CN110159297A CN201910517199.8A CN201910517199A CN110159297A CN 110159297 A CN110159297 A CN 110159297A CN 201910517199 A CN201910517199 A CN 201910517199A CN 110159297 A CN110159297 A CN 110159297A
Authority
CN
China
Prior art keywords
workbench
roll guard
coal mine
vertical
mine shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910517199.8A
Other languages
Chinese (zh)
Other versions
CN110159297B (en
Inventor
高峰
杨小凤
曹阳
徐忠和
耿建平
赵民
苏爱明
高红波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan Design And Research Institute Group Co Ltd Of Coal Industry
Original Assignee
Taiyuan Design And Research Institute Group Co Ltd Of Coal Industry
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan Design And Research Institute Group Co Ltd Of Coal Industry filed Critical Taiyuan Design And Research Institute Group Co Ltd Of Coal Industry
Priority to CN201910517199.8A priority Critical patent/CN110159297B/en
Publication of CN110159297A publication Critical patent/CN110159297A/en
Application granted granted Critical
Publication of CN110159297B publication Critical patent/CN110159297B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D7/00Shaft equipment, e.g. timbering within the shaft
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Ladders (AREA)
  • Forklifts And Lifting Vehicles (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses coal mine shaft lining arragement constructions, belong to downhole safety field;The technical problem to be solved is that providing, a kind of structure is simple, easy to use, reduces cost, meets specification, safe and reliable coal mine shaft lining arragement construction;Solve the technical solution of technical problem use are as follows: a kind of coal mine shaft lining arrangement knot is connected with workbench rear portion, workbench two sides are provided with carrying girder, carrying girder is connected with workbench two sides, carrying girder is mutually perpendicular to longitudinal bearer, connection ladder and roll guard are provided between workbench, roll guard includes rear portion roll guard and side roll guard, rear portion roll guard is connected with longitudinal bearer, side roll guard is connected with carrying girder, and roll guard, workbench, shaft of vertical well barrel form enclosure space;It the composite can be widely applied to downhole safety field.

Description

Coal mine shaft lining arragement construction
Technical field
Coal mine shaft lining arragement construction of the present invention, belongs to downhole safety technical field.
Background technique
With the increase of exploitation of coal resources intensity, seam mining condition is increasingly sophisticated, when underground work, safety It is placed on primary, staff must have the channel and place of escape, and general this channel is arranged in vertical, but this The shaft construction cost of kind vertical is very high, and cost itself is directly related with the size of shaft section and depth, and pit shaft is deep Degree is that we can not change, but the size of section layout can control, and in general, meet shaft production need While asking, under the premise of meeting national associated safety regulation, section is smaller, and cost about saves, but does not have also in existing production There is corresponding structure.
Summary of the invention
It is easy to use the invention overcomes the deficiencies of the prior art, and provides a kind of structure is simple, cost is reduced, Meet specification, safe and reliable coal mine shaft lining arragement construction.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention are as follows: a kind of coal mine shaft lining arrangement knot and work Platform rear portion is connected, and workbench two sides are provided with carrying girder, and carrying girder is connected with workbench two sides, carries girder It is mutually perpendicular to longitudinal bearer, connection ladder is provided between workbench and roll guard, roll guard include rear portion guard boom Column and side roll guard, rear portion roll guard are connected with longitudinal bearer, and side roll guard is connected with carrying girder, guard boom Column, workbench, shaft of vertical well barrel form enclosure space.
The workbench is glass fiber reinforced plastic platform.
It is connected between the rear portion roll guard and longitudinal bearer by drag hook.
The carrying girder is arranged in workbench side lower part, passes through between the carrying girder and workbench The curved bolt of 7 words is connected.
The side roll guard of the workbench lower part is connected with carrying girder lower part by hook, the side on top Roll guard is connected by hook with the curved bolt of 7 words.
The rear portion roll guard and side roll guard is glass fiber reinforced plastic fence.
The longitudinal bearer both ends are connected with shaft of vertical well inner wall, and connecting place is provided with big beam bracket.
Described carrying girder one end is connected with longitudinal bearer, and the other end is connected with shaft of vertical well inner wall, with shaft of vertical well Inner wall connecting place is provided with small beam bracket.
The connection ladder is wire ladder, and the connection ladder is connected to spaced workbench, the connection ladder With shaft of vertical well inner wall at 10 degree of angle.
The position that the connection ladder is connected with workbench is provided with manhole, and the connection ladder is connected with workbench Position be provided with manhole.
Compared with the prior art, the invention has the following beneficial effects: using support crossbeam, support girder, workbench, Roll guard and shaft of vertical well form enclosure space, can be convenient staff and communicate wherein, improve the safety of operation, together When space size can be transformed according to different pit shafts, use scope is wide, strong flexibility, workbench, roll guard Using glass steel material, low cost can satisfy safety requirements, reduce costs, and improve benefit.
Detailed description of the invention
Following further describes the present invention with reference to the drawings.
Fig. 1 is the structural diagram of the present invention schemes.
Fig. 2 is the front view of Fig. 1.
Fig. 3 is the partial enlarged view of Fig. 1.
Fig. 4 is III direction view of Fig. 3.
Fig. 5 is IV direction view of Fig. 3.
1 it is vertical in figure, 2 be workbench, 3 be longitudinal bearer, 4 be carrying girder, 5 be rear portion roll guard, 6 is side Frontier defense barrier shielding, 7 be connection ladder, 8 be hook, 9 be the curved bolt of 7 words.
Specific embodiment
As shown in Figure 1 and Figure 2, coal mine shaft lining arragement construction of the present invention, including vertical 1, along 1 axis side of vertical in vertical 1 To arranged for interval has multiple workbenches 2 being parallel to each other, and 2 front of workbench is connected with 1 shaft wall of vertical, and work is flat 2 rear portion of platform is provided with longitudinal bearer 3, and longitudinal bearer 3 is connected with 2 rear portion of workbench, and 2 two sides of workbench are provided with carrying Girder 4, carrying girder 4 are connected with 2 two sides of workbench, and carrying girder 4 is mutually perpendicular to longitudinal bearer 3, between workbench 2 It is provided with connection ladder 7 and roll guard, roll guard includes rear portion roll guard 5 and side roll guard 6, rear portion roll guard 5 are connected with longitudinal bearer 3, and side roll guard 6 is connected with carrying girder 4, and roll guard, work flat, 1 shaft wall group of vertical At enclosure space, making platform 2 is glass fiber reinforced plastic platform, is connected between rear portion roll guard 5 and longitudinal bearer 3 by drag hook 8, is carried The setting of girder 4 passes through the curved 9 phase continuous cropping of bolt of 7 words between 2 side lower part of workbench, the carrying girder 4 and work flat 2 The side roll guard 6 of 2 lower part of platform is connected with carrying 4 lower part of girder by hook 8, and the side roll guard 6 on top passes through Hook 8 is connected with the curved bolt 9 of 7 words, and portion's roll guard 5 and side roll guard 6 are glass fiber reinforced plastic fence., both ends and 1 pit shaft of vertical Inner wall is connected, and connecting place is provided with big beam bracket, and carrying 4 one end of girder is connected with longitudinal bearer 3, the other end and 1 pit shaft of vertical Inner wall is connected, and 1 shaft in wall connecting place of vertical is provided with small beam bracket, and connection ladder 7 is wire ladder, and the connection ladder 7 connects Lead to spaced workbench 2, for the connection ladder 7 with shaft of vertical well inner wall at 10 degree of angle, connection ladder 7 and work are flat The connected position of platform 2 is provided with manhole.
In the use of the present invention, being set up according to different vertical, it may be convenient to adjust the size of workbench, lead to It crosses load bearing beam, workbench, roll guard and shaft of vertical well inner wall group and is combined into enclosed construction, facilitate the discrepancy of personnel, structure letter It is single, it is convenient using secured, cost is reduced, securely and reliably.
The embodiment of the present invention is explained in detail above in conjunction with attached drawing, but the present invention is not limited to above-mentioned implementations Example, within the knowledge of a person skilled in the art, can also make without departing from the purpose of the present invention Various change out.

Claims (10)

1. coal mine shaft lining arragement construction, including vertical (1), it is characterised in that: along vertical (1) axis direction in vertical (1), Every being disposed with multiple workbenches (2) being parallel to each other, workbench (2) front is connected with vertical (1) shaft wall, and work is flat Platform (2) rear portion is provided with longitudinal bearer (3), and longitudinal bearer (3) is connected with workbench (2) rear portion, workbench (2) two sides It is provided with carrying girder (4), carrying girder (4) is connected with workbench (2) two sides, carries girder (4) and longitudinal bearer (3) phase It is mutually vertical, be provided with connection terraced (7) and roll guard between workbench (2), roll guard include rear portion roll guard (5) and Side roll guard (6), rear portion roll guard (5) are connected with longitudinal bearer (3), side roll guard (6) and carrying girder (4) It is connected, roll guard, workbench (2), vertical (1) shaft wall form enclosure space.
2. a kind of coal mine shaft lining wellbore arrangement structure according to claim 1, it is characterised in that: the workbench It (2) is glass fiber reinforced plastic platform.
3. a kind of coal mine shaft lining wellbore arrangement structure according to claim 1, it is characterised in that: the rear portion guard boom It is connected between column (5) and longitudinal bearer (3) by drag hook (8).
4. a kind of coal mine shaft lining wellbore arrangement structure according to claim 1, it is characterised in that: the carrying girder (4) it is arranged between workbench (2) side lower part, the carrying girder (4) and workbench (2) and passes through the curved bolt of 7 words (9) it is connected.
5. a kind of coal mine shaft lining wellbore arrangement structure according to claim 4, it is characterised in that: the workbench (2) the side roll guard (6) of lower part is connected with carrying girder (4) lower part by linking up with (8), the side roll guard on top (6) it is connected by linking up with (8) with the curved bolt of 7 words (9).
6. a kind of coal mine shaft lining wellbore arrangement structure according to claim 1, it is characterised in that: the rear portion guard boom Column (5) and side roll guard (6) are glass fiber reinforced plastic fence.
7. a kind of coal mine shaft lining wellbore arrangement structure according to claim 1, it is characterised in that: the longitudinal bearer (3) both ends are connected with vertical (1) shaft in wall, and connecting place is provided with big beam bracket.
8. a kind of coal mine shaft lining wellbore arrangement structure according to claim 1, it is characterised in that: the carrying girder (4) one end is connected with longitudinal bearer (3), and the other end is connected with vertical (1) shaft in wall, with vertical (1) shaft in wall connecting place It is provided with small beam bracket.
9. a kind of coal mine shaft lining wellbore arrangement structure according to claim 1, it is characterised in that: the connection is terraced (7) For wire ladder, the connection terraced (7) is connected to spaced workbench (2), in the connection terraced (7) and shaft of vertical well Wall is at 10 degree of angle.
10. a kind of coal mine shaft lining wellbore arrangement structure according to claim 9, it is characterised in that: the connection is terraced (7) The position being connected with workbench (2) is provided with manhole.
CN201910517199.8A 2019-07-09 2019-07-09 Coal mine vertical shaft arrangement structure Active CN110159297B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910517199.8A CN110159297B (en) 2019-07-09 2019-07-09 Coal mine vertical shaft arrangement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910517199.8A CN110159297B (en) 2019-07-09 2019-07-09 Coal mine vertical shaft arrangement structure

Publications (2)

Publication Number Publication Date
CN110159297A true CN110159297A (en) 2019-08-23
CN110159297B CN110159297B (en) 2023-12-01

Family

ID=67625823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910517199.8A Active CN110159297B (en) 2019-07-09 2019-07-09 Coal mine vertical shaft arrangement structure

Country Status (1)

Country Link
CN (1) CN110159297B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114809762A (en) * 2022-06-29 2022-07-29 煤炭工业太原设计研究院集团有限公司 Totally-enclosed coal storage yard under complex terrain and geological conditions and enclosing method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1486538A (en) * 1965-06-19 1967-06-30 Nat Res Dev Security fence
DE10257560A1 (en) * 2002-03-20 2003-10-02 Tracto Technik platform
JP2004036178A (en) * 2002-07-02 2004-02-05 Shimizu Corp Method for assembling deck unit
JP2007032098A (en) * 2005-07-27 2007-02-08 Nippon Steel Corp Method of connecting between large beam and small beam, and connection structure between the same
JP2008215019A (en) * 2007-03-07 2008-09-18 Kobe Steel Ltd Shaft structure
JP3167847U (en) * 2011-03-01 2011-05-19 米沢電気工事株式会社 Fall prevention fence for construction holes
WO2013147652A2 (en) * 2012-03-30 2013-10-03 Общество с ограниченной ответственностью "Инженерное бюро Юркевича" Metro station and method for constructing same
DE102013018796A1 (en) * 2013-11-11 2015-05-13 Deilmann-Haniel Shaft Sinking Gmbh Method and platform for the shaft extension
KR101854660B1 (en) * 2017-08-09 2018-05-03 우경기술주식회사 Closed tunnel filler part reinforcement structure using large diameter steel pipe and construction method thereof
CN210127855U (en) * 2019-07-09 2020-03-06 煤炭工业太原设计研究院集团有限公司 Coal mine vertical shaft arrangement structure

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1486538A (en) * 1965-06-19 1967-06-30 Nat Res Dev Security fence
DE10257560A1 (en) * 2002-03-20 2003-10-02 Tracto Technik platform
JP2004036178A (en) * 2002-07-02 2004-02-05 Shimizu Corp Method for assembling deck unit
JP2007032098A (en) * 2005-07-27 2007-02-08 Nippon Steel Corp Method of connecting between large beam and small beam, and connection structure between the same
JP2008215019A (en) * 2007-03-07 2008-09-18 Kobe Steel Ltd Shaft structure
JP3167847U (en) * 2011-03-01 2011-05-19 米沢電気工事株式会社 Fall prevention fence for construction holes
WO2013147652A2 (en) * 2012-03-30 2013-10-03 Общество с ограниченной ответственностью "Инженерное бюро Юркевича" Metro station and method for constructing same
DE102013018796A1 (en) * 2013-11-11 2015-05-13 Deilmann-Haniel Shaft Sinking Gmbh Method and platform for the shaft extension
KR101854660B1 (en) * 2017-08-09 2018-05-03 우경기술주식회사 Closed tunnel filler part reinforcement structure using large diameter steel pipe and construction method thereof
CN210127855U (en) * 2019-07-09 2020-03-06 煤炭工业太原设计研究院集团有限公司 Coal mine vertical shaft arrangement structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114809762A (en) * 2022-06-29 2022-07-29 煤炭工业太原设计研究院集团有限公司 Totally-enclosed coal storage yard under complex terrain and geological conditions and enclosing method

Also Published As

Publication number Publication date
CN110159297B (en) 2023-12-01

Similar Documents

Publication Publication Date Title
CN103643979B (en) Hydraulic support used for roadway temporary support and erecting and use method of hydraulic support
CN101666230B (en) Coal mining method of lengthened front-beam fully-mechanized mining and fully-mechanized top coal carving of three-soft coal seam and equipment
CN105003288B (en) A kind of method and support system of medium-thickness seam gob side entry retaining
CN108275573A (en) The construction method for hanging and lifting translation unit equipment of rock tunnel(ling) machine
CN106351679A (en) Soil similar coal working face fully sealed shield support device
CN207018019U (en) The advanced telescopic cantilever suspension device of tunnelling
CN204434116U (en) A kind of hanging device for interior courtyard lifting pipeline
CN110159297A (en) Coal mine shaft lining arragement construction
CN206448505U (en) Adjustable draw and insert-type all steel attachment type raise scaffold back cover panel assembly
CN204200257U (en) A kind of colliery driving suspension device
CN105736027A (en) Support group for gob-side entry retaining
CN204532415U (en) A kind of fast-escape pipe with deixis
CN107313795A (en) A kind of light-duty scalable flexible hydraulic shield support
CN105201529B (en) Double tow ties up Flexible formwork assembly and its placement methods to a kind of gob side entry retaining crosswise
CN207161127U (en) Adopt and fill joint hydraulic bracket system
CN210127855U (en) Coal mine vertical shaft arrangement structure
CN209567738U (en) A kind of multiple spot lift for the rotary shaft excavation machine of method of sinking
CN108178110A (en) A kind of deep-sea mining water surface supports pipeline to lay recovery system
CN113586136A (en) Ground type head-on escape channel applied to long-distance tunneling
CN207863983U (en) Roadway head protects top and anchor bolt construction integrated apparatus temporarily
CN205558952U (en) Gob entry support group
CN207161140U (en) Fill servicing unit
CN208647961U (en) A kind of current device of belt conveyer
CN204938782U (en) A kind of lifting conveying device for combining vertical shaft
CN203742641U (en) Hydraulic support for temporary supporting of roadway

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant