CN110205913A - Assembled steel reinforced concrete combination beam protects logical bridge and construction method - Google Patents

Assembled steel reinforced concrete combination beam protects logical bridge and construction method Download PDF

Info

Publication number
CN110205913A
CN110205913A CN201910483953.0A CN201910483953A CN110205913A CN 110205913 A CN110205913 A CN 110205913A CN 201910483953 A CN201910483953 A CN 201910483953A CN 110205913 A CN110205913 A CN 110205913A
Authority
CN
China
Prior art keywords
steel
bridge
reinforced concrete
component
floorings
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910483953.0A
Other languages
Chinese (zh)
Inventor
张光桥
张迎春
刘东美
李莹炜
刘铭
慕长青
周高军
杨荣泉
郑帅
许晓杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Highway Bridge Construction Co Ltd
Shandong Luqiao Group Co Ltd
Original Assignee
Shandong Highway Bridge Construction Co Ltd
Shandong Luqiao Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Highway Bridge Construction Co Ltd, Shandong Luqiao Group Co Ltd filed Critical Shandong Highway Bridge Construction Co Ltd
Priority to CN201910483953.0A priority Critical patent/CN110205913A/en
Publication of CN110205913A publication Critical patent/CN110205913A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D1/00Bridges in general
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/268Composite concrete-metal
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Abstract

The present invention provides a kind of assembled steel reinforced concrete combination beams to protect logical bridge and construction method, solve the problems, such as that conventional steel bar concrete structure protects logical bridge in terms of construction speed, operation labor intensity, recycling, effectively play as the construction action for temporarily ensureing passing bridge beam bridge.A kind of logical bridge of assembled steel reinforced concrete combination beam guarantor, including floorings component, steel main girder components, connection component and concrete-bar component, wherein: floorings component includes the prefabricated reinforced concrete bridge plate of multiple regular arrangements, reserves between contiguous prefabricated RC bridge deck and pours portion;Steel main girder components include multiple steel girders, and setting is connected as one below floorings component, and through connection component and floorings component;It include longitudinal reinforcement and transverse steel with concrete-bar component, longitudinal reinforcement is arranged between contiguous prefabricated RC bridge deck along bridge length direction, and transverse steel is arranged between contiguous prefabricated RC bridge deck along bridge width direction.

Description

Assembled steel reinforced concrete combination beam protects logical bridge and construction method
Technical field
Present invention relates particularly to a kind of assembled steel reinforced concrete combination beams to protect logical bridge and construction method, belongs to traffic engineering neck Domain.
Background technique
Protecting logical bridge is the provisional bridge for ensureing that automotive safety is current, and the requirement to bridge structure is relatively high, general to join Reinforced concrete structure is used according to permanent bridge form.Although the structure structure safety, site operation larger workload are built If the period is long, and the difficulty of the logical bridge of dismounting guarantor is also larger after the completion of main line road construction, and recovery utilization rate is not high, economical Property is poor.
Summary of the invention
In order to overcome above the shortcomings of the prior art, the present invention provides a kind of assembled steel reinforced concrete combination beams to protect logical bridge Beam and construction method solve conventional steel bar concrete structure and protect logical bridge in construction speed, operation labor intensity, recycling warp The problem for the benefit etc. of helping, effectively play as the construction action for temporarily ensureing passing bridge beam bridge.
The present invention to achieve the above object, is achieved through the following technical solutions:
A kind of logical bridge of assembled steel reinforced concrete combination beam guarantor, including floorings component, steel main girder components, connection component and reinforcing bar group Part, in which:
Floorings component includes the prefabricated reinforced concrete bridge plate of multiple regular arrangements, contiguous prefabricated RC bridge deck it Between reserve pour portion;
Steel main girder components include multiple steel girders, are arranged below floorings component, and pass through connection component and floorings component It is connected as one;With
Concrete-bar component includes longitudinal reinforcement and transverse steel, and longitudinal reinforcement is arranged mixed in contiguous prefabricated reinforcing bar along bridge length direction Between solidifying soil bridge plate, transverse steel is arranged between contiguous prefabricated RC bridge deck along bridge width direction.
The assembled steel reinforced concrete combination beam protects logical bridge preferred embodiment, and connection component includes anchor bolt, between anchor bolt Every being arranged above steel girder, the reserved through hole on prefabricated reinforced concrete bridge plate is arranged in the insertion of the anchor bolt other end.
The assembled steel reinforced concrete combination beam protects logical bridge preferred embodiment, is detachably connected guardrail on the outside of the steel girder of two sides.
The assembled steel reinforced concrete combination beam protects logical bridge preferred embodiment, and steel girder (1) section is I-shaped.
A kind of logical method for bridge construction of assembled steel reinforced concrete combination beam guarantor, comprising the following steps:
1) steel girder is combined into i shaped cross section using steel plate welding;
2) a series of anchor bolts are arranged in setting interval at the top of steel girder;
3) steel guard rail is set on the outside of two sides steel girder, is connected by screw bolts between steel guard rail and steel girder;
4) prefabricated reinforced concrete bridge plate is connect with steel girder;
5) after prefabricated reinforced concrete bridge plate is installed, the longitudinal reinforcement and lateral steel between prefabricated reinforced concrete bridge plate are bound Muscle, while prefabricated reinforced concrete bridge plate reserved through hole is cleared up, finally unify perfusion mortar, it is ensured that floorings component and steel girder Component connection is integral;Pour bridge deck pavement, open to traffic;
6) when needing to remove, after pave-load layer and perfusion mortar are removed, floorings component is hung away using lifting device, is removed Concrete-bar component and steel main girder components as construction next time to use.
The present invention has the advantages that
1, overall structure is simple, and complicated connector, stress be not clear.
2, floorings component, steel main girder components, connection component and concrete-bar component can be prefabricated, are modularization, assembled Component, the factorial production, good reliability.
3, total assembling and disassembling is convenient and efficient, and field operation intensity is small, and construction efficiency is high.
4, floorings component, steel main girder components, the equal recoverable of connection component, good economy performance.
Detailed description of the invention
Attached drawing is used to provide further understanding of the present invention, and constitutes part of specification, with reality of the invention It applies example to be used to explain the present invention together, not be construed as limiting the invention.
Fig. 1 is that assembled steel reinforced concrete combination beam of the present invention protects logical bridge schematic front view.
Fig. 2 is that assembled steel reinforced concrete combination beam of the present invention protects logical bridge schematic side view.
Fig. 3 is that assembled steel reinforced concrete combination beam of the present invention protects logical bridge schematic top plan view.
Fig. 4 is girder schematic front view of the present invention.
Fig. 5 is girder schematic top plan view of the present invention.
Fig. 6 is girder schematic side view of the present invention.
Fig. 7 is the adjacent prefabricated reinforced concrete bridge plate schematic front view of the present invention.
Fig. 8 is the adjacent prefabricated reinforced concrete bridge plate schematic side view of the present invention.
Fig. 9 is the adjacent prefabricated reinforced concrete bridge plate schematic top plan view of the present invention.
In figure, 1, steel girder;2, anchor bolt;3, steel guard rail;4, floorings;5, transverse joint;6, longitudinal joint;7, floorings are reserved Hole.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
A kind of logical bridge of assembled steel reinforced concrete combination beam guarantor, including floorings component, steel main girder components, connection component and reinforcing bar Component,
Floorings component includes the prefabricated reinforced concrete bridge plate 7 of multiple regular arrangements, contiguous prefabricated RC bridge deck 7 Between reserve pour portion;Steel main girder components include multiple steel girders 1, are arranged below floorings component, and pass through connection component It is connected as one with floorings component;Concrete-bar component includes longitudinal reinforcement 6 and transverse steel 5, and longitudinal reinforcement 6 is along bridge length side To being arranged between contiguous prefabricated RC bridge deck 7, transverse steel 5 is arranged along bridge width direction in contiguous prefabricated reinforcing bar Between concrete bridge plate 7.
In the present embodiment, connection component includes anchor bolt 2, and anchor bolt 2 is arranged at intervals on 1 top of steel girder, anchoring Reserved through hole on 2 other end of bolt insertion setting prefabricated reinforced concrete bridge plate 7.
In the present embodiment, guardrail 3 is detachably connected on the outside of the steel girder of two sides.
In the present embodiment, 1 section of steel girder be it is I-shaped, be welded to form using steel plate.
A kind of logical method for bridge construction of assembled steel reinforced concrete combination beam guarantor, comprising the following steps:
1) steel girder is combined into i shaped cross section using steel plate welding;
2) a series of anchor bolts 2 are arranged in setting interval at the top of steel girder;
3) steel guard rail is set on the outside of two sides steel girder, is connected by screw bolts between steel guard rail and steel girder;
4) prefabricated reinforced concrete bridge plate 7 is connect with steel girder;
5) after prefabricated reinforced concrete bridge plate 7 is installed, the longitudinal reinforcement and transverse direction between prefabricated reinforced concrete bridge plate 7 are bound Reinforcing bar, while 7 reserved through hole of prefabricated reinforced concrete bridge plate is cleared up, finally unify perfusion mortar, it is ensured that floorings component and steel Main girder components connection is integral;Pour bridge deck pavement, open to traffic;
6) when needing to remove, after pave-load layer and perfusion mortar are removed, floorings component is hung away using lifting device, is removed Concrete-bar component and steel main girder components as construction next time to use.
Using protecting the invention avoids conventional steel bar concrete structure, logical bridge construction low efficiency, operation labor intensity are big etc. to be asked Topic ensures that passing bridge uses effectively as interim, and the bridge floor durability and planarization formed compared to pure steel structure is good, and traveling is relaxed It is suitable.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features. All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention Within protection scope.

Claims (5)

1. a kind of assembled steel reinforced concrete combination beam protects logical bridge, it is characterised in that: including floorings component, steel main girder components, connection Component and concrete-bar component, in which:
Floorings component includes the prefabricated reinforced concrete bridge plate (7) of multiple regular arrangements, contiguous prefabricated reinforced concrete bridge It is reserved between plate (7) and pours portion;
Steel main girder components include multiple steel girders (1), are arranged below floorings component, and pass through connection component and bridge floor board group Part is connected as one;
Concrete-bar component includes longitudinal reinforcement and transverse steel, and longitudinal reinforcement is arranged mixed in contiguous prefabricated reinforcing bar along bridge length direction Between solidifying soil bridge plate (7), transverse steel is arranged between contiguous prefabricated RC bridge deck (7) along bridge width direction.
2. assembled steel reinforced concrete combination beam protects logical bridge according to claim 1, it is characterised in that: connection component includes anchoring spiral shell Bolt, anchor bolt are arranged at intervals on above steel girder (1), anchor bolt other end insertion setting prefabricated reinforced concrete bridge plate (7) reserved through hole on.
3. assembled steel reinforced concrete combination beam protects logical bridge according to claim 1, it is characterised in that: removable on the outside of the steel girder of two sides Unload connection guardrail (3).
4. assembled steel reinforced concrete combination beam protects logical bridge according to any one of the claim 1 to 3, it is characterised in that: steel girder (1) Section is I-shaped.
5. a kind of any one of claims 1 to 3 assembled steel reinforced concrete combination beam protects logical method for bridge construction, it is characterised in that: The following steps are included:
1) steel girder is combined into i shaped cross section using steel plate welding;
2) a series of anchor bolts (2) are arranged in setting interval at the top of steel girder;
3) steel guard rail is set on the outside of two sides steel girder, is connected by screw bolts between steel guard rail and steel girder;
4) prefabricated reinforced concrete bridge plate (7) is connect with steel girder;
5) after prefabricated reinforced concrete bridge plate (7) is installed, binding prefabricated reinforced concrete bridge plate (7) between longitudinal reinforcement and Transverse steel, while prefabricated reinforced concrete bridge plate (7) reserved through hole is cleared up, finally unify perfusion mortar, it is ensured that bridge floor board group Part connect integral with steel main girder components;Pour bridge deck pavement, open to traffic;
6) when needing to remove, after pave-load layer and perfusion mortar are removed, floorings component is hung away using lifting device, is removed Concrete-bar component and steel main girder components as construction next time to use.
CN201910483953.0A 2019-06-05 2019-06-05 Assembled steel reinforced concrete combination beam protects logical bridge and construction method Pending CN110205913A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910483953.0A CN110205913A (en) 2019-06-05 2019-06-05 Assembled steel reinforced concrete combination beam protects logical bridge and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910483953.0A CN110205913A (en) 2019-06-05 2019-06-05 Assembled steel reinforced concrete combination beam protects logical bridge and construction method

Publications (1)

Publication Number Publication Date
CN110205913A true CN110205913A (en) 2019-09-06

Family

ID=67790741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910483953.0A Pending CN110205913A (en) 2019-06-05 2019-06-05 Assembled steel reinforced concrete combination beam protects logical bridge and construction method

Country Status (1)

Country Link
CN (1) CN110205913A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111560851A (en) * 2020-04-29 2020-08-21 中交路桥建设有限公司 Fabricated steel-concrete composite beam open-guaranteed bridge and construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203768784U (en) * 2013-12-31 2014-08-13 湖南大学 Super toughness concrete plate-steel beam light combined bridge structure
CN106120532A (en) * 2016-07-26 2016-11-16 宁波金蛟龙重工钢构有限公司 A kind of novel prefabricated assembled steel concrete composite beam bridge superstructure and processing technology thereof
JP2017226977A (en) * 2016-06-20 2017-12-28 日本車輌製造株式会社 Construction method for steel structure
CN108221634A (en) * 2018-03-16 2018-06-29 中交高新科技产业发展有限公司 The Wavelike steel webplate I-shaped composite beam bridge of maximum assembling
CN108316120A (en) * 2018-02-08 2018-07-24 湖南工业大学 It can rapidly-assembled precast bridge and its construction method
CN108316125A (en) * 2018-02-11 2018-07-24 中交高新科技产业发展有限公司 Assembled combination folding web grider bridge
CN208586501U (en) * 2018-03-28 2019-03-08 华侨大学 A kind of mixed combined beam structure of steel-of compoiste adhering anchoring shear connections knot
KR101962788B1 (en) * 2018-05-30 2019-03-27 (주)비에스씨코리아 Temporary bridge construction method using steel girder and composite deck-plate and temporary bridge therewith

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203768784U (en) * 2013-12-31 2014-08-13 湖南大学 Super toughness concrete plate-steel beam light combined bridge structure
JP2017226977A (en) * 2016-06-20 2017-12-28 日本車輌製造株式会社 Construction method for steel structure
CN106120532A (en) * 2016-07-26 2016-11-16 宁波金蛟龙重工钢构有限公司 A kind of novel prefabricated assembled steel concrete composite beam bridge superstructure and processing technology thereof
CN108316120A (en) * 2018-02-08 2018-07-24 湖南工业大学 It can rapidly-assembled precast bridge and its construction method
CN108316125A (en) * 2018-02-11 2018-07-24 中交高新科技产业发展有限公司 Assembled combination folding web grider bridge
CN108221634A (en) * 2018-03-16 2018-06-29 中交高新科技产业发展有限公司 The Wavelike steel webplate I-shaped composite beam bridge of maximum assembling
CN208586501U (en) * 2018-03-28 2019-03-08 华侨大学 A kind of mixed combined beam structure of steel-of compoiste adhering anchoring shear connections knot
KR101962788B1 (en) * 2018-05-30 2019-03-27 (주)비에스씨코리아 Temporary bridge construction method using steel girder and composite deck-plate and temporary bridge therewith

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111560851A (en) * 2020-04-29 2020-08-21 中交路桥建设有限公司 Fabricated steel-concrete composite beam open-guaranteed bridge and construction method

Similar Documents

Publication Publication Date Title
CA2639701C (en) Bridge deck panel
CN105297641B (en) Highway T beam diaphragm plate prestressed reinforcement structure and carry out the engineering method reinforced with it
CN105603860A (en) Prefabricated T beam and construction method
CN103046478B (en) Strengthening and pulling device of hinge gap of compositional plate girder bridge
CN106436492A (en) Maintaining method of base plates of CRTS II-shaped plate type ballastless tracks
CN106087739A (en) A kind of combination U rib shaped steel floorings and preparation method thereof
CN109183634A (en) The construction and its construction method of simply supported T-beam bridge serialization are realized in end floor beam connection
CN211522899U (en) Long-span steel-concrete composite beam convenient to erect by bridge girder erection machine
CN210395128U (en) Hollow core plate beam connection structure in bridge widening
CN111441263A (en) Construction method for widening rigid connection of new and old bridges for keeping traffic passing
CN110205913A (en) Assembled steel reinforced concrete combination beam protects logical bridge and construction method
CN112281663B (en) Construction method for widening connection of upper structures of new and old bridges
CN108547222A (en) The reparation structure and its construction method of a kind of hollow slab girder bridge floor system damage
CN202865729U (en) Steel-concrete combined integral bridge
CN208949745U (en) A kind of wide construction of bridge spelling meeting new and old bridge differential settlement
CN209397518U (en) A kind of Hollow Slab Beam Bridge transverse prestress friction plate ruggedized construction
CN208235303U (en) A kind of precast prestressed modularization viaduct
CN110886185A (en) Box girder with anchoring device and box girder bridge
CN205474785U (en) Steel - ultra high performance concrete combination continuous bridge structure
CN211340374U (en) Novel steel-concrete composite beam shear force connecting key
CN209082348U (en) The construction of simply supported T-beam bridge serialization is realized in end floor beam connection
CN209619849U (en) A kind of shear connections structure for bridge
CN105088933B (en) Hollow slab bridge with inclined hinge joint and building method thereof
CN208266616U (en) A kind of I-shaped glass-fiber reinforced plastic grille construction site temporary pavement
CN103758021B (en) For the prefabricated case beam of stretch-draw transverse prestress

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190906

RJ01 Rejection of invention patent application after publication