CN110216734A - A kind of adhesive label production technology - Google Patents
A kind of adhesive label production technology Download PDFInfo
- Publication number
- CN110216734A CN110216734A CN201910487048.2A CN201910487048A CN110216734A CN 110216734 A CN110216734 A CN 110216734A CN 201910487048 A CN201910487048 A CN 201910487048A CN 110216734 A CN110216734 A CN 110216734A
- Authority
- CN
- China
- Prior art keywords
- roller
- paper tube
- connection
- connection roller
- movable chamber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B26—HAND CUTTING TOOLS; CUTTING; SEVERING
- B26D—CUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
- B26D11/00—Combinations of several similar cutting apparatus
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B26—HAND CUTTING TOOLS; CUTTING; SEVERING
- B26D—CUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
- B26D7/00—Details of apparatus for cutting, cutting-out, stamping-out, punching, perforating, or severing by means other than cutting
- B26D7/27—Means for performing other operations combined with cutting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B26—HAND CUTTING TOOLS; CUTTING; SEVERING
- B26D—CUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
- B26D7/00—Details of apparatus for cutting, cutting-out, stamping-out, punching, perforating, or severing by means other than cutting
- B26D7/27—Means for performing other operations combined with cutting
- B26D7/32—Means for performing other operations combined with cutting for conveying or stacking cut product
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B26—HAND CUTTING TOOLS; CUTTING; SEVERING
- B26F—PERFORATING; PUNCHING; CUTTING-OUT; STAMPING-OUT; SEVERING BY MEANS OTHER THAN CUTTING
- B26F1/00—Perforating; Punching; Cutting-out; Stamping-out; Apparatus therefor
- B26F1/38—Cutting-out; Stamping-out
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B41—PRINTING; LINING MACHINES; TYPEWRITERS; STAMPS
- B41C—PROCESSES FOR THE MANUFACTURE OR REPRODUCTION OF PRINTING SURFACES
- B41C1/00—Forme preparation
- B41C1/14—Forme preparation for stencil-printing or silk-screen printing
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B41—PRINTING; LINING MACHINES; TYPEWRITERS; STAMPS
- B41M—PRINTING, DUPLICATING, MARKING, OR COPYING PROCESSES; COLOUR PRINTING
- B41M1/00—Inking and printing with a printer's forme
- B41M1/12—Stencil printing; Silk-screen printing
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09F—DISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
- G09F3/00—Labels, tag tickets, or similar identification or indication means; Seals; Postage or like stamps
- G09F3/08—Fastening or securing by means not forming part of the material of the label itself
- G09F3/10—Fastening or securing by means not forming part of the material of the label itself by an adhesive layer
Abstract
The invention discloses a kind of adhesive label production technologies, comprising: a, blanking procedure;B, plate-making, inking process;C, printing process;D, cutting die production, die cutting procedure: design department makes the cutting die line pattern of final finished by drawing, gives cutting die producer, after confirmation, pattern is pasted on plastic plate, goes out graph outline by cutting die scroll saw with sawing machine;E, testing stage before rubber patch: checking on the quality to cross cutting semi-finished product in waste discharge according to quality control standards (QCS), distinguishes the qualified product and rejected product after checking, and is identified with laminating adhesive paper slip in case subsequent processing is received;It need to reprocess, fill in and reprocess list and retract concerned process steps;F, rubber patch process: according to feed-vacuumize-cleaning robot-row steep-drips the closed process of glue-repairing-and completes rubber patch;G, arranging process.
Description
Technical field
The invention belongs to adhesive sticker processing technique fields, more particularly, to a kind of adhesive label production technology.
Background technique
Adhesive label impact paper etc. is using paper, film or special material as fabric, and the back side is coated with adhesive, to apply
Silicon base stock is a kind of composite material of protection sheet, and becomes finished product labeling after the processing such as being printed, being die cut.In application, only need to be from
It removes, gently presses on base stock, the surface of various substrates can be attached to, it is possible to use labelling machine automatic labeling in the production line.
Adhesive label needs adhesive material doing slitting treatment in process of production, by the adhesive material after cutting
It is wound on paper tube, adhesive material is collected, existing collect to material after cutting is usually that paper tube is nested into transfer roller
On, then manually put paper tube uniformly to collect the adhesive material after cutting on transfer roller, worker is putting paper tube manually
Shi Wufa accurately controls position, is easy that paper tube is made to misplace, while worker needs to put manually paper tube to be inserted on transfer roller also
It is good, the time for being inserted in paper tube is increased, the production efficiency of adhesive label is influenced.
Summary of the invention
The present invention for overcome the deficiencies in the prior art, provides a kind of adhesive label production technology.
To achieve the goals above, the invention adopts the following technical scheme: a kind of adhesive label production technology, comprising:
A, blanking procedure: the blanking notification sheet that blanking personnel issue according to production division, from raw material silo get as defined in do not do
Glue material checks its model, and fills in outbound list;Raw material is put into cutting machine, the raw material after making cutting is in collecting device
Inside it is rolled into a roll;
B, plate-making, inking process: plate-making personnel are responsible for signing for the egative film and tinctorial pattern of design department's offer, check the quality of egative film,
The mark content of quantity, egative film including egative film, text, lines, site edge actual situation degree, dot density, color separation film it
Between the contents such as register degree;
C, printing process: printing personnel according to production subpoena and process chart requirement, get corresponding halftone, ink, no first
Dry glue material, and carry out mutually inspection work;Check it is errorless after, fixed halftone and debug net away from, then with adhesive sticker locator material into
Row positioning, then begins to print;
D, cutting die production, die cutting procedure: design department makes the cutting die line pattern of final finished by drawing, gives cutting die system
Make personnel, after confirmation, pattern is pasted on plastic plate, goes out graph outline by cutting die scroll saw with sawing machine;
E, it testing stage before rubber patch: is checked on the quality in waste discharge according to quality control standards (QCS) to cross cutting semi-finished product, after distinguishing inspection
Qualified product and rejected product, and with laminating adhesive paper slip identify in case subsequent processing receive;It need to reprocess, fill in and reprocess list and move back
Return concerned process steps;
F, rubber patch process: according to feed-vacuumize-cleaning robot-row steep-drips the closed process of glue-repairing-and completes drop
Modeling;
G, arranging process: arrangement personnel get semi-finished product to upper process, put clear quantity, distinguish qualified product and rejected product;
Wherein, the collecting device in the step a includes transfer roller and the support component below the transfer roller, on the transfer roller
The first connection roller, the second connection roller, third connection roller and the 4th connection are equipped with equipped with the first movable chamber, in first movable chamber
Roller, the first connection roller, the second connection roller, third connection roller and the 4th connection roller are sequentially connected, and the first connection roller,
The diameter of second connection roller, third connection roller and the 4th connection roller is sequentially reduced, and the first connection roller is equipped with the second activity
Chamber, the second connection roller are arranged in second movable chamber, are additionally provided with reset spring in second movable chamber;Described
Two connection rollers, third connection roller and the 4th connection roll structure are identical as the first connection roller, the transfer roller side
Equipped with the first mounting plate, first mounting plate be equipped with cylinder, the cylinder piston rod be equipped with the first push plate, described first
Push plate divides on the first connection roller, the second connection roller, third connection roller and the 4th connection roller in first movable chamber
It She You not connection ring;Adhesive material is put into cutting machine to adhesive sticker material by adhesive material after raw material silo taking-up
Material is cut, and cylinder pushes the first push plate to move in the first movable chamber, and the first push plate is made to push the company in the first movable chamber
It is mobile to connect roller, is inserted into the 4th connection roller in third connection roller, third connection roller is inserted into the second connection roller, the second connection
Roller is inserted into the first connection roller, and the connection ring on four connection rollers is close to each other, by the paper tube set with connection ring corresponding number
Enter onto transfer roller, be placed on paper tube in connection ring, push paper tube, until innermost paper tube side wall connects with the first push plate side wall
Touching, cylinder will or piston rod recycling, connection roller reset spring elastic force effect under reset, make connect roller move to initial position
On, the paper tube being sheathed on connection roller is separated, the paper tube on each connection roller is made to collect not doing after the completion of being cut respectively
Glue material.
Connection ring is all pushed to transfer roller one end by way of cylinder pushes the first push plate, connection ring is made to be in one
The paper tube of preset quantity, can all be nested on transfer roller by place together, and by paper tube toward pushing inside transfer roller, the first push plate is to paper tube
The movable maximum distance of institute provides constraints, and keeps paper tube corresponding with each connection ring, then under the action of reset spring
Make to connect roller movement, connect roller movement and drive connection ring mobile, makes connection ring that paper tube can exist automatically with when connecting roller movement
Position is set on transfer roller, is placed in paper tube uniformly on transfer roller convenient for being collected to the adhesive material after cutting;Pass through
The mutual cooperation for connecting roller, cylinder and reset spring, puts paper tube automatically on transfer roller
It is good, paper tube is put without manually going, shortens and is arranged the paper tube time, so that the operation for being arranged paper tube is become more convenient, is promoted not
The production efficiency of dry glue labeling;After the good adhesive material of winding on paper tube, the head of adhesive material is cut off, cylinder pushes the
One push plate moves forward, makes push rod push connection roller toward one end motion of transfer roller, paper tube is all pushed to transfer roller one end, can be facilitated
Paper tube is taken out from transfer roller, promoted to the collection efficiency of paper tube.
Silk screen tension selected by plate-making in the step b is in 6~8kg/cm2;By the suitable tension of silk screen to mention
Plate-making effect is risen, guarantees the beauty of version type, promotes final product quality.
Halftone is removed from Stretching machine after placing 12h after adhesive material brush coating in the step b;Block is used before printing down
Adhesive tape seals surrounding, and places 3~4 days;Glue is adhered to preferably on adhesive material by prolonged mode, is promoted
The fiting effect of glue and adhesive material.
Halftone in the step b carries out degreasing and roughening treatment before frictioning, to new halftone, then by light in darkroom
Quick dose is poured into glass, is added 80~100mL of water, is sufficiently stirred;Photosensitizer will be made adequately soluble in water under stirring,
Required photosensitizer raw material is made, to do further processing processing to adhesive label.
Adhesive material in the step b is lain against in baking oven after frictioning, and oven temperature is less than or equal to 40 DEG C, is placed
0.5h is thorough to drying;Temperature in baking oven is controlled, avoids temperature is excessively high from impacting to glue, makes glue higher
At a temperature of its internal moisture is evaporated, to obtain the preferable finished product of viscosity.
It is equipped with third movable chamber in the first connection roller, the third movable chamber is set to second movable chamber side,
The third movable chamber side wall is equipped with first through hole, and the third movable chamber passes through the first through hole and second activity
Chamber communicates, and the connection ring is equipped with cavity, and fixed link is equipped in the cavity, and second connection roller one end is equipped with and institute
The push rod that first through hole matches is stated, when the push rod is inserted into the first through hole, the fixed link is toward the cavity
Bottom movement;When paper tube is covered upper transfer roller, cylinder pushes the first push plate to move in the first movable chamber, thus by the second connection
Roller is pushed into the second movable chamber, and after the second connection roller enters in the second movable chamber, push rod is inserted into first through hole, is made
Push rod drives fixed link to move toward cavity bottom, enters in cavity at the top of fixed link, and connection ring surface is made to be in formation state,
Keep paper tube unobstructed when being inserted in transfer roller;After paper tube is nested on transfer roller, cylinder retract piston bar keeps push rod logical from first
Deviate from hole, fixed link is up moved along cavity inner wall, makes to be in contact at the top of fixed link with paper tube inner wall, paper tube is fixed on
In connection ring, move paper tube together with connection roller;After paper tube is nested into connection ring, paper tube is risen by fixed link
Fixed function moves paper tube together with connection ring, convenient for positioning to paper tube, paper tube is avoided to occur to beat in connection ring
Sliding phenomenon;After new paper tube is nested into connection ring, air cylinder driven piston rod retraction, push rod is first deviate from out of first through hole
Connection roller starts to move again afterwards, stretches out connection roller fixed link before mobile just out of cavity and is in contact with paper tube inner wall, makes to connect
Connect roller it is mobile when paper tube can be driven to move together;When adhesive material is after the completion of retracting, cylinder pushes connection roller mobile, even
Roller is connect after being moved to transfer roller one end, push rod is inserted into first through hole, enters fixed link automatically in cavity, fixed link
Be not in contact the fixed function lost to paper tube with paper tube, new to change to so as to easily remove paper tube from connection ring
Paper tube continue to run equipment, promote the processing efficiency of adhesive label.
The second mounting plate is equipped with above the transfer roller, second mounting plate is equipped with multiple loose slots, the loose slot
It is corresponding with the connection ring, it is equipped with scraper plate in the loose slot, second mounting plate is equipped with the second through-hole, and described second
Connecting shaft is equipped in through-hole, the connecting shaft is arranged on the scraper plate, and the connecting shaft and scraper plate transmission cooperate, institute
The second mounting plate is stated equipped with for driving the first driving motor of the connecting shaft rotation;After paper tube is fixed in connection ring,
Adhesive material is rolled up on paper tube, and the first driving motor is drivingly connected axis rotation, makes connecting shaft that scraper plate be driven to turn to paper tube
Two sides, paper tube drive the adhesive material two sides on paper tube to be in contact with scraper plate side wall while rotating with transfer roller, will not
The flash of dry glue material two sides strikes off, while scraper plate positions the adhesive material on paper tube, makes the adhesive sticker material after being cut
Material is set around on paper tube, is collected to adhesive material;Adhesive material is set to be coiled collection under the action of scraper plate
When the side wall of adhesive material can be struck off, the flash on adhesive material section is struck off, to adhesive material rise
To burr removing processing;It is in contact since scraper plate is set to paper tube two sides with adhesive material side wall, plays scraper plate to adhesive material
Positioning action makes adhesive material is neat to be set around on paper tube, adhesive material is avoided to collapse from paper tube;In the first driving
The position of scraper plate is adjusted under the action of motor, when connection roller when moving in the presence of cylinder, the first driving motor
Driving scraper plate turns at the top of the second mounting plate, and scraper plate is avoided to cause to hinder to the movement of connection roller;When connection roller is on transfer roller
Position determine after, the first driving motor driving scraper plate move down, match scraper plate with paper tube side wall, convenient in scraper plate
Burr removing and positioning action are played to adhesive material under effect.
The invention has the following advantages that being nested by the mutual cooperation of connection roller, cylinder and reset spring by paper tube
It sets paper tube automatically on transfer roller, puts paper tube without manually going, shorten and be arranged the paper tube time, make to be arranged
The operation of paper tube becomes more convenient, promotes the production efficiency of adhesive label.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of collecting device of the present invention.
Fig. 2 is the diagrammatic cross-section one of collecting device of the present invention.
Fig. 3 is enlarged drawing at the A in Fig. 2.
Fig. 4 is the diagrammatic cross-section two of collecting device of the present invention.
Fig. 5 is enlarged drawing at the B in Fig. 4.
Fig. 6 is enlarged drawing at the C in Fig. 4.
Fig. 7 is enlarged drawing at the D in Fig. 4.
Specific embodiment
Embodiment 1:
A kind of adhesive label production technology, comprising: a, blanking procedure: blanking personnel notify according to the blanking that production division issues
It is single, defined adhesive material is got from raw material silo, checks its model, and fills in outbound list;Raw material is put into cutting machine
In, the raw material after making cutting is rolled into a roll in collecting device;B, plate-making, inking process: plate-making personnel are responsible for signing for design portion
The egative film and tinctorial pattern that door provides, check the quality of egative film, the mark content of quantity, egative film including egative film, text, lines, net
The edge actual situation degree of point, dot density, the contents such as register degree between color separation film;C, printing process: printing personnel are first
According to production subpoena and process chart requirement, corresponding halftone, ink, adhesive material are got, and carries out mutually inspection work;It checks
After errorless, fixed halftone simultaneously debugs net away from then being positioned with adhesive sticker locator material, then begin to print;D, cutting die system
Make, die cutting procedure: design department makes the cutting die line pattern of final finished by drawing, gives cutting die producer, verification
After errorless, pattern is pasted on plastic plate, goes out graph outline by cutting die scroll saw with sawing machine;E, testing stage before rubber patch: to mould
It cuts semi-finished product to be checked on the quality in waste discharge according to quality control standards (QCS), distinguishes the qualified product and rejected product after checking, and with again
Film paper slip identifies in case subsequent processing is received;It need to reprocess, fill in and reprocess list and retract concerned process steps;F, it rubber patch process: presses
Shine into expect-vacuumize-cleaning robot-row steep-drips the closed process of glue-repairing-and completes rubber patch;G, arranging process: whole
Reason personnel get semi-finished product to upper process, put clear quantity, distinguish qualified product and rejected product;Selected by plate-making in the step b
Silk screen tension is in 6kg/cm2;Net is removed from Stretching machine after placing 12h after adhesive material brush coating in the step b
Version;Surrounding is sealed with block adhesive tape before printing down, and is placed 3 days;Halftone in the step b carries out new halftone before frictioning
Degreasing and roughening treatment, then pour into photosensitizer in glass in darkroom, add water 80mL, are sufficiently stirred;In the step b
Adhesive material lain against in baking oven after frictioning, oven temperature is 40 DEG C, places 0.5h to dry thorough.
As shown in figs. 1-7, the collecting device in the step a includes transfer roller 1 and the support group set on 1 lower section of transfer roller
Part, the transfer roller 1 are equipped with the first movable chamber, and the first connection roller 12, second is equipped in first movable chamber and connects roller 13, the
Three connection rollers 14 and the 4th connection roller 15, the first connection roller 12, second connect roller 13, third connection roller 14 and the 4th connection
Roller 15 is sequentially connected, and the first connection roller 12, second connects the diameter of roller 13, third connection roller 14 and the 4th connection roller 15
It is sequentially reduced, the first connection roller 12 is equipped with the second movable chamber, and the second connection roller 13 is arranged in second activity
It is intracavitary, reset spring 124 is additionally provided in second movable chamber;The second connection roller 13, third connection roller 14 and institute
It is identical as the first connection roller 11 to state the 4th connection 15 structure of roller, 1 side of transfer roller is equipped with the first mounting plate 2, and described the
One mounting plate 2 is equipped with cylinder 21, and being rotatably connected on 21 piston rod of cylinder has the first push plate 17, first push plate 17
In first movable chamber, the first connection roller 12, second connects roller 13, third connection roller 14 and the 4th connection roller 15
On be respectively equipped with connection ring 16;Adhesive material is put into cutting machine to not by adhesive material after raw material silo taking-up
Dry glue material is cut, and cylinder 21 pushes the first push plate 17 to move in the first movable chamber, and the first push plate 17 is made to push first
Connection roller in movable chamber is mobile, is inserted into the 4th connection roller 15 in third connection roller 14, and third connection roller 14 is inserted into the
In two connection rollers 13, the second connection roller 13 is inserted into the first connection roller 12, and the connection ring 16 on four connection rollers is close to each other,
It will be nested on transfer roller 1 with the paper tube of 16 corresponding number of connection ring, be placed on paper tube in connection ring 16, push paper tube, until most
The paper tube side wall of inside is in contact with 17 side wall of the first push plate, and cylinder 21 recycles piston rod, connects roller in 124 bullet of reset spring
Power effect is lower to be resetted, and moves to connection roller on initial position, and the paper tube that will be sheathed on connection roller separates, and makes each connection roller
On paper tube collect the adhesive material after the completion of being cut respectively.
Connection ring is all pushed to transfer roller one end by way of cylinder pushes the first push plate, connection ring is made to be in one
The paper tube of preset quantity, can all be nested on transfer roller by place together, and by paper tube toward pushing inside transfer roller, the first push plate is to paper tube
The movable maximum distance of institute provides constraints, and keeps paper tube corresponding with each connection ring, then under the action of reset spring
Make to connect roller movement, connect roller movement and drive connection ring mobile, makes connection ring that paper tube can exist automatically with when connecting roller movement
Position is set on transfer roller, is placed in paper tube uniformly on transfer roller convenient for being collected to the adhesive material after cutting;Pass through
The mutual cooperation for connecting roller, cylinder and reset spring, puts paper tube automatically on transfer roller
It is good, paper tube is put without manually going, shortens and is arranged the paper tube time, so that the operation for being arranged paper tube is become more convenient, is promoted not
The production efficiency of dry glue labeling;After the good adhesive material of winding on paper tube, the head of adhesive material is cut off, cylinder pushes the
One push plate moves forward, makes push rod push connection roller toward one end motion of transfer roller, paper tube is all pushed to transfer roller one end, can be facilitated
Paper tube is taken out from transfer roller, promoted to the collection efficiency of paper tube.
First mounting plate is equipped with the second driving motor 22, and the output shaft of the second driving motor is equipped with the first transmission
Wheel 221, the first driving wheel and transfer roller transmission cooperate, and provide rotary power to transfer shares;Transfer roller is equipped with multiple first through slots 11, even
Ring inner wall is connect equipped with connecting rod 161, connecting rod is arranged in the first through slot, and connection ring is fixed on connection roller by connecting rod
On;It is logical that second matched with connecting rod is equipped on first connection roller, the second connection roller, third connection roller and the 4th connection roller
Slot, making connection roller, connecting rod can move in the second through slot when moving;After paper tube is nested into connection ring, the second driving electricity
Machine drives transfer roller rotation, and the first through slot plays position-limiting action to connecting rod, so that the first through slot and connecting rod is cooperated, transfer roller is made to exist
Connection ring is driven to rotate together when rotation, to make paper be collected during rotation to adhesive material, to do
Glue material coiling is on paper tube.
Third movable chamber 121 is equipped in the first connection roller 12, the third movable chamber 121 is set to second activity
Chamber side, 121 side wall of third movable chamber are equipped with first through hole 122, and the third movable chamber 121 is logical by described first
Hole 122 is communicated with second movable chamber, and the connection ring 16 is equipped with cavity, is equipped with fixed link 18, institute in the cavity
It states 13 one end of the second connection roller and is equipped with the push rod 131 matched with the first through hole 122, when the push rod 131 is inserted into institute
When stating in first through hole 122, the fixed link 18 is moved toward the cavity bottom;When paper tube is covered upper transfer roller 1, cylinder 21 is pushed away
Dynamic first push plate 17 moves in the first movable chamber, to the second connection roller 13 is pushed into the second movable chamber, the second connection
After roller 13 enters in the second movable chamber, push rod 131 is inserted into first through hole 122, and push rod 131 is made to drive fixed link 18 past
Cavity bottom moves, and enters in cavity at the top of fixed link 18, so that 16 surface of connection ring is in formation state, be inserted in paper tube
It is unobstructed when transfer roller 1;After paper tube is nested on transfer roller 1,21 retract piston bar of cylinder makes push rod 131 from first through hole 122
Interior abjection, fixed link 18 are up moved along cavity inner wall, so that 18 top of fixed link is in contact with paper tube inner wall, paper tube is fixed
In connection ring 16, move paper tube together with connection roller;After paper tube is nested into connection ring, by fixed link to paper
Fixed function has been managed, has moved paper tube together with connection ring, convenient for positioning to paper tube, paper tube has been avoided to send out in connection ring
Raw slipping phenomenon;After new paper tube is nested into connection ring, air cylinder driven piston rod retraction, push rod is first out of first through hole
Roller is connected after abjection to start to move again, is stretched out connection roller fixed link before mobile just out of cavity and is in contact with paper tube inner wall,
Make connect roller it is mobile when paper tube can be driven to move together;When adhesive material is after the completion of retracting, cylinder pushes connection roller to move
It is dynamic, roller is connected after being moved to transfer roller one end, push rod is inserted into first through hole, and enter fixed link automatically in cavity,
Fixed link is not in contact the fixed function lost to paper tube with paper tube, so as to which easily paper tube is removed from connection ring, with
Changing to new paper tube continues to run equipment, promotes the processing efficiency of adhesive label.
Bottom of fixed is arranged in third movable chamber, and bottom of fixed is hinged with motion bar 182, is set in a connection ring
There are four fixed links, and corresponding motion bar is also four, and one end of four motion bars is hinged on one point, third movable chamber
Inner wall is equipped with the first groove 123, one end of motion bar and is placed in the first groove;When push rod is inserted into first through hole,
Push rod is in contact with one end of motion bar, pushes motion bar one end to move in the first groove under the action of push rod, to make
Motion bar drives fixed link to move in third movable chamber when moving, makes to enter inside cavity at the top of fixed link, so as to right
Paper tube is dismounted.
First push plate side wall is equipped with the guide plate 171 matched with first through slot, and guide plate side wall is equipped with gear
Block 172, first push plate one end are equipped with pushing block 173, and pushing block is corresponding with first through hole;When cylinder pushes the first push plate mobile,
First push plate is in contact with reset spring, pushes connection roller toward one end motion of transfer roller, until the first push plate is pushed to roller is connected
Behind transfer roller one end, cylinder continues to press on the first push plate, makes the second connection roller, third connection roller, the 4th connection roller upper push-rod insertion
Into first through hole, pushing block is inserted into the first through hole on the 4th connection roller, moves fixed link toward cavity bottom, fixed link
Top enters in cavity, to dismount to paper tube;When being installed to paper tube, paper tube is all nested on transfer roller, it will
Paper tube makes innermost paper tube be in contact with the first push plate side wall upper stopper, plays the role of positioning to paper tube toward pushing inside transfer roller,
After innermost paper tube is in contact with block, stop push paper tube, air cylinder driven piston rod retracts, under the action of connecting roller
Automatically paper tube is spread, promotes the convenience of replacement paper tube;Reduce the first push plate under the action of block and connect roller with the 4th
Distance, convenient for preferably being positioned to paper tube.
Fixed block 181 is equipped with when at the top of fixed link, it is recessed that connection ring-side wall is equipped with second matched with the fixed block
Slot 162, fixed block bottom are equipped with support spring 183;When fixed link moves in cavity under the drive of motion bar, fixed link
It drives fixed block to move in the second groove, is embedded into fixed block in the second groove, the second groove provides receiving for fixed block
Space makes connection ring surface be in formation state, convenient for dismounting to paper tube;When push rod and pushing block are deviate from out of first through hole
When, motion bar one end is no longer influenced by the effect of power, pushes fixed block up to move under the action of support spring elastic force, to make
Fixed block is in contact with paper tube inner wall, plays fixed function to paper tube;Contacted by fixed block with paper tube inner wall, increase fixed link with
The contact area of paper tube inner wall promotes fixed link to the fixed effect of paper tube;Paper tube is consolidated further to increase fixed block
Determine effect, rubber membrane can be covered in fixed block surface, to increase the frictional force of fixed block and paper tube.
The second mounting plate 4 is equipped with above the transfer roller 1, second mounting plate 4 is equipped with multiple loose slots 41, the work
Dynamic slot 41 is corresponding with the connection ring 16, and scraper plate 42 is equipped in the loose slot 41, and second mounting plate 4 is equipped with second
Through-hole is equipped with connecting shaft 44 in second through-hole, and the connecting shaft 44 is arranged on the scraper plate 42, the connecting shaft 44
It is driven and cooperates with the scraper plate 42, second mounting plate 4 is equipped with the first driving for driving the connecting shaft 44 to rotate
Motor 43;After paper tube is fixed in connection ring 16, adhesive material is rolled up on paper tube, and the first driving motor 43 is drivingly connected axis
44 rotations, make connecting shaft 44 that scraper plate 42 be driven to turn to paper tube two sides, and paper tube drives paper tube while rotating with transfer roller 1
On adhesive material two sides be in contact with 42 side wall of scraper plate, the flash of adhesive material two sides is struck off, at the same scraper plate 42 will
Adhesive material positioning on paper tube, is set around the adhesive material after being cut on paper tube, carries out to adhesive material
It collects;Strike off adhesive material can to the side wall of adhesive material when being coiled collection,
Flash on adhesive material section is struck off, burr removing processing is played to adhesive material;Since scraper plate is set to paper tube two sides
It is in contact with adhesive material side wall, scraper plate is made to play the role of positioning adhesive material, make adhesive material is neat to be set around
On paper tube, adhesive material is avoided to collapse from paper tube;The position of scraper plate is adjusted under the action of the first driving motor,
When connection roller when moving in the presence of cylinder, the first driving motor driving scraper plate is turned at the top of the second mounting plate, is avoided
Scraper plate causes to hinder to the movement of connection roller;After position of the connection roller on transfer roller determines, the first driving motor drives scraper plate
It moves down, matches scraper plate with paper tube side wall, convenient for playing burr removing and positioning to adhesive material under the action of scraper plate
Effect.
First driving motor output shaft is equipped with the second driving wheel 431, and one end of the connecting shaft is equipped with and second driving wheel
The third driving wheel 441 matched, under the mutual cooperation of the second driving wheel and third driving wheel, by the dynamic of the first driving motor
Power passes to connecting shaft, rotates connecting shaft under the action of the first driving motor;It is recessed that loose slot side inner wall is equipped with third
Slot 46, other side inner wall are equipped with atmospheric pressure cavity 45, are equipped with the second push plate 451, the second push plate and the scraper plate side wall in atmospheric pressure cavity
It is in contact, limit spring 461 is equipped in third groove;When winding adhesive material on paper tube, the driving of the first driving motor is scraped
Plate turns to the position that is in contact with adhesive material side wall, and the flash of adhesive material side wall is struck off;When being arranged on paper tube
After a certain amount of adhesive material, it is filled with air-flow in atmospheric pressure cavity, increases the air pressure in atmospheric pressure cavity, pushes under the influence of air pressure
Second push plate makes the second push plate that scraper plate be pushed to move toward third groove direction, and scraper plate squeezes limit spring, shortens between two scraper plates
Distance, so that scraper plate is played side wall to adhesive material and play squeezing action, increase scraper plate to the cleaning effect of adhesive material side wall,
It plays the role of positioning simultaneously to adhesive material, is set around adhesive material on paper tube with smooth state.
The support component include the first supporting block 32, the second supporting block 34 and third supporting block, the first supporting block and
Third supporting block is respectively arranged on transfer roller both ends, and it is circular arc that the first supporting block, the second supporting block and third support block structure are identical
After shape section, and it is equipped with ball on three pieces of supporting block inner walls, transfer roller is enable to be placed in normal rotation when supporting fast upper;First support
Block bottom is equipped with first hydraulic cylinder 31, and the second supporting block bottom is equipped with second hydraulic cylinder 33, and third supporting block bottom is equipped with support
Seat, when transfer roller rotation is collected adhesive material, first hydraulic cylinder drives the first supporting block to extend, and makes the first support
Block and third supporting block, which cooperate, provides support force for transfer roller;When replacing to paper tube, cylinder pushes to connection ring
Transfer roller one end, second hydraulic cylinder drive the second supporting block up to move, so that the second supporting block is in contact with transfer roller, the second supporting block
It is not in contact with connection ring in connection ring side, first hydraulic cylinder drives the first supporting block to move down, so as to convenient
Paper tube is removed from connection ring, paper tube is replaced.
After the adhesive material on the paper tube in connection ring reaches predetermined amount, adhesive material is cut, cylinder
It pushes the first push plate toward one end motion of the first movable chamber, the first push plate is made to push connection roller close to each other, insert connection roller successively
Enter into adjacent connection roller, connection ring is pressed in transfer roller one end;Cylinder continues to press on push plate, and pushing block and push rod is made to be inserted into
In one through-hole, fixed block is entered in the second groove, loses the fixed function to paper tube, and the first supporting block and the second supporting block are matched
It closes and exchanges, the paper tube for being wound with adhesive material is removed from connection ring, then new paper tube is nested into connection ring, paper tube
It pushes paper tube inside after being nested into connection ring, makes paper tube toward transfer roller internal motion, until innermost paper tube and guide block phase
After contact, stop being packed into paper tube, air cylinder driven piston rod back moves, and pushing block and push rod are first deviate from out of first through hole, fixed
Block is stretched out out of second groove to be in contact with paper tube inner wall, plays fixed function to paper tube;Then work of the connection roller in reset spring
Initial position is moved under, connection ring is driven to move together, makes connection ring that paper tube be driven to move together, paper tube is uniformly spread
On transfer roller, the replacement of paper tube is completed, equipment is continued to run.
Embodiment 2:
A kind of adhesive label production technology, comprising: a, blanking procedure: blanking personnel notify according to the blanking that production division issues
It is single, defined adhesive material is got from raw material silo, checks its model, and fills in outbound list;Raw material is put into cutting machine
In, the raw material after making cutting is rolled into a roll in collecting device;B, plate-making, inking process: plate-making personnel are responsible for signing for design portion
The egative film and tinctorial pattern that door provides, check the quality of egative film, the mark content of quantity, egative film including egative film, text, lines, net
The edge actual situation degree of point, dot density, the contents such as register degree between color separation film;C, printing process: printing personnel are first
According to production subpoena and process chart requirement, corresponding halftone, ink, adhesive material are got, and carries out mutually inspection work;It checks
After errorless, fixed halftone simultaneously debugs net away from then being positioned with adhesive sticker locator material, then begin to print;D, cutting die system
Make, die cutting procedure: design department makes the cutting die line pattern of final finished by drawing, gives cutting die producer, verification
After errorless, pattern is pasted on plastic plate, goes out graph outline by cutting die scroll saw with sawing machine;E, testing stage before rubber patch: to mould
It cuts semi-finished product to be checked on the quality in waste discharge according to quality control standards (QCS), distinguishes the qualified product and rejected product after checking, and with again
Film paper slip identifies in case subsequent processing is received;It need to reprocess, fill in and reprocess list and retract concerned process steps;F, it rubber patch process: presses
Shine into expect-vacuumize-cleaning robot-row steep-drips the closed process of glue-repairing-and completes rubber patch;G, arranging process: whole
Reason personnel get semi-finished product to upper process, put clear quantity, distinguish qualified product and rejected product;Selected by plate-making in the step b
Silk screen tension is in 8kg/cm2;Net is removed from Stretching machine after placing 12h after adhesive material brush coating in the step b
Version;Surrounding is sealed with block adhesive tape before printing down, and is placed 4 days;Halftone in the step b carries out new halftone before frictioning
Degreasing and roughening treatment, then pour into photosensitizer in glass in darkroom, add water 100mL, are sufficiently stirred;The step b
In adhesive material lain against in baking oven after frictioning, oven temperature is 30 DEG C, places 0.5h to dry thorough;The collection
Equipment is identical as the collecting device structure in embodiment 1.
Embodiment 3:
A kind of adhesive label production technology, comprising: a, blanking procedure: blanking personnel notify according to the blanking that production division issues
It is single, defined adhesive material is got from raw material silo, checks its model, and fills in outbound list;Raw material is put into cutting machine
In, the raw material after making cutting is rolled into a roll in collecting device;B, plate-making, inking process: plate-making personnel are responsible for signing for design portion
The egative film and tinctorial pattern that door provides, check the quality of egative film, the mark content of quantity, egative film including egative film, text, lines, net
The edge actual situation degree of point, dot density, the contents such as register degree between color separation film;C, printing process: printing personnel are first
According to production subpoena and process chart requirement, corresponding halftone, ink, adhesive material are got, and carries out mutually inspection work;It checks
After errorless, fixed halftone simultaneously debugs net away from then being positioned with adhesive sticker locator material, then begin to print;D, cutting die system
Make, die cutting procedure: design department makes the cutting die line pattern of final finished by drawing, gives cutting die producer, verification
After errorless, pattern is pasted on plastic plate, goes out graph outline by cutting die scroll saw with sawing machine;E, testing stage before rubber patch: to mould
It cuts semi-finished product to be checked on the quality in waste discharge according to quality control standards (QCS), distinguishes the qualified product and rejected product after checking, and with again
Film paper slip identifies in case subsequent processing is received;It need to reprocess, fill in and reprocess list and retract concerned process steps;F, it rubber patch process: presses
Shine into expect-vacuumize-cleaning robot-row steep-drips the closed process of glue-repairing-and completes rubber patch;G, arranging process: whole
Reason personnel get semi-finished product to upper process, put clear quantity, distinguish qualified product and rejected product;Selected by plate-making in the step b
Silk screen tension is in 7kg/cm2;Net is removed from Stretching machine after placing 12h after adhesive material brush coating in the step b
Version;Surrounding is sealed with block adhesive tape before printing down, and is placed 3 days;Halftone in the step b carries out new halftone before frictioning
Degreasing and roughening treatment, then pour into photosensitizer in glass in darkroom, add water 90mL, are sufficiently stirred;In the step b
Adhesive material lain against in baking oven after frictioning, oven temperature is 35 DEG C, places 0.5h to dry thorough;The collection is set
It is standby identical as collecting device structure in embodiment 1.
Claims (7)
1. a kind of adhesive label production technology, it is characterised in that: include:
A, blanking procedure: the blanking notification sheet that blanking personnel issue according to production division, from raw material silo get as defined in do not do
Glue material checks its model, and fills in outbound list;Raw material is put into cutting machine, the raw material after making cutting is in collecting device
Inside it is rolled into a roll;
B, plate-making, inking process: plate-making personnel are responsible for signing for the egative film and tinctorial pattern of design department's offer, check the quality of egative film,
The mark content of quantity, egative film including egative film, text, lines, site edge actual situation degree, dot density, color separation film it
Between the contents such as register degree;
C, printing process: printing personnel according to production subpoena and process chart requirement, get corresponding halftone, ink, no first
Dry glue material, and carry out mutually inspection work;Check it is errorless after, fixed halftone and debug net away from, then with adhesive sticker locator material into
Row positioning, then begins to print;
D, cutting die production, die cutting procedure: design department makes the cutting die line pattern of final finished by drawing, gives cutting die system
Make personnel, after confirmation, pattern is pasted on plastic plate, goes out graph outline by cutting die scroll saw with sawing machine;
E, it testing stage before rubber patch: is checked on the quality in waste discharge according to quality control standards (QCS) to cross cutting semi-finished product, after distinguishing inspection
Qualified product and rejected product, and with laminating adhesive paper slip identify in case subsequent processing receive;It need to reprocess, fill in and reprocess list and move back
Return concerned process steps;
F, rubber patch process: according to feed-vacuumize-cleaning robot-row steep-drips the closed process of glue-repairing-and completes drop
Modeling;
G, arranging process: arrangement personnel get semi-finished product to upper process, put clear quantity, distinguish qualified product and rejected product;
Wherein, the collecting device in the step a include transfer roller (1) and be set to the transfer roller (1) below support component, it is described
Transfer roller (1) is equipped with the first movable chamber, and the first connection roller (12), the second connection roller (13), the are equipped in first movable chamber
Three connections roller (14) and the 4th connection roller (15), first connection roller (12), the second connection roller (13), third connection roller (14)
And the 4th connection roller (15) be sequentially connected, and it is described first connection roller (12), second connection roller (13), third connection roller (14) and
The diameter of 4th connection roller (15) is sequentially reduced, and first connection roller (12) is equipped with the second movable chamber, second connection
Roller (13) is arranged in second movable chamber, and reset spring (124) are additionally provided in second movable chamber;Second connection
Roller (13), third connection roller (14) and the 4th connection roller (15) structure are identical as first connection roller (11), institute
Transfer roller (1) side is stated equipped with the first mounting plate (2), first mounting plate (2) is equipped with cylinder (21), and the cylinder (21) is living
Stopper rod is equipped with the first push plate (17), and first push plate (17) is set in first movable chamber, the first connection roller
(12), connection ring (16) are respectively equipped in the second connection roller (13), third connection roller (14) and the 4th connection roller (15);Adhesive sticker
Adhesive material is put into cutting machine and is cut to adhesive material after raw material silo taking-up by material, cylinder (21)
The first push plate (17) movement in the first movable chamber is pushed, makes the first push plate (17) that the connection roller in the first movable chamber to be pushed to move
It is dynamic, it is inserted into the 4th connection roller (15) in third connection roller (14), third connection roller (14) is inserted into the second connection roller (13)
Interior, the second connection roller (13) is inserted into the first connection roller (12), and the connection rings (16) on four connection rollers are close to each other, will be with
The paper tube of connection ring (16) corresponding number is nested on transfer roller (1), is placed on paper tube on connection ring (16), pushes paper tube, until
Innermost paper tube side wall is in contact with the first push plate (17) side wall, and cylinder (21) recycles piston rod, and connection roller is resetting bullet
The effect of spring (124) elastic force is lower to be resetted, and moves to connection roller on initial position, and the paper tube that will be sheathed on connection roller separates, and is made
Paper tube on each connection roller collects the adhesive material after the completion of being cut respectively.
2. a kind of adhesive label production technology described in accordance with the claim 1, it is characterised in that: the plate-making in the step b
Selected silk screen tension is in 6~8kg/cm2。
3. a kind of adhesive label production technology described in accordance with the claim 1, it is characterised in that: not doing in the step b
Halftone is removed from Stretching machine after placing 12h after glue material brush coating;Surrounding is sealed with block adhesive tape before printing down, and places 3~4
It.
4. a kind of adhesive label production technology described in accordance with the claim 1, it is characterised in that: the halftone in the step b
Before frictioning, degreasing and roughening treatment are carried out to new halftone, then pour into photosensitizer in glass in darkroom, add water 80~
100mL is sufficiently stirred.
5. a kind of adhesive label production technology described in accordance with the claim 1, it is characterised in that: not doing in the step b
Glue material is lain against in baking oven after frictioning, and oven temperature is less than or equal to 40 DEG C, and it is thorough to drying to place 0.5h.
6. a kind of adhesive label production technology described in accordance with the claim 1, it is characterised in that: first connection roller (12)
Interior to be equipped with third movable chamber (121), the third movable chamber (121) is set to second movable chamber side, the third activity
Chamber (121) side wall be equipped with first through hole (122), the third movable chamber (121) by the first through hole (122) with it is described
Second movable chamber communicates, and the connection ring (16) is equipped with cavity, is equipped with fixed link (18) in the cavity, and described second connects
It connects roller (13) one end and is equipped with the push rod (131) matched with the first through hole (122), when the push rod (131) is inserted into institute
State first through hole (122) it is interior when, the fixed link (18) toward the cavity bottom move;When paper tube is covered upper transfer roller (1), gas
Cylinder (21) pushes the first push plate (17) movement in the first movable chamber, so that the second connection roller (13) is pushed into the second movable chamber
Interior, after the second connection roller (13) enters in the second movable chamber, push rod (131) is inserted into first through hole (122), makes push rod
(131) driving fixed link (18) is moved toward cavity bottom, is entered in cavity at the top of fixed link (18), is made connection ring (16) surface
In formation state, keep paper tube unobstructed when being inserted in transfer roller (1);After paper tube is nested on transfer roller (1), cylinder (21) is returned
Contracting piston rod moves push rod (131) abjection, fixed link (18) out of first through hole (122) up along cavity inner wall, makes solid
It is in contact at the top of fixed pole (18) with paper tube inner wall, paper tube is fixed on connection ring (16), move paper tube together with connection roller
It is dynamic.
7. a kind of adhesive label production technology described in accordance with the claim 1, it is characterised in that: set above the transfer roller (1)
Have the second mounting plate (4), second mounting plate (4) is equipped with multiple loose slots (41), the loose slot (41) and the company
It is corresponding to connect ring (16), is equipped with scraper plate (42) in the loose slot (41), second mounting plate (4) is equipped with the second through-hole,
It is equipped in second through-hole connecting shaft (44), the connecting shaft (44) is arranged on the scraper plate (42), the connecting shaft
(44) cooperate with the scraper plate (42) transmission, second mounting plate (4) is equipped with for driving the connecting shaft (44) to rotate
The first driving motor (43);After paper tube is fixed on connection ring (16), adhesive material is rolled up on paper tube, the first driving electricity
Machine (43) is drivingly connected axis (44) rotation, makes connecting shaft (44) that scraper plate (42) to be driven to turn to paper tube two sides, and paper tube is with turning
While roller (1) rotates, the adhesive material two sides on paper tube are driven to be in contact with scraper plate (42) side wall, by adhesive material two
The flash of side strikes off, at the same scraper plate (42) by paper tube adhesive material position, make the adhesive material after being cut around
On paper tube, adhesive material is collected.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011017634.XA CN112223409A (en) | 2019-06-05 | 2019-06-05 | Production process of adhesive sticker label convenient to operate |
CN201910487048.2A CN110216734B (en) | 2019-06-05 | 2019-06-05 | Production process of adhesive sticker label |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910487048.2A CN110216734B (en) | 2019-06-05 | 2019-06-05 | Production process of adhesive sticker label |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011017634.XA Division CN112223409A (en) | 2019-06-05 | 2019-06-05 | Production process of adhesive sticker label convenient to operate |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110216734A true CN110216734A (en) | 2019-09-10 |
CN110216734B CN110216734B (en) | 2021-02-26 |
Family
ID=67819426
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910487048.2A Active CN110216734B (en) | 2019-06-05 | 2019-06-05 | Production process of adhesive sticker label |
CN202011017634.XA Withdrawn CN112223409A (en) | 2019-06-05 | 2019-06-05 | Production process of adhesive sticker label convenient to operate |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011017634.XA Withdrawn CN112223409A (en) | 2019-06-05 | 2019-06-05 | Production process of adhesive sticker label convenient to operate |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN110216734B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111761939A (en) * | 2020-07-13 | 2020-10-13 | 宁波兆荣文化科技股份有限公司 | Table game card printing process and method |
CN112572005A (en) * | 2019-09-30 | 2021-03-30 | 昆山市蓝天印务有限公司 | Peanut production process with self-adhesive label |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201677351U (en) * | 2009-11-30 | 2010-12-22 | 宝利时(深圳)胶粘制品有限公司 | Machine capable of automatically cutting and discharging adhesive tape |
CN102267142A (en) * | 2011-07-19 | 2011-12-07 | 杜建刚 | Die cutting machine using combined die cutting method and being applicable to winding drum material |
JP2014147991A (en) * | 2013-01-31 | 2014-08-21 | Brother Ind Ltd | Tape printing device |
CN207465390U (en) * | 2017-11-01 | 2018-06-08 | 绍兴市上虞华扬印制有限公司 | A kind of die-cutting machine that material warning function is lacked with feed end |
CN108422476A (en) * | 2018-05-15 | 2018-08-21 | 雷淑娟 | A kind of prepared slices of Chinese crude drugs slicing device |
CN208773721U (en) * | 2018-08-17 | 2019-04-23 | 深圳市友事达塑胶制品有限公司 | A kind of die-cutting machine cleaning device |
-
2019
- 2019-06-05 CN CN201910487048.2A patent/CN110216734B/en active Active
- 2019-06-05 CN CN202011017634.XA patent/CN112223409A/en not_active Withdrawn
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201677351U (en) * | 2009-11-30 | 2010-12-22 | 宝利时(深圳)胶粘制品有限公司 | Machine capable of automatically cutting and discharging adhesive tape |
CN102267142A (en) * | 2011-07-19 | 2011-12-07 | 杜建刚 | Die cutting machine using combined die cutting method and being applicable to winding drum material |
JP2014147991A (en) * | 2013-01-31 | 2014-08-21 | Brother Ind Ltd | Tape printing device |
CN207465390U (en) * | 2017-11-01 | 2018-06-08 | 绍兴市上虞华扬印制有限公司 | A kind of die-cutting machine that material warning function is lacked with feed end |
CN108422476A (en) * | 2018-05-15 | 2018-08-21 | 雷淑娟 | A kind of prepared slices of Chinese crude drugs slicing device |
CN208773721U (en) * | 2018-08-17 | 2019-04-23 | 深圳市友事达塑胶制品有限公司 | A kind of die-cutting machine cleaning device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112572005A (en) * | 2019-09-30 | 2021-03-30 | 昆山市蓝天印务有限公司 | Peanut production process with self-adhesive label |
CN111761939A (en) * | 2020-07-13 | 2020-10-13 | 宁波兆荣文化科技股份有限公司 | Table game card printing process and method |
Also Published As
Publication number | Publication date |
---|---|
CN112223409A (en) | 2021-01-15 |
CN110216734B (en) | 2021-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110216734A (en) | A kind of adhesive label production technology | |
CN105728362B (en) | Waste discharge film recovery method and waste discharge film-recovering machine | |
CN110223597B (en) | Adhesive sticker manufacturing process | |
CN108214992A (en) | A kind of ditch plastic bag recovery water removal device | |
CN111619222B (en) | Printing laminating equipment | |
CN106179865B (en) | A kind of overlay film coating process and device | |
CN104309877A (en) | Special automatic label pasting device for blood collection tube | |
CN201510967U (en) | Battery gluing mechanism and full-automatic veneering pad machine applying the same | |
CN105645150A (en) | Full-automatic rolling packaging equipment for heat-shrinkable sheets | |
CN204316278U (en) | A kind of magnetic steel separating device | |
CN207773674U (en) | A kind of shuttlecock processing labeling glue spreading apparatus | |
CN207208579U (en) | A kind of film sticking apparatus for laminating machine | |
CN216736879U (en) | Numerical control die cutting device for adhesive labels | |
CN108724314A (en) | A kind of automatic detection waste discharge film repair machine | |
CN203397082U (en) | Process equipment for refitting and assembling photosensitive drums of toner cartridges | |
CN208869042U (en) | A kind of label roll automatic blanking device | |
CN113598246A (en) | Withering machine capable of being heated uniformly and keeping tea blank leaves complete | |
CN113477737B (en) | Capacitor shell mold equipped with automatic demolding device | |
CN112676395A (en) | Bending and forming machine for building construction | |
CN111700734A (en) | Production facility of panty-shape diapers core | |
CN108557203A (en) | Battery core tape sticking device | |
CN113895050B (en) | Preparation process of table tennis bat rubber | |
CN115447271B (en) | Energy-saving and environment-friendly cigarette packaging printing equipment | |
CN220720612U (en) | Multistage rapid curing device for label printing | |
CN212490421U (en) | Production facility of panty-shape diapers core |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20210203 Address after: 528300 Guangdong Province Foshan Shunde District Beijiao town Shunjiang community residents committee Industrial Park Xingye East Road 2-2 Qide real estate Park Phase 2 Building 4 301 (residence declaration) Applicant after: Guangdong Rongke Industrial Co.,Ltd. Address before: 313300 tianzihu modern industrial park, Anji County, Huzhou City, Zhejiang Province Applicant before: ZHEJIANG SUOFAN ADHESIVE PRODUCTS Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |