Prior art keywords
tubing
etch
proof
manufacture craft
sandblasting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910479859.8A
Other languages
Chinese (zh)
Inventor
朱向勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Guan Yi Sheng New Mstar Technology Ltd
Original Assignee
Anhui Guan Yi Sheng New Mstar Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Guan Yi Sheng New Mstar Technology Ltd filed Critical Anhui Guan Yi Sheng New Mstar Technology Ltd
Priority to CN201910479859.8A priority Critical patent/CN110239052A/en
Publication of CN110239052A publication Critical patent/CN110239052A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29BPREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
    • B29B13/00Conditioning or physical treatment of the material to be shaped
    • B29B13/06Conditioning or physical treatment of the material to be shaped by drying
    • B29B13/065Conditioning or physical treatment of the material to be shaped by drying of powder or pellets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29BPREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
    • B29B7/00Mixing; Kneading
    • B29B7/002Methods
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/001Combinations of extrusion moulding with other shaping operations
    • B29C48/0022Combinations of extrusion moulding with other shaping operations combined with cutting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/03Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor characterised by the shape of the extruded material at extrusion
    • B29C48/09Articles with cross-sections having partially or fully enclosed cavities, e.g. pipes or channels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/25Component parts, details or accessories; Auxiliary operations
    • B29C48/88Thermal treatment of the stream of extruded material, e.g. cooling
    • B29C48/90Thermal treatment of the stream of extruded material, e.g. cooling with calibration or sizing, i.e. combined with fixing or setting of the final dimensions of the extruded article

Abstract

The invention discloses a kind of etch-proof PE tubing manufacture craft, include the following steps: that raw material and equipment prepare, dry, mixing, drying, plasticizing squeeze out, mold molding, cooling and shaping, and sandblasting, coating, solidification are cut, packaging;The beneficial effects of the present invention are: the PE pipe after sandblasting, coating, solidification has excellent anti-corrosive properties, weatherability and electric insulating quality, the frictional resistance generated during pumped (conveying) medium is smaller, more efficient;Not incrustation will not lead to the problem of bacteria breed, can effectively ensure that the quality of medium, have its excellent comprehensive performance;PE100 resin has good heat resistance and cold resistance, and chemical stability is good, rigidity and toughness also with higher, and mechanical strength is good;Chemical stability is good, at room temperature, does not dissolve in any organic solvent, the corrosion of acid and alkali resistance and various salts is that raw material prepares PE tubing using PE100 resin, further increases the anticorrosion ability of PE tubing.

Description

A kind of etch-proof PE tubing manufacture craft
Technical field
The invention belongs to PE tubing manufacture technology fields, and in particular to a kind of etch-proof PE tubing manufacture craft.
Background technique
PE is polyethylene, and the application range of general PE tubing feedwater piping is the temperature lower than 40 DEG C, is not used to hot water Conveyance conduit, PE tubing are that a kind of crystallinity is high, nonpolar thermoplastic resin.The milky appearance of ortho states HDPE, micro- Thin section is in a degree of translucent.PE has the characteristic of excellent resistance to most of lives and chemicals for industrial use.It is certain The chemicals of type can generate chemical attack, such as corrosive oxidation agent (concentrated nitric acid), aromatic hydrocarbon (dimethylbenzene) and halogenated hydrocarbon (four Chlorination carbon).
Existing PE tubing antiseptic property is poor, for a long time by the erosion of water, can be corroded through in a relatively short period of time when serious Hole;
Anti-microbial property is poor, and when water quality is poor, containing more microorganism, these microorganisms are easily in pipe intussusception endophytic bacteria.
Summary of the invention
The purpose of the present invention is to provide a kind of etch-proof PE tubing manufacture crafts, to solve to mention in above-mentioned background technique PE tubing antiseptic property out is poor, can corrosion failure in a relatively short period of time when serious for a long time by the erosion of water;Anti-microbial property Difference, when water quality is poor, containing more microorganism, these microorganisms are easily the pipe intussusception endophytic bacteria the problem of.
To achieve the above object, the invention provides the following technical scheme: a kind of etch-proof PE tubing manufacture craft, including Following steps:
Step 1: raw material and equipment prepare: raw material includes: PE100 resin, 2% color masterbatch, epoxy powder;Equipment includes Extruder, drying box, vacuum sizing box, Electric heat oven, solidification case, shower cooling box, cutting machine;
Step 2: dry: PE100 resin, 2% color masterbatch, epoxy powder are dried;
Step 3: mixing, drying: PE100 resin, 2% color masterbatch after will be dry in step 2 be mixed, and are stirred Uniformly, and mixture after mixing evenly is placed in drying box and is dried;
Step 4: plasticizing squeezes out: the mixture after mixing, drying enters extruder by hopper, through conveying, compression, melts Melt, under homogenization, elastomeric state is become from solid-granular material, then viscous state is become from elastomeric state, and continuously squeeze out;
Step 5: mold molding: the melting charge squeezed out from extruder introduces mold, in profiled section after helical shunt Fusion compacting is tubular parison, finally from die extrusion;
Step 6: cooling and shaping: the heat pipe base squeezed out from mold is under negative pressure state through calibration sleeve vacuum sizing box Sizing and cooling, integrally curing sizing cooling by tubing inside using spray woods cooler bin;
Step 7: sandblasting, coating, solidification: sandblasting is carried out to the steel pipe after solidifying and setting, the good steel pipe of sandblasting is put into electricity Oven heat is preheated, and is carried out coating after painting installs to preheated tubing and is put into solidification case and solidifies to obtain finished product;
Step 8: it cutting: by the PE tubing produced according to setting fixed length is required, is then cut by cutting machine;
Step 9: packaging: the tubing after cutting shifts roll-over table onto, through inspection after, qualified product is packed and stored, it is unqualified then It crushes and recycles.
As a preferred technical solution of the invention, in the step 2, dry moisture content of the raw material < 8%.
As a preferred technical solution of the invention, in the step 3, mixture after mixing evenly is placed in It is dried in drying box, the moisture content < 4% after drying.
As a preferred technical solution of the invention, in the step 5, mold is before use, heat preservation 20-30min.
As a preferred technical solution of the invention, in the step 6, outside the internal diameter > PE tubing of calibration sleeve Diameter 1-3mm.
As a preferred technical solution of the invention, in the step 7, the steel pipe after solidifying and setting is sprayed The good steel pipe of sandblasting is put into Electric heat oven at 200-250 DEG C and preheats 1.2-1.8h by sand.
As a preferred technical solution of the invention, in the step 7, heating equipment is preheating to 180 and takes the photograph after spraying Family name's degree solidifies the substrate sprayed.
As a preferred technical solution of the invention, in the step 7, coating is carried out to preheated tubing, is applied After installing, it is put into solidification case and solidifies 15 minutes to obtain finished product at 200 DEG C.
As a preferred technical solution of the invention, in the step 8, cutting machine is advised according to the PE tubing of production Lattice are different, adjustment technology pulse, feed velocity and cutting diameter.
Compared with prior art, the beneficial effects of the present invention are:
(1) the PE pipe after sandblasting, coating, solidification has excellent anti-corrosive properties, weatherability and electric insulating quality, use process In will not because environment generate corrosion or galvanic corrosion, the service life used is long, the light of the PE inside pipe wall after sandblasting, coating, solidification Cleanliness is high, water absorption rate is low, and the frictional resistance generated during pumped (conveying) medium is smaller, more efficient;Not incrustation will not produce The problem of endophytic bacteria is bred, can effectively ensure that the quality of medium, have its excellent comprehensive performance;
(2) PE100 resin have good heat resistance and cold resistance, chemical stability is good, rigidity also with higher with Toughness, mechanical strength are good;Chemical stability is good, at room temperature, does not dissolve in any organic solvent, acid and alkali resistance and various salt The corrosion of class is that raw material prepares PE tubing using PE100 resin, further increases the anticorrosion ability of PE tubing.
Detailed description of the invention
Fig. 1 is flow chart of the invention.
Specific embodiment
Embodiment 1
A kind of etch-proof PE tubing manufacture craft, includes the following steps:
Step 1: raw material and equipment prepare: raw material includes: PE100 resin, 2% color masterbatch, epoxy powder;Equipment includes Extruder, drying box, vacuum sizing box, Electric heat oven, solidification case, shower cooling box, cutting machine;
Step 2: dry: PE100 resin, 2% color masterbatch, epoxy powder to be dried, dry moisture content of the raw material < 8%;
Step 3: mixing, drying: PE100 resin, 2% color masterbatch after will be dry in step 2 be mixed, and are stirred Uniformly, and mixture after mixing evenly is placed in drying box and is dried, the moisture content < 4% after drying;
Step 4: plasticizing squeezes out: the mixture after mixing, drying enters extruder by hopper, through conveying, compression, melts Melt, under homogenization, elastomeric state is become from solid-granular material, then viscous state is become from elastomeric state, and continuously squeeze out;
Step 5: mold molding: the melting charge that squeezes out from extruder introduces mold, mold before use, heat preservation 20min, It is compacted be tubular parison in profiled section fusion after helical shunt, finally from die extrusion;
Step 6: cooling and shaping: the heat pipe base squeezed out from mold is under negative pressure state through calibration sleeve vacuum sizing box Sizing and cooling, the outer diameter 1mm of the internal diameter > PE tubing of calibration sleeve, it is whole using spray woods cooler bin by cooling inside tubing Solidifying and setting;
Step 7: sandblasting, coating, solidification: sandblasting is carried out to the steel pipe after solidifying and setting, the good steel pipe of sandblasting is put into electricity Oven heat preheats 1.8h at 200 DEG C, carries out coating to preheated tubing, heating equipment is preheating to 180 degrees Celsius after spraying The substrate sprayed is solidified, after painting installs, solidification case is put into and solidifies 15 minutes to obtain finished product at 200 DEG C;
Step 8: it cutting: by the PE tubing produced according to setting fixed length is required, is then cut, is cut by cutting machine Cutting mill is different according to the PE tubing specification of production, adjustment technology pulse, feed velocity and cutting diameter;
Step 9: packaging: the tubing after cutting shifts roll-over table onto, through inspection after, qualified product is packed and stored, it is unqualified then It crushes and recycles.
PE100 is that a kind of crystallinity is high, nonpolar thermoplastic resin, and high density polyethylene (HDPE) is kind of a white powder graininess Product, nontoxic, tasteless, density is within the scope of 0.940-0.976g/cm3;Crystallinity is 80-90%, softening point 125-135 DEG C, using temperature up to 100 DEG C;120-160 DEG C of fusion temperature, material biggish for molecule, it is proposed that fusion temperature range exists Between 200-250 DEG C;It has good heat resistance and cold resistance, and chemical stability is good, rigidity and toughness also with higher, Mechanical strength is good;Dielectric properties, environmental stress crack resistance are also preferable;Wearability, electrical insulating property, toughness and cold resistance compared with It is good;Chemical stability is good, at room temperature, does not dissolve in any organic solvent, the corrosion of acid and alkali resistance and various salts;
PE pipe after sandblasting, coating, solidification has good electric insulating quality, will not generate galvanic corrosion, and water absorption rate is low, mechanical Intensity is high, and coefficient of friction is small, can achieve the purpose that long-time service;Root system of plant and soil environment stress can also effectively be prevented Destruction etc.;PE pipe after sandblasting, coating, solidification has excellent anti-corrosive properties, weatherability and an electric insulating quality, in use process Will not because environment generate corrosion or galvanic corrosion, the service life used is long, the PE inside pipe wall after sandblasting, coating, solidification it is bright and clean Spend that high, water absorption rate is low, the frictional resistance generated during pumped (conveying) medium is smaller, more efficient;Not incrustation will not generate The problem of bacteria breed, can effectively ensure that the quality of medium, have its excellent comprehensive performance, very strong corrosion resistance and Mechanicalness, good chemical-resistant stability and water resistance have the effects of drag reduction, anti-corrosion, resistance to compression, antibacterial, it is not generally by defeated Send the restriction of medium, coating material: epoxy powder is suitable for 80 DEG C of working environments below, and coating has high adhesive force, Coating hardness is high, impact resistance is good, and has preferable resistance to chemical corrosion.
Embodiment 2
A kind of etch-proof PE tubing manufacture craft, includes the following steps:
Step 1: raw material and equipment prepare: raw material includes: PE100 resin, 2% color masterbatch, epoxy powder;Equipment includes Extruder, drying box, vacuum sizing box, Electric heat oven, solidification case, shower cooling box, cutting machine;
Step 2: dry: PE100 resin, 2% color masterbatch, epoxy powder to be dried, dry moisture content of the raw material < 8%;
Step 3: mixing, drying: PE100 resin, 2% color masterbatch after will be dry in step 2 be mixed, and are stirred Uniformly, and mixture after mixing evenly is placed in drying box and is dried, the moisture content < 4% after drying;
Step 4: plasticizing squeezes out: the mixture after mixing, drying enters extruder by hopper, through conveying, compression, melts Melt, under homogenization, elastomeric state is become from solid-granular material, then viscous state is become from elastomeric state, and continuously squeeze out;
Step 5: mold molding: the melting charge that squeezes out from extruder introduces mold, mold before use, heat preservation 25min, It is compacted be tubular parison in profiled section fusion after helical shunt, finally from die extrusion;
Step 6: cooling and shaping: the heat pipe base squeezed out from mold is under negative pressure state through calibration sleeve vacuum sizing box Sizing and cooling, the outer diameter 2mm of the internal diameter > PE tubing of calibration sleeve, it is whole using spray woods cooler bin by cooling inside tubing Solidifying and setting;
Step 7: sandblasting, coating, solidification: sandblasting is carried out to the steel pipe after solidifying and setting, the good steel pipe of sandblasting is put into electricity Oven heat preheats 1.5h at 225 DEG C, carries out coating to preheated tubing, heating equipment is preheating to 180 degrees Celsius after spraying The substrate sprayed is solidified, after painting installs, solidification case is put into and solidifies 15 minutes to obtain finished product at 200 DEG C;
Step 8: it cutting: by the PE tubing produced according to setting fixed length is required, is then cut, is cut by cutting machine Cutting mill is different according to the PE tubing specification of production, adjustment technology pulse, feed velocity and cutting diameter;
Step 9: packaging: the tubing after cutting shifts roll-over table onto, through inspection after, qualified product is packed and stored, it is unqualified then It crushes and recycles.
PE100 is that a kind of crystallinity is high, nonpolar thermoplastic resin, and high density polyethylene (HDPE) is kind of a white powder graininess Product, nontoxic, tasteless, density is within the scope of 0.940-0.976g/cm3;Crystallinity is 80-90%, softening point 125-135 DEG C, using temperature up to 100 DEG C;120-160 DEG C of fusion temperature, material biggish for molecule, it is proposed that fusion temperature range exists Between 200-250 DEG C;It has good heat resistance and cold resistance, and chemical stability is good, rigidity and toughness also with higher, Mechanical strength is good;Dielectric properties, environmental stress crack resistance are also preferable;Wearability, electrical insulating property, toughness and cold resistance compared with It is good;Chemical stability is good, at room temperature, does not dissolve in any organic solvent, the corrosion of acid and alkali resistance and various salts;
PE pipe after sandblasting, coating, solidification has good electric insulating quality, will not generate galvanic corrosion, and water absorption rate is low, mechanical Intensity is high, and coefficient of friction is small, can achieve the purpose that long-time service;Root system of plant and soil environment stress can also effectively be prevented Destruction etc.;PE pipe after sandblasting, coating, solidification has excellent anti-corrosive properties, weatherability and an electric insulating quality, in use process Will not because environment generate corrosion or galvanic corrosion, the service life used is long, the PE inside pipe wall after sandblasting, coating, solidification it is bright and clean Spend that high, water absorption rate is low, the frictional resistance generated during pumped (conveying) medium is smaller, more efficient;Not incrustation will not generate The problem of bacteria breed, can effectively ensure that the quality of medium, have its excellent comprehensive performance, very strong corrosion resistance and Mechanicalness, good chemical-resistant stability and water resistance have the effects of drag reduction, anti-corrosion, resistance to compression, antibacterial, it is not generally by defeated Send the restriction of medium, coating material: epoxy powder is suitable for 80 DEG C of working environments below, and coating has high adhesive force, Coating hardness is high, impact resistance is good, and has preferable resistance to chemical corrosion.
Embodiment 3
A kind of etch-proof PE tubing manufacture craft, includes the following steps:
Step 1: raw material and equipment prepare: raw material includes: PE100 resin, 2% color masterbatch, epoxy powder;Equipment includes Extruder, drying box, vacuum sizing box, Electric heat oven, solidification case, shower cooling box, cutting machine;
Step 2: dry: PE100 resin, 2% color masterbatch, epoxy powder to be dried, dry moisture content of the raw material < 8%;
Step 3: mixing, drying: PE100 resin, 2% color masterbatch after will be dry in step 2 be mixed, and are stirred Uniformly, and mixture after mixing evenly is placed in drying box and is dried, the moisture content < 4% after drying;
Step 4: plasticizing squeezes out: the mixture after mixing, drying enters extruder by hopper, through conveying, compression, melts Melt, under homogenization, elastomeric state is become from solid-granular material, then viscous state is become from elastomeric state, and continuously squeeze out;
Step 5: mold molding: the melting charge squeezed out from extruder introduces mold, and mold is before use, heat preservation 20- 30min is compacted be tubular parison, finally from die extrusion after helical shunt in profiled section fusion;
Step 6: cooling and shaping: the heat pipe base squeezed out from mold is under negative pressure state through calibration sleeve vacuum sizing box Sizing and cooling, the outer diameter 3mm of the internal diameter > PE tubing of calibration sleeve, it is whole using spray woods cooler bin by cooling inside tubing Solidifying and setting;
Step 7: sandblasting, coating, solidification: sandblasting is carried out to the steel pipe after solidifying and setting, the good steel pipe of sandblasting is put into electricity Oven heat preheats 1.2h at 250 DEG C, carries out coating to preheated tubing, heating equipment is preheating to 180 degrees Celsius after spraying The substrate sprayed is solidified, after painting installs, solidification case is put into and solidifies 15 minutes to obtain finished product at 200 DEG C;
Step 8: it cutting: by the PE tubing produced according to setting fixed length is required, is then cut, is cut by cutting machine Cutting mill is different according to the PE tubing specification of production, adjustment technology pulse, feed velocity and cutting diameter;
Step 9: packaging: the tubing after cutting shifts roll-over table onto, through inspection after, qualified product is packed and stored, it is unqualified then It crushes and recycles.
PE100 is that a kind of crystallinity is high, nonpolar thermoplastic resin, and high density polyethylene (HDPE) is kind of a white powder graininess Product, nontoxic, tasteless, density is within the scope of 0.940-0.976g/cm3;Crystallinity is 80-90%, softening point 125-135 DEG C, using temperature up to 100 DEG C;120-160 DEG C of fusion temperature, material biggish for molecule, it is proposed that fusion temperature range exists Between 200-250 DEG C;It has good heat resistance and cold resistance, and chemical stability is good, rigidity and toughness also with higher, Mechanical strength is good;Dielectric properties, environmental stress crack resistance are also preferable;Wearability, electrical insulating property, toughness and cold resistance compared with It is good;Chemical stability is good, at room temperature, does not dissolve in any organic solvent, the corrosion of acid and alkali resistance and various salts;
PE pipe after sandblasting, coating, solidification has good electric insulating quality, will not generate galvanic corrosion, and water absorption rate is low, mechanical Intensity is high, and coefficient of friction is small, can achieve the purpose that long-time service;Root system of plant and soil environment stress can also effectively be prevented Destruction etc.;PE pipe after sandblasting, coating, solidification has excellent anti-corrosive properties, weatherability and an electric insulating quality, in use process Will not because environment generate corrosion or galvanic corrosion, the service life used is long, the PE inside pipe wall after sandblasting, coating, solidification it is bright and clean Spend that high, water absorption rate is low, the frictional resistance generated during pumped (conveying) medium is smaller, more efficient;Not incrustation will not generate The problem of bacteria breed, can effectively ensure that the quality of medium, have its excellent comprehensive performance, very strong corrosion resistance and Mechanicalness, good chemical-resistant stability and water resistance have the effects of drag reduction, anti-corrosion, resistance to compression, antibacterial, it is not generally by defeated Send the restriction of medium, coating material: epoxy powder is suitable for 80 DEG C of working environments below, and coating has high adhesive force, Coating hardness is high, impact resistance is good, and has preferable resistance to chemical corrosion.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (9)

1. a kind of etch-proof PE tubing manufacture craft, which comprises the steps of:
Step 1: raw material and equipment prepare: raw material includes: PE100 resin, 2% color masterbatch, epoxy powder;Equipment includes squeezing out Machine, drying box, vacuum sizing box, Electric heat oven, solidification case, shower cooling box, cutting machine;
Step 2: dry: PE100 resin, 2% color masterbatch, epoxy powder are dried;
Step 3: mixing, drying: PE100 resin, 2% color masterbatch after will be dry in step 2 be mixed, and are stirred It is even, and mixture after mixing evenly is placed in drying box and is dried;
Step 4: plasticizing squeezes out: the mixture after mixing, drying enters extruder by hopper, through conveying, compression, melting, equal Under change effect, elastomeric state is become from solid-granular material, then viscous state is become from elastomeric state, and continuously squeeze out;
Step 5: mold molding: the melting charge squeezed out from extruder introduces mold, merges after helical shunt in profiled section Compacting is tubular parison, finally from die extrusion;
Step 6: cooling and shaping: the heat pipe base squeezed out from mold passes through the sizing of calibration sleeve vacuum sizing box under negative pressure state And cooling, using spray woods cooler bin by cooling inside tubing, integrally curing sizing;
Step 7: sandblasting, coating, solidification: carrying out sandblasting to the steel pipe after solidifying and setting, and the good steel pipe of sandblasting is put into electric heating and is dried Case is preheated, and is carried out coating after painting installs to preheated tubing and is put into solidification case and solidifies to obtain finished product;
Step 8: it cutting: by the PE tubing produced according to setting fixed length is required, is then cut by cutting machine;
Step 9: packaging: the tubing after cutting shifts roll-over table onto, and after examining, qualified product is packed and stored, unqualified, crushes It recycles.
2. a kind of etch-proof PE tubing manufacture craft according to claim 1, it is characterised in that: in the step 2, Dry moisture content of the raw material < 8%.
3. a kind of etch-proof PE tubing manufacture craft according to claim 1, it is characterised in that: in the step 3, Mixture after mixing evenly is placed in drying box and is dried, the moisture content < 4% after drying.
4. a kind of etch-proof PE tubing manufacture craft according to claim 1, it is characterised in that: in the step 5, Mold is before use, heat preservation 20-30min.
5. a kind of etch-proof PE tubing manufacture craft according to claim 1, it is characterised in that: in the step 6, The outer diameter 1-3mm of the internal diameter > PE tubing of calibration sleeve.
6. a kind of etch-proof PE tubing manufacture craft according to claim 1, it is characterised in that: in the step 7, Sandblasting is carried out to the steel pipe after solidifying and setting, the good steel pipe of sandblasting is put into Electric heat oven at 200-250 DEG C and preheats 1.2- 1.8h。
7. a kind of etch-proof PE tubing manufacture craft according to claim 6, it is characterised in that: in the step 7, Heating equipment is preheating to 180 degrees Celsius and solidifies to the substrate sprayed after spraying.
8. a kind of etch-proof PE tubing manufacture craft according to claim 7, it is characterised in that: in the step 7, Coating is carried out to preheated tubing, after painting installs, solidification case is put into and solidifies 15 minutes to obtain finished product at 200 DEG C.
9. a kind of etch-proof PE tubing manufacture craft according to claim 1, it is characterised in that: in the step 8, Cutting machine is different according to the PE tubing specification of production, adjustment technology pulse, feed velocity and cutting diameter.
CN201910479859.8A 2019-06-04 2019-06-04 A kind of etch-proof PE tubing manufacture craft Pending CN110239052A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910479859.8A CN110239052A (en) 2019-06-04 2019-06-04 A kind of etch-proof PE tubing manufacture craft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910479859.8A CN110239052A (en) 2019-06-04 2019-06-04 A kind of etch-proof PE tubing manufacture craft

Publications (1)

Publication Number Publication Date
CN110239052A true CN110239052A (en) 2019-09-17

Family

ID=67886031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910479859.8A Pending CN110239052A (en) 2019-06-04 2019-06-04 A kind of etch-proof PE tubing manufacture craft

Country Status (1)

Country Link
CN (1) CN110239052A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112886523A (en) * 2021-01-11 2021-06-01 江苏云轩达电力科技有限公司 Anti-drag flame-retardant corrosion-resistant cable protection pipe and preparation process thereof
CN113290898A (en) * 2021-05-25 2021-08-24 安徽杰蓝特新材料有限公司 Corrosion-resistant drainage pipeline and preparation method thereof
WO2022021487A1 (en) * 2020-07-31 2022-02-03 临海伟星新型建材有限公司 Manufacturing method for high-rigidity pe pipeline

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105032728A (en) * 2015-07-31 2015-11-11 安徽得力汽车部件有限公司 Method for antiseptic treatment of inner sleeve
CN105128374A (en) * 2015-08-24 2015-12-09 江苏洁润管业有限公司 PE pipe production technology

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105032728A (en) * 2015-07-31 2015-11-11 安徽得力汽车部件有限公司 Method for antiseptic treatment of inner sleeve
CN105128374A (en) * 2015-08-24 2015-12-09 江苏洁润管业有限公司 PE pipe production technology

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
史新华: "《建筑水暖及空调工程施工质量控制》", 31 May 2006, 中国计划出版社 *
左继成等: "《高分子材料成型加工基本原料及工艺》", 31 January 2017, 北京理工大学出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022021487A1 (en) * 2020-07-31 2022-02-03 临海伟星新型建材有限公司 Manufacturing method for high-rigidity pe pipeline
CN112886523A (en) * 2021-01-11 2021-06-01 江苏云轩达电力科技有限公司 Anti-drag flame-retardant corrosion-resistant cable protection pipe and preparation process thereof
CN113290898A (en) * 2021-05-25 2021-08-24 安徽杰蓝特新材料有限公司 Corrosion-resistant drainage pipeline and preparation method thereof

Similar Documents

Publication Publication Date Title
CN110239052A (en) A kind of etch-proof PE tubing manufacture craft
CN101486821B (en) Nontoxic chlorinated polyvinyl chloride pipe and preparation thereof
CN101307843B (en) Manufacture method of antibiotic plastic pipes for water supply
CN101747552B (en) Steel-pipeline outer-layer anticorrosive polyethylene compound and preparation method thereof
CN103419385B (en) A kind of manufacture method of high pressure resistant polyphenylene sulfide composite and flexible tubing
CN100478386C (en) Mineral-base composite material and the heat sink therewith
CN105086068A (en) Water-absorbing granule for HDPE (high-density polyethylene) tubes, and preparation method and application thereof
CN103568240A (en) Extruding and forming method of polyethylene pipe for water supply
CN105440399A (en) Polyvinyl wood-plastic composite and preparation method thereof
CN102079838A (en) Special material for chlorinated polyvinyl chloride chemical pipeline
CN111303512A (en) Antibacterial PE pipe and preparation method thereof
CN104311978A (en) Linear low-density polyethylene pipe material
CN105385007A (en) Preparation method of polyethylene pipe for delivering chemical products
CN102618022B (en) Double-resistance nylon tube and preparation method thereof
CN111347699A (en) Preparation method of PE water supply pipe
CN1290902C (en) Nano anticorrosive antibacterial plastic-metal composite pipe and its manufacturing method
CN107417987A (en) A kind of pvc pipe extruding-out process of effectively lifting tensile strength
CN110643097A (en) Antibacterial PE pipeline material
CN109705513A (en) A kind of high performance 3 d printing Biocomposite material and preparation method thereof
CN107384035A (en) A kind of preparation method of lubricating type anti-corrosive powder paint
CN111171473B (en) Large-diameter PVC-U water supply accessory injection molding granules and preparation method thereof
CN108407165B (en) Rotational molding preparation method of ultra-pure reagent packaging barrel with gradient structure
CN101817217A (en) Method for manufacturing heat-conduction plastic pipe
CN112248489A (en) Production method of high-strength PVC (polyvinyl chloride) buckle plate
CN108892840A (en) A kind of degradable super high molecular weight HDPE composite plastic double-wall corrugated pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190917