CN110183080A - A kind of reinforced concrete septic tank and its hanging method - Google Patents

A kind of reinforced concrete septic tank and its hanging method Download PDF

Info

Publication number
CN110183080A
CN110183080A CN201910415602.6A CN201910415602A CN110183080A CN 110183080 A CN110183080 A CN 110183080A CN 201910415602 A CN201910415602 A CN 201910415602A CN 110183080 A CN110183080 A CN 110183080A
Authority
CN
China
Prior art keywords
septic tank
cover board
wall
pit shaft
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910415602.6A
Other languages
Chinese (zh)
Other versions
CN110183080B (en
Inventor
燕成飞
王一博
黄天明
段宇民
吕琨
魏可心
冯诚恭
王阳
王伟博
赵哲生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SCEGC No 5 Construction Engineering Group Co Ltd
Original Assignee
SCEGC No 5 Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SCEGC No 5 Construction Engineering Group Co Ltd filed Critical SCEGC No 5 Construction Engineering Group Co Ltd
Priority to CN201910415602.6A priority Critical patent/CN110183080B/en
Publication of CN110183080A publication Critical patent/CN110183080A/en
Application granted granted Critical
Publication of CN110183080B publication Critical patent/CN110183080B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F11/00Treatment of sludge; Devices therefor
    • C02F11/02Biological treatment
    • C02F11/04Anaerobic treatment; Production of methane by such processes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2201/00Apparatus for treatment of water, waste water or sewage
    • C02F2201/002Construction details of the apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Organic Chemistry (AREA)
  • Molecular Biology (AREA)
  • Mechanical Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Treatment Of Biological Wastes In General (AREA)

Abstract

The invention discloses a kind of reinforced concrete septic tank and its hanging methods, the septic tank includes septic tank body, septic tank cover plate part and septic tank wellbore section, the septic tank body includes septic tank bottom plate and septic tank wall, septic tank partition wall and septic tank beam body are provided in the rectangular cavities, the rectangular cavities are divided into precipitating chamber and clarification chamber by the septic tank partition wall, suspender is provided in the septic tank bottom plate, the septic tank cover plate part includes the first septic tank cover board, septic tank cover board connecting plate and the second septic tank cover board, the septic tank wellbore section includes the first septic tank pit shaft and the second septic tank pit shaft;The hanging method is the following steps are included: the excavation and concrete cushion of one, foundation pit are laid with;Two, septic tank lifts;Three, septic tank backfills.The present invention has rational design, easily operated, while reducing the occupancy to live road, place as far as possible, does not influence the progress of the other subdivisional works in scene.

Description

A kind of reinforced concrete septic tank and its hanging method
Technical field
The invention belongs to septic tank technical fields, more particularly, to a kind of reinforced concrete septic tank and its hanging method.
Background technique
Septic tank is a kind of equipment for handling excrement and filtering precipitating, and principle is that solidfied material is decomposed in bottom of pond, upper layer Aquation object, flows away into pipeline, it is therefore prevented that line clogging has the sufficient time to hydrolyze to solidfied material.Septic tank refer to by Sanitary sewage lattice precipitating, the small-sized processing structures of anaerobic digestion are carried out to sludge.
There are some problems for septic tank traditional at present: first, the construction time is longer, and is easy choke the road, influences Mechanical and personnel passage in is likely to result in project duration delay to influence the construction period when serious;The second, change excrement Pond construction space is narrow, and it is inconvenient that worker constructs, and construction quality is difficult to ensure;Third, septic tank are to be installed in septic tank foundation pit, It is immovable, it is not easy to repeat to recycle.Therefore, nowadays lack a kind of reinforced concrete septic tank and its hanging method, just It is easy for construction, easily operated in transfer installation and recycling, while the occupancy to live road, place is reduced as far as possible, The progress of the other subdivisional works in scene is not influenced.
Summary of the invention
In view of the above-mentioned deficiencies in the prior art, the technical problem to be solved by the present invention is that providing a kind of reinforced concrete Native septic tank and its hanging method, design is rationally, easy for construction, easily operated convenient for transfer installation and recycling, simultaneously The occupancy to live road, place is reduced as far as possible, does not influence the progress of the other subdivisional works in scene, it is practical.
In order to solve the above technical problems, the technical solution adopted by the present invention is that: a kind of reinforced concrete septic tank, feature It is: including septic tank body, the septic tank cover plate part being arranged on septic tank body and is arranged in the septic tank cover board Septic tank wellbore section on component;
The septic tank body includes septic tank bottom plate and is disposed around septic tank bottom plate surrounding and forms the change of rectangular cavities Manure pit wall, is provided with septic tank partition wall and septic tank beam body in the rectangular cavities, and the septic tank partition wall is by the rectangle Cavity is divided into precipitating chamber and clarification chamber, and the septic tank beam body is located at the top of clarification chamber, is provided with and hangs in the septic tank bottom plate Tool is provided with import on the septic tank wall of precipitating chamber, is provided with outlet on the septic tank wall of the clarification chamber, The septic tank partition wall is provided with water hole in the middle part of short transverse;
The septic tank cover plate part includes the first septic tank cover board, the septic tank cover board set gradually by import to outlet Connecting plate and the second septic tank cover board, the first septic tank cover board is mounted in septic tank wall and septic tank beam body, described Septic tank cover board connecting plate is mounted in septic tank wall, septic tank partition wall and septic tank beam body, the second septic tank cover board It is mounted on septic tank wall and septic tank partition wall, is provided with the first cover plate through hole on the first septic tank cover board, described The second cover plate through hole is provided on two septic tank cover boards;
The septic tank wellbore section includes that the first septic tank pit shaft being arranged on the first septic tank cover board and setting exist The second septic tank pit shaft on second septic tank cover board is provided with the first pit shaft through-hole, and institute on the first septic tank pit shaft It states and is provided with the first bellows in the first pit shaft through-hole, the second pit shaft through-hole, and institute are provided on the second septic tank pit shaft It states and is provided with the second bellows in the second pit shaft through-hole, and the center of the first pit shaft through-hole and first cover plate through hole weight It closes, the second pit shaft through-hole is overlapped with the center of the second cover plate through hole;
The septic tank body is armored concrete pond body, and the first septic tank cover board and the second septic tank cover board are Reinforced concrete cover plate, the septic tank cover board connecting plate are armored concrete connecting plate, the first septic tank pit shaft and the Two septic tank pit shafts are armored concrete pit shaft.
Above-mentioned a kind of reinforced concrete septic tank, it is characterised in that: the suspender includes two wide along septic tank bottom plate Short I-steel, two long I-steel for being symmetrically welded at short I-steel both ends and the setting that degree direction is laid in parallel are in short I-steel Junction with long I-steel and the pond body lifting lug on long I-steel, the junction of the pond body lifting lug and long I-steel is set It is equipped with triangle strengthening steel slab, the short I-steel and the long I-steel are respectively positioned in septic tank bottom plate, and the pond body lifting lug is stretched Septic tank bottom plate out;
The quantity of the pond body lifting lug is four, and four pond body lifting lugs surround rectangle.
Above-mentioned a kind of reinforced concrete septic tank, it is characterised in that: be provided with step at the top of the septic tank wall Portion, the step surface of the stage portion and the top surface of the top surface of septic tank partition wall and septic tank beam body are flush, the stage portion Top surface of the step surface apart from septic tank wall spacing and the thickness of the first septic tank cover board, septic tank cover board connecting plate thickness The thickness of degree and the second septic tank cover board is all the same.
Above-mentioned a kind of reinforced concrete septic tank, it is characterised in that: the first septic tank pit shaft and the second septic tank The double-deck locking well lid is provided on pit shaft, double-deck lock is provided with shroud at the top of well lid, the bilayer locks on well lid Venthole is offered, and is provided with snorkel in the venthole, the snorkel is located in shroud;
The quadrangle of the first septic tank cover board is provided with the first cover board lifting lug, the quadrangle of the septic tank cover board connecting plate It is provided with connection shell lug, the quadrangle of the second septic tank cover board is provided with the second cover board lifting lug;
It is symmetrically arranged with the first pit shaft lifting lug on the first septic tank pit shaft, is symmetrically set on the second septic tank pit shaft It is equipped with the second pit shaft lifting lug.
A kind of above-mentioned reinforced concrete septic tank, it is characterised in that: the medial surface setting of the precipitating chamber and clarification chamber Have a waterproof layer, the waterproof layer with a thickness of 1mm~1.2mm;
The septic tank wall includes leading wall with the integrally formed septic tank of septic tank bottom plate and being arranged to lead wall in septic tank On side wall, the junction that the side wall and septic tank lead wall is provided with steel plate for sealing water, the one of the steel plate for sealing water End protrudes into septic tank and leads wall, and the other end of the steel plate for sealing water protrudes into side wall.
Above-mentioned a kind of reinforced concrete septic tank, it is characterised in that: the septic tank leads side within the walls and septic tank bottom The junction of plate medial surface is provided with armpit angle;
Import on the septic tank wall is provided with import bellows, and the outlet on the septic tank wall is provided with out It is disposed with leak stopping spirit packing course and waterproof mortar from the inside to the outside outside mouth bellows, the import bellows and outlet bellows Layer, the waterproof mortar course and the septic tank wall are tightly connected.
Above-mentioned a kind of reinforced concrete septic tank, it is characterised in that: the bottom of the septic tank bottom plate is provided with coagulation Soil padding, the concrete cushion be C15 plain concrete, and the concrete cushion with a thickness of 100mm~120mm;
The quantity of the water hole be it is multiple, multiple water holes put Xiang Bushe along the width of septic tank partition wall, adjacent The spacing of two water holes is 200mm~300mm, and the water hole is rectangle water hole.
Above-mentioned a kind of reinforced concrete septic tank, it is characterised in that: successively set from the bottom to top in the septic tank bottom plate It is equipped with lower layer's steel mesh and upper steel mesh, supporting steel bar, casual labourer's word are provided between lower layer's steel mesh and upper steel mesh Steel and the long I-steel are between lower layer's steel mesh and upper steel mesh.
Meanwhile a kind of the invention also discloses method and steps simple, design rationally and realizes convenient armored concrete The hanging method of manure pit, which is characterized in that method includes the following steps:
Step 1: the excavation and concrete cushion of foundation pit are laid with:
Step 101, in septic tank region to be installed, end a foundation pit;Wherein, the length of the foundation pit is greater than septic tank The length of pond body, the width of the foundation pit are greater than the width of septic tank body, and the depth of the foundation pit is greater than septic tank body Highly;
Step 102 tamps the bottom of institute's foundation pit, until the flatness error on the bottom of foundation ditch surface is not more than 5mm; Then concrete cushion is laid in the bottom of foundation ditch;
Step 103 measures unwrapping wire in concrete mats layer surface, obtains foundation pit rectangular area;Wherein, the foundation pit square Shape region is identical as the bottom section of septic tank body;
Step 2: septic tank lifts:
Step 201 is lifted septic tank body to foundation pit rectangular area using crane hook suspender;Wherein, septic tank The bottom of body and the foundation pit rectangular area are overlapped;
Step 202 is hung using crane successively by the first septic tank cover board, septic tank cover board connecting plate and the second septic tank lid Plate is lifted to the top of septic tank body;Wherein, the top of septic tank body is connect with the first septic tank cover board, septic tank cover board It is flush at the top of plate and the second septic tank cover board;Wherein, the first septic tank cover board is mounted on septic tank wall and changes excrement In the beam body of pond, the septic tank cover board connecting plate is mounted in septic tank wall, septic tank partition wall and septic tank beam body, and described Two septic tank cover boards are mounted on septic tank wall and septic tank partition wall;
First septic tank pit shaft is hung on the first septic tank cover board by step 203 using crane, by the second septic tank pit shaft It is hung on the second septic tank cover board;Wherein, the center of the first bellows in the first septic tank pit shaft and the first septic tank The center of the first cover plate through hole is overlapped on cover board, and excrement is changed with second in the center of the second bellows in the second septic tank pit shaft The center of the second cover plate through hole is overlapped on the cover board of pond;
Step 204, to the junction of the first septic tank pit shaft and the first septic tank cover board and the second septic tank pit shaft with It is in the milk the junction of second septic tank cover board;
Step 3: septic tank backfills:
Step 301 installs the double-deck locking well lid on the first septic tank pit shaft and the second septic tank pit shaft, locks in bilayer Snorkel is installed on well lid, and shroud is installed outside snorkel;Wherein, shroud is mounted on the first septic tank pit shaft and second and changes At the top of manure pit pit shaft;
Step 302 is tamped along the foundation depth direction back-filling in layers from the bottom to top, until filling and leading up the foundation pit to road Face.
A kind of hanging method of above-mentioned reinforced concrete septic tank, it is characterised in that: concrete mats described in step 102 Layer be C15 plain concrete, and the concrete cushion with a thickness of 100mm~120mm;
It is specific as follows when back-filling in layers is tamped in step 302:
It after every layer of backfill is with a thickness of 200mm~250mm, is tamped using rammer, and the stone roller mark of rammer overlaps width Degree is 10cm~20cm;
The excavation and concrete cushion of step 1 foundation pit are laid with before progress, it is also necessary to carry out four pond body lifting lugs in suspender Position determination and selection lifting wirerope;
The determination of the position of four pond body lifting lugs in suspender, detailed process is as follows:
Step A, it determines the center of gravity of septic tank body, and the center of gravity of septic tank body is projected to the bottom surface of septic tank bottom plate Inside obtain center of gravity subpoint Q;
Step B, the level of the broadside medial surface of the septic tank wall of center of gravity subpoint Q to close center of gravity subpoint Q is obtained Spacing is simultaneously denoted as Lc, obtain center of gravity subpoint Q to septic tank wall long side medial surface horizontal space simultaneously be denoted as Lk;Wherein, will Broadside medial surface close to the septic tank wall of center of gravity subpoint Q is denoted as reference side;
Step C, a broadside of the rectangle that four pond body lifting lugs surround is away from the horizontal space of the reference sideThe horizontal space of the long side medial surface of the long back gauge septic tank wall for the rectangle that four pond body lifting lugs surround isWherein, the center for the rectangle that four pond body lifting lugs surround is overlapped with center of gravity subpoint Q, four pond body lifting lugs about Center of gravity subpoint Q is symmetrically laid;
Selection lifting wirerope, detailed process is as follows:
Step I, according to formulaObtain wirerope critical length Gl, then lifting length of steel rope is selected Degree is Gl~1.5Gl;Wherein, LgIndicate horizontal space of the septic tank partition wall apart from reference side, hgIndicate septic tank partition wall Top surface of the top surface apart from septic tank bottom plate height;
Step II, according to formulaObtain the safeload load of every lifting wirerope;Wherein, W is indicated The weight of septic tank body, θ indicate the angle of septic tank bottom plate in lifting wirerope and septic tank body;
Step III, according to formulaObtain lifting breaking force of rope summation Fp;Wherein, KaExpression is hung The safety coefficient of steel loading cord, and KaValue range be reduction coefficient that 5~6, A indicates lifting wirerope, and the value model of A Enclose is 0.8~0.85;
Step IV, when lift wirerope Nominal Tensile be 1400Mpa when, according to formulaIt is hung The diameter D of steel loading cord;Wherein, breaking force of rope summation F is liftedpUnit be newton, lift the diameter D's of wirerope Unit is millimeter;
When the Nominal Tensile for lifting wirerope is 1550Mpa, according to formulaObtain lifting steel wire The diameter D of rope;
When the Nominal Tensile for lifting wirerope is 1700Mpa, according to formulaObtain lifting steel wire The diameter D of rope;
When the Nominal Tensile for lifting wirerope is 1850Mpa, according to formulaObtain lifting steel wire The diameter D of rope;
When the Nominal Tensile for lifting wirerope is 2000Mpa, according to formulaObtain lifting steel wire The diameter D of rope.
Compared with the prior art, the present invention has the following advantages:
1, rationally, easy for construction, worker operation is easy for reinforced concrete septic tank of the invention design.
2, septic tank body of the present invention, septic tank cover plate part and septic tank wellbore section are in prefabricated processing Place carries out, and solves the problems, such as the small constructional difficulties in live inner space at present, and septic tank construction efficiency can be improved.
3, septic tank body of the present invention includes septic tank bottom plate and septic tank wall, and is set in septic tank bottom plate Suspender is set, is on the one hand convenient for lifting septic tank body by suspender;On the other hand the intensity of septic tank bottom plate is increased, Guarantee that septic tank bottom plate and septic tank lead globality of the wall in handling and installation process.
4, the setting of septic tank beam body of the present invention is to connect for the first septic tank cover board and septic tank cover board The installation of fishplate bar, on the one hand, be the weight for the ease of bearing the first septic tank cover board and septic tank cover board connecting plate, another party Face is easy to lift for the ease of septic tank cover board is divided into multiple minor flaps and is attached installation, and difficulty of construction is reduced.
5, the present invention can also carry out multiple septic tank bodies, septic tank cover board, septic tank connecting plate and septic tank simultaneously The prefabricated production of pit shaft, consequently facilitating realize the assembling of multiple septic tanks, it is practical, while realizing progress multiple septic tanks Production.
6, septic tank of the invention can also carry out disassembly movement as needed, convenient for repeating to recycle, reduce construction rubbish Pollution of the rubbish to environment.
7, reinforced concrete septic tank hanging method step of the invention is simple, and only needing in erecting bed will be in septic tank Septic tank body production, septic tank cover board, septic tank cover board connecting plate and septic tank pit shaft assemble, it is easy for construction, Worker operation is easy, and reduces the occupancy to live road, place, does not influence the progress of the other subdivisional works in scene;In addition It reduces facility material to launch, reduces personnel cost investment, reach cost efficiency, moreover it is possible to ensure the construction quality.
In conclusion the present invention has rational design, it is easy for construction, easily operated convenient for transfer installation and recycling, simultaneously The occupancy to live road, place is reduced as far as possible, does not influence the progress of the other subdivisional works in scene, it is practical.
Below by drawings and examples, technical scheme of the present invention will be described in further detail.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of reinforced concrete septic tank of the present invention.
Fig. 2 is the structure of reinforced concrete septic tank of the present invention (removing septic tank cover plate part and septic tank wellbore section) Schematic diagram.
Fig. 3 is the structural schematic diagram of reinforced concrete septic tank pond body suspender of the present invention.
Fig. 4 is the A-A cross-sectional view of Fig. 1.
Fig. 5 is the B-B cross-sectional view of Fig. 1.
Fig. 6 is the flow diagram of the hanging method of reinforced concrete septic tank of the present invention.
Description of symbols:
1-lower layer's steel mesh;2-leak stopping spirit packing courses;3-suspenders;
The short I-steel of 3-1-;The long I-steel of 3-2-;3-3-pond body lifting lug;
3-4-triangle strengthening steel slab;4-upper steel meshes;5-shrouds;
6-snorkels;7-steel plate for sealing water;8-septic tank bottom plates;
9-septic tanks lead wall;10-waterproof mortar courses;11-double-deck locking the well lids;
12-side walls;14-waterproof layers;
15-septic tank partition walls;15-1-precipitating chamber;15-2-clarification chamber;
16-water holes;17-septic tank beam bodies;18-septic tank walls;
The first bellows of 19-1-;The second bellows of 19-2-;20-1-the first pit shaft lifting lug;
20-2-the second pit shaft lifting lug;21-septic tank bodies;
22-1-the first septic tank cover board;22-2-the second septic tank cover board;
23-septic tank cover board connecting plates;23-1-connection shell lug;
24-1-the first cover board lifting lug;24-2-the second cover board lifting lug;
25-1-the first septic tank pit shaft;25-2-the second septic tank pit shaft;26-stage portions;
27-imports;27-1-import bellows;28-outlets;
28-1-outlet bellows;29-concrete cushions;31-armpit angles.
Specific embodiment
A kind of reinforced concrete septic tank as shown in Figure 1 to Figure 4, including septic tank body 21, setting are in septic tank Septic tank cover plate part on body 21 and the septic tank wellbore section being arranged on the septic tank cover plate part;
The septic tank body 21 includes septic tank bottom plate 8 and is disposed around 8 surrounding of septic tank bottom plate and forms rectangular cavities Septic tank wall 18, be provided with septic tank partition wall 15 and septic tank beam body 17, the septic tank partition wall in the rectangular cavities The rectangular cavities are divided into precipitating chamber 15-1 and clarification chamber 15-2 by 15, and the septic tank beam body 17 is located at the top clarification chamber 15-2 Portion is provided with suspender 3 in the septic tank bottom plate 8, is provided with import 27 on the septic tank wall 18 of precipitating chamber 15-1, leans on It is provided with outlet 28 on the septic tank wall 18 of the nearly clarification chamber 15-2, the septic tank partition wall 15 is along the middle part of short transverse It is provided with water hole 16;
The septic tank cover plate part includes the first septic tank cover board 22-1 set gradually by import 27 to outlet 28, changes Manure pit cover board connecting plate 23 and the second septic tank cover board 22-2, the first septic tank cover board 22-1 are mounted on septic tank wall 18 In septic tank beam body 17, the septic tank cover board connecting plate 23 is mounted on septic tank wall 18, septic tank partition wall 15 and changes excrement In pond beam body 17, the second septic tank cover board 22-2 is mounted on septic tank wall 18 and septic tank partition wall 15, and described first It is provided with the first cover plate through hole on septic tank cover board 22-1, it is logical that the second cover board is provided on the second septic tank cover board 22-2 Hole;
The septic tank wellbore section includes the first septic tank pit shaft 25-1 being arranged on the first septic tank cover board 22-1 Be arranged on the second septic tank pit shaft 25-2, the first septic tank pit shaft 25-1 for being arranged on the second septic tank cover board 22-2 There is the first pit shaft through-hole, and is provided with the first bellows 19-1, the second septic tank pit shaft 25- in the first pit shaft through-hole It is provided with the second pit shaft through-hole on 2, and is provided with the second bellows 19-2 in the second pit shaft through-hole, and first pit shaft Through-hole is overlapped with the center of first cover plate through hole, and the second pit shaft through-hole is overlapped with the center of the second cover plate through hole;
The septic tank body 21 is armored concrete pond body, the first septic tank cover board 22-1 and the second septic tank lid Plate 22-2 is reinforced concrete cover plate, and the septic tank cover board connecting plate 23 is armored concrete connecting plate, and described first changes Manure pit pit shaft 25-1 and the second septic tank pit shaft 25-2 is armored concrete pit shaft.
As shown in figure 3, the suspender 3 includes two and lays in parallel along 8 width direction of septic tank bottom plate in the present embodiment Short I-steel 3-1, two long I-steel 3-2 for being symmetrically welded at the both ends short I-steel 3-1 and setting are in short I-steel 3-1 and length The junction of I-steel 3-2 and pond body the lifting lug 3-3, the pond body lifting lug 3-3 and long I-steel 3- being located on long I-steel 3-2 2 junction is provided with triangle strengthening steel slab 3-4, the short I-steel 3-1 and the long I-steel 3-2 and is respectively positioned on septic tank bottom In plate 8, the pond body lifting lug 3-3 stretches out septic tank bottom plate 8;
The quantity of the pond body lifting lug 3-3 is four, and four pond body lifting lug 3-3 surround rectangle.
As shown in Fig. 2, the top of the septic tank wall 18 is provided with stage portion 26, the stage portion in the present embodiment 26 step surface is flush with the top surface of septic tank partition wall 15 and the top surface of septic tank beam body 17, the step of the stage portion 26 The thickness of the spacing of the top surface of identity distance ionization manure pit wall 18 and the first septic tank cover board 22-1, septic tank cover board connecting plate 23 The thickness of thickness and the second septic tank cover board 22-2 are all the same.
As shown in figure 4, being arranged on the first septic tank pit shaft 25-1 and the second septic tank pit shaft 25-2 in the present embodiment There is the double-deck locking well lid 11, the double-deck top for locking well lid 11 is provided with shroud 5, and double-deck lock opens up on well lid 11 There is venthole, and be provided with snorkel 6 in the venthole, the snorkel 6 is located in shroud 5;
The quadrangle of the first septic tank cover board 22-1 is provided with the first cover board lifting lug 24-1, the septic tank cover board connection The quadrangle of plate 23 is provided with connection shell lug 23-1, and the quadrangle of the second septic tank cover board 22-2 is provided with the second cover board lifting lug 24-2;
The first pit shaft lifting lug 20-1, the second septic tank pit shaft are symmetrically arranged on the first septic tank pit shaft 25-1 The second pit shaft lifting lug 20-2 is symmetrically arranged on 25-2.
As shown in figure 4, the medial surface of the precipitating chamber 15-1 and clarification chamber 15-2 is provided with waterproof layer in the present embodiment 14, the waterproof layer 14 with a thickness of 1mm~1.2mm;
The septic tank wall 18 includes leading wall 9 with the integrally formed septic tank of septic tank bottom plate 8 and being arranged in septic tank The side wall 12 on wall 9 is led, the junction that the side wall 12 leads wall 9 with septic tank is provided with steel plate for sealing water 7, described to stop One end of water steel plate 7 protrudes into septic tank and leads wall 9, and the other end of the steel plate for sealing water 7 protrudes into side wall 12.
As shown in figure 4, the septic tank leads the junction of 9 medial surface of wall Yu 8 medial surface of septic tank bottom plate in the present embodiment It is provided with armpit angle 31;
Import 27 on the septic tank wall 18 is provided with import bellows 27-1, going out on the septic tank wall 18 Mouth 28 is provided with outside outlet bellows 28-1, the import bellows 27-1 and outlet bellows 28-1 and sets gradually from the inside to the outside There are leak stopping spirit packing course 2 and waterproof mortar course 10, the waterproof mortar course 10 is tightly connected with the septic tank wall 18.
As shown in figure 5, the bottom of the septic tank bottom plate 8 is provided with concrete cushion 29, the coagulation in the present embodiment Soil padding 29 be C15 plain concrete, and the concrete cushion 29 with a thickness of 100mm~120mm;
The quantity of the water hole 16 be it is multiple, multiple water holes 16 are put along the width of septic tank partition wall 15 to cloth If the spacing of two neighboring water hole 16 is 200mm~300mm, the water hole 16 is rectangle water hole.
As shown in figure 4,1 He of lower layer's steel mesh is disposed in the septic tank bottom plate 8 from the bottom to top in the present embodiment Upper steel mesh 4 is provided with supporting steel bar, the short I-steel 3-1 and the length between lower layer's steel mesh 1 and upper steel mesh 4 I-steel 3-2 is between lower layer's steel mesh 1 and upper steel mesh 4.
In the present embodiment, the purpose of setting suspender 3 is in septic tank bottom plate 8: being on the one hand convenient for through suspender 3 to septic tank Pond body 21 is lifted;On the other hand the intensity of septic tank bottom plate 8 is increased, guarantees septic tank bottom plate 8 and septic tank body 21 Globality in handling and installation process.
In the present embodiment, septic tank partition wall 15 along short transverse middle part setting water hole 16 purpose be: be in order into After the excrement decomposition precipitating for entering to precipitate chamber 15-1, the hyrate physical efficiency on upper layer enters clarification chamber 15-2 by water hole 16, thus Enter discharge of pipes by outlet 28, prevents line clogging;In addition the excrement sludge to precipitate is decomposed by anaerobic fermentation, is made Organic matter in excrement resolves into stable inorganic matter, and putrefactive primary sludge is converted into stable ripe sludge, changes excrement Structure, reduce the moisture content of sludge, excrement drawn clearly to outward transport, landfill or be used as fertilizer, reduce environmental pollution.
In the present embodiment, the purpose of setting septic tank beam body 17 is in septic tank body 21: being to supply the first septic tank The installation of cover board 22-1 and septic tank cover board connecting plate 23, on the one hand, be for the ease of bearing the first septic tank cover board and changing excrement The weight of pond cover board connecting plate reduces septic tank cover board deflection deformation;It on the other hand is for the ease of by septic tank cover plate part It is divided into multiple minor flaps and is attached installation, be easy to lift, reduces difficulty of construction.
In the present embodiment, the purpose that the first septic tank pit shaft 25-1 is arranged on the first septic tank cover board 22-1 is: first, It is in order to increase the double-deck height for locking well lid 11, so that the double-deck well lid 11 that locks can partially basset, consequently facilitating to heavy The deposit of shallow lake chamber 15-1 carries out extraction cleaning;Second, it is in order to backfill element soil on the first septic tank cover board 22-1 as change Manure pit heat preservation, avoids septic tank from freezing, septic tank is caused to block.
In the present embodiment, the purpose that the second septic tank pit shaft 25-2 is arranged on the second septic tank cover board 22-2 is: first, It is in order to increase the double-deck height for locking well lid 11, so that the double-deck well lid 11 that locks can partially basset, consequently facilitating to clear The deposit of cavity clearing 15-2 carries out extraction cleaning;Second, it is in order to backfill element soil on the second septic tank cover board 22-2 as change Manure pit heat preservation, avoids septic tank from freezing, septic tank is caused to block.
In the present embodiment, the purpose that long I-steel 3-2 is arranged is: being to increase two for the ease of the installation of pond body lifting lug 3-3 The spacing of the pond body lifting lug 3-3 of a length direction along septic tank bottom plate 8, consequently facilitating during ensuring lifting, septic tank The steadily of centre of gravity of body 21;In addition, being the tension resistance shear behavior in order to increase septic tank bottom plate 8, septic tank bottom plate 8 is improved Intensity.
In the present embodiment, the purpose that short I-steel 3-1 is arranged between two parallel long I-steel 3-2 is: being in order to even I-steel 3-2 two long is met, so that I-steel 3-2 two long is connected as an entirety, so that it is guaranteed that four pond body lifting lug 3-3 rise Uniform force when hanging;The tension resistance shear behavior for also increasing septic tank bottom plate 8 simultaneously, improves the intensity of septic tank bottom plate 8.
It is because precipitating decomposition is easy to produce biogas in septic tank, septic tank methane accumulation will increase pond in the present embodiment Interior pressure can generate explosion, and snorkel 6 is arranged on well lid 11 so locking in bilayer, ventilates, so that it is guaranteed that septic tank Interior pressure is in safe range.
In the present embodiment, shroud 5 is set outside snorkel 6, be the fallen leaves in order to avoid road surface, impurity or at any time etc. its His pollutant enter snorkel 6 cause snorkel 6 block.
In the present embodiment, setting waterproof layer 14 with a thickness of 1mm~1.2mm, if the thickness of waterproof layer 14 is greater than 1.2mm When, waterproof layer can crack, peeling, bond the problems such as insecure;If the thickness of waterproof layer 14 is less than 1mm, cannot effectively rise To waterproof effect.
In the present embodiment, when it is implemented, the waterproof layer 14 is JS water-repellent paint, it is because anti-using other films After water material is brushed, need to carry out the coating of mortar cover;And its coating for not needing mortar cover, reduce construction work Sequence, and can effectively increase the volume in septic tank;In addition JS water-repellent paint does not pollute the environment, and ageing-resistant performance is strong, prevents The water service life is long, can effectively adapt to buried septic tank, and its cohesive force is strong, JS water-repellent paint and septic tank medial surface Adhesion strength improves its durability and stability up to 0.5MPa or more.
In the present embodiment, septic tank leads 9 medial surface of wall and the junction of 8 medial surface of septic tank bottom plate is provided with armpit angle 31 Purpose is: first, it is for the ease of leading wall 9 and the progress waterproof layer coating of 8 junction of septic tank bottom plate to septic tank;Second, be In order to reduce the stress that septic tank leads wall 9 Yu 8 junction of septic tank bottom plate, septic tank is avoided to lead the company of wall 9 Yu septic tank bottom plate 8 It meets place and crack occurs.
In the present embodiment, the purpose that waterproof mortar course 10 is arranged at import 27 and outlet 28 is: being because being prevented first The coating of water sand pulp layer 10 reduces the gap of import 27 and outlet 28, consequently facilitating import bellows 27-1 and outlet bellows The installation of 28-1, so that the import bellows 27-1 of installation is located at the center of import 27, outlet bellows 28-1 is located at The center of mouth 28;The purpose of leak stopping spirit packing course 2 is set, is because of import bellows 27-1 and outlet bellows 28-1 installation Later, to clog import bellows 27-1 and export gap certain between bellows 28-1 and waterproof mortar course 10, thus really Protect the sealed connection of import bellows 27-1 and import 27 and outlet bellows 28-1 and outlet 28.
In the present embodiment, when it is implemented, JS water-repellent paint can also be used in the leak stopping spirit packing course 2.
In the present embodiment, the concrete cushion 29 with a thickness of 100mm~120mm.
In the present embodiment, the purpose of the bottom setting concrete cushion 29 of septic tank body 21, first, it is to be change excrement Pond provides a smooth mounting surface, it is ensured that septic tank lifts in place;Second, it is because if there is ground in septic tank installation region It is lauched stretching or rainwater is entered in foundation pit, the bearing capacity of bottom of foundation ditch can be destroyed, septic tank is caused to tilt or settle;The Three, it is to avoid septic tank bottom to generate ponding for water proof, draining, influence soil matrix condition.
In the present embodiment, setting concrete cushion 29 is with a thickness of the purpose of 100mm~120mm: if concrete mats The thickness of layer 29 is greater than 120mm, on the one hand will increase construction cost, on the other hand can increase the height of septic tank body, cannot Effectively ensure that the thickness of the above back fill course of septic tank cover board;If the thickness of concrete cushion 29 is less than 100mm, bearing capacity It is small, isolation effectively cannot be supported to septic tank.
In the present embodiment, the spacing of two neighboring water hole 16 is 250mm~300mm, and the water hole 16 is rectangle mistake Water hole.
In the present embodiment, the purpose that lower layer's steel mesh 1 and upper steel mesh 4 is arranged is: being for the ease of suspender 3 on the one hand The installation of middle long I-steel 3-2 and short I-steel 3-1;On the other hand, it is strength and stability in order to enhance septic tank bottom plate.
In the present embodiment, because pouring to form septic tank bottom plate 8 and septic tank leads wall 9 first during practice of construction, so 9 top of wall is led in septic tank afterwards to pour to form side wall 12, therefore is set in the junction that side wall 12 leads wall 9 with septic tank It is equipped with steel plate for sealing water 7, so that one end of steel plate for sealing water 7 protrudes into septic tank and leads wall 9, the other end of steel plate for sealing water 7 protrudes into all side walls Body 12 avoids seeping water to realize that side wall 12 and septic tank lead the further waterproof of the junction of wall 9.
A kind of hanging method of reinforced concrete septic tank as described in Figure 6, comprising the following steps:
Step 1: the excavation and concrete cushion of foundation pit are laid with:
Step 101, in septic tank region to be installed, end a foundation pit;Wherein, the length of the foundation pit is greater than septic tank The length of pond body 21, the width of the foundation pit are greater than the width of septic tank body 21, and the depth of the foundation pit is greater than septic tank The height of body 21;
Step 102 tamps the bottom of institute's foundation pit, until the flatness error on the bottom of foundation ditch surface is not more than 5mm; Then concrete cushion 29 is laid in the bottom of foundation ditch;
Step 103 measures unwrapping wire on 29 surface of concrete cushion, obtains foundation pit rectangular area;Wherein, the foundation pit Rectangular area is identical as the bottom section of septic tank body 21;
Step 2: septic tank lifts:
Step 201 hooks suspender 3 using crane for the lifting of septic tank body 21 to foundation pit rectangular area;Wherein, septic tank The bottom of pond body 21 and the foundation pit rectangular area are overlapped;
Step 202 is hung using crane and successively changes the first septic tank cover board 22-1, septic tank cover board connecting plate 23 and second Manure pit cover board 22-2 is lifted to the top of septic tank body 21;Wherein, the top of septic tank body 21 and the first septic tank cover board It is flush at the top of 22-1, septic tank cover board connecting plate 23 and the second septic tank cover board 22-2;Wherein, the first septic tank lid Plate 22-1 is mounted in septic tank wall 18 and septic tank beam body 17, and the septic tank cover board connecting plate 23 is mounted on septic tank wall In body 18, septic tank partition wall 15 and septic tank beam body 17, the second septic tank cover board 22-2 is mounted on 18 He of septic tank wall On septic tank partition wall 15;
First septic tank pit shaft 25-1 is hung on the first septic tank cover board 22-1 by step 203 using crane, and second is changed Manure pit pit shaft 25-2 is hung on the second septic tank cover board 22-2;Wherein, the first ripple in the first septic tank pit shaft 25-1 The center of pipe 19-1 is overlapped with the center of the first upper first cover plate through hole of septic tank cover board 22-1, the second septic tank pit shaft The center of the second bellows 19-2 in 25-2 is overlapped with the center of the second upper second cover plate through hole of septic tank cover board 22-2;
Step 204 changes excrement to the junction of the first septic tank pit shaft 25-1 and the first septic tank cover board 22-1 and second Pond pit shaft 25-2 and the junction of the second septic tank cover board 22-2 are in the milk;
Step 3: septic tank backfills:
Step 301 installs the double-deck locking well lid 11 on the first septic tank pit shaft 25-1 and the second septic tank pit shaft 25-2, It is locked in bilayer and snorkel 6 is installed on well lid 11, and shroud 5 is installed outside snorkel 6;Wherein, shroud 5 is mounted on the first change At the top of manure pit pit shaft 25-1 and the second septic tank pit shaft 25-2;
Step 302 is tamped along the foundation depth direction back-filling in layers from the bottom to top, until filling and leading up the foundation pit to road Face.
As shown in Fig. 2, concrete cushion 29 described in step 102 is the plain concrete of C15, and described in the present embodiment Concrete cushion 29 with a thickness of 100mm~120mm;
It is specific as follows when back-filling in layers is tamped in step 302:
It after every layer of backfill is with a thickness of 200mm~250mm, is tamped using rammer, and the stone roller mark of rammer overlaps width Degree is 10cm~20cm;
The excavation and concrete cushion of step 1 foundation pit are laid with before progress, it is also necessary to be carried out four pond bodies in suspender 3 and be hung The determination of the position of ear 3-3 and selection lifting wirerope;
The determination of the position of four pond body lifting lug 3-3 in suspender 3, detailed process is as follows:
Step A, it determines the center of gravity of septic tank body 21, and the center of gravity of septic tank body 21 is projected into septic tank bottom plate 8 Bottom surface in obtain center of gravity subpoint Q;
Step B, the water of the broadside medial surface of the septic tank wall 18 of center of gravity subpoint Q to close center of gravity subpoint Q is obtained Flat spacing is simultaneously denoted as Lc, obtain center of gravity subpoint Q to septic tank wall 18 long side medial surface horizontal space simultaneously be denoted as Lk;Its In, the broadside medial surface that will be close to the septic tank wall 18 of center of gravity subpoint Q is denoted as reference side;
Step C, a broadside of the rectangle that four pond body lifting lug 3-3 are surrounded is away from the horizontal space of the reference side ForBetween the level of the long side medial surface of the long back gauge septic tank wall 18 for the rectangle that four pond body lifting lug 3-3 are surrounded Away from forWherein, the center for the rectangle that four pond body lifting lug 3-3 are surrounded is overlapped with center of gravity subpoint Q, and four pond bodies are hung Ear 3-3 is symmetrically laid about center of gravity subpoint Q;
Selection lifting wirerope, detailed process is as follows:
Step I, according to formulaObtain wirerope critical length Gl, then lifting length of steel rope is selected Degree is Gl~1.5Gl;Wherein, LgIndicate horizontal space of the septic tank partition wall 15 apart from reference side, hgIndicate septic tank every The height of top surface of the top surface of wall 15 apart from septic tank bottom plate 8;
Step II, according to formulaObtain the safeload load of every lifting wirerope;Wherein, W is indicated The weight of septic tank body 21, θ indicate the angle of septic tank bottom plate 8 in lifting wirerope and septic tank body 21;
Step III, according to formulaObtain lifting breaking force of rope summation Fp;Wherein, KaExpression is hung The safety coefficient of steel loading cord, and KaValue range be reduction coefficient that 5~6, A indicates lifting wirerope, and the value model of A Enclose is 0.8~0.85;
Step IV, when lift wirerope Nominal Tensile be 1400Mpa when, according to formulaIt is hung The diameter D of steel loading cord;Wherein, breaking force of rope summation F is liftedpUnit be newton, lift the diameter D's of wirerope Unit is millimeter;
When the Nominal Tensile for lifting wirerope is 1550Mpa, according to formulaObtain lifting steel wire The diameter D of rope;
When the Nominal Tensile for lifting wirerope is 1700Mpa, according to formulaObtain lifting steel wire The diameter D of rope;
When the Nominal Tensile for lifting wirerope is 1850Mpa, according to formulaObtain lifting steel wire The diameter D of rope;
When the Nominal Tensile for lifting wirerope is 2000Mpa, according to formulaObtain lifting steel wire The diameter D of rope.
In the present embodiment, setting lifting rope capacity Gl~1.5GlPurpose be: first, if lifting rope capacity Greater than 1.5Gl, will affect the intensity of pond body lifting lug 3-3, increase the local stress of pond body lifting lug 3-3 ontology, be unfavorable for safety jaw Dress;Second, if lifting rope capacity is less than Gl, cause wirerope can not impaling, influence normally to lift;Third, be in order to Ensuring in 21 hoisting process of septic tank body, it is ensured that lifting wirerope does not contact the septic tank partition wall 15 in septic tank body 21, Avoid lifting that septic tank partition wall 15 is caused to damage.
In conclusion the present invention has rational design, it is easy for construction, easily operated convenient for transfer installation and recycling, simultaneously The occupancy to live road, place is reduced as far as possible, does not influence the progress of the other subdivisional works in scene, it is practical.
The above is only presently preferred embodiments of the present invention, is not intended to limit the invention in any way, it is all according to the present invention Technical spirit any simple modification to the above embodiments, change and equivalent structural changes, still fall within skill of the present invention In the protection scope of art scheme.

Claims (10)

1. a kind of reinforced concrete septic tank, it is characterised in that: including septic tank body (21), be arranged in septic tank body (21) On septic tank cover plate part and the septic tank wellbore section that is arranged on the septic tank cover plate part;
The septic tank body (21) includes septic tank bottom plate (8) and is disposed around septic tank bottom plate (8) surrounding and forms rectangular cavity The septic tank wall (18) of body is provided with septic tank partition wall (15) and septic tank beam body (17), describedization in the rectangular cavities The rectangular cavities are divided into precipitating chamber (15-1) and clarification chamber (15-2), septic tank beam body (17) position by manure pit partition wall (15) At the top of clarification chamber (15-2), suspender (3) are provided in the septic tank bottom plate (8), close to the septic tank of precipitating chamber (15-1) It is provided with import (27) on wall (18), is provided with outlet (28), institute on the septic tank wall (18) of clarification chamber (15-2) It states septic tank partition wall (15) and is provided with water hole (16) in the middle part of short transverse;
The septic tank cover plate part include by import (27) to outlet (28) set gradually the first septic tank cover board (22-1), Septic tank cover board connecting plate (23) and the second septic tank cover board (22-2), the first septic tank cover board (22-1) being mounted on excrement On bay wall body (18) and septic tank beam body (17), the septic tank cover board connecting plate (23) is mounted on septic tank wall (18), changes On manure pit partition wall (15) and septic tank beam body (17), the second septic tank cover board (22-2) be mounted on septic tank wall (18) and On septic tank partition wall (15), the first cover plate through hole, second septic tank are provided on the first septic tank cover board (22-1) The second cover plate through hole is provided on cover board (22-2);
The septic tank wellbore section includes the first septic tank pit shaft (25-1) being arranged on the first septic tank cover board (22-1) With the second septic tank pit shaft (25-2) being arranged on the second septic tank cover board (22-2), the first septic tank pit shaft (25-1) On be provided with the first pit shaft through-hole, and the first bellows (19-1) is provided in the first pit shaft through-hole, described second changes excrement It is provided with the second pit shaft through-hole on pond pit shaft (25-2), and is provided with the second bellows (19-2) in the second pit shaft through-hole, And the first pit shaft through-hole is overlapped with the center of first cover plate through hole, the second pit shaft through-hole and the second cover plate through hole Center be overlapped;
The septic tank body (21) is armored concrete pond body, the first septic tank cover board (22-1) and the second septic tank lid Plate (22-2) is reinforced concrete cover plate, and the septic tank cover board connecting plate (23) is armored concrete connecting plate, and described the One septic tank pit shaft (25-1) and the second septic tank pit shaft (25-2) are armored concrete pit shaft.
2. a kind of reinforced concrete septic tank described in accordance with the claim 1, it is characterised in that: the suspender (3) includes two The short I-steel (3-1) laid in parallel along septic tank bottom plate (8) width direction, two be symmetrically welded at short I-steel (3-1) two The long I-steel (3-2) at end and setting short I-steel (3-1) and long I-steel (3-2) junction and positioned at long I-steel Pond body lifting lug (3-3) on (3-2), the junction of the pond body lifting lug (3-3) and long I-steel (3-2) are provided with triangle reinforcing Steel plate (3-4), the short I-steel (3-1) and the long I-steel (3-2) are respectively positioned in septic tank bottom plate (8), the pond body Lifting lug (3-3) stretches out septic tank bottom plate (8);
The quantity of the pond body lifting lug (3-3) is four, and four pond body lifting lugs (3-3) surround rectangle.
3. a kind of reinforced concrete septic tank described in accordance with the claim 1, it is characterised in that: the septic tank wall (18) Top is provided with stage portion (26), the step surface of the stage portion (26) and the top surface of septic tank partition wall (15) and septic tank beam body (17) top surface is flush, the spacing and first of top surface of the step surface of the stage portion (26) apart from septic tank wall (18) The thickness of the thickness of septic tank cover board (22-1), the thickness of septic tank cover board connecting plate (23) and the second septic tank cover board (22-2) It is all the same.
4. a kind of reinforced concrete septic tank described in accordance with the claim 1, it is characterised in that: the first septic tank pit shaft Double-deck locking well lid (11), the double-deck top for locking well lid (11) are provided on (25-1) and the second septic tank pit shaft (25-2) Portion is provided with shroud (5), and double-deck lock offers venthole on well lid (11), and is provided with snorkel in the venthole (6), the snorkel (6) is located in shroud (5);
The quadrangle of the first septic tank cover board (22-1) is provided with the first cover board lifting lug (24-1), the septic tank cover board connection The quadrangle of plate (23) is provided with connection shell lug (23-1), and the quadrangle of the second septic tank cover board (22-2) is provided with the second lid Shell lug (24-2);
The first pit shaft lifting lug (20-1), the second septic tank pit shaft are symmetrically arranged on the first septic tank pit shaft (25-1) The second pit shaft lifting lug (20-2) is symmetrically arranged on (25-2).
5. a kind of reinforced concrete septic tank described in accordance with the claim 1, it is characterised in that: the precipitating chamber (15-1) and clear The medial surface of cavity clearing (15-2) is provided with waterproof layer (14), the waterproof layer (14) with a thickness of 1mm~1.2mm;
The septic tank wall (18) includes leading wall (9) and setting with septic tank bottom plate (8) integrally formed septic tank to change excrement The side wall (12) on wall (9) is led in pond, and the junction that the side wall (12) and septic tank lead wall (9) is provided with water-stopping steel Plate (7), one end of the steel plate for sealing water (7) are protruded into septic tank and are led wall (9), and the other end of the steel plate for sealing water (7) protrudes into side Wall (12).
6. a kind of reinforced concrete septic tank described in accordance with the claim 1, it is characterised in that: the septic tank is led in wall (9) Side and the junction of septic tank bottom plate (8) medial surface are provided with armpit angle (31);
Import (27) on the septic tank wall (18) is provided with import bellows (27-1), on the septic tank wall (18) Outlet (28) be provided with outlet bellows (28-1), the import bellows (27-1) and export bellows (28-1) outside by interior Leak stopping spirit packing course (2) and waterproof mortar course (10), the waterproof mortar course (10) and the septic tank wall are disposed with to outer Body (18) is tightly connected.
7. a kind of reinforced concrete septic tank described in accordance with the claim 1, it is characterised in that: the septic tank bottom plate (8) Bottom is provided with concrete cushion (29), and the concrete cushion (29) is the plain concrete of C15, and the concrete cushion (29) with a thickness of 100mm~120mm;
The quantity of the water hole (16) be it is multiple, multiple water holes (16) are put along the width of septic tank partition wall (15) to cloth If the spacing of two neighboring water hole (16) is 200mm~300mm, the water hole (16) is rectangle water hole.
8. a kind of reinforced concrete septic tank according to claim 2, it is characterised in that: in the septic tank bottom plate (8) Be disposed with lower layer's steel mesh (1) and upper steel mesh (4) from the bottom to top, lower layer's steel mesh (1) and upper steel mesh (4) it Between be provided with supporting steel bar, the short I-steel (3-1) and the long I-steel (3-2) are located at lower layer's steel mesh (1) and upper reinforcing bar Between net (4).
9. a kind of hanging method of reinforced concrete septic tank, which is characterized in that method includes the following steps:
Step 1: the excavation and concrete cushion of foundation pit are laid with:
Step 101, in septic tank region to be installed, end a foundation pit;Wherein, the length of the foundation pit is greater than septic tank body (21) length, the width of the foundation pit are greater than the width of septic tank body (21), and the depth of the foundation pit is greater than septic tank The height of body (21);
Step 102 tamps the bottom of institute's foundation pit, until the flatness error on the bottom of foundation ditch surface is not more than 5mm;Then Concrete cushion (29) are laid in the bottom of foundation ditch;
Step 103 measures unwrapping wire on concrete cushion (29) surface, obtains foundation pit rectangular area;Wherein, the foundation pit square Shape region is identical as the bottom section of septic tank body (21);
Step 2: septic tank lifts:
Step 201 hooks suspender (3) using crane for septic tank body (21) lifting to foundation pit rectangular area;Wherein, septic tank The bottom of pond body (21) and the foundation pit rectangular area are overlapped;
Step 202 is hung using crane and successively changes the first septic tank cover board (22-1), septic tank cover board connecting plate (23) and second Manure pit cover board (22-2) is lifted to the top of septic tank body (21);Wherein, excrement is changed with first in the top of septic tank body (21) It is flush at the top of pond cover board (22-1), septic tank cover board connecting plate (23) and the second septic tank cover board (22-2);Wherein, described First septic tank cover board (22-1) is mounted on septic tank wall (18) and septic tank beam body (17), the septic tank cover board connection Plate (23) is mounted in septic tank wall (18), septic tank partition wall (15) and septic tank beam body (17), the second septic tank lid Plate (22-2) is mounted on septic tank wall (18) and septic tank partition wall (15);
First septic tank pit shaft (25-1) is hung on the first septic tank cover board (22-1) by step 203 using crane, and second is changed Manure pit pit shaft (25-2) is hung on the second septic tank cover board (22-2);Wherein, in the first septic tank pit shaft (25-1) The center of one bellows (19-1) is overlapped with the center of the first cover plate through hole on the first septic tank cover board (22-1), and described second changes Second cover plate through hole on the center of the second bellows (19-2) in manure pit pit shaft (25-2) and the second septic tank cover board (22-2) Center be overlapped;
Step 204 changes excrement to the junction of the first septic tank pit shaft (25-1) and the first septic tank cover board (22-1) and second Pond pit shaft (25-2) and the junction of the second septic tank cover board (22-2) are in the milk;
Step 3: septic tank backfills:
Step 301 installs the double-deck locking well lid on the first septic tank pit shaft (25-1) and the second septic tank pit shaft (25-2) (11), it is locked in bilayer and snorkel (6) is installed on well lid (11), and shroud (5) are installed outside snorkel (6);Wherein, shroud (5) it is mounted at the top of the first septic tank pit shaft (25-1) and the second septic tank pit shaft (25-2);
Step 302 is tamped along the foundation depth direction back-filling in layers from the bottom to top, until filling and leading up the foundation pit to road surface.
10. a kind of hanging method of reinforced concrete septic tank according to claim 9, it is characterised in that: in step 102 The concrete cushion (29) be C15 plain concrete, and the concrete cushion (29) with a thickness of 100mm~120mm;
It is specific as follows when back-filling in layers is tamped in step 302:
After every layer of backfill is with a thickness of 200mm~250mm, tamped using rammer, and the stone roller mark lap width of rammer is 10cm~20cm;
The excavation and concrete cushion of step 1 foundation pit are laid with before progress, it is also necessary to carry out four pond body lifting lugs in suspender (3) The determination of the position of (3-3) and selection lifting wirerope;
The determination of the position of four pond body lifting lugs (3-3) in suspender (3), detailed process is as follows:
Step A, it determines the center of gravity of septic tank body (21), and the center of gravity of septic tank body (21) is projected into septic tank bottom plate (8) center of gravity subpoint Q is obtained in bottom surface;
Step B, the level of the broadside medial surface of the septic tank wall (18) of center of gravity subpoint Q to close center of gravity subpoint Q is obtained Spacing is simultaneously denoted as Lc, obtain center of gravity subpoint Q to septic tank wall (18) long side medial surface horizontal space simultaneously be denoted as Lk;Its In, the broadside medial surface that will be close to the septic tank wall (18) of center of gravity subpoint Q is denoted as reference side;
Step C, a broadside of the rectangle that four pond body lifting lugs (3-3) surround is away from the horizontal space of the reference sideThe level of the long side medial surface of the long back gauge septic tank wall (18) for the rectangle that four pond body lifting lugs (3-3) surround Spacing isWherein, the center for the rectangle that four pond body lifting lugs (3-3) surround is overlapped with center of gravity subpoint Q, and four Pond body lifting lug (3-3) is symmetrically laid about center of gravity subpoint Q;
Selection lifting wirerope, detailed process is as follows:
Step I, according to formulaObtain wirerope critical length Gl, then select lifting rope capacity for Gl~1.5Gl;Wherein, LgIndicate the horizontal space of septic tank partition wall (15) apart from reference side, hgIndicate septic tank partition wall (15) height of top surface of the top surface apart from septic tank bottom plate (8);
Step II, according to formulaObtain the safeload load of every lifting wirerope;Wherein, W expressionization excrement The weight of pond pond body (21), θ indicate the angle of septic tank bottom plate (8) in lifting wirerope and septic tank body (21);
Step III, according to formulaObtain lifting breaking force of rope summation Fp;Wherein, KaIndicate lifting steel The safety coefficient of cord, and KaValue range be reduction coefficient that 5~6, A indicates lifting wirerope, and the value range of A is 0.8~0.85;
Step IV, when lift wirerope Nominal Tensile be 1400Mpa when, according to formulaObtain lifting steel The diameter D of cord;Wherein, breaking force of rope summation F is liftedpUnit be newton, lift the unit of the diameter D of wirerope For millimeter;
When the Nominal Tensile for lifting wirerope is 1550Mpa, according to formulaObtain lifting wirerope Diameter D;
When the Nominal Tensile for lifting wirerope is 1700Mpa, according to formulaObtain lifting wirerope Diameter D;
When the Nominal Tensile for lifting wirerope is 1850Mpa, according to formulaObtain lifting wirerope Diameter D;
When the Nominal Tensile for lifting wirerope is 2000Mpa, according to formulaObtain lifting wirerope Diameter D.
CN201910415602.6A 2019-05-18 2019-05-18 Reinforced concrete septic tank and hoisting method thereof Active CN110183080B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910415602.6A CN110183080B (en) 2019-05-18 2019-05-18 Reinforced concrete septic tank and hoisting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910415602.6A CN110183080B (en) 2019-05-18 2019-05-18 Reinforced concrete septic tank and hoisting method thereof

Publications (2)

Publication Number Publication Date
CN110183080A true CN110183080A (en) 2019-08-30
CN110183080B CN110183080B (en) 2022-02-01

Family

ID=67716785

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910415602.6A Active CN110183080B (en) 2019-05-18 2019-05-18 Reinforced concrete septic tank and hoisting method thereof

Country Status (1)

Country Link
CN (1) CN110183080B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111003915A (en) * 2020-01-09 2020-04-14 湖南沃工环境科技有限公司 Installation process of glass fiber reinforced plastic septic tank
CN112551847A (en) * 2020-12-24 2021-03-26 甘肃海纳塑业有限公司 PE septic tank and preparation method thereof
CN114263466A (en) * 2021-12-20 2022-04-01 安徽理工大学 Method for controlling prefabricated construction temperature crack of well wall in winter in alpine region

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000107779A (en) * 1998-10-01 2000-04-18 Sekisui Chem Co Ltd Structure of supporting filter medium in septic tank
CN204000933U (en) * 2014-08-22 2014-12-10 中铁十一局集团城市轨道工程有限公司 A kind of combustion gas and water supply pipe cross the box-structure of Metro Deep Excavation
CN204939229U (en) * 2015-08-28 2016-01-06 国家电网公司 Small precast assembled steel reinforced concrete life-stylize manure pit
CN106277687A (en) * 2016-08-30 2017-01-04 北海运龙环保材料有限责任公司 The installation method of stem pressing glass reinforced plastics anaerobic tank
CN109098207A (en) * 2018-09-21 2018-12-28 中建局集团第二建筑有限公司 A kind of prefabricated combustion gas cabin of underground pipe gallery, template system and construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000107779A (en) * 1998-10-01 2000-04-18 Sekisui Chem Co Ltd Structure of supporting filter medium in septic tank
CN204000933U (en) * 2014-08-22 2014-12-10 中铁十一局集团城市轨道工程有限公司 A kind of combustion gas and water supply pipe cross the box-structure of Metro Deep Excavation
CN204939229U (en) * 2015-08-28 2016-01-06 国家电网公司 Small precast assembled steel reinforced concrete life-stylize manure pit
CN106277687A (en) * 2016-08-30 2017-01-04 北海运龙环保材料有限责任公司 The installation method of stem pressing glass reinforced plastics anaerobic tank
CN109098207A (en) * 2018-09-21 2018-12-28 中建局集团第二建筑有限公司 A kind of prefabricated combustion gas cabin of underground pipe gallery, template system and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111003915A (en) * 2020-01-09 2020-04-14 湖南沃工环境科技有限公司 Installation process of glass fiber reinforced plastic septic tank
CN112551847A (en) * 2020-12-24 2021-03-26 甘肃海纳塑业有限公司 PE septic tank and preparation method thereof
CN114263466A (en) * 2021-12-20 2022-04-01 安徽理工大学 Method for controlling prefabricated construction temperature crack of well wall in winter in alpine region
CN114263466B (en) * 2021-12-20 2024-01-30 安徽理工大学 Winter prefabrication construction temperature crack control method for well wall of well drilling in alpine region

Also Published As

Publication number Publication date
CN110183080B (en) 2022-02-01

Similar Documents

Publication Publication Date Title
CN110183080A (en) A kind of reinforced concrete septic tank and its hanging method
CN101603315B (en) Method for constructing seepage prevention system of secondary cofferdam for immersed tube tunnel
CN116695715A (en) Inflatable fore shaft pipe and construction method thereof applied to underground diaphragm wall
CN110206307A (en) A kind of reinforced concrete septic tank construction method
CN107364902A (en) A kind of mounting structure of buried sewage treatment equipment
CN209010962U (en) A kind of pier dry method mounting structure
CA2742262A1 (en) Interlocking ballast block
JP5432814B2 (en) Construction method of concrete body for septic tank protection
CN101812853A (en) Swimming pool base actively anti-floating construction method
CN212427407U (en) Comprehensive water-proof and drainage system for elevator shaft foundation pit shaft
CN219343438U (en) Tunnel drainage inspection shaft device
CN109137751A (en) Based on pier dry method mounting process in the water for sitting bottom cofferdam water sealing structure
CN218148389U (en) Be arranged in hole well child mould integral erection device
CN220953500U (en) "Water tank" type gravity ground ox
CN212715050U (en) Anti pressure relief system that floats of basement bottom plate
CN218933184U (en) Cast-in-situ assembled pit and elevator shaft foundation pit supporting structure
CN107338797B (en) Steel plate concrete combined anti-floating water stop structure and construction method thereof
CN114482081B (en) Deep foundation pit fertilizer groove backfill system
CN219933194U (en) Box and prefabricated pipe pier
CN220888695U (en) Concrete caisson for dewatering in foundation pit
CN212772700U (en) Repair damaged structure that blocks up of sewage pipe
CN109024286B (en) Construction method for cast-in-situ V-shaped pier of concrete support wall
CN211817667U (en) Fabricated overhead backfill structure and toilet thereof
CN217679204U (en) Foundation pit dewatering well sealing system
CN220414297U (en) Foundation ditch dewatering well closing cap structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant