CN110175814A - A kind of strong event lifecycle management model - Google Patents

A kind of strong event lifecycle management model Download PDF

Info

Publication number
CN110175814A
CN110175814A CN201910352465.6A CN201910352465A CN110175814A CN 110175814 A CN110175814 A CN 110175814A CN 201910352465 A CN201910352465 A CN 201910352465A CN 110175814 A CN110175814 A CN 110175814A
Authority
CN
China
Prior art keywords
project
management
quality
item
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910352465.6A
Other languages
Chinese (zh)
Inventor
雷润林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou Yingtai Laizhi Enterprise Management Consulting Co Ltd
Original Assignee
Lanzhou Yingtai Laizhi Enterprise Management Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou Yingtai Laizhi Enterprise Management Consulting Co Ltd filed Critical Lanzhou Yingtai Laizhi Enterprise Management Consulting Co Ltd
Priority to CN201910352465.6A priority Critical patent/CN110175814A/en
Publication of CN110175814A publication Critical patent/CN110175814A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of strong event lifecycle management models, belong to lifecycle management field.Administrative model includes project initiation module, project analysis module, Project in Operation module and project achievement module;Each module completes different work, but connects each other, system modular, so that the entire each step of project from start to end is all clear, entire implementation process procedure, the health for being conducive to project is effectively runed.

Description

A kind of strong event lifecycle management model
Technical field
The invention belongs to lifecycle management fields, and in particular to a kind of strong event lifecycle management model.
Background technique
Project management is a set of technical method based on received management principle, these techniques or methods for planning, Assessment, control work activities, on time, by budget, according to specification reach ideal final effect.
Project management the main contents include scope management, time management, expenses management, quality management, human resource management, Risk management, communication management, Purchases And Contracts management and the big field of integrated management nine.Main target is: meeting the requirement of project With expectation;Meet project interests relevant party different requirement and expectation;Meet project identified requirement and expectation;Meet The requirement and expectation that project not yet identifies.
The life cycle of project is divided into: phase of approving and initiate a project, project initiation phase, project development maturity period and project complete the phase, Main finished item identification demand, deduction solution, project implementation and end project;But at present for Whole Life Cycle of Projects There are no the administrative model systems of a system, so that project inadequate sharpening and procedure in entire implementation process.
Summary of the invention
It is an object of the invention to: a kind of strong event lifecycle management model is provided, project is solved and gives birth to entirely Order the administrative model system of none system of period, project inadequate sharpening and procedure in entire implementation process.
The technical solution adopted by the invention is as follows:
A kind of strong event lifecycle management model, comprising: project initiation module, project analysis module, project fortune Seek module and project achievement module;
Project initiation module receives user's idea, forms project integrated planning layout, comprising: project contract management, project Recommendation management and project application report management and project initiation progress control;
Project analysis module analyzes project many factors, is effectively assessed whole project, comprising: range pipe Reason, time management, expenses management, quality management, human resource management and risk management;
Project in Operation module is after project initiation and analysis, and project implementation implements management, comprising: communication management, buying With contract management, integrated management and user management;
Project achievement modules exhibit Project in Operation achievement, statistical item is from starting, analyze the entire project implementation of operation The various situations generated in journey, obtain statistical report.
Further, project contract management generates project contract information and checks for user in the project initiation module;
Project proposal management directly can report recommendation to authorities, save project recommendation for user check with Modification, can check that project proposal reports progress and examination & approval progress;
Project application report management reports and submits project Demonstration Report to government part, and save project application paper is checked for user With modification, it can check that project application reports and submits progress and examination & approval progress;
Project initiation progress control is to project overall progress record and control.
Further, in the project analysis module scope management working range that project is completed be managed and Control, comprising: the change control of the demand, the range, range that define planned project identified project and wide verification;
Time management is the timing node of each item of arrangement project, comprising: item definition, item sequence, item duration are estimated Calculation, event schedule arrangement, item progress monitoring and scanning time nodes records;
Expenses management is managed and records to the expense in project whole process, comprising: expense estimation, expense budget, Payment control and expense record;
Quality management is managed the quality for the substantive product that the work quality and project of entire project generate, and wraps It includes: quality planning, quality control, quality assurance and quality improvement;
Role needed for human resource management determination and allocated items, responsibility, return relationship, and be managed, including Role and Responsibility distribution, staffing governing plan and organization chart;
Risk management mainly identifies and analysis project risk and takes counter-measure, comprising: risk identification, risk amount Change, control is implemented in Risk responses research and Risk responses.
Further, the project in the entire implementation process of project is collected and transmitted to communication management in the Project in Operation module Information, generation, collection, propagation, preservation and configuration process including project information;
Article needed for the Purchases And Contracts management statistics project implementation forms shopping list and can check and modify, and storage is adopted Purchase contract is checked for user;Project Procurement Management includes Four processes: planning purchasing management implements buying, control buying, terminates Buying;
Whole project is coordinated in integrated management, trade-off between conflicting target and scheme is occurring, to reach the phase The requirement of prestige exceeds expectation requirement, comprising: formulates project charter, guidance and management project and executes, monitor project work, is whole Body change control and project ending;
User management is mainly to user to the change management in the entire project implementation process, including change plan and note Record.
In conclusion by adopting the above-described technical solution, the beneficial effects of the present invention are:
1. a kind of strong event lifecycle management model, by each stage work mould in project whole life cycle Block, and be managed collectively, so that project is all clear in the job placement in each stage, procedure has stronger Objective, right Emergency case in the project implementation process more can accurately hold and handle.
2. the present invention counts all information of Whole Life Cycle of Projects, facilitates the control to entire project and divide Analysis promotes project to develop towards the direction of health so that the advantage and disadvantage of project are very clear.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings, in which:
Fig. 1 is a kind of strong event lifecycle management model framework figure;
Fig. 2 is project initiation module frame chart of the present invention;
Fig. 3 is project analysis module frame chart of the present invention;
Fig. 4 is Project in Operation module frame chart of the present invention.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that described herein, specific examples are only used to explain the present invention, not For limiting the present invention, i.e., described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is logical The component for the embodiment of the present invention being often described and illustrated herein in the accompanying drawings can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiment of the present invention provided in the accompanying drawings is not intended to limit below claimed The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiment of the present invention, those skilled in the art Member's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
It should be noted that the relational terms of term " first " and " second " or the like be used merely to an entity or Operation is distinguished with another entity or operation, and without necessarily requiring or implying between these entities or operation, there are any This actual relationship or sequence.Moreover, the terms "include", "comprise" or its any other variant be intended to it is non-exclusive Property include so that include a series of elements process, method, article or equipment not only include those elements, but also Further include other elements that are not explicitly listed, or further include for this process, method, article or equipment it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including described There is also other identical elements in the process, method, article or equipment of element.
A kind of strong event lifecycle management model, comprising: project initiation module, project analysis module, project fortune Seek module and project achievement module;
The project initiation module receives user's idea, forms project integrated planning layout, comprising: project contract management, Project proposal management and project application report management and project initiation progress control;
Specifically, user's demand determining first, analysis project income ratio, research project feasibility, analysis project should have Condition;
It proposes project solutions, forms project proposal, project proposal is by its authorities of project investment direction The file reported, project proposal are the forms to the written materialization for planning a certain work, are projects from being susceptible to implement Initial stage becomes the imagination of project investment the investment of outline from the necessity and possibility that macroscopically discussion project is set up It is recommended that.Reporting for project proposal can make preliminary decision for project examination organ, it is possible to reduce the blindness of items selection, It lays the foundation for feasibility study.Project proposal is intended to sketch the contours of the whole of project and summarizes, the basic situation of item body, provides Golden source, economic results in society and scheduling.
By the project proposal management of project initiation module recommendation, save project directly can be reported to authorities Recommendation is checked and is modified for user, can check that project proposal reports progress and examination & approval progress;
Project proposal is to summarize whole project, it is also necessary to report and submit project application to report, be that enterprise investment construction should report political affairs When the project that mansion is checked and approved, to obtain administrative permission of the system of project approval organ to projects awaiting construction, by the project opinion checking and approving requirement and reporting and submitting Card report.Project application report answers emphasis to illustrate the items such as external effect, public character of project, including maintenance economic security, rationally Development and utilization resource preserves the ecological environment, optimizes great layout, ensure public interest, prevent the contents such as monopolization, according to political affairs The requirement of mansion public administration, to projects awaiting construction from programming and distribution, the utilization of resources, energy conservation, expropriation of land immigrant, ecological environment, economy and Social influence etc. carries out comprehensive demonstration, carries out approval for relevant department's investment in enterprise project and provides foundation.
The basic content of project application report includes: to declare unit and project overview, development plan, industrial policy and industry Access analysis, development of resources and comprehensive utilization analysis, energy-saving scheme analysis, construction land, earth clearance and immigration allocation analysis, Environment and ecology influence analysis, economic impact analysis, social impact analysis.
Project Demonstration Report, save project are reported and submitted to government part by the project application report management of project initiation module Application paper is checked and is modified for user, can check that project application reports and submits progress and examination & approval progress;
It needs to sign the project implementation contract when project determines, this contract can be according to demand by project initiation module Project contract management generates project contract information and checks for user, facilitates the management and storage of contract.
All progresses of project during startup can be by the progress control of project initiation module to checking, i.e., User can be facilitated to the control of project, and make corresponding operating instruction, during project initiation, pass through the operation of procedure Mode also ensures going on smoothly for project so that development of projects is more clear.
The project analysis module analyzes project many factors, is effectively assessed whole project, comprising: range Management, time management, expenses management, quality management, human resource management and risk management;
Specifically, the working range to be completed to project of scope management is managed and controls, comprising: identifies project Demand, the change control of the range, range of definition planned project and wide verification;
It is understood that the management of scope of project be to project should include what and should not include what carry out phase The definition and control answered, including to guarantee project can range as required complete involved in all processes, comprising: determine item Purpose demand, the definition range of planned project, the implementation of scope management, the change of range control management and wide verification etc.. It can also think that scope of project refers to the process of to generate all working included by Project Product and generate used in these products.? Mesh shareholder must reach common understanding in terms of which type of product is project will generate, and also reach in terms of how producing these products At certain common recognition.
Time management is the timing node of each item of arrangement project, comprising: item definition, item sequence, item duration are estimated Calculation, event schedule arrangement, item progress monitoring and scanning time nodes records;
It is understood that arranged rational PROJECT TIME is a key content in project management, its purpose is to protect Card is timely completed project, reasonable distribution resource, plays optimum working efficiency, reasonable to arrange the time, guarantees that project is timely completed.
Item definition: project work is decomposed into smaller, more manageable work item, these items are to ensure Complete the enforceable detailed task of entire project.In the project implementation, all items are arranged into a specific item inventory, And allow each member of project team how many need of work processing can be understood.Project list takes document form, with Using and managing convenient for other processes of project.
Item sequence: on the basis of item inventory, find out dependence between project item and special dimension according to Rely relationship, job order.Particular order and priority logic relationship desired by considering inside team and consideration are internal and external, external In the case where with external various dependences and for the finished item some related works to be done, to item implementation sequence It is ranked up.
The estimation of item duration: the estimation of item duration is required for going out item according to item range, resource situation plan column Duration fully considers Activity List, reasonable resource requirement, the power factor of personnel and environmental factor to the shadow of project duration After sound, duration of estimation reality effectively and guarantees quality.After the completion of the estimation of item duration, the duration estimated data quantified, By its documenting, while improving simultaneously update transaction inventory.
Event schedule arrangement: the schedule of project means to explicitly define the beginning and end date of project activity, This is the process confirmed repeatedly.The determination of program should according to project network diagrams, the item duration of estimation, resource requirement, Resource sharing scenarios, the work calendar of the project implementation, progress limitation, earliest and latest time, Risk Management Plan, active characteristics Consider Deng unified, unified arrangement is carried out to the progress of each single item item, forms the progress table of project.
Item progress monitoring: item progress monitoring is mainly the practice condition for supervising item progress, in time discovery and correction Deviation, mistake.To consider in control the factor, the project process that influence project process variation change influence to other parts because The practical step that should be taken when element, program change.
Scanning time nodes records: establishing one " time log ", complete, accurate recording item in implementation process when Between how to spend.
Expenses management is managed and records to the expense in project whole process, comprising: expense estimation, expense budget, Payment control and expense record;
Expense estimation: expense estimates that the estimation as the price when project is implemented under certain constraint condition is a Xiang Chong The factor wanted, refer to estimate finished item respectively work the resources such as required people, material, equipment expense approximation, formed complete The expense of project estimates table.
Expense estimation is exchanged and is associated with the result of work quality, various forms of expenses.
Expense budget: expense budget includes the full payment of each single item independence item distribution, obtains what metric terms were implemented Expense baseline pays foundation, including direct labor budget, auxiliary as the expense measured and monitored in the project implementation process Service fee budget, bought articles expense budget;
Payment control: on the basis of in advance to Project Cost budget, Payment control guarantees every item in each Budget limitations carry out, it is specified that each department periodically reports its report on expenses, then expense auditing is carried out to it by control department, with Guarantee the legitimacy of various expenditures, then the expense having occurred and that compares with budget again, analyze whether it overspends, and takes Corresponding measure is made up.
Expense record: to the various and costs related letter generated during expense estimation, expense budget and Payment control Breath is recorded, convenient to check at any time.
Quality management carries out control, pipe to the quality for the substantive product that the work quality and project of entire project generate Reason, comprising: quality planning, quality control, quality assurance and quality improvement;
Quality planning: quality planning is to project, service, the special quality measures of contract provision, resource and activity command File.
The content of quality planning are as follows: the quality objective of realization;Job, requirement, responsibility and the completion that should bear Time etc.;Quality index and the user quality requirement that should reach within the plan phase;Objectives of Quality Developing in the plan phase, point Duan Jindu, the action of realization, project implementation preparation, important technical corrective measure, detection and technological development etc..
Quality control: quality control mainly supervision project implementation is as a result, by the result of project and the matter in advance formulated Amount standard is compared, and finds out its existing gap, and analyze the reason of forming this gap, and quality control is real through project The overall process applied.
Quality control includes: inspection, control figure, statistical sample, flow graph, trend analysis, technical parameter, expense and progress ginseng Number.
Quality assurance: quality assurance be the work of planned and system implement the basis for reaching quality planning requirement, be item The normal operation of mesh quality system provides reliable guarantee, through among the overall process of the project implementation.By quality audit, really Determine quality activity and its related result whether meets plan arrangement and whether these arrangements effectively implement and be suitable for reaching mesh Accordance of the status to prescribed requirement of object is audited in mark system, independent examination, evaluation, and determines whether that improvement need to be taken Corrective action guarantees design, implements to meet prescribed requirement with organizational process, protect to guarantee that project quality meets prescribed requirement Card quality system effectively runs and constantly improve, and improves quality management level.
The classification of quality audit includes: quality system audit, project quality audit, procedure quality audit, supervision and verification, interior Portion's quality audit, external mass audit.
Quality improvement: increase project validity and efficiency to improve the interests of project investment person.In most cases, matter Amount, which is improved, will require to change incorrect action and overcomes the process of this incorrect action.
Role needed for human resource management determination and allocated items, responsibility, return relationship, and be managed, including Role and Responsibility distribution, staffing governing plan and organization chart;
Role and Responsibility distribution: the Role and Responsibility in specific project go on smoothly each work can, by each Work is assigned to specific personal (or group), specifies responsibility of the different individual (or group) in this work, and every Item work can only have unique responsible person (or group), form functional table.Simultaneously because Role and Responsibility may at any time and Variation, in the result also clear this layer of relationship.
Staffing governing plan: which type of manpower resource when described project group need, and uses resource histogram Figure indicates.
Organization chart: it is the graphical representation that project reports relationship, the main working report described between Team Member Relationship.
Risk management mainly identifies and analysis project risk and takes counter-measure, comprising: risk identification, risk amount Change, control is implemented in Risk responses research and Risk responses;
Risk identification: confirmation is likely to affect the risk of development of projects, and records feature possessed by each risk. One, identify which risk may influence development of projects and record each side's region feature of specific risk;Two, project work group energy is identified It is controlled and the inherent risk that influences and controls the external risk except power and influence power beyond project work group etc..
Risk quantification: the interaction between assessment risk and risk, the range of the possible output result of evaluation project.
Risk responses research: it determines and the step of selecting and making reply to danger is carried out to chance;Countermeasure includes avoiding, subtracting Mitigation is received.
Risk responses implement control: reacting to changing caused by project process risk.When accident occurs, need Repeat risk identification, risk quantification and Risk responses and studies a whole set of basic measures.
For the Project in Operation module after project initiation and analysis, project implementation implements management, comprising: communication management, Purchases And Contracts management, integrated management and user management;
Specifically, communication management is collected and transmits the project information in the entire implementation process of project, including project information Generation, collection, propagation, preservation and configuration process;
It is understood that various situations will necessarily occur with the propulsion of project during project implementation, for These situations form different project information, are blazed abroad, are configured to different by way of directly informing and either announcing Role gets on, and by these information preservations, so that project develops towards target science, reasonable.
Article needed for the Purchases And Contracts management statistics project implementation forms shopping list and can check and modify, and storage is adopted Purchase contract is checked for user;Project Procurement Management includes Four processes: planning purchasing management implements buying, control buying, terminates Buying.
Plan purchasing management-record project procurement decisions, clear procurement practice, the process of the potential seller of identification.
Implement the process of buying-acquisition seller response, the selection seller and award of contract.
Buying-management buying relationship, supervision contract execution situation is controlled, and implements change as needed and takes correction The process of measure.
Terminate purchase-finish single buying process.
Whole project is coordinated in integrated management, trade-off between conflicting target and scheme is occurring, to reach the phase The requirement of prestige exceeds expectation requirement, comprising: formulates project charter, guidance and management project and executes, monitor project work, is whole Body change control and project ending;
Formulate project charter: one, official approval project or project stage;Two, project initial ranges specification is formulated, is summarized Ground descriptive item purpose range;Three, Project Management Plan is formulated, by determination, writes, coordinate and combines required for all partial plans Action form file, become Project Management Plan.
Guidance is executed with management project: the work that finished item governing plan determines, is reached scope of project specification and is determined Project demand.
Project work: the work that finished item governing plan determines is monitored, the project that scope of project specification determines is reached It is required that.
Whole change control: examine that deliverable achievement and organizational process money are changed and controlled in all change requests, approval It produces.
Project ending: it is finally completed the activity of all items management process group, formally terminates project or project stage.
User management is mainly to user to the change management in the entire project implementation process, including change plan and note Record.
Project achievement modules exhibit Project in Operation achievement, statistical item is from starting, analyze the entire project implementation of operation The various situations generated in journey, obtain statistical report.
The foregoing is merely illustrative of the preferred embodiments of the present invention, the protection scope being not intended to limit the invention, any Those skilled in the art within the spirit and principles in the present invention made by any modifications, equivalent replacements, and improvements etc., It should all be included in the protection scope of the present invention.

Claims (4)

1. a kind of strong event lifecycle management model, it is characterised in that: including project initiation module, project analysis mould Block, Project in Operation module and project achievement module;
Project initiation module receives user's idea, forms project integrated planning layout, comprising: project contract management, programmatic recommendation Book management and project application report management and project initiation progress control;
Project analysis module to project many factors analyze, whole project is effectively assessed, comprising: scope management, when Between management, expenses management, quality management, human resource management and risk management;
Project in Operation module is after project initiation and analysis, and project implementation implements management, comprising: communication management, buying and conjunction With management, integrated management and user management;
Project achievement modules exhibit Project in Operation achievement, statistical item is from starting, analyze in the entire project implementation process of operation The various situations generated, obtain statistical report.
2. a kind of strong event lifecycle management model according to claim 1, it is characterised in that: the project opens Project contract management generates project contract information and checks for user in dynamic model block;
Project proposal management directly can report recommendation to authorities, and save project recommendation is checked and repaired for user Change, can check that project proposal reports progress and examination & approval progress;
Project application report management reports and submits project Demonstration Report to government part, and save project application paper is checked and repaired for user Change, can check that project application reports and submits progress and examination & approval progress;
Project initiation progress control is to project overall progress record and control.
3. a kind of strong event lifecycle management model according to claim 1, it is characterised in that: the project point The working range to be completed to project of scope management is managed and controls in analysis module, comprising: the demand identified project, calmly The change control of the range, range of adopted planned project and wide verification;
Time management is the timing node of each item of arrangement project, comprising: item definition, item sequence, the estimation of item duration, thing The arrangement of item program, item progress monitoring and scanning time nodes records;
Expenses management is managed and records to the expense in project whole process, comprising: expense estimation, expense budget, expense Control and expense record;
Quality management is managed the quality for the substantive product that the work quality and project of entire project generate, comprising: Quality planning, quality control, quality assurance and quality improvement;
Role needed for human resource management determination and allocated items, responsibility, return relationship, and be managed, including role With allocation of duties, staffing governing plan and organization chart;
Risk management mainly identifies and analysis project risk and takes counter-measure, comprising: risk identification, risk quantification, wind Dangerous countermeasure and Risk responses implement control.
4. a kind of strong event lifecycle management model according to claim 1, it is characterised in that: the project fortune It seeks communication management in module to collect and transmit the project information in the entire implementation process of project, generation, receipts including project information Collection, propagation, preservation and configuration process;
Article needed for the Purchases And Contracts management statistics project implementation forms shopping list and can check and modify, and storage buying is closed It is checked with for user;Project Procurement Management includes Four processes: planning purchasing management implements buying, control buying, terminates to adopt Purchase;
Whole project is coordinated in integrated management, trade-off between conflicting target and scheme is occurring, to reach desired It is required that required beyond expectation, comprising: formulate project charter, guidance and management project execute, monitoring project work, whole become More control and project ending;
User management is mainly to user to the change management in the entire project implementation process, including change plan and record.
CN201910352465.6A 2019-04-29 2019-04-29 A kind of strong event lifecycle management model Withdrawn CN110175814A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910352465.6A CN110175814A (en) 2019-04-29 2019-04-29 A kind of strong event lifecycle management model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910352465.6A CN110175814A (en) 2019-04-29 2019-04-29 A kind of strong event lifecycle management model

Publications (1)

Publication Number Publication Date
CN110175814A true CN110175814A (en) 2019-08-27

Family

ID=67690289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910352465.6A Withdrawn CN110175814A (en) 2019-04-29 2019-04-29 A kind of strong event lifecycle management model

Country Status (1)

Country Link
CN (1) CN110175814A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116090705A (en) * 2023-03-06 2023-05-09 广东新视野信息科技股份有限公司 Data processing method and system based on intelligent building site and cloud platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116090705A (en) * 2023-03-06 2023-05-09 广东新视野信息科技股份有限公司 Data processing method and system based on intelligent building site and cloud platform

Similar Documents

Publication Publication Date Title
Ruiz-Benitez et al. Achieving sustainability through the lean and resilient management of the supply chain
Korenková et al. Linking a performance management system and competencies: Qualitative research
CN106779577A (en) The method for building up and system of Auditing Information System system
Sartor et al. Quality management: tools, methods, and standards
CN102521663A (en) Electronic supervision method
CN108345995A (en) A kind of enterprises economic management cost control system
Kuzmin et al. Simulating and reengineering stress management system—analysis of undesirable deviations
CN110175814A (en) A kind of strong event lifecycle management model
Orobinskiy et al. Development of risk-oriented technologies of the corporate financial controlling system
Levy Managing the managers: the Commission’s role in the implementation of spending programmes
Kosteva et al. Improvement of internal audit system in the institutions of the public sector in Russia
Zancul PLM reference model: a preliminary proposal for reference model evolution
Stipić Environmental accounting as a sustainable development strategy in Croatian companies
Karpenko et al. Development and implementation of a strategic personnel management system according to goals based on key performance indicators
Barabash et al. Modeling a set of management approaches for the effective operation of the environmental management system at the business entities
Ruiz et al. Flexible management of essential construction tasks using fuzzy OLAP cubes
Vladimirova et al. Model of risk management of construction project based on transaction costs
Duc et al. Design and Implement Low-Cost Industry 4.0 System Using Hybrid Six Sigma Methodology for CNC Manufacturing Process
Alherian et al. Integrated risk management model implementation's contextual dependence on company size
Anajafi et al. Developing effective project management for enterprise architecture projects
Zdyrko et al. Financial control, analysis and audit as tools of an effective management system: state, problems, prospects/collective monograph
Ehrenberger et al. Sustainability in Corporate Governance
Nekrasov et al. Which Strategy for Implementing Cost-Benefit Analysis of System Infrastructures and Market Design in the European Power Systems?
Dharmayanti et al. Analysis of the Covid-19 Pandemic Impact on the Performance of Construction Projects in Denpasar City
Joel et al. Journal of Economic Papers Vol: 13 N: 01 (2022), P: 750-765

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190827