CN110163579A - A kind of agenda managing method, device, electronic equipment and computer-readable medium - Google Patents
A kind of agenda managing method, device, electronic equipment and computer-readable medium Download PDFInfo
- Publication number
- CN110163579A CN110163579A CN201910469565.7A CN201910469565A CN110163579A CN 110163579 A CN110163579 A CN 110163579A CN 201910469565 A CN201910469565 A CN 201910469565A CN 110163579 A CN110163579 A CN 110163579A
- Authority
- CN
- China
- Prior art keywords
- schedule
- added
- list
- calendar events
- conflict
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/109—Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/1093—Calendar-based scheduling for persons or groups
Abstract
This application involves a kind of agenda managing method, device, electronic equipment and computer-readable mediums, which comprises obtains the prompting message that user passes through calendar prompting operation input in the application;If the prompting message has schedule, addition is intended to, and the schedule information of schedule to be added is determined according to the prompting message;Based on the schedule to be added schedule information determine the schedule to be added with whether adding schedule conflicts in schedule list, in the schedule list comprising multiple application programs adding schedule schedule information;If the schedule to be added conflicts with the adding schedule, issues schedule conflict and remind.The embodiment of the present invention can automatically determine whether schedule to be added conflicts with the adding schedule in schedule list, schedule to be added with adding schedule conflicts when, schedule conflict prompting can be issued, convenient for finding schedule conflict in time, and the calendar events of schedule to be added are adjusted in time, it is user-friendly.
Description
Technical field
This application involves field of computer technology more particularly to a kind of agenda managing method, device, electronic equipment and calculating
Machine readable medium.
Background technique
Currently, generally can have prompting function by various due to affairs complexity in life and work in the prior art
Calendar prompting is arranged in tool, and the tool for having prompting function can be illustratively mail, wechat or notepad etc..
However, after using email customization calendar prompting, if user customizes schedule using wechat again, even if wechat customization
Schedule mutually conflicts with the schedule of email customization, can will still be led because that can not participate in two schedules simultaneously with normal-custom, user
Affairs delay is caused, is made troubles to user.
Summary of the invention
In order to solve the above-mentioned technical problem or it at least is partially solved above-mentioned technical problem, this application provides a kind of days
Thread management method, apparatus, electronic equipment and computer-readable medium.
In a first aspect, this application provides a kind of agenda managing methods, which comprises
Obtain the prompting message that user passes through calendar prompting operation input in the application;
If the prompting message has schedule, addition is intended to, and determines that the schedule of schedule to be added is believed according to the prompting message
Breath;
Adding schedule is determined in the schedule to be added and schedule list based on the schedule information of the schedule to be added
Whether conflict, the schedule information of the adding schedule in the schedule list comprising multiple application programs;
If the schedule to be added conflicts with the adding schedule, issues schedule conflict and remind.
Optionally, the schedule information based on the schedule to be added determines has added in the schedule to be added and schedule list
Add whether schedule conflicts, the schedule information of the adding schedule in the schedule list comprising multiple application programs, comprising:
Calendar events are extracted in the schedule information;
Determine whether the calendar events of the schedule to be added conflict with the calendar events of adding schedule;
If the calendar events of the schedule to be added conflict with the calendar events of adding schedule, it is determined that described to be added
Schedule conflicts with adding schedule.
Optionally it is determined that whether the calendar events of the schedule to be added conflict with the calendar events of adding schedule, packet
It includes:
By the calendar events of schedule to be added compared with the calendar events of adding schedule each in schedule list;
If the calendar events of schedule to be added are identical as the calendar events of any adding schedule or partially overlap, can
Conflicted with the calendar events of the determination schedule to be added with the calendar events of adding schedule.
Optionally, the method also includes:
If any adding schedule in the schedule to be added and the schedule list repeats, forbid into schedule list
The schedule to be added is added, and issues schedule and repeats to remind.
Optionally, the method also includes:
If any adding schedule in the schedule to be added and the schedule list repeats, added in Xiang Cheng list
The schedule to be added, and schedule replicator is set for schedule corresponding with the schedule to be added in the schedule list.
Optionally it is determined that whether the schedule to be added repeats with any adding schedule in the schedule list, packet
It includes:
Determine whether the schedule to be added is located in schedule list based on the schedule information of the schedule to be added;
If the schedule to be added is located in the schedule list, the schedule to be added and adding schedule weight are determined
It is multiple.
Optionally, the method also includes:
If the schedule to be added does not conflict with adding schedule, the schedule to be added is added to schedule list;
When schedule corresponding with the schedule to be added expires in the schedule list, issues schedule and expire prompting.
Optionally, the method also includes:
When the schedule to be added is added to schedule list, day is extracted in the schedule information of the schedule to be added
Journey classification keyword;
It is determined according to the schedule classification keyword and reminds classification;
When schedule corresponding with the schedule to be added expires in the schedule list, issued according to the prompting classification
Schedule expires prompting.
Second aspect, the present invention provides a kind of calendar managing device, described device includes:
Module is obtained, passes through the prompting message of calendar prompting operation input in the application for obtaining user;
First determining module determines if for the prompting message there is schedule addition to be intended to according to the prompting message
The schedule information of schedule to be added;
Second determining module, for determining the schedule to be added and schedule based on the schedule information of the schedule to be added
Whether adding schedule conflicts in list, the schedule letter of the adding schedule in the schedule list comprising multiple application programs
Breath;
First reminding module issues schedule conflict and mentions if conflicting for the schedule to be added with the adding schedule
It wakes up.
Optionally, the second determining module, comprising:
Extraction unit, for extracting calendar events in the schedule information;
Whether the calendar events of the first determination unit, the calendar events for determining the schedule to be added and adding schedule rush
It is prominent;
Second determination unit, if being rushed for the calendar events of the schedule to be added and the calendar events of adding schedule
It is prominent, it is determined that the schedule to be added conflicts with adding schedule.
Optionally, first determination unit is also used to:
By the calendar events of schedule to be added compared with the calendar events of adding schedule each in schedule list;
If the calendar events of schedule to be added are identical as the calendar events of any adding schedule, partially overlap or the two
Between interval duration be less than the corresponding duration of distance between the two, then can determine the calendar events of the schedule to be added
Conflict with the calendar events of adding schedule.
Optionally, described device further include:
Schedule reprocesses module, if for any adding schedule in the schedule to be added and the schedule list
It repeats, forbids adding the schedule to be added into schedule list, and issue schedule and repeat to remind.
Optionally, described device further include:
First adding module, if any adding schedule in the schedule to be added and the schedule list repeats, to
It adds the schedule to be added in schedule list, and is arranged for schedule corresponding with the schedule to be added in the schedule list
Schedule replicator.
Optionally, described device further include:
Third determining module, for based on the schedule information of the schedule to be added determine the schedule to be added whether position
In schedule list;
4th determining module, if the schedule to be added is located in the schedule list, determine the schedule to be added with
Adding schedule repeats.
Optionally, described device further include:
Second adding module, if not conflicting for the schedule to be added with adding schedule, by the schedule to be added
It is added to schedule list;
Second reminding module, when expiring for schedule corresponding with the schedule to be added in the schedule list, hair
Schedule expires prompting out.
Optionally, second reminding module, comprising:
Extraction unit, for when the schedule to be added is added to schedule list, in the day of the schedule to be added
Schedule classification keyword is extracted in journey information;
5th determination unit reminds classification for determining according to the schedule classification keyword;
Third reminding unit is pressed when expiring for schedule corresponding with the schedule to be added in the schedule list
Schedule is issued according to the prompting classification to expire prompting.
The third aspect stores in the memory the present invention provides a kind of electronic equipment, including memory, processor
There is the computer program that can be run on the processor, the processor realizes above-mentioned first when executing the computer program
The step of method described in aspect.
Fourth aspect, the present invention provides a kind of computers of non-volatile program code that can be performed with processor can
Medium is read, said program code makes the processor execute method described in the first aspect.
Above-mentioned technical proposal provided by the embodiments of the present application has the advantages that compared with prior art
The embodiment of the present invention passes through the prompting letter of calendar prompting operation input by obtaining user first in the application
Breath, if the prompting message has schedule, addition is intended to, and the schedule information of schedule to be added is determined according to the prompting message, then
Based on the schedule to be added schedule information determine the schedule to be added with whether adding schedule conflicts in schedule list,
In the schedule list comprising multiple application programs adding schedule schedule information, if the schedule to be added and it is described
Adding schedule conflict issues schedule conflict and reminds.
The embodiment of the present invention can automatically determine whether schedule to be added conflicts with the adding schedule in schedule list,
Schedule to be added is reminded with that when adding schedule conflicts, can issue schedule conflict, convenient for the schedule conflict of discovery in time, and in time
The calendar events for adjusting schedule to be added avoid the application program due to using when adding schedule different, the day of caused addition
The problem of journey conflicts with each other, it is user-friendly.
Detailed description of the invention
The drawings herein are incorporated into the specification and forms part of this specification, and shows and meets implementation of the invention
Example, and be used to explain the principle of the present invention together with specification.
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, for those of ordinary skill in the art
Speech, without any creative labor, is also possible to obtain other drawings based on these drawings.
Fig. 1 is a kind of flow chart of agenda managing method provided by the embodiments of the present application;
Fig. 2 is the flow chart of another agenda managing method provided by the embodiments of the present application;
Fig. 3 is a kind of structure chart of calendar managing device provided by the embodiments of the present application.
Specific embodiment
To keep the purposes, technical schemes and advantages of the embodiment of the present application clearer, below in conjunction with the embodiment of the present application
In attached drawing, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described embodiment is
A part of the embodiment of the application, instead of all the embodiments.Based on the embodiment in the application, ordinary skill people
Member's every other embodiment obtained without making creative work, shall fall in the protection scope of this application.
Due in the prior art, after using email customization calendar prompting, if user customizes schedule using wechat again, even if
The schedule of wechat customization mutually conflicts with the schedule of email customization, still can will be because that can not participate in two simultaneously with normal-custom, user
A schedule and cause affairs to stop over, make troubles to user.For this purpose, providing a kind of schedule pipe again in one embodiment of the invention
Method, apparatus, electronic equipment and computer-readable medium are managed, the agenda managing method can be applied in computer, such as Fig. 1
Shown, the method may include following steps:
Step S101 obtains the prompting message that user passes through calendar prompting operation input in the application;
Illustratively, application program can be wechat, QQ or notepad etc., and calendar prompting operation can refer to that user is answering
With the operation for inputting prompting message in program.Such as: user inputs sending information after text in the chat interface of wechat, or
It is that menu is shown by long-pressing text after the text for receiving other users transmission, finally clicks the prompting button in menu,
The operation etc. that text addition is reminded, wherein showing that the mode of menu may include diversified forms according to text, user can root
It is set according to the hobby of oneself, such as long-pressing text, double-click text, the operation of two fingers touch-control text.
Step S102, if the prompting message has schedule, addition is intended to, and determines day to be added according to the prompting message
The schedule information of journey;
In embodiments of the present invention, the text of prompting message can be segmented, if the obtained word of participle and pre-
If schedule addition keyword it is consistent, then can determine prompting message have schedule addition be intended to, illustratively, prompting message
Text is " schedule that addition 2 pm on the 23rd goes to the address A to have a meeting ", then the word segmented can be with are as follows: " addition ", " 23
Day ", " afternoon ", " 2 points " " address A ", " meeting " and " schedule ", if schedule addition keyword is " addition " and " schedule ", by
It obtains then determining that prompting message has comprising adding keyword identical " addition " and " schedule " with schedule in word in participle
There is schedule addition to be intended to.
The schedule information of schedule to be added is extracted in prompting message, illustratively, schedule to be added is that the address A is gone to have a meeting
Schedule, schedule information may include calendar events etc..For example, " 2 pm on the 23rd " etc..
Step S103 is determined in the schedule to be added and schedule list based on the schedule information of the schedule to be added
Whether adding schedule conflicts, the schedule information of the adding schedule in the schedule list comprising multiple application programs;
In this step, calendar events are extracted in the schedule information, if the calendar events of the schedule to be added with
The calendar events conflict of adding schedule, it is determined that the schedule to be added conflicts with adding schedule.
It in embodiments of the present invention, may include multiple adding schedules in schedule list, each adding schedule has
Calendar events.
In this step, by the calendar events of adding schedule each in the calendar events of schedule to be added and schedule list
Compare, if the calendar events of schedule to be added are identical as the calendar events of any adding schedule, partially overlap or the two it
Between interval duration be less than the corresponding duration of distance between the two, then can determine the calendar events of the schedule to be added with
The calendar events conflict of adding schedule.
Illustratively, the calendar events of schedule to be added are " 2 pm on the 23rd ", the schedule of one of them adding schedule
Time is also " 2 pm on the 23rd ", and the calendar events of schedule to be added are identical as the calendar events of adding schedule, then can be true
The calendar events conflict identical as the calendar events of adding schedule of fixed schedule to be added.
Illustratively, the calendar events of schedule to be added are " 2 pm on the 23rd is to 3 points ", one of them adding schedule
Calendar events be also " 1 point to 2 points of afternoon on the 23rd ", the calendar events portion of the calendar events of schedule to be added and adding schedule
Divide and be overlapped, then can determine the conflict identical as the calendar events of adding schedule of the calendar events of schedule to be added.
Illustratively, the calendar events of schedule to be added are " 14:10-14:40 ", the schedule of one of them adding schedule
Time be " 13:00-14:00 ", another adding schedule calendar events be " 15:30-16:00 ", schedule to be added rise
Begin the time be 14:10 and first interval between the end time 14:00 of adding schedule when it is 10 minutes a length of, at this moment first
Need to obtain schedule to be added and the location information of adding schedule, according to the positional information calculation of the two it is between the two away from
From, and corresponding duration is calculated according to distance between the two, if a length of 10 minutes when interval are less than the duration being calculated,
The then schedule to be added and interval duration between adding schedule is less than schedule to be added and the distance between adding schedule pair
The duration answered, and then can determine the conflict identical as the calendar events of adding schedule of the calendar events of schedule to be added;
Similarly, the interval between the initial time of adding schedule of the end time 14:40 of schedule to be added and second
Duration can also be handled in the manner described above, and details are not described herein again.
Step S104 issues schedule conflict and reminds if the schedule to be added conflicts with the adding schedule.
In embodiments of the present invention, schedule conflict prompting can be popped up by display interface in a manner of pop-up, can also
It is popped up in a manner of through pop-up notification column.
For schedule to be added and the interval duration between adding schedule be less than schedule to be added and adding schedule it
Between distance corresponding duration the case where, in addition to schedule conflict is reminded out, according to schedule to be added and can also add day
The corresponding duration of the distance between journey issues schedule change and suggests, such as: schedule to be added and the distance between adding schedule
A length of 20 minutes when corresponding, then changing in suggestion can suggest that the calendar events of schedule to be added are revised as 14:30- by user
15:00, and then more times are reserved for schedule to be added.
The embodiment of the present invention passes through the prompting letter of calendar prompting operation input by obtaining user first in the application
Breath, if the prompting message has schedule, addition is intended to, and the schedule information of schedule to be added is determined according to the prompting message, then
Based on the schedule to be added schedule information determine the schedule to be added with whether adding schedule conflicts in schedule list,
In the schedule list comprising multiple application programs adding schedule schedule information, if the schedule to be added and it is described
Adding schedule conflict issues schedule conflict and reminds.
The embodiment of the present invention can automatically determine whether schedule to be added conflicts with the adding schedule in schedule list,
Schedule to be added is reminded with that when adding schedule conflicts, can issue schedule conflict, convenient for the schedule conflict of discovery in time, and in time
The calendar events for adjusting schedule to be added avoid the application program due to using when adding schedule different, the day of caused addition
The problem of journey conflicts with each other, it is user-friendly.
In addition, when user wants to check whether corresponding schedule is idle state in chat, then without go notepad or
Person is that calendar checks schedule, it is only necessary to which whether touch-control stroke to be added is you can learn that conflict, other day in the embodiment of the present invention
The problem of journey is the combination suitable for each APP, avoids stroke not intercommunication between multiple APP in the prior art.
In practical applications, user may be after adding schedule, it is likely that can forget to have added the schedule, later at certain
When some events occurs, user can be triggered and remember and add same schedule again, for this purpose, in another embodiment of the present invention
In, the method also includes:
If any adding schedule in the schedule to be added and the schedule list repeats, forbid into schedule list
The schedule to be added is added, and issues schedule and repeats to remind.
Determine whether the schedule to be added repeats with any adding schedule in the schedule list, comprising: be based on
The schedule information of the schedule to be added determines whether the schedule to be added is located in schedule list;If the schedule to be added
In the schedule list, determine that the schedule to be added is repeated with adding schedule.
Through the embodiment of the present invention, it can be avoided user and add duplicate schedule into schedule list, avoid schedule list
Redundancy, and user time is saved, avoiding user is that duplicate adding schedule wastes time.
In practical applications, user may be after adding schedule, it is likely that can forget to have added the schedule, later at certain
When some events occurs, user can be triggered and remember and add same schedule again, for this purpose, in another embodiment of the present invention
In, the method also includes:
If any adding schedule in the schedule to be added and the schedule list repeats, added in Xiang Cheng list
The schedule to be added, and schedule replicator is set for schedule corresponding with the schedule to be added in the schedule list.
Determine whether the schedule to be added repeats with any adding schedule in the schedule list, comprising: be based on
The schedule information of the schedule to be added determines whether the schedule to be added is located in schedule list;If the schedule to be added
In the schedule list, determine that the schedule to be added is repeated with adding schedule.
It through the embodiment of the present invention, can be after user adds duplicate schedule into schedule list, in schedule list
Corresponding position adding schedule replicator, convenient for user identification remove duplicate schedule, it is user-friendly.
In another embodiment of the present invention, as shown in Fig. 2, the method also includes:
The schedule to be added is added the Summer Solstice or the Winter Solstice if the schedule to be added does not conflict with adding schedule by step S201
Cheng Liebiao;
Step S202 when schedule corresponding with the schedule to be added expires in the schedule list, issues schedule and arrives
Phase reminds.
Through the embodiment of the present invention, can schedule to be added with adding schedule does not conflict when schedule to be added is normal
Be added to schedule list, and when schedule expires, remind subscriber calendar to expire, convenient for user according to the schedule of addition
Stroke.
In practical applications, since the affairs in Working Life are more many and diverse, user may add in schedule list
Many schedules expire prompting if frequently issuing same schedule, and user may spend the more time to go to differentiate and be specifically
What calendar prompting, for this purpose, in another embodiment of the present invention, the method also includes:
When the schedule to be added is added to schedule list, day is extracted in the schedule information of the schedule to be added
Journey classification keyword;Schedule classification keyword, for example, " meeting " or " going on business " etc..
It is determined according to the schedule classification keyword and reminds classification;Correspondingly, can be schedule classification keyword " meeting "
The prompting classification of " meeting " class is set, and the prompting classification of " meeting " class can correspond to the first prompt tone, be schedule classification keyword
" going on business " setting " is gone on business " the prompting classification of class, and the prompting classification of " going on business " class can correspond to the second prompt tone.
When schedule corresponding with the schedule to be added expires in the schedule list, issued according to the prompting classification
Schedule expires prompting.
In the embodiment of the present invention, different prompting classifications can be set for the schedule of different schedule classifications, and according to difference
Prompting classification issue schedule and expire promptings, the classification for issuing the schedule of prompting is differentiated convenient for user, it is user-friendly.
In another embodiment of the present invention, a kind of calendar managing device is also provided, as shown in figure 3, described device includes:
Module 11 is obtained, passes through the prompting message of calendar prompting operation input in the application for obtaining user;
First determining module 12, it is true according to the prompting message if for the prompting message there is schedule addition to be intended to
The schedule information of fixed schedule to be added;
Second determining module 13, for determining the schedule to be added and day based on the schedule information of the schedule to be added
Whether adding schedule conflicts in Cheng Liebiao, the schedule letter of the adding schedule in the schedule list comprising multiple application programs
Breath;
Reminding module 14 issues schedule conflict and reminds if conflicting for the schedule to be added with the adding schedule.
In another embodiment of the present invention, the second determining module, comprising:
Extraction unit, for extracting calendar events in the schedule information;
Whether the calendar events of the first determination unit, the calendar events for determining the schedule to be added and adding schedule rush
It is prominent;
Second determination unit, if being rushed for the calendar events of the schedule to be added and the calendar events of adding schedule
It is prominent, it is determined that the schedule to be added conflicts with adding schedule.
In another embodiment of the present invention, first determination unit is also used to:
By the calendar events of schedule to be added compared with the calendar events of adding schedule each in schedule list;
If the calendar events of schedule to be added are identical as the calendar events of any adding schedule, partially overlap or the two
Between interval duration be less than the corresponding duration of distance between the two, then can determine the calendar events of the schedule to be added
Conflict with the calendar events of adding schedule.
In another embodiment of the present invention, described device further include:
Schedule reprocesses module, if for any adding schedule in the schedule to be added and the schedule list
It repeats, forbids adding the schedule to be added into schedule list, and issue schedule and repeat to remind.
In another embodiment of the present invention, described device further include:
First adding module, if any adding schedule in the schedule to be added and the schedule list repeats, to
It adds the schedule to be added in schedule list, and is arranged for schedule corresponding with the schedule to be added in the schedule list
Schedule replicator.
In another embodiment of the present invention, described device further include:
Third determining module, for based on the schedule information of the schedule to be added determine the schedule to be added whether position
In schedule list;
4th determining module, if the schedule to be added is located in the schedule list, determine the schedule to be added with
Adding schedule repeats.
In another embodiment of the present invention, described device further include:
Second adding module, if not conflicting for the schedule to be added with adding schedule, by the schedule to be added
It is added to schedule list;
Second reminding module, when expiring for schedule corresponding with the schedule to be added in the schedule list, hair
Schedule expires prompting out.
In another embodiment of the present invention, described device further include:
Extraction module, for when the schedule to be added is added to schedule list, in the day of the schedule to be added
Schedule classification keyword is extracted in journey information;
5th determining module reminds classification for determining according to the schedule classification keyword;
Third reminding module is pressed when expiring for schedule corresponding with the schedule to be added in the schedule list
Schedule is issued according to the prompting classification to expire prompting.
In another embodiment of the present invention, also offer a kind of electronic equipment, including memory, processor, the storage
The computer program that can be run on the processor is stored in device, the processor is realized when executing the computer program
The step of method described in above method embodiment.
In another embodiment of the present invention, a kind of non-volatile program code that can be performed with processor is also provided
Computer-readable medium, said program code make the processor execute method described in the method embodiment.
Present invention also provides:
A1. a kind of agenda managing method, which comprises
Obtain the prompting message that user passes through calendar prompting operation input in the application;
If the prompting message has schedule, addition is intended to, and determines that the schedule of schedule to be added is believed according to the prompting message
Breath;
Adding schedule is determined in the schedule to be added and schedule list based on the schedule information of the schedule to be added
Whether conflict, the schedule information of the adding schedule in the schedule list comprising multiple application programs;
If the schedule to be added conflicts with the adding schedule, issues schedule conflict and remind.
A2. agenda managing method according to a1, it is determining described wait add based on the schedule information of the schedule to be added
Add schedule with whether adding schedule conflicts in schedule list, in the schedule list include multiple application programs addition day
The schedule information of journey, comprising:
Calendar events are extracted in the schedule information;
Determine whether the calendar events of the schedule to be added conflict with the calendar events of adding schedule;
If the calendar events of the schedule to be added conflict with the calendar events of adding schedule, it is determined that described to be added
Schedule conflicts with adding schedule.
A3. agenda managing method according to a1 determines the calendar events and adding schedule of the schedule to be added
Calendar events whether conflict, comprising:
By the calendar events of schedule to be added compared with the calendar events of adding schedule each in schedule list;
If the calendar events of schedule to be added are identical as the calendar events of any adding schedule, partially overlap or the two
Between interval duration be less than the corresponding duration of distance between the two, then can determine the calendar events of the schedule to be added
Conflict with the calendar events of adding schedule.
A4. agenda managing method according to a1, the method also includes:
If any adding schedule in the schedule to be added and the schedule list repeats, forbid into schedule list
The schedule to be added is added, and issues schedule and repeats to remind.
A5. agenda managing method according to a1, the method also includes:
If any adding schedule in the schedule to be added and the schedule list repeats, added in Xiang Cheng list
The schedule to be added, and schedule replicator is set for schedule corresponding with the schedule to be added in the schedule list.
A6. the agenda managing method according to A4 or A5, determine the schedule to be added whether with the schedule list
In any adding schedule repeat, comprising:
Determine whether the schedule to be added is located in schedule list based on the schedule information of the schedule to be added;
If the schedule to be added is located in the schedule list, the schedule to be added and adding schedule weight are determined
It is multiple.
A7. agenda managing method according to a1, the method also includes:
If the schedule to be added does not conflict with adding schedule, the schedule to be added is added to schedule list;
When schedule corresponding with the schedule to be added expires in the schedule list, issues schedule and expire prompting.
A8. agenda managing method according to a1, the method also includes:
When the schedule to be added is added to schedule list, day is extracted in the schedule information of the schedule to be added
Journey classification keyword;
It is determined according to the schedule classification keyword and reminds classification;
When schedule corresponding with the schedule to be added expires in the schedule list, issued according to the prompting classification
Schedule expires prompting.
B9. a kind of calendar managing device, described device include:
Module is obtained, passes through the prompting message of calendar prompting operation input in the application for obtaining user;
First determining module determines if for the prompting message there is schedule addition to be intended to according to the prompting message
The schedule information of schedule to be added;
Second determining module, for determining the schedule to be added and schedule based on the schedule information of the schedule to be added
Whether adding schedule conflicts in list, the schedule letter of the adding schedule in the schedule list comprising multiple application programs
Breath;
First reminding module issues schedule conflict and mentions if conflicting for the schedule to be added with the adding schedule
It wakes up.
B10. the calendar managing device according to B9, second determining module, comprising:
Extraction unit, for extracting calendar events in the schedule information;
Whether the calendar events of the first determination unit, the calendar events for determining the schedule to be added and adding schedule rush
It is prominent;
Second determination unit, if being rushed for the calendar events of the schedule to be added and the calendar events of adding schedule
It is prominent, it is determined that the schedule to be added conflicts with adding schedule.
B11. the calendar managing device according to B9, first determination unit are also used to:
By the calendar events of schedule to be added compared with the calendar events of adding schedule each in schedule list;
If the calendar events of schedule to be added are identical as the calendar events of any adding schedule, partially overlap or the two
Between interval duration be less than the corresponding duration of distance between the two, then can determine the calendar events of the schedule to be added
Conflict with the calendar events of adding schedule.
B12. the calendar managing device according to B9, described device further include:
Schedule reprocesses module, if for any adding schedule in the schedule to be added and the schedule list
It repeats, forbids adding the schedule to be added into schedule list, and issue schedule and repeat to remind.
B13. the calendar managing device according to B9, described device further include:
First adding module, if any adding schedule in the schedule to be added and the schedule list repeats, to
It adds the schedule to be added in schedule list, and is arranged for schedule corresponding with the schedule to be added in the schedule list
Schedule replicator.
B14. the calendar managing device according to B12 or B13, described device further include:
Third determining module, for based on the schedule information of the schedule to be added determine the schedule to be added whether position
In schedule list;
4th determining module, if the schedule to be added is located in the schedule list, determine the schedule to be added with
Adding schedule repeats.
B15. the calendar managing device according to B9, described device further include:
Second adding module, if not conflicting for the schedule to be added with adding schedule, by the schedule to be added
It is added to schedule list;
Second reminding module, when expiring for schedule corresponding with the schedule to be added in the schedule list, hair
Schedule expires prompting out.
B16. the calendar managing device according to B9, second reminding module, comprising:
Extraction unit, for when the schedule to be added is added to schedule list, in the day of the schedule to be added
Schedule classification keyword is extracted in journey information;
5th determination unit reminds classification for determining according to the schedule classification keyword;
Third reminding unit is pressed when expiring for schedule corresponding with the schedule to be added in the schedule list
Schedule is issued according to the prompting classification to expire prompting.
C17. a kind of electronic equipment, including memory, processor, being stored in the memory can be on the processor
The computer program of operation, the processor realize the described in any item methods of above-mentioned A1-A7 when executing the computer program
The step of.
D18. a kind of computer-readable medium for the non-volatile program code that can be performed with processor, described program generation
Code makes the processor execute the described in any item methods of A1-A7.
It should be noted that, in this document, the relational terms of such as " first " and " second " or the like are used merely to one
A entity or operation with another entity or operate distinguish, without necessarily requiring or implying these entities or operation it
Between there are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant are intended to
Cover non-exclusive inclusion, so that the process, method, article or equipment for including a series of elements not only includes those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or setting
Standby intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that
There is also other identical elements in the process, method, article or apparatus that includes the element.
The above is only a specific embodiment of the invention, is made skilled artisans appreciate that or realizing this hair
It is bright.Various modifications to these embodiments will be apparent to one skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention
It is not intended to be limited to the embodiments shown herein, and is to fit to and applied principle and features of novelty phase one herein
The widest scope of cause.
Claims (10)
1. a kind of agenda managing method, which is characterized in that the described method includes:
Obtain the prompting message that user passes through calendar prompting operation input in the application;
If the prompting message has schedule, addition is intended to, and the schedule information of schedule to be added is determined according to the prompting message;
Based on the schedule to be added schedule information determine in the schedule to be added and schedule list adding schedule whether
Conflict, the schedule information of the adding schedule in the schedule list comprising multiple application programs;
If the schedule to be added conflicts with the adding schedule, issues schedule conflict and remind.
2. agenda managing method according to claim 1, which is characterized in that the schedule information based on the schedule to be added
Determine the schedule to be added with whether adding schedule conflicts in schedule list, in the schedule list comprising it is multiple apply journey
The schedule information of the adding schedule of sequence, comprising:
Calendar events are extracted in the schedule information;
Determine whether the calendar events of the schedule to be added conflict with the calendar events of adding schedule;
If the calendar events of the schedule to be added conflict with the calendar events of adding schedule, it is determined that the schedule to be added
Conflict with adding schedule.
3. agenda managing method according to claim 1, which is characterized in that determine the calendar events of the schedule to be added
Whether conflict with the calendar events of adding schedule, comprising:
By the calendar events of schedule to be added compared with the calendar events of adding schedule each in schedule list;
If the calendar events of schedule to be added are identical as the calendar events of any adding schedule, partially overlap or therebetween
Interval duration be less than the corresponding duration of distance between the two, then can determine the calendar events of the schedule to be added with
The calendar events conflict of adding schedule.
4. agenda managing method according to claim 1, which is characterized in that the method also includes:
If any adding schedule in the schedule to be added and the schedule list repeats, forbid adding into schedule list
The schedule to be added, and issue schedule and repeat to remind.
5. agenda managing method according to claim 1, which is characterized in that the method also includes:
If any adding schedule in the schedule to be added and the schedule list repeats, in Xiang Cheng list described in addition
Schedule to be added, and schedule replicator is set for schedule corresponding with the schedule to be added in the schedule list.
6. agenda managing method according to claim 4 or 5, which is characterized in that determine the schedule to be added whether with
Any adding schedule in the schedule list repeats, comprising:
Determine whether the schedule to be added is located in schedule list based on the schedule information of the schedule to be added;
If the schedule to be added is located in the schedule list, determine that the schedule to be added is repeated with adding schedule.
7. agenda managing method according to claim 1, which is characterized in that the method also includes:
If the schedule to be added does not conflict with adding schedule, the schedule to be added is added to schedule list;
When schedule corresponding with the schedule to be added expires in the schedule list, issues schedule and expire prompting.
8. a kind of calendar managing device, which is characterized in that described device includes:
Module is obtained, passes through the prompting message of calendar prompting operation input in the application for obtaining user;
First determining module is determined according to the prompting message wait add if for the prompting message there is schedule addition to be intended to
Add the schedule information of schedule;
Second determining module, for determining the schedule to be added and schedule list based on the schedule information of the schedule to be added
In adding schedule whether conflict, in the schedule list comprising multiple application programs adding schedule schedule information;
First reminding module issues schedule conflict and reminds if conflicting for the schedule to be added with the adding schedule.
9. a kind of electronic equipment, including memory, processor, be stored in the memory to run on the processor
Computer program, which is characterized in that the processor realizes that the claims 1 to 7 are any when executing the computer program
The step of method described in item.
10. a kind of computer-readable medium for the non-volatile program code that can be performed with processor, which is characterized in that described
Program code makes the processor execute described any the method for claim 1 to 7.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910469565.7A CN110163579A (en) | 2019-05-31 | 2019-05-31 | A kind of agenda managing method, device, electronic equipment and computer-readable medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910469565.7A CN110163579A (en) | 2019-05-31 | 2019-05-31 | A kind of agenda managing method, device, electronic equipment and computer-readable medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110163579A true CN110163579A (en) | 2019-08-23 |
Family
ID=67630903
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910469565.7A Pending CN110163579A (en) | 2019-05-31 | 2019-05-31 | A kind of agenda managing method, device, electronic equipment and computer-readable medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110163579A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112016901A (en) * | 2020-09-03 | 2020-12-01 | 深圳市大数据研究院 | Method and system for intelligently generating schedule information |
CN113766064A (en) * | 2021-06-15 | 2021-12-07 | 荣耀终端有限公司 | Schedule processing method and electronic equipment |
CN114462954A (en) * | 2021-07-23 | 2022-05-10 | 荣耀终端有限公司 | Schedule conflict management method and electronic equipment |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120004942A1 (en) * | 2010-06-30 | 2012-01-05 | International Business Machines Corporation | Conflict Resolution in a Computerized Calendaring System |
CN102970334A (en) * | 2012-10-29 | 2013-03-13 | 东莞宇龙通信科技有限公司 | Multi-agenda conflict processing method and system thereof |
CN104463552A (en) * | 2013-09-22 | 2015-03-25 | 中国电信股份有限公司 | Method and device for generating calendar reminding |
CN105354702A (en) * | 2015-11-23 | 2016-02-24 | 魅族科技(中国)有限公司 | Conflict detection method and device for schedules |
CN107563723A (en) * | 2017-08-17 | 2018-01-09 | 上海擎感智能科技有限公司 | Schedule alarming method for power and device, computer-readable recording medium, terminal |
-
2019
- 2019-05-31 CN CN201910469565.7A patent/CN110163579A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120004942A1 (en) * | 2010-06-30 | 2012-01-05 | International Business Machines Corporation | Conflict Resolution in a Computerized Calendaring System |
CN102970334A (en) * | 2012-10-29 | 2013-03-13 | 东莞宇龙通信科技有限公司 | Multi-agenda conflict processing method and system thereof |
CN104463552A (en) * | 2013-09-22 | 2015-03-25 | 中国电信股份有限公司 | Method and device for generating calendar reminding |
CN105354702A (en) * | 2015-11-23 | 2016-02-24 | 魅族科技(中国)有限公司 | Conflict detection method and device for schedules |
CN107563723A (en) * | 2017-08-17 | 2018-01-09 | 上海擎感智能科技有限公司 | Schedule alarming method for power and device, computer-readable recording medium, terminal |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112016901A (en) * | 2020-09-03 | 2020-12-01 | 深圳市大数据研究院 | Method and system for intelligently generating schedule information |
CN113766064A (en) * | 2021-06-15 | 2021-12-07 | 荣耀终端有限公司 | Schedule processing method and electronic equipment |
CN113766064B (en) * | 2021-06-15 | 2023-11-14 | 荣耀终端有限公司 | Schedule processing method and electronic equipment |
CN114462954A (en) * | 2021-07-23 | 2022-05-10 | 荣耀终端有限公司 | Schedule conflict management method and electronic equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP7183154B2 (en) | Increased efficiency in task management applications | |
KR102466652B1 (en) | A mobile device for providing an integrated management of message information, a method for providing an integrated management of message information and a computer readable medium | |
KR102102570B1 (en) | Systems and methods for proactively identifying and surfacing relevant content on a touch-sensitive device | |
US20080141247A1 (en) | System and method for information management | |
US10088973B2 (en) | Event scheduling presentation in a graphical user interface environment | |
CN110163579A (en) | A kind of agenda managing method, device, electronic equipment and computer-readable medium | |
US8108206B2 (en) | Auto-generated to-do list | |
US11146510B2 (en) | Communication methods and apparatuses | |
Rong et al. | Managing uncertainty in time expressions for virtual assistants | |
JP2004534340A (en) | Forecast calendar | |
WO2014019466A1 (en) | Method and mobile terminal for notifying and displaying message | |
KR20090094860A (en) | Apparatus, method and computer program product providing user calendar interrupt button and function to automatically clear and re-schedule calendar events | |
Tang et al. | Supporting transitions in work: informing large display application design by understanding whiteboard use | |
CN102236715A (en) | Cooperating evaluating and filtering for e-mail message | |
US20200226554A1 (en) | Automated suggestions for to-do list reminders via native notifications | |
US20110099153A1 (en) | Method and apparatus for generating a polymorphic note | |
US20100036924A1 (en) | System and method for providing electronic reminders | |
CN106779605B (en) | Schedule reminding method and device, computing equipment and storage medium | |
US10643186B2 (en) | Electronic device and method for automatically responding to calendar event notifications | |
CN103533176A (en) | Method for opening application and terminal | |
KR20170100166A (en) | Method for providing automatic scheduling service using hot-key | |
Nawi et al. | Context-aware instant messenger with integrated scheduling planner | |
Zeldes | Infoglut | |
TW201401075A (en) | Calendar recording process for mobile appliance capable of receiving emails and text messages | |
Parchment et al. | Intelligent Agent based Student-Staff Scheduling System |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200723 Address after: 518000 Nanshan District science and technology zone, Guangdong, Zhejiang Province, science and technology in the Tencent Building on the 1st floor of the 35 layer Applicant after: TENCENT TECHNOLOGY (SHENZHEN) Co.,Ltd. Address before: 100029 Beijing Chaoyang District Huixin East Street No. 2 Residence General Real Estate Building 804 Applicant before: Tricorn (Beijing) Technology Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190823 |
|
RJ01 | Rejection of invention patent application after publication |