Prior art keywords
simulation calculation
data
floor data
simulation
calculation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910478514.0A
Other languages
Chinese (zh)
Other versions
CN110188490B (en
Inventor
周达
宋海川
刘慧�
许静惠
李凯彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201910478514.0A priority Critical patent/CN110188490B/en
Publication of CN110188490A publication Critical patent/CN110188490A/en
Application granted granted Critical
Publication of CN110188490B publication Critical patent/CN110188490B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • G06F16/2462Approximate or statistical queries
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/25Integrating or interfacing systems involving database management systems
    • G06F16/252Integrating or interfacing systems involving database management systems between a Database Management System and a front-end application
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Probability & Statistics with Applications (AREA)
  • Data Mining & Analysis (AREA)
  • Geometry (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Software Systems (AREA)
  • Computational Linguistics (AREA)
  • Evolutionary Computation (AREA)
  • Computer Hardware Design (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a method and a device for improving data simulation efficiency, a storage medium and an electronic device; wherein, the method comprises the following steps: periodically inquiring whether a first simulation calculation process exists at present; under the condition that the inquiry result is that the process of the first simulation calculation does not exist at present, triggering the working condition data to be processed to perform second simulation calculation; and saving the calculation result of the second simulation calculation to a database. According to the invention, the simulation calculation of the working condition data is carried out by utilizing the neutral period of the simulation calculation, so that the problems of long time and high energy consumption of dynamic simulation calculation carried out by a water system energy consumption simulation platform by importing or utilizing the existing meteorological and room data in the related technology are solved, and the effects of reducing energy consumption and improving user experience are achieved.

Description

Improve method and device, storage medium and the electronic device of data simulation efficiency
Technical field
The present invention relates to data simulation field, in particular to a kind of method and device for improving data simulation efficiency, Storage medium and electronic device.
Background technique
At present in HVAC industry, Air Conditioning Facilities energy consumption problem is significant concern point, always all in deep spy in industry It begs for;And to lectotype selection, whether reasonable, energy conservation has no establishing criteria, equipment manufacturer to the design of progress designing institute's early period system in industry Whether reasonable carry out Energy Saving Strategy when group control system design, system connects EERS and runs how many and do not know, only in engineering site It is artificially debugged according to end load operating condition, answer can be just known after system stable operation long-time.
Based on this, the research and development of water system energy simulation platform have been carried out;Water system energy simulation platform is in determining water system Under system form, each equipment of configuration appropriate, then by importing or dynamically being imitated using existing meteorological and room data The platform really calculated, wherein containing high-speed simulation and depth emulation, depth emulation is to be carried out with 10 seconds for a step-length A dynamic simulation need to calculate 8640 steps if calculating one day time, if calculating 1 year data, then need to calculate 3153600 Step, huge due to its calculation amount, the data calculated 1 year at present may need one day even longer time, user experience very not friendly It is good.
In view of the above problems in the related art, not yet there is effective solution at present.
Summary of the invention
The embodiment of the invention provides a kind of method and device for improving data simulation efficiency, storage medium and electronics dresses Set, at least solve the relevant technologies grey water system energy simulation platform by import or using existing meteorological and room data into The high problem of the simulation calculation time long energy consumption of Mobile state.
According to one embodiment of present invention, the method for improving data simulation efficiency is provided, comprising: periodic queries are worked as The preceding process that whether there is the first simulation calculation;It is the case where there is currently no the processes of the first simulation calculation in query result Under, it triggers and the second simulation calculation is carried out to floor data to be processed;The calculated result of second simulation calculation is saved in Database.
According to another embodiment of the invention, a kind of device for improving data simulation efficiency is provided, comprising: inquiry mould Block currently whether there is the process of the first simulation calculation for periodic queries;Emulation module, for being current in query result There is no in the case where the process of the first simulation calculation, triggers and the second simulation calculation is carried out to floor data to be processed;It saves Module, for the calculated result of second simulation calculation to be saved in database.
According to still another embodiment of the invention, a kind of storage medium is additionally provided, meter is stored in the storage medium Calculation machine program, wherein the computer program is arranged to execute the step in any of the above-described embodiment of the method when operation.
According to still another embodiment of the invention, a kind of electronic device, including memory and processor are additionally provided, it is described Computer program is stored in memory, the processor is arranged to run the computer program to execute any of the above-described Step in embodiment of the method.
It is just set out in the case where the process of the first simulation calculation is not present to operating condition number to be processed by the application According to the second simulation calculation of progress and save simulation result;That is, being in other no simulation calculations in this application Progress in the case where carry out the simulation calculation of floor data, so that neutral gear phase that simulation calculation is utilized carries out floor data Simulation calculation, to solve the relevant technologies grey water system energy simulation platform by importing or utilizing existing meteorological and room Data carry out the high problem of dynamic simulation calculation time long energy consumption, have achieved the effect that reduce energy consumption and have improved user experience.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present invention, constitutes part of this application, this hair Bright illustrative embodiments and their description are used to explain the present invention, and are not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is a kind of hardware block diagram of the terminal of the method for raising data simulation efficiency of the embodiment of the present invention;
Fig. 2 is the flow chart of the method according to an embodiment of the present invention for improving data simulation efficiency;
Fig. 3 is the schematic diagram of the pre- emulation according to an embodiment of the present invention based on big data;
Fig. 4 is the structural block diagram of the device according to an embodiment of the present invention for improving data simulation efficiency;
Fig. 5 is the alternative construction block diagram of the device according to an embodiment of the present invention for improving data simulation efficiency.
Specific embodiment
Hereinafter, the present invention will be described in detail with reference to the accompanying drawings and in combination with Examples.It should be noted that not conflicting In the case of, the features in the embodiments and the embodiments of the present application can be combined with each other.
It should be noted that description and claims of this specification and term " first " in above-mentioned attached drawing, " Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.
Embodiment 1
Embodiment of the method provided by the embodiment of the present application one can be filled in terminal, terminal or similar operation Set middle execution.For running at the terminal, Fig. 1 is a kind of end of the method for raising data simulation efficiency of the embodiment of the present invention The hardware block diagram at end.As shown in Figure 1, terminal 10 may include one or more (only showing one in Fig. 1) processors 102 It (processing unit that processor 102 can include but is not limited to Micro-processor MCV or programmable logic device FPGA etc.) and is used for The memory 104 of storing data, optionally, above-mentioned terminal can also include for the transmission device 106 of communication function and defeated Enter output equipment 108.It will appreciated by the skilled person that structure shown in FIG. 1 is only to illustrate, not to above-mentioned end The structure at end causes to limit.For example, terminal 10 may also include than shown in Fig. 1 more perhaps less component or have with Different configuration shown in Fig. 1.
Memory 104 can be used for storing computer program, for example, the software program and module of application software, such as this hair The corresponding computer program of method of raising data simulation efficiency in bright embodiment, processor 102 are stored in by operation Computer program in reservoir 104 realizes above-mentioned method thereby executing various function application and data processing.Storage Device 104 may include high speed random access memory, may also include nonvolatile memory, as one or more magnetic storage device, Flash memory or other non-volatile solid state memories.In some instances, memory 104 can further comprise relative to processing The remotely located memory of device 102, these remote memories can pass through network connection to terminal 10.The example packet of above-mentioned network Include but be not limited to internet, intranet, local area network, mobile radio communication and combinations thereof.
Transmitting device 106 is used to that data to be received or sent via a network.Above-mentioned network specific example may include The wireless network that the communication providers of terminal 10 provide.In an example, transmitting device 106 includes a network adapter (Network Interface Controller, referred to as NIC), can be connected by base station with other network equipments so as to It is communicated with internet.In an example, transmitting device 106 can be radio frequency (Radio Frequency, referred to as RF) Module is used to wirelessly be communicated with internet.
A kind of method of raising data simulation efficiency for running on above-mentioned terminal is provided in the present embodiment, and Fig. 2 is root According to the flow chart of the method for the raising data simulation efficiency of the embodiment of the present invention, as shown in Fig. 2, the process includes the following steps:
Step S202, periodic queries currently whether there is the process of the first simulation calculation;
Step S204 is there is currently no in the case where the process of the first simulation calculation in query result, and place is treated in triggering The floor data of reason carries out the second simulation calculation;
The calculated result of second simulation calculation is saved in database by step S206.
S202 to step S206 through the above steps just sets out in the case where the process of the first simulation calculation is not present Second simulation calculation is carried out to floor data to be processed and saves simulation result;That is, be in this application Without other simulation calculations progress in the case where carry out floor data simulation calculation, so that the neutral gear of simulation calculation be utilized Phase carries out the simulation calculation of floor data, to solve the relevant technologies grey water system energy simulation platform by importing or utilizing Existing meteorological and room data carries out the high problem of dynamic simulation calculation time long energy consumption, has reached reduction energy consumption and raising The effect of user experience.
In an optional embodiment of the present embodiment, is triggered in step S204 and floor data to be processed is carried out Before second simulation calculation, the method for the present embodiment can also include:
Step S200 obtains the floor data of user's input;
Step S201 carries out big data analysis to the floor data of input and obtains the floor data at place to be managed.
S200 and step S201 is it is found that the floor data to be processed being related in the application is to pass through through the above steps What big data analysis obtained, to reduce the disagreeableness experience sense for carrying out generating when depth emulation due to taking long time.
One of the present embodiment it is optional be the acquisition user that the embodiment of the present application step S200 is related in embodiment The mode of the floor data of input can be achieved in that
Step S200-11 acquires the floor data that user inputs on emulation platform by interface server;
Step S200-12 sends Hadoop cluster server for the floor data that user inputs based on interface server, Wherein, the floor data of input is stored in the storage server of Hadoop cluster server.
For above-mentioned steps S200-11 and step S200-12, it may is that collect first in specific application scenarios and use The floor data that family inputs on emulation platform, issues interface server;And then interface server receives data acquisition and sends Data, receive data using message-oriented middleware, using flume component, transmit data to hadoop cluster, data are arrived in storage In warehouse.In the preferred embodiment of the application, the Hadoop cluster being related in the application totally 20 servers, 4 pipes Reason node and 15 memory nodes, data are stored on HDFS.
Certain above-mentioned server in Hadoop cluster is for example, should in other application scenarios Hadoop cluster can be for 30 or 10 servers, and the quantity of management node and memory node can also be adjusted according to corresponding It is whole.
The periodic queries being related in another optional embodiment of the present embodiment, the application step S202 are current With the presence or absence of the mode of the process of the first simulation calculation, step can realize by the following method:
Step S202-12, setting is used for the plug-in unit of query procedure in Hadoop cluster server;
Step S202-13 currently whether there is the process of the first simulation calculation based on plug-in unit periodic queries.
For the plug-in unit being related in above-mentioned steps S202-12 and step S202-13, in the concrete application scene of the application In may is that Windows servlet A;Windows servlet A is placed on the server, which realizes every Every inquiry in 10 minutes (or other preset time periods), whether there is or not the processes for carrying out the first simulation calculation, if nothing, called above logical It crosses the floor data starting depth emulation that big data analysis obtains and carries out energy simulation calculating, and store data into corresponding number According to library.
In another optional embodiment of the present embodiment, the method and step of the present embodiment can also include: step S208 calls the meter of the second simulation calculation of preservation in the case where user inputs the floor data emulated in advance from database It calculates as a result, and being presented to user.
The application is illustrated below with reference to the specific embodiment of the present embodiment;
The specific embodiment proposes a kind of pre- emulation mode based on big data, and which is by collecting user to same The input operating condition in region carries out big data analysis, show that user is possible to the operating condition of input, is started automatically using server neutral gear Depth emulation carries out energy simulation calculating, not only reduces user and generate not friendly when depth emulation due to taking long time Good experience sense, while also reducing huge memory pressure caused by server excessively and is simultaneously calculated in user.
Fig. 3 is the schematic diagram of the pre- emulation according to an embodiment of the present invention based on big data, is based on Fig. 3, should be based on big number According to the method and step of pre- emulation mode include:
Data acquisition: S1 collects the floor data that user inputs on emulation platform, issues interface server;
S2, interface server receive data and acquire the data sent, receive data using message-oriented middleware, use Flume component transmits data to hadoop cluster, stores into data warehouse.
S3, totally 20 servers, 4 management nodes and 15 memory nodes, data are stored on HDFS hadoop cluster.
S4, by Windows servlet A place on the server, the service realize every 10 minutes inquiry whether there is or not into The process of row simulation calculation calls the floor data starting depth emulation obtained above by big data analysis to carry out if nothing Energy simulation calculates, and stores data into corresponding database;
S5 then calls directly associated databases when user inputs the operating condition emulated in advance on energy simulation platform, will protect The format export that the pre- emulation data deposited are needed with user;
Based on S1 through the above steps to step S5, server time dead is effectively utilized, carries out time-consuming huge Depth simulation calculation not only reduces server memory pressure caused by server due to calculation amount is huge, also to user's body Test further progress optimization.
Through the above description of the embodiments, those skilled in the art can be understood that according to above-mentioned implementation The method of example can be realized by means of software and necessary general hardware platform, naturally it is also possible to by hardware, but it is very much In the case of the former be more preferably embodiment.Based on this understanding, technical solution of the present invention is substantially in other words to existing The part that technology contributes can be embodied in the form of software products, which is stored in a storage In medium (such as ROM/RAM, magnetic disk, CD), including some instructions are used so that a terminal device (can be mobile phone, calculate Machine, server or network equipment etc.) execute method described in each embodiment of the present invention.
Embodiment 2
A kind of device for improving data simulation efficiency is additionally provided in the present embodiment, and the device is for realizing above-mentioned implementation Example and preferred embodiment, the descriptions that have already been made will not be repeated.As used below, term " module " may be implemented pre- Determine the combination of the software and/or hardware of function.Although device described in following embodiment is preferably realized with software, The realization of the combination of hardware or software and hardware is also that may and be contemplated.
Fig. 4 is the structural block diagram of the device according to an embodiment of the present invention for improving data simulation efficiency, as shown in figure 4, should Device includes: enquiry module 42, currently whether there is the process of the first simulation calculation for periodic queries;Emulation module 44, It couples and links with enquiry module 42, for being to be touched there is currently no in the case where the process of the first simulation calculation in query result It sends out and the second simulation calculation is carried out to floor data to be processed;Preserving module 46 is coupled with emulation module 44 and is linked, for by the The calculated result of two simulation calculations is saved in database.
Fig. 5 is the alternative construction block diagram of the device according to an embodiment of the present invention for improving data simulation efficiency, such as Fig. 5 institute Show, the device include: obtain module 52, couple and links with analysis module 52, for trigger to floor data to be processed into Before the second simulation calculation of row, the floor data of user's input is obtained;Analysis module 54 is coupled with emulation module 44 and is linked, and is used The floor data at place to be managed is obtained in carrying out big data analysis to the floor data of input.
Optionally, the acquisition module being related in the present embodiment is further can include: acquisition unit exists for acquiring user The floor data inputted on emulation platform;Transmission unit, for being sent to Hadoop collection based on the floor data for inputting user Group's server, wherein the floor data of input is stored in the storage server of Hadoop cluster server.
It should be noted that above-mentioned modules can be realized by software or hardware, for the latter, Ke Yitong Following manner realization is crossed, but not limited to this: above-mentioned module is respectively positioned in same processor;Alternatively, above-mentioned modules are with any Combined form is located in different processors.
Embodiment 3
The embodiments of the present invention also provide a kind of storage medium, computer program is stored in the storage medium, wherein The computer program is arranged to execute the step in any of the above-described embodiment of the method when operation.
Optionally, in the present embodiment, above-mentioned storage medium can be set to store by executing based on following steps Calculation machine program:
S1, periodic queries currently whether there is the process of the first simulation calculation;
S2 is to trigger there is currently no in the case where the process of the first simulation calculation to work to be processed in query result Condition data carry out the second simulation calculation;
The calculated result of second simulation calculation is saved in database by S3.
Optionally, in the present embodiment, above-mentioned storage medium can include but is not limited to: USB flash disk, read-only memory (Read- Only Memory, referred to as ROM), it is random access memory (Random Access Memory, referred to as RAM), mobile hard The various media that can store computer program such as disk, magnetic or disk.
The embodiments of the present invention also provide a kind of electronic device, including memory and processor, stored in the memory There is computer program, which is arranged to run computer program to execute the step in any of the above-described embodiment of the method Suddenly.
Optionally, above-mentioned electronic device can also include transmission device and input-output equipment, wherein the transmission device It is connected with above-mentioned processor, which connects with above-mentioned processor.
Optionally, in the present embodiment, above-mentioned processor can be set to execute following steps by computer program:
S1, periodic queries currently whether there is the process of the first simulation calculation;
S2 is to trigger there is currently no in the case where the process of the first simulation calculation to work to be processed in query result Condition data carry out the second simulation calculation;
The calculated result of second simulation calculation is saved in database by S3.
Optionally, the specific example in the present embodiment can be with reference to described in above-described embodiment and optional embodiment Example, details are not described herein for the present embodiment.
Obviously, those skilled in the art should be understood that each module of the above invention or each step can be with general Computing device realize that they can be concentrated on a single computing device, or be distributed in multiple computing devices and formed Network on, optionally, they can be realized with the program code that computing device can perform, it is thus possible to which they are stored It is performed by computing device in the storage device, and in some cases, it can be to be different from shown in sequence execution herein Out or description the step of, perhaps they are fabricated to each integrated circuit modules or by them multiple modules or Step is fabricated to single integrated circuit module to realize.In this way, the present invention is not limited to any specific hardware and softwares to combine.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.It is all within principle of the invention, it is made it is any modification, etc. With replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of method of data simulation characterized by comprising
Periodic queries currently whether there is the process of the first simulation calculation;
Query result be there is currently no in the case where the process of the first simulation calculation, triggering to floor data to be processed into The second simulation calculation of row;
The calculated result of second simulation calculation is saved in database.
2. the method according to claim 1, wherein carrying out second to floor data to be processed in the triggering Before simulation calculation, the method also includes:
Obtain the floor data of user's input;
Big data analysis is carried out to the floor data of input and obtains the floor data at the place to be managed.
3. according to the method described in claim 2, it is characterized in that, the floor data for obtaining user's input, comprising:
The floor data that user inputs on emulation platform is acquired by interface server;
Hadoop cluster server is sent by the floor data that user inputs based on the interface server, wherein described defeated The floor data entered is stored in the storage server of the Hadoop cluster server.
4. according to the method described in claim 3, it is characterized in that, the periodic queries currently whether there is the first emulation meter The process of calculation, comprising:
Setting is used for the plug-in unit of query procedure in the Hadoop cluster server;
It currently whether there is the process of the first simulation calculation based on the plug-in unit periodic queries.
5. method according to claim 1 to 4, which is characterized in that the method also includes:
In the case where user inputs the floor data emulated in advance, the second emulation meter of preservation is called from the database The calculated result of calculation, and presented to the user.
6. a kind of device of data simulation characterized by comprising
Enquiry module currently whether there is the process of the first simulation calculation for periodic queries;
Emulation module, for being there is currently no in the case where the process of the first simulation calculation in query result, place is treated in triggering The floor data of reason carries out the second simulation calculation;
Preserving module, for the calculated result of second simulation calculation to be saved in database.
7. device according to claim 6, which is characterized in that described device further include:
Module is obtained, for it is defeated to obtain user before the triggering carries out the second simulation calculation to floor data to be processed The floor data entered;
Analysis module obtains the floor data at the place to be managed for carrying out big data analysis to the floor data of input.
8. device according to claim 7, which is characterized in that the acquisition module includes:
Acquisition unit, the floor data inputted on emulation platform for acquiring user;
Transmission unit, for being sent to Hadoop cluster server based on the floor data for inputting user, wherein the input Floor data be stored in the storage server of the Hadoop cluster server.
9. a kind of storage medium, which is characterized in that be stored with computer program in the storage medium, wherein the computer Program is arranged to execute method described in any one of claim 1 to 5 when operation.
10. a kind of electronic device, including memory and processor, which is characterized in that be stored with computer journey in the memory Sequence, the processor are arranged to run the computer program to execute side described in any one of claim 1 to 5 Method.
CN201910478514.0A 2019-06-03 2019-06-03 Method and device for improving data simulation efficiency, storage medium and electronic device Expired - Fee Related CN110188490B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910478514.0A CN110188490B (en) 2019-06-03 2019-06-03 Method and device for improving data simulation efficiency, storage medium and electronic device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910478514.0A CN110188490B (en) 2019-06-03 2019-06-03 Method and device for improving data simulation efficiency, storage medium and electronic device

Publications (2)

Publication Number Publication Date
CN110188490A true CN110188490A (en) 2019-08-30
CN110188490B CN110188490B (en) 2021-03-23

Family

ID=67720000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910478514.0A Expired - Fee Related CN110188490B (en) 2019-06-03 2019-06-03 Method and device for improving data simulation efficiency, storage medium and electronic device

Country Status (1)

Country Link
CN (1) CN110188490B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112182769A (en) * 2020-10-10 2021-01-05 中国运载火箭技术研究院 Flexible semi-physical simulation method and device, computer storage medium and electronic equipment

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5649164A (en) * 1994-12-30 1997-07-15 International Business Machines Corporation Sets and holds in virtual time logic simulation for parallel processors
JP2000172537A (en) * 1998-12-04 2000-06-23 Nippon Steel Corp Device and method for performance prediction and recording medium
CN1541033A (en) * 2003-03-31 2004-10-27 ������������ʽ���� Electric-field luminous display circuit
JP2010033130A (en) * 2008-07-25 2010-02-12 Internatl Business Mach Corp <Ibm> Simulation method, system, and program
CN102958089A (en) * 2011-08-24 2013-03-06 电信科学技术研究院 Simulation method and simulation device
CN103150604A (en) * 2011-12-06 2013-06-12 株式会社日立制作所 Production line simulation model building method and production line simulation model building device
CN105629920A (en) * 2014-09-22 2016-06-01 财团法人工业技术研究院 Processing monitoring system and method
WO2016167068A1 (en) * 2015-04-16 2016-10-20 株式会社日立製作所 Whole integrated analysis model assist device and whole integrated analysis model assist method
CN106200612A (en) * 2016-07-07 2016-12-07 百度在线网络技术(北京)有限公司 For testing the method and system of vehicle
CN106781461A (en) * 2016-12-02 2017-05-31 交通运输部公路科学研究所 A kind of freeway net operation situation deduces thermal starting technology online
CN106933117A (en) * 2017-05-08 2017-07-07 南京药育智能科技有限公司 Pharmaceutical protocol simulation control subsystem with smell generator
CN107229517A (en) * 2016-03-25 2017-10-03 阿里巴巴集团控股有限公司 Method for scheduling task and device
CN107316103A (en) * 2017-06-04 2017-11-03 东南大学 Sight spot dynamic mass Forecasting Methodology based on echo state network
CN108200118A (en) * 2017-12-04 2018-06-22 中山大学 A kind of solution based on the request of movement simulation platform high concurrent
CN108469745A (en) * 2018-03-05 2018-08-31 中国神华能源股份有限公司 Operating condition in-circuit emulation method and on-line simulation system for gas-fired station
CN108877368A (en) * 2018-06-22 2018-11-23 国电南瑞科技股份有限公司 A kind of grid simulation Training Methodology based on the application of more scenes
CN109298990A (en) * 2018-10-17 2019-02-01 平安科技(深圳)有限公司 Log storing method, device, computer equipment and storage medium
CN109582109A (en) * 2013-03-07 2019-04-05 贝斯莱尔科技有限公司 Data center's control method and system
CN109767031A (en) * 2018-12-19 2019-05-17 平安科技(深圳)有限公司 Model classifiers method for building up, device, computer equipment and storage medium

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5649164A (en) * 1994-12-30 1997-07-15 International Business Machines Corporation Sets and holds in virtual time logic simulation for parallel processors
JP2000172537A (en) * 1998-12-04 2000-06-23 Nippon Steel Corp Device and method for performance prediction and recording medium
CN1541033A (en) * 2003-03-31 2004-10-27 ������������ʽ���� Electric-field luminous display circuit
JP2010033130A (en) * 2008-07-25 2010-02-12 Internatl Business Mach Corp <Ibm> Simulation method, system, and program
CN102958089A (en) * 2011-08-24 2013-03-06 电信科学技术研究院 Simulation method and simulation device
CN103150604A (en) * 2011-12-06 2013-06-12 株式会社日立制作所 Production line simulation model building method and production line simulation model building device
CN109582109A (en) * 2013-03-07 2019-04-05 贝斯莱尔科技有限公司 Data center's control method and system
CN105629920A (en) * 2014-09-22 2016-06-01 财团法人工业技术研究院 Processing monitoring system and method
WO2016167068A1 (en) * 2015-04-16 2016-10-20 株式会社日立製作所 Whole integrated analysis model assist device and whole integrated analysis model assist method
CN107229517A (en) * 2016-03-25 2017-10-03 阿里巴巴集团控股有限公司 Method for scheduling task and device
CN106200612A (en) * 2016-07-07 2016-12-07 百度在线网络技术(北京)有限公司 For testing the method and system of vehicle
CN106781461A (en) * 2016-12-02 2017-05-31 交通运输部公路科学研究所 A kind of freeway net operation situation deduces thermal starting technology online
CN106933117A (en) * 2017-05-08 2017-07-07 南京药育智能科技有限公司 Pharmaceutical protocol simulation control subsystem with smell generator
CN107316103A (en) * 2017-06-04 2017-11-03 东南大学 Sight spot dynamic mass Forecasting Methodology based on echo state network
CN108200118A (en) * 2017-12-04 2018-06-22 中山大学 A kind of solution based on the request of movement simulation platform high concurrent
CN108469745A (en) * 2018-03-05 2018-08-31 中国神华能源股份有限公司 Operating condition in-circuit emulation method and on-line simulation system for gas-fired station
CN108877368A (en) * 2018-06-22 2018-11-23 国电南瑞科技股份有限公司 A kind of grid simulation Training Methodology based on the application of more scenes
CN109298990A (en) * 2018-10-17 2019-02-01 平安科技(深圳)有限公司 Log storing method, device, computer equipment and storage medium
CN109767031A (en) * 2018-12-19 2019-05-17 平安科技(深圳)有限公司 Model classifiers method for building up, device, computer equipment and storage medium

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
全浩军: "盲优化软硬件划分技术研究", 《万方数据库》 *
王艳: "嵌入式系统可逆调试器的设计与实现", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112182769A (en) * 2020-10-10 2021-01-05 中国运载火箭技术研究院 Flexible semi-physical simulation method and device, computer storage medium and electronic equipment
CN112182769B (en) * 2020-10-10 2024-02-13 中国运载火箭技术研究院 Flexible semi-physical simulation method and device, computer storage medium and electronic equipment

Also Published As

Publication number Publication date
CN110188490B (en) 2021-03-23

Similar Documents

Publication Publication Date Title
CN109347947A (en) A kind of method of load balancing, name server and cluster nas server
CN101973031B (en) Cloud robot system and implementation method
CN104049575B (en) It is collected in Process Control System and delivers data to big data machine
CN104767629B (en) Distribute the method, apparatus and system of service node
CN103761309B (en) Operation data processing method and system
CN105282047A (en) Access request processing method and device
CN108924233A (en) Electric power collection copies group system and method
CN102625486B (en) Agent node, sensor network, and method for acquiring sensor network data
CN110399387A (en) Method and device based on table incidence relation dynamic generation query SQL
CN106534318A (en) OpenStack cloud platform resource dynamic scheduling system and method based on flow affinity
CN109787915A (en) Flow control methods, device, electronic equipment and the storage medium of network access
CN101753404A (en) Network resource downloading method
CN105049298A (en) Method and system for monitoring cloud resource
CN101937359A (en) Simulation application-orientated universal extensible computing system
CN104346345A (en) Data storage method and device
CN103347051B (en) Sharing and call method of a kind of numerically-controllmachine machine tool design resource cloud model
CN112487484A (en) Dynamic configuration method and device for node permission in block chain network
CN110347882A (en) Consanguinity analysis method and device, storage medium and the electronic device of data
CN110188490A (en) Method and device for improving data simulation efficiency, storage medium and electronic device
CN108924203A (en) Data copy self-adapting distribution method, distributed computing system and relevant device
CN106325233A (en) Visual programming logic distribution control system and implementation method
CN105471893A (en) Distributed equivalent data stream connection method
CN103747033B (en) A kind of method of community discovery
CN102546063A (en) Energy consumption simulation tool of wireless sensor network and simulation method thereof
CN107277095B (en) Session segmentation method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210323

CF01 Termination of patent right due to non-payment of annual fee