CN110210789A - Resource distribution dispatching method, the device, equipment of power grid test business - Google Patents

Resource distribution dispatching method, the device, equipment of power grid test business Download PDF

Info

Publication number
CN110210789A
CN110210789A CN201910522366.8A CN201910522366A CN110210789A CN 110210789 A CN110210789 A CN 110210789A CN 201910522366 A CN201910522366 A CN 201910522366A CN 110210789 A CN110210789 A CN 110210789A
Authority
CN
China
Prior art keywords
business
measured
resource
test
power grid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910522366.8A
Other languages
Chinese (zh)
Inventor
曾纪钧
黎睿德
刘晔
龙震岳
林嘉鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Information Center of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Information Center of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Information Center of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201910522366.8A priority Critical patent/CN110210789A/en
Publication of CN110210789A publication Critical patent/CN110210789A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of resource distribution dispatching methods of power grid test business, method includes the following steps: obtaining the idling-resource of power grid test macro;The corresponding test prioritization of each business to be measured is calculated, and by each delineation of activities to be measured into corresponding test prioritization queue;Using the sequence of colony intelligence optimization algorithm according to priority from high to low, idling-resource is distributed to each business to be measured in each test prioritization queue.Using technical solution provided by the embodiment of the present invention, testing efficiency is significantly improved, improves resource utilization, reduces test operating cost.The invention also discloses resource distribution dispatching device, equipment and the storage mediums of a kind of power grid test business, have relevant art effect.

Description

Resource distribution dispatching method, the device, equipment of power grid test business
Technical field
The present invention relates to the configuration of power network resources intelligence and dispatching technique fields, more particularly to a kind of power grid test business Resource distribution dispatching method, device, equipment and computer readable storage medium.
Background technique
Modern age scientific and technological progress promotes the automation and intelligence of production process again, proposes to the power quality of power grid higher The requirement of update needs to test power grid.
In the prior art, power grid test organization carries out the demand money of artificial layout test plan and human configuration test business Source generally requires repeatedly to confirm that can system idling-resource meet the test plan of institute's layout, while more systems being needed to provide Source ensures that test business smoothly executes.If there are abnormal conditions in test process of service execution, tester can not the One time adjusted test plan, and testing efficiency is low, and the resource utilization for testing the test macro of business department is low, tests business It is at high cost.
In conclusion how to efficiently solve, existing power grid test method testing efficiency is low, and resource utilization is low, test The problems such as operating cost is high is current those skilled in the art's urgent problem.
Summary of the invention
The object of the present invention is to provide a kind of resource distribution scheduling of power grid test business, this method significantly improves survey Efficiency is tried, resource utilization is improved, reduces test operating cost;It is a further object of the present invention to provide a kind of tests of power grid Resource distribution dispatching method, device, equipment and the computer readable storage medium of business.
In order to solve the above technical problems, the invention provides the following technical scheme:
A kind of resource distribution dispatching method of power grid test business, comprising:
Obtain the idling-resource of power grid test macro;
Calculate the corresponding test prioritization of each business to be measured, and by each delineation of activities to be measured to corresponding test In priority query;
Using the sequence of colony intelligence optimization algorithm according to priority from high to low, the idling-resource is distributed into each survey Try each business to be measured in priority query.
In a kind of specific embodiment of the invention, the idling-resource is being distributed into each test prioritization team After each business to be measured in column, further includes:
When receiving business addition request to be measured, the step of the idling-resource for obtaining power grid test macro is repeated Suddenly, to be redistributed to the idling-resource.
In a kind of specific embodiment of the invention, the corresponding test prioritization of each business to be measured is calculated, comprising:
To the corresponding resource requirement configuration information of each business to be measured, length of testing speech information and urgency level information It is weighted, obtains the corresponding test prioritization of each business to be measured;
By each delineation of activities to be measured into corresponding test prioritization queue, comprising:
By service priority range belonging to each business to be measured, by each delineation of activities to be measured to corresponding test In priority query.
In a kind of specific embodiment of the invention, further includes:
According to the busy degree of the total resources demand configuration information of current each business to be measured, phase is carried out to system resource The investment and release adjustment answered.
A kind of resource distribution dispatching device of power grid test business, comprising:
Source obtaining module, for obtaining the idling-resource of power grid test macro;
Delineation of activities module, for calculating the corresponding test prioritization of each business to be measured, and by each industry to be measured Business is divided into corresponding test prioritization queue;
Resource distribution module, for the sequence using colony intelligence optimization algorithm according to priority from high to low, by the free time Resource allocation is to each business to be measured in each test prioritization queue.
In a kind of specific embodiment of the invention, the source obtaining module is also used to by the idling-resource After distributing to each business to be measured in each test prioritization queue, when receiving business addition request to be measured, The step of repeating the idling-resource for obtaining power grid test macro, to be redistributed to the idling-resource.
In a kind of specific embodiment of the invention, the delineation of activities module includes priority computational submodule and industry Business divides submodule,
The priority computational submodule be specially to the corresponding resource requirement configuration information of each business to be measured, Length of testing speech information and urgency level information are weighted, and obtain the corresponding test prioritization of each business to be measured Module;
The delineation of activities submodule is specially to press service priority range belonging to each business to be measured, will be each described Delineation of activities to be measured is to the module in corresponding test prioritization queue.
In a kind of specific embodiment of the invention, further includes:
System resource adjusts module, for the busy according to the currently total resources demand configuration information of each business to be measured Degree is put into accordingly to system resource and is discharged adjustment.
A kind of resource distribution controlling equipment of power grid test business, comprising:
Memory, for storing computer program;
Processor realizes the resource distribution scheduling of power grid test business as previously described when for executing the computer program The step of method.
A kind of computer readable storage medium is stored with computer program on the computer readable storage medium, described The step of resource distribution dispatching method of power grid test business as previously described is realized when computer program is executed by processor.
Using method provided by the embodiment of the present invention, by the way that when executing power grid test business, the automatic power grid that obtains is surveyed The idling-resource of test system, calculates the corresponding test prioritization of each business to be measured, and will each delineation of activities to be measured to correspondence Test prioritization queue in, using the sequence of colony intelligence optimization algorithm according to priority from high to low, idling-resource is distributed to Each business to be measured in each test prioritization queue.It is tested compared to existing by artificial layout test plan and human configuration The mode of business demand resource, the application is by automatically calculating the idling-resource of power grid test macro using colony intelligence optimization Idling-resource is distributed to each business to be measured in each test prioritization queue by the sequence of method according to priority from high to low, larger Ground improves testing efficiency, improves resource utilization, reduces test operating cost.
Correspondingly, the embodiment of the invention also provides corresponding with the above-mentioned power grid test resource distribution dispatching method of business Power grid test business resource distribution dispatching device, equipment and computer readable storage medium, have above-mentioned technique effect, This is repeated no more.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is a kind of implementation flow chart for the resource distribution dispatching method that power grid tests business in the embodiment of the present invention;
Fig. 2 is another implementation flow chart for the resource distribution dispatching method that power grid tests business in the embodiment of the present invention;
Fig. 3 is a kind of structural block diagram of the resource distribution dispatching device of power grid test business in the embodiment of the present invention;
Fig. 4 is a kind of structural block diagram of the resource distribution controlling equipment of power grid test business in the embodiment of the present invention.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, with reference to the accompanying drawings and detailed description The present invention is described in further detail.Obviously, described embodiments are only a part of the embodiments of the present invention, rather than Whole embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise Under every other embodiment obtained, shall fall within the protection scope of the present invention.
Embodiment one:
Referring to Fig. 1, Fig. 1 is a kind of implementation stream for the resource distribution dispatching method that power grid tests business in the embodiment of the present invention Cheng Tu, this method may comprise steps of:
S101: the idling-resource of power grid test macro is obtained.
Director server can be established in advance with the power grid test macro in power grid test organization and is connected to the network, and can such as be passed through GPRS or WIFI network connection such as can be start by set date test business, can obtain when needing to test business to be measured The idling-resource of power grid test macro is taken, so as to know the current resource distribution situation of power grid test macro.
S102: calculating the corresponding test prioritization of each business to be measured, and by each delineation of activities to be measured to corresponding survey It tries in priority query.
For existing business to be measured, the corresponding test prioritization of each business to be measured can be calculated, it such as can be according to The urgency level of each business to be measured is each corresponding test prioritization of traffic assignments to be measured.And test prioritization can be preset Queue, and each delineation of activities to be measured can such as be preset into the to be measured of which rank into corresponding test prioritization queue Business corresponds to the test prioritization queue of which appropriate level, in order to it is subsequent according to the test arranging service table to the sky of system Not busy resource is allocated and dispatches.
S103: using the sequence of colony intelligence optimization algorithm according to priority from high to low, idling-resource is distributed into each test Each business to be measured in priority query.
The idling-resource of power grid test macro is being got, and it is preferential that the corresponding test of each business to be measured is calculated Grade and by each business to be measured and after being divided into corresponding test prioritization queue, can use colony intelligence optimization algorithm with maximum Changing cloud computing resources utilization rate is guiding, finds out the optimal solution of all service dynamic planning to be measured in each test prioritization queue, And according to the principle of priority from high in the end, the sky of the business to be measured in the high test prioritization queue of preferential layout priority The idling-resource distribution of business to be tested in not busy resource allocation, then the low test prioritization queue of layout priority, thus raw At optimal test arranging service table, so as to carry out test operation to each business to be measured according to each test prioritization, realize Automation layout to power grid business to be measured avoids and fights for test business caused by resource mutually between each business to be measured and execute Have some setbacks problem, can real-time and accurately grasp the idling-resource of current service resources conditions of demand and power grid test macro to be measured Situation.It does not need artificial cumbersome ground and repeatedly confirms whether system idling-resource can satisfy the test plan of institute's layout, do not need For each business to be measured it is special it is vacant go out excessive resource ensure the smooth execution of each business to be measured, reduce unit business to be measured Resource consumption, cloud computing intelligent resource distribution and scheduling system can effectively be combined with test business, fill power grid The blank that layout test assignment is automated in Process of Information, improves resource utilization, significantly improves to business to be measured Testing efficiency, reduce test operating cost.
Using method provided by the embodiment of the present invention, by the way that when executing power grid test business, the automatic power grid that obtains is surveyed The idling-resource of test system, calculates the corresponding test prioritization of each business to be measured, and will each delineation of activities to be measured to correspondence Test prioritization queue in, using the sequence of colony intelligence optimization algorithm according to priority from high to low, idling-resource is distributed to Each business to be measured in each test prioritization queue.It is tested compared to existing by artificial layout test plan and human configuration The mode of business demand resource, the application is by automatically calculating the idling-resource of power grid test macro using colony intelligence optimization Idling-resource is distributed to each business to be measured in each test prioritization queue by the sequence of method according to priority from high to low, larger Ground improves testing efficiency, improves resource utilization, reduces test operating cost.
It should be noted that based on the above embodiment one, the embodiment of the invention also provides be correspondingly improved scheme.Rear Involved in continuous embodiment with can mutually be referred between same steps or corresponding steps in above-described embodiment one, corresponding beneficial effect Can also be cross-referenced, it is no longer repeated one by one in improvement embodiment below.
Embodiment two:
Referring to fig. 2, Fig. 2 is that the another of the resource distribution dispatching method that power grid tests business in the embodiment of the present invention is implemented Flow chart, this method may comprise steps of:
S201: the idling-resource of power grid test macro is obtained.
S202: the corresponding resource requirement configuration information of each business to be measured, length of testing speech information and urgency level are believed Breath is weighted, and obtains the corresponding test prioritization of each business to be measured.
In view of the resource requirement configuration information of each business to be measured, length of testing speech information and urgency level information survey calculating The importance of priority is tried, it can be to the corresponding resource requirement configuration information of each business to be measured, length of testing speech information and tight Anxious degree information is weighted, and obtains the corresponding weight of each business to be measured, so as to according to weight size obtain respectively to The corresponding test prioritization of survey business.For example, being essentially that the corresponding test of the relatively high business to be measured of urgency level is excellent First grade is relatively high.
S203: by service priority range belonging to each business to be measured, each delineation of activities to be measured is excellent to corresponding test In first grade queue.
Multiple service priority ranges can be preset, the corresponding test of each business to be measured is preferential being calculated It, can be preferential to corresponding test by each delineation of activities to be measured by service priority range belonging to each business to be measured after grade In grade queue.
S204: using the sequence of colony intelligence optimization algorithm according to priority from high to low, idling-resource is distributed into each test Each business to be measured in priority query.
S205: judging whether to receive business addition request to be measured, if so, the step of repeating S201 to S204, If it is not, thening follow the steps S206.
Director server can obtain in real time the test business executive condition of test macro, the operating status of test macro with And whether receive business addition request to be measured.When determine receive business to be measured addition request when, then illustrate there is currently The priority of each business to be measured is there may be variation, the step of needing to repeat S201 to S204, to update current electric grid The idling-resource of test macro and the priority that each business to be measured after new business to be measured is added, to carry out weight to idling-resource New distribution, realizes the automation layout to power grid business to be measured.Generally guarantee test macro normal operation, when receive to After the addition request of survey business, director server can recalculate the priority of all business to be measured, and be divided into corresponding test In priority query, priority level is first calculated to maximize cloud computing resources utilization rate as guiding using colony intelligence optimization algorithm The resource allocation proposal of business to be measured in high test prioritization queue, then calculate in the low test prioritization queue of priority to The service resources allocation plan to be measured of survey business.It is eventually calculated in 2min~3min and generates newest arranging service to be measured Planning chart and corresponding resource distribution and scheduling scheme, thus realize that power grid test organization directly effectively increases and decreases test business, And efficiently carry out operational trials work.And works as test macro operating status to deposit when abnormal, step can also be repeated Test arranging service work of the S201 into step S204, can adjust in time test plan.If not receiving to be measured Business addition request, then illustrate that not new business to be measured is added, can continue to hold according to original test arranging service scheme Each test business of row, and step S206 can be continued to execute.
S206: according to the busy degree of the total resources demand configuration information of current each business to be measured, system resource is carried out Corresponding investment and release adjustment.
It, can be according to current each to be measured under the premise of guaranteeing that the resource allocation of each business to be measured meets test resource demand The busy degree of the total resources demand configuration information of business, is put into accordingly to system resource and is discharged adjustment." not busy When ", i.e., it, can be to the system of not running when being much smaller than the total resources of power grid test macro to resource needed for operational trials to be measured Resource is discharged.In " busy ", i.e., when larger to resource needed for operational trials to be measured, the resource previously discharged can be thrown Enter test to use, to improve system resource utilization rate, and realizes the smallest optimal solution adaptive resource scheduling strategy of energy consumption. System resource can be virtual machine system resource.
Corresponding to above method embodiment, the embodiment of the invention also provides a kind of resource distributions of power grid test business Dispatching device, the resource distribution dispatching device of power grid test business described below and the money of above-described power grid test business Source configuration schedules method can correspond to each other reference.
Referring to Fig. 3, Fig. 3 is a kind of structural frames of the resource distribution dispatching device of power grid test business in the embodiment of the present invention Figure, the apparatus may include:
Source obtaining module 31, for obtaining the idling-resource of power grid test macro;
Delineation of activities module 32, for calculating the corresponding test prioritization of each business to be measured, and by each business to be measured It is divided into corresponding test prioritization queue;
Resource distribution module 33 provides the free time for the sequence using colony intelligence optimization algorithm according to priority from high to low Distribute to each business to be measured in each test prioritization queue in source.
Using device provided by the embodiment of the present invention, by the way that when executing power grid test business, the automatic power grid that obtains is surveyed The idling-resource of test system, calculates the corresponding test prioritization of each business to be measured, and will each delineation of activities to be measured to correspondence Test prioritization queue in, using the sequence of colony intelligence optimization algorithm according to priority from high to low, idling-resource is distributed to Each business to be measured in each test prioritization queue.It is tested compared to existing by artificial layout test plan and human configuration The mode of business demand resource, the application is by automatically calculating the idling-resource of power grid test macro using colony intelligence optimization Idling-resource is distributed to each business to be measured in each test prioritization queue by the sequence of method according to priority from high to low, larger Ground improves testing efficiency, improves resource utilization, reduces test operating cost.
In a kind of specific embodiment of the invention, source obtaining module 31 is also used to distribute to by idling-resource After each business to be measured in each test prioritization queue, when receiving business addition request to be measured, acquisition electricity is repeated The step of idling-resource of net test macro, to be redistributed to idling-resource.
In a kind of specific embodiment of the invention, delineation of activities module 32 includes priority computational submodule and business Submodule is divided,
Priority computational submodule is specially to the corresponding resource requirement configuration information of each business to be measured, length of testing speech Information and urgency level information are weighted, and obtain the module of the corresponding test prioritization of each business to be measured;
Delineation of activities submodule is specially to press service priority range belonging to each business to be measured, by each delineation of activities to be measured To the module in corresponding test prioritization queue.
In a kind of specific embodiment of the invention, further includes:
System resource adjusts module, for the busy journey according to the currently total resources demand configuration information of each business to be measured Degree, is put into accordingly to system resource and is discharged adjustment.
Corresponding to above method embodiment, referring to fig. 4, Fig. 4 is the resource that power grid provided by the present invention tests business The schematic diagram of configuration schedules equipment, the equipment may include:
Memory 41, for storing computer program;
Processor 42 can realize following steps when for executing the computer program of the above-mentioned storage of memory 41:
Obtain the idling-resource of power grid test macro;The corresponding test prioritization of each business to be measured is calculated, and will be each Delineation of activities to be measured is into corresponding test prioritization queue;Utilize colony intelligence optimization algorithm according to priority from high to low suitable Idling-resource is distributed to each business to be measured in each test prioritization queue by sequence.
Above method embodiment is please referred to for the introduction of equipment provided by the invention, this will not be repeated here by the present invention.
It is computer-readable the present invention also provides a kind of computer readable storage medium corresponding to above method embodiment It is stored with computer program on storage medium, can realize following steps when computer program is executed by processor:
Obtain the idling-resource of power grid test macro;The corresponding test prioritization of each business to be measured is calculated, and will be each Delineation of activities to be measured is into corresponding test prioritization queue;Utilize colony intelligence optimization algorithm according to priority from high to low suitable Idling-resource is distributed to each business to be measured in each test prioritization queue by sequence.
The computer readable storage medium may include: USB flash disk, mobile hard disk, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), magnetic or disk etc. is various to deposit Store up the medium of program code.
Above method embodiment is please referred to for the introduction of computer readable storage medium provided by the invention, the present invention exists This is not repeated them here.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with it is other The difference of embodiment, same or similar part may refer to each other between each embodiment.For being filled disclosed in embodiment It sets, for equipment and computer readable storage medium, since it is corresponded to the methods disclosed in the examples, so the comparison of description Simply, reference may be made to the description of the method.
Used herein a specific example illustrates the principle and implementation of the invention, and above embodiments are said It is bright to be merely used to help understand technical solution of the present invention and its core concept.It should be pointed out that for the common of the art , without departing from the principle of the present invention, can be with several improvements and modifications are made to the present invention for technical staff, these Improvement and modification are also fallen within the protection scope of the claims of the present invention.

Claims (10)

1. a kind of resource distribution dispatching method of power grid test business characterized by comprising
Obtain the idling-resource of power grid test macro;
It calculates the corresponding test prioritization of each business to be measured and tests each delineation of activities to be measured preferentially to corresponding In grade queue;
Using the sequence of colony intelligence optimization algorithm according to priority from high to low, it is excellent that the idling-resource is distributed into each test Each business to be measured in first grade queue.
2. the resource distribution dispatching method of power grid according to claim 1 test business, which is characterized in that by the sky After not busy resource allocation is to each business to be measured in each test prioritization queue, further includes:
When receiving business to be measured addition request, the step of repeating the idling-resource for obtaining power grid test macro, To be redistributed to the idling-resource.
3. the resource distribution dispatching method of power grid test business according to claim 1 or 2, which is characterized in that calculate each The corresponding test prioritization of business to be measured, comprising:
The corresponding resource requirement configuration information of each business to be measured, length of testing speech information and urgency level information are carried out Weighted calculation obtains the corresponding test prioritization of each business to be measured;
By each delineation of activities to be measured into corresponding test prioritization queue, comprising:
It is by service priority range belonging to each business to be measured, each delineation of activities to be measured is preferential to corresponding test In grade queue.
4. the resource distribution dispatching method of power grid test business according to claim 3, which is characterized in that further include:
According to the busy degree of the total resources demand configuration information of current each business to be measured, system resource is carried out corresponding Investment and release adjustment.
5. a kind of resource distribution dispatching device of power grid test business characterized by comprising
Source obtaining module, for obtaining the idling-resource of power grid test macro;
Delineation of activities module is drawn for calculating the corresponding test prioritization of each business to be measured, and by each business to be measured It assigns in corresponding test prioritization queue;
Resource distribution module, for the sequence using colony intelligence optimization algorithm according to priority from high to low, by the idling-resource Distribute to each business to be measured in each test prioritization queue.
6. the resource distribution dispatching device of power grid test business according to claim 5, which is characterized in that the resource obtains Modulus block, be also used to the idling-resource is distributed to each business to be measured in each test prioritization queue it Afterwards, when receiving business to be measured addition request, the step of repeating the idling-resource for obtaining power grid test macro, with The idling-resource is redistributed.
7. the resource distribution dispatching device of power grid test business according to claim 5 or 6, which is characterized in that the industry Business division module includes priority computational submodule and delineation of activities submodule,
The priority computational submodule is specially to the corresponding resource requirement configuration information of each business to be measured, test Duration information and urgency level information are weighted, and obtain the mould of the corresponding test prioritization of each business to be measured Block;
The delineation of activities submodule is specially to press service priority range belonging to each business to be measured, will be each described to be measured Delineation of activities is to the module in corresponding test prioritization queue.
8. the resource distribution dispatching device of power grid test business according to claim 7, which is characterized in that further include:
System resource adjusts module, for the busy journey according to the currently total resources demand configuration information of each business to be measured Degree, is put into accordingly to system resource and is discharged adjustment.
9. a kind of resource distribution controlling equipment of power grid test business characterized by comprising
Memory, for storing computer program;
Processor, the power grid test business as described in any one of Claims 1-4 is realized when for executing the computer program The step of resource distribution dispatching method.
10. a kind of computer readable storage medium, which is characterized in that be stored with computer on the computer readable storage medium Program realizes the money of the power grid test business as described in any one of Claims 1-4 when the computer program is executed by processor The step of source configuration schedules method.
CN201910522366.8A 2019-06-17 2019-06-17 Resource distribution dispatching method, the device, equipment of power grid test business Pending CN110210789A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910522366.8A CN110210789A (en) 2019-06-17 2019-06-17 Resource distribution dispatching method, the device, equipment of power grid test business

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910522366.8A CN110210789A (en) 2019-06-17 2019-06-17 Resource distribution dispatching method, the device, equipment of power grid test business

Publications (1)

Publication Number Publication Date
CN110210789A true CN110210789A (en) 2019-09-06

Family

ID=67793155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910522366.8A Pending CN110210789A (en) 2019-06-17 2019-06-17 Resource distribution dispatching method, the device, equipment of power grid test business

Country Status (1)

Country Link
CN (1) CN110210789A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111506898A (en) * 2020-04-07 2020-08-07 中国信息通信研究院 Information service security evaluation method and device
CN111709723A (en) * 2020-07-20 2020-09-25 港胜技术服务(深圳)有限公司 RPA business process intelligent processing method, device, computer equipment and storage medium
CN111800310A (en) * 2020-06-17 2020-10-20 北京智网信测科技有限公司 Scheduling algorithm for task management module of Internet of things testing cloud platform
CN112650687A (en) * 2020-12-30 2021-04-13 绿盟科技集团股份有限公司 Method, device, equipment and medium for testing execution priority of engine scheduling action
CN113282402A (en) * 2021-07-22 2021-08-20 航天中认软件测评科技(北京)有限责任公司 Test task scheduling method oriented to complex resource constraint
CN114285780A (en) * 2021-12-23 2022-04-05 中国电子科技集团公司第十四研究所 Radar network testing system and method based on priority queue
CN115794591A (en) * 2023-02-06 2023-03-14 南方电网数字电网研究院有限公司 Scheduling method of power grid IT (information technology) resources

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102915254A (en) * 2011-08-02 2013-02-06 中兴通讯股份有限公司 Task management method and device
CN103699445A (en) * 2013-12-19 2014-04-02 北京奇艺世纪科技有限公司 Task scheduling method, device and system
CN106506670A (en) * 2016-11-21 2017-03-15 北京永信至诚科技股份有限公司 A kind of cloud platform virtual resource high speed dispatching method and system
CN108345501A (en) * 2017-01-24 2018-07-31 全球能源互联网研究院 A kind of distributed resource scheduling method and system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102915254A (en) * 2011-08-02 2013-02-06 中兴通讯股份有限公司 Task management method and device
CN103699445A (en) * 2013-12-19 2014-04-02 北京奇艺世纪科技有限公司 Task scheduling method, device and system
CN106506670A (en) * 2016-11-21 2017-03-15 北京永信至诚科技股份有限公司 A kind of cloud platform virtual resource high speed dispatching method and system
CN108345501A (en) * 2017-01-24 2018-07-31 全球能源互联网研究院 A kind of distributed resource scheduling method and system

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111506898A (en) * 2020-04-07 2020-08-07 中国信息通信研究院 Information service security evaluation method and device
CN111800310B (en) * 2020-06-17 2021-11-26 北京智网信测科技有限公司 Scheduling method for task management module of Internet of things test cloud platform
CN111800310A (en) * 2020-06-17 2020-10-20 北京智网信测科技有限公司 Scheduling algorithm for task management module of Internet of things testing cloud platform
CN111709723A (en) * 2020-07-20 2020-09-25 港胜技术服务(深圳)有限公司 RPA business process intelligent processing method, device, computer equipment and storage medium
CN111709723B (en) * 2020-07-20 2023-11-28 港胜技术服务(深圳)有限公司 RPA business process intelligent processing method, device, computer equipment and storage medium
CN112650687A (en) * 2020-12-30 2021-04-13 绿盟科技集团股份有限公司 Method, device, equipment and medium for testing execution priority of engine scheduling action
CN112650687B (en) * 2020-12-30 2024-03-19 绿盟科技集团股份有限公司 Method, device, equipment and medium for testing execution priority of engine scheduling action
CN113282402B (en) * 2021-07-22 2021-11-05 航天中认软件测评科技(北京)有限责任公司 Test task scheduling method oriented to complex resource constraint
CN113282402A (en) * 2021-07-22 2021-08-20 航天中认软件测评科技(北京)有限责任公司 Test task scheduling method oriented to complex resource constraint
CN114285780A (en) * 2021-12-23 2022-04-05 中国电子科技集团公司第十四研究所 Radar network testing system and method based on priority queue
CN114285780B (en) * 2021-12-23 2023-12-15 中国电子科技集团公司第十四研究所 Radar network testing system and testing method based on priority queue
CN115794591A (en) * 2023-02-06 2023-03-14 南方电网数字电网研究院有限公司 Scheduling method of power grid IT (information technology) resources
CN115794591B (en) * 2023-02-06 2023-05-23 南方电网数字电网研究院有限公司 Scheduling method for IT (information technology) resources of power grid

Similar Documents

Publication Publication Date Title
CN110210789A (en) Resource distribution dispatching method, the device, equipment of power grid test business
CN105740051B (en) Cloud computing resources based on Revised genetic algorithum dispatch implementation method
CN109606180B (en) Intelligent dynamic power allocation charging method
CN109861850B (en) SLA-based stateless cloud workflow load balancing scheduling method
CN110515704A (en) Resource regulating method and device based on Kubernetes system
CN105468435A (en) NFV dynamic resource distribution method
CN106293950A (en) A kind of resource optimization management method towards group system
CN102665282B (en) Distribution method of multi-user parallel transmission resource in wireless heterogeneous network
CN104951372A (en) Method for dynamic allocation of Map/Reduce data processing platform memory resources based on prediction
CN113132945B (en) Energy-saving scheduling method and system for railway private network base station cell
CN101374077A (en) Method and system for forwarding network management alarm
WO2020134133A1 (en) Resource allocation method, substation, and computer-readable storage medium
CN110289631A (en) A kind of calculation method and system of wind farm energy storage device capacity
CN109451056A (en) Server dynamic allocation method and system between more clusters
CN103703830B (en) A kind of physical resource adjustment, device and controller
CN115543624A (en) Heterogeneous computing power arrangement scheduling method, system, equipment and storage medium
CN103458520A (en) Allocation method and device of uplink frequency domain resources
CN112092670B (en) Charging pile queuing and charging management method
CN116231632B (en) Power regulation and control method and system for photovoltaic power station, electronic equipment and storage medium
CN116131304A (en) Power distribution energy storage management system for novel power system
CN105955816A (en) Event scheduling method and device
CN112968962B (en) Cloud platform storage resource scheduling method based on distributed computer cluster architecture
CN110955522B (en) Resource management method and system for coordination performance isolation and data recovery optimization
CN104572304A (en) Method for intelligently maintaining and managing cluster rendering tasks in balance manner
CN109475006A (en) M2M service resource allocation method and distribution system based on Dynamic Packet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190906