CN110212471A - Generate electricity fast power restoration system - Google Patents

Generate electricity fast power restoration system Download PDF

Info

Publication number
CN110212471A
CN110212471A CN201910530461.2A CN201910530461A CN110212471A CN 110212471 A CN110212471 A CN 110212471A CN 201910530461 A CN201910530461 A CN 201910530461A CN 110212471 A CN110212471 A CN 110212471A
Authority
CN
China
Prior art keywords
cable
restoration system
coupler
power restoration
fast power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910530461.2A
Other languages
Chinese (zh)
Inventor
沈振宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Norte Technology Co Ltd
Original Assignee
Yunnan Norte Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Norte Technology Co Ltd filed Critical Yunnan Norte Technology Co Ltd
Priority to CN201910530461.2A priority Critical patent/CN110212471A/en
Publication of CN110212471A publication Critical patent/CN110212471A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G15/00Cable fittings
    • H02G15/08Cable junctions
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/08Distribution boxes; Connection or junction boxes

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Stand-By Power Supply Arrangements (AREA)

Abstract

The invention discloses power generation fast power restoration systems, including quickly accessing case, connecting cable and MC confluence clamp, the surface for quickly accessing case is provided with MC and quickly accesses socket, the connecting cable includes the first cable, one end of first cable is connected with the female coupler for being inserted into male panel itself, the other end of first cable is connected with the public coupler inside insertion parent panel, connecting cable further includes the second cable, one end of second cable is provided with the female coupler connecting with the male coupler of the first cable, the other end of second cable, which is provided with, is connected with public coupler with parent panel.The present invention can obtain social benefit and management benefit, electricity consumption reliability can also be improved, generator car fast power restoration system is effectively reduced frequency of power cut, shortens customer outage hours, user is avoided to have a power failure overtime and super secondary, pass through the tracking to power failure equipments, it can determine the range and user that power-off event influences, effectively promotion service quality.

Description

Generate electricity fast power restoration system
Technical field
The present invention relates to technical field of power generation, more particularly to power generation fast power restoration system.
Background technique
With the development of society, electric power has more and more important influence to resident living, not only it is related to the life of resident Living, production and study, also will affect the amusement and communication of resident, once having a power failure, can produce bigger effect to resident living.Restore Electric power, it is particularly significant to establish fast power restoration system, can not only establish fast power restoration reaction mechanism, reduces client's power off time, Scope of power outage, additionally it is possible to the adverse effect of power failure is reduced, for this purpose, it is proposed that power generation fast power restoration system.
Summary of the invention
Technical problems based on background technology, the invention proposes power generation fast power restoration systems, have and reduce power failure Number shortens customer outage hours, avoids user's power failure time-out and super secondary feature, solving the prior art can not fast quick-recovery Power supply, the problem of being produced bigger effect to resident living.
The invention provides the following technical scheme: power generation fast power restoration system, including quickly access case, connecting cable and MC and converge Clamp is flowed, the surface for quickly accessing case is provided with MC and quickly accesses socket, and the connecting cable includes the first cable, described One end of first cable is connected with the female coupler for being inserted into male panel itself, and it is female that the other end of first cable is connected with insertion The public coupler of panel itself.
Preferably, the connecting cable further includes the second cable, and one end of second cable is provided with and the first cable Male coupler connection female coupler, the other end of second cable, which is provided with, is connected with public coupler with parent panel.
Preferably, the connecting cable further includes third cable, and one end of the third cable is connected with to be connected with public panel The other end of the female coupler connect, the third cable connects wired ear.
Preferably, the length of first cable is 35 meters, and the length of second cable is 24 meters, the third cable Length be 1 meter.
Preferably, the surface for quickly accessing case is provided with the line ear access socket connecting with line ear.
Preferably, one end of the MC confluence clamp is connected with parallel busbar line, and the other end of the MC confluence clamp connects Be connected to can 360 degree rotation connector.
Preferably, the installation tool coincideing for screwing contact element and bronze medal, the peace are provided on the connector Holding tool is detachable.
Preferably, the surface for quickly accessing case is provided with work dial gauge, chopper switch and killer switch.
The present invention provides power generation fast power restoration systems, and the 40-60 minute that the prior art expends is foreshortened to 2-4 minutes, Social benefit and management benefit can be obtained, additionally it is possible to electricity consumption reliability is improved, since electric power disaster is unavoidable, it is difficult to pre- It surveys, therefore construction fast power restoration system is particularly significant, generator car fast power restoration system is effectively reduced frequency of power cut, shortens and use Family power off time avoids user from having a power failure overtime and super secondary, passes through the tracking to power failure equipments, it may be determined that the model that power-off event influences It encloses and user, is provided strong support for power off notifying to family, effectively promotion service quality.
Detailed description of the invention
Fig. 1 is that the present invention quickly accesses box structure schematic diagram;
Fig. 2 is the cable connection structure schematic diagram of the embodiment of the present invention one;
Fig. 3 is the cable connection structure schematic diagram of the embodiment of the present invention two;
Fig. 4 is the cable connection structure schematic diagram of the embodiment of the present invention three;
Fig. 5 is MC of the present invention confluence clamp structure schematic diagram.
In figure: 1, quickly accessing case;2, connecting cable;3, MC confluence clamp;4, MC quickly accesses socket;5, the first electricity Cable;6, the second cable;7, third cable;8, female coupler;9, public coupler;10, public panel;11, parent panel;12, line ear; 13, line ear accesses socket;14, connector;15, installation tool;16, work dial gauge;17, chopper switch;18, breaker is opened It closes.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1-5, the present invention provides a kind of technical solution: power generation fast power restoration system, including quickly access case 1, Connecting cable 2 and MC converge clamp 3, and the surface for quickly accessing case 1 is provided with MC and quickly accesses socket 4, and connecting cable 2 includes the One cable 5, one end of the first cable 5 are connected with the female coupler 8 being inserted into inside male panel 10, and the other end of the first cable 5 connects The public coupler 9 being connected to inside insertion parent panel 11.
Embodiment one:
Generate electricity fast power restoration system, including quickly accesses case 1, connecting cable 2 and MC confluence clamp 3, quickly accesses case 1 Surface is provided with MC and quickly accesses socket 4, and connecting cable 2 includes the first cable 5, and it is public that one end of the first cable 5 is connected with insertion Female coupler 8 inside panel 10, the other end of the first cable 5 are connected with the public coupler 9 inside insertion parent panel 11, connection Cable 2 further includes the second cable 6, and one end of the second cable 6 is provided with the female coupling connecting with the male coupler 9 of the first cable 5 Device 8, the other end of the second cable 6, which is provided with, is connected with public coupler 9 with parent panel 11, MC converge clamp 3 one end with it is parallel The connection of busbar line, the other end of MC confluence clamp 3 be connected with can 360 degree rotation connector 14, be arranged on connector 14 useful In screwing the contact element installation tool 15 identical with bronze medal, installation tool 15 is detachable, and the surface for quickly accessing case 1 is provided with Work dial gauge 16, chopper switch 17 and killer switch 18.
Connection cables are quickly accessed socket 4 and connect by the technical program with MC only need to expend 1-2 minutes, between connection cables Connection needs to expend 1-2 minutes, and connection cables, which are connect by MC confluence clamp 3 with distribution box, needs to expend 1-2 minutes, consumes in total When 3-6 minutes, and the prior art first step needs to expend 10-15 minutes, and second step needs to expend 20-30 minutes, and third step needs 10-15 minutes are expended, total time-consuming 40-60 minutes, social benefit and management benefit can be obtained using the technical program, moreover it is possible to Electricity consumption reliability is enough improved, since electric power disaster is unavoidable, it is difficult to it predicts, therefore construction fast power restoration system is particularly significant, Generator car fast power restoration system is effectively reduced frequency of power cut, shortens customer outage hours, avoids user from having a power failure overtime and super It is secondary, pass through the tracking to power failure equipments, it may be determined that the range and user that power-off event influences provide effectively for power off notifying to family It supports, effectively promotion service quality.
Embodiment two:
Generate electricity fast power restoration system, including quickly accesses case 1, connecting cable 2 and MC confluence clamp 3, quickly accesses case 1 Surface is provided with MC and quickly accesses socket 4, and connecting cable 2 includes the first cable 5, and it is public that one end of the first cable 5 is connected with insertion Female coupler 8 inside panel 10, the other end of the first cable 5 are connected with the public coupler 9 inside insertion parent panel 11, and MC converges Stream clamp 3 one end connected with parallel busbar line, MC converge clamp 3 the other end be connected with can 360 degree rotation connector 14, The installation tool 15 coincideing for screwing contact element and bronze medal is provided on connector 14, installation tool 15 is detachable, quickly The surface of access case 1 is provided with work dial gauge 16, chopper switch 17 and killer switch 18.
Connection cables are quickly accessed socket 4 and connect by the technical program with MC only need to expend 1-2 minutes, and connection cables pass through MC confluence clamp 3 is connect with distribution box needs to expend 1-2 minutes, in total time-consuming 2-4 minutes, and the prior art first step needs to consume Taking 10-15 minutes, second step needs to expend 20-30 minutes, and third step needs to expend 10-15 minutes, and total time-consuming 40-60 minutes, Social benefit and management benefit can be obtained using the technical program, additionally it is possible to improve electricity consumption reliability, due to electric power disaster without It can avoid, it is difficult to predict, therefore construction fast power restoration system is particularly significant, generator car fast power restoration system, which is effectively reduced, stops Electric number shortens customer outage hours, avoids user from having a power failure overtime and super secondary, passes through the tracking to power failure equipments, it may be determined that stop The range and user that electric event influences, provide strong support for power off notifying to family, effectively promotion service quality.
Embodiment three:
Generate electricity fast power restoration system, including quickly accesses case 1, connecting cable 2 and MC confluence clamp 3, quickly accesses case 1 Surface is provided with MC and quickly accesses socket 4, and connecting cable 2 includes the first cable 5, and it is public that one end of the first cable 5 is connected with insertion Female coupler 8 inside panel 10, the other end of the first cable 5 be connected with insertion parent panel 11 inside public coupler 9, first The length of cable 5 is 35 meters, and the length of the second cable 6 is 24 meters, and the length of third cable 7 is 1 meter, and connecting cable 2 further includes Third cable 7, one end of third cable 7 are connected with the female coupler 8 connecting with male panel 10, and the other end of third cable 7 connects It is connected to line ear 12, the surface for quickly accessing case 1 is provided with the line ear access socket 13 connecting with line ear 12, MC confluence clamp 3 One end is connected with parallel busbar line, MC confluence clamp 3 the other end be connected with can 360 degree rotation connector 14, connector 14 On be provided with the installation tool 15 coincideing for screwing contact element and bronze medal, installation tool 15 is detachable, quickly accesses case 1 Surface is provided with work dial gauge 16, chopper switch 17 and killer switch 18.
Connection cables are connect by the technical program with line ear access socket 13 need to expend 10-15 minutes, and connection cables pass through MC confluence clamp 3 is connect with distribution box needs to expend 1-2 minutes, in total time-consuming 11-17 minutes, and the prior art first step needs 10-15 minutes are expended, second step needs to expend 20-30 minutes, and third step needs to expend 10-15 minutes, and total time-consuming 40-60 points Clock can obtain social benefit and management benefit using the technical program, additionally it is possible to electricity consumption reliability be improved, due to electric power disaster It is unavoidable, it is difficult to predict, therefore construction fast power restoration system is particularly significant, generator car fast power restoration system is effectively reduced Frequency of power cut shortens customer outage hours, avoids user from having a power failure overtime and super secondary, passes through the tracking to power failure equipments, it may be determined that The range and user that power-off event influences, provide strong support for power off notifying to family, effectively promotion service quality.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (8)

1. generate electricity fast power restoration system, including quickly accesses case (1), connecting cable (2) and MC confluence clamp (3), feature exists In: the surface for quickly accessing case (1) is provided with MC and quickly accesses socket (4), and the connecting cable (2) includes the first cable (5), one end of first cable (5), which is connected with, is inserted into the internal female coupler (8) of male panel (10), first cable (5) the other end is connected with the internal public coupler (9) of insertion parent panel (11).
2. power generation fast power restoration system according to claim 1, it is characterised in that: the connecting cable (2) further includes Two cables (6), one end of second cable (6) are provided with the female coupler connecting with the male coupler (9) of the first cable (5) (8), the other end of second cable (6), which is provided with, is connected with public coupler (9) with parent panel (11).
3. power generation fast power restoration system according to claim 2, it is characterised in that: the connecting cable (2) further includes Three cables (7), one end of the third cable (7) are connected with the female coupler (8) connecting with male panel (10), the third electricity The other end of cable (7) connects wired ear (12).
4. power generation fast power restoration system according to claim 3, it is characterised in that: the length of first cable (5) is 35 meters, the length of second cable (6) is 24 meters, and the length of the third cable (7) is 1 meter.
5. power generation fast power restoration system according to claim 3, it is characterised in that: the surface for quickly accessing case (1) It is provided with line ear access socket (13) connecting with line ear (12).
6. power generation fast power restoration system according to claim 1, it is characterised in that: one end of MC confluence clamp (3) Connected with parallel busbar line, the other end of MC confluence clamp (3) be connected with can 360 degree rotation connector (14).
7. power generation fast power restoration system according to claim 6, it is characterised in that: be arranged on the connector (14) useful In screwing the contact element installation tool (15) identical with bronze medal, the installation tool (15) is detachable.
8. power generation fast power restoration system according to claim 1, it is characterised in that: the surface for quickly accessing case (1) It is provided with work dial gauge (16), chopper switch (17) and killer switch (18).
CN201910530461.2A 2019-06-19 2019-06-19 Generate electricity fast power restoration system Pending CN110212471A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910530461.2A CN110212471A (en) 2019-06-19 2019-06-19 Generate electricity fast power restoration system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910530461.2A CN110212471A (en) 2019-06-19 2019-06-19 Generate electricity fast power restoration system

Publications (1)

Publication Number Publication Date
CN110212471A true CN110212471A (en) 2019-09-06

Family

ID=67793562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910530461.2A Pending CN110212471A (en) 2019-06-19 2019-06-19 Generate electricity fast power restoration system

Country Status (1)

Country Link
CN (1) CN110212471A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206557299U (en) * 2017-03-03 2017-10-13 广西云涌科技有限公司 A kind of emergency power supply Quick access device with decompression timing
CN208401087U (en) * 2018-05-09 2019-01-18 武汉里得电力科技股份有限公司 A kind of confluence pinching tools
CN208571036U (en) * 2018-08-07 2019-03-01 武汉里得电力科技股份有限公司 A kind of low pressure quickly accesses complexes
CN209948591U (en) * 2019-06-19 2020-01-14 云南诺霆科技有限公司 Rapid power generation recovery system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206557299U (en) * 2017-03-03 2017-10-13 广西云涌科技有限公司 A kind of emergency power supply Quick access device with decompression timing
CN208401087U (en) * 2018-05-09 2019-01-18 武汉里得电力科技股份有限公司 A kind of confluence pinching tools
CN208571036U (en) * 2018-08-07 2019-03-01 武汉里得电力科技股份有限公司 A kind of low pressure quickly accesses complexes
CN209948591U (en) * 2019-06-19 2020-01-14 云南诺霆科技有限公司 Rapid power generation recovery system

Similar Documents

Publication Publication Date Title
US9995768B2 (en) Interconnection meter socket adapters
US9318861B2 (en) Meter collar for plug-in connection of distributed power generation
US9772347B2 (en) Interconnection meter socket adapters
US9379545B2 (en) Systems and methods for battery assemblies
CN114144683B (en) System for electrically connecting a metering device and a distributed energy device
US20130106397A1 (en) Meter collar for plug-in connection of distributed power generation
US20100191489A1 (en) Distributed Generation Power System
US11428710B2 (en) Methods and systems for connecting and metering distributed energy resource devices
TWI521817B (en) Distribution board, distribution board system, and self-sustaining distribution board
CN109309933A (en) A kind of mobile phone signal open air femto cell monitoring system
US7991567B1 (en) Centralized operating meter for energy technologies
JP6179590B2 (en) Link adapter, distribution board, distribution board system
CN105067859A (en) Power metering system equipped with monitoring component
CN209948591U (en) Rapid power generation recovery system
KR101200950B1 (en) Power management system for using wired and wireless data gathering unit
CN110212471A (en) Generate electricity fast power restoration system
WO2007014424A1 (en) An electrical power distribution and control system
US4884022A (en) Voltage testing device attachable to the blade terminals of a power meter
CN105515185A (en) Small-sized relay protection intelligent terminal device adopting clamping structure
CN212462270U (en) AC power supply line and cabinet device
CN205862557U (en) A kind of electric energy meter centralized automatic meter-reading device
WO2017011339A1 (en) Interconnection meter socket adapters
CN104460571A (en) UPS remote monitoring system
CN203405480U (en) Voltage quality monitor installation box with protection
CN205791806U (en) A kind of dish-style Stirling solar power generation monitoring system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination