CN110221107A - Electric energy metering box mounting bracket - Google Patents

Electric energy metering box mounting bracket Download PDF

Info

Publication number
CN110221107A
CN110221107A CN201910560035.3A CN201910560035A CN110221107A CN 110221107 A CN110221107 A CN 110221107A CN 201910560035 A CN201910560035 A CN 201910560035A CN 110221107 A CN110221107 A CN 110221107A
Authority
CN
China
Prior art keywords
connecting rod
electric energy
energy metering
chassis
metering box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910560035.3A
Other languages
Chinese (zh)
Other versions
CN110221107B (en
Inventor
谭焱
艾雪
陈君
王健
任普普
许朋波
冯军波
徐军
商晓凯
薛晴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linqu Power Supply Co Of State Grid Shandong Electric Power Co
State Grid Corp of China SGCC
Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Linqu Power Supply Co Of State Grid Shandong Electric Power Co
State Grid Corp of China SGCC
Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Linqu Power Supply Co Of State Grid Shandong Electric Power Co, State Grid Corp of China SGCC, Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Linqu Power Supply Co Of State Grid Shandong Electric Power Co
Priority to CN201910560035.3A priority Critical patent/CN110221107B/en
Publication of CN110221107A publication Critical patent/CN110221107A/en
Application granted granted Critical
Publication of CN110221107B publication Critical patent/CN110221107B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/02Constructional details
    • G01R11/04Housings; Supporting racks; Arrangements of terminals

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Patch Boards (AREA)

Abstract

The present invention is electric energy metering box mounting bracket.Its technical solution are as follows: upper frame, chassis and adjustment frame;Adjustment frame energy radial drawing, adjustment frame first end and second end are connect with upper frame and chassis respectively;The angled bending in the first face of upper frame and the second face, the second face of upper frame cover electric energy metering box top surface, and the first face of upper frame is set to the electric energy metering box back side;The angled bending in the first face of chassis and the second face, electric energy metering box are mounted on the second face of chassis, and the first face of chassis is set to the electric energy metering box back side.Electric energy metering box can be made to be rapidly secured at any position of electric pole, and keep certain distance with electric pole;Installation method uniformity is strong, and bracket can be adjusted with the size of electric energy metering box, realizes standardized work construction, and technique is more beautiful;Upper frame covers electric energy metering box, prevents rainwater from entering electricity box.

Description

Electric energy metering box mounting bracket
Technical field
The present invention relates to electric energy metering box technical field, especially a kind of electric energy metering box mounting bracket.
Background technique
Electric energy metering box is the important component distributed electric energy in electric system, measure electric energy, in low pressure 0.4kV supply lines Lu Zhong, electric energy metering box are typically mounted on the room exterior wall of power consumer, facilitate staff's meter reading and maintenance, are filled and are used in some agricultures Electric region, being limited by geographical location is influenced far from building, needs for electric energy metering box to be mounted in low pressure 0.4kV power supply line Electric pole on.
When electric energy metering box to be mounted on electric pole, generally electric energy metering box is bound on electric pole using iron wire.This side It is insecure that formula not only will appear binding, the phenomenon that electric energy metering box is easy to fall off, and electric energy metering box is close to electric pole, on staff Lower climbing electric pole needs to be easy to happen around more electric energy metering box and step on bar accident.
Summary of the invention
For existing electric energy metering box is fixed on electric pole the technical issues of can only binding using iron wire, of the invention is main Purpose is to provide a kind of electric energy metering box mounting bracket, realizes electric energy metering box and is fixed firmly on electric pole and does not influence staff Climb the technical effect of electric pole.
The present invention proposes a kind of electric energy metering box mounting bracket, comprising: upper frame, chassis and adjustment frame;The adjustment frame energy diameter To stretching, the adjustment frame first end and second end is connect with the upper frame and the chassis respectively;First face of upper frame with The angled bending in second face, second face of upper frame cover electric energy metering box top surface, and first face of upper frame is set to electric energy meter The case back side;The angled bending in first face of chassis and the second face, electric energy metering box are mounted on second face of chassis, the bottom The first face of frame is set to the electric energy metering box back side.By being provided with adjustment frame, enable mounting bracket according to the height of electric energy metering box, Various sizes of electric energy metering box is installed.
Further, the adjustment frame includes first connecting rod and second connecting rod, the first connecting rod and the second connecting rod Arranged in a crossed manner, the first connecting rod first end is connect with the second connecting rod first end with first face of upper frame;Described first Connecting rod second end and the second connecting rod second end are connect with first face of chassis.Pass through setting first connecting rod and second connecting rod It is arranged in a crossed manner, allow adjustment frame according to the height of electric energy metering box, adjust the intersecting angle of first connecting rod and second connecting rod, So as to adjust the height of adjustment frame, to be adapted to the height of electric energy metering box.
Further, the first connecting rod and the second connecting rod are made of at least two support bars, on the support bar Installation sliding slot is offered, the support bar is screwed two-by-two.The development length of support bar, enables adjustment frame according to electric energy The height of electricity box adjusts the height of adjustment frame, and it is adjustable to make to integrate mounting bracket height, adapts to the electric energy meter of different height Case.And support bar is the support bar of unified specification, ease of assembly and production.
Further, third is installed between the first connecting rod first end and the second connecting rod first end and crosspoint Connecting rod, the third connecting rod first end are installed in the first connecting rod installation sliding slot, and the third connecting rod second end is installed on In the second connecting rod installation sliding slot;Between the first connecting rod second end and the second connecting rod second end and the crosspoint Fourth link is installed, the fourth link first end is installed in the first connecting rod installation sliding slot, the fourth link the Two ends are installed in the second connecting rod installation sliding slot.It is firm that triangle is formed between third connecting rod and fourth link and crosspoint Shape prevents first connecting rod and second connecting rod from sliding, and influences the stability of entire mounting bracket.And it is arranged on electric energy metering box There is mounting hole, across the screw of third connecting rod and fourth link, electric energy metering box is fixed on third connecting rod and fourth link, prevents Only electric energy metering box is mobile.
Further, the upper frame other side is provided with extension upper frame, and the extension upper frame specification is identical as the upper frame, Installation is screwed with the upper frame.
Further, the chassis other side is provided with extension chassis, and the extension chassis specification is identical as the chassis, Installation is screwed with the chassis.
Further, symmetrically arranged first mounting hole, the top are offered on the upper frame and described chassis the same side Frame and the chassis are fixedly mounted on electric pole by fastener, and the fastener includes the first clamping groove of semicircular arc and sets It is placed in the fastening ear at first clamping groove both ends, the second mounting hole, second mounting hole are offered on the fastening ear The corresponding first mounting hole setting, first clamping groove are connected on electric pole, are equipped with spiral shell on first mounting hole Nail, screw pass through second mounting hole for the fastener and electric pole clamping.By the way that fastener is arranged, mounting bracket is fastened On electric pole.
Further, the upper frame and the chassis side are provided with anti-skidding break iron, and the anti-skidding break iron offers second Clamping groove, the first clamping groove and electric pole clamping described in the second clamping groove face.By being provided with anti-skidding break iron, give Above-mentioned mounting bracket applies bigger frictional force on electric pole, and matching fastener prevents from above-mentioned mounting bracket being mounted on electricity It is slid when on bar.
Electric energy metering box mounting bracket provided by the invention can make electric energy metering box be rapidly secured at any position of electric pole, and Certain distance is kept with electric pole, staff is facilitated to step on bar up and down;Installation method uniformity is strong, and bracket can be with the ruler of electric energy metering box It is very little to be adjusted, realize standardized work construction, technique is more beautiful;Upper frame covers electric energy metering box, prevents rainwater from entering table Case.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the embodiment of the present invention.
Wherein, 1, upper frame;2, extend upper frame;3, chassis;4, extend chassis;5, fastener;6, anti-skidding break iron;7, the first peace Fill hole;8, countersunk head screw;9, third connecting rod;10, second connecting rod;11, first connecting rod;12, fourth link.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description.Obviously, described embodiment is only a part of the embodiments of the present invention, instead of all the embodiments.Base Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts it is all its His embodiment, shall fall within the protection scope of the present invention.
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute is only used in the embodiment of the present invention In explaining in relative positional relationship, the motion conditions etc. under a certain particular pose (as shown in the picture) between each component, if should When particular pose changes, then directionality instruction also correspondingly changes correspondingly.
In addition, the description for being related to " first ", " second " etc. in the present invention is used for description purposes only, and should not be understood as referring to Show or imply its relative importance or implicitly indicates the quantity of indicated technical characteristic." first ", " are defined as a result, Two " feature can explicitly or implicitly include at least one of the features.In addition, the technical solution between each embodiment can It to be combined with each other, but must be based on can be realized by those of ordinary skill in the art, when the combination of technical solution occurs Conflicting or cannot achieve when, will be understood that the combination of this technical solution is not present, also not the present invention claims protection model Within enclosing.
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
Referring to Fig.1, a kind of electric energy metering box mounting bracket provided by the invention, comprising: upper frame 1, chassis 3 and adjustment frame;It adjusts Whole frame energy radial drawing, adjustment frame include first connecting rod 11 and second connecting rod 10, and first connecting rod 11 and the intersection of second connecting rod 10 are set It sets, 11 first end of first connecting rod is connect with 10 first end of second connecting rod with 1 first face of upper frame;11 second end of first connecting rod and second 10 second end of connecting rod is connect with 3 first face of chassis.Sliding slot, 11 He of first connecting rod are offered on first face of upper frame 1 and chassis 3 The both ends of second connecting rod 10 are fixed in the sliding slot of upper frame 1 and chassis 3 by countersunk head screw.
First connecting rod 11 and second connecting rod 10 are made of three support bars, and installation sliding slot, support bar are offered on support bar It is fixed two-by-two by countersunk head screw.Third is installed between 11 first end of first connecting rod and 10 first end of second connecting rod and crosspoint Connecting rod 9,9 first end of third connecting rod are installed on first connecting rod 11 by countersunk head screw and install in sliding slot, and 9 second end of third connecting rod is logical Countersunk head screw is crossed to be installed in the installation sliding slot of second connecting rod 10;11 second end of first connecting rod and 10 second end of second connecting rod with intersect Fourth link 12 is installed, 12 first end of fourth link is installed on first connecting rod 11 by countersunk head screw and installs sliding slot between point In, 12 second end of fourth link is installed on second connecting rod 10 by countersunk head screw and installs in sliding slot.
First connecting rod 11 and second connecting rod 10 it is arranged in a crossed manner, allow adjustment frame according to the height of electric energy metering box, adjust The intersecting angle of whole first connecting rod 11 and second connecting rod 10, so as to adjust the height of adjustment frame, to be adapted to the height of electric energy metering box, First connecting rod 11 and second connecting rod 10 are made of support bar, and support bar can be according to first connecting rod 11 and the current direction of second connecting rod 10 Direction extend outwardly, by adjusting the development length of the intersecting angle and support bar of first connecting rod 11 and second connecting rod 10, make Adjustment frame can adjust the height of adjustment frame according to the height of electric energy metering box, and it is adjustable to make to integrate mounting bracket height, adapt to The electric energy metering box of different height.And support bar is the support bar of unified specification, ease of assembly and production.
Triangle stable shape is formed between third connecting rod 9 and fourth link 12 and crosspoint, prevents 11 He of first connecting rod Second connecting rod 10 slides, and influences the stability of entire mounting bracket.And mounting hole is provided on electric energy metering box, pass through third Electric energy metering box is fixed on third connecting rod 9 and fourth link 12, prevents electric energy metering box by the screw of connecting rod 9 and fourth link 12 It is mobile.
1 other side of upper frame, which is provided with, extends upper frame 2, and extension 2 specification of upper frame is identical as upper frame 1, solid by screw with upper frame 1 Dingan County's dress.3 other side of chassis, which is provided with, extends chassis 4, and extension 4 specification of chassis is identical as chassis 3, solid by screw with chassis 3 Dingan County's dress.
When stating mounting bracket in use, according to the specification of electric energy metering box, adjustment extends chassis 4, makes mounting bracket Chassis 3 and extend chassis 4 length it is consistent with electric energy metering box length, electric energy metering box is placed on chassis 3, adjustment extend push up Frame 2 makes to extend upper frame 2 and the length of upper frame 1 is consistent with electric energy metering box length, electric energy metering box top surface is covered.By being provided with Extend upper frame 2 and extend chassis 4, can be can adapt to more according to the size adjusting chassis 3 of electric energy metering box and the length of upper frame 1 The size of more electric energy metering boxs.1 first face of upper frame is bent with the second face at right angle, and 1 second face of upper frame is complete by electric energy metering box top surface It covers, plays the role of rain visor, entered in electric energy metering box for sewage such as rain covers, 1 first face of upper frame is set to electric energy The electricity box back side.
Symmetrically arranged first mounting hole 7 is offered on 3 the same side of upper frame 1 and chassis, upper frame 1 and chassis 3 are by fastener 5 It is fixedly mounted on electric pole, fastener 5 includes the first clamping groove of semicircular arc and is set to the first clamping groove both ends Ear is fastened, fastens and offers the second mounting hole on ear, corresponding first mounting hole 7 setting of the second mounting hole, the first clamping groove card It connects on electric pole, countersunk head screw 8 is installed on first mounting hole 7, countersunk head screw 8 passes through the second mounting hole for fastener 5 and electricity Bar clamping.Upper frame 1 and 3 side of chassis are provided with anti-skidding break iron 6, and anti-skidding break iron 6 offers the second clamping groove, and the second clamping is recessed The first clamping groove of slot face and electric pole clamping.By being provided with anti-skidding break iron 6, apply more on electric pole to above-mentioned mounting bracket Big frictional force, matching fastener 5 prevent the landing when above-mentioned mounting bracket to be mounted on electric pole.
The above description is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all utilizations Equivalent structure or equivalent flow shift made by description of the invention and accompanying drawing content is applied directly or indirectly in other correlations Technical field, be included within the scope of the present invention.

Claims (8)

1. a kind of electric energy metering box mounting bracket characterized by comprising upper frame (1), chassis (3) and adjustment frame;
The adjustment frame energy radial drawing, the adjustment frame first end and second end respectively with the upper frame (1) and the chassis (3) it connects;
The angled bending in (1) first face of upper frame and the second face, (1) second face of upper frame cover electric energy metering box top surface, (1) first face of upper frame is set to the electric energy metering box back side;
The angled bending in (3) first face of chassis and the second face, electric energy metering box are mounted on (3) second face of chassis, institute It states (3) first face of chassis and is set to the electric energy metering box back side.
2. electric energy metering box mounting bracket as described in claim 1, which is characterized in that the adjustment frame include first connecting rod (11) and Second connecting rod (10), the first connecting rod (11) and the second connecting rod (10) are arranged in a crossed manner, the first connecting rod (11) first End is connect with the second connecting rod (10) first end with (1) first face of upper frame;
First connecting rod (11) second end and the second connecting rod (10) second end are connect with (3) first face of chassis.
3. electric energy metering box mounting bracket as claimed in claim 2, which is characterized in that the first connecting rod (11) and described second connects Bar (10) is made of at least two support bars, and installation sliding slot is offered on the support bar, and the support bar passes through screw two-by-two It is fixed.
4. electric energy metering box mounting bracket as claimed in claim 3, which is characterized in that first connecting rod (11) first end and described Second connecting rod (10) is equipped with third connecting rod (9) between first end and crosspoint, and third connecting rod (9) first end is installed on institute It states in first connecting rod (11) installation sliding slot, third connecting rod (9) second end is installed on the second connecting rod (10) installation sliding slot In;
The 4th is equipped between first connecting rod (11) second end and the second connecting rod (10) second end and the crosspoint Connecting rod (12), fourth link (12) first end are installed in the first connecting rod (11) installation sliding slot, the fourth link (12) second end is installed in the second connecting rod (10) installation sliding slot.
5. electric energy metering box mounting bracket as described in claim 1, which is characterized in that upper frame (1) other side is provided with extension Upper frame (2), extension upper frame (2) specification is identical as the upper frame (1), is screwed installation with the upper frame (1).
6. electric energy metering box mounting bracket as described in claim 1, which is characterized in that chassis (3) other side is provided with extension Chassis (4), extension chassis (4) specification is identical as the chassis (3), is screwed installation with the chassis (3).
7. electric energy metering box mounting bracket as described in claim 1, which is characterized in that the upper frame (1) and the chassis (3) are same Symmetrically arranged first mounting hole (7), the upper frame (1) and the chassis (3) is offered on side to be fixedly mounted by fastener (5) On electric pole, the fastener (5) includes the first clamping groove of semicircular arc and is set to first clamping groove both ends Fastening ear, offer the second mounting hole on the fastening ear, second mounting hole corresponds to first mounting hole (7) and sets It sets, first clamping groove is connected on electric pole, is equipped with screw on first mounting hole (7), and screw passes through described the Two mounting holes are by the fastener (5) and electric pole clamping.
8. electric energy metering box mounting bracket as claimed in claim 5, which is characterized in that the upper frame (1) and the chassis (3) side It is provided with anti-skidding break iron (6), the anti-skidding break iron (6) offers the second clamping groove, described in the second clamping groove face First clamping groove and electric pole clamping.
CN201910560035.3A 2019-06-25 2019-06-25 Electric energy meter box mounting bracket Active CN110221107B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910560035.3A CN110221107B (en) 2019-06-25 2019-06-25 Electric energy meter box mounting bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910560035.3A CN110221107B (en) 2019-06-25 2019-06-25 Electric energy meter box mounting bracket

Publications (2)

Publication Number Publication Date
CN110221107A true CN110221107A (en) 2019-09-10
CN110221107B CN110221107B (en) 2021-04-09

Family

ID=67815047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910560035.3A Active CN110221107B (en) 2019-06-25 2019-06-25 Electric energy meter box mounting bracket

Country Status (1)

Country Link
CN (1) CN110221107B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116865119A (en) * 2023-07-07 2023-10-10 河南明欧电气有限公司 Novel cover aluminium zinc sheet electric energy metering box
CN117347687A (en) * 2023-10-09 2024-01-05 南京国电南思科技发展股份有限公司 Electric energy meter with back positioning structure

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008011396A1 (en) * 2007-11-23 2009-05-28 Hager Electro Gmbh & Co. Kg Mounting for an electricity meter, in a building, takes two meters and data processing and/or transfer nits for conversion to electronic meters
CN201569682U (en) * 2009-12-05 2010-09-01 厉进军 Fixing support for electric energy meter box
CN204855599U (en) * 2015-07-30 2015-12-09 国网山东沂水县供电公司 Electric energy meter installing support
CN105866491A (en) * 2016-03-31 2016-08-17 国网山东省电力公司蓬莱市供电公司 Bracket used for fixing electricity meter boxes
CN206935428U (en) * 2017-05-27 2018-01-30 陈思羽 A kind of multi-functional adjustable physical experiment table
CN107906331A (en) * 2017-12-27 2018-04-13 嘉兴恒杰电力设备安装有限公司 A kind of adjustable metering box bracket
CN208125788U (en) * 2018-05-03 2018-11-20 广东电网有限责任公司 A kind of adjustable ammeter locating support

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008011396A1 (en) * 2007-11-23 2009-05-28 Hager Electro Gmbh & Co. Kg Mounting for an electricity meter, in a building, takes two meters and data processing and/or transfer nits for conversion to electronic meters
CN201569682U (en) * 2009-12-05 2010-09-01 厉进军 Fixing support for electric energy meter box
CN204855599U (en) * 2015-07-30 2015-12-09 国网山东沂水县供电公司 Electric energy meter installing support
CN105866491A (en) * 2016-03-31 2016-08-17 国网山东省电力公司蓬莱市供电公司 Bracket used for fixing electricity meter boxes
CN206935428U (en) * 2017-05-27 2018-01-30 陈思羽 A kind of multi-functional adjustable physical experiment table
CN107906331A (en) * 2017-12-27 2018-04-13 嘉兴恒杰电力设备安装有限公司 A kind of adjustable metering box bracket
CN208125788U (en) * 2018-05-03 2018-11-20 广东电网有限责任公司 A kind of adjustable ammeter locating support

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116865119A (en) * 2023-07-07 2023-10-10 河南明欧电气有限公司 Novel cover aluminium zinc sheet electric energy metering box
CN116865119B (en) * 2023-07-07 2024-05-24 河南明欧电气有限公司 Novel cover aluminium zinc sheet electric energy metering box
CN117347687A (en) * 2023-10-09 2024-01-05 南京国电南思科技发展股份有限公司 Electric energy meter with back positioning structure
CN117347687B (en) * 2023-10-09 2024-04-05 南京国电南思科技发展股份有限公司 Electric energy meter with back positioning structure

Also Published As

Publication number Publication date
CN110221107B (en) 2021-04-09

Similar Documents

Publication Publication Date Title
CN110221107A (en) Electric energy metering box mounting bracket
US7314205B2 (en) System and method for mounting a breaker panel to a pole
CN205212179U (en) But angle regulation's lightning rod
CN209418750U (en) A kind of antenna mounting component
CN209119306U (en) A kind of dual-frequency base station antenna
CN205354805U (en) Power supply system's outdoor transformer mounting structure
CN206313236U (en) A kind of socket
CN211229080U (en) Grid structure with optimize sight and ventilation function
CN209088052U (en) Antenna installation stent and antenna mounting device
CN203562509U (en) Inclination angle adjustable mounting bracket for remote radio unit (RRU) of integrated antenna
CN204282585U (en) A kind of shower house pull bar
CN209766668U (en) Rotary adjustable wiring end
CN211220392U (en) Clamp plate fastening type electric power steel pipe tower optical cable down-leading clamp connector
CN218209843U (en) Outer quick-witted support of air conditioner convenient to adjust installation
CN203055341U (en) Electricity iron tower signboard fixing support
CN207485233U (en) A kind of decorative strip assembly
CN2733137Y (en) Vortex-proof pre-distribution cable fixing mount
CN211059077U (en) Mounting structure of air exchange fan of prefabricated building
CN205087768U (en) Elevator layer door toeguard device
CN202978145U (en) Distribution box
CN202252358U (en) Inclined-surface or circular-arc-surface electric wire or cable support frame
CN209369480U (en) A kind of slope fence
CN203213510U (en) Z-shaped metal claw element for fixing distorted body
CN218117365U (en) Tree house structure with adjustable
CN203213511U (en) Herringbone metal claw element for fixing distorted body

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant