CN110212537A - A kind of electric network swim risk perceptions method - Google Patents

A kind of electric network swim risk perceptions method Download PDF

Info

Publication number
CN110212537A
CN110212537A CN201910326033.8A CN201910326033A CN110212537A CN 110212537 A CN110212537 A CN 110212537A CN 201910326033 A CN201910326033 A CN 201910326033A CN 110212537 A CN110212537 A CN 110212537A
Authority
CN
China
Prior art keywords
electric network
matrix
node
network swim
swim
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910326033.8A
Other languages
Chinese (zh)
Inventor
陈奂
张衡
桂昌乾
张正义
许朝萍
陈明刚
张显文
詹乐贵
覃义荣
龙章勇
刘君
林先堪
石鹏昌
喻群
杨皓
张宇红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Power Grid Co Ltd
Original Assignee
Guizhou Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Power Grid Co Ltd filed Critical Guizhou Power Grid Co Ltd
Priority to CN201910326033.8A priority Critical patent/CN110212537A/en
Publication of CN110212537A publication Critical patent/CN110212537A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/04Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
    • H02J3/06Controlling transfer of power between connected networks; Controlling sharing of load between connected networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of electric network swim risk perceptions method, this method includes obtaining Net Frame of Electric Network figure, constructs Jacobian matrix, calculates electric network current diagram, carries out risk perceptions early warning to power grid.The present invention obtains corresponding Jacobian matrix under electric network swim different situations according to Net Frame of Electric Network figure, singular value decomposition is carried out to the Jacobian matrix under electric network swim again, calculate the voltage of each node and power distribution in physics transmission line of electricity, obtain electric network current diagram, risk perceptions early warning is carried out to power grid according to electric network current diagram, security risk to find in power network line is excluded, and the design scheme for optimizing power grid by Load flow calculation, improves the stability and Resource allocation and smoothing ability of electric system.

Description

A kind of electric network swim risk perceptions method
Technical field
The invention belongs to electric system simulation and calculate analysis technical field, and in particular to a kind of electric network swim risk perceptions Method.
Background technique
At runtime, under electrical source voltage incentive action, electric current or power pass through each element of system from power supply for electric system Offered load is distributed in power network everywhere, referred to as the direction of energy;Electric system is many power stations, substation, distribution It stands, user etc. is got up the system formed by transmission and disttrbution connection.Electric power (electric energy) is generated in power station, wherein one Part loses when by transmission and distribution line, substation and power distribution station, and the remaining overwhelming majority is finally consumed by load.This Sample consumes to by load from the generation of electricity, which transmission and distribution line is flowed through, and each node voltage is how many, and electricity is just in this calculating Power Load flow calculation or abbreviation Load flow calculation.
In electrical network field, power transmission and transformation equipment operation risk is the synthesis degree that equipment fault possibility and failure cause consequence Amount, and equipment fault consequence except need to count and equipment direct losses in addition to, it is often more important that need to consider equipment fault to power grid security transport Harm, that is, need the level analysis equipment operation risk from power grid brought by capable and power supply reliability.
Currently, electrical network field is there are production management construction of system lags, peopleware ability is not high and operation management inertia The unfavorable factors such as thinking, power grid risk control are difficult.
Summary of the invention
Goal of the invention of the invention is: in order to solve problem above existing in the prior art, the invention proposes one kind Electric network swim risk perceptions method breaks data among systems barrier to effectively take precautions against electric power safety accident event, summarizes point Analysis perceives electric network swim risk, improves safe operation of electric network.
The technical scheme is that a kind of electric network swim risk perceptions method, comprising the following steps:
S1, Net Frame of Electric Network figure is obtained;
S2, corresponding Jacobian matrix under electric network swim is calculated according to Net Frame of Electric Network figure;
S3, singular value decomposition is carried out to the Jacobian matrix under electric network swim, calculates each node in physics transmission line of electricity Voltage and power distribution, obtain electric network current diagram;
S4, risk perceptions early warning is carried out to power grid according to electric network current diagram.
As above-mentioned electric network swim risk perceptions further improvements in methods, the step S2 is calculated according to Net Frame of Electric Network figure Corresponding Jacobian matrix under electric network swim, specifically include it is following step by step:
S201, the corresponding electrical power wiring figure of Net Frame of Electric Network figure is converted into equivalent circuit diagram;
S202, node admittance matrix is constructed according to equivalent circuit diagram;
S203, corresponding Jacobian matrix under electric network swim is calculated according to node admittance matrix.
As above-mentioned electric network swim risk perceptions further improvements in methods, the step S202 is according to equivalent circuit diagram structure Node admittance matrix is built, specially
The incidence matrix of electric power networks is obtained according to equivalent circuit diagram, when using I=YV matrix form n node of expression Node admittance matrix equation group, i.e.,
Wherein
Respectively node Injection Current column vector and column voltage vector, calculate node admittance matrix, i.e.,
Wherein, Y indicates node admittance matrix, diagonal element YiiIndicate the self-admittance of node i, off diagonal element YijTable Show the transadmittance between node i and node j.
As above-mentioned electric network swim risk perceptions further improvements in methods, in the step S203, phase under electric network swim The Jacobian matrix answered is specially
Wherein, JF(V1, V2..., Vn) indicate corresponding Jacobian matrix under electric network swim.
As above-mentioned electric network swim risk perceptions further improvements in methods, in the step S3, under electric network swim Jacobian matrix carry out singular value decomposition, specifically include it is following step by step:
S301, according to the Jacobian matrix J under electric network swim, enable orthogonal matrix A1=JJT, orthogonal matrix A2=JTJ;
S302, orthogonal matrix A is calculated1, A2Characteristic root, be expressed as
Wherein, λ1, λ2Respectively indicate orthogonal matrix A1, A2Characteristic root, E indicate unit matrix;
S303, by orthogonal matrix A1, A2Characteristic root sort from large to small, obtain orthogonal matrix A1, A2Eigenmatrix ∧1, ∧2, it is expressed as
S304, eigenmatrix ∧ is calculated1, ∧2Corresponding eigenvectors matrix, is expressed as
Wherein, U1, U2Respectively indicate eigenmatrix ∧1, ∧2Corresponding eigenvectors matrix;
S305, calculate electric network swim under Jacobian matrix J singular value decomposition, be expressed as
Wherein, ∑ indicates that size is the matrix of m × n.
As above-mentioned electric network swim risk perceptions further improvements in methods, the Jacobian matrix J under electric network swim is calculated Singular value decomposition when, matrix ∑ is embodied as
Wherein, ∑1Middle element is character pair matrix ∧1, ∧2The secondary root of middle element.
As above-mentioned electric network swim risk perceptions further improvements in methods, in the step S3, physics power transmission line is calculated When the voltage of each node and power are distributed in road, specifically to transmission line of electricity, power transformer group, reactance group, capacitance group in power grid Force device and force device between connection type calculated.
As above-mentioned electric network swim risk perceptions further improvements in methods, the step S4 is according to electric network current diagram to electricity Net carry out risk perceptions early warning, specifically include it is following step by step:
S401, warning information is obtained, positioning and display alarm generation position in electric network current diagram;
S402, the chart spacing that fault element connection is cut out according to power grid topological relation, to the incidence number of the chart spacing Accordingly and topological relation is coloured;
S403, it is based on power grid topological relation, the chart spacing and the fault element is spliced, and it is detailed to generate failure Thin hum pattern;
It is S404, the background color of electric network current diagram is dimmed, highlight the fault detail hum pattern.
As above-mentioned electric network swim risk perceptions further improvements in methods, in the step S402, according to power network topology Relationship cuts out the chart spacing of fault element connection, specially
Centered on the faulty line where fault element, the two sides tie point of faulty line is found on tidal current chart;
The force device that two sides tie point is separately connected is searched in the power grid topological relation of grid topology data record;
The plant stand where the force device of two sides is searched, searches for the force device institute in the plant stand figure of the force device respectively Chart spacing, cut out respectively in the plant stand figure of both ends force device fault element connection chart spacing.
The beneficial effects of the present invention are: the present invention is according to corresponding refined under Net Frame of Electric Network figure acquisition electric network swim different situations Gram than matrix, then singular value decomposition is carried out to the Jacobian matrix under electric network swim, calculates each node in physics transmission line of electricity Voltage and power distribution, obtain electric network current diagram, according to electric network current diagram to power grid carry out risk perceptions early warning, to find Security risk in power network line is excluded, and optimizes the design scheme of power grid by Load flow calculation, improves electric system Stability and Resource allocation and smoothing ability.
Detailed description of the invention
Fig. 1 is electric network swim risk perceptions method flow schematic diagram of the invention;
Fig. 2 is the flow diagram that electric network current diagram is calculated in the present invention.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that described herein, specific examples are only used to explain the present invention, not For limiting the present invention.
As shown in Figure 1, being electric network swim risk perceptions method flow schematic diagram of the invention;A kind of electric network swim risk sense Perception method, comprising the following steps:
S1, Net Frame of Electric Network figure is obtained;
S2, corresponding Jacobian matrix under electric network swim is calculated according to Net Frame of Electric Network figure;
S3, singular value decomposition is carried out to the Jacobian matrix under electric network swim, calculates each node in physics transmission line of electricity Voltage and power distribution, obtain electric network current diagram;
S4, risk perceptions early warning is carried out to power grid according to electric network current diagram.
In an alternate embodiment of the present invention where, as shown in Fig. 2, above-mentioned steps S2 calculates power grid according to Net Frame of Electric Network figure Corresponding Jacobian matrix under trend, specifically include it is following step by step:
S201, the corresponding electrical power wiring figure of Net Frame of Electric Network figure is converted into equivalent circuit diagram;
S202, node admittance matrix is constructed according to equivalent circuit diagram;
S203, corresponding Jacobian matrix under electric network swim is calculated according to node admittance matrix.
In step s 201, it is corresponding to extract Net Frame of Electric Network figure according to the Net Frame of Electric Network figure that step S1 is obtained first by the present invention Electrical power wiring figure, then obtained electrical power wiring figure is converted into equivalent circuit diagram.
In step S202, the present invention constructs node admittance matrix according to equivalent circuit diagram, and node admittance matrix is according to electricity Road knowledge finds out the incidence matrix of the network, is solved in the matrix form of nodal voltage equation.
It is above-mentioned that node admittance matrix is constructed according to equivalent circuit diagram, specifically:
The incidence matrix of electric power networks is obtained according to equivalent circuit diagram, when using I=YV matrix form n node of expression Node admittance matrix equation group, i.e.,
Wherein
By taking 3 nodes as an example, node admittance matrix equation group is indicated are as follows:
Wherein, Y11=(y1+y4+y6),Y22=(y2+y5+y6),Y33=(y3+y4+y6) indicate node 1,2,3 self-admittance, Y12=Y21=-y6,Y13=Y31=-y4,Y23=Y32=-y5Indicate the transadmittance between respective nodes.
Respectively node Injection Current column vector and column voltage vector, calculate node admittance matrix, i.e.,
Wherein, Y indicates node admittance matrix, diagonal element YiiIndicate the self-admittance of node i, off diagonal element YijTable Show the transadmittance between node i and node j.
The present invention carries out mathematical abstractions by building node admittance matrix, to electric power networks electrical characteristic, reflects electric power The parameter and wiring condition of network.
In step S203, the present invention calculates corresponding Jacobian matrix under electric network swim, tool according to node admittance matrix Body is
Wherein, JF(V1, V2..., Vn) indicate corresponding Jacobian matrix under electric network swim.
In an alternate embodiment of the present invention where, above-mentioned steps S3 first carries out the Jacobian matrix under electric network swim Singular value decomposition, specifically include it is following step by step:
S301, according to the Jacobian matrix J under electric network swim, enable orthogonal matrix A1=JJT, orthogonal matrix A2=JTJ, A1For The matrix of one m × m, A2For the matrix of a n × n;
S302, orthogonal matrix A is calculated1, A2Characteristic root, be expressed as
Wherein, λ1, λ2Respectively indicate orthogonal matrix A1, A2Characteristic root, E indicate unit matrix;
S303, by orthogonal matrix A1, A2Characteristic root sort from large to small, obtain orthogonal matrix A1, A2Eigenmatrix ∧1, ∧2, it is expressed as
S304, eigenmatrix ∧ is calculated1, ∧2Corresponding eigenvectors matrix, is expressed as
Wherein, U1, U2Respectively indicate eigenmatrix ∧1, ∧2Corresponding eigenvectors matrix,
S305, calculate electric network swim under Jacobian matrix J singular value decomposition, be expressed as
Wherein, ∑ indicates that size is the matrix of m × n, is embodied as
Wherein, ∑1Middle element is character pair matrix ∧1, ∧2The secondary root of middle element.
When the voltage of each node and power are distributed in calculating physics transmission line of electricity, since dynamic element numerical value is difficult to estimate Meter, and it is large number of, it is difficult to control in calculating, therefore the present invention has transmission of electricity for the static cell related generally in power grid Connection type between the big force device of route, power transformer group, reactance group, capacitance group etc. four and force device is such as connected Either parallel connection etc. carries out electric network swim calculating using above-mentioned two calculating key factor.
The present invention is calculated in physics transmission line of electricity by carrying out intellectual analysis to electric network swim data about each node Voltage and power distribution, so that the position of optimization design grid nodes and connection type, reach the stabilization of power grid.
In an alternate embodiment of the present invention where, above-mentioned steps S4 carries out risk perceptions to power grid according to electric network current diagram Early warning, specifically include it is following step by step:
S401, warning information is obtained, positioning and display alarm generation position in electric network current diagram;
S402, the chart spacing that fault element connection is cut out according to power grid topological relation, to the incidence number of the chart spacing Accordingly and topological relation is coloured;
S403, it is based on power grid topological relation, the chart spacing and the fault element is spliced, and it is detailed to generate failure Thin hum pattern;
It is S404, the background color of electric network current diagram is dimmed, highlight the fault detail hum pattern.
In S402, the chart spacing of fault element connection is cut out according to power grid topological relation, specially
Centered on the faulty line where fault element, the two sides tie point of faulty line is found on tidal current chart;
The force device that two sides tie point is separately connected is searched in the power grid topological relation of grid topology data record;
The plant stand where the force device of two sides is searched, searches for the force device institute in the plant stand figure of the force device respectively Chart spacing, cut out respectively in the plant stand figure of both ends force device fault element connection chart spacing.
The present invention is calculated by electric network swim, and the weak ring in transmission line of electricity can be found out in increasingly complicated power grid Section provides strong data for staff in maintenance process and calculates support, optimizes grid power transmission structure, improve the defeated of power grid Electrical efficiency and whole electric power resource utilization rate;For large-scale electricity consumption manufacturing enterprise such as steel-making enterprise etc., trend meter is utilized The adjustment to voltage can be passed through by calculating numerical value, the power plant such as voltage value and power network line needed for can be very good to calculate production Maintain the stabilization of electric power;Risk present in power grid can be calculated out by Load flow calculation, to find the peace in power network line Then full hidden danger is excluded, and improve electric system on the whole by the design scheme that Load flow calculation optimizes power grid Stability and Resource allocation and smoothing ability.
Those of ordinary skill in the art will understand that the embodiments described herein, which is to help reader, understands this hair Bright principle, it should be understood that protection scope of the present invention is not limited to such specific embodiments and embodiments.This field Those of ordinary skill disclosed the technical disclosures can make according to the present invention and various not depart from the other each of essence of the invention The specific variations and combinations of kind, these variations and combinations are still within the scope of the present invention.

Claims (9)

1. a kind of electric network swim risk perceptions method, which comprises the following steps:
S1, Net Frame of Electric Network figure is obtained;
S2, corresponding Jacobian matrix under electric network swim is calculated according to Net Frame of Electric Network figure;
S3, singular value decomposition is carried out to the Jacobian matrix under electric network swim, calculates the electricity of each node in physics transmission line of electricity Pressure and power distribution, obtain electric network current diagram;
S4, risk perceptions early warning is carried out to power grid according to electric network current diagram.
2. electric network swim risk perceptions method as described in claim 1, which is characterized in that the step S2 is according to Net Frame of Electric Network Figure calculate electric network swim under corresponding Jacobian matrix, specifically include it is following step by step:
S201, the corresponding electrical power wiring figure of Net Frame of Electric Network figure is converted into equivalent circuit diagram;
S202, node admittance matrix is constructed according to equivalent circuit diagram;
S203, corresponding Jacobian matrix under electric network swim is calculated according to node admittance matrix.
3. electric network swim risk perceptions method as claimed in claim 2, which is characterized in that the step S202 is according to equivalent electricity Road figure constructs node admittance matrix, specially
The incidence matrix of electric power networks is obtained according to equivalent circuit diagram, node when n node is indicated using I=YV matrix form Admittance matrix equation group, i.e.,
Wherein
Respectively node Injection Current column vector and column voltage vector, calculate node admittance matrix, i.e.,
Wherein, Y indicates node admittance matrix, diagonal element YiiIndicate the self-admittance of node i, off diagonal element YijIndicate node Transadmittance between i and node j.
4. electric network swim risk perceptions method as claimed in claim 2, which is characterized in that in the step S203, power grid tide Flowing down corresponding Jacobian matrix is specially
Wherein, JF(V1, V2..., Vn) indicate corresponding Jacobian matrix under electric network swim.
5. electric network swim risk perceptions method as described in claim 1, which is characterized in that in the step S3, to power grid tide The Jacobian matrix that flows down carries out singular value decomposition, specifically include it is following step by step:
S301, according to the Jacobian matrix J under electric network swim, enable orthogonal matrix A1=JJT, orthogonal matrix A2=JTJ;
S302, orthogonal matrix A is calculated1, A2Characteristic root, be expressed as
Wherein, λ1, λ2Respectively indicate orthogonal matrix A1, A2Characteristic root, E indicate unit matrix;
S303, by orthogonal matrix A1, A2Characteristic root sort from large to small, obtain orthogonal matrix A1, A2Eigenmatrix ∧1, ∧2, it is expressed as
S304, eigenmatrix ∧ is calculated1, ∧2Corresponding eigenvectors matrix, is expressed as
Wherein, U1, U2Respectively indicate eigenmatrix ∧1, ∧2Corresponding eigenvectors matrix;
S305, calculate electric network swim under Jacobian matrix J singular value decomposition, be expressed as
Wherein, ∑ indicates that size is the matrix of m × n.
6. electric network swim risk perceptions method as claimed in claim 5, which is characterized in that calculate the Jacobi under electric network swim When the singular value decomposition of matrix J, matrix ∑ is embodied as
Wherein, ∑1Middle element is character pair matrix ∧1, ∧2The secondary root of middle element.
7. electric network swim risk perceptions method as described in claim 1, which is characterized in that in the step S3, calculate physics When the voltage of each node and power are distributed in transmission line of electricity, specifically to transmission line of electricity in power grid, power transformer group, reactance group, Connection type between the force device and force device of capacitance group is calculated.
8. electric network swim risk perceptions method as described in claim 1, which is characterized in that the step S4 is according to electric network swim Figure to power grid carry out risk perceptions early warning, specifically include it is following step by step:
S401, warning information is obtained, positioning and display alarm generation position in electric network current diagram;
S402, the chart spacing that fault element connection is cut out according to power grid topological relation, to the associated data of the chart spacing with And topological relation is coloured;
S403, it is based on power grid topological relation, the chart spacing and the fault element is spliced, and generate fault detail letter Breath figure;
It is S404, the background color of electric network current diagram is dimmed, highlight the fault detail hum pattern.
9. electric network swim risk perceptions method as claimed in claim 7, which is characterized in that in the step S402, according to electricity Net topology relationship cuts out the chart spacing of fault element connection, specially
Centered on the faulty line where fault element, the two sides tie point of faulty line is found on tidal current chart;
The force device that two sides tie point is separately connected is searched in the power grid topological relation of grid topology data record;
The plant stand where the force device of two sides is searched, where searching for the force device in the plant stand figure of the force device respectively Chart spacing cuts out the chart spacing of fault element connection respectively in the plant stand figure of both ends force device.
CN201910326033.8A 2019-04-23 2019-04-23 A kind of electric network swim risk perceptions method Pending CN110212537A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910326033.8A CN110212537A (en) 2019-04-23 2019-04-23 A kind of electric network swim risk perceptions method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910326033.8A CN110212537A (en) 2019-04-23 2019-04-23 A kind of electric network swim risk perceptions method

Publications (1)

Publication Number Publication Date
CN110212537A true CN110212537A (en) 2019-09-06

Family

ID=67786169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910326033.8A Pending CN110212537A (en) 2019-04-23 2019-04-23 A kind of electric network swim risk perceptions method

Country Status (1)

Country Link
CN (1) CN110212537A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112968470A (en) * 2021-02-20 2021-06-15 中国电建集团华东勘测设计研究院有限公司 Topological optimization method for offshore wind farm current collection system avoiding resonance region

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104166941A (en) * 2014-07-02 2014-11-26 国家电网公司 Alarm information visualization method used for electrical network trend graph and system
CN104463350A (en) * 2014-11-11 2015-03-25 国家电网公司 Regional power grid real-time status visual early warning system based on tide dynamic graphs
CN107947192A (en) * 2017-12-15 2018-04-20 西安理工大学 A kind of optimal reactive power allocation method of droop control type isolated island micro-capacitance sensor

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104166941A (en) * 2014-07-02 2014-11-26 国家电网公司 Alarm information visualization method used for electrical network trend graph and system
CN104463350A (en) * 2014-11-11 2015-03-25 国家电网公司 Regional power grid real-time status visual early warning system based on tide dynamic graphs
CN107947192A (en) * 2017-12-15 2018-04-20 西安理工大学 A kind of optimal reactive power allocation method of droop control type isolated island micro-capacitance sensor

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘宗歧 等: "《电力系统分析 学习指导》", 31 October 2005 *
周海云 等: "《矩阵理论 简明教程》", 30 April 2011 *
陈敏: ""基于最小奇异值灵敏度的静态电压稳定分析与研究"", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112968470A (en) * 2021-02-20 2021-06-15 中国电建集团华东勘测设计研究院有限公司 Topological optimization method for offshore wind farm current collection system avoiding resonance region

Similar Documents

Publication Publication Date Title
CN107895947B (en) Power distribution network fragile line identification method
CN103580022B (en) A kind of electrical power system dynamic reactive storage computational methods
CN105403811A (en) Wind power plant power grid fault diagnosis method and device
CN104901308B (en) Power system critical circuits discrimination method
CN103107544B (en) On-line pre-deciding method for offshore oilfield group power grid emergency control
CN109301878A (en) A kind of distributed generation resource consistency control method and control system based on multiple agent
CN112149280A (en) Method for obtaining power grid strength of multi-feed-in system of new energy containing SVG
CN110350522A (en) A kind of electric system vulnerable line identifying method based on Weighted H index
CN104361200A (en) Sensitivity-based reactive compensation and location optimization method
CN104408539B (en) A kind of comprehensive evaluation of power distribution network optimization allocation method and system
Zhang et al. Reliability evaluation of modular multilevel converter based on Markov model
Li et al. Optimization method of skeleton network partitioning scheme considering resilience active improvement in power system restoration after typhoon passes through
CN109802417A (en) Reply DC Line Fault impacts the power grid emergency control method and device of weak communication channel
CN110212537A (en) A kind of electric network swim risk perceptions method
CN114186858A (en) Method and system for evaluating importance of energy storage planning node of power distribution network
Khare et al. Optimal PMU placement using matrix modification based integer linear programming
CN103997041B (en) A kind of on-Line Voltage stabilizing determination system of alternating current-direct current combined hybrid system
Wu et al. Optimal black start strategy for microgrids considering the uncertainty using a data‐driven chance constrained approach
Gao et al. Concepts, structure and developments of high-reliability cyber-physical fusion based coordinated planning for distribution system
CN116054224A (en) Quick evaluation method for commutation failure of multi-feed direct-current transmission system
CN104156614A (en) Electric-system risk assessment method based on static security region
CN112653136A (en) Power electronic multi-feed-in power system key line identification method and system
CN107818414B (en) Method for generating N-2 expected accident set of large-scale alternating current-direct current hybrid power grid
CN106410788A (en) Key line identification method for power grid based on transmission betweenness
Cao et al. Quantitative Analysis of Dynamic Response Features of Sending-end Power Grid under LCC-HVDC Blocking

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190906

RJ01 Rejection of invention patent application after publication