 6th ball valve 14 is connected on metering units 5 and the pipeline of outer defeated unit 6 connection, 6th ball valve 14 is using electrical ball valve;6th ball valve 14 is connect with control unit electric signal;The valve group 16 includes well The urgent block valve 7 of field high-low pressure, check-valves 8 and the first ball valve 9, the check-valves 8 are connected to well site high-low pressure and are promptly truncated Between valve 7 and the first ball valve 9, the output end of first ball valve 9 is connect with the input port of multi-path rotation flowing valve 4; First ball valve 9 is using electrical ball valve;Electronic first ball valve 9 is connect with control unit electric signal;The metering Unit 5 includes the second ball valve 10, third ball valve 11 and flowmeter 15;The flowmeter 15 is connected to the second ball valve 10 and third Between ball valve 11;The input terminal of second ball valve 10 is connect with the output port of multi-path rotation flowing valve 4;Described The output end of three ball valves 11 is connect with the output end of the 6th ball valve 14;Second ball valve 10 and third ball valve 11 using Electrical ball valve;Second ball valve 10 and third ball valve are connect with control unit electric signal;The flowmeter 15 is using single-phase or more Multi-phase flowmeter;Outer defeated 6 output end of unit is connected with the 4th ball valve 12, and the 4th ball valve 12 is using electric ball Valve;4th ball valve 12 is connect with control unit electric signal;The input terminal of 6th ball valve 14 is also connected with the 5th ball valve 13, 5th ball valve 13 is using electrical ball valve;5th ball valve 13 is connect with control unit electric signal.
In actual use, the present invention makes full use of multi-path rotation flowing valve, realizes that the measurement flow of different gas wells is cut It changes, 1 flowmeter, which is only arranged, can meet the measuring requirement of all gas wells, realize long-range rotation metering switching;The present invention passes through The high-low pressure emergency cut-off of each well and the outer defeated long-range pass in entire well site are realized in long-range control of the control unit to electronic valve Disconnected, process is simple, and equipment is few, it can be achieved that unattended, and long-range control greatly reduces artificial execute-in-place and management point, drops Low construction investment, meets the requirement of gas well fine-grained management.
Embodiment nine:
Gas gathering system, including a kind of gas field cluster well field are measured in a kind of gas field cluster well field rotation according to shown in Fig. 1-2 Gas collecting apparatus is measured in rotation;The input terminal and gas well of a kind of valve group 16 of gas field cluster well field rotation metering gas collecting apparatus The output end of christmas tree connects, and output end and the well site of the 6th ball valve 14 of gas collecting apparatus are measured in a kind of field rotation of gas field cluster well Outer defeated flow line connection;The group number that the valve group 16 is arranged is matched with the well head number of gas field cluster well.
The present embodiment is by taking 3 well formula cluster wells as an example.In actual use, by the first gas well christmas tree 1, the second gas well gas production The output end of tree 2 and third gas well christmas tree 3, is separately connected a valve group 16, and valve group 16 and multi-path rotation circulate respectively Valve 4 connects, then the 6th ball valve 14 is connect with well site flow line and transports to downstream yard.
The present invention takes full advantage of multi-path rotation flowing valve, realizes the measurement flow switching of different gas wells, is only arranged 1 Flowmeter can meet the measuring requirement of all gas wells, it can be achieved that long-range rotation metering switching, the high-low pressure of each well are promptly cut Disconnected and entire well site outer defeated remote shutdown, process is simple, and equipment is few, it can be achieved that unattended, and long-range control greatly reduces Artificial execute-in-place and management point, reduce construction investment, meet the requirement of gas well fine-grained management.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
In the absence of conflict, those skilled in the art can according to the actual situation will be relevant in above-mentioned each example Technical characteristic is combined with each other, and to reach corresponding technical effect, will not repeat them here particularly for various combined situations.
The above, only presently preferred embodiments of the present invention, the present invention be not intended to be limited to it is shown in this article this A little embodiments, and it is to fit to the widest scope consistent with principles disclosed herein and novel features.According to this hair Bright technical spirit any simple modification, equivalent change and modification to the above embodiments, still fall within the technology of the present invention In the range of scheme.

Claims (9)

1. gas collecting apparatus is measured in a kind of field rotation of gas field cluster well, it is characterised in that: including
Multi-path rotation flowing valve (4), multi-path rotation flowing valve (4) are provided with multiple input ports and two output ports, The multi-path rotation flowing valve (4) is using electronic multi-path rotation flowing valve;
Valve group (16), valve group (16) be at least arranged the output end of two groups and each valve group respectively with multi-path rotation flowing valve (4) Different input ports connection;
Metering units (5), the input terminal of metering units (5) are connect with an output port of multi-path rotation flowing valve (4);
Outer defeated unit (6), the input terminal of outer defeated unit (6) are connect with the another output mouth of multi-path rotation flowing valve (4), The output end of outer defeated unit (6) is connected on the pipeline of metering units (5) output;
Control unit, control unit are connect with multi-path rotation flowing valve (4), metering units (5) and valve group (16) electric signal.
2. gas collecting apparatus is measured in a kind of gas field cluster well field rotation as described in claim 1, it is characterised in that: further include the 6th Ball valve (14);The input terminal of 6th ball valve (14) is connected on metering units (5) and the pipeline of outer defeated unit (6) connection, and the 6th Ball valve (14) is using electrical ball valve;6th ball valve (14) is connect with control unit electric signal.
3. gas collecting apparatus is measured in a kind of gas field cluster well field rotation as claimed in claim 2, it is characterised in that: described the 6th The input terminal of ball valve (14) is also connected with the 5th ball valve (13), and the 5th ball valve (13) is using electrical ball valve;5th Ball valve (13) is connect with control unit electric signal.
4. gas collecting apparatus is measured in a kind of gas field cluster well field rotation as described in claim 1, it is characterised in that: the valve group It (16) include the urgent block valve of well site high-low pressure (7), check-valves (8) and the first ball valve (9), the check-valves (8) is connected to Between the urgent block valve of well site high-low pressure (7) and the first ball valve (9), the output end and multi-path wheel of first ball valve (9) The input port of change of current port valve (4) connects;The input terminal and gas well christmas tree of the urgent block valve of well site high-low pressure (7) connect It connects.
5. gas collecting apparatus is measured in a kind of gas field cluster well field rotation as claimed in claim 4, it is characterised in that: described first Ball valve (9) is using manually or electrically ball valve;Electronic first ball valve (9) connect with control unit electric signal.
6. gas collecting apparatus is measured in a kind of gas field cluster well field rotation as described in claim 1, it is characterised in that: the metering Unit (5) includes the second ball valve (10), third ball valve (11) and flowmeter (15);The flowmeter (15) is connected to the second ball Between valve (10) and third ball valve (11);The input terminal of second ball valve (10) is defeated with multi-path rotation flowing valve (4) Exit port connection;The output end of the third ball valve (11) is connect with the output end of the 6th ball valve (14);Second ball Valve (10) and third ball valve (11) are using electrical ball valve;Second ball valve (10) and third ball valve (11) and control unit telecommunications Number connection;The flowmeter (15) uses single-phase meter or multi-phase flowmeter.
7. gas collecting apparatus is measured in a kind of gas field cluster well field rotation as described in claim 1, it is characterised in that: described is outer defeated Unit (6) output end is connected with the 4th ball valve (12), and the 4th ball valve (12) is using electrical ball valve;4th ball valve (12) it is connect with control unit electric signal.
8. gas collecting apparatus is measured in a kind of gas field cluster well field rotation as described in claim 1, it is characterised in that: further include the 6th Ball valve (14);The input terminal of 6th ball valve (14) is connected on metering units (5) and the pipeline of outer defeated unit (6) connection, and the 6th Ball valve (14) is using electrical ball valve;6th ball valve (14) is connect with control unit electric signal;The valve group (16) includes The urgent block valve of well site high-low pressure (7), check-valves (8) and the first ball valve (9), the check-valves (8) are connected to well site height It compresses between anxious block valve (7) and the first ball valve (9), the output end and multi-path rotation flowing valve of first ball valve (9) (4) input port connection;First ball valve (9) is using electrical ball valve;Electronic first ball valve (9) and control unit Electric signal connection;The metering units (5) include the second ball valve (10), third ball valve (11) and flowmeter (15);Described Flowmeter (15) is connected between the second ball valve (10) and third ball valve (11);The input terminal of second ball valve (10) and more The output port of access rotation flowing valve (4) connects;The output end of the third ball valve (11) is defeated with the 6th ball valve (14) Outlet connection;Second ball valve (10) and third ball valve (11) is using electrical ball valve;Second ball valve (10) and third Ball valve is connect with control unit electric signal;The flowmeter (15) uses single-phase or multi-phase flowmeter;The outer defeated unit (6) output end is connected with the 4th ball valve (12), and the 4th ball valve (12) is using electrical ball valve;4th ball valve (12) with The connection of control unit electric signal;The input terminal of 6th ball valve (14) is also connected with the 5th ball valve (13), and the described the 5th Ball valve (13) is using electrical ball valve;5th ball valve (13) is connect with control unit electric signal.
9. gas gathering system is measured in a kind of field rotation of gas field cluster well, it is characterised in that: including described in claim 1-8 any one A kind of field rotation of gas field cluster well measure gas collecting apparatus;A kind of valve of the gas field cluster well field rotation metering gas collecting apparatus The input terminal of group (16) is connect with the output end of gas well christmas tree, and the 6th of gas collecting apparatus is measured in a kind of field rotation of gas field cluster well Defeated flow line connection outside the output end of ball valve (14) and well site;The group number and gas field cluster well of valve group (16) setting The matching of well head number.
CN201910667770.4A 2019-07-23 2019-07-23 Gas field cluster well field rotation metering gas collection device and system Active CN110242250B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910667770.4A CN110242250B (en) 2019-07-23 2019-07-23 Gas field cluster well field rotation metering gas collection device and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910667770.4A CN110242250B (en) 2019-07-23 2019-07-23 Gas field cluster well field rotation metering gas collection device and system

Publications (2)

Publication Number Publication Date
CN110242250A true CN110242250A (en) 2019-09-17
CN110242250B CN110242250B (en) 2024-09-17

Family

ID=67893298

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910667770.4A Active CN110242250B (en) 2019-07-23 2019-07-23 Gas field cluster well field rotation metering gas collection device and system

Country Status (1)

Country Link
CN (1) CN110242250B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2189439C2 (en) * 1999-02-22 2002-09-20 Тимашев Анис Тагирович Method of developing oil deposits and block complex system of plants for method embodiment
CA2706755A1 (en) * 2009-02-24 2010-08-24 Relevant, Inc. Well gauging system and method
CN202012323U (en) * 2011-03-31 2011-10-19 西安长庆科技工程有限责任公司 Measurement test device for cluster gas well
CN104373083A (en) * 2014-11-07 2015-02-25 西安长庆科技工程有限责任公司 Movable skid-mounted cluster type well field integrated device
CN204941479U (en) * 2015-09-29 2016-01-06 四川科宏石油天然气工程有限公司 A kind of cluster well station produces skid-mounted unit
CN210422568U (en) * 2019-07-23 2020-04-28 西安长庆科技工程有限责任公司 Gas field cluster well site rotation metering gas collection device and system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2189439C2 (en) * 1999-02-22 2002-09-20 Тимашев Анис Тагирович Method of developing oil deposits and block complex system of plants for method embodiment
CA2706755A1 (en) * 2009-02-24 2010-08-24 Relevant, Inc. Well gauging system and method
CN202012323U (en) * 2011-03-31 2011-10-19 西安长庆科技工程有限责任公司 Measurement test device for cluster gas well
CN104373083A (en) * 2014-11-07 2015-02-25 西安长庆科技工程有限责任公司 Movable skid-mounted cluster type well field integrated device
CN204941479U (en) * 2015-09-29 2016-01-06 四川科宏石油天然气工程有限公司 A kind of cluster well station produces skid-mounted unit
CN210422568U (en) * 2019-07-23 2020-04-28 西安长庆科技工程有限责任公司 Gas field cluster well site rotation metering gas collection device and system

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
刘银春;王莉华;李卫;陈虹;刘;郑欣;: "苏里格气田南区块天然气集输工艺技术", 天然气工业, no. 06 *
张向京;李华;张昀;李晓芸;刘杰;苟景卫;: "天然气井口数据远传建设应用", 石油化工应用, no. 05 *
王德涛;: "天然气井口数据远传建设应用", 化工管理, no. 11 *
王登海;郑欣;张祥光;冯启涛;张萍萍;: "苏里格气田稳产期地面工程的优化难点与对策", 天然气工业, no. 12 *

Also Published As

Publication number Publication date
CN110242250B (en) 2024-09-17

Similar Documents

Publication Publication Date Title
CN103383121B (en) Regional air conditioner dispersion secondary pumping system
CN212201992U (en) Universal valve body integrated device for single well and group well water-mixing wellhead process
CN101554541A (en) Complex T-shaped pipe separator for multi-phase flow separation and separation method thereof
CN207780633U (en) For the temperature and cooling water flow number measure and control device inside mass concrete
CN101761322A (en) High-efficiency energy-saving oil exploitation method
CN102705710A (en) Multi-well alternant separation measurement combined device for rapidly switching separate delivery and mixing delivery of gas and liquid
CN110242250A (en) Gas collecting apparatus and system are measured in a kind of field rotation of gas field cluster well
CN210422568U (en) Gas field cluster well site rotation metering gas collection device and system
CN106194106B (en) A kind of multiple-way valve mixes liquid injection allocation metering device
CN211200539U (en) Intelligent peak regulation water supply system
CN202000985U (en) Saturated steam regulating and controlling device
CN201809323U (en) Tube bundle type natural gas separation device
CN204827385U (en) Wide -range individual well oil gas metering device
CN208781078U (en) A kind of gas discharge Intellectualized controller
CN203347763U (en) Scattered oilfield flooding booster and water distribution intelligent integration device
CN2769510Y (en) Multi-well combined constant-flow water distributor
CN107388037A (en) Novel voltage-regulating batch meter
CN104295899A (en) 8-well-type heating and separating integrated device
CN208471998U (en) A kind of integration skid-mounted unit of multi-purpose station oil vapor treatment equipment
CN214886985U (en) Skid-mounted separation metering device for medium-low pressure natural gas cluster well group
CN207196084U (en) Novel voltage-regulating batch meter
CN203732139U (en) Multi-vessel parallel-connection pVTt-method gas flow-rate detection device
CN108531216A (en) A kind of integration skid-mounted unit of multi-purpose station oil vapor treatment equipment
CN206053902U (en) A kind of multiple-way valve mixes liquid injection allocation metering device
CN203264568U (en) Gas mixing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201029

Address after: 710018 Shaanxi province Xi'an Weiyang road Fengcheng four Changqing building

Applicant after: XI'AN CHANGQING TECHNOLOGY ENGINEERING Co.,Ltd.

Applicant after: CHINA NATIONAL PETROLEUM Corp.

Address before: 710018 Shaanxi province Xi'an Weiyang road Fengcheng four Changqing building

Applicant before: XI'AN CHANGQING TECHNOLOGY ENGINEERING Co.,Ltd.

GR01 Patent grant
GR01 Patent grant