CN110160794A - A kind of intercooler thermal cycling test system and test method - Google Patents

A kind of intercooler thermal cycling test system and test method Download PDF

Info

Publication number
CN110160794A
CN110160794A CN201810248967.XA CN201810248967A CN110160794A CN 110160794 A CN110160794 A CN 110160794A CN 201810248967 A CN201810248967 A CN 201810248967A CN 110160794 A CN110160794 A CN 110160794A
Authority
CN
China
Prior art keywords
test
thermal cycling
switching valve
control system
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810248967.XA
Other languages
Chinese (zh)
Inventor
马浩
卢天邦
刘盼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Hanhai Detection Technology Co Ltd
Original Assignee
Shanghai Hanhai Detection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Hanhai Detection Technology Co Ltd filed Critical Shanghai Hanhai Detection Technology Co Ltd
Priority to CN201810248967.XA priority Critical patent/CN110160794A/en
Publication of CN110160794A publication Critical patent/CN110160794A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M15/00Testing of engines
    • G01M15/02Details or accessories of testing apparatus

Abstract

A kind of intercooler thermal cycling test system and test method, including two admission lines, two admission lines are connected to gas source, two admission lines be equipped with by control system control add, heat-exchange system, each admission line other end is connect with test specimen respectively, the test specimen other end is connect with exhaust pipe, each exhaust pipe other end is connect with heat-exchange system respectively, the first and second switching valve controlled by control system is respectively equipped on each admission line, exhaust pipe, two the first switching valve connections, two the second switching valve connections;Two test specimens are connected between two admission lines and two exhaust pipes;Gas stop valve, pressure regulator valve, the first and second switching valve, throttle valve are controlled by control system according to test requirements document, so that heat, cold medium is alternately passed through two test specimens by set temperature, time and the frequency;Until completion portion thermal cycling test.The thermal shock test of test specimen at different temperatures, compact-sized, easy to maintenance, long service life can be achieved in the present invention.

Description

A kind of intercooler thermal cycling test system and test method
Technical field
The present invention relates to a kind of technical field of vehicle detection, espespecially a kind of intercooler thermal cycling test system and test side Method.
Background technique
For automobile as the convenient and fast vehicles, the demand in market is increasing.However client is to the safety of vehicle, reliable Property, the requirement of comfort are also higher and higher., profession also more and more accurate for the testing requirements of vehicle component, it is ensured that can be true Operation conditions in real simulating vehicle traveling engineering.
Engine is the core of automobile, and performance determines the performance of vehicle.And the subsystem of engine is also it in weight Weight.
The pilot system of existing detection engine uses gas pulses, has the shortcomings that following two:
1, domestic existing only one air accumulator of gas pulses, single air accumulator heats gas and cooling control is compared Difficulty, being unable to complete being switched fast between gas low temperature and high temperature, (switching needs 1 are small between the low temperature and high temperature of an air accumulator When or so, and standard and real vehicle operating condition are 3 minutes or so);
2, existing gas pulses are opened and closed to control internal pressure using solenoid valve, when solenoid valve closes control pressure, gas It is the i.e. no air mass flow not recycled, it is more difficult to cause to control gas flow.
Therefore, how a kind of intercooler thermal cycling test system is set and test method is able to solve the above problem, is this The project that inventor concentrates on studies.
Summary of the invention
The purpose of the present invention is to provide a kind of Novel intercooler thermal cycling test system and test methods, may be implemented The thermal shock test requirement of test specimen at different temperatures, compact-sized, after-sales service is convenient, easy to operate, long service life.
To achieve the goals above, technical solution of the invention are as follows: a kind of intercooler thermal cycling test system, wherein Including two admission lines, one end of two admission lines is connected to gas source, is set respectively on two admission lines There is a heating system controlled by control system, two admission lines are equipped with the heat-exchange system controlled by control system, and two The other end of admission line described in item is connect with one end of test specimen respectively, the other end of two test specimens respectively with exhaust pipe Connection, the other end of two exhaust pipes connect with the heat-exchange system respectively, are respectively equipped on each admission line The first switching valve controlled by the control system is respectively equipped with controlled by the control system on each exhaust pipe Two switching valves, each first switching valve are connect with another first switching valve respectively by tracheae, each second switching Valve is connect with another second switching valve respectively by tracheae.
Intercooler thermal cycling test system of the present invention, test specimen described in two of them are all set in cold test case, and two The admission line is connect after being each passed through cold test case with two test specimens.
Intercooler thermal cycling test system of the present invention, wherein each test specimen connection is located in the cold test case The first temperature sensor and pressure sensor are respectively equipped on admission line part, each test specimen connection is located at the room temperature Second temperature sensor, each first temperature sensor, pressure sensing are respectively equipped on exhaust pipe part in chamber Device and second temperature sensor pass through signal wire respectively and connect with control system.
Intercooler thermal cycling test system of the present invention is controlled wherein being respectively equipped on each admission line by control system Flow detector.
Intercooler thermal cycling test system of the present invention is provided with air mistake described in two of them between admission line and gas source Filter.
Intercooler thermal cycling test system of the present invention is located at gas source and the air mistake on admission line described in two of them Part between filter is respectively equipped with the gas stop valve controlled by the control system, is located at air on each admission line Position after filter is respectively equipped with the pressure regulator valve controlled by the control system, be located on two exhaust pipes test specimen with Part between second switching valve is respectively equipped with the throttle valve controlled by the control system.
Intercooler thermal cycling test system of the present invention, wherein first switching valve, the second switching valve are triple valve.
Intercooler thermal cycling test system of the present invention, admission line described in two of them and even on tracheae and described in two Exhaust pipe and be even respectively equipped with silencer on tracheae.
Intercooler thermal cycling test system of the present invention, wherein the air inlet of each admission line is connected separately with gas storage Tank, each air accumulator are connected to gas source respectively.
A kind of test method using the intercooler thermal cycling test system comprising following steps:
(1) two test specimens are connected between two admission lines and two exhaust pipes;
(2) according to the medium temperature of test requirements document and flow, by control system to the gas stop valve on system pipeline, pressure regulation Valve, the first switching valve, throttle valve and the second switching valve are controlled, and according to the medium temperature of setting, time and the frequency, make hot Jie Matter and cold medium alternately pass through two test specimens and are tested, and heating period and cooling stage are determined according to testing standard;
(3) thermal cycling test inside intercooler is completed until completing defined temperature alternating number in circulation step (2).
After adopting the above scheme, intercooler thermal cycling test system and test method of the present invention pass through two different air Heating system, gas medium have two different temperature values, and every test specimen makes to try by the first switching valve and the second switching valve Different temperature there are two gathering around in part, by switching repeatedly, there are two the alternate thermal shock test process of temperature, examinations in test specimen Testing flow in process can be automatically adjusted by throttle valve, and temperature sensor is respectively set in test specimen entrance and exit, can be real-time The temperature value of test specimen is fed back, gas temperature switching is fast, complies fully with standard and actual requirement;Test is precisely controlled by pressure regulator valve Required output pressure, and test flow is big, internal diameter of the pipeline is big, and delay pressure loss is small, and pressure is equal to air inlet in test specimen Pressure on pipeline, therefore pressure detecting point is set on admission line, test specimen flow, come real-time detection, and are fed back by flowmeter It controlling and exports to control system, gas interior constitutes circulation, and it is more stable to control of flow and pressure, really simulate real vehicle Working condition, provide technical guarantee for product reliability and experimental reliability;Pass through two air accumulators of setting and two examinations Part constitutes circulation, and energy recycling does not cause to waste, and the system maintenance is convenient, can be easy to disassemble.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of intercooler thermal cycling test system of the present invention.
With reference to the accompanying drawing, by embodiment, the present invention is described further.
Specific embodiment
The schematic perspective view of intercooler thermal cycling test system embodiment of the present invention as shown in Figure 1, including two into Feed channel 1, simultaneously Lian Houjun is connected to gas source 19 for one end of two admission lines 1, and gas source 19 uses 0.3MPa low-pressure compressed air, Gas source 19 is respectively enterd after two air accumulators 2 in two admission lines 1, is respectively equipped on two admission lines 1 by control system The heating system 3 of system control, heating system 3 use air pipeline electric heater.Two admission lines 1 are simultaneously connected with by control system The heat-exchange system 4 of control, heat-exchange system 4 use plate heat exchanger.The other end of two admission lines 1 respectively with test specimen 5 one End connection, the other end of two test specimens 5 are connect with exhaust pipe 6 respectively, and the other end of two exhaust pipes 6 is with heat exchange respectively System 4 connects, and the first switching valve 7 controlled by control system is respectively equipped on each admission line 1, is set respectively on each exhaust pipe 6 There is the second switching valve 8 controlled by control system, the first switching valve 7 and the second switching valve 8 are triple valves.Each first switching valve 7 both ends are connected on admission line 1, and the third end of two the first switching valves 7 is linked together by tracheae.Each second The both ends of switching valve 8 are connected on exhaust pipe 6, and the third end of two the second switching valves 8 is linked together by tracheae. Two admission lines 1 and even on tracheae and two exhaust pipes 6 and be even respectively equipped with silencer 9 on tracheae.
It is connected in turn from the front to the back between air accumulator 2 and heating system 3 by control system control on each admission line 1 Gas stop valve 10, air filter 11, the pressure regulator valve 12 by control system control and the flow by control system control of system Detection device.Flow detector uses flowmeter 13.On two exhaust pipes 6 between test specimen 5 and the second switching valve 8 Part is respectively equipped with the throttle valve 14 controlled by control system.
Two test specimens 5 are all set in cold test case 15, two admission lines 1 be each passed through after cold test case 15 with Two test specimens 5 connect.The first temperature is respectively equipped on 1 part of admission line being located in cold test case 15 that each test specimen 5 connects Sensor 16 and pressure sensor 17 are spent, is distinguished on 6 part of exhaust pipe being located in cold test case 15 that each test specimen 5 connects Equipped with second temperature sensor 18, each first temperature sensor 16, pressure sensor 17 and second temperature sensor 18 are led to respectively Signal wire is crossed to connect with control system.
Using the test method of above-described embodiment intercooler thermal cycling test system, include the following steps:
(1) two test specimens 5 are connected between two admission lines 1 and two exhaust pipes 6;
(2) according to the medium temperature of test requirements document and flow, by control system to gas stop valve 10, the tune on admission line 1 Pressure valve 12, the first switching valve 7, the throttle valve 14 on exhaust pipe 6 and the second switching valve 8 are controlled, according to the medium of setting Temperature, time and the frequency make thermal medium and cold medium alternately pass through two test specimens 5 and are tested, heating period and cooling stage It is determined according to testing standard;
(3) thermal cycling test inside intercooler is completed until completing defined temperature alternating number in circulation step (2).
Intercooler thermal cycling test system and test method of the present invention are situated between by two different air heating systems, gas Matter has two different temperature values, there are two every test specimen 5 makes to gather around in test specimen 5 by the first switching valve 7 and the second switching valve 8 Different temperature, by switching repeatedly, there are two the alternate thermal shock test processes of temperature in test specimen 5, flow during test Amount can be automatically adjusted by throttle valve 14, and the first temperature sensor 16 and second is respectively set in the entrance and exit of test specimen 5 Temperature sensor 18, can Real-time Feedback test specimen 5 temperature value, gas temperature switching is fast, complies fully with standard and actual requirement;It is logical It crosses pressure regulator valve 12 and is precisely controlled output pressure required for test, and test flow is big, internal diameter of the pipeline is big, delay pressure loss Small, pressure is equal to the pressure on admission line 1 in test specimen 5, therefore pressure detecting point is set on admission line 1, the stream of test specimen 5 It measures through flowmeter 13 come real-time detection, and feeds back to control system control output, gas interior constitutes circulation, to flow and pressure Power control is more stable, really simulates the working condition of real vehicle, provides technology for product reliability and experimental reliability It ensures;Circulation is constituted by two air accumulators 2 of setting and two test specimens 5, energy recycling does not cause to waste, system dimension Shield is convenient, can be easy to disassemble.
Embodiment described above is only that preferred embodiments of the present invention will be described, not to the scope of the present invention It is defined, without departing from the spirit of the design of the present invention, this field ordinary engineering and technical personnel is to technology of the invention The various changes and improvements that scheme is made, should fall within the scope of protection determined by the claims of the present invention.

Claims (10)

1. a kind of intercooler thermal cycling test system, which is characterized in that including two admission lines, two admission lines One end is connected to gas source, the heating system controlled by control system is respectively equipped on two admission lines, described in two Admission line is equipped with the heat-exchange system that is controlled by control system, the other end of two admission lines respectively with test specimen one End connection, the other end of two test specimens connect with exhaust pipe respectively, the other end of two exhaust pipes respectively with The heat-exchange system connects, and is respectively equipped with the first switching valve controlled by the control system, each institute on each admission line The second switching valve for being respectively equipped on exhaust pipe and being controlled by the control system is stated, each first switching valve passes through tracheorrhaphy It is not connect with another first switching valve, each second switching valve is connected with another second switching valve respectively by tracheae It connects.
2. intercooler thermal cycling test system as described in claim 1, which is characterized in that two test specimens are all set in often In temperature test box, two admission lines are connect after being each passed through cold test case with two test specimens.
3. intercooler thermal cycling test system as claimed in claim 2, which is characterized in that each test specimen connection is located at institute It states and is respectively equipped with the first temperature sensor and pressure sensor on the admission line part in cold test case, each test specimen connects Second temperature sensor, each first temperature are respectively equipped on the exhaust pipe part being located in the cold test case connect Sensor, pressure sensor and second temperature sensor pass through signal wire respectively and connect with control system.
4. intercooler thermal cycling test system as claimed in claim 3, which is characterized in that set respectively on each admission line There is the flow detector controlled by control system.
5. intercooler thermal cycling test system as claimed in claim 4, which is characterized in that two admission lines and gas source Between be provided with air filter.
6. intercooler thermal cycling test system as claimed in claim 5, which is characterized in that be located on two admission lines Part between gas source and the air filter is respectively equipped with the gas stop valve controlled by the control system, it is each it is described into Position after being located at air filter in feed channel is respectively equipped with the pressure regulator valve controlled by the control system, two exhausts Part on pipeline between test specimen and the second switching valve is respectively equipped with the throttle valve controlled by the control system.
7. intercooler thermal cycling test system as claimed in claim 6, which is characterized in that first switching valve, second cut Changing valve is triple valve.
8. intercooler thermal cycling test system as claimed in claim 7, which is characterized in that two admission lines and even On tracheae and two exhaust pipes and be even respectively equipped with silencer on tracheae.
9. intercooler thermal cycling test system as claimed in claim 8, which is characterized in that the air inlet of each admission line It is connected separately with air accumulator, each air accumulator is connected to gas source respectively.
10. a kind of test method using intercooler thermal cycling test system as claimed in claim 9, which is characterized in that including Following steps:
(1) two test specimens are connected between two admission lines and two exhaust pipes;
(2) according to the medium temperature of test requirements document and flow, by control system to the gas stop valve on system pipeline, pressure regulation Valve, the first switching valve, throttle valve and the second switching valve are controlled, and according to the medium temperature of setting, time and the frequency, make hot Jie Matter and cold medium alternately pass through two test specimens and are tested, and heating period and cooling stage are determined according to testing standard;
(3) thermal cycling test inside intercooler is completed until completing defined temperature alternating number in circulation step (2).
CN201810248967.XA 2018-03-25 2018-03-25 A kind of intercooler thermal cycling test system and test method Pending CN110160794A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810248967.XA CN110160794A (en) 2018-03-25 2018-03-25 A kind of intercooler thermal cycling test system and test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810248967.XA CN110160794A (en) 2018-03-25 2018-03-25 A kind of intercooler thermal cycling test system and test method

Publications (1)

Publication Number Publication Date
CN110160794A true CN110160794A (en) 2019-08-23

Family

ID=67636342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810248967.XA Pending CN110160794A (en) 2018-03-25 2018-03-25 A kind of intercooler thermal cycling test system and test method

Country Status (1)

Country Link
CN (1) CN110160794A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111982554A (en) * 2020-08-17 2020-11-24 浙江银轮机械股份有限公司 Intercooler heat resistance test equipment and intercooler heat resistance test method
CN114441180A (en) * 2020-11-02 2022-05-06 中国航发商用航空发动机有限责任公司 Low-temperature durability test system and test method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040042457A (en) * 2002-11-14 2004-05-20 현대자동차주식회사 Inter cooler for endurance test
CN105334045A (en) * 2015-12-14 2016-02-17 金陵科技学院 Gas cold and hot impact test system based on PLC and control method thereof
CN105445030A (en) * 2014-08-27 2016-03-30 上海德朗汽车零部件制造有限公司 Device for heat cycle test of automobile intercooler
CN105910938A (en) * 2016-06-03 2016-08-31 无锡市奥斯韦特科技有限公司 Impact test box and impact mode thereof
CN106680128A (en) * 2016-12-27 2017-05-17 无锡宏盛换热器制造股份有限公司 Thermal shock test system for detecting service life of air intercooler
CN206420709U (en) * 2017-01-13 2017-08-18 深圳市万斯得自动化设备有限公司 Thermal shock equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040042457A (en) * 2002-11-14 2004-05-20 현대자동차주식회사 Inter cooler for endurance test
CN105445030A (en) * 2014-08-27 2016-03-30 上海德朗汽车零部件制造有限公司 Device for heat cycle test of automobile intercooler
CN105334045A (en) * 2015-12-14 2016-02-17 金陵科技学院 Gas cold and hot impact test system based on PLC and control method thereof
CN105910938A (en) * 2016-06-03 2016-08-31 无锡市奥斯韦特科技有限公司 Impact test box and impact mode thereof
CN106680128A (en) * 2016-12-27 2017-05-17 无锡宏盛换热器制造股份有限公司 Thermal shock test system for detecting service life of air intercooler
CN206420709U (en) * 2017-01-13 2017-08-18 深圳市万斯得自动化设备有限公司 Thermal shock equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111982554A (en) * 2020-08-17 2020-11-24 浙江银轮机械股份有限公司 Intercooler heat resistance test equipment and intercooler heat resistance test method
CN114441180A (en) * 2020-11-02 2022-05-06 中国航发商用航空发动机有限责任公司 Low-temperature durability test system and test method
CN114441180B (en) * 2020-11-02 2023-10-13 中国航发商用航空发动机有限责任公司 Low-temperature endurance test system and test method

Similar Documents

Publication Publication Date Title
CN104993161B (en) A kind of air supply system experimental provision of Experimental research on proton exchange membrane fuel cells for vehicles
CN109708829A (en) The HVAC leak supervision method and monitoring system judged by difference in flow
CN102235212A (en) Exhaust bypass flow control for exhaust heat recovery
CN102175714A (en) Heat radiator and fan performance testing system
CN110160794A (en) A kind of intercooler thermal cycling test system and test method
CN106017968A (en) EGR cooler heat exchange efficiency detection system
CN105954052A (en) Capillary tube obstruction detection system and method
CN105572602A (en) Test platform for fuel cell cooling system
CN111811825A (en) Multifunctional engine cooling temperature control system and control method thereof
CN102706396A (en) Capillary tube flow testing device
CN104295359B (en) Cold temperature control equipment and operational approach in a kind of electromotor
CN107290166A (en) Simulate fluid temperature (F.T.) and/or the fast-changing pilot system of pressure and test method
CN104635794A (en) Apparatus for precisely regulating intake temperature by water cooling
CN209589480U (en) A kind of intercooler thermal cycling test system
CN210923044U (en) Verification test device for aviation fuel-air radiator temperature alternating circulation rack
CN112326535A (en) Low-temperature test system for hydraulic filter and detection method thereof
CN102434333B (en) Auxiliary pressurization system for diesel engine bench test and using method of auxiliary pressurization system
CN104075421A (en) Hot-water device for air conditioner
CN205783938U (en) Air conditioning system and there is its air-conditioner
CN206420709U (en) Thermal shock equipment
CN105972868B (en) Air-conditioning system, air conditioner system control method and air conditioner
CN209689940U (en) Heat exchange equipment verifying attachment and its verifying bench
CN108917867B (en) Dynamic detection system for fuel oil consumption
CN113237823A (en) High-low temperature circulation test system for proton exchange membrane fuel cell
CN111811831A (en) Intercooler thermal cycle test equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190823