CN110242063B - Protection device for protruded beam body and installation method - Google Patents

Protection device for protruded beam body and installation method Download PDF

Info

Publication number
CN110242063B
CN110242063B CN201910509995.7A CN201910509995A CN110242063B CN 110242063 B CN110242063 B CN 110242063B CN 201910509995 A CN201910509995 A CN 201910509995A CN 110242063 B CN110242063 B CN 110242063B
Authority
CN
China
Prior art keywords
plate body
beam body
plate
installation
guard according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201910509995.7A
Other languages
Chinese (zh)
Other versions
CN110242063A (en
Inventor
余文明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Qichen Sunshine Building Material Co ltd
Original Assignee
Fujian Qichen Sunshine Building Material Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Qichen Sunshine Building Material Co ltd filed Critical Fujian Qichen Sunshine Building Material Co ltd
Priority to CN201910509995.7A priority Critical patent/CN110242063B/en
Publication of CN110242063A publication Critical patent/CN110242063A/en
Application granted granted Critical
Publication of CN110242063B publication Critical patent/CN110242063B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/30Safety or protective measures preventing damage to building parts or finishing work during construction against mechanical damage or dirt, e.g. guard covers of stairs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention provides a protection device and an installation method for a protruded beam body, and relates to the technical field of building safety, wherein the protection device for the protruded beam body comprises an installation part arranged at the joint of the beam body and a wall body, the installation part comprises a first plate body connected with the beam body, a second plate body connected with the wall body and a rotating cover connected with one side, far away from the first plate body, of the second plate body, the rotating cover rotates around the joint with the second plate body, winding rollers are arranged in a space defined by the first plate body, the second plate body and the rotating cover, the number of the installation parts is two, and protection cloth is connected between the winding rollers of the two installation parts. The protection device and the installation method for the convex beam body are safe, reliable, simple in structure and convenient to install and disassemble, protect the convex beam body and prevent scraping and colliding, and the protection cloth can be replaced at any time and detached and cleaned.

Description

Protection device for protruded beam body and installation method
Technical Field
The invention relates to the technical field of building safety,
in particular, the present invention relates to a projecting beam body guard and method of installation.
Background
The building formwork is widely used in the field of concrete construction, and can form concrete structures and members according to specified positions and geometric dimensions, maintain the correct positions of the concrete structures and the members, and bear the self weight of the building formwork and external loads acting on the building formwork.
The building templates are the formwork and the support which are formed by pouring concrete, the using amount of the building templates is large at the construction site of a concrete building, and due to the planning of the building, a plurality of bearing columns, protruding beams and cross beams are arranged, the protruding parts of the protruding beams are very hard and are difficult to predict, workers can collide with the protruding beams to cause damage, or the building materials are scraped and abraded to the beams when being carried, the appearance is attractive, and the stability of the beams is damaged.
Therefore, in order to solve the above problems, it is necessary to design a reasonable protection device for the protruding beam body.
Disclosure of Invention
The invention aims to provide a protective device for a convex beam body, which is safe, reliable, simple in structure, convenient to mount and dismount, capable of protecting the convex beam body, preventing scraping and collision, replacing protective cloth at any time and dismounting and cleaning the protective cloth.
In order to achieve the purpose, the invention is realized by adopting the following technical scheme:
the utility model provides a protector of protrusion roof beam body, is including setting up in the installation department of roof beam body and wall connection department, the installation department include with the first plate body of roof beam body coupling, with wall connection's second plate body and with the second plate body is kept away from the rotation lid of first plate body one side connection, rotate the lid around with the junction of second plate body rotates, be provided with in the space that first plate body, second plate body and rotation lid enclose around rolling up the roller, the quantity of installation department is two, two the installation department around being connected with protection cloth between the rolling up the roller.
Preferably, the first plate body and the second plate body are provided with mounting holes, and the mounting holes are provided with a punching drill bit, a suction cup sleeved outside the punching drill bit, an air suction motor communicated with the suction cup and a fixing nut for fixing the suction cup.
Preferably, the number of the mounting holes is at least one.
Preferably, an extending plate is arranged at the end of the first plate body, and a clamping groove for facilitating clamping of the winding roller is formed in the extending plate.
Preferably, one end of the rotating cover, which is far away from the second plate body, is arc-shaped.
Preferably, an arc-shaped block is arranged on one side, away from the wall body, of the beam body.
Preferably, the number of the arc-shaped blocks is at least one.
Preferably, the protective cloth is a soft cloth woven by polyester fibers.
Another object of the present invention is to provide a method for installing a protection device for a projecting beam body, comprising the following steps:
s1: reserving an installation part installation space at two connecting positions of the beam body and the wall respectively;
s2: fixing the first plate body, the second plate body and the rotating cover of the mounting part;
s3: two ends of the protective cloth are respectively wound to the two winding rollers, and the winding rollers are clamped into spaces surrounded by the first plate body, the second plate body and the rotating cover;
s4: the winding roller is rotated to tighten the protective cloth, and the rotating cover is rotated.
Preferably, when step S2 is executed, mounting holes are formed in both the first plate and the second plate, a drill bit at the mounting hole punches the beam and the wall respectively, a suction cup outside the drill bit discharges air in the hole under the guidance of the suction motor, the suction cup sucks the mounting hole, the first plate and the second plate are fixed to the beam and the wall respectively, and finally the suction cup is fixed by a fixing nut.
Preferably, in step S3, the wind-up roller is engaged with a notch formed in a protruding plate provided at an end of the first plate member.
The protection device and the installation method of the convex beam body have the beneficial effects that: safe and reliable, simple structure, the installation and the dismantlement of being convenient for protect the bulge roof beam body, prevent that the scraping from colliding with, can change protection cloth at any time moreover, can pull down the washing to protection cloth.
Drawings
FIG. 1 is a schematic top view of a protection device for a projection beam according to the present invention;
FIG. 2 is a schematic structural view of a mounting portion of a protection device for a projected beam according to the present invention;
FIG. 3 is a schematic front view of an installation part of a protection device for a projected beam according to the present invention;
FIG. 4 is a schematic flow chart illustrating a method for installing a protection device for a protruded beam according to the present invention
In the figure: 1. the first plate body, 11, the drill bit, 12, the sucking disc, 13, the motor that induced drafts, 14, fixation nut, 15, stretch out the board, 2, the second plate body, 3, rotate the lid, 4, around the winding up roller, 5, protection cloth, 7, installation department, 8, the roof beam body, 81, arc piece, 9, wall body.
Detailed Description
The invention is further described below with reference to the accompanying drawings and examples.
The building formwork is widely used in the field of concrete construction, and can form concrete structures and members according to specified positions and geometric dimensions, maintain the correct positions of the concrete structures and the members, and bear the self weight of the building formwork and external loads acting on the building formwork.
The building templates are the formwork and the support which are formed by pouring concrete, the using amount of the building templates is large at the construction site of a concrete building, and due to the planning of the building, a plurality of bearing columns, protruding beams and cross beams are arranged, the protruding parts of the protruding beams are very hard and are difficult to predict, workers can collide with the protruding beams to cause damage, or the building materials are scraped and abraded to the beams when being carried, the appearance is attractive, and the stability of the beams is damaged.
The first embodiment is as follows: as shown in fig. 1 to 3, which are only one embodiment of the present invention, a protection device for a protruding beam includes an installation portion 7 disposed at a connection portion between a beam 8 and a wall 9, where the installation portion 7 includes a first plate 1 connected to the beam 8, a second plate 2 connected to the wall 9, and a rotating cover 3 connected to a side of the second plate 2 far from the first plate 1, the rotating cover 3 rotates around the connection portion with the second plate 2, winding rollers 4 are disposed in a space surrounded by the first plate 1, the second plate 2, and the rotating cover 3, the number of the installation portions 7 is two, and a protection cloth 5 is connected between the winding rollers 4 of the two installation portions 7.
According to the invention, two installation parts 7 are respectively installed at two connecting positions of a beam body 8 and a wall body 9, the installation parts 7 are connected with the beam body 8 through a first plate body 1 and are connected with the wall body 9 through a second plate body 2 for fixing, the protection cloth 5 is connected between the winding rollers 4 of the two installation parts 7, the protection cloth 5 is rotated by rotating the winding rollers 4, the protection cloth 5 is ensured to wind around the beam body 8 and be tightened, the beam body 8 is protected, the effect of preventing workers from being injured is achieved, and the building materials can be prevented from scraping the beam body 8.
Thus, the protection cloth 5 is dirty and can rotate the two winding rollers 4, the protection cloth 5 wound on the winding rollers 4 in advance is rotated out to replace the dirty protection cloth 5, the dirty protection cloth 5 is wound to the outer ring of one of the two winding rollers 4, and after the construction period is finished, the winding rollers 4 are detached to clean the protection cloth 5.
The protection cloth 5 that the book was reserved on the winding roller 4 in installation department 7, as long as cover with the rotation lid 3 that the second plate body 2 is connected, alright prevent that the dust from getting into installation department 7, the protection cloth 5 of reserving so can effectively prevent dust and prevent dirty.
It should be noted that, be provided with the mounting hole on first plate body 1 and the second plate body 2, mounting hole department is provided with drill bit 11, the cover is located the sucking disc 12 in the drill bit 11 outside, with the motor 13 that induced drafts that the sucking disc 12 communicates and be used for fixing the fixation nut 14 of sucking disc 12. Laminate installation department 7 to roof beam body 8 and wall body 9 junction, the drill bit 11 in mounting hole department punches on roof beam body 8 and wall body 9 respectively, the sucking disc 12 in the drill bit 11 outside is discharged the interior air in the hole under the guide of the motor 13 that induced drafts, sucking disc 12 holds mounting hole department, it is fixed to roof beam body 8 and wall body 9 respectively to push down first plate body 1 and second plate body 2 under the atmospheric pressure's that the negative pressure arouses pressure, use fixation nut 14 to fix sucking disc 12 at last, guarantee the stability of installation department 7.
Finally, the end part of the first plate body 1 is provided with an extending plate 15, and a clamping groove for clamping the winding roller 4 is formed in the extending plate 15. The winding roller 4 is clamped into a clamping groove in the extending plate 15 arranged at the end of the first plate body 1, wherein the clamping groove is circular, and the winding roller 4 is fixed and can rotate around the axis of the clamping groove.
The protection device for the convex beam body is safe and reliable, simple in structure and convenient to install and disassemble, protects the convex beam body, prevents scraping and colliding, can replace the protection cloth at any time, and can disassemble and clean the protection cloth.
The second embodiment is only one embodiment of the present invention, as shown in fig. 1 to 3, and in order to make the protection effect of the protection device of the projecting beam body of the present invention better and the stability degree higher, the present invention further has the following design:
first, the quantity of mounting hole is one at least, and in fact, all be provided with at least one mounting hole on first plate body 1 and the second plate body 2, a plurality of mounting holes department fix first plate body 1 and second plate body 2 like this, and the stability of installation department 7 is better like this.
Also, it keeps away from to rotate lid 3 the one end of second plate body 2 is the arc, and in fact, when closing and rotating lid 3, it keeps away from to rotate lid 3 the one end of second plate body 2 contacts with first plate body 1, and protection cloth 5 also derives from first plate body 1 one side, for the rolling of protection cloth 5 of being convenient for, it keeps away from to rotate lid 3 the one end of second plate body 2 is the arc, has effectively avoided rotating lid 3 to push down protection cloth 5 so that protection cloth 5 rotates impaired phenomenon emergence unable pivoted even.
And, the roof beam body 8 is kept away from one side of wall body 9 is provided with arc piece 81, conveniently guides the transmission of protection cloth 5, also avoids protection cloth and roof beam body 8 to take place the scraping, further cushions the injury that the staff collided to roof beam body 8 simultaneously.
Of course, the number of the arc blocks 81 is at least one, and actually, one arc block 81 is arranged on each of the two right-angle sides of the beam body 8.
Finally, the protective cloth 5 is soft cloth woven by polyester fibers, so that the buffer protection effect can be effectively achieved, and the polyester fibers are wear-resistant and corrosion-resistant.
The protection device for the convex beam body is safe and reliable, simple in structure and convenient to install and disassemble, protects the convex beam body, prevents scraping and collision, can replace the protection cloth at any time, and can disassemble and clean the protection cloth.
Third embodiment, as shown in fig. 4, which is only one embodiment of the present invention, the present invention further provides a method for installing a guard device for a projection beam body, including the steps of:
s1: reserving an installation part installation space at two connecting positions of the beam body and the wall respectively;
s2: fixing the first plate body, the second plate body and the rotating cover of the mounting part;
s3: two ends of the protective cloth are respectively wound to the two winding rollers, and the winding rollers are clamped into spaces surrounded by the first plate body, the second plate body and the rotating cover;
s4: the winding roller is rotated to tighten the protective cloth, and the rotating cover is rotated.
Certainly, when step S2 is executed, the first plate body and the second plate body are both provided with mounting holes, the drill bit at the mounting holes is used for respectively drilling on the beam body and the wall body, the suction disc at the outer side of the drill bit discharges air in the hole under the guide of the air suction motor, the suction disc sucks the mounting holes, the first plate body and the second plate body are respectively fixed on the beam body and the wall body, and finally the suction disc is fixed by using the fixing nut.
In step S3, the wind-up roller is engaged with the engaging groove of the extension plate provided at the end of the first plate member.
The protection device and the installation method for the convex beam body are safe, reliable, simple in structure and convenient to install and disassemble, protect the convex beam body and prevent scraping and colliding, and the protection cloth can be replaced at any time and detached and cleaned.
The present invention is not limited to the above-described specific embodiments, and various modifications and variations are possible. Any modifications, equivalents, improvements and the like made to the above embodiments in accordance with the technical spirit of the present invention should be included in the scope of the present invention.

Claims (9)

1. A protection device of a projecting beam body is characterized in that: including setting up in installation department (7) of roof beam body (8) and wall body (9) junction, installation department (7) include with first plate body (1) that roof beam body (8) are connected, with second plate body (2) that wall body (9) are connected and with second plate body (2) are kept away from rotation lid (3) that first plate body (1) one side is connected, rotate lid (3) around with the junction of second plate body (2) rotates, be provided with in the space that first plate body (1), second plate body (2) and rotation lid (3) enclose around winding up roller (4), the quantity of installation department (7) is two, two be connected with protection cloth (5) between winding up roller (4) of installation department (7), keep away from roof beam body (8) one side of wall body (9) is provided with arc piece (81).
2. A projection beam body guard according to claim 1 wherein: be provided with the mounting hole on first plate body (1) and the second plate body (2), mounting hole department is provided with drill bit (11), the cover is located sucking disc (12) in the drill bit (11) outside, with suction motor (13) and be used for fixing of sucking disc (12) intercommunication.
3. A projection beam body guard according to claim 2 wherein: the number of the mounting holes is at least one.
4. A projection beam body guard according to claim 1 wherein: the utility model discloses a winding roller, including first plate body (1), first plate body (1) tip is provided with stretches out board (15), it is used for the convenience to stretch out to be provided with on board (15) the draw-in groove that winding roller (4) card was gone into.
5. A projection beam body guard according to claim 1 wherein: one end of the rotating cover (3) far away from the second plate body (2) is arc-shaped.
6. A projection beam body guard according to claim 1 wherein: the number of the arc-shaped blocks (81) is at least one.
7. The method of installing a projection beam body guard according to any one of claims 1 to 6, wherein: the method comprises the following steps:
s1: reserving an installation part installation space at two connecting positions of the beam body and the wall respectively;
s2: fixing the first plate body, the second plate body and the rotating cover of the mounting part;
s3: two ends of the protective cloth are respectively wound to the two winding rollers, and the winding rollers are clamped into spaces surrounded by the first plate body, the second plate body and the rotating cover;
s4: the winding roller is rotated to tighten the protective cloth, and the rotating cover is rotated.
8. The method of installing a projection beam body guard according to claim 7, wherein:
when step S2 is executed, mounting holes are formed in the first plate body and the second plate body, the punching drill bits at the mounting holes are used for punching on the beam body and the wall body respectively, the suckers at the outer sides of the punching drill bits are used for discharging air in the holes under the guiding of the air suction motor, the suckers are used for sucking the mounting holes, the first plate body and the second plate body are fixed to the beam body and the wall body respectively, and finally the suckers are fixed through fixing nuts.
9. The method of installing a projection beam body guard according to claim 7, wherein:
in step S3, the winding roller is engaged with a slot of a protruding plate provided at an end of the first plate.
CN201910509995.7A 2019-06-13 2019-06-13 Protection device for protruded beam body and installation method Expired - Fee Related CN110242063B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910509995.7A CN110242063B (en) 2019-06-13 2019-06-13 Protection device for protruded beam body and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910509995.7A CN110242063B (en) 2019-06-13 2019-06-13 Protection device for protruded beam body and installation method

Publications (2)

Publication Number Publication Date
CN110242063A CN110242063A (en) 2019-09-17
CN110242063B true CN110242063B (en) 2021-10-26

Family

ID=67886950

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910509995.7A Expired - Fee Related CN110242063B (en) 2019-06-13 2019-06-13 Protection device for protruded beam body and installation method

Country Status (1)

Country Link
CN (1) CN110242063B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114776061B (en) * 2022-06-22 2022-08-23 中铁建工集团有限公司 Nondestructive connection construction method for steel structure auxiliary component and main structure
CN115045521B (en) * 2022-07-29 2023-07-25 中建八局第一建设有限公司 Anti-rust nail-free installation and plugging integrated device and installation method for electric embedded box

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1777359A2 (en) * 2005-10-21 2007-04-25 Tremco Illbruck Produktion GmbH Plastering strip and rolled plastering strip
CN105264154A (en) * 2013-04-12 2016-01-20 Peri有限公司 Tarpaulin roll
CN205705125U (en) * 2016-07-01 2016-11-23 长江师范学院 A kind of malleation adsorbent equipment and moulding fixing device thereof
CN207847131U (en) * 2018-01-18 2018-09-11 江苏精享裕建工有限公司 A kind of easy-to-mount engineering protection system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8007886B2 (en) * 2005-12-21 2011-08-30 Johns Manville Performance enhancing underlayment, underlayment assembly, and method
CN205369960U (en) * 2016-01-26 2016-07-06 深圳市鹏润装饰工程有限公司 Wall body external corner protection device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1777359A2 (en) * 2005-10-21 2007-04-25 Tremco Illbruck Produktion GmbH Plastering strip and rolled plastering strip
CN105264154A (en) * 2013-04-12 2016-01-20 Peri有限公司 Tarpaulin roll
CN205705125U (en) * 2016-07-01 2016-11-23 长江师范学院 A kind of malleation adsorbent equipment and moulding fixing device thereof
CN207847131U (en) * 2018-01-18 2018-09-11 江苏精享裕建工有限公司 A kind of easy-to-mount engineering protection system

Also Published As

Publication number Publication date
CN110242063A (en) 2019-09-17

Similar Documents

Publication Publication Date Title
CN110242063B (en) Protection device for protruded beam body and installation method
KR20220088285A (en) Dry cutting method for structure of nuclear facility
ITVI20060324A1 (en) PROTECTIVE STRUCTURE, PARTICULARLY FOR AIR-CONDITIONERS.
KR200398859Y1 (en) Protection frame for a building
JPH0584347U (en) Lifeline retractable safety equipment
CN213509931U (en) Guardrail convenient to install for building construction
GB2348455A (en) Air brick faceplate
KR20190002090U (en) A hose reel with a brush-type withdrawal guide
CN207538492U (en) A kind of combination tool formula faces side hole protector
CN213555962U (en) Electromechanical engineering environmental protection dust collector
KR20130004857U (en) Fixing device for construction protective net
CN213358906U (en) Water channel sewage disposal device with anti-blocking structure for environmental engineering
CN212505928U (en) Safety warning device is used in road construction with adjustable
KR20150000070U (en) Cleaninng tool for crain rail
KR200468089Y1 (en) Safety covering for building protection
CN214365436U (en) Building engineering protection network
CN216407622U (en) Flexible support drag chain protective structure of oil pipe quality sorting equipment
CN110359739B (en) Container equipment room convenient to disassemble and assemble
CN216042808U (en) Protective net convenient to disassemble and assemble for commercial building construction
CN211001181U (en) Engine protection plate convenient to dismantle
CN221225519U (en) License plate and voice broadcast text content display device
CN218208199U (en) Pipe protector is used in air conditioner installation
CN113605666B (en) Face limit structure post auxiliary construction platform
KR20140002621U (en) Roll film work with a protective hood
CN220486832U (en) Clean energy building curtain wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211026