CN110144854A - A kind of RCC dam gallery arrangement, construction method - Google Patents

A kind of RCC dam gallery arrangement, construction method Download PDF

Info

Publication number
CN110144854A
CN110144854A CN201910440973.XA CN201910440973A CN110144854A CN 110144854 A CN110144854 A CN 110144854A CN 201910440973 A CN201910440973 A CN 201910440973A CN 110144854 A CN110144854 A CN 110144854A
Authority
CN
China
Prior art keywords
sunk type
gallery
concrete
dam
collector drain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910440973.XA
Other languages
Chinese (zh)
Other versions
CN110144854B (en
Inventor
王立成
吴剑疆
李宁博
任智锋
贾静
王成言
贾瑞旗
于野
李岳东
刘春锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Water Resources Beifang Investigation Design and Research Co Ltd
Original Assignee
China Water Resources Beifang Investigation Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Water Resources Beifang Investigation Design and Research Co Ltd filed Critical China Water Resources Beifang Investigation Design and Research Co Ltd
Priority to CN201910440973.XA priority Critical patent/CN110144854B/en
Publication of CN110144854A publication Critical patent/CN110144854A/en
Application granted granted Critical
Publication of CN110144854B publication Critical patent/CN110144854B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/20Restraining of underground water by damming or interrupting the passage of underground water by displacing the water, e.g. by compressed air

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a kind of RCC dam gallery arrangements, construction method, the main grout curtain gallery of sunk type is excavated on excavating the dam foundation completed, sunk type collector drain, sunk type cross traffic collector drain, in the main grout curtain gallery side wall of sunk type, sunk type collector drain side wall, sunk type cross traffic collector drain side wall casting concrete, in the main grout curtain gallery of sunk type, prefabricated arch ring is set at the top of sunk type collector drain and sunk type cross traffic collector drain, grout curtain is done in the main grout curtain gallery of sunk type, drainage hole is set, in sunk type collector drain, drainage hole is set, levelling blinding concrete is poured in the dam foundation and prefabricated arch ring top, prefabricated arch ring overhead height control pours under levelling blinding concrete, after the completion of pouring levelling blinding concrete and pouring, glitch-free progress top grinding coagulation Soil pours work.The present invention reduces the segmentation of storehouse surface, accelerates speed of perfusion, ensure that construction quality.

Description

A kind of RCC dam gallery arrangement, construction method
Technical field
The present invention relates to a kind of RCC dam, especially a kind of RCC dam gallery arrangement, construction method are main It is used for Compacted Concrete Gravity Dam Section and the construction of arch dam foundation gallery.
Background technique
RCC dam is a kind of new concrete dam, is risen in late 1970s, dam material mainly uses The concrete of dry poor-water mud.Relative to normality concrete dam, quickly put in storage, pave, rolling be RCC dam most Big advantage only accomplishes that above three is quick, just can guarantee the quality of grinding coagulation soil pouring quality and Coating combination.But often RCC dam is at foundation construction position, the case where there is vertical and horizontal gallery interlaced arrangements, by concrete pouring bin Face segmentation rolled so that concrete is difficult to, it has to become normal concrete or abnormal concrete poured, and this two Person's concrete calorific value is big, and temperature control difficulty is big, in fact it could happen that large-scale distress in concrete brings safety hidden to safety of dam body Suffer from, how to solve dam foundation gallery arrangement, facilitating grinding concrete construction is a urgent problem to be solved.
Summary of the invention
The technical problem to be solved by the invention is to provide a kind of RCC dam gallery arrangements, construction method, can be with The segmentation for reducing grinding coagulation soil lift surface, accelerates the speed of perfusion of concrete, ensure that construction quality.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is that: a kind of RCC dam gallery arrangement, Construction method, comprising the following steps:
(1) the main grout curtain gallery of sunk type, sunk type collector drain and sunk type are excavated on excavating the dam foundation completed Cross traffic collector drain;
(2) corridor is drained in the main grout curtain gallery side wall of sunk type, sunk type collector drain side wall, sunk type cross traffic Road side wall distinguishes casting concrete, at the top of the main grout curtain gallery of sunk type, at the top of sunk type collector drain and sunk type is horizontal Prefabricated arch ring is set at the top of to traffic collector drain;
(3) grout curtain is done in the main grout curtain gallery of sunk type, drainage hole is set, be arranged in sunk type collector drain and arrange Water hole;
(4) levelling blinding concrete is poured in the dam foundation and prefabricated arch ring top, prefabricated arch ring overhead height control is pouring Under levelling blinding concrete, after the completion of pouring levelling blinding concrete and pouring, interference-free carries out top grinding coagulation soil Pouring construction.
The main grout curtain gallery side wall casting concrete thickness >=1.0m of sunk type, sunk type cross traffic collector drain side Wall casting concrete thickness >=0.5m, sunk type collector drain side wall casting concrete thickness >=0.5m.
Levelling blinding concrete is poured in the dam foundation and prefabricated arch ring top, levelling blinding concrete is more than the dam foundation and Prefabricated arch Enclose at least 0.3m.
The RCC dam is Compacted Concrete Gravity Dam Section or rolled concrete arch dam.
The beneficial effects of the present invention are: can glitch-free progress top grinding coagulation soil pour work, reduction rolls mixed The segmentation of solidifying soil lift surface, accelerates the speed of perfusion and construction quality of concrete.Simultaneously can reduce abnormal concrete and often The dosage of state concrete simplifies Concrete Temperature Control measure, reaches guarantee construction quality, the purpose of investment reduction.
Detailed description of the invention
Fig. 1 is New RCC dam gallery structure schematic diagram of the invention.
Fig. 2 is gallery partial enlargement diagram of the invention.
Fig. 3 is gallery plan view of the invention.
Specific embodiment
Invention is further described in detail with reference to the accompanying drawings and detailed description:
As shown in Figure 1-3, RCC dam gallery of the invention is arranged, construction method, comprising the following steps:
(1) the main grout curtain gallery 2 of sunk type, sunk type collector drain 3 are excavated on excavating the dam foundation 1 completed and are sunk Formula cross traffic collector drain 4;
(2) in main 2 side wall of grout curtain gallery of sunk type, 3 side wall of sunk type collector drain, the draining of sunk type cross traffic 4 side wall of gallery distinguishes casting concrete 5,2 top of the main grout curtain gallery of sunk type, 3 top of sunk type collector drain and under Prefabricated arch ring 6 is set at the top of heavy formula cross traffic collector drain 4;
(3) grout curtain 7 is done in the main grout curtain gallery 2 of sunk type, drainage hole 8 is set, is set in sunk type collector drain 3 Set drainage hole 8;
(4) levelling blinding concrete 9 is poured in the dam foundation 1 and 6 top of prefabricated arch ring, prefabricated 6 overhead height of arch ring control exists It pours under levelling blinding concrete 9, after the completion of pouring levelling blinding concrete 9 and pouring, interference-free carries out top and rolls 10 pouring construction of concrete.
Main 2 side wall casting concrete thickness of the grout curtain gallery >=1.0m of sunk type drains corridor in sunk type cross traffic 4 side wall casting concrete thickness of road >=0.5m and in 3 side wall casting concrete thickness of sunk type collector drain >=0.5m.
Pour levelling blinding concrete 9 in the dam foundation 1 and 6 top of prefabricated arch ring, levelling blinding concrete 9 be more than the dam foundation 1 and The prefabricated at least 0.3m of arch ring 6.
The RCC dam is Compacted Concrete Gravity Dam Section or rolled concrete arch dam.
Below by taking gravity dam as an example, it is described in detail:
The main grout curtain gallery 2 of sunk type is excavated on excavating the dam foundation 1 completed, and excavates 1 sunk type collector drain of the dam foundation 3,1 sunk type cross traffic collector drain 4 of the dam foundation is excavated, in the main 2 side wall casting concrete 5 of grout curtain gallery of sunk type, 3 side wall casting concrete 5 of sunk type collector drain, in 4 side wall casting concrete 5 of sunk type cross traffic collector drain, under Prefabricated arch ring is set at the top of the heavy main grout curtain gallery 2 of formula, sunk type collector drain 3 and sunk type cross traffic collector drain 4 6, grout curtain 7 is done in the main grout curtain gallery 2 of sunk type, drainage hole 8 is set, drainage hole is set in sunk type collector drain 3 8, levelling blinding concrete 9 is poured in the dam foundation 1 and 6 top of prefabricated arch ring, prefabricated 6 overhead height of arch ring control pours levelling bed course Under concrete 9, after the completion of pouring levelling blinding concrete 9 and pouring, glitch-free progress top grinding coagulation soil 10 is poured Work.The present invention can reduce the segmentation of grinding coagulation soil lift surface, accelerate the speed of perfusion of concrete, ensure that construction matter Amount.
Wherein main 25 thickness of side wall casting concrete of the grout curtain gallery >=1.0m of sunk type is arranged in sunk type cross traffic 45 thickness of side wall casting concrete of water gallery >=0.5m and in 35 thickness of side wall casting concrete of sunk type collector drain >=0.5m. Levelling blinding concrete 9 is poured in the dam foundation 1 and 6 top of prefabricated arch ring, and levelling 9 thickness of blinding concrete is more than the dam foundation 1 and prefabricated 6 thickness of arch ring >=0.3m.
Example described above is merely to illustrate technical idea and feature of the invention, and its object is to those skilled in the art Member only cannot limit the scope of the patents of the invention with this example it will be appreciated that the contents of the present invention and implement accordingly, i.e., and all Same changes or modifications made by revealed spirit are invented, are still fallen within the scope of the present invention.

Claims (4)

1. a kind of RCC dam gallery arrangement, construction method, which comprises the following steps:
(1) excavated on excavating the dam foundation (1) completed the main grout curtain gallery (2) of sunk type, sunk type collector drain (3) and under Heavy formula cross traffic collector drain (4);
(2) in main grout curtain gallery (2) side wall of sunk type, sunk type collector drain (3) side wall, the draining of sunk type cross traffic Gallery (4) side wall distinguishes casting concrete (5), at the top of the main grout curtain gallery (2) of sunk type, sunk type collector drain (3) Prefabricated arch ring (6) is set at the top of top and sunk type cross traffic collector drain (4);
(3) it does grout curtain (7), is arranged drainage hole (8), in sunk type collector drain in the main grout curtain gallery (2) of sunk type (3) drainage hole (8) are set;
(4) it is poured levelling blinding concrete (9) in the dam foundation (1) and prefabricated arch ring (6) top, prefabricated arch ring (6) overhead height control System is pouring under levelling blinding concrete (9), and after the completion of pouring levelling blinding concrete (9) and pouring, interference-free is carried out Native (10) pouring construction of top grinding coagulation.
2. RCC dam gallery arrangement, construction method according to claim 1, which is characterized in that the main curtain of sunk type Irrigation gallery (2) side wall casting concrete thickness >=1.0m, sunk type cross traffic collector drain (4) side wall casting concrete are thick Degree >=0.5m, sunk type collector drain (3) side wall casting concrete thickness >=0.5m.
3. RCC dam gallery arrangement, construction method according to claim 1, which is characterized in that in the dam foundation (1) and in advance Arch ring (6) top processed pours levelling blinding concrete (9), and levelling blinding concrete (9) is more than the dam foundation (1) and prefabricated arch ring (6) At least 0.3m.
4. RCC dam gallery arrangement, construction method according to claim 1, which is characterized in that the grinding coagulation Earth dam is Compacted Concrete Gravity Dam Section or rolled concrete arch dam.
CN201910440973.XA 2019-05-24 2019-05-24 Roller compacted concrete dam gallery arrangement and construction method Active CN110144854B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910440973.XA CN110144854B (en) 2019-05-24 2019-05-24 Roller compacted concrete dam gallery arrangement and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910440973.XA CN110144854B (en) 2019-05-24 2019-05-24 Roller compacted concrete dam gallery arrangement and construction method

Publications (2)

Publication Number Publication Date
CN110144854A true CN110144854A (en) 2019-08-20
CN110144854B CN110144854B (en) 2021-05-14

Family

ID=67593080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910440973.XA Active CN110144854B (en) 2019-05-24 2019-05-24 Roller compacted concrete dam gallery arrangement and construction method

Country Status (1)

Country Link
CN (1) CN110144854B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5956032B1 (en) * 2015-07-23 2016-07-20 一般財団法人ダム技術センター Method for constructing dam corridor, corridor cell of dam corridor and formwork used for manufacturing corridor cell
CN106592533A (en) * 2016-12-23 2017-04-26 中国电建集团贵阳勘测设计研究院有限公司 Method for evaluating attenuation of seepage control system by using correlation coefficient between seepage variables
CN108265683A (en) * 2018-03-13 2018-07-10 中水北方勘测设计研究有限责任公司 The gallery arrangement of RCC dam

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5956032B1 (en) * 2015-07-23 2016-07-20 一般財団法人ダム技術センター Method for constructing dam corridor, corridor cell of dam corridor and formwork used for manufacturing corridor cell
CN106592533A (en) * 2016-12-23 2017-04-26 中国电建集团贵阳勘测设计研究院有限公司 Method for evaluating attenuation of seepage control system by using correlation coefficient between seepage variables
CN108265683A (en) * 2018-03-13 2018-07-10 中水北方勘测设计研究有限责任公司 The gallery arrangement of RCC dam

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李昌彩: "高坝洲碾压混凝土大坝廊道设置研究", 《水力发电》 *
童元雄等: "碾压混凝土拱坝预制灌浆廊道布置研究", 《黑龙江水利科技》 *

Also Published As

Publication number Publication date
CN110144854B (en) 2021-05-14

Similar Documents

Publication Publication Date Title
CN206408655U (en) The top plate sidewall structure of covered back-digging construction
CN205382466U (en) Concrete face rockfill dam
CN104790435A (en) Post-subsidence pouring belt advancing waterstop impermeable concrete structure and construction technology thereof
CN205875194U (en) Pouring jacket cofferdam bearing platform structure
CN102367735B (en) Back-to-back waterstop installation equipment for tunnel construction joint
CN105672443B (en) Structure integrating anchoring of anti-seepage film, flood interception and passing
CN205530580U (en) System integrating anchoring of impermeable membrane, flood interception and passage
CN107740708B (en) Construction structure and construction method for preventing leakage of tunnel arch wall foot
CN110144854A (en) A kind of RCC dam gallery arrangement, construction method
CN208152063U (en) A kind of superelevation infiltration coefficient sand ovum stratum Groundwater Control system
CN216075134U (en) Rich water district faces lake sandy soil deep basal pit hillside top construction road structure
CN105780820A (en) Anti-floating structure of bottom plate of underground building
CN110258660A (en) The manufacture craft and shut-in well technique of the decompression drainage sump of basement anti-floating
CN115492057A (en) Concrete core rock-fill dam structure body and construction method
CN109594590A (en) Building basement waterproof treatment structure and its construction method under the conditions of a kind of rock-mass
CN106149641B (en) A kind of rock for making panel have maintenanceability and method
CN210122735U (en) Underground structure anti-floating system based on outward-protruding wing foot plate
CN113846663A (en) Concrete continuous tooth wall structure without structural joint and construction method
CN208235463U (en) A kind of novel spillway discharge structure
CN202081425U (en) Water-saving mechanism for foundation pit water of building construction
CN203668975U (en) Sedimentation post-cast strip advancing water stopping anti-permeability concrete structure
CN219973262U (en) Seepage-proofing structure suitable for deep coverage dam foundation
CN207211173U (en) CFRD reverse drainage system
CN207297090U (en) A kind of sewer structure for expansive stratum Tunnel Base draining
CN109826203A (en) The support system of fender post and water-stop curtain building-in depth Length discrepancy

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant