CN110239673B - Movable floating type liquid cargo lightering maritime work platform with dynamic positioning device and lightering method - Google Patents

Movable floating type liquid cargo lightering maritime work platform with dynamic positioning device and lightering method Download PDF

Info

Publication number
CN110239673B
CN110239673B CN201910557026.9A CN201910557026A CN110239673B CN 110239673 B CN110239673 B CN 110239673B CN 201910557026 A CN201910557026 A CN 201910557026A CN 110239673 B CN110239673 B CN 110239673B
Authority
CN
China
Prior art keywords
liquid cargo
tank
area
tank container
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910557026.9A
Other languages
Chinese (zh)
Other versions
CN110239673A (en
Inventor
张冲
霍燕宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Anthracene Tianjie Energy Technology Co ltd
Original Assignee
Nanjing Anthracene Tianjie Energy Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Anthracene Tianjie Energy Technology Co ltd filed Critical Nanjing Anthracene Tianjie Energy Technology Co ltd
Priority to CN201910557026.9A priority Critical patent/CN110239673B/en
Publication of CN110239673A publication Critical patent/CN110239673A/en
Application granted granted Critical
Publication of CN110239673B publication Critical patent/CN110239673B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/002Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for goods other than bulk goods
    • B63B25/004Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for goods other than bulk goods for containers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/14Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed pressurised
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/16Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed heat-insulated
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/10Arrangement of ship-based loading or unloading equipment for cargo or passengers of cranes
    • B63B27/12Arrangement of ship-based loading or unloading equipment for cargo or passengers of cranes of gantry type
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/30Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/30Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
    • B63B27/34Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures using pipe-lines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C1/00Pressure vessels, e.g. gas cylinder, gas tank, replaceable cartridge
    • F17C1/002Storage in barges or on ships
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C5/00Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures
    • F17C5/02Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures for filling with liquefied gases
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • G01D21/02Measuring two or more variables by means not covered by a single other subclass
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • B63B2022/006Buoys specially adapted for measuring or watch purposes

Abstract

The invention discloses a movable floating liquid cargo lightering maritime work platform with a dynamic positioning device and a lightering method, wherein the platform mainly comprises a movable floating platform: the movable floating platform comprises a body, one end of the body is rotatably connected with the single-point mooring device, the body is provided with a liquid cargo tank and a liquid cargo tank container filling and hoisting operation area positioned above the liquid cargo tank, and the liquid cargo tank container is arranged in the operation area; bridge machines which can move longitudinally along the filling and hoisting operation area are arranged along two sides of the liquid cargo tank container; the tank cargo space is connected with a filling system for filling liquid into the tank container. This scheme has the buffer memory ability and refutes the function with changeing, is provided with hoist and mount and fills the dress region on the platform simultaneously, and the disconnect-type design fills the dress and the efficiency of hoist and mount is higher, and the security performance is better.

Description

Movable floating type liquid cargo lightering maritime work platform with dynamic positioning device and lightering method
Technical Field
The invention relates to oil and gas transfer equipment, in particular to a liquid cargo or a liquid cargo lightering transportation system and a method thereof, wherein the liquid cargo comprises liquefied natural gas L NG, liquid ethylene L EG, petroleum gas L PG and the like.
Background
The special transportation based on the tank container becomes an industrial hotspot, the tank container transportation is flexible and changeable, and the packaged goods can be directly sent to a container port 2.1-type hazardous chemical substance wharf closer to a client through sea transportation, river transportation and river transportation without the help of a special receiving station. Meanwhile, land transportation and water transportation can be better connected, and multi-type water and land transportation can be carried out.
For this reason, the technical personnel have improved and proposed some new solutions. Mainly comprising an offshore platform system, for example, patent CN107575738 proposes an offshore platform, which has the advantages of stable working environment and no land resource occupation, but has the disadvantages of being an offshore fixed building, limited by geographic space, large investment, strict approval, long approval period, and large potential safety hazard due to the fact that the offshore platform is filled and hoisted in the same region. In another solution, the platform is used only for storing liquid cargo and transporting the liquid cargo to the transfer ship through the pipeline without a filling function. This approach has significant limitations, either requiring long pipes to extend them to the dock or requiring the transfer vessel itself to carry the filler equipment, which is typically large and wasteful of space and resources when installed on the transfer vessel.
Disclosure of Invention
The purpose of the invention is as follows: the utility model provides a portable floating liquid goods refutes marine platform with power positioner to solve the above-mentioned problem that prior art exists. Meanwhile, the refuting method based on the movable floating type liquid cargo refuting maritime work platform with the dynamic positioning device is provided.
The technical scheme is as follows: a movable floating type liquid cargo lightering maritime work platform with a dynamic positioning device comprises a movable floating type platform,
the movable platform comprises a first body and a second body, one end of the first body is rotatably connected with the single-point mooring device, the first body is provided with a liquid cargo tank container filling and hoisting operation area, and the liquid cargo tank container is arranged in the operation area; bridge machines which can move longitudinally along the filling and hoisting operation area are arranged along two sides of the liquid cargo tank container; the first body is provided with a filling system for filling liquid into the tank container;
the second body is connected to one end of the first body through a hinge type soft connecting arm, the second body is provided with a liquid cargo tank, the liquid cargo tank is connected with a conveying pipe, and the conveying pipe extends to the first body and is communicated with a filling system;
the tail part of the first body and/or the bow part of the second body are/is provided with a power positioning device, and the power positioning device is a full-rotation propeller, a lateral propeller or a water-jet propeller; when the first body and the second body are relatively deviated under the action of external force, a reverse acting force is provided through the power positioning device, and the first body and/or the second body are/is pushed and corrected;
a flexible connecting mechanism capable of longitudinally compensating is arranged between the first body and the second body, and comprises a first pipe frame fixed at the tail part of the first body through a first support, a second pipe frame fixed at the bow part of the second body through a second support, a first connecting shaft fixed at the tail part of the first body, a second connecting shaft fixed at the tail part of the second body, a connecting arm rotationally connected with the first connecting shaft and the second connecting shaft, a compensating trolley connected to the first pipe frame in a sliding manner, a pipe clamp fixed on the compensating trolley, a rotary joint fixed on the second pipe frame, and a hose extending from the first body to the second body through the first pipe frame, the pipe clamp, the rotary joint and the second pipe frame; the connecting arms are at least two groups and are distributed in a triangular shape; one end of the connecting arm is respectively connected with different connecting points on the first connecting shaft, and the other end of the connecting arm is connected with the same connecting point on the second connecting shaft;
when the liquid cargo bulk transport ship approaches to the movable floating platform, the liquid cargo tank on the second body is communicated with the liquid cargo bulk transport ship through the pipeline system, and the liquid cargo is transferred to the bulk transport ship;
when the tank container carrier approaches the movable floating platform, the tank container is transferred to the tank container carrier by the bridge crane on the first body.
In a further embodiment, the liquid cargo tank container filling and hoisting operation area comprises a first area and a second area arranged at a distance from the first area, wherein a first bridge crane and a second bridge crane are respectively arranged in the second area;
when the empty tank container carrier moves to the first area, the first bridge crane transfers the empty tank container to the movable floating platform and accumulates it in a predetermined manner; the tank container carrier moves to the second area; the second bridge crane transfers the tank container filled with the liquid cargo to a tank container transport ship; at the same time, the tank container in the first area is filled with a filling device.
The tank container is a lifting tank container and comprises a tank body, a frame body which is fixed around the tank body and forms a square supporting frame, a liquid inlet and a liquid outlet which are respectively arranged at the upper side and the lower side of the tank body, and an automatic filling opening which is arranged at one side of the tank body; the automatic filling port comprises a liquid guiding pipe welded on the inner wall of the tank body and provided with a circumferential opening, a spring sleeved in the liquid guiding pipe in an inner mode, one end of the spring is abutted to the tail end of the liquid guiding pipe, one end of the blocking piece penetrates through a guide hole in the tail end of the spring and the liquid guiding pipe to extend into the tank body, the other end of the blocking piece forms a protruding part matched with the inner diameter of the open end of the liquid guiding pipe, a guide pipe welded along the outer side of the automatic filling port and covering the automatic filling port, a push rod rotatably connected to the inner wall of the guide pipe, a jacking rod with one end rotatably connected with the push rod and the other end; the filling joint assembly comprises a sealing connecting ring and a screwed pipe which are fixed at the end part of the guide pipe, a sealing ring fixed between the sealing connecting ring and the screwed pipe, and a positioning sleeve fixed at the end part of the screwed pipe; the screwed pipe and the guide pipe are connected in an embedded mode and are connected and reinforced through flanges.
In a further embodiment, the end of the guide pipe is provided with a pressure-bearing pipe, and a one-way valve is arranged in the pressure-bearing pipe.
In a further embodiment, the end of the ejection rod is provided with a stop protrusion, and a stop block is fixed on the inner wall of the guide tube, and when the ejection rod moves reversely to a desired position, the stop protrusion abuts against the stop block to stop the ejection rod from further moving reversely.
In a further embodiment, the system further comprises an environment monitoring system, wherein the environment monitoring system comprises a plurality of groups of buoys which are arranged in a predetermined sea area and form a grid layout, an anemometry sensor, a seawater current meter and a spectrum remote sensing meter which are arranged on the buoys, and a data processing center which is in signal connection with the anemometry sensor and the seawater current meter; when the data processing center comprises an area sea wave short-term prediction module, the area sea wave short-term prediction module is used for: receiving wind direction, wind speed, wave height, wave direction, flow speed and flow direction data sent by a wind speed and wind direction sensor, a seawater current meter and a spectrum remote sensing instrument at intervals of preset time; preprocessing and standardizing the data; training standardized data through a DBN model to obtain trained data, and then performing parameter tuning on the trained data through a BP algorithm to obtain tuning parameters; after data acquired by at least three groups of adjacent interval time are processed, a wind vector field, a first wave vector field and a flow vector field are established;
acquiring wave field image data at preset time intervals, preprocessing the image data, extracting textures of wave images, determining wave crest lines of waves, calculating the wavelength according to the distance between two continuous wave crest lines, numbering each found wave crest, and establishing a wave crest field diagram; starting a next frame of image, searching a peak appearing in the previous frame of image and searching a new peak, numbering the new peak, adding the new peak to a peak field image, and establishing a peak propagation direction vector image according to the direction of the new peak and the adjacent nearest peak and the interval time of the image; comparing the first wave vector field with the wave crest propagation direction, and training data by adopting a neural network to obtain reference data; controlling the maritime work platform according to the reference data so as to keep the maritime work platform stable;
when the wave crest in the previous frame image is overlapped with the wave crest of the next frame and the overlapping distance is less than the critical value, the same wave crest is judged, and the serial numbers are combined.
A liquid cargo lightering method adopting the lightering maritime work platform comprises the following steps:
firstly, enabling a liquid cargo bulk ship to be close to a movable floating type liquid cargo lightering maritime work platform with a dynamic positioning device;
secondly, the cargo is sequentially transshipped to a cargo tank on the maritime work platform through a material receiving and discharging arm and a cargo pipe bag from the bulk cargo ship;
filling the cargo in the liquid cargo tank into the tank container through a filling system on a movable floating type liquid cargo lightering maritime work platform with a dynamic positioning device;
fourthly, the liquid cargo tank container transport ship leans against the maritime work platform, the empty tank on the ship is hoisted to the tank container filling area by the bridge crane, and the empty tank on the ship is hoisted to the tank container stacking filling area by the bridge crane in the hoisting operation area; after the lifting is finished, the liquid cargo tank container transport ship moves to another operation area, and the full tank is lifted to the ship through the bridge crane.
In a further embodiment, the fourth step is further: the movable floating type liquid cargo lightering maritime work platform with the dynamic positioning device is provided with a first area and a second area, a first bridge crane and a second bridge crane are respectively arranged in the first area and the second area, a liquid cargo tank container transport ship loaded with empty boxes firstly stops at the first area, and the empty boxes are transferred to the first area through the first bridge crane to be stacked; after the hoisting is finished, the liquid cargo tank container is transferred to a second area, and the full tank on the maritime work platform is hoisted to a ship through a second bridge crane; meanwhile, another liquid cargo tank container transport ship is parked in the first area, and empty tanks are hoisted and stacked in the first area through the first bridge crane.
A liquid cargo lightering method adopting the lightering maritime work platform comprises the following steps,
the method comprises the following steps that firstly, a tank container transport ship loaded with full tanks of liquid cargos starts from each marginal gas field, moves to a movable floating type liquid cargo lightering maritime work platform with a dynamic positioning device, stops at a first area, and transfers the full tanks to the maritime work platform through a first bridge crane; the transport ship is transferred to a second area, and the second bridge crane transfers the empty boxes to the transport ship;
secondly, reversely filling through a filling system, and transferring liquid cargos in the tank container to a liquid cargo tank of the maritime work platform;
thirdly, the liquid cargo bulk transport ship leans against one side of the maritime work platform and is fixed;
and step four, transferring the liquid cargo in the liquid cargo tank from the maritime work platform to a liquid cargo bulk transport ship through the object pipe bag and the receiving and unloading arm, and transferring the liquid cargo to a preset address through the liquid cargo bulk transport ship.
In a further embodiment, the step one further comprises:
the movable floating type liquid cargo lightering maritime work platform with the dynamic positioning device is provided with a first area and a second area, a first bridge crane and a second bridge crane are respectively arranged in the first area and the second area, a liquid cargo tank container transport ship loaded with full tanks firstly stops at the first area, and full and empty tanks are transferred to the first area through the first bridge crane to be stacked; after the hoisting is finished, the liquid cargo tank container is transferred to a second area, and the full and empty tank on the maritime work platform is hoisted to a ship through a second bridge crane; meanwhile, another liquid cargo tank container ship is parked in the first area, and empty and full containers are hoisted and stacked in the first area through the first bridge crane.
Has the advantages that: the maritime work platform is provided with the cargo tank, fills dress system and tank container, has the buffer memory ability and refutes the function, is provided with hoist and mount and fills the dress region simultaneously on the platform, and the disconnect-type design fills dress and hoist and mount efficiency is higher, and the security performance is better.
Drawings
Fig. 1 is a schematic plan view of the mobile floating L NG offshore racking and collection lightering platform of the present invention.
Fig. 2a and 2b are schematic views of the movable floating barging platform of the present invention.
Fig. 3a to 3f are partially enlarged schematic views of the present invention.
Fig. 4 is a schematic diagram of an implementation of the present invention.
Fig. 5 is a partial schematic view of the automatic filling port of the present invention.
In the figure, a movable floating platform 1, a liquid cargo bulk carrier 2, a liquid cargo tank container carrier 3, an superstructure and smoke exhaust ventilation zone 4, a container bridge crane 5, a liquid cargo tank container filling and hoisting operation A zone 6, a liquid cargo tank container filling and hoisting operation B zone 7, a liquid cargo unloading and tank container filling centralized control zone 8, a BOG reliquefaction module 9, an upper L NG cargo pipe bag 10, a liquid cargo unloading arm 11, a crane track 12, a liquid cargo tank dome (liquid phase gas phase inlet and outlet 13), a single point mooring system 14, a liquid cargo tank 15, a liquid cargo tank container loading and filling platform 16, a liquid cargo tank container 17, a tank side wall 101, a push rod 102, a top-open rod 103, a liquid guiding pipe 104, a stop member 105, a spring 106, a circumferential opening 107, a first sealing member 108, a stop block 109, a connecting ring 110, a one-way valve 111, a pressure bearing pipe 112, a flange 113, a connecting pipe 114, a positioning sleeve 115, a second body 301, a second connecting shaft clamp 304, a lateral thruster 303, a second connecting steel pipe rack 305, a first connecting pipe 308, a first pipe support arm 308, a first rotating compensation arm connecting joint 310, a single point rotating compensation thruster 405 and a single point rotating shaft joint 410.
Detailed Description
In the following description, numerous specific details are set forth in order to provide a more thorough understanding of the present invention.
The L NG transportation problem in coastal inland areas in China meets a large bottleneck, and the island areas, such as southeast Asia areas, are rich in oil and gas resources, but due to the fact that associated gas sources of a plurality of scattered marginal gas fields or oil fields are limited by small scale and special liquefied gas investment wharf conditions, proper ways cannot be found for collection and utilization.
Aiming at the problems, the movable floating type liquid cargo lightering maritime work platform with the dynamic positioning device comprises a movable floating type platform 1, wherein the movable floating type platform 1 can be mainly reconstructed by adopting the existing ship or platform and can also be newly built according to the actual requirements. The displacement of the ship is determined according to the actual engineering requirements. The mobile floating platform 1 mainly comprises at least one body that can float on the surface or in a semi-submerged state. In order to fix the body in a predetermined area without the need for a fixed building (dock or offshore) the solution uses a single point mooring for the fixing. The single point mooring system 14 may employ catenary buoy mooring and single anchor leg mooring such as jacket tower rigid arm mooring, fixed tower single point mooring, disconnectable turret buoy mooring, and permanent turret mooring. The piling mode can also be adopted. Through the mooring device, the marine platform can rotate 360 degrees along with the ocean current, so that the influence of the ocean current on the marine platform is reduced, and the stability is improved.
The maritime work platform body is provided with a storage system, for example, a liquid cargo tank or a liquid cargo hold 15 is arranged in the cabin, and a liquid cargo tank container filling and hoisting operation area (a liquid cargo tank container stacking and filling platform 16) is arranged above a deck and is used for stacking a liquid cargo tank container 17. A filling system is connected to the tank container 15 for filling the tank container with liquid. Bridge machines which can move longitudinally along the liquid cargo tank container filling and hoisting operation A area 6 are arranged along two sides of the liquid cargo tank container filling and hoisting operation A area. The marine platform is used for realizing the functions of storage, filling and hoisting of the marine platform body. That is, the above functions can be performed on the marine platform body without extending through a pipeline to a dock, land or other transfer vessel. The small transfer ship does not need to be provided with a filling system. Through the systematic design of this kind of integral type, full flow, can let the maritime work platform carry out work in the place far away apart from the coast, the security is better, simultaneously, to transporting the ship, need not to carry out big structural transformation, can transport tank container can. Therefore, the marine platform of this application, its function is stronger, and is lower to the requirement of other boats, and is better to the adaptability of environment.
The floating platform is also provided with an superstructure and smoke exhaust ventilation area 4, a liquid cargo receiving and unloading and tank container filling centralized control area 8 and a BOG reliquefaction module 9.
The work flow is generally as follows, when the liquid cargo bulk carrier 2 approaches the movable floating platform 1, the liquid cargo tank 15 on the movable floating platform 1 communicates with the liquid cargo bulk carrier 2 through the piping system (including the upper portion L NG cargo piping 10 and the liquid cargo receiving and discharging arm 11) to transfer the liquid cargo to the bulk carrier, when the tank container carrier approaches the movable floating platform 1, the tank container is transferred to the tank container carrier through the bridge crane, which moves through the crane rail 12 provided axially along the platform, to operate the containers at different positions.
The tail part of the first body and/or the bow part of the second body are/is provided with a power positioning device, and the power positioning device is a full-rotation propeller, a lateral propeller or a water-jet propeller; when the first body and the second body are relatively deviated under the action of external force, reverse acting force is provided through the power positioning device, and the first body and/or the second body are/is pushed and corrected.
A flexible connecting mechanism capable of longitudinally compensating is arranged between the first body and the second body, and comprises a first pipe frame fixed at the tail part of the first body through a first support, a second pipe frame fixed at the bow part of the second body through a second support, a first connecting shaft fixed at the tail part of the first body, a second connecting shaft fixed at the tail part of the second body, a connecting arm rotationally connected with the first connecting shaft and the second connecting shaft, a compensating trolley connected to the first pipe frame in a sliding manner, a pipe clamp fixed on the compensating trolley, a rotary joint fixed on the second pipe frame, and a hose extending to the second body from the first body through the first pipe frame, the pipe clamp, the rotary joint and the second pipe frame; at least two groups of connecting arms are distributed in a triangular shape; one end of the connecting arm is respectively connected with different connecting points on the first connecting shaft, and the other end of the connecting arm is connected with the same connecting point on the second connecting shaft.
Firstly, in this technical scheme, rectify a deviation through power positioner to offset some with stable effort of influence body such as wave, ocean current, gush, wind, guarantee between first body and the second body basically stable.
Furthermore, the first body and the second body cannot keep the center lines coincident, and in order to solve the problem of flexibility of connecting pipes and the like, the first body and the second body are flexibly connected.
It should be noted that the filling process is done directly on the platform, without being done on a transport vessel, and without being piped to land or other vessels.
In order to improve the working efficiency and safety, a further improvement is made, in a preferred embodiment, the liquid cargo tank container filling and hoisting operation a-zone 6 comprises a first zone and a second zone spaced apart from the first zone, in which a first bridge crane and a second bridge crane are respectively arranged. Set up two at least operation districts promptly, through carrying out work in turn, improve work efficiency, reduce time and wasting of resources, fill dress work and hoist and mount work simultaneously and be the separation, also safer. In this scheme, the working process is described as follows:
when the empty tank container carrier moves to the first area, the first bridge crane transfers the empty tank container to the movable floating platform 1 and accumulates it in a predetermined manner; the tank container carrier moves to the second area; the second bridge crane transfers the tank container filled with the liquid cargo to a tank container transport ship; at the same time, the tank container in the first area is filled with a filling device. In other embodiments, a plurality of working areas may be provided, and the working areas in the above embodiments are preferred embodiments. When a plurality of working areas are set, the maximum use of system resources can be realized through the alternative working scheme.
In the present application, since the filling work is performed on a platform, there is a need for improvements to the platform, and it has been stated above that the work area is optimized to improve the work efficiency and safety.
During filling, the safety performance needs to be further improved. The existing tank container is generally filled on land and is slightly influenced by ocean currents and sea winds, and although a marine platform adopts a stabilizing system, the existing tank container has certain fluctuation relative to the land and avoids problems in extreme cases. The filling structure is optimized, and the method specifically comprises the following steps:
the tank container is a lifting tank container and comprises a tank body, a frame body which is fixed around the tank body and forms a square support frame, a liquid inlet and a liquid outlet which are respectively arranged at the upper side and the lower side of the tank body, and an automatic filling opening which is arranged at one side of the tank body; the automatic filling port comprises a liquid guiding pipe 104 welded on the inner wall of the tank body and provided with a circumferential opening 107, a spring 106 sleeved in the liquid guiding pipe 104 and having one end abutted against the tail end of the liquid guiding pipe 104, a stop member 105 having one end penetrating through a guide hole at the tail end of the spring 106 and the liquid guiding pipe 104 and extending into the tank body and the other end forming a convex part matched with the inner diameter of the open end of the liquid guiding pipe 104, a guide pipe welded along the outer side of the automatic filling port and covering the automatic filling port, a push rod 102 rotatably connected to the inner wall of the guide pipe, a top opening rod 103 having one end rotatably connected with the push rod 102 and the other end connected with the stop member 105, and a filling joint; the fill adapter assembly includes a seal attachment ring 110 and a threaded tube 114 secured to the end of the guide tube, a seal ring secured between the seal attachment ring 110 and the threaded tube 114, and a locating collar 115 secured to the end of the threaded tube 114. (ii) a The screwed pipe 114 is connected with the guide pipe in a jogged mode and is connected and reinforced through a flange 113. A positioning portion in which one end of the knock-out lever 103 is located is provided outside the stopper 105. A first seal 108 is provided on the outside of the stop.
During filling, the filling end is adjusted to the side wall 101 of the pipe body, the positioning sleeve 115 is opened, the thread plugging piece is turned down, the filling end enters the guide pipe in a rotating mode, the tail end of the filling end abuts against the push rod 102, the ejection rod 103 is driven to move, the stop piece 105 is ejected, the pipeline is communicated, and liquid injection operation is carried out. After the operation is finished, the filling end head is rotated out, and the related mechanisms are reversely reset. The spring 106 pushes the stopper 105 to seal and simultaneously the threaded closure is screwed on and the locating sleeve 115 is closed. .
In a further embodiment, the end of the pilot tube is provided with a pressure-bearing tube 112, said pressure-bearing tube 112 being provided with a one-way valve 111 therein. The tail end of the ejection rod 103 is provided with a stop protrusion, the inner wall of the guide tube is fixed with a stop block 109, and when the ejection rod 103 moves reversely to a desired position, the stop protrusion abuts against the stop block 109 to stop the ejection rod 103 from continuing to move reversely. Under extreme conditions, to avoid the internal pressure that material failure or other reasons caused too big, then spacing through the mode of butt, avoid the dwang to rotate inefficacy, cause the leakage.
In a further embodiment, the system further comprises an environment monitoring system, wherein the environment monitoring system comprises a plurality of groups of buoys which are arranged in a predetermined sea area and form a grid layout, an anemometry sensor, a seawater current meter and a spectrum remote sensing meter which are arranged on the buoys, and a data processing center which is in signal connection with the anemometry sensor and the seawater current meter; when the data processing center comprises an area sea wave short-term prediction module, the area sea wave short-term prediction module is used for: receiving wind direction, wind speed, wave height, wave direction, flow speed and flow direction data sent by a wind speed and wind direction sensor, a seawater current meter and a spectrum remote sensing instrument at intervals of preset time; preprocessing and standardizing the data; training standardized data through a DBN model to obtain trained data, and then performing parameter tuning on the trained data through a BP algorithm to obtain tuning parameters; after data acquired by at least three groups of adjacent interval time are processed, a wind vector field, a first wave vector field and a flow vector field are established;
acquiring wave field image data at preset time intervals, preprocessing the image data, extracting textures of wave images, determining wave crest lines of waves, calculating the wavelength according to the distance between two continuous wave crest lines, numbering each found wave crest, and establishing a wave crest field diagram; starting a next frame of image, searching a peak appearing in the previous frame of image and searching a new peak, numbering the new peak, adding the new peak to a peak field image, and establishing a peak propagation direction vector image according to the direction of the new peak and the adjacent nearest peak and the interval time of the image; comparing the first wave vector field with the wave crest propagation direction, and training data by adopting a neural network to obtain reference data; controlling the maritime work platform according to the reference data so as to keep the maritime work platform stable; when the wave crest in the previous frame image is overlapped with the wave crest of the next frame and the overlapping distance is less than the critical value, the same wave crest is judged, and the serial numbers are combined.
As shown in fig. 1 and fig. 2a, the working process of the present invention when transferring is as follows:
a liquid cargo lightering method adopting the lightering maritime work platform comprises the following steps:
firstly, enabling a liquid cargo bulk ship to be close to a movable floating type liquid cargo lightering maritime work platform with a dynamic positioning device;
secondly, the cargo is sequentially transshipped to a cargo tank 15 on the maritime work platform through a material receiving and discharging arm and a cargo pipe bag from the bulk liquid cargo ship;
filling the cargo in the cargo tank 15 into the tank container through a filling system on a movable floating type liquid cargo lightering maritime work platform with a dynamic positioning device;
fourthly, the liquid cargo tank container transport ship 3 is close to a maritime work platform, and an empty tank on the ship is hoisted to a tank container stacking and filling area by a bridge crane; after the lifting is finished, the liquid cargo tank container transport ship 3 moves to another operation area, and the full tank is lifted to the ship through the bridge crane.
In a further embodiment, the fourth step is further: the movable floating type liquid cargo lightering maritime work platform with the dynamic positioning device is provided with a first area and a second area, a first bridge crane and a second bridge crane are respectively arranged in the first area and the second area, a liquid cargo tank container transport ship 3 loaded with empty tanks firstly stops at the first area, and full empty tanks are transferred to the first area through the first bridge crane to be stacked; after the hoisting is finished, the liquid cargo tank container 17 is transferred to a second area, and the empty and full containers on the maritime work platform are hoisted to the ship through a second bridge crane; meanwhile, another liquid cargo tank container ship 3 is docked in the first area, and full and empty tanks are hoisted and stacked in the first area by the first bridge crane.
Example one, refuting and split charging of lng.
And (4) carrying out lightering split charging, namely carrying out liquid cargo lightering transfer from the L NG bulk carrier to the L NG package carrier-L NG container carrier by using the platform.
The specific process is divided into the following 4 stages:
step 1, L NG side-by-side mooring stage of bulk carrier
L NG bulk carrier is moored alongside the maritime platform 1 fixed by single point mooring with the aid of tugboats, pusher wheels, etc.
Step 2, L NG cargo unloading stage
L NG cargo is transshipped from an L NG bulk carrier vessel to L NG cargo tanks 15 on a platform via L NG take-off arms 11 and L NG cargo capsules 10 in sequence.
Step 3, tank container large-scale filling stage (taking B area as an example, and vice versa)
L NG batches were loaded into L NG tankers stacked in zone B using the L NG tankers filling module on the lightend maritime platform.
And 4, replacing and lifting the full boxes and the empty boxes.
And 3, simultaneously with the step 3, the L NG tank container transport ship sails into the area range of the platform, is laterally moored at the other side of the platform, and the container bridge crane 5 hoists the empty containers carried on the transport ship to the tank container stacking and filling area which is originally idle on the area A. after the empty containers are hoisted completely, the empty containers are moored again and laterally leaned to the corresponding position of the area B, and the full containers filled in the stage 3 are hoisted to the L NG tank container transport ship through the container bridge crane 5.
The platform can be used for transshipping the goods of the bulk carrier to the packaging type goods carrier without the aid of an L NG special receiving device and a container port dock.
As shown in fig. 3, in order to solve the problem, "collecting and utilizing the associated gas sources in many scattered marginal gas fields or oil fields in a suitable manner has not been found due to the restriction of small scale and special wharf conditions for investing liquefied gas" when the collecting and refuting are performed. The working process of the invention is as follows:
a liquid cargo lightering method adopting the lightering maritime work platform comprises the following steps,
the method comprises the following steps that firstly, a tank container transport ship loaded with full tanks of liquid cargos starts from each marginal gas field, moves to a movable floating type liquid cargo lightering maritime work platform with a dynamic positioning device, stops at a first area, and transfers the full tanks to the maritime work platform through a first bridge crane; the transport ship is transferred to a second area, and the second bridge crane transfers the empty boxes to the transport ship;
secondly, reversely filling the tank container through a filling system, and transferring the liquid cargo in the tank container to a liquid cargo tank 15 of the maritime work platform;
thirdly, the liquid cargo bulk transport ship 2 leans against one side of the maritime work platform and is fixed;
and step four, transferring the liquid cargo in the liquid cargo tank 15 from the maritime work platform to the liquid cargo bulk transport ship 2 through the object pipe bag and the receiving and unloading arm, and transferring the liquid cargo to a preset address through the liquid cargo bulk transport ship 2.
In a further embodiment, the step one further comprises:
the movable floating type liquid cargo lightering maritime work platform with the dynamic positioning device is provided with a first area and a second area, a first bridge crane and a second bridge crane are respectively arranged in the first area, a liquid cargo tank type container transport ship 3 loaded with full tanks firstly stops at the first area, and empty tanks are transferred to the first area through the first bridge crane to be stacked; after the hoisting is finished, the liquid cargo tank container 17 is transferred to a second area, and the full tank on the maritime work platform is hoisted to the ship through a second bridge crane; meanwhile, another liquid cargo tank container carrier 3 is docked in the first area, and empty tanks are hoisted and stacked in the first area by the first bridge crane.
Second example, liquefied natural gas gathering lightens, and liquid cargo transfer from L NG package type carrier-L NG container carrier 3 to L NG bulk carrier 2 is realized by the platform.
The specific process is also divided into 4 stages:
step 1, lifting and replacing the full boxes and the empty boxes.
The container bridge crane 5 of each of the A area and the B area of the platform lifts the full containers collected from a plurality of marginal gas fields of the L NG tank container transport ship to the working A area of the platform, and lifts the empty containers stacked in the working B area to the L NG tank container transport ship.
Step 2, L NG collect lightering stage-reverse delivery of stock in full bin.
The L NG tank container filling module on the lightering maritime platform was used to reverse-deliver the liquid cargo in the full tank in zone a into the L NG liquid cargo tank 15 of the platform.
Step 3, L NG the side-by-side mooring stage of the bulk carrier.
L NG bulk carrier is moored at the other side of the maritime work platform fixed by single point mooring with the assistance of tug boat, push-push boat, etc.
Step 4, L NG collect lightering stage-reverse delivery of stock in full bin.
The liquid cargo in the L NG liquid cargo tank 15 is conveyed into the liquid cargo tank 15 in the L NG bulk transport ship which is berthed at the other side through a dome of the liquid cargo tank 15, namely the liquid phase gas phase access and exit 13, the upper L NG cargo tube bag and the L NG receiving and unloading arm.
By means of the multifunctional maritime work refuting platform, a skid-mounted natural gas liquefaction device can be built for an interpatient gas field scattered gas source, the natural gas liquefaction device is transported to a floating L NG refuting maritime work platform by using an L NG tank type container transport ship, then the natural gas liquefaction device is reversely gathered by the platform and finally refuted to a L NG bulk transport ship, and then long-distance ocean transportation is carried out to a demand end.
The technical innovation point is that the platform is a movable floating maritime work platform integrating overstroking, buffering, split charging, collecting and lifting, and has at least the characteristics that a tank container stacking and batch filling area on the platform is divided into two areas A, B, the middle area of the area A and the area B is filled with a tank container, a L NG cargo receiving and unloading control area is safely isolated, filling of a tank container is carried out in one area, the other area can still carry out a loading and unloading operation industry of L NG tank containers, the operation efficiency of the platform and the turnover efficiency of an NG L NG tank container are effectively improved, the platform is a movable floating platform 1, the platform is applicable to operating environments with different water depths, simultaneously the single-point mooring mode has a wind direction marking effect, the influence of environmental factors such as wind direction flow and constant volume flow on the platform body and the tank container transportation by using a buffer tank container transfer platform L and L3 can be avoided to the whole buffer storage and buffer storage of a tank container transfer platform and the buffer storage tank storage platform, the buffer storage tank storage and the buffer storage of the floating platform can be used for storing the floating cargo storage and the floating platform, the floating transportation of the floating platform can be greatly improved by a floating platform, the floating platform L, the floating platform can be used for storing the floating platform, the floating transportation of a floating platform L, the floating platform can be used for storing and transporting the floating platform, the floating platform L, the floating platform can be used for transferring the floating platform, the floating platform can be realized by a floating platform, the floating platform 366957, the floating platform can be used for transferring the floating platform for transferring the large tank cargo between the floating platform for transferring the large tank cargo between the large tank cargo and the large tank cargo receiving and the large tank cargo transferring the large tank cargo and the large tank of the large tank cargo and the large tank of the large tank cargo receiving tank of the large tank cargo and the large tank of the large tank cargo and the large tank of the large tank cargo and the large tank of the large tank can be carried out, the large tank can be carried by the large tank cargo and the large tank of the large tank cargo, the large tank cargo transferring the large tank of the large tank cargo transferring the large tank of the large tank can be realized by the large tank cargo transferring the large tank can be realized by the large tank of the large tank.
It should be noted that the various features described in the above embodiments may be combined in any suitable manner without departing from the scope of the invention. The invention is not described in detail in order to avoid unnecessary repetition. In addition, any combination of the various embodiments of the present invention is also possible, and the same should be considered as the disclosure of the present invention as long as it does not depart from the spirit of the present invention.

Claims (6)

1. A movable floating type liquid cargo lightering maritime work platform with a dynamic positioning device is characterized by comprising a movable floating type platform,
the movable platform comprises a first body and a second body, one end of the first body is rotatably connected with the single-point mooring device, the first body is provided with a liquid cargo tank container filling and hoisting operation area, and the liquid cargo tank container is arranged in the operation area; bridge machines which can move longitudinally along the filling and hoisting operation area are arranged along two sides of the liquid cargo tank container; the first body is provided with a filling system for filling liquid into the tank container;
the second body is connected to one end of the first body through a hinge type soft connecting arm, the second body is provided with a liquid cargo tank, the liquid cargo tank is connected with a conveying pipe, and the conveying pipe extends to the first body and is communicated with a filling system;
the tail part of the first body and/or the bow part of the second body are/is provided with a power positioning device, and the power positioning device is a full-rotation propeller, a lateral propeller or a water-jet propeller; when the first body and the second body are relatively deviated under the action of external force, a reverse acting force is provided through the power positioning device, and the first body and/or the second body are/is pushed and corrected;
a flexible connecting mechanism capable of longitudinally compensating is arranged between the first body and the second body, and comprises a first pipe frame fixed at the tail part of the first body through a first support, a second pipe frame fixed at the bow part of the second body through a second support, a first connecting shaft fixed at the tail part of the first body, a second connecting shaft fixed at the tail part of the second body, a connecting arm rotationally connected with the first connecting shaft and the second connecting shaft, a compensating trolley connected to the first pipe frame in a sliding manner, a pipe clamp fixed on the compensating trolley, a rotary joint fixed on the second pipe frame, and a hose extending from the first body to the second body through the first pipe frame, the pipe clamp, the rotary joint and the second pipe frame; the connecting arms are at least two groups and are distributed in a triangular shape; one end of the connecting arm is respectively connected with different connecting points on the first connecting shaft, and the other end of the connecting arm is connected with the same connecting point on the second connecting shaft;
when the liquid cargo bulk transport ship approaches to the movable floating platform, the liquid cargo tank on the second body is communicated with the liquid cargo bulk transport ship through the pipeline system, and the liquid cargo is transferred to the bulk transport ship;
transferring the tank container to the tank container carrier by the bridge crane on the first body when the tank container carrier approaches the movable floating platform;
the liquid cargo tank container filling and hoisting operation area comprises a first area and a second area arranged at intervals with the first area, and a first bridge crane and a second bridge crane are respectively arranged in the second area;
when the empty tank container carrier moves to the first area, the first bridge crane transfers the empty tank container to the movable floating platform and accumulates it in a predetermined manner; the tank container carrier moves to the second area; the second bridge crane transfers the tank container filled with the liquid cargo to a tank container transport ship; at the same time, the tank container in the first area is filled with a filling device;
the tank container is a lifting tank container and comprises a tank body, a frame body which is fixed around the tank body and forms a square supporting frame, a liquid inlet and a liquid outlet which are respectively arranged at the upper side and the lower side of the tank body, and an automatic filling opening which is arranged at one side of the tank body; the automatic filling port comprises a liquid guiding pipe welded on the inner wall of the tank body and provided with a circumferential opening, a spring sleeved in the liquid guiding pipe in an inner mode, one end of the spring is abutted to the tail end of the liquid guiding pipe, one end of the blocking piece penetrates through a guide hole in the tail end of the spring and the liquid guiding pipe to extend into the tank body, the other end of the blocking piece forms a protruding part matched with the inner diameter of the open end of the liquid guiding pipe, a guide pipe welded along the outer side of the automatic filling port and covering the automatic filling port, a push rod rotatably connected to the inner wall of the guide pipe, a jacking rod with one end rotatably connected with the push rod and the other end; the filling joint assembly comprises a sealing connecting ring and a screwed pipe which are fixed at the end part of the guide pipe, a sealing ring fixed between the sealing connecting ring and the screwed pipe, and a positioning sleeve fixed at the end part of the screwed pipe; the screwed pipe and the guide pipe are connected in an embedded manner and are connected and reinforced through a flange;
the movable floating type liquid cargo lightering maritime work platform with the dynamic positioning device also comprises an environment monitoring system, wherein the environment monitoring system comprises a plurality of groups of buoys which are arranged in a preset sea area and form a grid-type layout, an anemorumbometer, a seawater current meter and a spectrum remote sensing meter which are arranged on the buoys, and a data processing center which is in signal connection with the anemorumbometer and the seawater current meter; the data processing center comprises a regional sea wave short-term prediction module, and the regional sea wave short-term prediction module is used for: receiving wind direction, wind speed, wave height, wave direction, flow speed and flow direction data sent by a wind speed and wind direction sensor, a seawater current meter and a spectrum remote sensing instrument at intervals of preset time; preprocessing and standardizing the data; training standardized data through a DBN model to obtain trained data, and then performing parameter tuning on the trained data through a BP algorithm to obtain tuning parameters; after data acquired by at least three groups of adjacent interval time are processed, a wind vector field, a first wave vector field and a flow vector field are established;
acquiring wave field image data at preset time intervals, preprocessing the image data, extracting textures of wave images, determining wave crest lines of waves, calculating the wavelength according to the distance between two continuous wave crest lines, numbering each found wave crest, and establishing a wave crest field diagram; starting a next frame of image, searching a peak appearing in the previous frame of image and searching a new peak, numbering the new peak, adding the new peak to a peak field image, and establishing a peak propagation direction vector image according to the direction of the new peak and the adjacent nearest peak and the interval time of the image; comparing the first wave vector field with the wave crest propagation direction, and training data by adopting a neural network to obtain reference data; controlling the maritime work platform according to the reference data so as to keep the maritime work platform stable;
when the wave crest in the previous frame image is overlapped with the wave crest of the next frame and the overlapping distance is less than the critical value, the same wave crest is judged, and the serial numbers are combined.
2. The movable floating liquid cargo lightering maritime work platform with dynamic positioning device according to claim 1, characterized in that the end of the guiding pipe is provided with a pressure bearing pipe, and the pressure bearing pipe is internally provided with a one-way valve.
3. The movable floating liquid cargo lightering maritime work platform with the power positioning device as claimed in claim 1, wherein the end of the ejector rod is provided with a stop protrusion, the inner wall of the guide pipe is fixed with a stop block, and when the ejector rod moves reversely to a desired position, the stop protrusion abuts against the stop block to stop the ejector rod from further moving reversely.
4. The movable floating liquid cargo lightering maritime work platform with dynamic positioning device according to claim 1, wherein the outer side of the stopper is provided with a first sealing element.
5. A method of liquid cargo lightering using the lightering maritime work platform according to any one of claims 1 to 4, comprising the steps of:
firstly, enabling a liquid cargo bulk ship to be close to a movable floating type liquid cargo lightering maritime work platform with a dynamic positioning device;
secondly, the cargo is sequentially transshipped to a cargo tank on the maritime work platform through a material receiving and discharging arm and a cargo pipe bag from the bulk cargo ship;
filling the cargo in the liquid cargo tank into the tank container through a filling system on a movable floating type liquid cargo lightering maritime work platform with a dynamic positioning device;
fourthly, the liquid cargo tank container transport ship leans against the maritime work platform, and an empty tank on the ship is hoisted to a tank container filling and hoisting operation area by a bridge crane; after the lifting is finished, the liquid cargo tank container transport ship moves to another operation area, and the full tank is lifted to the ship through the bridge crane.
6. The liquid cargo lightering method of claim 5, wherein the fourth step is further:
the movable floating type liquid cargo lightering maritime work platform with the dynamic positioning device is provided with a first area and a second area, a first bridge crane and a second bridge crane are respectively arranged in the first area and the second area, a liquid cargo tank container transport ship loaded with empty boxes firstly stops at the first area, and the empty boxes are transferred to the first area through the first bridge crane to be stacked; after the hoisting is finished, the liquid cargo tank container is transferred to a second area, and the full tank on the maritime work platform is hoisted to a ship through a second bridge crane; meanwhile, another liquid cargo tank container transport ship is parked in the first area, and empty tanks are hoisted and stacked in the first area through the first bridge crane.
CN201910557026.9A 2019-06-25 2019-06-25 Movable floating type liquid cargo lightering maritime work platform with dynamic positioning device and lightering method Active CN110239673B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910557026.9A CN110239673B (en) 2019-06-25 2019-06-25 Movable floating type liquid cargo lightering maritime work platform with dynamic positioning device and lightering method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910557026.9A CN110239673B (en) 2019-06-25 2019-06-25 Movable floating type liquid cargo lightering maritime work platform with dynamic positioning device and lightering method

Publications (2)

Publication Number Publication Date
CN110239673A CN110239673A (en) 2019-09-17
CN110239673B true CN110239673B (en) 2020-08-04

Family

ID=67889300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910557026.9A Active CN110239673B (en) 2019-06-25 2019-06-25 Movable floating type liquid cargo lightering maritime work platform with dynamic positioning device and lightering method

Country Status (1)

Country Link
CN (1) CN110239673B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109969350B (en) * 2019-03-28 2020-01-17 南京蒽天捷能源科技有限公司 Movable floating type liquid cargo lightering maritime work platform and lightering method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104334481A (en) * 2012-06-11 2015-02-04 西门子公司 Floating transship platform
CN107074337A (en) * 2014-11-27 2017-08-18 韩国海洋科学技术院 Can self power generation and handle boil-off gas gas hydrates tank container Load System
CN107249978A (en) * 2015-02-24 2017-10-13 裕廊船厂有限公司 Using can floating offshore warehouse method
CN107575738A (en) * 2017-10-18 2018-01-12 上海宏华海洋油气装备有限公司 Offshore platforms formula LNG is received and distribution system
CN108361543A (en) * 2018-04-16 2018-08-03 张家港富瑞深冷科技有限公司 A kind of new type low temperature structure of container and its manufacturing method
CN109250041A (en) * 2017-07-14 2019-01-22 西班牙天然气能源集团公司 Barge for carry liquefied natural gas LNG tank vehicle
CN109340557A (en) * 2018-11-15 2019-02-15 上海宏华海洋油气装备有限公司 The filling of liquefied natural gas container and movement system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104334481A (en) * 2012-06-11 2015-02-04 西门子公司 Floating transship platform
CN107074337A (en) * 2014-11-27 2017-08-18 韩国海洋科学技术院 Can self power generation and handle boil-off gas gas hydrates tank container Load System
CN107249978A (en) * 2015-02-24 2017-10-13 裕廊船厂有限公司 Using can floating offshore warehouse method
CN109250041A (en) * 2017-07-14 2019-01-22 西班牙天然气能源集团公司 Barge for carry liquefied natural gas LNG tank vehicle
CN107575738A (en) * 2017-10-18 2018-01-12 上海宏华海洋油气装备有限公司 Offshore platforms formula LNG is received and distribution system
CN108361543A (en) * 2018-04-16 2018-08-03 张家港富瑞深冷科技有限公司 A kind of new type low temperature structure of container and its manufacturing method
CN109340557A (en) * 2018-11-15 2019-02-15 上海宏华海洋油气装备有限公司 The filling of liquefied natural gas container and movement system

Also Published As

Publication number Publication date
CN110239673A (en) 2019-09-17

Similar Documents

Publication Publication Date Title
CN109969350B (en) Movable floating type liquid cargo lightering maritime work platform and lightering method
CN101297144B (en) A system using a catenary flexible conduit for transferring a cryogenic fluid
KR101797199B1 (en) Systems and methods for floating dockside liquefaction of natural gas
CN110239674B (en) Movable serial floating liquid cargo lightering maritime work platform and lightering method
US6829901B2 (en) Single point mooring regasification tower
KR102414330B1 (en) System and method for heading control of a floating lng vessel using real-time monitored cargo containment system strain data
KR101427086B1 (en) Transporting and transferring fluid
US3407768A (en) Offshore storage, mooring and loading facility
CN112810767B (en) Offshore deep-water power mooring floating traction crude oil pipeline conveying method
CN102963502A (en) Single-point moored floating body device for marine engineering
CN110254645B (en) Movable floating type bilateral operation LNG lightering maritime work platform and lightering method
CN105000137A (en) Sector rotation single point mooring liquid transportation system
EA031420B1 (en) Cargo transfer vessel
CN110239673B (en) Movable floating type liquid cargo lightering maritime work platform with dynamic positioning device and lightering method
Rutkowski A comparison between conventional buoy mooring CBM, single point mooring SPM and single anchor loading sal systems considering the hydro-meteorological condition limits for safe ship’s operation offshore
WO2016036690A1 (en) System and method for small scale marine transpoation of cryogenic hydrocarbons
KR850000332A (en) Natural gas production method and system of offshore oil well
AU2021211356B2 (en) Support vessel for assisting in loading fluid hydrocarbon cargo onto a carrier vessel, and related system and method
CN220076629U (en) Box-type carbon dioxide storage and transportation and seabed injection platform
JP4713095B2 (en) Offshore offloading system
CN107640293A (en) A kind of exploitation of offshore oil and gas drilling goods and materials store feeding mechanism
Rutkowski A comparison between DP offshore loading operation on submerged turret loading system STL, submerged single anchor loading system SAL and offshore loading system OLS considering the hydro-meteorological condition limits for the safe ship’s operation offshore
KR20170000778U (en) Mooring Device And System For Bunkering Vessel
KR20150024508A (en) Crude oil transportation system
WO2022221924A1 (en) Gas transportation and storage system

Legal Events

Date Code Title Description