CN110206481A - 降水井施工装置 - Google Patents

降水井施工装置 Download PDF

Info

Publication number
CN110206481A
CN110206481A CN201910334867.3A CN201910334867A CN110206481A CN 110206481 A CN110206481 A CN 110206481A CN 201910334867 A CN201910334867 A CN 201910334867A CN 110206481 A CN110206481 A CN 110206481A
Authority
CN
China
Prior art keywords
tup
connecting rod
downcomer
reinforcing ring
pressure device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910334867.3A
Other languages
English (en)
Inventor
李智
夏颖
钟卫斌
孙仕斌
刘明周
廖红玉
金锋
杨济滔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN YIYE CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
WUHAN YIYE CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN YIYE CONSTRUCTION ENGINEERING Co Ltd filed Critical WUHAN YIYE CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201910334867.3A priority Critical patent/CN110206481A/zh
Publication of CN110206481A publication Critical patent/CN110206481A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B4/00Drives for drilling, used in the borehole
    • E21B4/06Down-hole impacting means, e.g. hammers
    • E21B4/14Fluid operated hammers

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Paleontology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明公开了一种降水井施工装置,包括空压机、钻机、打压器、连接杆、锤头和降水管,空压机为钻机供能,打压器安装在钻机上,锤头安装在连接杆底端,降水管沿线开设有滤料孔且底端安装有加强环,锤头外径略小于降水管内径、略大于加强环内径,连接杆和锤头插入降水管内,连接杆顶端安装在打压器上。该装置施工难度低,减少了施工工序,节省了工期和材料,避免了塌孔。

Description

降水井施工装置
技术领域
本发明属于市政工程施工领域,具体涉及一种降水井施工装置。
技术背景
在市政工程中,进行深基坑施工时,需要辅助配合降水井进行施工。目前进行降水井施工时,对点位进行循环钻进,然后采用泥浆护壁,同时进行管材加工,管材四周缠绕钢丝网及尼龙网,待钻进成功后,将管材放入孔中,然后洗井,然后在管材两侧回填反滤料,最后运行降水井。目前的降水井施工需要在管材四周布置钢丝网及尼龙网,而且两侧还需要回填反滤料,工艺繁多,工序复杂,施工效率低,效果不好,而且若地层出现建筑垃圾,循环钻进难以施工,容易导致塌孔现象。
发明内容
本发明的目的是提供一种降水井施工装置,该装置施工难度低,减少了施工工序,节省了工期和材料,避免了塌孔。
本发明所采用的技术方案是:
一种降水井施工装置,其特征在于:包括空压机、钻机、打压器、连接杆、锤头和降水管,空压机为钻机供能,打压器安装在钻机上,锤头安装在连接杆底端,降水管沿线开设有滤料孔且底端安装有加强环,锤头外径略小于降水管内径、略大于加强环内径,连接杆和锤头插入降水管内,连接杆顶端安装在打压器上。
进一步地,加强环焊接在降水管底端,连接杆两端分别与锤头和打压器螺纹连接。
进一步地,加强环厚度为5-10mm、高度为4-6cm,锤头外径小于降水管内径5-10mm。
进一步地,滤料孔的孔距为15-25cm。
本发明的有益效果是:
常规装置只能先成孔,再下降水管,成孔尺寸大、施工难度高,该装置成孔和下降水管可以同步进行,钻孔尺寸与降水管尺寸相近,施工难度低,而且方便降水管在锤头的施力下穿透建筑垃圾层,避免了塌孔;降水管到位后无需人工洗井和回填,无需在管材周边需布置尼龙网及钢丝网等,并且降水管可以提前加工,也可以回收周转,在保证施工质量的前提下,减少了施工工序,节省了工期和材料,降低了工程造价。
附图说明
图1是本发明实施例的工作示意图。
图2是本发明实施例中连接杆和锤头的示意图。
图3是本发明实施例中降水管的示意图。
图4是本发明实施例中虹吸作用的示意图。
图5是本发明实施例中水泵排水的示意图。
图中:1-空压机;2-钻机;3-打压器;4-连接杆;5-降水管;6-锤头;7-加强环;8-滤料孔;9-水泵;10-排水管。
具体实施方式
下面结合附图和实施例对本发明作进一步的说明。
一种降水井施工装置,工作步骤为:
S1、如图1所示,定位降水井,将空压机1、钻机2、打压器3、连接杆4、锤头6和降水管5运至降水井位置,其中,空压机1为钻机2供能,打压器3安装在钻机2上,如图2所示,锤头6螺纹连接在连接杆4底端,如图3所示,降水管5沿线开设有滤料孔8(滤料孔8的孔距为15-25cm,优选20cm,作用是透水的同时防止杂质进入降水管5)且底端焊接固定有加强环7,锤头6外径略小于降水管5内径、略大于加强环7内径(加强环7厚度为5-10mm,高度为4-6cm,高度优选5cm,锤头6外径小于降水管5内径5-10mm)。
S2、如图1所示,将连接杆4和锤头6插入降水管5内,再将连接杆4顶端与打压器3螺纹连接。
S3、如图1所示,启动空压机1,钻机2通过打压器3和连接杆4带动锤头6封口的压在加强环7上并向下移动(锤头6封口的压在加强环7上,目的是防止地下水涌入),降水管5随加强环7同步下沉。
S4、降水管5下沉到位后,移走连接杆4和锤头6,如图4所示,地下水在虹吸作用下涌入降水管5内从而完成洗井。
S5、如图5所示,在降水管5内放入水泵9,水泵9通过排水管10将降水管5内的地下水引至降水井外。
S6、基坑施工完成后,通过打拔机将降水管5拔出回收。
常规装置只能先成孔,再下降水管5,成孔尺寸大、施工难度高,该装置成孔和下降水管5可以同步进行,钻孔尺寸与降水管5尺寸相近,施工难度低,而且方便降水管5在锤头6的施力下穿透建筑垃圾层,避免了塌孔;而且降水管5到位后无需人工洗井和回填,避免了常规工艺中需要用循环泵等设备进行洗井,无需在管材周边需布置尼龙网及钢丝网等,并且降水管5可以提前加工,也可以回收周转,在保证施工质量的前提下,减少了施工工序,节省了工期和材料,降低了工程造价。
应当理解的是,对本领域普通技术人员来说,可以根据上述说明加以改进或变换,而所有这些改进和变换都应属于本发明所附权利要求的保护范围。

Claims (4)

1.一种降水井施工装置,其特征在于:包括空压机、钻机、打压器、连接杆、锤头和降水管,空压机为钻机供能,打压器安装在钻机上,锤头安装在连接杆底端,降水管沿线开设有滤料孔且底端安装有加强环,锤头外径略小于降水管内径、略大于加强环内径,连接杆和锤头插入降水管内,连接杆顶端安装在打压器上。
2.如权利要求1所述的降水井施工装置,其特征在于:加强环焊接在降水管底端,连接杆两端分别与锤头和打压器螺纹连接。
3.如权利要求1所述的降水井施工装置,其特征在于:加强环厚度为5-10mm、高度为4-6cm,锤头外径小于降水管内径5-10mm。
4.如权利要求1所述的降水井施工装置,其特征在于:滤料孔的孔距为15-25cm。
CN201910334867.3A 2019-04-24 2019-04-24 降水井施工装置 Pending CN110206481A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910334867.3A CN110206481A (zh) 2019-04-24 2019-04-24 降水井施工装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910334867.3A CN110206481A (zh) 2019-04-24 2019-04-24 降水井施工装置

Publications (1)

Publication Number Publication Date
CN110206481A true CN110206481A (zh) 2019-09-06

Family

ID=67786249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910334867.3A Pending CN110206481A (zh) 2019-04-24 2019-04-24 降水井施工装置

Country Status (1)

Country Link
CN (1) CN110206481A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111425133A (zh) * 2020-03-30 2020-07-17 中国一冶集团有限公司 降水井施工装置及其施工方法
CN113445901A (zh) * 2021-06-04 2021-09-28 中信建设有限责任公司 一种坚硬土层长周期降水的施工方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000020064U (ko) * 1999-04-27 2000-11-25 유인섭 천공기의 공기해머 및 그 비트의 구조
RU2190064C2 (ru) * 2000-11-16 2002-09-27 Жунусова Татьяна Вячеславовна Скважина и способ ее эксплуатации
CN103485357A (zh) * 2013-09-03 2014-01-01 中铁建设集团有限公司 一种轻型井点降水管成孔装置及其方法
US20140054090A1 (en) * 2011-03-04 2014-02-27 Owen Schicker Mechanical force generator for a downhole excitation apparatus
CN203891010U (zh) * 2014-05-22 2014-10-22 赵守众 一次成桩潜孔锤
CN106192981A (zh) * 2016-07-08 2016-12-07 河海大学 一种降水强夯一体装置及其使用方法
CN106284388A (zh) * 2016-08-28 2017-01-04 神翼航空器科技(天津)有限公司 井管及其埋设井管的方法
CN207004431U (zh) * 2017-05-17 2018-02-13 福建岩土工程勘察研究院 软土地基激振打井装置
CN109518706A (zh) * 2018-11-19 2019-03-26 五冶集团上海有限公司 一种成井过程中无需泥浆的降水井施工方法
CN210370479U (zh) * 2019-04-24 2020-04-21 武汉一冶建筑安装工程有限责任公司 降水井施工装置

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000020064U (ko) * 1999-04-27 2000-11-25 유인섭 천공기의 공기해머 및 그 비트의 구조
RU2190064C2 (ru) * 2000-11-16 2002-09-27 Жунусова Татьяна Вячеславовна Скважина и способ ее эксплуатации
US20140054090A1 (en) * 2011-03-04 2014-02-27 Owen Schicker Mechanical force generator for a downhole excitation apparatus
CN103485357A (zh) * 2013-09-03 2014-01-01 中铁建设集团有限公司 一种轻型井点降水管成孔装置及其方法
CN203891010U (zh) * 2014-05-22 2014-10-22 赵守众 一次成桩潜孔锤
CN106192981A (zh) * 2016-07-08 2016-12-07 河海大学 一种降水强夯一体装置及其使用方法
CN106284388A (zh) * 2016-08-28 2017-01-04 神翼航空器科技(天津)有限公司 井管及其埋设井管的方法
CN207004431U (zh) * 2017-05-17 2018-02-13 福建岩土工程勘察研究院 软土地基激振打井装置
CN109518706A (zh) * 2018-11-19 2019-03-26 五冶集团上海有限公司 一种成井过程中无需泥浆的降水井施工方法
CN210370479U (zh) * 2019-04-24 2020-04-21 武汉一冶建筑安装工程有限责任公司 降水井施工装置

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
孙耀民,吕建详,董继伟,常居信,柯海军: "空气潜孔锤取心钻进技术在砂卵砾石层管棚水平钻孔施工中的应用", 地质与勘探, no. 04, 5 August 1994 (1994-08-05) *
杨明超;李贺;常清伟;: "潜孔锤钻机在砂卵石地层降水工程中的应用", 市政技术, no. 05, 10 September 2017 (2017-09-10) *
郭恒;袁啸岩;李金强;陈玮;李小利;: "岩溶地区散土-硬岩复杂地层降水井施工技术研究及应用", 施工技术, no. 19, 10 October 2017 (2017-10-10) *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111425133A (zh) * 2020-03-30 2020-07-17 中国一冶集团有限公司 降水井施工装置及其施工方法
CN113445901A (zh) * 2021-06-04 2021-09-28 中信建设有限责任公司 一种坚硬土层长周期降水的施工方法

Similar Documents

Publication Publication Date Title
CN108149699B (zh) 一种可回收式快速成井的降水井装置及其施工方法
CN103967028A (zh) 一种沉管降水结构及其采用此结构处理突发性基坑水涌、喷泉的方法
CN109667542A (zh) 破碎地层中多级分段非连续跟管钻进锚索施工方法
CN110939137A (zh) 一种用于砂类土层的振动排水锚杆支护结构及其施工方法
CN102383431A (zh) 中掘预应力离心管桩(方桩)沉桩装置及其新型沉桩法
CN102912797A (zh) 一种含有降水功能的基坑支护方法
CN110206481A (zh) 降水井施工装置
CN110318661A (zh) 降水井施工方法
CN201826302U (zh) 用于大直径现浇薄壁混凝土复合桩的成孔器
CN108442386A (zh) 一种可拆芯扩体锚固结构装置及其组装施工方法
CN105908706B (zh) 一种基坑围护结构中灌注桩纵向钢筋的回收方法
CN105780792B (zh) 一种基坑高水头减压降水井封井方法及封井结构
CN206721904U (zh) 一种集成降水抽水系统
CN102345287A (zh) 大直径现浇薄壁混凝土复合桩的施工方法及专用成孔器
CN113863344A (zh) 一种护筒与井管一体化的降水井装置及其施工方法
CN106088123A (zh) 一种砂土地质钢管井降水位装置及其施工方法
CN106939610A (zh) 一种集成降水抽水系统
CN104594349A (zh) 桩基工程中可循环再用钢护筒的液举法施工工法
CN104264671A (zh) 可回收锚杆
CN105804079A (zh) 大直径桩孔内坚硬岩石破碎工具及方法
CN206173985U (zh) 井管
CN206015511U (zh) 一种植桩钢管柱
CN202247919U (zh) 深基坑排水辅助装置
CN210370479U (zh) 降水井施工装置
CN211143179U (zh) 一种分次压入式回灌井结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination