CN110175319A - A kind of report generation method and device - Google Patents

A kind of report generation method and device Download PDF

Info

Publication number
CN110175319A
CN110175319A CN201910377733.XA CN201910377733A CN110175319A CN 110175319 A CN110175319 A CN 110175319A CN 201910377733 A CN201910377733 A CN 201910377733A CN 110175319 A CN110175319 A CN 110175319A
Authority
CN
China
Prior art keywords
report
parameter
report generation
generation model
business datum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910377733.XA
Other languages
Chinese (zh)
Inventor
王鹏飞
陈红
李振勇
刘华
赵函可
王志善
王岩
陈曦
马冬蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bank of China Ltd
Original Assignee
Bank of China Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bank of China Ltd filed Critical Bank of China Ltd
Priority to CN201910377733.XA priority Critical patent/CN110175319A/en
Publication of CN110175319A publication Critical patent/CN110175319A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/166Editing, e.g. inserting or deleting
    • G06F40/177Editing, e.g. inserting or deleting of tables; using ruled lines
    • G06F40/18Editing, e.g. inserting or deleting of tables; using ruled lines of spreadsheets
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/166Editing, e.g. inserting or deleting
    • G06F40/186Templates

Abstract

This specification embodiment provides a kind of report generation method and device.The described method includes: obtaining report generation request;The report generation request, including report parameter and business datum;According to the report parameter, corresponding report parameter addition instruction is obtained;The first report generation model is operated using report parameter addition instruction, obtains the second report generation model;Report is generated according to the business datum and the second report generation model.By the above method, the current desired report wanted can be generated in the case where need to only provide report parameter, without additionally programming, save corresponding time and resource.

Description

A kind of report generation method and device
Technical field
This specification embodiment is related to field of computer technology, in particular to a kind of report generation method and device.
Background technique
Report is a kind of include the information such as business datum table, specifically can be directed to each intermediate item detail and remittance Total information is arranged and is shown.It is can wrap in report containing different parameters, is corresponding with several business numbers for each parameter According to.An intuitive reflection concisely can be carried out to parameters and its business datum using report.
It may include different parameters for report generated, and correspond to format, the data sample of parameters Formula may all can be different.At present when being handled for different reports, if often all being needed it includes there is different projects Corresponding program is worked out for generating corresponding report.At the same time, it for different report programs, often also requires to increase If the information such as document analysis and document definition configuration so when the report quantity of required generation is larger, generally require to compile The contents such as large number of program i.e. document analysis information are made, workload is undoubtedly increased, and safeguard that numerous report is raw Excessive energy is also needed at program, to be easy to cause the waste of time and resource.
Summary of the invention
The purpose of this specification embodiment is to provide a kind of report generation method and device, to solve to generate in the prior art A large amount of reports need to work out a large amount of report programs, to waste time and the problem of resource.
It is realized in order to solve the above technical problems, the embodiment of the present application provides a kind of report generation method and device :
A kind of report form generation method, comprising:
Obtain report generation request;The report generation request, including report parameter and business datum;
According to the report parameter, corresponding report parameter addition instruction is obtained;
The first report generation model is operated using report parameter addition instruction, obtains the second report generation mould Type;
Report is generated according to the business datum and the second report generation model.
A kind of report generation device, comprising:
Request module, for obtaining report generation request;The report generation request, including report parameter and business Data;
Instruction acquisition module, for obtaining corresponding report parameter addition instruction according to the report parameter;
Second report generation model obtains module, for being instructed using report parameter addition to the first report generation mould Type is operated, and the second report generation model is obtained;
Report generation module, for generating report according to the business datum and the second report generation model.
The technical solution provided by above this specification embodiment is as it can be seen that the report that this specification embodiment is generated for needs Table, according to wherein entrained report parameter, obtains corresponding report parameter addition and refers to after getting report generation request It enables, and the first report generation model is operated according to report parameter addition instruction, obtain the second report generation model. In conjunction with business datum entrained in institute's report generation request, required for being directly generated using the second report generation model Report.The method shown through the foregoing embodiment, can be directly according to entrained in the report generation request received Report parameter, obtain corresponding instruction and the first report generation model operated, and can be raw using the model modified At required report, to solve the problems, such as to be required to work out corresponding generation program for different reports, report is avoided The complicated processes that table generates;The first report generation model can be reused in the implementation process of this method, avoided The problem of needing overspending energy to safeguard in the case where generation model is excessive, has saved corresponding time and resource.
Detailed description of the invention
In order to illustrate more clearly of this specification embodiment or technical solution in the prior art, below will to embodiment or Attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only The some embodiments recorded in this specification, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is a kind of flow chart of report form generation method of this specification embodiment;
Fig. 2 is a kind of module map of report generation device of this specification embodiment;
Fig. 3 is a kind of schematic diagram of presentation parameter bandwagon effect of this specification embodiment.
Specific embodiment
Below in conjunction with the attached drawing in this specification embodiment, the technical solution in this specification embodiment is carried out clear Chu is fully described by, it is clear that described embodiment is only this specification a part of the embodiment, rather than whole implementation Example.The embodiment of base in this manual, those of ordinary skill in the art are obtained without making creative work Every other embodiment, all should belong to this specification protection range.
In order to preferably apply embodiments herein, report is generated according to corresponding demand, before generating new report, in advance First it is provided with the first report generation model.First report generation model is the model for being able to carry out modification to generate report.? In first report generation model, it is packaged with every report parameter in advance.Report parameter therein is carried out by different instructions After calling, modified report generation model can be enabled to add corresponding report parameter, different type can be generated Report.
A kind of specific embodiment of report form generation method of the application is introduced below in conjunction with attached drawing 1.The execution master of the method Body is server, and the specific implementation step of the report form generation method is as follows:
S100: report generation request is obtained.
Report generation request is the request for obtaining current desired new report.It, can be in report generation request Carry report parameter and business datum.Report generation request can be user and directly be inputted by front-end interface, can also Be other servers when needing to call corresponding report to request transmitted by the server.
Report parameter is parameter included in the report of acquisition required for the report generation request.For example, user needs Obtain include report ID, mechanism number, currency, these parameters of operating time report, then to report transmitted by server Generating the report parameter for including in request is report ID, mechanism number, currency, operating time.
Report parameter can also include Metre variables and table body parameter.Metre variables are generally the beginning in report in report Description to information such as report name, report ID, statement dates, report mechanisms number.Different Metre variables can not be same It is shown in row, i.e., Metre variables and its corresponding business datum are arranged in report according to lateral.In general report It include multirow Metre variables.Certain key messages in report can be observably checked by the setting of Metre variables.Table body Parameter is the data body portion in report.Under normal circumstances, the table body parameter in single page report constitutes record, and table body record is For every field in record.Table body parameter and its corresponding business datum are arranged generally according to longitudinal.
It is defined by Metre variables and the preparatory of table body parameter, so that the data that report is showed are more structured, Convenient for the progress of relevant work.Correspondingly, the report item encapsulated in advance in the first report generation model can also be corresponding with table The format of head parameter and table body parameter.The information that the setting of Metre variables and table body parameter can preferably carry report into Row is shown.
Business datum is data entrained in the report of required generation.It is the report of required generation that business datum is corresponding In report parameter.For example, the report of required generation need include report ID, mechanism number, the operating time, operator these Report item, then business datum is the data corresponding to aforementioned four report item.A certain item report parameter can be corresponding with more A business datum.
It can also include presentation parameter in the report generation request.It, can be by presentation parameter by the way that presentation parameter is arranged Corresponding business datum can be shown according to default displaying format.Showing format can be to keep presentation parameter institute right The business datum answered is more eye-catching, to be easier to obtain corresponding concern;It can also be such that presentation parameter can be preferably The beginning of user's new page or new report is reminded, for example, being directed to first report parameter of report new page, it, which can be set, is Format is shown, to prompt the beginning of user's report new page.
It can also include format control instruction in the report generation request.Format control instruction is used for the entirety to report Format is adjusted.It, can be in advance targetedly to report by presetting format control instruction in report generation is requested The format such as entering a new line, skip is controlled in table.For example, the overall formats such as being entered a new line, being skipped in corresponding position When operation, corresponding format control instruction can be set, for carrying out typesetting to report overall format.It is controlled by format The setting of instruction preferably can carry out arrangement arrangement to the overall format of report, convenient for the preview of report item, be conducive to work The progress of work.
The first report generation model can be the first report generation subprogram.In this case, the report ginseng Number addition instruction, can be corresponding control statement, for example, for being associated with logical file and object in the first report generation subprogram Manage the DD sentence of file.In actual application, corresponding report is generated using program and corresponding sentence, realizes the application Technical solution, can more effectively meet the application environment of herein described method.
S200: according to the report parameter, corresponding report parameter addition instruction is obtained.
Report parameter addition instruction is the instruction operated for the first report generation model.Different report parameters, It is corresponding with corresponding report parameter addition instruction.For example, when including this parameter of currency in report parameter, it can be corresponding Monetary parameter addition instruction is obtained, for being adjusted to the first report generation model.Report parameter addition instruction can be with It is the instruction pre-set for the change conditions of report item, need to be adjusted the first report generation model When, according to different report parameters, corresponding instruction can be directly acquired.When report generation request in include presentation parameter When, it is also necessary to obtain corresponding presentation parameter adjustment instruction.The presentation parameter adjustment instruction, for presentation parameter is corresponding Business datum is set as default and shows format.For example, when the presentation parameter is report ID, accessed presentation parameter tune Whole instruction can set report ID to showing format, so that the format of this report item of report ID is different from other reports The format of table entry can more observably be prompted to the relevant information of user.
S300: the first report generation model is operated using report parameter addition instruction, obtains the second report Generate model.
Second report generation model is the model for generating the new report for corresponding to report generation request.By to first Report generation model is operated, available second report generation model.
After getting report parameter addition instruction, corresponding operation can be carried out to the first report generation model.For example, The report parameter includes operator's parameter, is added and is instructed according to corresponding operator's parameter, can be in first report Table, which generates, increases this report parameter of operator to realize the adjustment to the first report generation model in model.
When including presentation parameter in report generation request, and corresponding presentation parameter is obtained according to the presentation parameter When adjustment instruction, the first report generation model can also be operated using the presentation parameter adjustment instruction, obtained The business datum of presentation parameter in two report generation model reports generated can show that format is shown with default, thus More observably the project can be shown.
It is the first report generation subprogram in the first report generation model, is report according to accessed by report parameter In the case that table parameter adds sentence, carrying out operation to the first report generation subprogram be can be in first report life At corresponding report parameter addition sentence is added in subprogram, wherein packaged report parameter is called, to obtain Second report generation subprogram.It, can be more intuitively by the addition of subprogram setting and the respective statement for subprogram Actual application is carried out to the step of the application.
S400: report is generated according to the business datum and the second report generation model.
Second report generation model is to be directed to obtained model after the first report item is adjusted, and be can be used for Generate report.When including to ultimately generate report item included by report in the second report generation model, in conjunction with each report Required report can be generated in project data corresponding to table entry.
When the report parameter in report is corresponding with Metre variables and table body parameter, according to pre-set corresponding to each Each report parameter is configured by the setting of report parameter according to the format of Metre variables or table body parameter.For example, being directed to The report parameters such as report name, report ID, report generation time, are generally shown in gauge outfit, by itself and corresponding business Data are according to laterally being arranged, consequently facilitating user checks;And in report for example Business Name, the business amount of money, The report parameters such as traffic handling time are generally shown in report main body in the form of fields, according to the lattice of table body parameter Formula is used longitudinal direction to be arranged, and in order to carry out typesetting to report, is preferably shown to specific field data.
When including presentation parameter in report generation request, and corresponding presentation parameter tune is obtained for presentation parameter After whole instruction is adjusted the first report generation model, obtained second report generation model can be in final report In with default show that format is shown presentation parameter.The default format for showing format and can be different from other business datums, And presentation parameter is served and is emphasized, so that the project more can be checked observably by user.
Presentation parameter is illustrated below with a specific example.As shown in figure 3, report ID and report in report The table time is arranged to presentation parameter.It is default to show that format is, for the specific character of items of the business datum in presentation parameter, These characters are reconfigured to the format for being arranged as itself.Corresponding presentation parameter adjustment is obtained for the two report items to refer to It enables, the first report generation model is adjusted, the second report generation model is obtained.Recycle the second report generation model Corresponding report is generated, report ID as shown in Figure 3 is obtained and statement dates is disposed as the default report sample for showing format.It is logical Crossing above-mentioned specific example can be seen that setting by presentation parameter, can be well to the report item for needing eye-catching displaying It is emphasized, conducive to the displaying of report.
It is subprogram in the first report generation model, and raw to the first report according to acquired report parameter addition sentence It is operated at subprogram, after obtaining the second report generation subprogram, generates corresponding report using the second report generation subprogram Table.In a specific example, it can use specified interface and call the second report generation subprogram, and according to the industry Data of being engaged in generate report.Report generation model is applied in the form of subprogram, more meets practical operation situation, and more Easily the technical solution described in this method is implemented, and preferably meets corresponding technical requirements.
Due to the limited width of report, when the table body parameter in report is excessive, if directly to each table body parameter pair The business datum answered is shown the width that may exceed report.Therefore, data length threshold can be set for report parameter Value when the length of the business datum corresponding to the report item is greater than the data length threshold value, carries out the business datum Folds operation.Folds operation can be the data that front end length in intercept service data is equal to data length threshold value, and will not by The data of interception are folded to the second row and are shown.After folds, it is still desirable to the data for being folded to the second row are judged, if The data length threshold value is still greater than in the row data, repeats folds operation.It is operated by above-mentioned folds, so that report parameter pair The business datum answered can be shown within the specified range, when the table body parameter in report is more, can also make report to it In all data carried, thus effectively show report content.
Since the line number that can include in report is limited, in the case where business datum is more, the second report generation is utilized When model generates corresponding report, it is possible that the case where line number of business datum is arranged beyond report itself line number.For Number of data lines threshold value has can be set in the second report generation model in above situation.If the line number of business datum is big in report When the number of data lines threshold value, page switching operation is executed to the data beyond number of data lines threshold portion.Pass through above-mentioned behaviour of skipping Make, so that also can be reasonably shown to data therein, when the corresponding business datum of report parameter is more to have Conducive to the displaying of report content.
When including format control instruction in report generation request, report is being generated using the second report generation model During, according to corresponding format control instruction, the pattern of report can be controlled.For example, generating report name It enters a new line after this report item, then according to the format control instruction, line feed operation is carried out at this.Pass through format Control instruction can targetedly control the pattern of report, meet the corresponding displaying requirement of report.
A Sample Scenario introduced below is illustrated above-mentioned report form generation method.Bank cashier A needs to generate Report name, report ID, mechanism ID, transaction amount these report items, and report ID therein is utilized and shows that format carries out The report of displaying.Bank cashier A is by the report parameter of required report and corresponding business datum and comprising entering a new line and paging The format control instruction of position, submits to server A.Server A is receiving the report item and corresponding business datum Afterwards, report generation request is generated.Report parameter in the report generation request includes report name, report ID, mechanism ID, hands over The easy amount of money, report generation request in also include corresponding generating item purpose business datum, while also comprising setting report ID be exhibition Show parameter and the format control instruction for adjusting the operations such as skip, enter a new line.
Above-mentioned report generation request is sent to the server B for being used to execute above-mentioned report form generation method by server A.Service Device B obtains corresponding report parameter addition instruction after receiving the report generation request, according to report parameter, corresponds to The report parameters such as report name therein, report ID, mechanism ID, transaction amount, and obtained according to presentation parameter and correspond to report The presentation parameter adjustment instruction of ID recycles the report parameter addition instruction, presentation parameter adjustment instruction raw to the first report It is operated at model, obtains the second report generation model.Second report generation models coupling business datum, format control refer to It enables, and the item length threshold value according to corresponding to every report item carries out folds to business datum, after generating candidate report, then According to number of data lines threshold value, page switching operation is executed to candidate report, obtains report required for final bank teller A.
After server B report required for generating, the report is fed back into server A, is fed back to by server A Teller A, the generation demand of report needed for completing teller A.
It can be seen that the present processes when needing to generate new report by above-mentioned Sample Scenario, it is only necessary to according to For the report parameter of all-purpose financial statements project, corresponding adjustment sentence is obtained, can be obtained for generating current desired report Report generation model, without additionally working out report program, to solve maintenance report generator heavy workload, waste The problem of time and resource.Meanwhile according to the Sample Scenario of above-mentioned report generation, it can be seen that the present processes can also be right Corresponding report project is shown, to accomplish to keep report orderliness apparent, important information can be emphasized, is more enriched The function of report.
A kind of embodiment of report generation device of the application introduced below, as shown in Fig. 2, the device includes:
Request module 210, for obtaining report generation request;Report generation request, including report parameter and Business datum;
Instruction acquisition module 220, for obtaining corresponding report parameter addition instruction according to the report parameter;
Second report generation model obtains module 230, for raw to the first report using report parameter addition instruction It is operated at model, obtains the second report generation model;
Report generation module 240, for generating report according to the business datum and the second report generation model.
The report parameter, comprising: Metre variables and table body parameter.
The first report generation model, comprising: be packaged with the report generation model of report parameter in advance.
The second report generation model obtains module 230, comprising:
Report parameter calls subelement 231, for being instructed using report parameter addition to the first report generation model In report parameter be called.
The report generation request, further includes presentation parameter;Described device further include:
Presentation parameter adjustment instruction obtains module 250, for obtaining corresponding presentation parameter tune according to the presentation parameter Whole instruction;The presentation parameter adjustment instruction shows format for setting default for the corresponding business datum of presentation parameter;
Correspondingly, the second report generation model obtains module 230, comprising:
Second report generation model obtains subelement 232, for utilizing the presentation parameter adjustment instruction and the report Parameter addition instruction operates the first report generation model, obtains the second report generation model.
The first report generation model, including the first report generation subprogram;The report parameter addition instruction, including Report parameter adjusts sentence;The second report generation model obtains module 230, comprising:
Second report generation subprogram generates subelement 233, for adding the report in the first report generation subprogram Table parameter adds sentence, obtains the second report generation subprogram;
Correspondingly, the report generation module 240, comprising:
First report generation subelement 241, for calling the second report generation subprogram, and root using specified interface Report is generated according to the business datum.
The second report generation model, including data length threshold value;Described device further include:
Folds module 260, when being greater than the item length threshold value for the length in the business datum, to the business Data carry out folds operation.
In the second report generation model, including number of data lines threshold value;The report generation module 240, comprising:
Module of skipping 242 executes when the line number for the business datum in this page of report is greater than the number of data lines threshold value Page switching operation.
In the report generation request, including format control instruction;The report generation module 240, comprising:
Second report generation subelement 243, for according to the business datum, the format control instruction and described second Report generation model generates report.
In the 1990s, the improvement of a technology can be distinguished clearly be on hardware improvement (for example, Improvement to circuit structures such as diode, transistor, switches) or software on improvement (improvement for method flow).So And with the development of technology, the improvement of current many method flows can be considered as directly improving for hardware circuit. Designer nearly all obtains corresponding hardware circuit by the way that improved method flow to be programmed into hardware circuit.Cause This, it cannot be said that the improvement of a method flow cannot be realized with hardware entities module.For example, programmable logic device (Programmable Logic Device, PLD) (such as field programmable gate array (Field Programmable Gate Array, FPGA)) it is exactly such a integrated circuit, logic function determines device programming by user.By designer Voluntarily programming comes a digital display circuit " integrated " on a piece of PLD, designs and makes without asking chip maker Dedicated IC chip 2.Moreover, nowadays, substitution manually makes IC chip, and this programming is also used instead mostly " logic compiler (logic compiler) " software realizes that software compiler used is similar when it writes with program development Seemingly, and the source code before compiling also handy specific programming language is write, this is referred to as hardware description language (Hardware Description Language, HDL), and HDL is also not only a kind of, but there are many kind, such as ABEL (Advanced Boolean Expression Language)、AHDL(Altera Hardware Description Language)、Confluence、CUPL(Cornell University Programming Language)、HDCal、JHDL (Java Hardware Description Language)、Lava、Lola、MyHDL、PALASM、RHDL(Ruby Hardware Description Language) etc., VHDL (Very-High-Speed is most generally used at present Integrated Circuit Hardware Description Language) and Verilog2.Those skilled in the art It will be apparent to the skilled artisan that only needing method flow slightly programming in logic and being programmed into integrated circuit with above-mentioned several hardware description languages In, so that it may it is readily available the hardware circuit for realizing the logical method process.
System, device, module or the unit that above-described embodiment illustrates can specifically realize by computer chip or entity, Or it is realized by the product with certain function.It is a kind of typically to realize that equipment is computer.Specifically, computer for example may be used Think personal computer, laptop computer, cellular phone, camera phone, smart phone, personal digital assistant, media play It is any in device, navigation equipment, electronic mail equipment, game console, tablet computer, wearable device or these equipment The combination of equipment.
As seen through the above description of the embodiments, those skilled in the art can be understood that this specification The mode of required first hardware platform can be added to realize by software.Based on this understanding, the technical solution of this specification Substantially the part that contributes to existing technology can be embodied in the form of software products in other words, the computer software Product can store in storage medium, such as ROM/RAM, magnetic disk, CD, including some instructions are used so that a computer Equipment (can be personal computer, server or the network equipment etc.) executes each embodiment of this specification or embodiment Certain parts described in method.
All the embodiments in this specification are described in a progressive manner, same and similar portion between each embodiment Dividing may refer to each other, and each embodiment focuses on the differences from other embodiments.Especially for system reality For applying example, since it is substantially similar to the method embodiment, so being described relatively simple, related place is referring to embodiment of the method Part explanation.
This specification can be used in numerous first or dedicated computing system environments or configuration.Such as: personal computer, Server computer, handheld device or portable device, laptop device, multicomputer system, microprocessor-based system, Set top box, programmable consumer-elcetronics devices, network PC, minicomputer, mainframe computer including any of the above system are set Standby distributed computing environment etc..
This specification can describe in the general context of computer-executable instructions executed by a computer, such as journey Sequence module.Generally, program module include routines performing specific tasks or implementing specific abstract data types, programs, objects, Component, data structure etc..This specification can also be practiced in a distributed computing environment, in these distributed computing environment In, by executing task by the connected remote processing devices of communication network.In a distributed computing environment, program module It can be located in the local and remote computer storage media including storage equipment.
Although depicting this specification by embodiment, it will be appreciated by the skilled addressee that there are many become for this specification Shape and the spirit changed without departing from this specification, it is desirable to which the attached claims include these deformations and change without departing from this The spirit of specification.

Claims (10)

1. a kind of report form generation method characterized by comprising
Obtain report generation request;The report generation request, including report parameter and business datum;
According to the report parameter, corresponding report parameter addition instruction is obtained;
The first report generation model is operated using report parameter addition instruction, obtains the second report generation model;
Report is generated according to the business datum and the second report generation model.
2. the method as described in claim 1, which is characterized in that the report parameter, comprising: Metre variables and table body parameter.
3. the method as described in claim 1, which is characterized in that the first report generation model, comprising: be packaged with report in advance The report generation model of table parameter.
4. method as claimed in claim 3, which is characterized in that described to be instructed using report parameter addition to the first report Model is generated to be operated, comprising:
The report parameter in the first report generation model is called using report parameter addition instruction.
5. the method as described in claim 1, which is characterized in that the report generation request, further includes presentation parameter;The side Method further include:
According to the presentation parameter, corresponding presentation parameter adjustment instruction is obtained;The presentation parameter adjustment instruction, for that will open up Show that the corresponding business datum of parameter is set as default and shows format;
Correspondingly, described that the first report generation model is operated using report parameter addition instruction, obtain the second report Table generates model, comprising:
The first report generation model is operated using the presentation parameter adjustment instruction and report parameter addition instruction, Obtain the second report generation model.
6. the method as described in claim 1, which is characterized in that the first report generation model, including the first report generation Subprogram;The report parameter addition instruction, including report parameter add sentence;It is described to utilize report parameter addition instruction First report generation model is operated, the second report generation model is obtained, comprising:
The report parameter addition sentence is added in the first report generation subprogram, obtains the second report generation subprogram;
It is correspondingly, described that report is generated according to the business datum and the second report generation model, comprising:
The second report generation subprogram is called using specified interface, and report is generated according to the business datum.
7. the method as described in claim 1, which is characterized in that the second report generation model, including data length threshold value; It is described report is generated according to the business datum and the second report generation model before, further includes:
If the length of the business datum is greater than the data length threshold value, folds operation is carried out to the business datum.
8. the method as described in claim 1, which is characterized in that in the second report generation model, including number of data lines threshold Value;It is described that report is generated according to the business datum and the second report generation model, comprising:
If the line number of report parameter and business datum is greater than the number of data lines threshold value in report page, page switching operation is executed.
9. the method as described in claim 1, which is characterized in that in the report generation request, including format control instruction;Institute It states and report is generated according to the business datum and the second report generation model, comprising:
Report is generated according to the business datum, the format control instruction and the second report generation model.
10. a kind of report generation device characterized by comprising
Request module, for obtaining report generation request;The report generation request, including report parameter and business number According to;
Instruction acquisition module, for obtaining corresponding report parameter addition instruction according to the report parameter;
Second report generation model obtain module, for using the report parameter addition instruction to the first report generation model into Row operation, obtains the second report generation model;
Report generation module, for generating report according to the business datum and the second report generation model.
CN201910377733.XA 2019-05-05 2019-05-05 A kind of report generation method and device Pending CN110175319A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910377733.XA CN110175319A (en) 2019-05-05 2019-05-05 A kind of report generation method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910377733.XA CN110175319A (en) 2019-05-05 2019-05-05 A kind of report generation method and device

Publications (1)

Publication Number Publication Date
CN110175319A true CN110175319A (en) 2019-08-27

Family

ID=67690623

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910377733.XA Pending CN110175319A (en) 2019-05-05 2019-05-05 A kind of report generation method and device

Country Status (1)

Country Link
CN (1) CN110175319A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111090974A (en) * 2019-12-27 2020-05-01 中国银行股份有限公司 Report generation method, device and equipment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101071416A (en) * 2007-07-02 2007-11-14 华为技术有限公司 Report template generating system, development tool, development method and report client end
CN101908039A (en) * 2010-06-29 2010-12-08 北京科技大学 Report template customizing system
CN102279848A (en) * 2010-06-09 2011-12-14 中国电信股份有限公司 Method and device for generating report template
CN106469140A (en) * 2015-08-17 2017-03-01 朗新科技股份有限公司 A kind of report generating system and its method
CN106649242A (en) * 2016-12-29 2017-05-10 郑州云海信息技术有限公司 Method and system for generating report
JP2018085005A (en) * 2016-11-25 2018-05-31 キヤノン株式会社 Report preparation system
CN108804402A (en) * 2017-04-28 2018-11-13 北京京东尚科信息技术有限公司 Report generating system based on big data platform and method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101071416A (en) * 2007-07-02 2007-11-14 华为技术有限公司 Report template generating system, development tool, development method and report client end
CN102279848A (en) * 2010-06-09 2011-12-14 中国电信股份有限公司 Method and device for generating report template
CN101908039A (en) * 2010-06-29 2010-12-08 北京科技大学 Report template customizing system
CN106469140A (en) * 2015-08-17 2017-03-01 朗新科技股份有限公司 A kind of report generating system and its method
JP2018085005A (en) * 2016-11-25 2018-05-31 キヤノン株式会社 Report preparation system
CN106649242A (en) * 2016-12-29 2017-05-10 郑州云海信息技术有限公司 Method and system for generating report
CN108804402A (en) * 2017-04-28 2018-11-13 北京京东尚科信息技术有限公司 Report generating system based on big data platform and method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
董思文;屠培期;: "基于FastReport的客户管理系统的报表设计" *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111090974A (en) * 2019-12-27 2020-05-01 中国银行股份有限公司 Report generation method, device and equipment
CN111090974B (en) * 2019-12-27 2023-10-24 中国银行股份有限公司 Report generation method, device and equipment

Similar Documents

Publication Publication Date Title
Green Report on dialogue specification tools
CN105761007B (en) Auxiliary method and system for information management software design
CN106469140A (en) A kind of report generating system and its method
CN113886362A (en) Data storage system and storage method based on workflow engine and low-code platform
JPH03111969A (en) Method for supporting plan formation
CN109144511B (en) Method and system for automatically generating numerical simulation graphical user interface
CN113268227A (en) Zero-code visualization software development platform and development method
CN108268615B (en) Data processing method, device and system
CN102289428A (en) Method and device for generating forms in bulk
CN110175319A (en) A kind of report generation method and device
CN114185874A (en) Big data based modeling method and device, development framework and equipment
US20160018952A1 (en) Multi-Format Editors
US10114622B2 (en) Method and system for customizing a graphic user interface of a manufacturing execution system screen
CN107391099A (en) A kind of resource preprocess method and device
Lane A design space and design rules for user interface software architecture
Beaudoux et al. Specifying and running rich graphical components with loa
CN104573526B (en) Software product multi version management method, device and computer equipment
CN114780539A (en) Method, system and storage medium for generating report form in multiple dimensions
KR20130068601A (en) Apparatus and method for dynamic customization and execution of query based software logic for multitenant
CN110069678A (en) A kind of data processing method and device
Henriksen Slx: pyramid power
CN100440226C (en) Chip algorithm simulating platform and method
Schneider et al. AUI: A programming language for developing plastic interactive software
Mii et al. Software re-engineering and reuse from a japanese point of view
JPH08166973A (en) Image data managing system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination