CN110216734A - A kind of adhesive label production technology - Google Patents

A kind of adhesive label production technology Download PDF

Info

Publication number
CN110216734A
CN110216734A CN201910487048.2A CN201910487048A CN110216734A CN 110216734 A CN110216734 A CN 110216734A CN 201910487048 A CN201910487048 A CN 201910487048A CN 110216734 A CN110216734 A CN 110216734A
Authority
CN
China
Prior art keywords
roller
paper tube
connection
connection roller
movable chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910487048.2A
Other languages
Chinese (zh)
Other versions
CN110216734B (en
Inventor
肖烈民
王俊强
敬小平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Rongke Industrial Co.,Ltd.
Original Assignee
Zhejiang Suo Fan Adhesive Article Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Suo Fan Adhesive Article Co Ltd filed Critical Zhejiang Suo Fan Adhesive Article Co Ltd
Priority to CN202011017634.XA priority Critical patent/CN112223409A/en
Priority to CN201910487048.2A priority patent/CN110216734B/en
Publication of CN110216734A publication Critical patent/CN110216734A/en
Application granted granted Critical
Publication of CN110216734B publication Critical patent/CN110216734B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26DCUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
    • B26D11/00Combinations of several similar cutting apparatus
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26DCUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
    • B26D7/00Details of apparatus for cutting, cutting-out, stamping-out, punching, perforating, or severing by means other than cutting
    • B26D7/27Means for performing other operations combined with cutting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26DCUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
    • B26D7/00Details of apparatus for cutting, cutting-out, stamping-out, punching, perforating, or severing by means other than cutting
    • B26D7/27Means for performing other operations combined with cutting
    • B26D7/32Means for performing other operations combined with cutting for conveying or stacking cut product
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26FPERFORATING; PUNCHING; CUTTING-OUT; STAMPING-OUT; SEVERING BY MEANS OTHER THAN CUTTING
    • B26F1/00Perforating; Punching; Cutting-out; Stamping-out; Apparatus therefor
    • B26F1/38Cutting-out; Stamping-out
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B41PRINTING; LINING MACHINES; TYPEWRITERS; STAMPS
    • B41CPROCESSES FOR THE MANUFACTURE OR REPRODUCTION OF PRINTING SURFACES
    • B41C1/00Forme preparation
    • B41C1/14Forme preparation for stencil-printing or silk-screen printing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B41PRINTING; LINING MACHINES; TYPEWRITERS; STAMPS
    • B41MPRINTING, DUPLICATING, MARKING, OR COPYING PROCESSES; COLOUR PRINTING
    • B41M1/00Inking and printing with a printer's forme
    • B41M1/12Stencil printing; Silk-screen printing
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F3/00Labels, tag tickets, or similar identification or indication means; Seals; Postage or like stamps
    • G09F3/08Fastening or securing by means not forming part of the material of the label itself
    • G09F3/10Fastening or securing by means not forming part of the material of the label itself by an adhesive layer

Abstract

The invention discloses a kind of adhesive label production technologies, comprising: a, blanking procedure;B, plate-making, inking process;C, printing process;D, cutting die production, die cutting procedure: design department makes the cutting die line pattern of final finished by drawing, gives cutting die producer, after confirmation, pattern is pasted on plastic plate, goes out graph outline by cutting die scroll saw with sawing machine;E, testing stage before rubber patch: checking on the quality to cross cutting semi-finished product in waste discharge according to quality control standards (QCS), distinguishes the qualified product and rejected product after checking, and is identified with laminating adhesive paper slip in case subsequent processing is received;It need to reprocess, fill in and reprocess list and retract concerned process steps;F, rubber patch process: according to feed-vacuumize-cleaning robot-row steep-drips the closed process of glue-repairing-and completes rubber patch;G, arranging process.

Description

A kind of adhesive label production technology
Technical field
The invention belongs to adhesive sticker processing technique fields, more particularly, to a kind of adhesive label production technology.
Background technique
Adhesive label impact paper etc. is using paper, film or special material as fabric, and the back side is coated with adhesive, to apply Silicon base stock is a kind of composite material of protection sheet, and becomes finished product labeling after the processing such as being printed, being die cut.In application, only need to be from It removes, gently presses on base stock, the surface of various substrates can be attached to, it is possible to use labelling machine automatic labeling in the production line.
Adhesive label needs adhesive material doing slitting treatment in process of production, by the adhesive material after cutting It is wound on paper tube, adhesive material is collected, existing collect to material after cutting is usually that paper tube is nested into transfer roller On, then manually put paper tube uniformly to collect the adhesive material after cutting on transfer roller, worker is putting paper tube manually Shi Wufa accurately controls position, is easy that paper tube is made to misplace, while worker needs to put manually paper tube to be inserted on transfer roller also It is good, the time for being inserted in paper tube is increased, the production efficiency of adhesive label is influenced.
Summary of the invention
The present invention for overcome the deficiencies in the prior art, provides a kind of adhesive label production technology.
To achieve the goals above, the invention adopts the following technical scheme: a kind of adhesive label production technology, comprising:
A, blanking procedure: the blanking notification sheet that blanking personnel issue according to production division, from raw material silo get as defined in do not do Glue material checks its model, and fills in outbound list;Raw material is put into cutting machine, the raw material after making cutting is in collecting device Inside it is rolled into a roll;
B, plate-making, inking process: plate-making personnel are responsible for signing for the egative film and tinctorial pattern of design department's offer, check the quality of egative film, The mark content of quantity, egative film including egative film, text, lines, site edge actual situation degree, dot density, color separation film it Between the contents such as register degree;
C, printing process: printing personnel according to production subpoena and process chart requirement, get corresponding halftone, ink, no first Dry glue material, and carry out mutually inspection work;Check it is errorless after, fixed halftone and debug net away from, then with adhesive sticker locator material into Row positioning, then begins to print;
D, cutting die production, die cutting procedure: design department makes the cutting die line pattern of final finished by drawing, gives cutting die system Make personnel, after confirmation, pattern is pasted on plastic plate, goes out graph outline by cutting die scroll saw with sawing machine;
E, it testing stage before rubber patch: is checked on the quality in waste discharge according to quality control standards (QCS) to cross cutting semi-finished product, after distinguishing inspection Qualified product and rejected product, and with laminating adhesive paper slip identify in case subsequent processing receive;It need to reprocess, fill in and reprocess list and move back Return concerned process steps;
F, rubber patch process: according to feed-vacuumize-cleaning robot-row steep-drips the closed process of glue-repairing-and completes drop Modeling;
G, arranging process: arrangement personnel get semi-finished product to upper process, put clear quantity, distinguish qualified product and rejected product;
Wherein, the collecting device in the step a includes transfer roller and the support component below the transfer roller, on the transfer roller The first connection roller, the second connection roller, third connection roller and the 4th connection are equipped with equipped with the first movable chamber, in first movable chamber Roller, the first connection roller, the second connection roller, third connection roller and the 4th connection roller are sequentially connected, and the first connection roller, The diameter of second connection roller, third connection roller and the 4th connection roller is sequentially reduced, and the first connection roller is equipped with the second activity Chamber, the second connection roller are arranged in second movable chamber, are additionally provided with reset spring in second movable chamber;Described Two connection rollers, third connection roller and the 4th connection roll structure are identical as the first connection roller, the transfer roller side Equipped with the first mounting plate, first mounting plate be equipped with cylinder, the cylinder piston rod be equipped with the first push plate, described first Push plate divides on the first connection roller, the second connection roller, third connection roller and the 4th connection roller in first movable chamber It She You not connection ring;Adhesive material is put into cutting machine to adhesive sticker material by adhesive material after raw material silo taking-up Material is cut, and cylinder pushes the first push plate to move in the first movable chamber, and the first push plate is made to push the company in the first movable chamber It is mobile to connect roller, is inserted into the 4th connection roller in third connection roller, third connection roller is inserted into the second connection roller, the second connection Roller is inserted into the first connection roller, and the connection ring on four connection rollers is close to each other, by the paper tube set with connection ring corresponding number Enter onto transfer roller, be placed on paper tube in connection ring, push paper tube, until innermost paper tube side wall connects with the first push plate side wall Touching, cylinder will or piston rod recycling, connection roller reset spring elastic force effect under reset, make connect roller move to initial position On, the paper tube being sheathed on connection roller is separated, the paper tube on each connection roller is made to collect not doing after the completion of being cut respectively Glue material.
Connection ring is all pushed to transfer roller one end by way of cylinder pushes the first push plate, connection ring is made to be in one The paper tube of preset quantity, can all be nested on transfer roller by place together, and by paper tube toward pushing inside transfer roller, the first push plate is to paper tube The movable maximum distance of institute provides constraints, and keeps paper tube corresponding with each connection ring, then under the action of reset spring Make to connect roller movement, connect roller movement and drive connection ring mobile, makes connection ring that paper tube can exist automatically with when connecting roller movement Position is set on transfer roller, is placed in paper tube uniformly on transfer roller convenient for being collected to the adhesive material after cutting;Pass through The mutual cooperation for connecting roller, cylinder and reset spring, puts paper tube automatically on transfer roller It is good, paper tube is put without manually going, shortens and is arranged the paper tube time, so that the operation for being arranged paper tube is become more convenient, is promoted not The production efficiency of dry glue labeling;After the good adhesive material of winding on paper tube, the head of adhesive material is cut off, cylinder pushes the One push plate moves forward, makes push rod push connection roller toward one end motion of transfer roller, paper tube is all pushed to transfer roller one end, can be facilitated Paper tube is taken out from transfer roller, promoted to the collection efficiency of paper tube.
Silk screen tension selected by plate-making in the step b is in 6~8kg/cm2;By the suitable tension of silk screen to mention Plate-making effect is risen, guarantees the beauty of version type, promotes final product quality.
Halftone is removed from Stretching machine after placing 12h after adhesive material brush coating in the step b;Block is used before printing down Adhesive tape seals surrounding, and places 3~4 days;Glue is adhered to preferably on adhesive material by prolonged mode, is promoted The fiting effect of glue and adhesive material.
Halftone in the step b carries out degreasing and roughening treatment before frictioning, to new halftone, then by light in darkroom Quick dose is poured into glass, is added 80~100mL of water, is sufficiently stirred;Photosensitizer will be made adequately soluble in water under stirring, Required photosensitizer raw material is made, to do further processing processing to adhesive label.
Adhesive material in the step b is lain against in baking oven after frictioning, and oven temperature is less than or equal to 40 DEG C, is placed 0.5h is thorough to drying;Temperature in baking oven is controlled, avoids temperature is excessively high from impacting to glue, makes glue higher At a temperature of its internal moisture is evaporated, to obtain the preferable finished product of viscosity.
It is equipped with third movable chamber in the first connection roller, the third movable chamber is set to second movable chamber side, The third movable chamber side wall is equipped with first through hole, and the third movable chamber passes through the first through hole and second activity Chamber communicates, and the connection ring is equipped with cavity, and fixed link is equipped in the cavity, and second connection roller one end is equipped with and institute The push rod that first through hole matches is stated, when the push rod is inserted into the first through hole, the fixed link is toward the cavity Bottom movement;When paper tube is covered upper transfer roller, cylinder pushes the first push plate to move in the first movable chamber, thus by the second connection Roller is pushed into the second movable chamber, and after the second connection roller enters in the second movable chamber, push rod is inserted into first through hole, is made Push rod drives fixed link to move toward cavity bottom, enters in cavity at the top of fixed link, and connection ring surface is made to be in formation state, Keep paper tube unobstructed when being inserted in transfer roller;After paper tube is nested on transfer roller, cylinder retract piston bar keeps push rod logical from first Deviate from hole, fixed link is up moved along cavity inner wall, makes to be in contact at the top of fixed link with paper tube inner wall, paper tube is fixed on In connection ring, move paper tube together with connection roller;After paper tube is nested into connection ring, paper tube is risen by fixed link Fixed function moves paper tube together with connection ring, convenient for positioning to paper tube, paper tube is avoided to occur to beat in connection ring Sliding phenomenon;After new paper tube is nested into connection ring, air cylinder driven piston rod retraction, push rod is first deviate from out of first through hole Connection roller starts to move again afterwards, stretches out connection roller fixed link before mobile just out of cavity and is in contact with paper tube inner wall, makes to connect Connect roller it is mobile when paper tube can be driven to move together;When adhesive material is after the completion of retracting, cylinder pushes connection roller mobile, even Roller is connect after being moved to transfer roller one end, push rod is inserted into first through hole, enters fixed link automatically in cavity, fixed link Be not in contact the fixed function lost to paper tube with paper tube, new to change to so as to easily remove paper tube from connection ring Paper tube continue to run equipment, promote the processing efficiency of adhesive label.
The second mounting plate is equipped with above the transfer roller, second mounting plate is equipped with multiple loose slots, the loose slot It is corresponding with the connection ring, it is equipped with scraper plate in the loose slot, second mounting plate is equipped with the second through-hole, and described second Connecting shaft is equipped in through-hole, the connecting shaft is arranged on the scraper plate, and the connecting shaft and scraper plate transmission cooperate, institute The second mounting plate is stated equipped with for driving the first driving motor of the connecting shaft rotation;After paper tube is fixed in connection ring, Adhesive material is rolled up on paper tube, and the first driving motor is drivingly connected axis rotation, makes connecting shaft that scraper plate be driven to turn to paper tube Two sides, paper tube drive the adhesive material two sides on paper tube to be in contact with scraper plate side wall while rotating with transfer roller, will not The flash of dry glue material two sides strikes off, while scraper plate positions the adhesive material on paper tube, makes the adhesive sticker material after being cut Material is set around on paper tube, is collected to adhesive material;Adhesive material is set to be coiled collection under the action of scraper plate When the side wall of adhesive material can be struck off, the flash on adhesive material section is struck off, to adhesive material rise To burr removing processing;It is in contact since scraper plate is set to paper tube two sides with adhesive material side wall, plays scraper plate to adhesive material Positioning action makes adhesive material is neat to be set around on paper tube, adhesive material is avoided to collapse from paper tube;In the first driving The position of scraper plate is adjusted under the action of motor, when connection roller when moving in the presence of cylinder, the first driving motor Driving scraper plate turns at the top of the second mounting plate, and scraper plate is avoided to cause to hinder to the movement of connection roller;When connection roller is on transfer roller Position determine after, the first driving motor driving scraper plate move down, match scraper plate with paper tube side wall, convenient in scraper plate Burr removing and positioning action are played to adhesive material under effect.
The invention has the following advantages that being nested by the mutual cooperation of connection roller, cylinder and reset spring by paper tube It sets paper tube automatically on transfer roller, puts paper tube without manually going, shorten and be arranged the paper tube time, make to be arranged The operation of paper tube becomes more convenient, promotes the production efficiency of adhesive label.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of collecting device of the present invention.
Fig. 2 is the diagrammatic cross-section one of collecting device of the present invention.
Fig. 3 is enlarged drawing at the A in Fig. 2.
Fig. 4 is the diagrammatic cross-section two of collecting device of the present invention.
Fig. 5 is enlarged drawing at the B in Fig. 4.
Fig. 6 is enlarged drawing at the C in Fig. 4.
Fig. 7 is enlarged drawing at the D in Fig. 4.
Specific embodiment
Embodiment 1:
A kind of adhesive label production technology, comprising: a, blanking procedure: blanking personnel notify according to the blanking that production division issues It is single, defined adhesive material is got from raw material silo, checks its model, and fills in outbound list;Raw material is put into cutting machine In, the raw material after making cutting is rolled into a roll in collecting device;B, plate-making, inking process: plate-making personnel are responsible for signing for design portion The egative film and tinctorial pattern that door provides, check the quality of egative film, the mark content of quantity, egative film including egative film, text, lines, net The edge actual situation degree of point, dot density, the contents such as register degree between color separation film;C, printing process: printing personnel are first According to production subpoena and process chart requirement, corresponding halftone, ink, adhesive material are got, and carries out mutually inspection work;It checks After errorless, fixed halftone simultaneously debugs net away from then being positioned with adhesive sticker locator material, then begin to print;D, cutting die system Make, die cutting procedure: design department makes the cutting die line pattern of final finished by drawing, gives cutting die producer, verification After errorless, pattern is pasted on plastic plate, goes out graph outline by cutting die scroll saw with sawing machine;E, testing stage before rubber patch: to mould It cuts semi-finished product to be checked on the quality in waste discharge according to quality control standards (QCS), distinguishes the qualified product and rejected product after checking, and with again Film paper slip identifies in case subsequent processing is received;It need to reprocess, fill in and reprocess list and retract concerned process steps;F, it rubber patch process: presses Shine into expect-vacuumize-cleaning robot-row steep-drips the closed process of glue-repairing-and completes rubber patch;G, arranging process: whole Reason personnel get semi-finished product to upper process, put clear quantity, distinguish qualified product and rejected product;Selected by plate-making in the step b Silk screen tension is in 6kg/cm2;Net is removed from Stretching machine after placing 12h after adhesive material brush coating in the step b Version;Surrounding is sealed with block adhesive tape before printing down, and is placed 3 days;Halftone in the step b carries out new halftone before frictioning Degreasing and roughening treatment, then pour into photosensitizer in glass in darkroom, add water 80mL, are sufficiently stirred;In the step b Adhesive material lain against in baking oven after frictioning, oven temperature is 40 DEG C, places 0.5h to dry thorough.
As shown in figs. 1-7, the collecting device in the step a includes transfer roller 1 and the support group set on 1 lower section of transfer roller Part, the transfer roller 1 are equipped with the first movable chamber, and the first connection roller 12, second is equipped in first movable chamber and connects roller 13, the Three connection rollers 14 and the 4th connection roller 15, the first connection roller 12, second connect roller 13, third connection roller 14 and the 4th connection Roller 15 is sequentially connected, and the first connection roller 12, second connects the diameter of roller 13, third connection roller 14 and the 4th connection roller 15 It is sequentially reduced, the first connection roller 12 is equipped with the second movable chamber, and the second connection roller 13 is arranged in second activity It is intracavitary, reset spring 124 is additionally provided in second movable chamber;The second connection roller 13, third connection roller 14 and institute It is identical as the first connection roller 11 to state the 4th connection 15 structure of roller, 1 side of transfer roller is equipped with the first mounting plate 2, and described the One mounting plate 2 is equipped with cylinder 21, and being rotatably connected on 21 piston rod of cylinder has the first push plate 17, first push plate 17 In first movable chamber, the first connection roller 12, second connects roller 13, third connection roller 14 and the 4th connection roller 15 On be respectively equipped with connection ring 16;Adhesive material is put into cutting machine to not by adhesive material after raw material silo taking-up Dry glue material is cut, and cylinder 21 pushes the first push plate 17 to move in the first movable chamber, and the first push plate 17 is made to push first Connection roller in movable chamber is mobile, is inserted into the 4th connection roller 15 in third connection roller 14, and third connection roller 14 is inserted into the In two connection rollers 13, the second connection roller 13 is inserted into the first connection roller 12, and the connection ring 16 on four connection rollers is close to each other, It will be nested on transfer roller 1 with the paper tube of 16 corresponding number of connection ring, be placed on paper tube in connection ring 16, push paper tube, until most The paper tube side wall of inside is in contact with 17 side wall of the first push plate, and cylinder 21 recycles piston rod, connects roller in 124 bullet of reset spring Power effect is lower to be resetted, and moves to connection roller on initial position, and the paper tube that will be sheathed on connection roller separates, and makes each connection roller On paper tube collect the adhesive material after the completion of being cut respectively.
Connection ring is all pushed to transfer roller one end by way of cylinder pushes the first push plate, connection ring is made to be in one The paper tube of preset quantity, can all be nested on transfer roller by place together, and by paper tube toward pushing inside transfer roller, the first push plate is to paper tube The movable maximum distance of institute provides constraints, and keeps paper tube corresponding with each connection ring, then under the action of reset spring Make to connect roller movement, connect roller movement and drive connection ring mobile, makes connection ring that paper tube can exist automatically with when connecting roller movement Position is set on transfer roller, is placed in paper tube uniformly on transfer roller convenient for being collected to the adhesive material after cutting;Pass through The mutual cooperation for connecting roller, cylinder and reset spring, puts paper tube automatically on transfer roller It is good, paper tube is put without manually going, shortens and is arranged the paper tube time, so that the operation for being arranged paper tube is become more convenient, is promoted not The production efficiency of dry glue labeling;After the good adhesive material of winding on paper tube, the head of adhesive material is cut off, cylinder pushes the One push plate moves forward, makes push rod push connection roller toward one end motion of transfer roller, paper tube is all pushed to transfer roller one end, can be facilitated Paper tube is taken out from transfer roller, promoted to the collection efficiency of paper tube.
First mounting plate is equipped with the second driving motor 22, and the output shaft of the second driving motor is equipped with the first transmission Wheel 221, the first driving wheel and transfer roller transmission cooperate, and provide rotary power to transfer shares;Transfer roller is equipped with multiple first through slots 11, even Ring inner wall is connect equipped with connecting rod 161, connecting rod is arranged in the first through slot, and connection ring is fixed on connection roller by connecting rod On;It is logical that second matched with connecting rod is equipped on first connection roller, the second connection roller, third connection roller and the 4th connection roller Slot, making connection roller, connecting rod can move in the second through slot when moving;After paper tube is nested into connection ring, the second driving electricity Machine drives transfer roller rotation, and the first through slot plays position-limiting action to connecting rod, so that the first through slot and connecting rod is cooperated, transfer roller is made to exist Connection ring is driven to rotate together when rotation, to make paper be collected during rotation to adhesive material, to do Glue material coiling is on paper tube.
Third movable chamber 121 is equipped in the first connection roller 12, the third movable chamber 121 is set to second activity Chamber side, 121 side wall of third movable chamber are equipped with first through hole 122, and the third movable chamber 121 is logical by described first Hole 122 is communicated with second movable chamber, and the connection ring 16 is equipped with cavity, is equipped with fixed link 18, institute in the cavity It states 13 one end of the second connection roller and is equipped with the push rod 131 matched with the first through hole 122, when the push rod 131 is inserted into institute When stating in first through hole 122, the fixed link 18 is moved toward the cavity bottom;When paper tube is covered upper transfer roller 1, cylinder 21 is pushed away Dynamic first push plate 17 moves in the first movable chamber, to the second connection roller 13 is pushed into the second movable chamber, the second connection After roller 13 enters in the second movable chamber, push rod 131 is inserted into first through hole 122, and push rod 131 is made to drive fixed link 18 past Cavity bottom moves, and enters in cavity at the top of fixed link 18, so that 16 surface of connection ring is in formation state, be inserted in paper tube It is unobstructed when transfer roller 1;After paper tube is nested on transfer roller 1,21 retract piston bar of cylinder makes push rod 131 from first through hole 122 Interior abjection, fixed link 18 are up moved along cavity inner wall, so that 18 top of fixed link is in contact with paper tube inner wall, paper tube is fixed In connection ring 16, move paper tube together with connection roller;After paper tube is nested into connection ring, by fixed link to paper Fixed function has been managed, has moved paper tube together with connection ring, convenient for positioning to paper tube, paper tube has been avoided to send out in connection ring Raw slipping phenomenon;After new paper tube is nested into connection ring, air cylinder driven piston rod retraction, push rod is first out of first through hole Roller is connected after abjection to start to move again, is stretched out connection roller fixed link before mobile just out of cavity and is in contact with paper tube inner wall, Make connect roller it is mobile when paper tube can be driven to move together;When adhesive material is after the completion of retracting, cylinder pushes connection roller to move It is dynamic, roller is connected after being moved to transfer roller one end, push rod is inserted into first through hole, and enter fixed link automatically in cavity, Fixed link is not in contact the fixed function lost to paper tube with paper tube, so as to which easily paper tube is removed from connection ring, with Changing to new paper tube continues to run equipment, promotes the processing efficiency of adhesive label.
Bottom of fixed is arranged in third movable chamber, and bottom of fixed is hinged with motion bar 182, is set in a connection ring There are four fixed links, and corresponding motion bar is also four, and one end of four motion bars is hinged on one point, third movable chamber Inner wall is equipped with the first groove 123, one end of motion bar and is placed in the first groove;When push rod is inserted into first through hole, Push rod is in contact with one end of motion bar, pushes motion bar one end to move in the first groove under the action of push rod, to make Motion bar drives fixed link to move in third movable chamber when moving, makes to enter inside cavity at the top of fixed link, so as to right Paper tube is dismounted.
First push plate side wall is equipped with the guide plate 171 matched with first through slot, and guide plate side wall is equipped with gear Block 172, first push plate one end are equipped with pushing block 173, and pushing block is corresponding with first through hole;When cylinder pushes the first push plate mobile, First push plate is in contact with reset spring, pushes connection roller toward one end motion of transfer roller, until the first push plate is pushed to roller is connected Behind transfer roller one end, cylinder continues to press on the first push plate, makes the second connection roller, third connection roller, the 4th connection roller upper push-rod insertion Into first through hole, pushing block is inserted into the first through hole on the 4th connection roller, moves fixed link toward cavity bottom, fixed link Top enters in cavity, to dismount to paper tube;When being installed to paper tube, paper tube is all nested on transfer roller, it will Paper tube makes innermost paper tube be in contact with the first push plate side wall upper stopper, plays the role of positioning to paper tube toward pushing inside transfer roller, After innermost paper tube is in contact with block, stop push paper tube, air cylinder driven piston rod retracts, under the action of connecting roller Automatically paper tube is spread, promotes the convenience of replacement paper tube;Reduce the first push plate under the action of block and connect roller with the 4th Distance, convenient for preferably being positioned to paper tube.
Fixed block 181 is equipped with when at the top of fixed link, it is recessed that connection ring-side wall is equipped with second matched with the fixed block Slot 162, fixed block bottom are equipped with support spring 183;When fixed link moves in cavity under the drive of motion bar, fixed link It drives fixed block to move in the second groove, is embedded into fixed block in the second groove, the second groove provides receiving for fixed block Space makes connection ring surface be in formation state, convenient for dismounting to paper tube;When push rod and pushing block are deviate from out of first through hole When, motion bar one end is no longer influenced by the effect of power, pushes fixed block up to move under the action of support spring elastic force, to make Fixed block is in contact with paper tube inner wall, plays fixed function to paper tube;Contacted by fixed block with paper tube inner wall, increase fixed link with The contact area of paper tube inner wall promotes fixed link to the fixed effect of paper tube;Paper tube is consolidated further to increase fixed block Determine effect, rubber membrane can be covered in fixed block surface, to increase the frictional force of fixed block and paper tube.
The second mounting plate 4 is equipped with above the transfer roller 1, second mounting plate 4 is equipped with multiple loose slots 41, the work Dynamic slot 41 is corresponding with the connection ring 16, and scraper plate 42 is equipped in the loose slot 41, and second mounting plate 4 is equipped with second Through-hole is equipped with connecting shaft 44 in second through-hole, and the connecting shaft 44 is arranged on the scraper plate 42, the connecting shaft 44 It is driven and cooperates with the scraper plate 42, second mounting plate 4 is equipped with the first driving for driving the connecting shaft 44 to rotate Motor 43;After paper tube is fixed in connection ring 16, adhesive material is rolled up on paper tube, and the first driving motor 43 is drivingly connected axis 44 rotations, make connecting shaft 44 that scraper plate 42 be driven to turn to paper tube two sides, and paper tube drives paper tube while rotating with transfer roller 1 On adhesive material two sides be in contact with 42 side wall of scraper plate, the flash of adhesive material two sides is struck off, at the same scraper plate 42 will Adhesive material positioning on paper tube, is set around the adhesive material after being cut on paper tube, carries out to adhesive material It collects;Strike off adhesive material can to the side wall of adhesive material when being coiled collection, Flash on adhesive material section is struck off, burr removing processing is played to adhesive material;Since scraper plate is set to paper tube two sides It is in contact with adhesive material side wall, scraper plate is made to play the role of positioning adhesive material, make adhesive material is neat to be set around On paper tube, adhesive material is avoided to collapse from paper tube;The position of scraper plate is adjusted under the action of the first driving motor, When connection roller when moving in the presence of cylinder, the first driving motor driving scraper plate is turned at the top of the second mounting plate, is avoided Scraper plate causes to hinder to the movement of connection roller;After position of the connection roller on transfer roller determines, the first driving motor drives scraper plate It moves down, matches scraper plate with paper tube side wall, convenient for playing burr removing and positioning to adhesive material under the action of scraper plate Effect.
First driving motor output shaft is equipped with the second driving wheel 431, and one end of the connecting shaft is equipped with and second driving wheel The third driving wheel 441 matched, under the mutual cooperation of the second driving wheel and third driving wheel, by the dynamic of the first driving motor Power passes to connecting shaft, rotates connecting shaft under the action of the first driving motor;It is recessed that loose slot side inner wall is equipped with third Slot 46, other side inner wall are equipped with atmospheric pressure cavity 45, are equipped with the second push plate 451, the second push plate and the scraper plate side wall in atmospheric pressure cavity It is in contact, limit spring 461 is equipped in third groove;When winding adhesive material on paper tube, the driving of the first driving motor is scraped Plate turns to the position that is in contact with adhesive material side wall, and the flash of adhesive material side wall is struck off;When being arranged on paper tube After a certain amount of adhesive material, it is filled with air-flow in atmospheric pressure cavity, increases the air pressure in atmospheric pressure cavity, pushes under the influence of air pressure Second push plate makes the second push plate that scraper plate be pushed to move toward third groove direction, and scraper plate squeezes limit spring, shortens between two scraper plates Distance, so that scraper plate is played side wall to adhesive material and play squeezing action, increase scraper plate to the cleaning effect of adhesive material side wall, It plays the role of positioning simultaneously to adhesive material, is set around adhesive material on paper tube with smooth state.
The support component include the first supporting block 32, the second supporting block 34 and third supporting block, the first supporting block and Third supporting block is respectively arranged on transfer roller both ends, and it is circular arc that the first supporting block, the second supporting block and third support block structure are identical After shape section, and it is equipped with ball on three pieces of supporting block inner walls, transfer roller is enable to be placed in normal rotation when supporting fast upper;First support Block bottom is equipped with first hydraulic cylinder 31, and the second supporting block bottom is equipped with second hydraulic cylinder 33, and third supporting block bottom is equipped with support Seat, when transfer roller rotation is collected adhesive material, first hydraulic cylinder drives the first supporting block to extend, and makes the first support Block and third supporting block, which cooperate, provides support force for transfer roller;When replacing to paper tube, cylinder pushes to connection ring Transfer roller one end, second hydraulic cylinder drive the second supporting block up to move, so that the second supporting block is in contact with transfer roller, the second supporting block It is not in contact with connection ring in connection ring side, first hydraulic cylinder drives the first supporting block to move down, so as to convenient Paper tube is removed from connection ring, paper tube is replaced.
After the adhesive material on the paper tube in connection ring reaches predetermined amount, adhesive material is cut, cylinder It pushes the first push plate toward one end motion of the first movable chamber, the first push plate is made to push connection roller close to each other, insert connection roller successively Enter into adjacent connection roller, connection ring is pressed in transfer roller one end;Cylinder continues to press on push plate, and pushing block and push rod is made to be inserted into In one through-hole, fixed block is entered in the second groove, loses the fixed function to paper tube, and the first supporting block and the second supporting block are matched It closes and exchanges, the paper tube for being wound with adhesive material is removed from connection ring, then new paper tube is nested into connection ring, paper tube It pushes paper tube inside after being nested into connection ring, makes paper tube toward transfer roller internal motion, until innermost paper tube and guide block phase After contact, stop being packed into paper tube, air cylinder driven piston rod back moves, and pushing block and push rod are first deviate from out of first through hole, fixed Block is stretched out out of second groove to be in contact with paper tube inner wall, plays fixed function to paper tube;Then work of the connection roller in reset spring Initial position is moved under, connection ring is driven to move together, makes connection ring that paper tube be driven to move together, paper tube is uniformly spread On transfer roller, the replacement of paper tube is completed, equipment is continued to run.
Embodiment 2:
A kind of adhesive label production technology, comprising: a, blanking procedure: blanking personnel notify according to the blanking that production division issues It is single, defined adhesive material is got from raw material silo, checks its model, and fills in outbound list;Raw material is put into cutting machine In, the raw material after making cutting is rolled into a roll in collecting device;B, plate-making, inking process: plate-making personnel are responsible for signing for design portion The egative film and tinctorial pattern that door provides, check the quality of egative film, the mark content of quantity, egative film including egative film, text, lines, net The edge actual situation degree of point, dot density, the contents such as register degree between color separation film;C, printing process: printing personnel are first According to production subpoena and process chart requirement, corresponding halftone, ink, adhesive material are got, and carries out mutually inspection work;It checks After errorless, fixed halftone simultaneously debugs net away from then being positioned with adhesive sticker locator material, then begin to print;D, cutting die system Make, die cutting procedure: design department makes the cutting die line pattern of final finished by drawing, gives cutting die producer, verification After errorless, pattern is pasted on plastic plate, goes out graph outline by cutting die scroll saw with sawing machine;E, testing stage before rubber patch: to mould It cuts semi-finished product to be checked on the quality in waste discharge according to quality control standards (QCS), distinguishes the qualified product and rejected product after checking, and with again Film paper slip identifies in case subsequent processing is received;It need to reprocess, fill in and reprocess list and retract concerned process steps;F, it rubber patch process: presses Shine into expect-vacuumize-cleaning robot-row steep-drips the closed process of glue-repairing-and completes rubber patch;G, arranging process: whole Reason personnel get semi-finished product to upper process, put clear quantity, distinguish qualified product and rejected product;Selected by plate-making in the step b Silk screen tension is in 8kg/cm2;Net is removed from Stretching machine after placing 12h after adhesive material brush coating in the step b Version;Surrounding is sealed with block adhesive tape before printing down, and is placed 4 days;Halftone in the step b carries out new halftone before frictioning Degreasing and roughening treatment, then pour into photosensitizer in glass in darkroom, add water 100mL, are sufficiently stirred;The step b In adhesive material lain against in baking oven after frictioning, oven temperature is 30 DEG C, places 0.5h to dry thorough;The collection Equipment is identical as the collecting device structure in embodiment 1.
Embodiment 3:
A kind of adhesive label production technology, comprising: a, blanking procedure: blanking personnel notify according to the blanking that production division issues It is single, defined adhesive material is got from raw material silo, checks its model, and fills in outbound list;Raw material is put into cutting machine In, the raw material after making cutting is rolled into a roll in collecting device;B, plate-making, inking process: plate-making personnel are responsible for signing for design portion The egative film and tinctorial pattern that door provides, check the quality of egative film, the mark content of quantity, egative film including egative film, text, lines, net The edge actual situation degree of point, dot density, the contents such as register degree between color separation film;C, printing process: printing personnel are first According to production subpoena and process chart requirement, corresponding halftone, ink, adhesive material are got, and carries out mutually inspection work;It checks After errorless, fixed halftone simultaneously debugs net away from then being positioned with adhesive sticker locator material, then begin to print;D, cutting die system Make, die cutting procedure: design department makes the cutting die line pattern of final finished by drawing, gives cutting die producer, verification After errorless, pattern is pasted on plastic plate, goes out graph outline by cutting die scroll saw with sawing machine;E, testing stage before rubber patch: to mould It cuts semi-finished product to be checked on the quality in waste discharge according to quality control standards (QCS), distinguishes the qualified product and rejected product after checking, and with again Film paper slip identifies in case subsequent processing is received;It need to reprocess, fill in and reprocess list and retract concerned process steps;F, it rubber patch process: presses Shine into expect-vacuumize-cleaning robot-row steep-drips the closed process of glue-repairing-and completes rubber patch;G, arranging process: whole Reason personnel get semi-finished product to upper process, put clear quantity, distinguish qualified product and rejected product;Selected by plate-making in the step b Silk screen tension is in 7kg/cm2;Net is removed from Stretching machine after placing 12h after adhesive material brush coating in the step b Version;Surrounding is sealed with block adhesive tape before printing down, and is placed 3 days;Halftone in the step b carries out new halftone before frictioning Degreasing and roughening treatment, then pour into photosensitizer in glass in darkroom, add water 90mL, are sufficiently stirred;In the step b Adhesive material lain against in baking oven after frictioning, oven temperature is 35 DEG C, places 0.5h to dry thorough;The collection is set It is standby identical as collecting device structure in embodiment 1.

Claims (7)

1. a kind of adhesive label production technology, it is characterised in that: include:
A, blanking procedure: the blanking notification sheet that blanking personnel issue according to production division, from raw material silo get as defined in do not do Glue material checks its model, and fills in outbound list;Raw material is put into cutting machine, the raw material after making cutting is in collecting device Inside it is rolled into a roll;
B, plate-making, inking process: plate-making personnel are responsible for signing for the egative film and tinctorial pattern of design department's offer, check the quality of egative film, The mark content of quantity, egative film including egative film, text, lines, site edge actual situation degree, dot density, color separation film it Between the contents such as register degree;
C, printing process: printing personnel according to production subpoena and process chart requirement, get corresponding halftone, ink, no first Dry glue material, and carry out mutually inspection work;Check it is errorless after, fixed halftone and debug net away from, then with adhesive sticker locator material into Row positioning, then begins to print;
D, cutting die production, die cutting procedure: design department makes the cutting die line pattern of final finished by drawing, gives cutting die system Make personnel, after confirmation, pattern is pasted on plastic plate, goes out graph outline by cutting die scroll saw with sawing machine;
E, it testing stage before rubber patch: is checked on the quality in waste discharge according to quality control standards (QCS) to cross cutting semi-finished product, after distinguishing inspection Qualified product and rejected product, and with laminating adhesive paper slip identify in case subsequent processing receive;It need to reprocess, fill in and reprocess list and move back Return concerned process steps;
F, rubber patch process: according to feed-vacuumize-cleaning robot-row steep-drips the closed process of glue-repairing-and completes drop Modeling;
G, arranging process: arrangement personnel get semi-finished product to upper process, put clear quantity, distinguish qualified product and rejected product;
Wherein, the collecting device in the step a include transfer roller (1) and be set to the transfer roller (1) below support component, it is described Transfer roller (1) is equipped with the first movable chamber, and the first connection roller (12), the second connection roller (13), the are equipped in first movable chamber Three connections roller (14) and the 4th connection roller (15), first connection roller (12), the second connection roller (13), third connection roller (14) And the 4th connection roller (15) be sequentially connected, and it is described first connection roller (12), second connection roller (13), third connection roller (14) and The diameter of 4th connection roller (15) is sequentially reduced, and first connection roller (12) is equipped with the second movable chamber, second connection Roller (13) is arranged in second movable chamber, and reset spring (124) are additionally provided in second movable chamber;Second connection Roller (13), third connection roller (14) and the 4th connection roller (15) structure are identical as first connection roller (11), institute Transfer roller (1) side is stated equipped with the first mounting plate (2), first mounting plate (2) is equipped with cylinder (21), and the cylinder (21) is living Stopper rod is equipped with the first push plate (17), and first push plate (17) is set in first movable chamber, the first connection roller (12), connection ring (16) are respectively equipped in the second connection roller (13), third connection roller (14) and the 4th connection roller (15);Adhesive sticker Adhesive material is put into cutting machine and is cut to adhesive material after raw material silo taking-up by material, cylinder (21) The first push plate (17) movement in the first movable chamber is pushed, makes the first push plate (17) that the connection roller in the first movable chamber to be pushed to move It is dynamic, it is inserted into the 4th connection roller (15) in third connection roller (14), third connection roller (14) is inserted into the second connection roller (13) Interior, the second connection roller (13) is inserted into the first connection roller (12), and the connection rings (16) on four connection rollers are close to each other, will be with The paper tube of connection ring (16) corresponding number is nested on transfer roller (1), is placed on paper tube on connection ring (16), pushes paper tube, until Innermost paper tube side wall is in contact with the first push plate (17) side wall, and cylinder (21) recycles piston rod, and connection roller is resetting bullet The effect of spring (124) elastic force is lower to be resetted, and moves to connection roller on initial position, and the paper tube that will be sheathed on connection roller separates, and is made Paper tube on each connection roller collects the adhesive material after the completion of being cut respectively.
2. a kind of adhesive label production technology described in accordance with the claim 1, it is characterised in that: the plate-making in the step b Selected silk screen tension is in 6~8kg/cm2
3. a kind of adhesive label production technology described in accordance with the claim 1, it is characterised in that: not doing in the step b Halftone is removed from Stretching machine after placing 12h after glue material brush coating;Surrounding is sealed with block adhesive tape before printing down, and places 3~4 It.
4. a kind of adhesive label production technology described in accordance with the claim 1, it is characterised in that: the halftone in the step b Before frictioning, degreasing and roughening treatment are carried out to new halftone, then pour into photosensitizer in glass in darkroom, add water 80~ 100mL is sufficiently stirred.
5. a kind of adhesive label production technology described in accordance with the claim 1, it is characterised in that: not doing in the step b Glue material is lain against in baking oven after frictioning, and oven temperature is less than or equal to 40 DEG C, and it is thorough to drying to place 0.5h.
6. a kind of adhesive label production technology described in accordance with the claim 1, it is characterised in that: first connection roller (12) Interior to be equipped with third movable chamber (121), the third movable chamber (121) is set to second movable chamber side, the third activity Chamber (121) side wall be equipped with first through hole (122), the third movable chamber (121) by the first through hole (122) with it is described Second movable chamber communicates, and the connection ring (16) is equipped with cavity, is equipped with fixed link (18) in the cavity, and described second connects It connects roller (13) one end and is equipped with the push rod (131) matched with the first through hole (122), when the push rod (131) is inserted into institute State first through hole (122) it is interior when, the fixed link (18) toward the cavity bottom move;When paper tube is covered upper transfer roller (1), gas Cylinder (21) pushes the first push plate (17) movement in the first movable chamber, so that the second connection roller (13) is pushed into the second movable chamber Interior, after the second connection roller (13) enters in the second movable chamber, push rod (131) is inserted into first through hole (122), makes push rod (131) driving fixed link (18) is moved toward cavity bottom, is entered in cavity at the top of fixed link (18), is made connection ring (16) surface In formation state, keep paper tube unobstructed when being inserted in transfer roller (1);After paper tube is nested on transfer roller (1), cylinder (21) is returned Contracting piston rod moves push rod (131) abjection, fixed link (18) out of first through hole (122) up along cavity inner wall, makes solid It is in contact at the top of fixed pole (18) with paper tube inner wall, paper tube is fixed on connection ring (16), move paper tube together with connection roller It is dynamic.
7. a kind of adhesive label production technology described in accordance with the claim 1, it is characterised in that: set above the transfer roller (1) Have the second mounting plate (4), second mounting plate (4) is equipped with multiple loose slots (41), the loose slot (41) and the company It is corresponding to connect ring (16), is equipped with scraper plate (42) in the loose slot (41), second mounting plate (4) is equipped with the second through-hole, It is equipped in second through-hole connecting shaft (44), the connecting shaft (44) is arranged on the scraper plate (42), the connecting shaft (44) cooperate with the scraper plate (42) transmission, second mounting plate (4) is equipped with for driving the connecting shaft (44) to rotate The first driving motor (43);After paper tube is fixed on connection ring (16), adhesive material is rolled up on paper tube, the first driving electricity Machine (43) is drivingly connected axis (44) rotation, makes connecting shaft (44) that scraper plate (42) to be driven to turn to paper tube two sides, and paper tube is with turning While roller (1) rotates, the adhesive material two sides on paper tube are driven to be in contact with scraper plate (42) side wall, by adhesive material two The flash of side strikes off, at the same scraper plate (42) by paper tube adhesive material position, make the adhesive material after being cut around On paper tube, adhesive material is collected.
CN201910487048.2A 2019-06-05 2019-06-05 Production process of adhesive sticker label Active CN110216734B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202011017634.XA CN112223409A (en) 2019-06-05 2019-06-05 Production process of adhesive sticker label convenient to operate
CN201910487048.2A CN110216734B (en) 2019-06-05 2019-06-05 Production process of adhesive sticker label

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910487048.2A CN110216734B (en) 2019-06-05 2019-06-05 Production process of adhesive sticker label

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN202011017634.XA Division CN112223409A (en) 2019-06-05 2019-06-05 Production process of adhesive sticker label convenient to operate

Publications (2)

Publication Number Publication Date
CN110216734A true CN110216734A (en) 2019-09-10
CN110216734B CN110216734B (en) 2021-02-26

Family

ID=67819426

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201910487048.2A Active CN110216734B (en) 2019-06-05 2019-06-05 Production process of adhesive sticker label
CN202011017634.XA Withdrawn CN112223409A (en) 2019-06-05 2019-06-05 Production process of adhesive sticker label convenient to operate

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN202011017634.XA Withdrawn CN112223409A (en) 2019-06-05 2019-06-05 Production process of adhesive sticker label convenient to operate

Country Status (1)

Country Link
CN (2) CN110216734B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111761939A (en) * 2020-07-13 2020-10-13 宁波兆荣文化科技股份有限公司 Table game card printing process and method
CN112572005A (en) * 2019-09-30 2021-03-30 昆山市蓝天印务有限公司 Peanut production process with self-adhesive label

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201677351U (en) * 2009-11-30 2010-12-22 宝利时(深圳)胶粘制品有限公司 Machine capable of automatically cutting and discharging adhesive tape
CN102267142A (en) * 2011-07-19 2011-12-07 杜建刚 Die cutting machine using combined die cutting method and being applicable to winding drum material
JP2014147991A (en) * 2013-01-31 2014-08-21 Brother Ind Ltd Tape printing device
CN207465390U (en) * 2017-11-01 2018-06-08 绍兴市上虞华扬印制有限公司 A kind of die-cutting machine that material warning function is lacked with feed end
CN108422476A (en) * 2018-05-15 2018-08-21 雷淑娟 A kind of prepared slices of Chinese crude drugs slicing device
CN208773721U (en) * 2018-08-17 2019-04-23 深圳市友事达塑胶制品有限公司 A kind of die-cutting machine cleaning device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201677351U (en) * 2009-11-30 2010-12-22 宝利时(深圳)胶粘制品有限公司 Machine capable of automatically cutting and discharging adhesive tape
CN102267142A (en) * 2011-07-19 2011-12-07 杜建刚 Die cutting machine using combined die cutting method and being applicable to winding drum material
JP2014147991A (en) * 2013-01-31 2014-08-21 Brother Ind Ltd Tape printing device
CN207465390U (en) * 2017-11-01 2018-06-08 绍兴市上虞华扬印制有限公司 A kind of die-cutting machine that material warning function is lacked with feed end
CN108422476A (en) * 2018-05-15 2018-08-21 雷淑娟 A kind of prepared slices of Chinese crude drugs slicing device
CN208773721U (en) * 2018-08-17 2019-04-23 深圳市友事达塑胶制品有限公司 A kind of die-cutting machine cleaning device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112572005A (en) * 2019-09-30 2021-03-30 昆山市蓝天印务有限公司 Peanut production process with self-adhesive label
CN111761939A (en) * 2020-07-13 2020-10-13 宁波兆荣文化科技股份有限公司 Table game card printing process and method

Also Published As

Publication number Publication date
CN112223409A (en) 2021-01-15
CN110216734B (en) 2021-02-26

Similar Documents

Publication Publication Date Title
CN110216734A (en) A kind of adhesive label production technology
CN105728362B (en) Waste discharge film recovery method and waste discharge film-recovering machine
CN110223597B (en) Adhesive sticker manufacturing process
CN108214992A (en) A kind of ditch plastic bag recovery water removal device
CN111619222B (en) Printing laminating equipment
CN106179865B (en) A kind of overlay film coating process and device
CN104309877A (en) Special automatic label pasting device for blood collection tube
CN201510967U (en) Battery gluing mechanism and full-automatic veneering pad machine applying the same
CN105645150A (en) Full-automatic rolling packaging equipment for heat-shrinkable sheets
CN204316278U (en) A kind of magnetic steel separating device
CN207773674U (en) A kind of shuttlecock processing labeling glue spreading apparatus
CN207208579U (en) A kind of film sticking apparatus for laminating machine
CN216736879U (en) Numerical control die cutting device for adhesive labels
CN108724314A (en) A kind of automatic detection waste discharge film repair machine
CN203397082U (en) Process equipment for refitting and assembling photosensitive drums of toner cartridges
CN208869042U (en) A kind of label roll automatic blanking device
CN113598246A (en) Withering machine capable of being heated uniformly and keeping tea blank leaves complete
CN113477737B (en) Capacitor shell mold equipped with automatic demolding device
CN112676395A (en) Bending and forming machine for building construction
CN111700734A (en) Production facility of panty-shape diapers core
CN108557203A (en) Battery core tape sticking device
CN113895050B (en) Preparation process of table tennis bat rubber
CN115447271B (en) Energy-saving and environment-friendly cigarette packaging printing equipment
CN220720612U (en) Multistage rapid curing device for label printing
CN212490421U (en) Production facility of panty-shape diapers core

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210203

Address after: 528300 Guangdong Province Foshan Shunde District Beijiao town Shunjiang community residents committee Industrial Park Xingye East Road 2-2 Qide real estate Park Phase 2 Building 4 301 (residence declaration)

Applicant after: Guangdong Rongke Industrial Co.,Ltd.

Address before: 313300 tianzihu modern industrial park, Anji County, Huzhou City, Zhejiang Province

Applicant before: ZHEJIANG SUOFAN ADHESIVE PRODUCTS Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant