- CN110158647A CN110158647A CN201910450372.7A CN201910450372A CN110158647A CN 110158647 A CN110158647 A CN 110158647A CN 201910450372 A CN201910450372 A CN 201910450372A CN 110158647 A CN110158647 A CN 110158647A
- Authority
- CN
- China
- Prior art keywords
- construction
- transport
- jenny
- pipe gallery
- underground pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
Abstract
The invention discloses a kind of transport of materials methods in Urban Underground pipe gallery small space, belong to underground pipe gallery construction technical field of construction.Step of the present invention are as follows: step 1: at piping lane foundation pit starting position away from reserved at construction guard fender 2.5 meters distance installation two-orbits;Step 2: jenny device is assembled in piping lane foundation pit end;Step 3: construction material requested is loaded on shipping platform in piping lane foundation pit end;Step 4: with BIM technology carry out road virtual lead change and suspension bridge simulation installation;Step 5: device Host is by transport of materials to designated position;Step 6: construction material requested is hung to bottom of foundation ditch and carries out piping lane construction.Construction method of the present invention is simple, carries out track installation using the vacant position of foundation pit to enclosing edge, effectively reduces hardening cost, engineering material is transported any construction area with jenny device, device installation is simple, and equipment cost is low, strong operability.
Description
Technical field
The present invention relates to underground pipe gallery technical field of construction, narrow more specifically to a kind of Urban Underground pipe gallery
Transport of materials method in small space.
Background technique
China's underground pipe gallery is gradually obtained achieving fast development, the importance of underground pipe gallery in recent years
The approval in more and more cities, underground pipe gallery has become the indispensable mating urban operating mechanism in city, existing in city
When carrying out piping lane construction under turnpike road, piping lane construction site is narrow, and when transport of materials needs temporary enclosed road, serious shadow
Sound traffic causes vehicle congestion, brings greatly trip to influence to pedestrian's trip, while there is also one for lifting material outside enclosing
Fixed security risk, therefore a kind of transport of materials method in Urban Underground pipe gallery small space is invented, by constructing in piping lane
Plain type transport channel is set in enclosing, by special hoisting transportation device, make material lifting and transport all in the venue into
Row, this mode not only solve the influence and safety problem of traffic congestion, apply simultaneously because also improving in the convenience of device
Work speed saves duration control cost.
Summary of the invention
1. technical problems to be solved by the inivention
In view of the defects existing in the prior art with deficiency, the present invention provides a kind of Urban Underground pipe gallery small spaces
Interior transport of materials method, construction method of the present invention is simple, strong operability, transports engineering material with jenny device
Any construction area, equipment cost is low, and cost performance is high.
2. technical solution
In order to achieve the above objectives, technical solution provided by the invention are as follows:
Transport of materials method in a kind of Urban Underground pipe gallery small space of the invention, the steps include:
Step 1: at piping lane foundation pit starting position away from reserved at construction guard fender 2.5 meters distance installation two-orbits, track
1.2 meters of spacing;
Step 2: piping lane foundation pit end carry out hanging device assembling, assemble jenny device, jenny device by
Device Host and shipping platform composition, by device Host and shipping platform assembly and connection, device Host includes that rotatable movement is hung
Arm, jenny clump weight and jenny ancillary equipment, rotatable mobile boom are mounted on jenny counterweight block gap
The bottom of rotatable mobile boom is arranged in the upper surface of shipping platform, jenny ancillary equipment;
Step 3: construction material requested is loaded on shipping platform in piping lane foundation pit end;
Step 4: with BIM technology carry out road virtual lead change and suspension bridge simulation installation;
Step 5: device Host and shipping platform pass through track drawing for transport of materials to designated position;
Step 6: construction material requested is hung to by bottom of foundation ditch by rotatable mobile boom stretching, extension and carries out piping lane construction.
Further, the step one: track installation is carried out using the vacant position of foundation pit to enclosing edge.
Further, the step two: shipping platform includes safe fence and steel plate, and the edge of steel plate is welded with peace
Carry construction material in the upper surface of full fence, steel plate.
Further, the step five is transported engineering material with jenny device using the construction of storehouse method is jumped
Any construction area.
Further, the step six: the lifting and transport of engineering material carry out in construction guard fender.
3. beneficial effect
Using technical solution provided by the invention, compared with prior art, have the following beneficial effects:
Construction method of the present invention is simple, strong operability, carries out track peace using the vacant position of foundation pit to enclosing edge
Dress, therefore vacant place is road reset condition before excavation of foundation pit, effectively reduces hardening cost, being mounted directly track can be into
Row is lower to walk process, and the lifting and transport of engineering material carry out in construction guard fender, is not take up the outer normal vehicle operation road of enclosing,
Traffic dispersion expense is reduced, using the construction of storehouse method is jumped, engineering material is transported into any construction area with jenny device,
Device installation is simple, and equipment cost is low, and cost performance is high, and flexible operation is changeable.
Detailed description of the invention
Fig. 1 is working state figure of the invention;
Fig. 2 is jenny device overall structure figure of the invention;
Fig. 3 is device Host structure chart of the invention;
Fig. 4 is shipping platform structure chart of the invention;
Fig. 5 is step one working state figure of the invention;
Fig. 6 is step two working state figure of the invention;
Fig. 7 is step five working state figure of the invention;
Fig. 8 is step six working state figure of the invention.
In figure: 1, jenny device;11, device Host;111, rotatable mobile boom;112, jenny counterweight
Block;113, jenny ancillary equipment;12, shipping platform;121, safe fence;122, steel plate.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and examples:
Embodiment 1
A kind of transport of materials method out of Fig. 1-6 can be seen that the present embodiment Urban Underground pipe gallery small space,
It the steps include:
Step 1: at piping lane foundation pit starting position away from reserved at construction guard fender 2.5 meters distance installation two-orbits, track
1.2 meters of spacing, in Fig. 1 or Fig. 5, A is enclosing;
Step 2: carrying out hanging device assembling in piping lane foundation pit end, assemble jenny device 1, can from Fig. 2
Out, jenny device 1 is made of device Host 11 and shipping platform 12, by device Host 11 and 12 groups of loads of shipping platform
It connects, from figure 3, it can be seen that device Host 11 includes rotatable mobile boom 111, jenny clump weight 112 and jenny
Ancillary equipment 113, rotatable mobile boom 111 are spaced the upper surface for being mounted on shipping platform 12 with jenny clump weight 112,
The bottom of rotatable mobile boom 111 is arranged in jenny ancillary equipment 113, from fig. 4, it can be seen that shipping platform 12 includes
Safe fence 121 and steel plate 122, the edge of steel plate 122 are welded with safe fence 121, and construction is carried in the upper surface of steel plate 122
Material;
Step 3: construction material requested is loaded on shipping platform 12 in piping lane foundation pit end;
Step 4: with BIM technology carry out road virtual lead change and suspension bridge simulation installation;
Step 5: from figure 7 it can be seen that device Host 11 and shipping platform 12 pass through track drawing for transport of materials to finger
Positioning is set;
Step 6: from figure 8, it is seen that construction material requested is hung to foundation pit by the rotatable mobile stretching, extension of boom 111
Bottom carries out piping lane construction.
Construction method of the present invention is simple, strong operability, carries out track peace using the vacant position of foundation pit to enclosing edge
Dress, therefore vacant place is road reset condition before excavation of foundation pit, effectively reduces hardening cost, being mounted directly track can be into
Row is lower to walk process, and the lifting and transport of engineering material carry out in construction guard fender, is not take up the outer normal vehicle operation road of enclosing,
Traffic dispersion expense is reduced, using the construction of storehouse method is jumped, engineering material is transported into any construction area with jenny device 1
Domain, device installation is simple, and equipment cost is low, and cost performance is high, and flexible operation is changeable.
Schematically the present invention and embodiments thereof are described above, description is not limiting, institute in attached drawing
What is shown is also one of embodiments of the present invention, and actual structure is not limited to this.So if the common skill of this field
Art personnel are enlightened by it, without departing from the spirit of the invention, are not inventively designed and the technical solution
Similar frame mode and embodiment, are within the scope of protection of the invention.
Claims (5)
1. a kind of transport of materials method in Urban Underground pipe gallery small space, it is characterised in that: the steps include:
Step 1: at piping lane foundation pit starting position away from reserved at construction guard fender 2.5 meters distance installation two-orbits, interorbital away from
1.2 rice;
Step 2: hanging device assembling is carried out in piping lane foundation pit end, is assembled jenny device (1), jenny device (1)
It is made of device Host (11) and shipping platform (12), by device Host (11) and shipping platform (12) assembly and connection, equipment master
Machine (11) includes rotatable mobile boom (111), jenny clump weight (112) and jenny ancillary equipment (113), can be revolved
The upper surface that dynamic boom (111) and jenny clump weight (112) interval is mounted on shipping platform (12) is shifted, jenny is auxiliary
Equipment (113) are helped to be arranged in the bottom of rotatable mobile boom (111);
Step 3: construction material requested is loaded on shipping platform (12) in piping lane foundation pit end;
Step 4: with BIM technology carry out road virtual lead change and suspension bridge simulation installation;
Step 5: device Host (11) and shipping platform (12) pass through track drawing for transport of materials to designated position;
Step 6: construction material requested is hung to by bottom of foundation ditch by rotatable mobile boom (111) stretching, extension and carries out piping lane construction.
2. transport of materials method in a kind of Urban Underground pipe gallery small space according to claim 1, feature exist
In: the step one: track installation is carried out using the vacant position of foundation pit to enclosing edge.
3. transport of materials method in a kind of Urban Underground pipe gallery small space according to claim 1, feature exist
In: the step two: shipping platform (12) includes safe fence (121) and steel plate (122), the edge weldering of steel plate (122)
It is connected to safe fence (121), construction material is carried in the upper surface of steel plate (122).
4. transport of materials method in a kind of Urban Underground pipe gallery small space according to claim 1, feature exist
In: engineering material is transported any construction area with jenny device (1) using the construction of storehouse method is jumped by the step five
Domain.
5. transport of materials method in a kind of Urban Underground pipe gallery small space according to claim 1, feature exist
In: the step six: the lifting and transport of engineering material carry out in construction guard fender.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910450372.7A CN110158647B (en) | 2019-05-28 | 2019-05-28 | Material transportation method in narrow space of urban underground comprehensive pipe gallery |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910450372.7A CN110158647B (en) | 2019-05-28 | 2019-05-28 | Material transportation method in narrow space of urban underground comprehensive pipe gallery |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110158647A true CN110158647A (en) | 2019-08-23 |
CN110158647B CN110158647B (en) | 2021-02-19 |
Family
ID=67629357
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910450372.7A Active CN110158647B (en) | 2019-05-28 | 2019-05-28 | Material transportation method in narrow space of urban underground comprehensive pipe gallery |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110158647B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112647525A (en) * | 2021-01-14 | 2021-04-13 | 中国建筑第八工程局有限公司 | Urban underground comprehensive pipe gallery open cut foundation pit drainage device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202369301U (en) * | 2011-12-16 | 2012-08-08 | 杨核 | Miniature crawler type tray crane |
WO2016152770A1 (en) * | 2015-03-20 | 2016-09-29 | コベルコクレーン株式会社 | Boom attach/detach device of crane and boom attach/detach method for crane |
CN206427940U (en) * | 2016-12-19 | 2017-08-22 | 西安丁子电子信息科技有限公司 | A kind of lifting transport trolley of on-site |
CN207360528U (en) * | 2017-10-24 | 2018-05-15 | 上海华润大东船务工程有限公司 | A kind of transport of materials mechanism in narrow and small cabin |
CN108951328A (en) * | 2018-07-25 | 2018-12-07 | 中国十七冶集团有限公司 | A kind of Urban Underground pipe gallery traffic dispersion method based on BIM technology |
-
2019
- 2019-05-28 CN CN201910450372.7A patent/CN110158647B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202369301U (en) * | 2011-12-16 | 2012-08-08 | 杨核 | Miniature crawler type tray crane |
WO2016152770A1 (en) * | 2015-03-20 | 2016-09-29 | コベルコクレーン株式会社 | Boom attach/detach device of crane and boom attach/detach method for crane |
CN206427940U (en) * | 2016-12-19 | 2017-08-22 | 西安丁子电子信息科技有限公司 | A kind of lifting transport trolley of on-site |
CN207360528U (en) * | 2017-10-24 | 2018-05-15 | 上海华润大东船务工程有限公司 | A kind of transport of materials mechanism in narrow and small cabin |
CN108951328A (en) * | 2018-07-25 | 2018-12-07 | 中国十七冶集团有限公司 | A kind of Urban Underground pipe gallery traffic dispersion method based on BIM technology |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112647525A (en) * | 2021-01-14 | 2021-04-13 | 中国建筑第八工程局有限公司 | Urban underground comprehensive pipe gallery open cut foundation pit drainage device |
Also Published As
Publication number | Publication date |
---|---|
CN110158647B (en) | 2021-02-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104847364B (en) | A kind of shield continuous cutting pile foundation passes through residential building group construction method | |
CN104060830B (en) | Method for lifting and transporting large parts of underground nuclear power station | |
CN108561146A (en) | A kind of shield machine of variable-diameter | |
CN206591432U (en) | Pipe installing job platform | |
CN108501197A (en) | The omnipotent beat of ferry-boat formula integrates flowing water prefabricated member production line | |
CN105133754A (en) | Prefabricated concrete shear wallboard counterbore guide type mounting device and method | |
CN206635599U (en) | A kind of road surface for caving in road, which is speedily carried out rescue work, fixes device | |
CN102767300B (en) | Ring-type stereo-parking system | |
CN110158647A (en) | A kind of transport of materials method in Urban Underground pipe gallery small space | |
CN104876131A (en) | Method for disassembling large tower crane by utilizing small tower crane | |
CN204434116U (en) | A kind of hanging device for interior courtyard lifting pipeline | |
CN203654767U (en) | Rotating table, rotating tower, conveying pipe, pumping mechanism and cantilever crane type material distribution device | |
CN104234447A (en) | Tool-type suspension staircase for deep foundation pit | |
CN106837376A (en) | Bind module turning device for subway tunnel section of jurisdiction | |
CN208885341U (en) | A kind of armored concrete foot plank evacuation platform for tunnel | |
CN106800265A (en) | A kind of aerial work platform collision-proof method | |
CN105804087A (en) | Installation method for steel structure below large deep foundation pit supporting beam | |
CN207362706U (en) | Load carrying type hanging basket operating platform | |
CN203359892U (en) | Device for assembling and disassembling construction trolley inside tunnel | |
CN103231993A (en) | Indoor GIS (Gas Insulated Switchgear) transporting and locating device and use method | |
CN107161851B (en) | A kind of gantry slag bucket device and method for completing automatic clinker-removing by self gravitation effect | |
CN205636495U (en) | Cast in situ concrete roof beam construction support | |
CN204131065U (en) | The non-migrating formula suspension protection system of a kind of communication pipe and cable | |
CN106012830B (en) | A kind of Super Long Tunnel anchor utilizes the horizontal hole in the tunnel method that laterally transhipment reinforcing pull rod is constructed | |
CN203834504U (en) | Structure of basement reverse construction method tower crane foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |