CN110231961A - A kind of control method and system that master control borad is restarted - Google Patents

A kind of control method and system that master control borad is restarted Download PDF

Info

Publication number
CN110231961A
CN110231961A CN201910569850.6A CN201910569850A CN110231961A CN 110231961 A CN110231961 A CN 110231961A CN 201910569850 A CN201910569850 A CN 201910569850A CN 110231961 A CN110231961 A CN 110231961A
Authority
CN
China
Prior art keywords
master control
standby
restarted
restart request
complete machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910569850.6A
Other languages
Chinese (zh)
Other versions
CN110231961B (en
Inventor
符志清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Depp Information Technology Co Ltd
Original Assignee
Hangzhou Depp Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Depp Information Technology Co Ltd filed Critical Hangzhou Depp Information Technology Co Ltd
Priority to CN201910569850.6A priority Critical patent/CN110231961B/en
Publication of CN110231961A publication Critical patent/CN110231961A/en
Application granted granted Critical
Publication of CN110231961B publication Critical patent/CN110231961B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F13/00Interconnection of, or transfer of information or other signals between, memories, input/output devices or central processing units
    • G06F13/10Program control for peripheral devices
    • G06F13/102Program control for peripheral devices where the programme performs an interfacing function, e.g. device driver
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • G06F9/4401Bootstrapping
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/54Interprogram communication
    • G06F9/542Event management; Broadcasting; Multicasting; Notifications
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/54Interprogram communication
    • G06F9/546Message passing systems or structures, e.g. queues

Abstract

The application provides a kind of control method and system that master control borad is restarted.A kind of control method that master control borad is restarted, comprising: master control receives Restart Request, according to the Restart Request, it is determined whether complete machine is restarted;If complete machine is restarted, Restart Request is sent to standby master control by master control;After standby master control receives the Restart Request of master control transmission, preset reboot flag is modified according to the Restart Request, sends confirmation message to master control, and modify the local interface state being locally stored according to reboot flag;After master control receives the confirmation message that standby master control is sent, local interface disable operation is executed, and execute reboot operation, starts to the active and standby election stage, elect as main master control;Standby master control determines whether master control executes reboot operation according to preset mode, if it is determined that master control executes reboot operation, executes reboot operation, and starting to active and standby election stage is elected as standby master control.When so ensuring to carry out complete machine to frame type equipment to restart, masterslave switchover will not occur.

Description

A kind of control method and system that master control borad is restarted
Technical field
This application involves field of communication technology more particularly to a kind of control methods and system that master control borad is restarted.
Background technique
Frame type equipment belongs to a kind of distributed apparatus comprising master control (main control board) and standby master control (spare master control Plate).When frame type equipment operates normally, business processing, standby backup of the master control as master control, without any are carried out by master control Business processing, the user configuration and dynamic entry of standby master control are synchronous with master control holding.But when master control is pulled out, restarts Master control, master control exception are hung when waiting indefinitely, it may occur that masterslave switchover, at this time for master switching to master control, instead of former main master control Carry out business processing.
In the frame type equipment for possessing dual master control, frame type equipment determines that master control board type (is first powered on according to powering order Master control borad is master control, and the master control borad being powered on afterwards is standby master control).When restarting to frame type equipment progress complete machine, master control is received To complete machine Restart Request, complete machine Restart Request is sent to standby master control, standby master control is restarted, and is first carried out by standby master control and is restarted behaviour Make, standby master control sends the message that confirmation receives complete machine Restart Request to master control, after master control receives the message, then goes to hold Row reboot operation, so standby master control is excellent to be completed to restart one step ahead, determines that standby master control is new master control according to powering order, thus Masterslave switchover has occurred.
Since masterslave switchover has occurred when restarting to frame type equipment progress complete machine, if for the configuration of master control before restarting Data have missing or mistake, and standby master switching is new master control after the completion of restarting, and the configuration data of actual use has missing Or mistake, influence service stability and frame type equipment reliability.
Summary of the invention
In view of this, the application provides a kind of control method and system that master control borad is restarted.
Specifically, the application is achieved by the following technical solution:
In a first aspect, the embodiment of the present application provides a kind of control method that master control borad is restarted, it is applied to frame type equipment, it is described Frame type equipment includes master control and standby master control, which comprises
Master control receives Restart Request, according to the Restart Request, it is determined whether complete machine is restarted;
If complete machine is restarted, the Restart Request is sent to standby master control by master control;
After standby master control receives the Restart Request of master control transmission, mark is restarted according to Restart Request modification is preset Will sends confirmation message to master control, and modifies the local interface state being locally stored according to the reboot flag;
After master control receives the confirmation message that standby master control is sent, local interface disable operation is executed, and execute and restart behaviour Make, starts to the active and standby election stage, elect as master control;
Standby master control determines whether master control executes reboot operation according to preset mode, if it is determined that master control execution is restarted Operation, executes reboot operation, and starting to active and standby election stage is elected as standby master control.
Second aspect, the embodiment of the present application provide a kind of control system that master control borad is restarted, and are applied to frame type equipment, described Frame type equipment includes master control and standby master control, the system comprises:
Master control receives Restart Request, according to the Restart Request, it is determined whether complete machine is restarted;
If complete machine is restarted, the Restart Request is sent to standby master control by master control;
After standby master control receives the Restart Request of master control transmission, mark is restarted according to Restart Request modification is preset Will sends confirmation message to master control, and modifies the local interface state being locally stored according to the reboot flag;
After master control receives the confirmation message that standby master control is sent, local interface disable operation is executed, and execute and restart behaviour Make, starts to the active and standby election stage, elect as master control;
Standby master control determines whether master control executes reboot operation according to preset mode, if it is determined that master control execution is restarted Operation, executes reboot operation, and starting to active and standby election stage is elected as standby master control.
Technical solution provided by the present application determines whether master control executes according to preset mode by standby master control and restarts behaviour Make, if it is determined that master control executes reboot operation, executes reboot operation, and starting was elected as standby master control, such as to the active and standby election stage When this ensures to carry out complete machine to frame type equipment to restart, masterslave switchover will not occur, since masterslave switchover will not occur, avoid pair The influence of service stability and frame type equipment reliability.
Detailed description of the invention
Technical solution in ord to more clearly illustrate embodiments of the present application, below will be to required attached in embodiment description Figure is briefly described, it should be apparent that, the accompanying drawings in the following description is only some embodiments as described in this application, for For those of ordinary skill in the art, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is a kind of frame type equipment schematic diagram of internal structure shown in one exemplary embodiment of the application;
Fig. 2 is a kind of interaction flow schematic diagram shown in one exemplary embodiment of the application.
Specific embodiment
Example embodiments are described in detail here, and the example is illustrated in the accompanying drawings.Following description is related to When attached drawing, unless otherwise indicated, the same numbers in different drawings indicate the same or similar elements.Following exemplary embodiment Described in embodiment do not represent all embodiments consistent with the application.On the contrary, they be only with it is such as appended The example of the consistent device and method of some aspects be described in detail in claims, the application.
It is only to be not intended to be limiting the application merely for for the purpose of describing particular embodiments in term used in this application. It is also intended in the application and the "an" of singular used in the attached claims, " described " and "the" including majority Form, unless the context clearly indicates other meaning.It is also understood that term "and/or" used herein refers to and wraps It may be combined containing one or more associated any or all of project listed.
It will be appreciated that though various information, but this may be described using term first, second, third, etc. in the application A little information should not necessarily be limited by these terms.These terms are only used to for same type of information being distinguished from each other out.For example, not departing from In the case where the application range, the first information can also be referred to as the second information, and similarly, the second information can also be referred to as One information.Depending on context, word as used in this " if " can be construed to " ... when " or " when ... When " or " in response to determination ".
As shown in Figure 1, for a kind of frame type equipment schematic diagram of internal structure shown in the embodiment of the present application, frame type equipment includes Master control and standby master control.In the related technology, when restarting due to carrying out complete machine to frame type equipment, masterslave switchover has occurred, if The configuration data of standby master control has missing or mistake before restarting, and standby master switching is new master control after the completion of restarting, and actually makes Configuration data has missing or mistake, influences service stability and frame type equipment reliability.
In view of the above technical problems, the embodiment of the present application determines whether master control holds according to preset mode by standby master control Row reboot operation, if it is determined that master control executes reboot operation, executes reboot operation, and starting was elected and is to the active and standby election stage When so ensuring to carry out complete machine to frame type equipment to restart masterslave switchover will not occur for standby master control, due to will not occur it is active and standby fall It changes, avoids the influence to service stability and frame type equipment reliability.
In order to technical solution provided by the embodiments of the present application is described in detail, the following example is provided:
As shown in Fig. 2, for a kind of interaction flow signal for the control method that master control borad is restarted provided by the embodiments of the present application Figure, this method can specifically include following steps:
S201, master control receive Restart Request, according to the Restart Request, it is determined whether complete machine is restarted;
In the embodiment of the present application, user can input Restart Request in the page or order line, which can It to be restarted for complete machine, can also be restarted for master control, can also be restarted for standby master control, the application is real It applies example and this is not construed as limiting.
Master control receives above-mentioned Restart Request and determines whether the Restart Request restarts for complete machine according to the Restart Request.
For example, the mark of master control is carried in Restart Request and the mark of standby master control, master control receive the Restart Request, It can determine that the Restart Request is restarted for complete machine.
Wherein, in the embodiment of the present application complete machine restart refer to by more physics frame equipment groups at VSM logic box The case where separate unit physics frame type equipment complete machine is restarted in border, or refer to physics frame type equipment complete machine in non-VSM logic environment The case where restarting, the embodiment of the present application are not construed as limiting this.
S202, if complete machine is restarted, the Restart Request is sent to standby master control by master control;
If it is determined that complete machine is restarted, master control modifies preset complete machine reboot flag according to the Restart Request, specifically: root According to the corresponding relationship of preset Restart Request and complete machine reboot flag, preset complete machine reboot flag is modified.
For example, presetting a complete machine reboot flag in kernel, pair of Restart Request and complete machine reboot flag is preset It should be related to, as shown in table 1 below:
Restart Request Complete machine reboot flag
Restart for complete machine 1
Restart for master control 0
Restart for standby master control 0
Table 1
According to the corresponding relationship of above-mentioned preset Restart Request and complete machine reboot flag, if it is determined that complete machine is restarted, modification Preset complete machine reboot flag, is set to 1, if it is determined that master control is restarted or standby master control is restarted, and is modified preset complete machine and is restarted Mark, is set to 0.
In addition, Restart Request is sent to standby master control by master control if complete machine is restarted.Wherein it is sent to by Restart Request Before standby master control, master control determines whether standby master control can be used, if standby master control is available, Restart Request is sent to standby master control, no Then without sending.
S203 after standby master control receives the Restart Request of master control transmission, is modified preset heavy according to the Restart Request Open mark;
In standby this side of master control, after the Restart Request for receiving master control transmission, modified according to the Restart Request preset Reboot flag, wherein the reboot flag is the reboot flag of standby master control side.For example, standby master control receives restarting for master control transmission After request, preset reboot flag is modified, is set to 1.
S204, standby master control sends confirmation message to master control, and the local being locally stored is modified according to the reboot flag Interface status;
After modifying above-mentioned preset reboot flag, on the one hand, standby master control sends confirmation message, the confirmation to master control Message is for prompting master control to have received Restart Request, on the other hand, according to the preset reboot flag and local interface shape The corresponding relationship of state modifies the local interface state being locally stored, and is revised as local interface disabling by local interface available mode State.
For example, the reboot flag of standby master control side is set to 1, and local interface is locally stored in standby master control after above-mentioned modification State, as shown in table 2 below.
Table 2
By above-mentioned table 2 it is found that frame type equipment is there are local interface 1, local interface 2, standby master control stores above-mentioned Interface status, " UP " indicates that local interface is available, and according to the corresponding relationship of the preset reboot flag and local interface state, (reboot flag is set It is 1, corresponding local interface available mode is revised as local interface disabled status), the local interface state being locally stored is modified, Local interface disabled status is revised as by local interface available mode, as shown in table 3 below, " DOWN " is revised as by " UP ".
Local interface Local interface state
1 DOWN
2 DOWN
Table 3
By above-mentioned table 3 it is found that after by above-mentioned modification, the local interface state that standby master control is locally stored is disabling shape State.
Wherein during executing local interface disable operation, reboot flag is detected, if reboot flag is 1, no Call notification chain notifies virtual interface and upper layer application response interface event, can so greatly shorten required for executing interface disabling Time, it is ensured that standby master control completes local interface disable operation prior to master control.
Wherein, in the embodiment of the present application, local interface refer to by more physics frame equipment groups at VSM logic box Separate unit physics frame type equipment physical interface in border, or refer to frame type equipment physical interface in non-VSM logic environment, the application Embodiment is not construed as limiting this.
S205 executes local interface disable operation, and execute weight after master control receives the confirmation message that standby master control is sent Operation is opened, starts to the active and standby election stage, elects as master control;
Master control indicates that standby master control has received to restart and asks in the case where receiving the confirmation message that standby master control is sent It asks, local interface disable operation can be executed.It can be seen from the above, local interface refer to by more physics frame equipment groups at Separate unit physics frame type equipment physical interface in VSM logic environment, or refer to that frame type equipment physics connects in non-VSM logic environment Mouthful, the disable operation of physical interface is actually executed by master control here.
For example, as shown in table 4 below:
Physical interface Physical interface state
1 UP
2 UP
Table 4
By above-mentioned table 4 it is found that frame type equipment is there are physical interface 1, physical interface 2, " UP " indicates that physical interface is available, by Master control actually executes the disable operation of physical interface, and after executing physical interface disable operation, physical interface state becomes “DOWN”。
Wherein before executing local interface disable operation, it is default to judge whether modified complete machine reboot flag meets Requirement execute local interface disable operation if meeting preset requirement and if not meeting preset requirement do not execute local Interface disable operation.
For example, modifying complete machine reboot flag after above-mentioned determining complete machine is restarted, being set to 1, master control checks the complete machine weight Mark is opened, is equal to 1, executes local interface disable operation.Wherein during executing local interface disable operation, check that this is whole Machine reboot flag is equal to 1, then never calls notice chain notice virtual interface and upper layer application response interface event, so can be significantly Shorten and executes the time required for interface disables.
After executing local interface disable operation, master control can terminate the operation of local process, and dirty data is write back magnetic Then disk etc. executes reboot operation, start to the active and standby election stage, elect as master control.Here the active and standby election stage refers to Frame type equipment determines that (master control borad being first powered on is master control to master control board type, and the master control borad being powered on afterwards is standby according to powering order Master control), such master control is preferentially restarted, is powered on, and is after restart still main master control.
S206, standby master control determine whether master control executes reboot operation according to preset mode, if it is determined that master control is held Row reboot operation, executes reboot operation, and starting to active and standby election stage is elected as standby master control.
Whether master control, which executes, is determined according to preset mode after executing local interface disable operation for standby master control Reboot operation, such as message is sent to master control, judge whether that the return message for receiving master control is said if do not received Bright and master control lost contact, master control have executed reboot operation.
It should be noted that whether executing the implementation of reboot operation, the embodiment of the present application pair for determination master control This is not construed as limiting.
If it is determined that master control executes reboot operation, standby master control can terminate the operation of local process, dirty data is write back Disk etc., then executes reboot operation, and starting to active and standby election stage is elected as standby master control.Here the active and standby election stage refers to Being frame type equipment determines that (master control borad being first powered on is master control to master control board type, and the master control borad being powered on afterwards is according to powering order Standby master control), so standby master control executes reboot operation after determining that master control executes reboot operation, is after restart still standby main Control.
In addition, it is pre- that master control judges whether the modified complete machine reboot flag meets if standby master control is unavailable If requirement;If meeting preset requirement, local interface disable operation is executed.
For example, in the case where complete machine is restarted, if standby master control is unavailable, it is not necessary that Restart Request is sent to standby master control, Master control judges modified complete machine reboot flag, is equal to 1, executes local interface disable operation.
Furthermore if non-complete machine is restarted, master control is according to the Restart Request, it is determined whether master control is restarted or standby master Control is restarted, where it is determined whether the implementation that master control is restarted or standby master control is restarted, determines whether that complete machine is restarted with above-mentioned Implementation it is similar, this is no longer going to repeat them for the embodiment of the present application.
If master control is restarted, master control executes reboot operation, and starting was elected as standby master control, then to the active and standby election stage Standby master switching is new master control, carries out business processing instead of former master control, masterslave switchover occurs.
If standby master control is restarted, the Restart Request is sent to standby master control by master control, and standby master control receives master control hair After the Restart Request sent, reboot operation is executed, starting to active and standby election stage is elected as master control, master control still carries out industry Business processing, will not occur masterslave switchover.
It is true according to preset mode by standby master control by the above-mentioned description to technical solution provided by the embodiments of the present application Whether fixed master control executes reboot operation, if it is determined that master control executes reboot operation, executes reboot operation, starting to active and standby choosing In the act stage, masterslave switchover will not be occurred, due to not when so ensuring to carry out complete machine to frame type equipment to restart for standby master control by electing Masterslave switchover can occur, avoid the influence to service stability and frame type equipment reliability.
It is corresponding with above method embodiment, the embodiment of the present application also provides a kind of control system that master control borad is restarted, Applied to frame type equipment, the frame type equipment includes master control and standby master control, the system comprises:
Master control receives Restart Request, according to the Restart Request, it is determined whether complete machine is restarted;
If complete machine is restarted, the Restart Request is sent to standby master control by master control;
After standby master control receives the Restart Request of master control transmission, mark is restarted according to Restart Request modification is preset Will sends confirmation message to master control, and modifies the local interface state being locally stored according to the reboot flag;
After master control receives the confirmation message that standby master control is sent, local interface disable operation is executed, and execute and restart behaviour Make, starts to the active and standby election stage, elect as master control;
Standby master control determines whether master control executes reboot operation according to preset mode, if it is determined that master control execution is restarted Operation, executes reboot operation, and starting to active and standby election stage is elected as standby master control.
The effect realization process of each unit is specifically detailed in the realization process that step is corresponded in the above method in above-mentioned apparatus, Details are not described herein.
For device embodiment, since it corresponds essentially to embodiment of the method, so related place is referring to method reality Apply the part explanation of example.The apparatus embodiments described above are merely exemplary, wherein described be used as separation unit The unit of explanation may or may not be physically separated, and component shown as a unit can be or can also be with It is not physical unit, it can it is in one place, or may be distributed over multiple network units.It can be according to actual The purpose for needing to select some or all of the modules therein to realize application scheme.Those of ordinary skill in the art are not paying Out in the case where creative work, it can understand and implement.
The present invention can be in the general described in the text, such as program up and down of calculated value executable instruction performed by computer Module.Generally, program module includes routines performing specific tasks or implementing specific abstract data types, programs, objects, group Part, data structure etc..The present invention can also be practiced in a distributed computing environment, in these distributed computing environments, by Task is executed by the connected remote processing devices of communication network.In a distributed computing environment, program module can be with In the local and remote computer storage media including storage equipment.
The above is only a specific embodiment of the invention, it is noted that for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (10)

1. a kind of control method that master control borad is restarted, is applied to frame type equipment, the frame type equipment includes master control and standby master Control, which is characterized in that the described method includes:
Master control receives Restart Request, according to the Restart Request, it is determined whether complete machine is restarted;
If complete machine is restarted, the Restart Request is sent to standby master control by master control;
After standby master control receives the Restart Request of master control transmission, preset reboot flag is modified according to the Restart Request, to Master control sends confirmation message, and the local interface state being locally stored is modified according to the reboot flag;
After master control receives the confirmation message that standby master control is sent, local interface disable operation is executed, and execute reboot operation, opened It moves to the active and standby election stage, elects as master control;
Standby master control determines whether master control executes reboot operation according to preset mode, if it is determined that behaviour is restarted in master control execution Make, execute reboot operation, starting to active and standby election stage is elected as standby master control.
2. the method according to claim 1, wherein described be sent to standby master control for the Restart Request, comprising:
Master control determines whether standby master control can be used;
If standby master control is available, the Restart Request is sent to standby master control.
3. according to the method described in claim 2, it is characterized in that, if complete machine is restarted, the method also includes:
Master control modifies preset complete machine reboot flag according to the Restart Request;
After the master control receives the confirmation message that standby master control is sent, local interface disable operation is executed, comprising:
After master control receives the confirmation message that standby master control is sent, judge whether the modified complete machine reboot flag meets Preset requirement;
If meeting preset requirement, local interface disable operation is executed.
4. according to the method described in claim 3, it is characterized in that, the method also includes:
If standby master control is unavailable, master control judges whether the modified complete machine reboot flag meets preset requirement;
If meeting preset requirement, local interface disable operation is executed.
5. method according to any one of claims 1 to 4, which is characterized in that the method also includes:
If non-complete machine is restarted, according to the Restart Request, it is determined whether master control is restarted or standby master control is restarted;
If master control is restarted, master control executes reboot operation, and starting to active and standby election stage is elected as standby master control;
If standby master control is restarted, the Restart Request is sent to standby master control;
After standby master control receives the Restart Request of master control transmission, reboot operation is executed, starting to active and standby election stage elects and is Standby master control.
6. a kind of control system that master control borad is restarted, is applied to frame type equipment, the frame type equipment includes master control and standby master Control, which is characterized in that the system comprises:
Master control receives Restart Request, according to the Restart Request, it is determined whether complete machine is restarted;
If complete machine is restarted, the Restart Request is sent to standby master control by master control;
After standby master control receives the Restart Request of master control transmission, preset reboot flag is modified according to the Restart Request, to Master control sends confirmation message, and the local interface state being locally stored is modified according to the reboot flag;
After master control receives the confirmation message that standby master control is sent, local interface disable operation is executed, and execute reboot operation, opened It moves to the active and standby election stage, elects as master control;
Standby master control determines whether master control executes reboot operation according to preset mode, if it is determined that behaviour is restarted in master control execution Make, execute reboot operation, starting to active and standby election stage is elected as standby master control.
7. system according to claim 6, which is characterized in that the master control is restarted especially by following manner by described Request is sent to standby master control:
Master control determines whether standby master control can be used;
If standby master control is available, the Restart Request is sent to standby master control.
8. system according to claim 7, which is characterized in that if complete machine is restarted, the system also includes:
Master control modifies preset complete machine reboot flag according to the Restart Request;
The master control executes local interface disable operation especially by following manner:
After master control receives the confirmation message that standby master control is sent, judge whether the modified complete machine reboot flag meets Preset requirement;
If meeting preset requirement, local interface disable operation is executed.
9. system according to claim 8, which is characterized in that the system also includes:
If standby master control is unavailable, master control judges whether the modified complete machine reboot flag meets preset requirement;
If meeting preset requirement, local interface disable operation is executed.
10. according to the described in any item systems of claim 6 to 9, which is characterized in that the system also includes:
If non-complete machine is restarted, master control is according to the Restart Request, it is determined whether master control is restarted or standby master control is restarted;
If master control is restarted, master control executes reboot operation, and starting to active and standby election stage is elected as standby master control;
If standby master control is restarted, the Restart Request is sent to standby master control by master control;
After standby master control receives the Restart Request of master control transmission, reboot operation is executed, starting to active and standby election stage elects and is Standby master control.
CN201910569850.6A 2019-06-27 2019-06-27 Control method and system for restarting main control board Active CN110231961B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910569850.6A CN110231961B (en) 2019-06-27 2019-06-27 Control method and system for restarting main control board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910569850.6A CN110231961B (en) 2019-06-27 2019-06-27 Control method and system for restarting main control board

Publications (2)

Publication Number Publication Date
CN110231961A true CN110231961A (en) 2019-09-13
CN110231961B CN110231961B (en) 2023-02-28

Family

ID=67857570

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910569850.6A Active CN110231961B (en) 2019-06-27 2019-06-27 Control method and system for restarting main control board

Country Status (1)

Country Link
CN (1) CN110231961B (en)

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1889373A (en) * 2005-06-30 2007-01-03 华为技术有限公司 Method for realizing master and spare conversion of distributing connection equipment
CN101075861A (en) * 2007-06-28 2007-11-21 中兴通讯股份有限公司 Method for realizing main spared board thermal backup and reversing main spared board
US20080163248A1 (en) * 2006-12-29 2008-07-03 Futurewei Technologies, Inc. System and method for completeness of tcp data in tcp ha
CN101236588A (en) * 2007-01-31 2008-08-06 同方股份有限公司 Computer terminal port use permission control method
CN101340369A (en) * 2008-08-14 2009-01-07 杭州华三通信技术有限公司 Method and router for realizing virtual connection supported optimum restart
CN101621819A (en) * 2009-07-24 2010-01-06 中兴通讯股份有限公司 Information synchronization detection method for active-standby switching interface module, network element system and link
CN101882097A (en) * 2010-06-18 2010-11-10 福建星网锐捷网络有限公司 Main control board, embedded system and backup method for embedded system
CN102668463A (en) * 2009-11-16 2012-09-12 思科技术公司 Method for the provision of gateway anycast virtual mac reachability in extended subnets
US20130088951A1 (en) * 2011-09-19 2013-04-11 Huawei Technologies Co., Ltd. Multicast packet transmission method, related device and system
CN103200092A (en) * 2013-04-03 2013-07-10 杭州华三通信技术有限公司 Route process management method and equipment based on virtual network equipment
CN106161086A (en) * 2016-06-23 2016-11-23 杭州迪普科技有限公司 Control method that master control borad is restarted and device
CN108075971A (en) * 2017-12-25 2018-05-25 新华三技术有限公司 A kind of main/standby switching method and device
CN108322375A (en) * 2017-12-27 2018-07-24 瑞斯康达科技发展股份有限公司 A kind of Ethernet ring protection switching reverse method, node and system
CN109491842A (en) * 2017-09-11 2019-03-19 雅特生嵌入式计算有限公司 The signal pairing that module for failure safe computing system extends
CN109586964A (en) * 2018-11-30 2019-04-05 联芸科技(杭州)有限公司 The local port and port training method of two-way communication
CN109739622A (en) * 2018-12-29 2019-05-10 杭州迪普科技股份有限公司 Active and standby master control configuration and synchronization method and device based on frame type equipment

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1889373A (en) * 2005-06-30 2007-01-03 华为技术有限公司 Method for realizing master and spare conversion of distributing connection equipment
US20080163248A1 (en) * 2006-12-29 2008-07-03 Futurewei Technologies, Inc. System and method for completeness of tcp data in tcp ha
CN101236588A (en) * 2007-01-31 2008-08-06 同方股份有限公司 Computer terminal port use permission control method
CN101075861A (en) * 2007-06-28 2007-11-21 中兴通讯股份有限公司 Method for realizing main spared board thermal backup and reversing main spared board
CN101340369A (en) * 2008-08-14 2009-01-07 杭州华三通信技术有限公司 Method and router for realizing virtual connection supported optimum restart
CN101621819A (en) * 2009-07-24 2010-01-06 中兴通讯股份有限公司 Information synchronization detection method for active-standby switching interface module, network element system and link
CN102668463A (en) * 2009-11-16 2012-09-12 思科技术公司 Method for the provision of gateway anycast virtual mac reachability in extended subnets
CN101882097A (en) * 2010-06-18 2010-11-10 福建星网锐捷网络有限公司 Main control board, embedded system and backup method for embedded system
US20130088951A1 (en) * 2011-09-19 2013-04-11 Huawei Technologies Co., Ltd. Multicast packet transmission method, related device and system
CN103200092A (en) * 2013-04-03 2013-07-10 杭州华三通信技术有限公司 Route process management method and equipment based on virtual network equipment
CN106161086A (en) * 2016-06-23 2016-11-23 杭州迪普科技有限公司 Control method that master control borad is restarted and device
CN109491842A (en) * 2017-09-11 2019-03-19 雅特生嵌入式计算有限公司 The signal pairing that module for failure safe computing system extends
CN108075971A (en) * 2017-12-25 2018-05-25 新华三技术有限公司 A kind of main/standby switching method and device
CN108322375A (en) * 2017-12-27 2018-07-24 瑞斯康达科技发展股份有限公司 A kind of Ethernet ring protection switching reverse method, node and system
CN109586964A (en) * 2018-11-30 2019-04-05 联芸科技(杭州)有限公司 The local port and port training method of two-way communication
CN109739622A (en) * 2018-12-29 2019-05-10 杭州迪普科技股份有限公司 Active and standby master control configuration and synchronization method and device based on frame type equipment

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杨宝庆: ""硬盘播出系统应用体会"", 《科技信息》 *
齐爽: ""控制器双冗余设计与实现"", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *

Also Published As

Publication number Publication date
CN110231961B (en) 2023-02-28

Similar Documents

Publication Publication Date Title
JP5102901B2 (en) Method and system for maintaining data integrity between multiple data servers across a data center
US9519656B2 (en) System and method for providing a virtualized replication and high availability environment
CN110807064B (en) Data recovery device in RAC distributed database cluster system
CN105354113B (en) A kind of system and method for server, management server
US9423956B2 (en) Emulating a stretched storage device using a shared storage device
EP3750066B1 (en) Protection of infrastructure-as-a-service workloads in public cloud
CN103581225A (en) Distributed system node processing task method
US8843581B2 (en) Live object pattern for use with a distributed cache
WO2011156922A1 (en) Method and system for workload distributing and processing across a network of replicated virtual machines
CN105607972B (en) A kind of method and device repaired extremely
CN106528327A (en) Data processing method and backup server
CN102238093A (en) Service interruption prevention method and device
CN101231604A (en) Apparatus, system, and method for volume-level restoration of cluster server data
WO2017028375A1 (en) Version upgrading method and system
US6654880B1 (en) Method and apparatus for reducing system down time by restarting system using a primary memory before dumping contents of a standby memory to external storage
CN107111530A (en) A kind of disaster recovery method, system and device
US9195528B1 (en) Systems and methods for managing failover clusters
CN112181723A (en) Financial disaster recovery method and device, storage medium and electronic equipment
CN102457400B (en) Method for preventing split brain phenomenon from occurring on distributed replicated block device (DRBD) resource
CN110597660A (en) Data backup method, device, equipment and medium for virtual machine
CN113986450A (en) Virtual machine backup method and device
CN110231961A (en) A kind of control method and system that master control borad is restarted
CN109308232B (en) Method, device and system for rollback after virtual machine live migration fault
CN101420329B (en) Method for upgrading communication system and communication system therefor
JP2014038551A (en) Data storage device, method for controlling data storage device, and control program of data storage device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant