CN110224406A - For increasing the method and device of electric power responsible consumer electricity consumption reliability in two lines road - Google Patents

For increasing the method and device of electric power responsible consumer electricity consumption reliability in two lines road Download PDF

Info

Publication number
CN110224406A
CN110224406A CN201910426139.5A CN201910426139A CN110224406A CN 110224406 A CN110224406 A CN 110224406A CN 201910426139 A CN201910426139 A CN 201910426139A CN 110224406 A CN110224406 A CN 110224406A
Authority
CN
China
Prior art keywords
responsible consumer
lines road
interconnection switch
route
increasing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910426139.5A
Other languages
Chinese (zh)
Inventor
海清
田蓺
马慧玲
薛东海
胡晓
王志强
刘志勇
薛琛
王栋
陶涛
方俊亚
杨曼
高讯
季国剑
左杨
杨睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Xianghe Group Co Ltd Electric Power Science And Technology Branch
State Grid Henan Electric Power Co Xingyang Power Supply Co
State Grid Corp of China SGCC
Zhengzhou Power Supply Co of Henan Electric Power Co
Original Assignee
Zhengzhou Xianghe Group Co Ltd Electric Power Science And Technology Branch
State Grid Henan Electric Power Co Xingyang Power Supply Co
State Grid Corp of China SGCC
Zhengzhou Power Supply Co of Henan Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Xianghe Group Co Ltd Electric Power Science And Technology Branch, State Grid Henan Electric Power Co Xingyang Power Supply Co, State Grid Corp of China SGCC, Zhengzhou Power Supply Co of Henan Electric Power Co filed Critical Zhengzhou Xianghe Group Co Ltd Electric Power Science And Technology Branch
Priority to CN201910426139.5A priority Critical patent/CN110224406A/en
Publication of CN110224406A publication Critical patent/CN110224406A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/04Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
    • H02J3/06Controlling transfer of power between connected networks; Controlling sharing of load between connected networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of for increasing the method and device of electric power responsible consumer electricity consumption reliability in two lines road, including a responsible consumer route and an insignificant subscribers' line, interconnection switch is installed between two lines road, the interconnection switch manually, electrically or is far controlled by single lever-type, realize the Loop Closing Operation on two lines road, the model FZW-32 of interconnection switch, the interconnection switch be arranged in two routes be closer or crossover location;The present invention installs interconnection switch additional to important subscribers' line, pass through the Loop Closing Operation of interconnection switch, by responsible consumer line load down to another route, mitigate the load pressure of responsible consumer route, simultaneously in a route when switch maintenance, load transfer can be reduced scope of power outage, improve power supply reliability.

Description

For increasing the method and device of electric power responsible consumer electricity consumption reliability in two lines road
Technical field:
The present invention relates to a kind of power transmission and transformation fields, more particularly to a kind of for increasing the side of electric power responsible consumer electricity consumption reliability Method and device.
Background technique:
Requirement with the increasing important power consumers of the development of social economy to power supply reliability is higher and higher, and regional Administrative and dual power supply user mostly joint uses route and relaying configuration level is fairly simple, when permanent fault occurs for route It will cause power loss all the way, it is therefore necessary to improve the power supply reliability of important power consumers.
Influence responsible consumer power supply reliability external factor mainly have: the restriction of enterprise external environment i.e. urban construction and The restriction that external force is destroyed;It is frequent that the restriction of user, that is, user's industry expands engineering, and only so that basic routing line is had a power failure the expansion of single industry, shows Amount when so losing many.
The main internal factor for having a power failure and restricting power supply reliability raising has, and mainly there are two aspects for safety at power cut: pre- peace Row has a power failure and fault outage.By taking power grid as an example, pre-arranged power failure probably accounts for 87%, and fault outage only accounts for 13%.
Restriction in terms of rack: line looped network rate, segments, the restriction of big separated time number of users;The restriction of device standard;
Restriction in terms of thought and knowledge: the reliable sex consciousness of base line worker is relatively thin weak, and in fact reliability management class runs through In production overall process, total involvement is needed;
Manage network to restrict: administrative staff are insufficient, update drawing and data not in time, not can guarantee the timeliness of data and accurate Property;
Examine the restriction of system: reliability index only examines distribution, and all units of influence reliability factor are not included in and are examined Core;
In short, electric power responsible consumer power supply reliability, is an important content of management of electric power dependability, power distribution system is directly embodied The power supply capacity united to user, reflects power industry to the satisfaction degree of national economy electrical energy demands.
Summary of the invention:
The technical problems to be solved by the present invention are: overcoming the deficiencies of the prior art and provide a kind of to important subscribers' line installation Interconnection switch mitigates responsible consumer by responsible consumer line load down to another route by the Loop Closing Operation of interconnection switch The method for being used to increase electric power responsible consumer electricity consumption reliability of the load pressure of route.
The technical scheme is that a kind of for increasing the side of electric power responsible consumer electricity consumption reliability in two lines road Method, when responsible consumer line load is larger, passes through the conjunction of interconnection switch in responsible consumer with interconnection switch is installed in electric line additional Ring operation mitigates the load pressure of responsible consumer route, the steps include: by responsible consumer line load down to another route
Step 1: analysis two lines road level power supply point be ground adjust license can Loop Closing Operation power supply point, and judge whether full Sufficient two lines road carries out a possibility that Loop Closing Operation;
Step 2: transferring two lines road load curve over the years, and analyze two lines road year maximum current value and average annual current value;
Step 3: transferring the protection definite value parameter on two lines road;
Step 4: installing interconnection switch at a distance of nearest or crossover location on two lines road according to the trend on two lines road;
Step 5: when responsible consumer line load is larger, by the Loop Closing Operation of interconnection switch, by responsible consumer line load Down to another route, mitigate the load pressure of responsible consumer route.
Further, the protection definite value parameter is that current transformer ratio parameter and route can be with maximum current values.
Further, the model FZW-32 of the interconnection switch uses single lever-type manual operation, electric operating or remote Control operation.
It is a kind of for increasing the device of electric power responsible consumer electricity consumption reliability in two lines road, including a responsible consumer line Road and an insignificant subscribers' line, it is characterized in that: interconnection switch is installed between two lines road, electricity manual by single lever-type The interconnection switch is moved or far controlled, realizes the Loop Closing Operation on two lines road.
Further, the distance of two routes is arranged in the model FZW-32 of the interconnection switch, the interconnection switch Relatively close or crossover location.
The beneficial effects of the present invention are:
1, the present invention installs interconnection switch additional to important subscribers' line, by the Loop Closing Operation of interconnection switch, by responsible consumer route Load mitigates the load pressure of responsible consumer route down to another route, while in a route when switch maintenance, can incite somebody to action Load transfer reduces scope of power outage, improves power supply reliability.
2, the present invention greatly reduces pre-arranged power off time, and the schedule ahead responsible consumer method of operation carries out load transfer.
3, present invention optimization Distributing network structure, the looped network rate for improving route improve the general level of the health of route, switch It is easy to operate, quick, realize the fast transfer of load.
Specific embodiment:
Embodiment:
For increasing the method and device of electric power responsible consumer electricity consumption reliability in two lines road, in responsible consumer electric line Interconnection switch is installed additional, by the Loop Closing Operation of interconnection switch, responsible consumer route to be born when responsible consumer line load is larger Lotus mitigates the load pressure of responsible consumer route, the steps include: down to another route
Step 1: analysis two lines road level power supply point be ground adjust license can Loop Closing Operation power supply point, and judge whether full Sufficient two lines road carries out a possibility that Loop Closing Operation;
Step 2: transferring two lines road load curve over the years, and analyze two lines road year maximum current value and average annual current value;
Step 3: transferring the protection definite value parameter on two lines road;
Step 4: installing interconnection switch at a distance of nearest or crossover location on two lines road according to the trend on two lines road;
Step 5: when responsible consumer line load is larger, by the Loop Closing Operation of interconnection switch, by responsible consumer line load Down to another route, mitigate the load pressure of responsible consumer route.
Further, protection definite value parameter is that current transformer ratio parameter and route can be with maximum current values.
Further, the model FZW-32 of interconnection switch uses single lever-type manual operation, electric operating or remote control behaviour Make.
When responsible consumer line load is larger, connection is realized using single lever-type manual operation, electric operating or remote-control operation The Loop Closing Operation of network switch mitigates the load pressure of responsible consumer route by responsible consumer line load down to another route, It, can also be using this operation when being overhauled to a route.
The above described is only a preferred embodiment of the present invention, be not intended to limit the present invention in any form, it is all It is any simple modification, equivalent change and modification to the above embodiments according to the technical essence of the invention, still falls within In the range of technical solution of the present invention.

Claims (5)

1. it is a kind of for increasing the method for electric power responsible consumer electricity consumption reliability in two lines road, in responsible consumer electric line Interconnection switch is installed additional, by the Loop Closing Operation of interconnection switch, responsible consumer route to be born when responsible consumer line load is larger Lotus mitigates the load pressure of responsible consumer route, the steps include: down to another route
Step 1: analysis two lines road level power supply point be ground adjust license can Loop Closing Operation power supply point, and judge whether full Sufficient two lines road carries out a possibility that Loop Closing Operation;
Step 2: transferring two lines road load curve over the years, and analyze two lines road year maximum current value and average annual current value;
Step 3: transferring the protection definite value parameter on two lines road;
Step 4: installing interconnection switch at a distance of nearest or crossover location on two lines road according to the trend on two lines road;
Step 5: when responsible consumer line load is larger, by the Loop Closing Operation of interconnection switch, by responsible consumer line load Down to another route, mitigate the load pressure of responsible consumer route.
2. it is according to claim 1 for increasing the method for electric power responsible consumer electricity consumption reliability in two lines road, it is special Sign is: the protection definite value parameter is that current transformer ratio parameter and route can be with maximum current values.
3. it is according to claim 1 for increasing the method for electric power responsible consumer electricity consumption reliability in two lines road, it is special Sign is: the model FZW-32 of the interconnection switch, uses single lever-type manual operation, electric operating or remote-control operation.
4. a kind of for increasing the device of electric power responsible consumer electricity consumption reliability in two lines road, including a responsible consumer route It is manual, electric by single lever-type it is characterized in that: install interconnection switch between two lines road with an insignificant subscribers' line Or the interconnection switch is far controlled, realize the Loop Closing Operation on two lines road.
5. it is according to claim 4 for increasing the device of electric power responsible consumer electricity consumption reliability in two lines road, it is special Sign is: the model FZW-32 of the interconnection switch, and what the interconnection switch was arranged in two routes is closer or intersects position It sets.
CN201910426139.5A 2019-05-21 2019-05-21 For increasing the method and device of electric power responsible consumer electricity consumption reliability in two lines road Pending CN110224406A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910426139.5A CN110224406A (en) 2019-05-21 2019-05-21 For increasing the method and device of electric power responsible consumer electricity consumption reliability in two lines road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910426139.5A CN110224406A (en) 2019-05-21 2019-05-21 For increasing the method and device of electric power responsible consumer electricity consumption reliability in two lines road

Publications (1)

Publication Number Publication Date
CN110224406A true CN110224406A (en) 2019-09-10

Family

ID=67821670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910426139.5A Pending CN110224406A (en) 2019-05-21 2019-05-21 For increasing the method and device of electric power responsible consumer electricity consumption reliability in two lines road

Country Status (1)

Country Link
CN (1) CN110224406A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112583023A (en) * 2020-12-22 2021-03-30 广东电网有限责任公司 Power grid line structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09285016A (en) * 1996-04-11 1997-10-31 Nissin Electric Co Ltd Power equipment
CN105576660A (en) * 2016-03-04 2016-05-11 国网安徽省电力公司宿州供电公司 Region power distribution network on-line simulation analysis device and system
CN205565891U (en) * 2016-03-22 2016-09-07 珠海博威智能电网有限公司 Close ring operation control
CN106451422A (en) * 2016-09-30 2017-02-22 国网江西省电力公司电力科学研究院 Simple 10kV distribution line load transfer risk assessment platform
CN109103879A (en) * 2018-10-18 2018-12-28 国网四川省电力公司德阳供电公司 A kind of full dimension closed loop network appraisal procedure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09285016A (en) * 1996-04-11 1997-10-31 Nissin Electric Co Ltd Power equipment
CN105576660A (en) * 2016-03-04 2016-05-11 国网安徽省电力公司宿州供电公司 Region power distribution network on-line simulation analysis device and system
CN205565891U (en) * 2016-03-22 2016-09-07 珠海博威智能电网有限公司 Close ring operation control
CN106451422A (en) * 2016-09-30 2017-02-22 国网江西省电力公司电力科学研究院 Simple 10kV distribution line load transfer risk assessment platform
CN109103879A (en) * 2018-10-18 2018-12-28 国网四川省电力公司德阳供电公司 A kind of full dimension closed loop network appraisal procedure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李 雪等: "提高重要电力用户供电可靠性的措施探讨", 《华东电力》 *
郑坚锋: "恩平地区基于合环转电的配网供电可靠性技术研究", 《中国新技术新产品》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112583023A (en) * 2020-12-22 2021-03-30 广东电网有限责任公司 Power grid line structure

Similar Documents

Publication Publication Date Title
CN109995145A (en) A kind of low-voltage network failure active analysis method based on intelligent distribution transformer terminals
CN112763846B (en) Distribution line intelligent power failure judgment method based on multi-data source information fusion
CN102227090A (en) Intelligent FA (feeder automation) system of 10kV-carrier communication
CN112036690B (en) Method for constructing power supply network of reclamation area
CN103872770A (en) Different power supply region feeder automation collocation method based on wiring mode
CN106505738B (en) A kind of distribution power automation terminal method for arranging based on power supply reliability
CN110224406A (en) For increasing the method and device of electric power responsible consumer electricity consumption reliability in two lines road
CN111106670B (en) Instruction ticket generation system and method based on power distribution network
CN111581777A (en) Power transfer weak ring quantitative identification method influencing power distribution network fault recovery
CN107437848B (en) System and method for non-signal access of stand-by power supply in monitoring background
CN102958237A (en) Lighting device
CN210199558U (en) Computer monitoring system for hydropower station
CN209417204U (en) A kind of district cable fault detection system
CN208337238U (en) A kind of Inspection and monitoring system of power distribution network power transmission and transforming equipment
CN112152205A (en) Intelligent low-voltage automatic switching management unit and management method
Lampley Volt/VAR control at Progress Energy Carolinas past, present and future
Hartwright et al. The improvement of customer service by system automation (power distribution)
CN111327121A (en) Automatic and communication planning system
CN204442801U (en) substation illumination system
CN110581595B (en) Upgrading and reforming method of street lamp power supply system
CN106786018A (en) A kind of termination rack for being suitable to ring main unit in-situ reformation
CN202190124U (en) Intelligent rural network 10 kV line comprehensive measurement and control system
Yanping Research on the Discussion on China's Power Distribution System and Its Automation Technology
CN208046315U (en) A kind of unattended straight-flow system
CN207939214U (en) It is a kind of containing distributed generation resource distribution switch distribute rationally and fling-cut system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190910

RJ01 Rejection of invention patent application after publication