CN110163574A - Engineering construction project report construction method and equipment based on BIM - Google Patents
Engineering construction project report construction method and equipment based on BIM Download PDFInfo
- Publication number
- CN110163574A CN110163574A CN201910428692.2A CN201910428692A CN110163574A CN 110163574 A CN110163574 A CN 110163574A CN 201910428692 A CN201910428692 A CN 201910428692A CN 110163574 A CN110163574 A CN 110163574A
- Authority
- CN
- China
- Prior art keywords
- file
- report
- engineering construction
- approval
- dimensional modeling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 133
- 238000000034 method Methods 0.000 claims abstract description 37
- 238000006243 chemical reaction Methods 0.000 claims abstract description 26
- 238000013440 design planning Methods 0.000 claims abstract description 10
- 238000005516 engineering process Methods 0.000 claims description 13
- 238000004590 computer program Methods 0.000 claims description 10
- 238000003860 storage Methods 0.000 abstract description 15
- 230000008569 process Effects 0.000 description 17
- 238000013439 planning Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 7
- 238000013461 design Methods 0.000 description 6
- 230000006870 function Effects 0.000 description 6
- 239000000463 material Substances 0.000 description 5
- 238000009877 rendering Methods 0.000 description 3
- 238000012550 audit Methods 0.000 description 2
- 239000004035 construction material Substances 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 230000010354 integration Effects 0.000 description 2
- 239000000178 monomer Substances 0.000 description 2
- 230000008520 organization Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 238000012795 verification Methods 0.000 description 2
- 230000003321 amplification Effects 0.000 description 1
- 230000006399 behavior Effects 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000003199 nucleic acid amplification method Methods 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000013341 scale-up Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F40/00—Handling natural language data
- G06F40/10—Text processing
- G06F40/12—Use of codes for handling textual entities
- G06F40/151—Transformation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Geometry (AREA)
- Computer Hardware Design (AREA)
- General Engineering & Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Health & Medical Sciences (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Primary Health Care (AREA)
- Civil Engineering (AREA)
- Audiology, Speech & Language Pathology (AREA)
- Computational Linguistics (AREA)
- Quality & Reliability (AREA)
- Architecture (AREA)
- Artificial Intelligence (AREA)
- Data Mining & Analysis (AREA)
- Operations Research (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to a kind of engineering construction project report construction method and equipment based on BIM, it is related to engineering construction technical field, wherein, method includes: to receive wait report the report for the engineering construction project built to build instruction, after receiving report and building instruction, obtain the three-dimensional modeling file wait report the engineering construction project built, with the specialized information wait report the engineering construction project built in three-dimensional modeling file, three-dimensional modeling file is converted, data after being converted, data after conversion include the data of design planning stage each element, the data after storage conversion.
Description
Technical field
The present invention relates to engineering construction technical fields, and in particular to engineering construction project report construction method based on BIM and sets
It is standby.
Background technique
Urban architecture is the material base that city is depended on for existence and development, and people, which handle official business, settle down, etc. is required to rely on city
Building.Construction unit need build a certain building in city when, generally require to local administrative department for construction or its
Authorized organization carries out report and builds, and then obtains construction permits after being audited by relevant departments.
In the related technology, construction unit generally requires construction unit and carries the two-dimentional drawing of building, related card when report is built
Prescribed paper etc. report building materials expect administrative department for construction carry out report build, related personnel receive report construction material after, need by
Report construction material therein is scanned, and is built with completing report, this mode time-consuming is long, efficiency is lower.
Summary of the invention
In view of this, in order to solve the problems, such as that present in the relevant technologies, the present invention provides one kind at least to a certain extent
Engineering construction project report construction method and equipment based on BIM.
The present invention adopts the following technical scheme:
In a first aspect, a kind of engineering construction project report construction method based on BIM, comprising:
It receives wait report the report for the engineering construction project built to build instruction;
After receiving the report and building instruction, the three-dimensional modeling file wait report the engineering construction project built is obtained, described three
Specialized information in dimension modeling file with described wait report the engineering construction project built;
The three-dimensional modeling file is converted, the data after being converted, the data after the conversion include: design
The data of planning stage each element;
Data after storing the conversion.
Optionally, further includes:
It receives described wait report the examination & approval for the engineering construction project built to instruct;
After receiving the examination & approval instruction, examination & approval content corresponding with the examination & approval instruction, the examination & approval content are obtained
It include: the data after the conversion, and/or, the approval index file of the engineering construction project;
According to the examination & approval content, corresponding approval results are obtained;
Store the approval results.
It is optionally, described to obtain examination & approval content corresponding with the examination & approval instruction, comprising:
Judge the classification of the examination & approval instruction;
According to the classification of different examination & approval instructions, examination & approval content corresponding with the examination & approval instruction is obtained.
Optionally, the three-dimensional modeling file further includes the location information of the engineering construction project, and the method is also wrapped
It includes:
Judge obtain current three-dimensional modeling file location information and history three-dimensional modeling file location information whether
Unanimously, if so, by the data of the data cover history three-dimensional modeling file of current three-dimensional modeling file;The history three-dimensional is built
Mould file is the corresponding three-dimensional modeling file of data after the conversion.
Optionally, the three-dimensional modeling file obtained wait report the engineering construction project built, comprising:
Obtain the threedimensional model file as described in 3 d modeling software foundation wait report the engineering construction project built;
The professional attributes message file that user fills in is obtained, the professional attributes message file includes the specialized information;
Specialized information in the professional attributes message file is attached on the threedimensional model file, three-dimensional is obtained and builds
Mould file.
Optionally, the three-dimensional modeling file obtained wait report the engineering construction project built, comprising:
The three-dimensional modeling file with specialized information wait report the engineering construction project built is directly acquired, it is described with profession
The three-dimensional modeling file of information is generated using specific software.
Optionally, the specialized information by the professional attributes message file is attached to the threedimensional model file
On, comprising:
Obtain the first filename of the professional attributes message file and the second filename of the threedimensional model file;
Judge whether first filename and second filename are consistent;
If so, the specialized information in the professional attributes message file is attached on the threedimensional model file.
Optionally, the specialized information includes: area, layer, plot ratio.
It is optionally, described that the three-dimensional modeling file is converted, comprising:
Data in the three-dimensional modeling file are converted to the data of osgjs format.
Optionally, before the data after the storage conversion, comprising:
Obtain preconfigured the file information;
The file information is matched to the correspondence of the data of design planning stage each element in the three-dimensional modeling file
Position.
Optionally, the file information includes the information of building concentration, further includes: the house type information in building concentration, and/
Or, the location information of building concentration.
Optionally, further includes:
Web-based WebGL technology renders the data after the conversion, on webpage in the form of 3-D graphic
Show design planning stage each element wait report the engineering construction project built.
Second aspect, a kind of engineering construction project report construction are standby, comprising:
Processor, and the memory being connected with the processor;
The memory is for storing computer program;
The processor is for calling and executing the computer program in the memory, to execute such as first aspect
The engineering construction project report construction method based on BIM.
The third aspect, a kind of storage medium, the storage medium are stored with computer program, and the computer program is located
When managing device execution, the engineering construction project report construction method based on BIM as described in relation to the first aspect is realized.
The invention adopts the above technical scheme, by first obtaining the three-dimensional modeling file wait report the engineering construction project built,
Then three-dimensional modeling file is converted, the data after being converted, and the data after conversion are stored, to complete to report
It builds, wherein the data after conversion include: the data of design planning stage each element;In this way, report builds unit when needing report to build,
It only needs to get three in program for wait report the three-dimensional modeling file of the specialized information for the engineering construction project built to upload
After tieing up modeling file, can three-dimensional modeling file be converted and be stored automatically, be built with completing report.Due to three-dimensional modeling file
In include engineering construction project specialized information, also include engineering construction project threedimensional model, therefore report build unit can not
Must carry two-dimentional drawing carry out report build, alternatively, it is also possible to check when reporting the file built in related personnel, built by three-dimensional
Mould file gets information about the entire content of engineering construction project, eliminates the links such as scanning, saves the time, and improve
The working efficiency of related personnel.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is the flow diagram for the engineering construction project report construction method based on BIM that the embodiment of the present invention one provides;
Fig. 2 is the flow diagram of the engineering construction project report construction method provided by Embodiment 2 of the present invention based on BIM;
Fig. 3 is another process signal of the engineering construction project report construction method provided by Embodiment 2 of the present invention based on BIM
Figure;
Fig. 4 is that the engineering construction project report that the embodiment of the present invention three provides builds standby structural schematic diagram.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, technical solution of the present invention will be carried out below
Detailed description.Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Base
Embodiment in the present invention, those of ordinary skill in the art are obtained all without making creative work
Other embodiment belongs to the range that the present invention is protected.
In order to better understand scheme provided by the present application, it is to be understood that the following contents:
The report often said in the narrow sense is built to be built for the report of engineering construction project, and engineering construction project report, which is built, refers to engineering construction project
It, must be to locality by construction unit or its agency after engineering project feasibility study report or other project verification files go through
Administrative department for construction or its authorized organization carry out report and build, and deliver for a check the approval documents of engineering project project verification, including bank provides
Credibility certificate and the construction land etc. of approval other relevant documents behavior.Construction unit reports to construction administrative service division
Registration form is sent, and delivers for a check and establishes file and planning permit of construction engineering, land use certificate, investment licensing and fund card as an item for processing
It is bright, after being write comments and sign one's name by construction administrative service division or the audit of its agency, construction unit's project registration form is returned, into applying
Work map file examination procedure.
Engineering construction project report construction method provided by the present application based on BIM not only includes that the report of above-mentioned narrow sense is built, also
It include that construction unit enters construction drawing inspection of documents program, it can be understood as the report for belonging to broad sense is built.
In the related art, either report builds process or construction drawing inspection of documents process, is all based on institute, construction unit
The two-dimentional drawing of offer is built or is examined to report, and which results in relevant departments to need to browse in checking process two-dimentional drawing progress
It examines, so that examining that the time is longer.
Architecture information model (Building Information Modeling, BIM) technology is a kind of applied to engineering
Design is built, the digitization tool of management, is integrated by the digitization to building, informationization model, in project planning, operation
It is shared and is transmitted in the lifecycle process of maintenance, engineers and technicians is made to make correct reason to various architecture informations
Solution and efficiently reply provide collaborative work for design team and each side's construction bodies including building, unit of operation
Basis plays a significant role improving production efficiency, save the cost and shortening the construction period aspect.In the application, BIM is based on by project
The model file from planning and designing in life-cycle processes, reports the file built and relevant departments to examine to relevant departments
The data of journey are stored entirely in a database, realize the integration of all information, constitute a complete BIM data packet,
The application is completely illustrated below.
Embodiment one
Fig. 1 is the flow diagram for the engineering construction project report construction method based on BIM that the embodiment of the present invention one provides.Such as
Shown in Fig. 1, the present embodiment provides a kind of engineering construction project report construction method based on BIM, comprising:
Step 101 is received wait report the report for the engineering construction project built to build instruction;
Wherein, report, which builds instruction, can build process in the newly-built report that operation interface selects for user.
Step 102, receive it is described report build instruction after, obtain wait report the engineering construction project built three-dimensional modeling text
Part, with the specialized information wait report the engineering construction project built in three-dimensional modeling file;
Wherein, the three-dimensional modeling file of acquisition can first pass through 3 d modeling software in the related technology, establish engineering and build
If specialized information, is then attached on threedimensional model file by the threedimensional model file of project;Also it is straight to can choose specific software
Deliver a child into the three-dimensional modeling file with specialized information.Specialized information includes: area, layer, plot ratio.
Step 103 is converted three-dimensional modeling file, the data after being converted, and the data after conversion include: design
The data of planning stage each element;
Data after step 104, storage conversion.
In the present embodiment, the report that can complete narrow sense in the related technology through the above steps builds process, that is, is receiving report
After building instruction, by first obtaining the three-dimensional modeling file wait report the engineering construction project built, then three-dimensional modeling file is carried out
Conversion, the data after being converted, and the data after conversion are stored, it is built with completing report, wherein the data packet after conversion
It includes: the data of design planning stage each element;In this way, report builds unit when needing report to build, it is only necessary to will be with wait report the engineering built
The three-dimensional modeling file of the specialized information of construction project is uploaded, can be automatic after program gets three-dimensional modeling file
Three-dimensional modeling file is converted and stored, is built with completing report.Due to including engineering construction project in three-dimensional modeling file
Specialized information also includes the threedimensional model of engineering construction project, therefore report builds unit and may not necessarily carry two-dimentional drawing and reported
It builds, alternatively, it is also possible to check when reporting the file built in related personnel, work is got information about by three-dimensional modeling file
The entire content of engineering construction item eliminates the links such as scanning, saves the time, and improves the work effect of related personnel
Rate.
Embodiment two
Fig. 2 is the flow diagram of the engineering construction project report construction method provided by Embodiment 2 of the present invention based on BIM.Such as
Shown in Fig. 2, the present embodiment provides a kind of engineering construction project report construction method based on BIM, comprising:
Step 201 is received wait report the report for the engineering construction project built to build instruction;
In some embodiments, report, which builds instruction, can build process in the newly-built report that operation interface selects for user.
Wherein, engineering construction project can be construction-engineering project, Urban Buried Pipeline Network project etc., wherein architectural engineering
Project can be workshop, theater, hotel, shop, school, hospital and house etc..
It is illustrated so that engineering construction project is residential building project as an example below, hereinafter referred to as project.
Step 202, after receiving report and building instruction, obtain the three-dimensional modeling file wait report the engineering construction project built, three
It ties up in modeling file with the specialized information wait report the engineering construction project built;
Wherein, there are many modes for obtaining three-dimensional modeling file, is illustrated in a manner of following two:
The first are as follows:
3 d modeling software in the related technology is first passed through, the threedimensional model file of engineering construction project is established, then will
Specialized information is attached on threedimensional model file, and Fig. 3 is the engineering construction project report provided by Embodiment 2 of the present invention based on BIM
Another flow diagram of construction method is illustrating for step 202, comprising:
The threedimensional model file wait report the engineering construction project built that step 301, acquisition are established by 3 d modeling software;
Wherein, there are many types of 3 d modeling software, for example, 3dsmax, sketchup, Eplan, Revit.By work
After the completion of the three-dimension modeling of engineering construction item, need that threedimensional model is exported as to general model on 3 d modeling software
Format-FBX format file.Since the threedimensional model that 3 d modeling software is established only includes the body and material information of project,
Therefore need to adhere to the specialized information of project.
Step 302 obtains the professional attributes message file that user fills in, and professional attributes message file includes specialized information;
Wherein, the basic content in professional attributes message file is specific format, for example, be Excel form,
It is provided with that specialized information is corresponding to fill in place in table, user will fill in the specialized information of engineering construction project to corresponding positions
It sets, professional attributes message file can be obtained.After filling in, the file name by professional attributes message file is needed to be revised as
The title consistent with the filename of threedimensional model file can be by the information matches of the two so as to when down-stream is read.
Further, specialized information is the indication information for needing to examine in approval stage, not only includes residential building project
Information, such as overall floorage, the area of dwelling structure, plot ratio, the ratio of green space of project;It further include in residential building project
The information of each building concentration, such as building height, the ground number of plies of building concentration.Wherein building concentration is the unit in project
Building.
Second filename of step 303, the first filename for obtaining professional attributes message file and threedimensional model file;
Step 304 judges whether the first filename and the second filename are consistent;
Step 305, if so, the specialized information in professional attributes message file is attached on threedimensional model file.
By obtaining the consistent professional attributes message file of file name and threedimensional model file, then show that professional attributes are believed
The specialized information ceased in file is the specialized information of threedimensional model file, therefore this specialized information is attached to threedimensional model file
On, to obtain the three-dimensional modeling file with specialized information.
By taking above-mentioned residential building project as an example, 3 d modeling software is needed in modeling for each building list in house
Body establishes model, and numbers for it;Therefore, the basic content in professional attributes message file, and according to building concentration
What number was filled in, i.e., specialized information is filled according to building concentration number.For example, having 10 in this residential building project
Building concentration, then, just need to fill in the number of each building concentration respectively in professional attributes message file, and single with building
Body numbers corresponding specialized information.
Further, there are many modes specialized information being attached on threedimensional model file, such as:
Obtain the corresponding architecture information of building concentration information in professional attributes message file;
Obtain the corresponding model information of building concentration information in threedimensional model file;
Architecture information in professional attributes message file is attached in model information.
After specialized information is attached on threedimensional model file, user can be by clicking different in threedimensional model file build
Monomer is built, and gets the specialized information being attached on building concentration.There are many modes that specialized information is shown on model, example
It can such as be shown in the form of table is.
Second are as follows:
The three-dimensional modeling file with specialized information wait report the engineering construction project built is directly acquired, has specialized information
Three-dimensional modeling file using specific software generate.
Wherein, specific software can be, but not limited to as the regular software of Electronic approval.The regular software of Electronic approval can built
When vertical residential building project threedimensional model, the specialized information of Housing Project is directly appended in threedimensional model, attachment is eliminated
The process of professional attributes message file, application are more convenient.
Step 203 obtains preconfigured the file information;
The file information is matched in three-dimensional modeling file by step 204;
Wherein, preconfigured the file information may include the house type information in building concentration information and building concentration.Tool
Body, due in threedimensional model file, not including the house type information of building concentration, believed by first obtaining preconfigured file
Breath, by the corresponding house type information matches of building concentration in the file information into threedimensional model file, to obtain believing with house type
The three-dimensional modeling file of breath.Wherein, house type information is shown there are many modes on three-dimensional modeling file, for example, can will
House type information is labeled on corresponding building concentration as a bubble, and user can view building by clicking bubble
The house type information of monomer.
It further, can also include the location information of engineering construction project in preconfigured the file information, it is similar,
The location information of project is matched in threedimensional model file, three-dimensional modeling file can be made to obtain the location information of project.
Step 205 is converted three-dimensional modeling file, the data after being converted, and the data after conversion include: design
The data of planning stage each element;
In conjunction with foregoing description, the format of three-dimensional modeling file is FBX file, is converted into osgjs format, can make three
Data in dimension modeling file are more preferably opened and preview.In the related technology, the data in three-dimensional modeling file are converted into osgjs
There are many modes of the data of format, such as carries the text that plug-in unit exports osgjs format by OSG (OpenSceneGraph)
Part, specifically can refer to description in the related technology, and the application repeats no more.
The data of design planning stage each element include the body and material of the house type information of above-mentioned building concentration, project
Information, specialized information of project etc..
Data after step 206, storage conversion.
It, can be in subsequent related personnel when examination & approval need to check file, directly by storing the data after conversion
It connects and is obtained in the database of storage, also ensure the validity of data.
The location information for the current three-dimensional modeling file that step 207, judgement obtain and the position of history three-dimensional modeling file
Whether information is consistent, if so, by the data of the data cover history three-dimensional modeling file of current three-dimensional modeling file;
Wherein, history three-dimensional modeling file is the corresponding three-dimensional modeling file of data after conversion.In this step, for
Be storage the engineering construction project built up of three-dimensional modeling file change (such as removal) when, will can newly plan three
The three-dimensional modeling file of dimension modeling file covering storage realizes the update of data to show the data of new projects.
Step 208, web-based WebGL technology render the data after conversion, with 3-D graphic on webpage
Form shows design planning stage each element wait report the engineering construction project built.
In this step, WebGL (Web Graphics Library, Web graph shape library) technical standard eliminates exploitation webpage
The trouble of dedicated Rendering Plug can be used for the Website page that creation has complexity 3D structure, therefore can will be turned by WebGL
The data of osgjs format after changing are rendered, with pyramidal mode (first rendering top pinnacle of a pagoda data, with pushing away for camera lens
Nearly amplification gradually rending model details) Fast rendering that carries out data shows, in addition when project has multiple schemes, also can
The comparison of multiple schemes is supported to show.In this way, related personnel can pass through when project proceeds to the process of related personnel's examination & approval
Scale-up model, to observe whether the detailed design of project standardizes.
Step 209 is received wait report the examination & approval for the engineering construction project built to instruct;
Wherein, examination & approval instruction can be the opening operation for the copending project that user selects in operation interface.
Step 210, receive examination & approval instruction after, judge examination & approval instruction classification;
Since each project is from the approval process for being designed into completion, multiple departments (such as environmental protection administration, fire-fighting portion are needed
Door, gardens department etc.) it is examined, therefore when different departments is examined, the content of examination & approval is different (for example, natural
Resource bureau is responsible for the examination & approval of overall city planning, regulatory plan, and whether the fire fighting device that Fire Department is responsible for project is up to standard
Deng), therefore its examination & approval instruction is also different.
Step 211, the classification instructed according to different examination & approval, obtain examination & approval content corresponding with examination & approval instruction.
Wherein, examination & approval content includes: the data after conversion, and/or, the approval index file of engineering construction project;
In the present embodiment, it is illustrated by taking the examination & approval of natural resources office as an example.The main contents packet of natural resources office examination & approval
Include project site selection opinion, project planning condition, land used license and examination & approval of project alternative etc..Corresponding examination & approval instruction is relevant people
The examination and approval procedure that member selects in interface then selects this project, passes through acquisition if related personnel wants examination and approval project addressing opinion
Whether project site selection position paper is qualified to examine this purpose project site selection.In this item, project site selection position paper is
The approval index file of engineering construction project.Certainly, other works are also had when examining other business or other departments examine
The approval index file of engineering construction item, will not enumerate herein.
Step 212, according to examination & approval content, obtain corresponding approval results;
Specifically, the related personnel of natural resources office examines window in examination & approval, by clicking project site selection, get
The permission notes for location of the project is closed, related personnel is by checking whether project site selection closes rule, to examine to project, to assign
Approval results.If project site selection closes rule, related personnel to the project assign the result that passes through of examination & approval and store examination & approval as a result,
And then proceed to next examination and approval project;If project site selection irregularity, project is returned, You Baojian unit submits new report again
Build file.
Step 213, storage approval results.
In relevant departments' approval process, each department is to need to circulate approval process, such as work as nature in examination & approval
Resource bureau related personnel audit after the completion of, result examine stores, then circulation to firmly found the bureau, the phase firmly founded the bureau
Pass personnel also need to send examination & approval instruction to program in examination & approval, then obtain examination & approval content, examine to examination & approval content
To upload approval results, and continue to store the approval results firmly founded the bureau, and so on, finally by the examination & approval of project
Journey is completely recorded.
Wherein, approval results include the essential information (project name, construction unit, contact method etc.) of examination and approval project, examine
Criticize personnel, date of approval, suggestions made after examination etc..It is in some embodiments, above-mentioned approval results are integrated in the table, it is looked into so as to subsequent
It is more intuitive when seeing.
It is understood that a certain item is not up to regulation and needs to return report when building unit in the project, it can be by this item
Approval results be stored as it is unqualified, when report build unit submit again meet as defined in report build file when, approval results are changed
For qualification, but can still be stored in the approval results that the report of preceding upload builds file.
So far, the report of the broad sense of project is built into the model file from planning and designing to step 213 based on above-mentioned steps 201
The data for the overall process examined to relevant departments are stored, and the integration of all information is realized, and constitute one completely
BIM data packet.Wherein above-mentioned data packet can export to mobile terminal, and related personnel can check that on mobile terminals project exists
The data in above-mentioned each stage;Or two dimensional code is converted thereof into, by scanning the two-dimensional code the data obtained in data packet, Jin Erjin
Row is checked.
Embodiment three
Fig. 4 is that the engineering construction project report based on BIM that the embodiment of the present invention three provides builds standby structural schematic diagram.Such as
Shown in Fig. 4, the present embodiment provides a kind of, and the engineering construction project report construction based on BIM is standby, comprising:
Processor 401, and the memory 402 being connected with processor;
Memory is for storing computer program;
Processor for calling and execute the computer program in memory, with execute as in embodiment one or two based on
The engineering construction project report construction method of BIM.
The specific implementation of the present embodiment may refer to the engineering based on BIM in above-described embodiment one and embodiment two
Related description in construction project report construction method embodiment, details are not described herein again.
Example IV
The present embodiment provides a kind of storage medium, storage medium is stored with computer program, and computer program is by processor
When execution, realize such as the engineering construction project report construction method based on BIM in embodiment one or embodiment two.
The specific implementation of the present embodiment may refer to the work based on BIM that previous embodiment one and embodiment two are recorded
Related description in engineering construction item report construction method embodiment, details are not described herein again.
It is understood that same or similar part can mutually refer in the various embodiments described above, in some embodiments
Unspecified content may refer to the same or similar content in other embodiments.
It should be noted that in the description of the present invention, term " first ", " second " etc. are used for description purposes only, without
It can be interpreted as indication or suggestion relative importance.In addition, in the description of the present invention, unless otherwise indicated, the meaning of " multiple "
Refer at least two.
Any process described otherwise above or method description are construed as in flow chart or herein, and expression includes
It is one or more for realizing specific logical function or process the step of executable instruction code module, segment or portion
Point, and the range of the preferred embodiment of the present invention includes other realization, wherein can not press shown or discussed suitable
Sequence, including according to related function by it is basic simultaneously in the way of or in the opposite order, Lai Zhihang function, this should be of the invention
Embodiment person of ordinary skill in the field understood.
It should be appreciated that each section of the invention can be realized with hardware, software, firmware or their combination.Above-mentioned
In embodiment, software that multiple steps or method can be executed in memory and by suitable instruction executing device with storage
Or firmware is realized.It, and in another embodiment, can be under well known in the art for example, if realized with hardware
Any one of column technology or their combination are realized: having a logic gates for realizing logic function to data-signal
Discrete logic, with suitable combinational logic gate circuit specific integrated circuit, programmable gate array (PGA), scene
Programmable gate array (FPGA) etc..
Those skilled in the art are understood that realize all or part of step that above-described embodiment method carries
It suddenly is that relevant hardware can be instructed to complete by program, the program can store in a kind of computer-readable storage medium
In matter, which when being executed, includes the steps that one or a combination set of embodiment of the method.
It, can also be in addition, each functional unit in each embodiment of the present invention can integrate in a processing module
It is that each unit physically exists alone, can also be integrated in two or more units in a module.Above-mentioned integrated mould
Block both can take the form of hardware realization, can also be realized in the form of software function module.The integrated module is such as
Fruit is realized and when sold or used as an independent product in the form of software function module, also can store in a computer
In read/write memory medium.
Storage medium mentioned above can be read-only memory, disk or CD etc..
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show
The description of example " or " some examples " etc. means specific features, structure, material or spy described in conjunction with this embodiment or example
Point is included at least one embodiment or example of the invention.In the present specification, schematic expression of the above terms are not
Centainly refer to identical embodiment or example.Moreover, particular features, structures, materials, or characteristics described can be any
One or more embodiment or examples in can be combined in any suitable manner.
Although the embodiments of the present invention has been shown and described above, it is to be understood that above-described embodiment is example
Property, it is not considered as limiting the invention, those skilled in the art within the scope of the invention can be to above-mentioned
Embodiment is changed, modifies, replacement and variant.
Claims (10)
1. a kind of engineering construction project report construction method based on BIM characterized by comprising
It receives wait report the report for the engineering construction project built to build instruction;
After receiving the report and building instruction, the three-dimensional modeling file wait report the engineering construction project built is obtained, the three-dimensional is built
Specialized information in mould file with described wait report the engineering construction project built;
The three-dimensional modeling file is converted, the data after being converted, the data after the conversion include: design planning
The data of stage each element;
Data after storing the conversion.
2. the method according to claim 1, wherein further include:
It receives described wait report the examination & approval for the engineering construction project built to instruct;
After receiving the examination & approval instruction, examination & approval content corresponding with the examination & approval instruction is obtained, the examination & approval content includes:
Data after the conversion, and/or, the approval index file of the engineering construction project;
According to the examination & approval content, corresponding approval results are obtained;
Store the approval results.
3. according to the method described in claim 2, it is characterized in that, described obtain in examination & approval corresponding with the examination & approval instruction
Hold, comprising:
Judge the classification of the examination & approval instruction;
According to the classification of different examination & approval instructions, examination & approval content corresponding with the examination & approval instruction is obtained.
4. according to right want 1 described in method, which is characterized in that the three-dimensional modeling file further includes the engineering construction project
Location information, the method also includes:
Judge whether the location information of the current three-dimensional modeling file obtained is consistent with the location information of history three-dimensional modeling file,
If so, by the data of the data cover history three-dimensional modeling file of current three-dimensional modeling file;The history three-dimensional modeling text
Part is the corresponding three-dimensional modeling file of data after the conversion.
5. the method according to claim 1, wherein described obtain wait report the three-dimensional for the engineering construction project built to build
Mould file, comprising:
Obtain the threedimensional model file as described in 3 d modeling software foundation wait report the engineering construction project built;
The professional attributes message file that user fills in is obtained, the professional attributes message file includes the specialized information;
Specialized information in the professional attributes message file is attached on the threedimensional model file, three-dimensional modeling text is obtained
Part.
6. the method according to claim 1, wherein described obtain wait report the three-dimensional for the engineering construction project built to build
Mould file, comprising:
The three-dimensional modeling file with specialized information wait report the engineering construction project built is directly acquired, it is described to have specialized information
Three-dimensional modeling file using specific software generate.
7. according to the method described in claim 5, it is characterized in that, the profession by the professional attributes message file is believed
Breath is attached on the threedimensional model file, comprising:
Obtain the first filename of the professional attributes message file and the second filename of the threedimensional model file;
Judge whether first filename and second filename are consistent;
If so, the specialized information in the professional attributes message file is attached on the threedimensional model file.
8. the method according to claim 1, wherein further include:
Obtain preconfigured the file information;
The file information is matched to the corresponding position of the data of design planning stage each element in the three-dimensional modeling file.
9. according to right want 1 described in method, which is characterized in that further include:
Web-based WebGL technology renders the data after the conversion, is shown in the form of 3-D graphic on webpage
Wait report the design planning stage each element for the engineering construction project built.
10. it is a kind of based on BIM engineering construction project report construction it is standby characterized by comprising processor, and with the place
The memory that reason device is connected;
The memory is for storing computer program;
The processor is for calling and executing the computer program in the memory, to execute such as claim 1-9
Described in any item methods.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910428692.2A CN110163574B (en) | 2019-05-22 | 2019-05-22 | BIM-based engineering construction project reporting method and equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910428692.2A CN110163574B (en) | 2019-05-22 | 2019-05-22 | BIM-based engineering construction project reporting method and equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110163574A true CN110163574A (en) | 2019-08-23 |
CN110163574B CN110163574B (en) | 2023-12-26 |
Family
ID=67631840
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910428692.2A Active CN110163574B (en) | 2019-05-22 | 2019-05-22 | BIM-based engineering construction project reporting method and equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110163574B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112184896A (en) * | 2020-10-15 | 2021-01-05 | 洛阳众智软件科技股份有限公司 | Three-dimensional building modeling method, device and system based on floor and inter-line assistance |
CN114417458A (en) * | 2021-12-22 | 2022-04-29 | 山东同圆数字科技有限公司 | Construction project online multidimensional reporting and construction collaboration system based on CIM technology |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103247004A (en) * | 2013-04-28 | 2013-08-14 | 中建安装工程有限公司 | Information management method and system based on electromechanical integrated BIM (building information model) |
CN107220431A (en) * | 2017-05-24 | 2017-09-29 | 上海蓝色星球电力科技有限公司 | A kind of data examination method and system based on specification provision and mathematical model |
CN108121704A (en) * | 2016-11-28 | 2018-06-05 | 星际空间(天津)科技发展有限公司 | A kind of three-dimensional final acceptance of construction system |
CN109726470A (en) * | 2018-12-27 | 2019-05-07 | 深圳市数字城市工程研究中心 | A kind of check method, device and the medium of threedimensional model index |
-
2019
- 2019-05-22 CN CN201910428692.2A patent/CN110163574B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103247004A (en) * | 2013-04-28 | 2013-08-14 | 中建安装工程有限公司 | Information management method and system based on electromechanical integrated BIM (building information model) |
CN108121704A (en) * | 2016-11-28 | 2018-06-05 | 星际空间(天津)科技发展有限公司 | A kind of three-dimensional final acceptance of construction system |
CN107220431A (en) * | 2017-05-24 | 2017-09-29 | 上海蓝色星球电力科技有限公司 | A kind of data examination method and system based on specification provision and mathematical model |
CN109726470A (en) * | 2018-12-27 | 2019-05-07 | 深圳市数字城市工程研究中心 | A kind of check method, device and the medium of threedimensional model index |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112184896A (en) * | 2020-10-15 | 2021-01-05 | 洛阳众智软件科技股份有限公司 | Three-dimensional building modeling method, device and system based on floor and inter-line assistance |
CN112184896B (en) * | 2020-10-15 | 2023-09-22 | 洛阳众智软件科技股份有限公司 | Three-dimensional building modeling method, device and system based on floor and open line assistance |
CN114417458A (en) * | 2021-12-22 | 2022-04-29 | 山东同圆数字科技有限公司 | Construction project online multidimensional reporting and construction collaboration system based on CIM technology |
Also Published As
Publication number | Publication date |
---|---|
CN110163574B (en) | 2023-12-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zhu et al. | Integration of BIM and GIS: Geometry from IFC to shapefile using open-source technology | |
Amirebrahimi et al. | A BIM-GIS integration method in support of the assessment and 3D visualisation of flood damage to a building | |
CN103314395B (en) | The method create, connected and show three-dimensional object | |
Donato et al. | BIM-QA/QC in the architectural design process | |
Sejati et al. | Open-source web GIS framework in monitoring urban land use planning: participatory solutions for developing countries. | |
Owen et al. | Research Roadmap Report-Integrated Design and Delivery Solutions (IDDS)[CIB Publication: 370] | |
Omrany et al. | The uptake of City Information Modelling (CIM): A comprehensive review of current implementations, challenges and future outlook | |
CN110135070A (en) | A kind of method and device of BIM model creation | |
Noardo et al. | Reference study of CityGML software support: The GeoBIM benchmark 2019—Part II | |
Ogwueleka et al. | The future of BIM technologies in Africa: prospects and challenges | |
Wang et al. | Urban information integration for advanced e-Planning in Europe | |
Tang et al. | Developing a BIM GIS–integrated method for urban underground piping management in China: a case study | |
CN110163574A (en) | Engineering construction project report construction method and equipment based on BIM | |
Saeidian et al. | A semantic 3D city model for underground land administration: Development and implementation of an ADE for CityGML 3.0 | |
Gürsoy Sürmeneli et al. | Design and implementation of a 4D cadastral legal model for Turkish land administration infrastructure based on LADM | |
US20150286690A1 (en) | System and Method for Site and Tower Information Modeling and Management | |
Kubota et al. | Data model–centered four-dimensional information management system for road maintenance | |
Talipova et al. | Perspectives of interactions CAD and GIS systems | |
Hajek | Creation of information-rich 3D model in Geographic Information System-case study at the castle kozel | |
Bazurto et al. | Geographic information system for Manabí sustainable development | |
Zibion | Development of a BIM-enabled software tool for facility management using interactive floor plans, graph-based data management and granular information retrieval | |
Seifert et al. | Urban strategy playground: Rethinking the urban planner’s toolbox | |
Linné et al. | Integrating Geographic Information and Valuation Modeling for Real Estate. | |
Makkonen | Semantic 3D modelling for infrastructure asset management | |
Benner et al. | Public participation and urban planning supported by OGC Web services |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: Floor 13, 14 and 15, building 3, lianfei building, No.1, Fenghua Road, high tech Development Zone, Luoyang City, Henan Province, 471000 Patentee after: Zhongzhi Software Co.,Ltd. Country or region after: China Address before: Floor 13, 14 and 15, building 3, lianfei building, No.1, Fenghua Road, Luoyang hi tech Development Zone, Luoyang City, Henan Province, 471000 Patentee before: Luoyang Zhongzhi Software Technology Co.,Ltd. Country or region before: China |
|