CN110175722A - Tour schedule planning system - Google Patents
Tour schedule planning system Download PDFInfo
- Publication number
- CN110175722A CN110175722A CN201910465084.9A CN201910465084A CN110175722A CN 110175722 A CN110175722 A CN 110175722A CN 201910465084 A CN201910465084 A CN 201910465084A CN 110175722 A CN110175722 A CN 110175722A
- Authority
- CN
- China
- Prior art keywords
- user
- unit
- lodging
- stroke
- sight spot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000013439 planning Methods 0.000 title claims abstract description 123
- 238000012545 processing Methods 0.000 claims abstract description 60
- 238000004891 communication Methods 0.000 claims abstract description 32
- 238000012216 screening Methods 0.000 claims abstract description 15
- 238000013500 data storage Methods 0.000 claims abstract description 7
- 238000005457 optimization Methods 0.000 claims description 9
- 238000000034 method Methods 0.000 claims description 8
- 238000004364 calculation method Methods 0.000 claims description 6
- 235000013399 edible fruits Nutrition 0.000 claims description 3
- 238000004886 process control Methods 0.000 claims description 2
- 238000012552 review Methods 0.000 claims 1
- 230000002354 daily effect Effects 0.000 description 25
- 238000010586 diagram Methods 0.000 description 7
- 230000005540 biological transmission Effects 0.000 description 3
- 230000003203 everyday effect Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- 238000011835 investigation Methods 0.000 description 2
- 230000003466 anti-cipated effect Effects 0.000 description 1
- 230000000739 chaotic effect Effects 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
- G06Q10/047—Optimisation of routes or paths, e.g. travelling salesman problem
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/14—Travel agencies
Landscapes
- Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Game Theory and Decision Science (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Entrepreneurship & Innovation (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention, which provides one kind, can automatically formulate the tour schedule for meeting user demand to save the tour schedule planning system of the planning time of user, it is characterized in that, it include: processing server, for carrying out processing to user's tourism data to obtain stroke planning result;And at least one user terminal, it communicates to connect with processing server and is held by the user with different user identification information, wherein, processing server has sight spot information storage unit, user data storage part, reach website acquisition unit, target scenic spot acquisition unit, sight spot screening unit, stroke planning generating unit and processing side communication unit, target scenic spot acquisition unit can obtain each sight spot for the target location that corresponding user selects as target scenic spot, sight spot screening unit can filter out the sight spot of the possible preference of user as plan tourist attractions from each target scenic spot, it includes the stroke planning result for planning tourist attractions to sort by recommendation tourism sequence that stroke planning generating unit, which can generate,.
Description
Technical field
The invention belongs to tourist service fields, and in particular to a kind of tour schedule planning system.
Background technique
With the development of traffic, going on a tour for people becomes increasingly to facilitate, therefore in festivals or holidays, people can be preferred to independently
Ground trip tourism is enjoyed and to conveniently loosen body and mind tourism with one of friend, household or itself people progress with a trip
More free tourism atmosphere is compared in trip.
But before autonomous tourism, people usually require to make largely to be prepared in advance, to formulate a trip for oneself
Roam all around the would case so that the sight spot for preferably selecting some oneself or kith and kin to prefer is played, while avoiding because when tourism does not have
Planning causes arrangement of time chaotic or travels the problem of forgetting to play certain sight spots on the way carefully.
Existing some tourism customization services are usually to have pre-established a series of tourism according to the sight spot in each city
Scheme, the tourism scheme for then allowing user to be fixed according to these are traveled;It is by artificial there are also some tourisms customization service
Tour schedule is customized for user, so that user be helped to formulate a tourism scheme that is as reasonable as possible and meeting user's needs.
However, the former is not able to satisfy diversified user's needs, some users wish that the user for laying particular stress on landscape, having lays particular stress on wave
It wishes to visit some sight spots with cultural spirit again while unrestrained tourism, fixed tourism customization service is difficult to meet all
The preference of user;Although the latter can be user's custom-made tour plan, this service not only needs extra work people
Member, which requires efforts, constantly to link up and develops programs with user, and user can also be allowed to generate additional stroke customization cost, meanwhile, people
Work planning can also have some not scientific enough arrangements.
Summary of the invention
To solve the above problems, the tour schedule for meeting user demand can be formulated automatically to save use by providing one kind
The tour schedule planning system of the planning time at family, present invention employs following technical solutions:
The present invention provides a kind of tour schedule planning systems, and the tourism demand data for being inputted according to user are to each
Sight spot carries out planning to provide a user tour schedule characterized by comprising processing server, for tourism demand
Data carry out processing to obtain stroke planning result;And at least one user terminal, simultaneously with processing server communication connection
Held by the user with different user identification information, wherein there is processing server sight spot information storage unit, trip information to deposit
Storage portion, user data storage part, reach website acquisition unit, target scenic spot acquisition unit, sight spot screening unit, stroke planning generating unit with
And processing side communication unit, sight spot information storage unit are stored with corresponding each sight spot and include that scenic spot location information, sight spot are estimated
It plays the sight spot information of time and assessment of scenic spot numerical value, trip information storage unit is stored with each trip of the correspondence obtained in advance
The trip website and site location information of mode and target location, user terminal have input display unit, picture storage unit
And user side communication unit, picture storage unit are stored with demand data input picture and stroke picture as the result is shown, input is aobvious
Show that portion shows that demand data input picture allows user's input to include at least starting city, target location, user's trip mode, user
Tourism demand data and corresponding user are identified letter by the tourism demand data of preference and tourist-day, user side communication unit
Breath is sent to processing server, and user data storage part corresponds to received tourism demand data and customer identification information
Storage reaches website acquisition unit and is obtained from trip information storage unit according to user's trip mode, starting city and target location
Take corresponding trip website as website is reached, target scenic spot acquisition unit is according to target location and scenic spot location acquisition of information pair
Answer each sight spot of target location as target scenic spot, sight spot screening unit is according to tourist-day, user preference and sight spot information
The sight spot of the possible preference of user is filtered out from each target scenic spot as plan tourist attractions, stroke planning generating unit is according to scape
Point information, plan tourist attractions and arrival website generation include by the row for planning tourist attractions for recommending tourism sequence sequence
Journey program results handle side communication unit according to customer identification information and stroke planning result are sent to corresponding user terminal, defeated
Enter display unit and shows that stroke picture and shows that stroke program results allow user to confirm as the result is shown.
Tour schedule planning system provided by the invention can also have such technical characteristic, wherein user preference packet
Scene, cultural, romantic, family and exploration are included, the scene of the respectively corresponding user preference of assessment of scenic spot numerical value is worth, culture is worth,
Romance value, family's value and exploration value.
Tour schedule planning system provided by the invention can also have such technical characteristic, wherein sight spot screening unit
Including ordering of optimization preference generation unit, play time calculating unit and sight spot acquisition computing unit, ordering of optimization preference generation unit root
The assessment of scenic spot numerical value of each target scenic spot of correspondence is ranked up from high to low as preference sight spot sequence, trip according to user preference
It plays time calculating unit to be calculated according to tourist-day and preset time of playing daily for the time of playing, sight spot, which obtains, to be calculated
Unit successively chooses target scenic spot from the sequence of preference sight spot and according to the estimated time meter of playing in the sight spot of the corresponding target scenic spot
The target scenic spot that can be accommodated within for the time of playing is calculated as plan tourist attractions.
Tour schedule planning system provided by the invention can also have such technical characteristic, wherein stroke planning is raw
It include travelling schedule generation unit, same day schedule setting unit, overall schedule control unit, starting point acquisition setting list at portion
Member, scenic spot location computing unit, play daily time cumulation unit, same day sight spot adding unit, overall schedule temporary storage location with
And program results generation unit, travelling schedule generation unit generate the travelling schedule of respective numbers according to tourist-day, work as light
Travelling schedule is successively set as same day travelling schedule, after travelling schedule was set whenever the same day, overall schedule by journey setup unit
Control unit just controls starting point and obtains setup unit for the last meter that sorts in the travelling schedule on the day before same day travelling schedule
Tourist attractions are drawn as starting starting point, control scenic spot location computing unit calculates according to scenic spot location information and originates starting point
Apart from nearest plan tourist attractions as nearest tourist attractions, and controls time cumulation unit of playing daily and will travel recently scape
The estimated time cumulation of playing in the sight spot of point adds up to play the time to daily, is further less than or equal in the daily accumulative time of playing every
Day play the time when control same day sight spot adding unit by nearest tourist attractions be added to the same day travelling schedule, overall day process control
Unit repeats above-mentioned control process and plays the time daily up to the daily accumulative time of playing is greater than, and adds up to play the time daily
Greater than play daily the time when control the temporary same day travelling schedule of overall schedule temporary storage location, program results generation unit is according to always
The each group travelling schedule kept in body schedule temporary storage location generates stroke planning result.
Tour schedule planning system provided by the invention can also have such technical characteristic, wherein processing server
Also there is lodging information storage unit, lodging information storage unit be stored with corresponding each lodging point and include lodging location information with
And the lodging information of lodging figure of merit, stroke planning generating unit further include that lodging range generation unit and lodging information obtain
Unit, lodging range generation unit is according to plan tourist attractions that are last in each travelling schedule or most starting and preset
It stays and determines that range generates lodging range to be selected, lodging information acquiring unit is obtained according to lodging location information in lodging model to be selected
The lodging information of each lodging point in enclosing and as lodging information to be selected handles side communication unit will according to customer identification information
When stroke planning result is sent to corresponding user terminal, lodging information to be selected is also sent to the user terminal, picture storage
Portion is also stored with lodging point selection picture, and input display unit also shows lodging point customization when showing stroke result screen and jumps
Region allows user to click, and lodging point selection picture is further shown after user clicks and shows corresponding each lodging information to be selected
Option and corresponding lodging figure of merit allow user to select the predetermined lodging point that will live.
Tour schedule planning system provided by the invention can also have such technical characteristic, wherein processing server
Also there is return station for acquiring portion, return station for acquiring portion is according to meter last in user's trip mode and stroke planning result
It draws tourist attractions and obtains the trip website nearest apart from the plan tourist attractions from trip information storage unit as return website.
Tour schedule planning system provided by the invention can also have such technical characteristic, wherein lodging information is also
It include estimated consumption of staying, processing server also has tourism budget calculation part, and trip information storage unit is also stored in advance
The trip price of each trip mode of the correspondence of acquisition and target location selects the predetermined lodging point that will be lived simultaneously in user
After confirmation, predetermined lodging point is sent to processing server by user side communication unit, it is contemplated that tourism budget acquisition unit is according to destination
Point, return website and predetermined point of staying obtain to go out accordingly from trip information storage unit and lodging information storage unit respectively
Row price and the estimated consumption and as estimated tourism budget of staying, processing side communication unit according to customer identification information by stroke
Program results are sent to corresponding user terminal, estimated tourism budget are also sent to the user terminal, picture storage unit is also deposited
It contains budget and shows that picture, input display unit show that budget shows picture and shows that estimated tourism budget allows user to confirm.
Tour schedule planning system provided by the invention can also have such technical characteristic, wherein tourism demand number
According to also comprising tourism budget, processing server also has time budget judging part, and the time budget judging part is for judging travelling
Whether number of days and the budget ratio for budget of travelling are lower than default ratio, once budget ratio is lower than default value, user side is logical
Letter portion just according to customer identification information send a budget judge information to corresponding user terminal, processing side communication unit according to
Budget is judged that information is sent to corresponding user terminal by family identification information, and picture storage unit also stores budget hint image, defeated
Enter display unit to show budget hint image and prompt the user with budgetary shortfall in this screen.
Tour schedule planning system provided by the invention can also have such technical characteristic, wherein reach website and obtain
Take portion obtain arrival website be it is multiple, stroke planning generating unit is when generating stroke planning result, successively according to each arrival
Website generate corresponding multiple stroke plannings as a result, processing side communication unit according to customer identification information by each stroke planning result
It is sent to corresponding user terminal, picture storage unit is stored with stroke result overview picture, and input display unit shows stroke result
Overview picture simultaneously shows that each stroke planning result allows user to select one and checked in detail, further shows after user's selection
Show that stroke picture and shows that corresponding with the selection of user stroke planning result allows user to confirm as the result is shown.
Tour schedule planning system provided by the invention can also have such technical characteristic, wherein picture storage unit
Stroke result editing pictures are also stored with, input display unit also shows stroke editor jump when showing stroke picture as the result is shown
Turning region allows user to click, and further shows that stroke result editing pictures allow user in stroke planning result after user clicks
Each plan tourist attractions carry out replacement or to it is each plan tourist attractions sequence be adjusted.
Invention action and effect
Tour schedule planning system according to the present invention, since target scenic spot acquisition unit can obtain according to the user's choice
All sight spots of corresponding target location are as target scenic spot, while sight spot screening unit carries out target scenic spot according to the preference of user
Screening, to maximumlly filter out the plan tourist attractions for meeting user preference in the travel time of user, further leads to
Overtravel plane-generating portion carries out stroke planning to plan tourist attractions to obtaining optimal tourism route, while meeting pair
The assessment at user preference sight spot and the planning arrangement of best stroke, so that the stroke planning result generated can be more
On meet user demand.Tour schedule planning system of the invention can provide one kind according to the tourism data that user inputs certainly
Dynamic stroke planning service avoids user and needs to take a significant amount of time the investigation for carrying out tourist attractions and stroke before tourism
Planning, preferably can provide tourist service for user.
Detailed description of the invention
Fig. 1 is the structural block diagram of tour schedule planning system in the embodiment of the present invention
Fig. 2 is the structural block diagram of user terminal in the embodiment of the present invention;
Fig. 3 is the schematic diagram of demand data input picture in the embodiment of the present invention;
Fig. 4 is the schematic diagram of stroke result overview picture in the embodiment of the present invention;
Fig. 5 is the schematic diagram of stroke picture as the result is shown in the embodiment of the present invention;And
Fig. 6 is the flow chart of stroke planning process in the embodiment of the present invention.
Specific embodiment
In order to be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, tie below
Examples and drawings are closed to be specifically addressed tour schedule planning system of the invention.
<embodiment>
Fig. 1 is the structural block diagram of tour schedule planning system in the embodiment of the present invention.
As shown in Figure 1, tour schedule planning system 100 has processing server 1, user terminal 2 and communication network 3.
Wherein, processing server 1 is used to handle user by the tourism demand data that user terminal 2 is sent, and uses
Family terminal 2 is the personal computer that user holds and has corresponding customer identification information (such as IP address).In the present embodiment,
Communication network 3 is internet, and 2 internet protocol-based of user terminal is communicated with processing server 1 to be connect.
Processing server 1 includes sight spot information storage unit 11, lodging information storage unit 12, user data storage part 13, goes out
Row information storage unit 14, reaches website acquisition unit 16, target scenic spot acquisition unit 17, sight spot screening unit at time budget judging part 15
18, stroke planning generating unit 19, return station for acquiring portion 20, tourism budget calculation part 21, processing side communication unit 22 and to upper
State the processing side control unit 23 that component work is controlled.
Sight spot information storage unit 11 is stored with the sight spot information for obtaining and corresponding in advance each sight spot.The sight spot information includes
Sight name, scenic spot location information, sight spot estimated play time and assessment of scenic spot numerical value.
In the present embodiment, sight name is used to be used as sight spot identification information, and each component parts in processing server 1 is logical
It crosses sight name and obtains the scenic spot location information at corresponding sight spot, sight spot estimated play time or assessment of scenic spot numerical value.
In the present embodiment, sight spot information storage unit 11 has sight spot information acquiring unit 11a, the sight spot information acquiring unit
11a is used to obtain scenic spot location information, scenic spot location letter from map application (such as GPS etc.) by technologies such as web crawlers
Breath is the latitude and longitude value at sight spot.
In the present embodiment, the sight spot estimated time of playing is divided into three grades, respectively play 7 hours, play 4 hours and
It plays 2 hours.In other embodiments, the sight spot estimated time of playing can also be set (such as basis according to scale of scenic area
The occupied area at sight spot, more big, the time of playing is longer), each grade for time of playing can also be respectively set as playing 5
~8 hours, the arbitrary value played 3~5 hours and played in 1~3 hour.
In the present embodiment, assessment of scenic spot numerical value is preset simultaneously by the disclosed evaluation label in each sight spot, environment comprehensive
It is stored in sight spot information storage unit 11, which is divided into honourable value, cultural value, romantic value, family's value and spy
Danger value, the value range of each assessment of scenic spot numerical value are 1~5.
Lodging information storage unit 12 is stored with the lodging information for obtaining and corresponding to each point of staying in advance.The lodging information packet
Include lodging point title, lodging location information, stay estimated spending amount and lodging figure of merit.
In the present embodiment, lodging information acquisition unit 12 has lodging information acquiring unit 12a, the lodging information acquiring unit
12a is automatic from third party system (such as the application such as hotel reservation, hotel reservation) by the methods of intelligent contract for timing
Obtain living for each points of staying such as point title of staying, lodging location information, the estimated spending amount of lodging and lodging figure of merit
Place information.In the present embodiment, point of staying is hotel, hotel or people place.
User data storage part 13 be used for from the received tourism demand data of user terminal 2 and customer identification information into
Row storage.Tourism demand data include starting city, target location, user's trip mode, user preference, tourist-day and trip
Budget is swum, customer identification information is the identification information (such as IP address of user terminal 2) of user terminal 2.
In the present embodiment, user preference is five kinds of labels for including scene, cultural, romantic, family and exploration, right respectively
Answer five kinds of assessment of scenic spot numerical value.User's trip mode includes aircraft, high-speed rail, train, steamer, hires a car and bus etc. is intercity
Trip mode.
Trip information storage unit 14 stores and various trip modes, corresponding starting city and the corresponding trip of target location
Price, trip website and site location information.
In the present embodiment, trip information storage unit 14 has trip information acquiring unit 14a, the trip information acquiring unit
14a is used to obtain automatically from third party system (such as taking the trips applications such as journey, Chinese railway) by the methods of intelligent contract
Price of going on a journey and trip website, and pass through technologies acquisition station point confidences from map application (such as GPS) such as web crawlers
Breath.
In the present embodiment, trip price is the price of intercity and corresponding trip mode, and trip website passes through each for user
A trip mode reaches the destination website of target location, and site location information is the latitude and longitude value where the website of destination.
Time budget judging part 15 be used for judge user selection travelling number of days and travel budget budget ratio whether
Lower than default ratio.
In the present embodiment, time budget judging part 15 receives the tourism sent from user terminal 2 in processing server 1 and needs
It asks and just travelling number of days and tourism budget is judged when data, once being judged as lower than default ratio, handle side control unit
23 just control processing side communication unit 22 just send a budget judge information to user terminal 2, and control associated components stopping pair
The processing of the tourism demand data.
Reach user's trip mode that website acquisition unit 16 is used to select according to user, originate city and target location from
Corresponding trip website is obtained in trip information storage unit 14 as arrival website.
In the present embodiment, when the trip website that the trip mode that user selects is multiple or single trip mode is multiple
When, it reaches website acquisition unit 16 and just obtains arrival website of the trip website of predetermined quantity (such as 3) as respective numbers.?
In other embodiments, trip mode also has the priority of default setting, and (e.g. aircraft is better than high-speed rail, high-speed rail better than train etc.
The sortord of decreasing priority), therefore reaching website acquisition unit 16 can be according to the priority of trip mode selection predetermined number
The arrival website of amount.
Target scenic spot acquisition unit 17 is used for the target location that selects according to user and obtains from sight spot information storage unit 11 pair
Answer each sight spot of target location as target scenic spot.
In the present embodiment, target scenic spot acquisition unit 17 is according to the destination range of target location (according to disclosed city number
According to acquisition, which can be longitude and latitude range) to all scenic spot location information of the storage of sight spot information storage unit 11
It is retrieved, so that all sight spots of the acquisition within the scope of the destination are as target scenic spot.
In the present embodiment, the target location that user selects is a city.In other embodiments, user can also select more
A adjacent city, an area or a country as target location, meanwhile, when target location be it is multiple when, target scape
Point acquisition unit generates an overall range according to the destination range of each target location, further obtains corresponding target scape
Point.
The sight spot of user preference, tourist-day and each target scenic spot that sight spot screening unit 18 is used to be selected according to user
Information filters out the sight spot of the possible preference of user as plan tourist attractions from each target scenic spot.Sight spot screening unit 18 includes
Ordering of optimization preference generation unit 181, play time calculating unit 182 and sight spot acquisition computing unit 183.
Ordering of optimization preference generation unit 181 is used to that each target scenic spot to be pressed scape according to user preference and assessment of scenic spot numerical value
Point figure of merit is ranked up from high to low as preference sight spot sequence.
In the present embodiment, ordering of optimization preference generation unit 181 comments the corresponding sight spot of each target scenic spot according to user preference
Valence mumber value is ranked up, for example, it is assumed that user preference be scene, ordering of optimization preference generation unit 181 by each target scenic spot according to
Its corresponding scene value carries out sequence from high to low, to obtain the preference sight spot being made of multiple target scenic spot ordered arrangements
Sequence.In the present embodiment, preference sight spot sequence is made of sight name.
The tourist-day that time calculating unit 182 is selected according to user of playing and preset time of playing daily calculate can
For the time of playing.
In the present embodiment, the time of playing daily was calculated using 8 hours, and time calculating unit 182 of playing will travel day
It is several to be multiplied to obtain for the time of playing with the time of playing daily.In other embodiments, time of playing daily can also be 7~10
Arbitrary value in hour range.
Sight spot obtains computing unit 183 and successively obtains from the preference sight spot sequence that ordering of optimization preference generation unit 181 sorts
Sort highest target scenic spot, and is calculated according to the sight spot of the corresponding target scenic spot estimated time of playing for playing in the time
The target scenic spot that can be accommodated is as plan tourist attractions.
In the present embodiment, sight spot obtains computing unit 183 when obtaining a target scenic spot, its corresponding sight spot is estimated
Add up when playing to overall to add up to play the time, and judges whether the totality accumulative time of playing was greater than for the time of playing:
Then using the target scenic spot of selection as plan tourist attractions when judgement is not more than, then stop carrying out target scenic spot when judgement is greater than
Selection and complete plan tourist attractions acquisition.
Stroke planning generating unit 19 is used for according to sight spot information, plan tourist attractions and reaches website generation stroke planning
As a result and lodging information to be selected, the trip program results include the plan tourist attractions for recommending tourism sequence sequence.Stroke
Plane-generating portion 19 include travelling schedule generation unit 191, same day schedule setting unit 192, overall schedule control unit 193,
Starting point acquisition setup unit 194, scenic spot location computing unit 195, time cumulation unit 196 of playing daily, same day sight spot add
Add unit 197, overall schedule temporary storage location 198, program results generation unit 199, lodging range generation unit 200 and stays
Point retrieval acquiring unit 201.
Travelling schedule generation unit 191 is used for the travelling schedule of the numerical generation respective numbers according to tourist-day.
It include each plan tourist attractions played on the day of suggestion in the present embodiment, in travelling schedule, and this is each
It sorts according to the sequence of playing of suggestion a plan tourist attractions.
Same day schedule setting unit 192 is for being successively set as same day travelling schedule for travelling schedule.
The component that overall schedule control unit 193 is used to set travelling schedule involved in stroke planning generating unit 19 works
It is controlled, including setup unit 194, scenic spot location computing unit 195, time cumulation unit of playing daily is obtained to starting point
196, the work that same day sight spot adding unit 197 and overall schedule temporary storage location 198 are related to travelling schedule setting is controlled.
Specifically, whenever same day schedule setting unit 192 sets a same day travelling schedule, overall schedule control unit
193, which just control starting point, obtains setup unit 194 for last plan of sorting in the travelling schedule on the day before same day travelling schedule
Tourist attractions as starting starting point, control scenic spot location computing unit 195 according to planned tourist attractions scenic spot location
Information is calculated with starting starting point apart from nearest plan tourist attractions as nearest tourist attractions, and is controlled and played the time daily
The estimated time cumulation of playing in the sight spot of nearest tourist attractions is added up to play the time by accumulated unit 196 to daily, further every
Day accumulative time of playing be less than or equal to play daily the time when control same day sight spot adding unit 197 nearest tourist attractions are added
To same day travelling schedule.Overall schedule control unit 193 repeats above-mentioned control until the daily accumulative time of playing is greater than every day tour
It plays the time, and trip on the day of controlling overall 198 pairs of temporary storage location of schedule when the daily accumulative time of playing being greater than and playing the time daily
Trip schedule is kept in.
In the present embodiment, if same day travelling schedule not the travelling schedule of the previous day when (same day be first day), set out
Point obtains setup unit 194 and just obtains the site location information for reaching website as starting starting point.
Program results generation unit 199 is used for according to each group travelling schedule kept in overall schedule temporary storage location 195
Generate stroke planning result.
In the present embodiment, program results generation unit 199 obtains each group travelling schedule from overall schedule temporary storage location 198,
And sequentially combined according to the number of days of each group travelling schedule, to form stroke planning result.
After program results generation unit 199 generates stroke planning result, overall schedule control unit 193 just controls overall
Schedule temporary storage location 198 deletes temporary all travelling schedules.
Lodging range generation unit 200 is used for according to generation lodging range to be selected.
In the present embodiment, stays and determine that range is used with ten kilometers of circular scopes for radius, lodging range generation unit
200 obtain daily travelling schedule from stroke planning result, and according to plan tourist attractions last in each travelling schedule
And the plan tourist attractions most started for second day, corresponding scenic spot location information is obtained from sight spot information storage unit 11, into
One step generates lodging range to be selected according to scenic spot location information and determining range of staying.
In the present embodiment, lodging range to be selected is corresponding with each travelling schedule respectively, for example, last according to first day
Plan tourist attractions and most start within second day plan tourist attractions generate two lodging ranges to be selected, all with first day
Travelling schedule is corresponding, indicates some lodging point that first day night user can live in this range.
Lodging point retrieval acquiring unit 201 is used to be lived according to lodging range to be selected to what is stored in lodging information storage unit 12
Place information is retrieved, thus obtain the lodging information of each lodging point within the scope of each lodging to be selected and as it is to be selected live
Place information.
It is last in the user's trip mode and stroke planning result that return station for acquiring portion 20 is used to be selected according to user
Plan tourist attractions obtain the trip website nearest apart from the plan tourist attractions from trip information storage unit 14 and be used as back
Return website.
Budget calculation part 21 of travelling is stored from lodging information respectively according to predetermined lodging point, arrival website and return website
Corresponding lodging is obtained in portion 12 and trip information storage unit 14 to expect consumption and trip price and travel in advance as estimated
It calculates.
In the present embodiment, tourism budget calculation part 21, which is used to receive user in processing server 2, determines the lodging lived
The calculating of estimated tourism budget is carried out after point, the budget includes according to the round-trip trip mode of user and lives for the estimated tourism
The price that place point obtains.In other embodiments, it is contemplated that tourism budget can also include travelling expenses and the tourism between tourist attractions
The estimated consumption in the sight spot at sight spot, for example, travelling expenses can be the price set according to the distance between sight spot, the more remote then travelling expenses of distance
Higher, the estimated consumption in sight spot can be the anticipated price of play time and the ticket price setting according to sight spot, play the time
It is more long, it consumes higher.
Processing side communication unit 22 be used to carry out between each composition part of processing server 1 and processing server 1 with
Data exchange between other terminals.
In the present embodiment, when arrival website acquisition unit 16 obtains multiple arrival websites, stroke planning generating unit 19 is with regard to root
Generate corresponding stroke planning respectively according to multiple arrival website as a result, further, in stroke plane-generating portion 19 according to tourism
After the demand data each stroke planning result of generation and lodging information to be selected and return station for acquiring portion 20 obtain return website,
Side communication unit 22 is handled just to be believed stroke planning result, lodging to be selected according to customer identification information corresponding with tourism demand data
Breath, arrival website and return website are sent to user terminal 2.
Processing side control unit 23 contains the calculating controlled for the work of each composition part to processing server 1
Machine program.
Fig. 2 is the structural block diagram of user terminal in the embodiment of the present invention.
As shown in Fig. 2, user terminal 2 includes picture storage unit 31, input display unit 32, user side communication unit 33 and uses
Family side control unit 34.
Picture storage unit 31 is stored with demand data input picture, budget hint image, stroke result overview picture, stroke
Picture, stay point selection picture, stroke result editing pictures and budget show picture as the result is shown.
Demand data input picture be used for when user enters system show and show in this screen correspond to originate city,
Target location, user's trip mode, user preference, tourist-day and the Option Box for budget of travelling allow user to select or fill out
It writes.
In the present embodiment, demand data input picture can be picture as shown in Figure 3: starting point, destination are right respectively
City and target location should be originated, user can open the combobox with city option by clicking corresponding box
And select city;Tourism center city, trip mode respectively correspond user preference and user's trip mode, and user can pass through selection
Corresponding text is so that it is determined that tourism demand data, this option can allow user to carry out multiselect;Trip number of days, budget is distinguished per capita
Corresponding tourist-day and tourism budget, user can select corresponding text by selection so that it is determined that tourism demand data,
This option is only single choice.
Budget hint image is used to show and when the budget for receiving the transmission of processing server 1 judges information in the picture
The signal language (for example, " your budgetary shortfall ") of middle display budgetary shortfall is to prompt user to reduce tourist-day or increase tourism
Budget.
Stroke result overview picture is used to show and when receiving the stroke planning result of the transmission of processing server 1 at this
The option of correspondence course program results is shown in picture.For example, as shown in figure 4, working as the stroke planning knot that processing server 1 generates
When fruit has 3, stroke result overview picture just shows three Option Boxes of corresponding each result, when the user clicks Option Box
When, stroke will be entered and picture and show corresponding stroke planning result as the result is shown.In other embodiments, in stroke planning
As a result Option Box can also show the simple stroke or sight spot image for being correspondingly formed program results, to preferably show
Stroke planning result.
Picture is used to show when user clicks the option in stroke result overview picture and in the picture stroke as the result is shown
Website, stroke planning result, lodging range to be selected and return website will be specifically reached in face accordingly according to stroke planning knot
The sequence of fruit is successively shown, as shown in figure 5, corresponding to the arrival website of user in first Option Box traveled first day, is connect
The Option Box to get off be followed successively by according to stroke planning result be arranged successively in each plan tourist attractions, when being in one day knot
Beam and at the beginning of second day, the lodging point Option Box for recommending to stay that display is determined according to lodging range to be selected.
When the user clicks when the Option Box of " recommendation is lived near the A of hotel ", point selection picture of staying will be entered.
In other embodiments, each scape can also be shown between stroke the respective option frame that picture is shown as the result is shown
Point, website and the distance between point of staying allow user to refer to.
Staying, point selection picture is for the display when user clicks and stays point Option Box and basis is corresponding in this screen
Lodging range to be selected shows that corresponding lodging point option allows user to select, and further determines current lodging point after user clicks
The lodging information of Option Box.In the present embodiment, point selection picture of staying also shows corresponding stay on point option side of staying and comments
Valence mumber value allows user to refer to.
Stroke result editing pictures are used to show when user clicks sight spot Option Box and allow user to stroke planning result
In each sight spot edited.In the present embodiment, stroke result editing pictures, which are shown, is corresponding in turn to each plan tourism scape
The editing options frame of point, the tourism sequence that user can drag editing options frame so as to adjust sight spot.In other implementations
In example, user can also be by clicking editing options frame to replace to sight spot.
Budget shows that picture is used to show and when receiving the estimated tourism budget of the transmission of processing server 1 in the picture
The middle estimated tourism budget of display allows user to check.In the present embodiment, budget shows that picture is a table, shows corresponding user
The spending amount of each website of stroke and point of staying, shows the total value of each spending amount in table bottom.At other
In embodiment, budget shows that picture can also show the estimated spending amount of sight spot and distance.
Input display unit 32 is for showing above-mentioned picture, so that it is corresponding man-machine that user can be carried out by these pictures
Interaction.
In the present embodiment, above-mentioned picture is the page screens that user is opened by browser.
User side communication unit 33 be used to carry out between each composition part of user terminal 2 and user terminal 2 and other
Data exchange between terminal.
User side control unit 34 is used to control the work of each composition part of user terminal 2.
In the present embodiment, user terminal 2 is one.In other embodiments, user terminal 2 can be multiple, Ge Geyong
Family terminal 2 has respectively different customer identification informations, by respective browser access process server 1 and passes through internet
Data interaction is carried out with processing server 1, is needed when processing server 1 receives multiple tourisms with corresponding customer identification information
When seeking data, associated components is just controlled by processing side control unit 23, each tourism demand data are carried out sequentially or parallel
Reason.
Fig. 6 is the flow chart of stroke planning process in the embodiment of the present invention.
As shown in fig. 6, user, which opens demand data input picture by user terminal 2 and inputs tourism in this screen, to be needed
Data are sought, the tourism demand data and customer identification information are sent to processing server 1, then opened by user side communication unit 33
Beginning following steps:
Travelling number of days in tourism demand data and budget of travelling are divided by obtain by step S1, time budget judging part 15
Budget ratio, and judge whether the budget ratio is lower than default ratio.S2 is entered step if being lower than, if not less than step is entered
Rapid S3;
Step S2, processing side communication unit 22 send a budget according to customer identification information and judge information to corresponding user
Terminal, subsequently into end state;
Step S3, reach website acquisition unit 16 according in tourism demand data user's trip mode, starting city and
Target location obtains corresponding trip website as website is reached, subsequently into step S4 from trip information storage unit 14;
Step S4, target scenic spot acquisition unit 17 are corresponding according to the scenic spot location acquisition of information at target location and each sight spot
Each sight spot of target location is as target scenic spot, subsequently into step S5;
Step S5, sight spot screening unit 18 is according to tourist-day, user preference and each target in tourism demand data
The sight spot information at sight spot filters out the sight spot of the possible preference of user as plan trip from all target scenic spots that step S2 is obtained
Sight spot is swum, subsequently into step S6,
Step S6, plan tourist attractions that stroke planning generating unit 19 is filtered out according to step S3, corresponding sight spot information
And the arrival website obtained in step S1 generates stroke planning result and lodging range to be selected, subsequently into step S7;
Step S7, return station for acquiring portion 20 is according to the user's trip mode and step S6 generation in tourism demand data
Stroke planning result in last plan tourist attractions obtain from trip information storage unit 14 apart from the plan tourist attractions
Nearest trip website is as return website, subsequently into step S8;
Step S8, processing side communication unit 22 according to customer identification information by stroke planning result, lodging range to be selected, reach
Website and return website are sent to corresponding user terminal, subsequently into end state.
Embodiment action and effect
According to tour schedule planning system provided in this embodiment, since target scenic spot acquisition unit can be according to the choosing of user
Select and obtain all sight spots of corresponding target location as target scenic spot, at the same sight spot screening unit according to the preference of user to target scape
Point is screened, so that the plan tourist attractions for meeting user preference are maximumlly filtered out in the travel time of user, into
One step carries out stroke planning to obtain optimal tourism route, simultaneously completely to plan tourist attractions by stroke planning generating unit
Foot is to the assessment at user preference sight spot and the planning arrangement of best stroke, so that the stroke planning result generated can be more
Meet user demand in big degree.The tourism data that tour schedule planning system of the invention can be inputted according to user provides
A kind of automatic stroke planning service, avoid user need to take a significant amount of time before tourism carry out tourist attractions investigation with
And the planning of stroke, can tourist service preferably be provided for user.
In embodiment, since user preference is classified as scene, culture, family, romance and exploration, realizes and pass through society
Meeting psychology carries out forecast assessment to the sight spot of the preference of user, therefore can preferably allow the sight spot of recommendation that can more meet use
The demand at family.
In embodiment, since there is stroke planning generating unit travelling schedule generation unit to be generated accordingly according to tourist-day
Travelling schedule, and successively the travelling schedule in each day calculate by same day schedule computing unit and set daily plan tourism scape
Point, therefore the scenic spot number played daily can be appropriately arranged according to the time of playing daily, so that stroke planning result has more
There is reasonability.
In embodiment, due to stroke planning generating unit also have lodging range generation unit according to each travelling schedule most
The latter sight spot or the first of second day sight spot set lodging range to be selected, and by lodging information acquiring unit according to this to
Lodging range is selected to obtain corresponding lodging information, it is achieved that meeting user on the basis of best distance to for point of staying
Property demand so that user does not have to staying constantly round-trip between point and sight spot but can more reasonably live in sight spot nearby
Near.
In embodiment, due to having tourism budget calculation part to calculate user's trip, the budget that point is lived of staying, together
When, according to psychological study, user is less sensitive for the cost at sight spot, therefore according to trip and the budget energy for point of staying
So that user understands this rough consumption of travelling.
In embodiment, when user selects multiple trip modes, reaching website acquisition unit will be according to each trip mode
Multiple arrival websites are obtained, so that stroke plane-generating portion be allowed to generate multiple stroke plannings as a result, therefore user can be allowed to select
More meet desired stroke planning as a result, promoting user experience.
In embodiment, since input display unit can also show that stroke result editing pictures allow user to compile stroke
Volume, therefore user can automatically replace unsatisfied sight spot in stroke planning result, or suitable to the tourism at sight spot
Sequence is adjusted, to promote user experience.
Above-described embodiment is only used for the specific embodiment illustrated the present invention, and the present invention is not limited to the above embodiments
Description range.
Claims (10)
1. a kind of tour schedule planning system, tourism demand data for being inputted according to user to each sight spot planned from
And provide a user recommendation tour schedule characterized by comprising
Processing server, for carrying out processing to the tourism demand data to obtain stroke planning result;And
At least one user terminal is communicated to connect with the processing server and is held by the user with different user identification information
Have,
Wherein, the processing server has sight spot information storage unit, trip information storage unit, user data storage part, arrival
Station for acquiring portion, target scenic spot acquisition unit, sight spot screening unit, stroke planning generating unit and processing side communication unit,
The sight spot information storage unit is stored with each sight spot of correspondence and includes scenic spot location information, sight spot it is expected that playing the time
And the sight spot information of assessment of scenic spot numerical value,
The trip information storage unit is stored with the trip of each trip mode of the correspondence obtained in advance and the target location
Website and site location information,
The user terminal has input display unit, picture storage unit and user side communication unit,
The picture storage unit is stored with demand data input picture and stroke picture as the result is shown,
The input display unit shows that the demand data input picture allows user's input to include at least starting city, target
Place, user's trip mode, the tourism demand data of user preference and tourist-day,
The tourism demand data and the corresponding customer identification information are sent to the place by the user side communication unit
Server is managed,
The user data storage part carries out correspondence to the received tourism demand data and the customer identification information and deposits
Storage,
The arrival website acquisition unit is according to user's trip mode, the starting city and the target location from described
Corresponding trip website is obtained in trip information storage unit is used as arrival website,
The target scenic spot acquisition unit according to the target location and the scenic spot location acquisition of information with corresponding to the target
Each sight spot of point as target scenic spot,
The sight spot screening unit is according to the tourist-day, the user preference and the sight spot information from each target
The sight spot that the possible preference of user is filtered out in sight spot is used as plan tourist attractions,
The stroke planning generating unit is generated according to the sight spot information, the plan tourist attractions and the arrival website and is wrapped
Containing by recommend tourism sequence sequence the plan tourist attractions stroke planning as a result,
The stroke planning result is sent to the corresponding use according to the customer identification information by the processing side communication unit
Family terminal,
The input display unit shows that the stroke picture and shows that the stroke planning result makes the user true as the result is shown
Recognize.
2. tour schedule planning system according to claim 1, it is characterised in that:
Wherein, the user preference includes scene, culture, romantic, family and exploration,
The assessment of scenic spot numerical value is respectively scene value, culture value, romantic value, family's value and the spy of the corresponding user preference
Danger value.
3. tour schedule planning system according to claim 2, it is characterised in that:
Wherein, the sight spot screening unit includes ordering of optimization preference generation unit, play time calculating unit and sight spot acquisition calculating
Unit,
The ordering of optimization preference generation unit is according to the user preference and the assessment of scenic spot numerical value by each target scape
Being ranked up from high to low as preference sight spot sequence of the assessment of scenic spot numerical value is pressed,
When the time calculating unit of playing is calculated according to the tourist-day and preset time of playing daily for playing
Between,
The sight spot obtains computing unit and successively chooses the target scenic spot from the sequence of the preference sight spot and be somebody's turn to do according to corresponding
The sight spot of the target scenic spot estimated time of playing calculates in the target scenic spot for that can accommodate in the time of playing
As plan tourist attractions.
4. tour schedule planning system according to claim 1, it is characterised in that:
Wherein, the stroke planning generating unit includes travelling schedule generation unit, same day schedule setting unit, overall day process control
Unit, starting point obtain setup unit, scenic spot location computing unit, time cumulation unit of playing daily, same day sight spot addition list
Member, overall schedule temporary storage location and the program results generation unit,
The travelling schedule generation unit generates the travelling schedule of respective numbers according to the tourist-day,
The travelling schedule is successively set as same day travelling schedule by the same day schedule setting unit,
After the same day travelling schedule is set, the totality schedule control unit just controls the starting point and obtains setting
Unit using the plan tourist attractions for sorting last in the travelling schedule on the day before the same day travelling schedule as starting starting point,
The scenic spot location computing unit is controlled to be calculated with the starting starting point according to the scenic spot location information apart from nearest institute
Plan tourist attractions are stated as nearest tourist attractions, and control the time cumulation unit of playing daily for the nearest tourism scape
The sight spot of point is estimated play time cumulation to it is daily it is accumulative play the time, be further less than etc. in the daily accumulative time of playing
In daily play the time when control same day sight spot adding unit by nearest tourist attractions be added to the same day travelling schedule, it is described
Overall schedule control unit repeats above-mentioned control process and plays the time daily up to the daily accumulative time of playing greater than described,
And the daily accumulative time of playing be greater than it is described play daily the time when control the overall schedule temporary storage location and keep in institute
Same day travelling schedule is stated,
Program results generation unit travelling schedule according to each group kept in the overall schedule temporary storage location generates
The stroke planning result.
5. tour schedule planning system according to claim 4, it is characterised in that:
Wherein, the processing server also has lodging information storage unit,
The lodging information storage unit is stored with corresponding each lodging point and includes lodging location information and lodging review number
The lodging information of value,
The stroke planning generating unit further includes lodging range generation unit and lodging point retrieval acquiring unit,
The lodging range generation unit is according to plan tourism scape that is last in each travelling schedule or most starting
Point and preset lodging determine that range generates lodging range to be selected,
The lodging point retrieval acquiring unit retrieves simultaneously the lodging information storage unit according to the lodging range to be selected
Obtain the lodging information of each lodging point within the scope of the lodging to be selected and as lodging information to be selected,
The processing side communication unit the stroke planning result is sent to according to the customer identification information it is corresponding described
When user terminal, the lodging information to be selected is also sent to the user terminal,
The picture storage unit is also stored with lodging point selection picture,
The input display unit, which also shows lodging point customization when showing the stroke result screen and jumps region, allows the use
Family is clicked, and the lodging point selection picture is further shown after the user clicks and shows corresponding each lodging to be selected
The option of information and the corresponding lodging figure of merit allow user to select the predetermined lodging point that will be lived.
6. tour schedule planning system according to claim 5, it is characterised in that:
Wherein, the processing server also has return station for acquiring portion,
The return station for acquiring portion is according to the meter last in user's trip mode and the stroke planning result
It draws tourist attractions and obtains the trip website nearest apart from the plan tourist attractions from the trip information storage unit as return
Website.
7. tour schedule planning system according to claim 6, it is characterised in that:
Wherein, the lodging information also includes estimated consumption of staying,
The processing server also has tourism budget calculation part,
The trip information storage unit is also stored with going out for each trip mode of the correspondence obtained in advance and the target location
Row price,
In the user predetermined lodging point that will live of selection and after confirming, the user side communication unit is by the predetermined lodging
Point is sent to the processing server,
The estimated tourism budget acquisition unit is according to the arrival website, the return website and the predetermined lodging point difference
Corresponding trip price is obtained from the trip information storage unit and the lodging information storage unit and estimated disappear of staying
Take and as estimated tourism budget,
The processing side communication unit the stroke planning result is sent to according to the customer identification information it is corresponding described
The estimated tourism budget is also sent to the user terminal by user terminal,
The picture storage unit is also stored with budget and shows picture,
The input display unit shows that the budget shows picture and shows that the estimated tourism budget allows user to confirm.
8. tour schedule planning system according to claim 1, it is characterised in that:
Wherein, the tourism demand data also include tourism budget,
The processing server also has time budget judging part, the time budget judging part for judge the travelling number of days with
And whether the budget ratio of the tourism budget is lower than default ratio,
Once the budget ratio is lower than the default value, the user side communication unit is just sent out according to the customer identification information
Send a budget judge information to the corresponding user terminal,
The budget is judged that information is sent to the corresponding use according to the customer identification information by the processing side communication unit
Family terminal,
The picture storage unit also stores budget hint image,
The input display unit shows the budget hint image and prompts budgetary shortfall to the user in this screen.
9. tour schedule planning system according to claim 1, it is characterised in that:
Wherein, the arrival website for reaching the acquisition of website acquisition unit is multiple,
The stroke planning generating unit is when generating the stroke planning result, successively according to each arrival website generation pair
Multiple stroke plannings for answering as a result,
Each stroke planning result is sent to corresponding institute according to the customer identification information by the processing side communication unit
User terminal is stated,
The picture storage unit is stored with stroke result overview picture,
The input display unit shows stroke result overview picture and shows that each stroke planning result allows the user to select
It selects wherein that any one is checked in detail, further shows that the stroke picture and is shown as the result is shown after user selection
Show that the stroke planning result corresponding with the selection of the user allows the user to confirm.
10. tour schedule planning system according to claim 1, it is characterised in that:
Wherein, the picture storage unit is also stored with stroke result editing pictures,
The input display unit also shown when showing the stroke picture as the result is shown stroke editor jump region allow it is described
User clicks, and further shows that the stroke result editing pictures allow the user to advise the stroke after the user clicks
Each plan tourist attractions in check off fruit carry out replacement or adjust to the sequence of each plan tourist attractions
It is whole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910465084.9A CN110175722A (en) | 2019-05-30 | 2019-05-30 | Tour schedule planning system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910465084.9A CN110175722A (en) | 2019-05-30 | 2019-05-30 | Tour schedule planning system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110175722A true CN110175722A (en) | 2019-08-27 |
Family
ID=67696798
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910465084.9A Pending CN110175722A (en) | 2019-05-30 | 2019-05-30 | Tour schedule planning system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110175722A (en) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110610351A (en) * | 2019-09-05 | 2019-12-24 | Oppo(重庆)智能科技有限公司 | Schedule generation method and related product |
CN110648027A (en) * | 2019-09-30 | 2020-01-03 | 福州林景行信息技术有限公司 | Self-driving tour digital line interactive generation system and working method thereof |
CN110990703A (en) * | 2019-12-06 | 2020-04-10 | 重庆锐云科技有限公司 | Intelligent tourist destination recommendation system and method based on user health state |
CN111582829A (en) * | 2020-05-11 | 2020-08-25 | 携程商旅信息服务(上海)有限公司 | Budget data updating processing method, system, electronic device and storage medium |
CN111966893A (en) * | 2020-07-28 | 2020-11-20 | 湖南省大美盈科研学旅游文化有限公司 | Text travel strategy query method and equipment |
CN112380431A (en) * | 2020-11-11 | 2021-02-19 | 喻丹 | Big data-based intelligent tourism analysis decision system and method |
CN112686778A (en) * | 2020-12-24 | 2021-04-20 | 河南牧业经济学院 | Big data-based travel route planning method, device and equipment |
CN112989214A (en) * | 2021-05-20 | 2021-06-18 | 湖北游游智游网络科技有限公司 | Tourism information display method and related equipment |
CN113033854A (en) * | 2019-12-09 | 2021-06-25 | 天津光电通信技术有限公司 | Personal affairs management method, device, terminal and storage medium |
CN113221028A (en) * | 2021-05-17 | 2021-08-06 | 杭州快盈信息科技有限公司 | Experiential route searching system based on optimal strategy |
CN113592249A (en) * | 2021-07-07 | 2021-11-02 | 深圳市伴行旅游科技有限公司 | Self-service tour guide system, guide method, device and readable storage medium |
CN113642745A (en) * | 2021-08-11 | 2021-11-12 | 余国立 | Garden data acquisition method and system |
CN113657643A (en) * | 2021-07-08 | 2021-11-16 | 海南天然橡胶产业集团股份有限公司 | Planning system for sea island tourism line |
CN113701782A (en) * | 2021-10-28 | 2021-11-26 | 深圳市羽翼数码科技有限公司 | Navigation system for realizing multi-destination optimal path planning |
CN115796788A (en) * | 2022-12-06 | 2023-03-14 | 中南财经政法大学 | Automatic data management system and method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080201227A1 (en) * | 2006-11-07 | 2008-08-21 | Lucia Urban Bakewell | Interactive, Internet-based, trip planning, travel resource, travel community, virtual travel, travel-based education, travel-related gaming and virtual/live tour system, methods, and processes, emphasizing a user's ability to tailor complete travel, trip, route, game and touring choices to unique user-specified personal interests, preferences, and special requirements for self and companions |
US20170083832A1 (en) * | 2015-09-17 | 2017-03-23 | Matthew David WILLIAMS | Systems and methods for planning and tracking travel |
CN106886837A (en) * | 2017-02-21 | 2017-06-23 | 携程旅游网络技术(上海)有限公司 | Free walker stroke based on time planning recommends method |
CN107423837A (en) * | 2017-04-12 | 2017-12-01 | 宁夏丝路风情旅游网络股份有限公司 | The Intelligent planning method and system of tourism route |
CN108710669A (en) * | 2018-05-16 | 2018-10-26 | 清远博云软件有限公司 | A kind of tourist attractions travelling route formulating method |
-
2019
- 2019-05-30 CN CN201910465084.9A patent/CN110175722A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080201227A1 (en) * | 2006-11-07 | 2008-08-21 | Lucia Urban Bakewell | Interactive, Internet-based, trip planning, travel resource, travel community, virtual travel, travel-based education, travel-related gaming and virtual/live tour system, methods, and processes, emphasizing a user's ability to tailor complete travel, trip, route, game and touring choices to unique user-specified personal interests, preferences, and special requirements for self and companions |
US20170083832A1 (en) * | 2015-09-17 | 2017-03-23 | Matthew David WILLIAMS | Systems and methods for planning and tracking travel |
CN106886837A (en) * | 2017-02-21 | 2017-06-23 | 携程旅游网络技术(上海)有限公司 | Free walker stroke based on time planning recommends method |
CN107423837A (en) * | 2017-04-12 | 2017-12-01 | 宁夏丝路风情旅游网络股份有限公司 | The Intelligent planning method and system of tourism route |
CN108710669A (en) * | 2018-05-16 | 2018-10-26 | 清远博云软件有限公司 | A kind of tourist attractions travelling route formulating method |
Non-Patent Citations (1)
Title |
---|
宏磊等: "旅客国内旅行线路推介系统及其实现", 《科技创新与应用》 * |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110610351B (en) * | 2019-09-05 | 2022-04-15 | Oppo(重庆)智能科技有限公司 | Schedule generation method and related product |
CN110610351A (en) * | 2019-09-05 | 2019-12-24 | Oppo(重庆)智能科技有限公司 | Schedule generation method and related product |
CN110648027A (en) * | 2019-09-30 | 2020-01-03 | 福州林景行信息技术有限公司 | Self-driving tour digital line interactive generation system and working method thereof |
CN110648027B (en) * | 2019-09-30 | 2022-08-16 | 福州林景行信息技术有限公司 | Self-driving tour digital line interactive generation system and working method thereof |
CN110990703A (en) * | 2019-12-06 | 2020-04-10 | 重庆锐云科技有限公司 | Intelligent tourist destination recommendation system and method based on user health state |
CN113033854A (en) * | 2019-12-09 | 2021-06-25 | 天津光电通信技术有限公司 | Personal affairs management method, device, terminal and storage medium |
CN111582829A (en) * | 2020-05-11 | 2020-08-25 | 携程商旅信息服务(上海)有限公司 | Budget data updating processing method, system, electronic device and storage medium |
CN111966893A (en) * | 2020-07-28 | 2020-11-20 | 湖南省大美盈科研学旅游文化有限公司 | Text travel strategy query method and equipment |
CN112380431A (en) * | 2020-11-11 | 2021-02-19 | 喻丹 | Big data-based intelligent tourism analysis decision system and method |
CN112686778A (en) * | 2020-12-24 | 2021-04-20 | 河南牧业经济学院 | Big data-based travel route planning method, device and equipment |
CN113221028B (en) * | 2021-05-17 | 2022-04-19 | 杭州快盈信息科技有限公司 | Experiential route searching system based on optimal strategy |
CN113221028A (en) * | 2021-05-17 | 2021-08-06 | 杭州快盈信息科技有限公司 | Experiential route searching system based on optimal strategy |
CN112989214A (en) * | 2021-05-20 | 2021-06-18 | 湖北游游智游网络科技有限公司 | Tourism information display method and related equipment |
CN113592249A (en) * | 2021-07-07 | 2021-11-02 | 深圳市伴行旅游科技有限公司 | Self-service tour guide system, guide method, device and readable storage medium |
CN113657643A (en) * | 2021-07-08 | 2021-11-16 | 海南天然橡胶产业集团股份有限公司 | Planning system for sea island tourism line |
CN113642745A (en) * | 2021-08-11 | 2021-11-12 | 余国立 | Garden data acquisition method and system |
CN113642745B (en) * | 2021-08-11 | 2023-09-01 | 余国立 | Garden data acquisition method and system |
CN113701782A (en) * | 2021-10-28 | 2021-11-26 | 深圳市羽翼数码科技有限公司 | Navigation system for realizing multi-destination optimal path planning |
CN115796788A (en) * | 2022-12-06 | 2023-03-14 | 中南财经政法大学 | Automatic data management system and method |
CN115796788B (en) * | 2022-12-06 | 2023-07-21 | 中南财经政法大学 | Automatic data management system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110175722A (en) | Tour schedule planning system | |
CN110175720A (en) | Tour schedule planing method and application | |
US6834229B2 (en) | Integrated journey planner | |
CN111859194B (en) | Intelligent travel service platform and automatic travel path planning method based on same | |
CN106886837A (en) | Free walker stroke based on time planning recommends method | |
US20120185793A1 (en) | Trip planning | |
CN105303487A (en) | Method and device of travel service | |
KR101905390B1 (en) | Methods for providing tour plans and reservation service | |
KR101758252B1 (en) | Method for providing tour itinerary service | |
CN106033589A (en) | Personalized service method and system for tour route | |
CN105389751A (en) | Travel service method and device | |
CN110648027B (en) | Self-driving tour digital line interactive generation system and working method thereof | |
KR20170046333A (en) | Service system for travel planning | |
JP2002073756A (en) | Device and system for providing travel guide, and recording medium for programs thereof | |
CN114049181B (en) | OTA-based dynamic travel accommodation processing method, system and storage medium | |
KR20210060949A (en) | Travel scheduling service apparatus using big data and user preference analysis | |
KR20220082172A (en) | Customized travel scheduling virtual reality platform system and Device method of the Same | |
KR20130120909A (en) | Method, server and computer-readable recording medium for managing and supplying tour information | |
CN105631781A (en) | Automated tour guiding method | |
CN110175294A (en) | Sight spot Numerical evaluation device and tour schedule planning system | |
TW202103067A (en) | Travel itinerary information processing method and application system thereof based on traffic approach, a starting city and a target location | |
CN108717640B (en) | Data processing method of travel information and electronic equipment | |
JP2011203914A (en) | Event information transmission device and computer program | |
WO2002015064A2 (en) | On-line interactive travel booking | |
KR20150117209A (en) | Travel planning system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190827 |