CN110162458A - Test data building method, device and storage medium - Google Patents
Test data building method, device and storage medium Download PDFInfo
- Publication number
- CN110162458A CN110162458A CN201910298384.2A CN201910298384A CN110162458A CN 110162458 A CN110162458 A CN 110162458A CN 201910298384 A CN201910298384 A CN 201910298384A CN 110162458 A CN110162458 A CN 110162458A
- Authority
- CN
- China
- Prior art keywords
- business
- test data
- data
- constructing
- operating system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 317
- 238000000034 method Methods 0.000 title claims abstract description 125
- 238000010276 construction Methods 0.000 claims abstract description 65
- GOLXNESZZPUPJE-UHFFFAOYSA-N spiromesifen Chemical compound CC1=CC(C)=CC(C)=C1C(C(O1)=O)=C(OC(=O)CC(C)(C)C)C11CCCC1 GOLXNESZZPUPJE-UHFFFAOYSA-N 0.000 claims description 5
- 238000005516 engineering process Methods 0.000 abstract description 2
- 238000011017 operating method Methods 0.000 description 16
- 230000005540 biological transmission Effects 0.000 description 10
- 241001269238 Data Species 0.000 description 8
- 238000010586 diagram Methods 0.000 description 5
- 238000004891 communication Methods 0.000 description 4
- 238000007726 management method Methods 0.000 description 4
- 238000012545 processing Methods 0.000 description 4
- 230000006870 function Effects 0.000 description 3
- 230000002159 abnormal effect Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 2
- 230000006399 behavior Effects 0.000 description 2
- 238000013523 data management Methods 0.000 description 2
- 239000004973 liquid crystal related substance Substances 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000009897 systematic effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/36—Preventing errors by testing or debugging software
- G06F11/3668—Software testing
- G06F11/3672—Test management
- G06F11/3684—Test management for test design, e.g. generating new test cases
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/36—Preventing errors by testing or debugging software
- G06F11/3668—Software testing
- G06F11/3672—Test management
- G06F11/3688—Test management for test execution, e.g. scheduling of test suites
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/02—Banking, e.g. interest calculation or account maintenance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/04—Trading; Exchange, e.g. stocks, commodities, derivatives or currency exchange
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- General Physics & Mathematics (AREA)
- Development Economics (AREA)
- Technology Law (AREA)
- Strategic Management (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Economics (AREA)
- Computer Hardware Design (AREA)
- Quality & Reliability (AREA)
- General Engineering & Computer Science (AREA)
- Debugging And Monitoring (AREA)
Abstract
The present invention relates to the field of test technology, disclose a kind of test data building method, this method comprises: obtaining the demand information of construction test data;Obtain the business scenario of construction test data;Obtain the data pass order between the multiple systems and multiple systems that business scenario is related to;The first operating system, the second operating system and third operating system are identified from multiple systems;Information operation, which is executed, according to demand executes the first execution program of the first business operation in the first operating system, obtain the first output data, the second execution program that the second operating system executes the second business operation is operated according to the first output data, obtain the second output data, the third execution program that third operating system executes third business operation is operated according to the second output data, obtains test data.The present invention also proposes a kind of test data constructing apparatus and a kind of computer readable storage medium.The construction efficiency of test data can be improved in the present invention.
Description
Technical field
The present invention relates to the field of test technology more particularly to a kind of test data building methods, device and computer-readable
Storage medium.
Background technique
In existing software test procedure, when tested test system is related to multiple systems, need to be learned by tester
Practise the systematic operation flow of institute, and then data constructed by tester, in this mode tester's learning cycle it is longer and
May be not accurate enough, thus inefficient in test data construction.
Summary of the invention
The present invention provides a kind of test data building method, device and computer readable storage medium, main purpose and exists
In the construction efficiency for improving test data.
To achieve the above object, the present invention also provides a kind of test data building methods, this method comprises:
Obtain the demand information of construction test data;
The business scenario for constructing the test data is obtained according to the demand information;
From being obtained in business scene database between the multiple systems and the multiple system that the business scenario is related to
Data pass order;
The first operating system, are identified from the multiple system according to the data pass order between the multiple system
Two operating systems and third operating system;
The first business operation executed in first operating system is obtained according to the business scenario, in second fortune
The second business operation that row system executes, in the third business operation that the third operating system executes;
Execute first business operation according to demand information operation first executes program, obtains the first output number
According to, first output data is transferred to second operating system, according to first output data operation execute described in
The second of second business operation executes program, obtains the second output data, second output data is transferred to the third
Program is run, program is executed according to the third that second output data operation executes the third business operation, is obtained described
Test data.
Optionally, the method also includes:
When obtaining first output data, first output data is saved, according to first business operation
Proportion calculates the testing progress for constructing the test data in the business scenario;
When obtaining first Data Data and the second output data, by first output data and described
Two output datas save, institute's accounting in the business scenario according to first business operation and second business operation
Example calculates the testing progress for constructing the test data.
Optionally, the method also includes:
Obtain multiple business realizing processes that target service scene and the target service scene include;
Obtain the execution frequency and significance level of each business realizing process in the multiple business realizing process;
According in the target service scene and the multiple business realizing process execute frequency be greater than predeterminated frequency and/
Or the business realizing process that significance level is greater than default significance level in the multiple business realizing process establishes the business field
Scape database.
Optionally, the test data is the test data for bank transaction, described to be obtained employment according to the demand information
The business scenario of the acquisition construction test data includes: in business scene database
Judge whether the test data is frequency of use is greater than default frequency of use during bank transaction data;
And/or
Judge whether the test data is the data for constructing difficulty and being greater than pre-set configuration difficulty;
If the test data is greater than the data of default frequency of use for frequency of use during bank transaction, according to described
Demand information obtains the business scenario for constructing the test data from business scene database;
If the test data is the data for constructing difficulty and being greater than pre-set configuration difficulty, according to the demand information from business
The business scenario for constructing the test data is obtained in scene database.
Optionally, the method also includes:
Receive the acquisition instruction for obtaining the test data;
Judge whether the sender of the acquisition instruction is the input side for inputting the demand information;
If the sender of the acquisition instruction is the input side for inputting the demand information, allow to obtain the test number
According to;
If the sender of the acquisition instruction is not the input side for inputting the demand information, forbid obtaining the test number
According to.
In addition, to achieve the above object, the present invention also provides a kind of test data constructing apparatus, which includes memory
And processor, the test data constructor that can be run on the processor, the test number are stored in the memory
Following steps are realized when being executed according to constructor by the processor:
Obtain the demand information of construction test data;
The business scenario for constructing the test data is obtained according to the demand information;
From being obtained in business scene database between the multiple systems and the multiple system that the business scenario is related to
Data pass order;
The first operating system, are identified from the multiple system according to the data pass order between the multiple system
Two operating systems and third operating system;
The first business operation executed in first operating system is obtained according to the business scenario, in second fortune
The second business operation that row system executes, in the third business operation that the third operating system executes;
Execute first business operation according to demand information operation first executes program, obtains the first output number
According to, first output data is transferred to second operating system, according to first output data operation execute described in
The second of second business operation executes program, obtains the second output data, second output data is transferred to the third
Program is run, program is executed according to the third that second output data operation executes the third business operation, is obtained described
Test data.
Optionally, the test data constructor can be executed by the processor, also realization following steps:
When obtaining first output data, first output data is saved, according to first business operation
Proportion calculates the testing progress for constructing the test data in the business scenario;
When obtaining first Data Data and the second output data, by first output data and described
Two output datas save, institute's accounting in the business scenario according to first business operation and second business operation
Example calculates the testing progress for constructing the test data.
Optionally, the test data constructor can be executed by the processor, also realization following steps:
Obtain multiple business realizing processes that target service scene and the target service scene include;
Obtain the execution frequency and significance level of each business realizing process in the multiple business realizing process;
According in the target service scene and the multiple business realizing process execute frequency be greater than predeterminated frequency and/
Or the business realizing process that significance level is greater than default significance level in the multiple business realizing process establishes the business field
Scape database.
Optionally, the test data is the test data for bank transaction, described to be obtained employment according to the demand information
The business scenario of the acquisition construction test data includes: in business scene database
Judge whether the test data is frequency of use is greater than default frequency of use during bank transaction data;
And/or
Judge whether the test data is the data for constructing difficulty and being greater than pre-set configuration difficulty;
If the test data is greater than the data of default frequency of use for frequency of use during bank transaction, according to described
Demand information obtains the business scenario for constructing the test data from business scene database;
If the test data is the data for constructing difficulty and being greater than pre-set configuration difficulty, according to the demand information from business
The business scenario for constructing the test data is obtained in scene database.
Optionally, the test data constructor can be executed by the processor, also realization following steps:
Receive the acquisition instruction for obtaining the test data;
Judge whether the sender of the acquisition instruction is the input side for inputting the demand information;
If the sender of the acquisition instruction is the input side for inputting the demand information, allow to obtain the test number
According to;
If the sender of the acquisition instruction is not the input side for inputting the demand information, forbid obtaining the test number
According to.
In addition, to achieve the above object, it is described computer-readable the present invention also provides a kind of computer readable storage medium
Test data constructor is stored on storage medium, the test data constructor can be held by one or more processor
Row, the step of to realize test data building method as described above.
Test data building method, device and computer readable storage medium proposed by the present invention obtain construction test number
According to demand information;The business scenario for constructing the test data is obtained according to the demand information;From business scene database
The middle data pass order obtained between the multiple systems and the multiple system that the business scenario is related to;According to described more
Data pass order between a system identifies the first operating system, the second operating system and third from the multiple system
Operating system;The first business operation executed in first operating system is obtained according to the business scenario, described second
The second business operation that operating system executes, in the third business operation that the third operating system executes;According to the demand
Information operation executes the first execution program of first business operation, obtains the first output data, by the first output number
According to second operating system is transferred to, the second of second business operation is executed according to first output data operation and is held
Line program obtains the second output data, and second output data is transferred to the third and runs program, according to described second
The third that output data operation executes the third business operation executes program, obtains the test data.Without tester
It is familiar with each system, it will be able to which maloperation when being rapidly performed by test data construction, while avoiding manual operation improves
The efficiency of test data construction.
Detailed description of the invention
Fig. 1 is the flow diagram for the test data building method that one embodiment of the invention provides;
Fig. 2 is the schematic diagram of internal structure for the test data constructing apparatus that one embodiment of the invention provides;
The module signal of test data constructor in the test data constructing apparatus that Fig. 3 provides for one embodiment of the invention
Figure.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
The present invention provides a kind of test data building method.It is the test that one embodiment of the invention provides shown in referring to Fig.1
The flow diagram of data configuration method.This method can be executed by an electronic device.
In the present embodiment, test data building method includes:
Step S10 obtains the demand information of construction test data.
The demand information is the relevant information for constructing test data.The demand information can be user's input.
The demand information may include the field of input data, the test data of construction.For example, the test data of construction
Field be withdrawal transaction number, input data be user input type of transaction, business assistant director, handle item.
The demand information can also include the field of the test data of construction and construct the corresponding industry of the test data
The information (for example, number of the title of business scenario or business scenario) for scene of being engaged in.
Step S20 obtains the business scenario for constructing the test data according to the demand information.
In the present embodiment, the business scenario is the business scenario for constructing test data.
In the present embodiment, the business scenario for obtaining construction test data includes the identification information for obtaining construction test data
(title of such as business scenario or the number of business scenario).
In a kind of possible embodiment, the business scenario of construction test data is obtained from demand information.
In a kind of possible embodiment, the business field of construction test data can also be obtained from business scene database
Scape.
For example, inputting number if the field that the demand information got is the test data of construction is withdrawal transaction number
According to the type of transaction inputted for user, business assistant director, item is handled, then obtains according to type of transaction, business assistant director, handles item
Construct the business scenario of withdrawal transaction number.
Optionally, in an alternative embodiment of the invention, the test data is the test data for bank transaction, described
It is obtained from business scene database according to the demand information and constructs the business scenario of the test data and include:
Judge whether the test data is frequency of use is greater than default frequency of use during bank transaction data;
And/or
Judge whether the test data is the data for constructing difficulty and being greater than pre-set configuration difficulty;
If the test data is greater than the data of default frequency of use for frequency of use during bank transaction, according to described
Demand information obtains the business scenario for constructing the test data from business scene database;
If the test data is the data for constructing difficulty and being greater than pre-set configuration difficulty, according to the demand information from business
The business scenario for constructing the test data is obtained in scene database.
In the present embodiment, the bank data refers to relevant to banking transaction data (such as bank card is transferred accounts
Data) or nontransaction data relevant to banking (such as bank card inquiry into balance data).
Wherein, the default frequency of use can need to set according to.
In one embodiment, it can obtain and count from real-time service system (such as bank transaction system) in advance
To different test datas in practical business (i.e. bank transaction during) frequency of use.Then getting a certain test number
According to later, obtaining frequency of use of test data during bank transaction.
The pre-set configuration difficulty is preset according to needing.For example, the construction difficulty of test data is second level, institute
Stating pre-set configuration difficulty is three-level, wherein the construction difficulty of the data of second level is greater than the construction difficulty of the data of three-level.The structure
The rank for making difficulty and can construct involved by the test data according to the quantity for constructing system involved in the test data
Business operation the step of determine.
In one embodiment, it carries out different construction difficulty gradings in advance for different test datas, is then obtaining
To after a certain test data, the construction difficulty level of the test data is obtained.
Through this embodiment, the property of can choose constructs the test data for the condition that meets.
Step S30 obtains multiple systems that the business scenario is related to and the multiple from business scene database
Data pass order between system.
It include the identification information of business scenario, the description of business scenario in the present embodiment, in the business scenario database
Information tests the operation information being related to and system information that business scenario is related to.
In an alternative embodiment, it after getting the identification information of the business scenario, obtains in the business scenario
Multiple systems that the business for including is related to.
In a kind of alternative embodiment, the multiple system includes: customer information system, product information system, information inquiry
System, information early warning system, system management system can also include several subsystems in this each system.
Wherein, customer information system is handed over for the essential information of managing customer and the additional information of client, record client
Detail, customer service inquiry, data management of business easy to operate etc..It can risk, hobby, habit to client by customer information system
The information of used, loyal degree etc. is assessed, in customer information system can also operation service to different clients into
The operations such as row statistics, analysis, purpose data classifying.
The product information system is used for the information of product and handling for various products of bank.For example, withdrawal, loan
The business handlings such as money, credit card Online Payment, financing sale, remittance, home currency and foreign currency clearing.
The information query system is used to inquire all kinds of business of bank, product information, report messages according to permission,
For example, information and all kinds of clients and the information of employee etc. of the multiple product that inquiry bank includes.
(such as no to client there are potential transaction risk or account wind for being reminded client for the information early warning system
It is reminded danger).Such as abnormal, credit expires to refund etc. and carries out the prompting of short message, mail to the account of client.
The system management system is for managing customer, maintenance related data, system documentation's backup.
Data pass order between the multiple system can be obtained according to the description information of the business scenario, or
It is obtained according to the operation flow of the business scenario.
Optionally, in an alternative embodiment of the invention, business scenario database, the side can be established by following steps
Method further include:
Obtain multiple business realizing processes that target service scene and the target service scene include;
Obtain the execution frequency and significance level of each business realizing process in the multiple business realizing process;
According in the target service scene and the multiple business realizing process execute frequency be greater than predeterminated frequency and/
Or the business realizing process that significance level is greater than default significance level in the multiple business realizing process establishes the business field
Scape database.
In the present embodiment, the quantity of the target service scene is multiple industry multiple, that acquisition target service scene includes
Implementation process of being engaged in includes obtaining multiple business realizing processes of each target service scene.
In the present embodiment, the target service scene can be banking scene.In other embodiments, the target
Business scenario can also be for on-line payment business scenario, online medical profession scene etc., and obtaining which target service scene can be with
It sets according to actual needs, after obtaining target service scene, business scenario database can be established according to target service scene,
And then carry out the construction of test data.
The predeterminated frequency and default important procedure are set as needed.
It is greater than predeterminated frequency and/or multiple industry according to frequency is executed in target service scene and multiple business realizing processes
It includes: to choose that the business realizing process that significance level is greater than default significance level in business implementation process, which establishes business scenario database,
Frequency is executed in multiple business realizing processes of target service scene is greater than weight in predeterminated frequency and/or multiple business realizing processes
Wanting degree to be greater than the business realizing process of default significance level is business realizing process corresponding with the target service scene, will
The target service scene and business realizing process corresponding with the target service scene are saved to business scenario database.
In the present embodiment, if a business scenario has multiple business realizing processes, multiple business realizing processes are ok
The same result data (for example, trading card number) is obtained, then chooses and executes frequency (i.e. actual motion frequency in actual application
Rate) it is greater than the business realizing process of predeterminated frequency, thus when constructing test data, as far as possible from true operation flow angle
The building of test data is carried out, so that the process of the test data of building is more in line with actual demand.
Meanwhile if a business scenario has multiple business realizing processes, multiple business realizing processes can obtain same
A result data (for example, trading card number) then chooses the industry that significance level in actual application is greater than default significance level
Business implementation process, to carry out the building of test data by important operation flow as far as possible when constructing test data, make
The process for the test data that must be constructed is more in line with actual demand.
Step S40 identifies the first fortune according to the data pass order between the multiple system from the multiple system
Row system, the second operating system and third operating system.
The first operating system, are identified from the multiple system according to the data pass order between the multiple system
Two operating systems and third operating system are to identify that operation order is first the first operating system from the multiple system,
Operating system and operation order that operation order is second are the operating system of third.
In the present embodiment, first operating system and second operating system are different system, described first
System and the third operating system can be identical or different system, second operating system and the third
Operating system is different system, also, the quantity of the first operating system, the second operating system and third operating system is all
It can be one or more.
Step S50 obtains the first business operation executed in first operating system according to the business scenario, in institute
The second business operation for stating the execution of the second operating system, in the third business operation that the third operating system executes.
After getting business scenario, the business operation in each operating system that the business scenario includes is obtained, i.e.,
Which kind of operation acquisition can execute in each operating system when constructing the test data.
First business operation may include one or more operating procedures, likewise, second business operation can
To include one or more operating procedures, the third business operation may include one or more operating procedures.
Step S60, execute first business operation according to demand information operation first execute program, obtain the
First output data is transferred to second operating system by one output data, is run according to first output data
Execute second business operation second executes program, obtains the second output data, second output data is transferred to
The third runs program, executes program according to the third that second output data operation executes the third business operation,
Obtain the test data.
The operation of information according to demand executes the first of the first business operation and executes program, obtains the first output data packet
Include: from demand information obtain initial data (such as user input type of transaction, subscriber-coded, business assistant director and working
Item), the first execution program for executing the first business operation is run according to the initial data, obtains the first output data.
In the present embodiment, the data transmission interface between each operating system can be pre-defined, and then passes through the number
The transmission of data is carried out according to coffret.When constructing data transmission interface, the format and transmission method (example of data transmission are defined
Such as, data are transmitted by post method).
Further, in an alternative embodiment of the invention, the method also includes:
When obtaining first output data, first output data is saved, according to first business operation
Proportion calculates the testing progress for constructing the test data in the business scenario;
When obtaining first Data Data and the second output data, by first output data and described
Two output datas save, institute's accounting in the business scenario according to first business operation and second business operation
Example calculates the testing progress for constructing the test data.
In the present embodiment, the first output data is the output data obtained after the first operating system is run, the second output
Data are the output data obtained after the second operating system is run.
By saving the first output data, the intermediate data generated in test data construction process can be saved,
Be conducive to the construction process of tester's tracking and testing data, it, can also be according to centre if mistake occurs in the test data of construction
Data come further check building test data during be which link there is a problem.
The testing progress that proportion calculates construction test data in business scenario according to the first business operation includes: to obtain
The total quantity for the operating procedure that first quantity of the operating procedure for taking the first business operation to include and the business scenario include,
The ratio for calculating first quantity and the total quantity determines that the ratio is the testing progress of the test data.
According to the first business operation and the second business operation, proportion calculates construction test data in business scenario
Testing progress include: the first quantity for obtaining the first business operation operating procedure for including, obtain the second business operation and include
Operating procedure the second quantity, and obtain the total quantity for the operating procedure that the business scenario includes, calculate described first
The ratio of the sum of quantity and second quantity with the total quantity determines that the ratio is the testing progress of the test data.
Through this embodiment, it can be accurately obtained testing progress when construction test data, be conducive to tester couple
The understanding of testing progress.
The test data building method that the present embodiment proposes obtains the demand information of construction test data;According to the need
Acquisition of information is asked to construct the business scenario of the test data;Obtain what the business scenario was related to from business scene database
Data pass order between multiple systems and the multiple system;According to the data pass order between the multiple system
The first operating system, the second operating system and third operating system are identified from the multiple system;According to the business field
Scape obtains the first business operation executed in first operating system, in the second business behaviour that second operating system executes
Make, in the third business operation that the third operating system executes;First business is executed according to demand information operation
The first of operation executes program, obtains the first output data, first output data is transferred to second operating system,
Execute second business operation according to first output data operation second executes program, obtains the second output data,
Second output data is transferred to the third operation program, the third is executed according to second output data operation
The third of business operation executes program, obtains the test data.Each system is familiar with without tester, it will be able to quickly
Maloperation when carrying out test data construction, while avoiding manual operation improves the efficiency of test data construction.
Further, in an alternative embodiment of the invention, after obtaining the test data, the method also includes:
Receive the acquisition instruction for obtaining the test data;
Judge whether the sender of the acquisition instruction is the input side for inputting the demand information;
If the sender of the acquisition instruction is the input side for inputting the demand information, allow to obtain the test number
According to;
If the sender of the acquisition instruction is not the input side for inputting the demand information, forbid obtaining the test number
According to.
In the present embodiment, the sender of the acquisition instruction is the acquisition side for obtaining the test data.If acquisition instruction
Sender be input demand information input side, indicate obtain the test data personnel and construct the test data personnel
For same people;If the sender of acquisition instruction is not the input side for inputting demand information, the personnel for obtaining the test data are indicated
It is different people with the personnel for constructing the test data.
In the present embodiment, authority managing and controlling can be carried out to constructed test data, avoids the use of test data mixed
Disorderly.
The present invention also provides a kind of test data constructing apparatus.It is the survey that one embodiment of the invention provides referring to shown in Fig. 2
Try the schematic diagram of internal structure of data structuring apparatus.
In the present embodiment, test data constructing apparatus 1 can be PC (Personal Computer, PC),
It can be the terminal devices such as smart phone, tablet computer, portable computer.The test data constructing apparatus 1 includes at least storage
Device 11, processor 12, network interface 13 and communication bus 14.
Wherein, memory 11 include at least a type of readable storage medium storing program for executing, the readable storage medium storing program for executing include flash memory,
Hard disk, multimedia card, card-type memory (for example, SD or DX memory etc.), magnetic storage, disk, CD etc..Memory 11
It can be the internal storage unit of test data constructing apparatus 1 in some embodiments, such as the test data constructing apparatus 1
Hard disk.Memory 11 is also possible to the External memory equipment of test data constructing apparatus 1 in further embodiments, such as tests
The plug-in type hard disk being equipped on data structuring apparatus 1, intelligent memory card (Smart Media Card, SMC), secure digital
(Secure Digital, SD) card, flash card (Flash Card) etc..Further, memory 11 can also both include test
The internal storage unit of data structuring apparatus 1 also includes External memory equipment.Memory 11 can be not only used for storage and be installed on
Application software and Various types of data, such as the code of test data constructor 01 of test data constructing apparatus 1 etc. can also be used
In temporarily storing the data that has exported or will export.
Processor 12 can be in some embodiments a central processing unit (Central Processing Unit,
CPU), controller, microcontroller, microprocessor or other data processing chips, the program for being stored in run memory 11
Code or processing data, such as execute test data constructor 01 etc..
Network interface 13 optionally may include standard wireline interface and wireless interface (such as WI-FI interface), be commonly used in
Communication connection is established between the device 1 and other electronic equipments.
Communication bus 14 is for realizing the connection communication between these components.
Optionally, which can also include user interface, and user interface may include display (Display), input
Unit such as keyboard (Keyboard), optional user interface can also include standard wireline interface and wireless interface.It is optional
Ground, in some embodiments, display can be light-emitting diode display, liquid crystal display, touch-control liquid crystal display and OLED
(Organic Light-Emitting Diode, Organic Light Emitting Diode) touches device etc..Wherein, display can also be appropriate
Referred to as display screen or display unit, for being shown in the information handled in test data constructing apparatus 1 and for showing visually
The user interface of change.
Fig. 2 illustrates only the test data constructing apparatus 1 with component 11-14 and test data constructor 01, this
Field technical staff it is understood that Fig. 2 shows structure do not constitute the restriction to test data constructing apparatus 1, can be with
Including perhaps combining certain components or different component layouts than illustrating less perhaps more components.
In 1 embodiment of device shown in Fig. 2, test data constructor 01 is stored in memory 11;Processor 12
Following steps are realized when executing the test data constructor 01 stored in memory 11:
Obtain the demand information of construction test data.
The demand information is the relevant information for constructing test data.The demand information can be user's input.
The demand information may include the field of input data, the test data of construction.For example, the test data of construction
Field be withdrawal transaction number, input data be user input type of transaction, business assistant director, handle item.
The demand information can also include the field of the test data of construction and construct the corresponding industry of the test data
The information (for example, number of the title of business scenario or business scenario) for scene of being engaged in.
The business scenario for constructing the test data is obtained according to the demand information.
In the present embodiment, the business scenario is the business scenario for constructing test data.
In the present embodiment, the business scenario for obtaining construction test data includes the identification information for obtaining construction test data
(title of such as business scenario or the number of business scenario).
In a kind of possible embodiment, the business scenario of construction test data is obtained from demand information.
In a kind of possible embodiment, the business field of construction test data can also be obtained from business scene database
Scape.
For example, inputting number if the field that the demand information got is the test data of construction is withdrawal transaction number
According to the type of transaction inputted for user, business assistant director, item is handled, then obtains according to type of transaction, business assistant director, handles item
Construct the business scenario of withdrawal transaction number.
Optionally, in an alternative embodiment of the invention, the test data is the test data for bank transaction, described
It is obtained from business scene database according to the demand information and constructs the business scenario of the test data and include:
Judge whether the test data is frequency of use is greater than default frequency of use during bank transaction data;
And/or
Judge whether the test data is the data for constructing difficulty and being greater than pre-set configuration difficulty;
If the test data is greater than the data of default frequency of use for frequency of use during bank transaction, according to described
Demand information obtains the business scenario for constructing the test data from business scene database;
If the test data is the data for constructing difficulty and being greater than pre-set configuration difficulty, according to the demand information from business
The business scenario for constructing the test data is obtained in scene database.
In the present embodiment, the bank data refers to relevant to banking transaction data (such as bank card is transferred accounts
Data) or nontransaction data relevant to banking (such as bank card inquiry into balance data).
Wherein, the default frequency of use can need to set according to.
In one embodiment, it can obtain and count from real-time service system (such as bank transaction system) in advance
To different test datas in practical business (i.e. bank transaction during) frequency of use.Then getting a certain test number
According to later, obtaining frequency of use of test data during bank transaction.
The pre-set configuration difficulty is preset according to needing.For example, the construction difficulty of test data is second level, institute
Stating pre-set configuration difficulty is three-level, wherein the construction difficulty of the data of second level is greater than the construction difficulty of the data of three-level.The structure
The rank for making difficulty and can construct involved by the test data according to the quantity for constructing system involved in the test data
Business operation the step of determine.
In one embodiment, it carries out different construction difficulty gradings in advance for different test datas, is then obtaining
To after a certain test data, the construction difficulty level of the test data is obtained.
Through this embodiment, the property of can choose constructs the test data for the condition that meets.
From being obtained in business scene database between the multiple systems and the multiple system that the business scenario is related to
Data pass order.
It include the identification information of business scenario, the description of business scenario in the present embodiment, in the business scenario database
Information tests the operation information being related to and system information that business scenario is related to.
In an alternative embodiment, it after getting the identification information of the business scenario, obtains in the business scenario
Multiple systems that the business for including is related to.
In a kind of alternative embodiment, the multiple system includes: customer information system, product information system, information inquiry
System, information early warning system, system management system can also include several subsystems in this each system.
Wherein, customer information system is handed over for the essential information of managing customer and the additional information of client, record client
Detail, customer service inquiry, data management of business easy to operate etc..It can risk, hobby, habit to client by customer information system
The information of used, loyal degree etc. is assessed, in customer information system can also operation service to different clients into
The operations such as row statistics, analysis, purpose data classifying.
The product information system is used for the information of product and handling for various products of bank.For example, withdrawal, loan
The business handlings such as money, credit card Online Payment, financing sale, remittance, home currency and foreign currency clearing.
The information query system is used to inquire all kinds of business of bank, product information, report messages according to permission,
For example, information and all kinds of clients and the information of employee etc. of the multiple product that inquiry bank includes.
(such as no to client there are potential transaction risk or account wind for being reminded client for the information early warning system
It is reminded danger).Such as abnormal, credit expires to refund etc. and carries out the prompting of short message, mail to the account of client.
The system management system is for managing customer, maintenance related data, system documentation's backup.
Data pass order between the multiple system can be obtained according to the description information of the business scenario, or
It is obtained according to the operation flow of the business scenario.
Optionally, in an alternative embodiment of the invention, business scenario database, the survey can be established by following steps
Examination data configuration program can be executed by the processor, also realization following steps:
Obtain multiple business realizing processes that target service scene and the target service scene include;
Obtain the execution frequency and significance level of each business realizing process in the multiple business realizing process;
According in the target service scene and the multiple business realizing process execute frequency be greater than predeterminated frequency and/
Or the business realizing process that significance level is greater than default significance level in the multiple business realizing process establishes the business field
Scape database.
In the present embodiment, the quantity of the target service scene is multiple industry multiple, that acquisition target service scene includes
Implementation process of being engaged in includes obtaining multiple business realizing processes of each target service scene.
In the present embodiment, the target service scene can be banking scene.In other embodiments, the target
Business scenario can also be for on-line payment business scenario, online medical profession scene etc., and obtaining which target service scene can be with
It sets according to actual needs, after obtaining target service scene, business scenario database can be established according to target service scene,
And then carry out the construction of test data.
The predeterminated frequency and default important procedure are set as needed.
It is greater than predeterminated frequency and/or multiple industry according to frequency is executed in target service scene and multiple business realizing processes
It includes: to choose that the business realizing process that significance level is greater than default significance level in business implementation process, which establishes business scenario database,
Frequency is executed in multiple business realizing processes of target service scene is greater than weight in predeterminated frequency and/or multiple business realizing processes
Wanting degree to be greater than the business realizing process of default significance level is business realizing process corresponding with the target service scene, will
The target service scene and business realizing process corresponding with the target service scene are saved to business scenario database.
In the present embodiment, if a business scenario has multiple business realizing processes, multiple business realizing processes are ok
The same result data (for example, trading card number) is obtained, then chooses and executes frequency (i.e. actual motion frequency in actual application
Rate) it is greater than the business realizing process of predeterminated frequency, thus when constructing test data, as far as possible from true operation flow angle
The building of test data is carried out, so that the process of the test data of building is more in line with actual demand.
Meanwhile if a business scenario has multiple business realizing processes, multiple business realizing processes can obtain same
A result data (for example, trading card number) then chooses the industry that significance level in actual application is greater than default significance level
Business implementation process, to carry out the building of test data by important operation flow as far as possible when constructing test data, make
The process for the test data that must be constructed is more in line with actual demand.
The first operating system, are identified from the multiple system according to the data pass order between the multiple system
Two operating systems and third operating system.
The first operating system, are identified from the multiple system according to the data pass order between the multiple system
Two operating systems and third operating system are to identify that operation order is first the first operating system from the multiple system,
Operating system and operation order that operation order is second are the operating system of third.
In the present embodiment, first operating system and second operating system are different system, described first
System and the third operating system can be identical or different system, second operating system and the third
Operating system is different system, also, the quantity of the first operating system, the second operating system and third operating system is all
It can be one or more.
The first business operation executed in first operating system is obtained according to the business scenario, in second fortune
The second business operation that row system executes, in the third business operation that the third operating system executes.
After getting business scenario, the business operation in each operating system that the business scenario includes is obtained, i.e.,
Which kind of operation acquisition can execute in each operating system when constructing the test data.
First business operation may include one or more operating procedures, likewise, second business operation can
To include one or more operating procedures, the third business operation may include one or more operating procedures.
Execute first business operation according to demand information operation first executes program, obtains the first output number
According to, first output data is transferred to second operating system, according to first output data operation execute described in
The second of second business operation executes program, obtains the second output data, second output data is transferred to the third
Program is run, program is executed according to the third that second output data operation executes the third business operation, is obtained described
Test data.
The operation of information according to demand executes the first of the first business operation and executes program, obtains the first output data packet
Include: from demand information obtain initial data (such as user input type of transaction, subscriber-coded, business assistant director and working
Item), the first execution program for executing the first business operation is run according to the initial data, obtains the first output data.
In the present embodiment, the data transmission interface between each operating system can be pre-defined, and then passes through the number
The transmission of data is carried out according to coffret.When constructing data transmission interface, the format and transmission method (example of data transmission are defined
Such as, data are transmitted by post method).
Further, in an alternative embodiment of the invention, the test data constructor can be executed by the processor,
Also realize following steps:
When obtaining first output data, first output data is saved, according to first business operation
Proportion calculates the testing progress for constructing the test data in the business scenario;
When obtaining first Data Data and the second output data, by first output data and described
Two output datas save, institute's accounting in the business scenario according to first business operation and second business operation
Example calculates the testing progress for constructing the test data.
In the present embodiment, the first output data is the output data obtained after the first operating system is run, the second output
Data are the output data obtained after the second operating system is run.
By saving the first output data, the intermediate data generated in test data construction process can be saved,
Be conducive to the construction process of tester's tracking and testing data, it, can also be according to centre if mistake occurs in the test data of construction
Data come further check building test data during be which link there is a problem.
The testing progress that proportion calculates construction test data in business scenario according to the first business operation includes: to obtain
The total quantity for the operating procedure that first quantity of the operating procedure for taking the first business operation to include and the business scenario include,
The ratio for calculating first quantity and the total quantity determines that the ratio is the testing progress of the test data.
According to the first business operation and the second business operation, proportion calculates construction test data in business scenario
Testing progress include: the first quantity for obtaining the first business operation operating procedure for including, obtain the second business operation and include
Operating procedure the second quantity, and obtain the total quantity for the operating procedure that the business scenario includes, calculate described first
The ratio of the sum of quantity and second quantity with the total quantity determines that the ratio is the testing progress of the test data.
Through this embodiment, it can be accurately obtained testing progress when construction test data, be conducive to tester couple
The understanding of testing progress.
The test data constructing apparatus that the present embodiment proposes obtains the demand information of construction test data;According to the need
Acquisition of information is asked to construct the business scenario of the test data;Obtain what the business scenario was related to from business scene database
Data pass order between multiple systems and the multiple system;According to the data pass order between the multiple system
The first operating system, the second operating system and third operating system are identified from the multiple system;According to the business field
Scape obtains the first business operation executed in first operating system, in the second business behaviour that second operating system executes
Make, in the third business operation that the third operating system executes;First business is executed according to demand information operation
The first of operation executes program, obtains the first output data, first output data is transferred to second operating system,
Execute second business operation according to first output data operation second executes program, obtains the second output data,
Second output data is transferred to the third operation program, the third is executed according to second output data operation
The third of business operation executes program, obtains the test data.Each system is familiar with without tester, it will be able to quickly
Maloperation when carrying out test data construction, while avoiding manual operation improves the efficiency of test data construction.
Further, in an alternative embodiment of the invention, after obtaining the test data, the test data construction
Program can be executed by the processor, also realization following steps:
Receive the acquisition instruction for obtaining the test data;
Judge whether the sender of the acquisition instruction is the input side for inputting the demand information;
If the sender of the acquisition instruction is the input side for inputting the demand information, allow to obtain the test number
According to;
If the sender of the acquisition instruction is not the input side for inputting the demand information, forbid obtaining the test number
According to.
In the present embodiment, the sender of the acquisition instruction is the acquisition side for obtaining the test data.If acquisition instruction
Sender be input demand information input side, indicate obtain the test data personnel and construct the test data personnel
For same people;If the sender of acquisition instruction is not the input side for inputting demand information, the personnel for obtaining the test data are indicated
It is different people with the personnel for constructing the test data.
In the present embodiment, authority managing and controlling can be carried out to constructed test data, avoids the use of test data mixed
Disorderly.
Optionally, in other embodiments, test data constructor can also be divided into one or more module,
One or more module is stored in memory 11, and by one or more processors (the present embodiment is processor 12) institute
It executes to complete the present invention, the so-called module of the present invention is the series of computation machine program instruction for referring to complete specific function
Section, for describing implementation procedure of the test data constructor in test data constructing apparatus.
It is the test data constructor in one embodiment of test data constructing apparatus of the present invention for example, referring to shown in Fig. 3
Program module schematic diagram, in the embodiment, test data constructor can be divided into the first acquisition module 10, second obtain
Modulus block 20, third obtain module 30, identification module the 40, the 4th obtains module 50 and operation module 60, illustratively:
First acquisition module 10 is used for: obtaining the demand information of construction test data;
Second acquisition module 20 is used for: the business scenario for constructing the test data is obtained according to the demand information;
Third obtain module 30 be used for: obtained from business scene database multiple systems that the business scenario is related to
And the data pass order between the multiple system;
Identification module 40 is used for: being identified from the multiple system according to the data pass order between the multiple system
First operating system, the second operating system and third operating system;
4th acquisition module 50 is used for: the first industry executed in first operating system is obtained according to the business scenario
Business operation, in the second business operation that second operating system executes, in the third business that the third operating system executes
Operation;
Operation module 60 is used for: execute first business operation according to demand information operation first executes journey
Sequence obtains the first output data, and first output data is transferred to second operating system, according to first output
Data run executes the second execution program of second business operation, obtains the second output data, by the second output number
According to the third operation program is transferred to, held according to the third that second output data operation executes the third business operation
Line program obtains the test data.
Above-mentioned first, which obtains module 10, second, obtains module 20, third acquisition module 30, the acquisition of identification module the 40, the 4th
The program modules such as module 50 and operation module 60 are performed realized functions or operations step and above-described embodiment substantially phase
Together, details are not described herein.
In addition, the embodiment of the present invention also proposes a kind of computer readable storage medium, the computer readable storage medium
On be stored with test data constructor, the test data constructor can be executed by one or more processors, with realize
Following operation:
Obtain the demand information of construction test data;
The business scenario for constructing the test data is obtained according to the demand information;
From being obtained in business scene database between the multiple systems and the multiple system that the business scenario is related to
Data pass order;
The first operating system, are identified from the multiple system according to the data pass order between the multiple system
Two operating systems and third operating system;
The first business operation executed in first operating system is obtained according to the business scenario, in second fortune
The second business operation that row system executes, in the third business operation that the third operating system executes;
Execute first business operation according to demand information operation first executes program, obtains the first output number
According to, first output data is transferred to second operating system, according to first output data operation execute described in
The second of second business operation executes program, obtains the second output data, second output data is transferred to the third
Program is run, program is executed according to the third that second output data operation executes the third business operation, is obtained described
Test data.
Computer readable storage medium specific embodiment of the present invention and above-mentioned test data constructing apparatus and each reality of method
It is essentially identical to apply example, does not make tired state herein.
It should be noted that the serial number of the above embodiments of the invention is only for description, do not represent the advantages or disadvantages of the embodiments.And
The terms "include", "comprise" herein or any other variant thereof is intended to cover non-exclusive inclusion, so that packet
Process, device, article or the method for including a series of elements not only include those elements, but also including being not explicitly listed
Other element, or further include for this process, device, article or the intrinsic element of method.Do not limiting more
In the case where, the element that is limited by sentence "including a ...", it is not excluded that including process, device, the article of the element
Or there is also other identical elements in method.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side
Method can be realized by means of software and necessary general hardware platform, naturally it is also possible to by hardware, but in many cases
The former is more preferably embodiment.Based on this understanding, technical solution of the present invention substantially in other words does the prior art
The part contributed out can be embodied in the form of software products, which is stored in one as described above
In storage medium (such as ROM/RAM, magnetic disk, CD), including some instructions are used so that terminal device (it can be mobile phone,
Computer, server or network equipment etc.) execute method described in each embodiment of the present invention.
The above is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair
Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills
Art field, is included within the scope of the present invention.
Claims (10)
1. a kind of test data building method, which is characterized in that the described method includes:
Obtain the demand information of construction test data;
The business scenario for constructing the test data is obtained according to the demand information;
From the number obtained in business scene database between the multiple systems and the multiple system that the business scenario is related to
According to pass order;
The first operating system, the second fortune are identified from the multiple system according to the data pass order between the multiple system
Row system and third operating system;
The first business operation executed in first operating system is obtained according to the business scenario, in second operation system
The second business operation that system executes, in the third business operation that the third operating system executes;
Execute first business operation according to demand information operation first executes program, obtains the first output data,
First output data is transferred to second operating system, executes described second according to first output data operation
The second of business operation executes program, obtains the second output data, and second output data is transferred to the third and is run
Program executes program according to the third that second output data operation executes the third business operation, obtains the test
Data.
2. test data building method as described in claim 1, which is characterized in that the method also includes:
When obtaining first output data, first output data is saved, according to first business operation in institute
It states proportion in business scenario and calculates the testing progress for constructing the test data;
When obtaining first Data Data and the second output data, by first output data and described second defeated
Data save out, the proportion meter in the business scenario according to first business operation and second business operation
Calculate the testing progress for constructing the test data.
3. test data building method as described in claim 1, which is characterized in that the method also includes:
Obtain multiple business realizing processes that target service scene and the target service scene include;
Obtain the execution frequency and significance level of each business realizing process in the multiple business realizing process;
It is greater than predeterminated frequency and/or institute according to frequency is executed in the target service scene and the multiple business realizing process
It states significance level in multiple business realizing processes and is greater than the business realizing process of default significance level and establish the business scenario number
According to library.
4. test data building method as claimed any one in claims 1 to 3, which is characterized in that the test data is
It is described to obtain the construction test from business scene database according to the demand information for the test data of bank transaction
The business scenario of data includes:
Judge whether the test data is frequency of use is greater than default frequency of use during bank transaction data;And/or
Judge whether the test data is the data for constructing difficulty and being greater than pre-set configuration difficulty;
If the test data is greater than the data of default frequency of use for frequency of use during bank transaction, according to the demand
Information obtains the business scenario for constructing the test data from business scene database;
If the test data is the data for constructing difficulty and being greater than pre-set configuration difficulty, according to the demand information from business scenario
The business scenario for constructing the test data is obtained in database.
5. test data building method as claimed any one in claims 1 to 3, which is characterized in that the method also includes:
Receive the acquisition instruction for obtaining the test data;
Judge whether the sender of the acquisition instruction is the input side for inputting the demand information;
If the sender of the acquisition instruction is the input side for inputting the demand information, allow to obtain the test data;
If the sender of the acquisition instruction is not the input side for inputting the demand information, forbid obtaining the test data.
6. a kind of test data constructing apparatus, which is characterized in that described device includes memory and processor, on the memory
It is stored with the test data constructor that can be run on the processor, the test data constructor is by the processor
Following steps are realized when execution:
Obtain the demand information of construction test data;
The business scenario for constructing the test data is obtained according to the demand information;
From the number obtained in business scene database between the multiple systems and the multiple system that the business scenario is related to
According to pass order;
The first operating system, the second fortune are identified from the multiple system according to the data pass order between the multiple system
Row system and third operating system;
The first business operation executed in first operating system is obtained according to the business scenario, in second operation system
The second business operation that system executes, in the third business operation that the third operating system executes;
Execute first business operation according to demand information operation first executes program, obtains the first output data,
First output data is transferred to second operating system, executes described second according to first output data operation
The second of business operation executes program, obtains the second output data, and second output data is transferred to the third and is run
Program executes program according to the third that second output data operation executes the third business operation, obtains the test
Data.
7. test data constructing apparatus as claimed in claim 6, which is characterized in that the test data constructor can be by institute
State processor execution, also realization following steps:
When obtaining first output data, first output data is saved, according to first business operation in institute
It states proportion in business scenario and calculates the testing progress for constructing the test data;
When obtaining first Data Data and the second output data, by first output data and described second defeated
Data save out, the proportion meter in the business scenario according to first business operation and second business operation
Calculate the testing progress for constructing the test data.
8. test data constructing apparatus as claimed in claim 6, which is characterized in that the test data constructor can be by institute
State processor execution, also realization following steps:
Obtain multiple business realizing processes that target service scene and the target service scene include;
Obtain the execution frequency and significance level of each business realizing process in the multiple business realizing process;
It is greater than predeterminated frequency and/or institute according to frequency is executed in the target service scene and the multiple business realizing process
It states significance level in multiple business realizing processes and is greater than the business realizing process of default significance level and establish the business scenario number
According to library.
9. test data constructing apparatus as claimed in claim 6, which is characterized in that the test data is for bank transaction
Test data, it is described to obtain the business field for constructing the test data from business scene database according to the demand information
Scape includes:
Judge whether the test data is frequency of use is greater than default frequency of use during bank transaction data;And/or
Judge whether the test data is the data for constructing difficulty and being greater than pre-set configuration difficulty;
If the test data is greater than the data of default frequency of use for frequency of use during bank transaction, according to the demand
Information obtains the business scenario for constructing the test data from business scene database;
If the test data is the data for constructing difficulty and being greater than pre-set configuration difficulty, according to the demand information from business scenario
The business scenario for constructing the test data is obtained in database.
10. a kind of computer readable storage medium, which is characterized in that be stored with test number on the computer readable storage medium
According to constructor, the test data constructor can be executed by one or more processor, with realize as claim 1 to
Described in any one of 5 the step of test data building method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910298384.2A CN110162458A (en) | 2019-04-15 | 2019-04-15 | Test data building method, device and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910298384.2A CN110162458A (en) | 2019-04-15 | 2019-04-15 | Test data building method, device and storage medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110162458A true CN110162458A (en) | 2019-08-23 |
Family
ID=67639576
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910298384.2A Pending CN110162458A (en) | 2019-04-15 | 2019-04-15 | Test data building method, device and storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110162458A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111625467A (en) * | 2020-06-03 | 2020-09-04 | 深圳华锐金融技术股份有限公司 | Automatic testing method and device, computer equipment and storage medium |
CN112363951A (en) * | 2020-12-03 | 2021-02-12 | 四川长虹电器股份有限公司 | Test method for separation of test scene and test data |
CN112667513A (en) * | 2020-12-31 | 2021-04-16 | 长沙市到家悠享网络科技有限公司 | Test method, test device, test equipment and storage medium |
CN112835803A (en) * | 2021-02-23 | 2021-05-25 | 北京联创信安科技股份有限公司 | Tool generation method, test data construction method, device, equipment and medium |
CN113064829A (en) * | 2021-04-13 | 2021-07-02 | 上海浦东发展银行股份有限公司 | Test data life tree structure based on credit card core and data generation method |
CN113094279A (en) * | 2021-04-25 | 2021-07-09 | 深圳前海微众银行股份有限公司 | Test data construction method, device and system and computer readable storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150227452A1 (en) * | 2014-02-12 | 2015-08-13 | Wipro Limited | System and method for testing software applications |
US20170109269A1 (en) * | 2015-10-16 | 2017-04-20 | Successfactors, Inc. | Test data framework |
CN109189669A (en) * | 2018-08-03 | 2019-01-11 | 平安科技(深圳)有限公司 | Test method, electronic device and the readable storage medium storing program for executing of business scenario |
CN109471796A (en) * | 2018-10-16 | 2019-03-15 | 平安证券股份有限公司 | Interface test method, device, computer equipment and storage medium |
-
2019
- 2019-04-15 CN CN201910298384.2A patent/CN110162458A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150227452A1 (en) * | 2014-02-12 | 2015-08-13 | Wipro Limited | System and method for testing software applications |
US20170109269A1 (en) * | 2015-10-16 | 2017-04-20 | Successfactors, Inc. | Test data framework |
CN109189669A (en) * | 2018-08-03 | 2019-01-11 | 平安科技(深圳)有限公司 | Test method, electronic device and the readable storage medium storing program for executing of business scenario |
CN109471796A (en) * | 2018-10-16 | 2019-03-15 | 平安证券股份有限公司 | Interface test method, device, computer equipment and storage medium |
Non-Patent Citations (1)
Title |
---|
顾静秋;: "北斗导航卫星地面综合测试系统研究与设计", 计算机产品与流通, no. 08 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111625467A (en) * | 2020-06-03 | 2020-09-04 | 深圳华锐金融技术股份有限公司 | Automatic testing method and device, computer equipment and storage medium |
CN112363951A (en) * | 2020-12-03 | 2021-02-12 | 四川长虹电器股份有限公司 | Test method for separation of test scene and test data |
CN112667513A (en) * | 2020-12-31 | 2021-04-16 | 长沙市到家悠享网络科技有限公司 | Test method, test device, test equipment and storage medium |
CN112835803A (en) * | 2021-02-23 | 2021-05-25 | 北京联创信安科技股份有限公司 | Tool generation method, test data construction method, device, equipment and medium |
CN112835803B (en) * | 2021-02-23 | 2024-02-23 | 北京联创信安科技股份有限公司 | Tool generation method, test data construction method, device, equipment and medium |
CN113064829A (en) * | 2021-04-13 | 2021-07-02 | 上海浦东发展银行股份有限公司 | Test data life tree structure based on credit card core and data generation method |
CN113094279A (en) * | 2021-04-25 | 2021-07-09 | 深圳前海微众银行股份有限公司 | Test data construction method, device and system and computer readable storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110162458A (en) | Test data building method, device and storage medium | |
US10643180B2 (en) | Fraud detection system automatic rule population engine | |
US8732838B2 (en) | Evaluating the effectiveness of a threat model | |
CN107038042A (en) | The method and device that a kind of business is performed | |
CN103460228A (en) | Method and apparatus for improving business process management systems | |
CN109299220A (en) | Worker's online testing test paper generation method and terminal device | |
CN104700169A (en) | Method and system for inspecting and managing invoices | |
US20130282583A1 (en) | Fraud detection system rule profile interaction | |
CN108492177A (en) | Domestic assets cross-border transaction method, server and storage medium | |
CN102880543B (en) | For the test data supply chain manager of integration testing platform | |
CN109872015A (en) | Method and device for behavioral data assessment | |
US20130144782A1 (en) | Electronic invoice payment prediction system and method | |
CN109544266A (en) | Product data method for pushing, device and computer readable storage medium | |
US10607204B2 (en) | Support messages based on merchant account context | |
Kuandee et al. | Asset Supply Chain Management System-based IoT Technology for Higher Education Institutions. | |
US20210326950A1 (en) | Supply chain management system and method | |
KR20140106176A (en) | Stock trading system and method thereof | |
CN108509259A (en) | Obtain the method and air control system in multiparty data source | |
CN117114901A (en) | Method, device, equipment and medium for processing insurance data based on artificial intelligence | |
CN109146724A (en) | Output value accounting method, device and computer readable storage medium | |
CN115660660A (en) | Payment processing method and device, computer equipment and storage medium | |
CN108320129A (en) | A kind of test data automation building method and device | |
CN112100183B (en) | Report query system, device and method based on label management | |
CN111405060B (en) | Service influence range determining method, device, tool and electronic equipment | |
CN107067137A (en) | A kind of power marketing metering class's routine work management control method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
AD01 | Patent right deemed abandoned | ||
AD01 | Patent right deemed abandoned |
Effective date of abandoning: 20240621 |