CN110144239A CN201910569260.3A CN201910569260A CN110144239A CN 110144239 A CN110144239 A CN 110144239A CN 201910569260 A CN201910569260 A CN 201910569260A CN 110144239 A CN110144239 A CN 110144239A
Authority
CN
China
Prior art keywords
temperature
steam
vapour
pressure reducer
treatment process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910569260.3A
Other languages
Chinese (zh)
Inventor
解金国
李佃钊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Qingyishan Petrochemical Technology Co Ltd
Original Assignee
Shandong Qingyishan Petrochemical Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Qingyishan Petrochemical Technology Co Ltd filed Critical Shandong Qingyishan Petrochemical Technology Co Ltd
Priority to CN201910569260.3A priority Critical patent/CN110144239A/en
Publication of CN110144239A publication Critical patent/CN110144239A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10GCRACKING HYDROCARBON OILS; PRODUCTION OF LIQUID HYDROCARBON MIXTURES, e.g. BY DESTRUCTIVE HYDROGENATION, OLIGOMERISATION, POLYMERISATION; RECOVERY OF HYDROCARBON OILS FROM OIL-SHALE, OIL-SAND, OR GASES; REFINING MIXTURES MAINLY CONSISTING OF HYDROCARBONS; REFORMING OF NAPHTHA; MINERAL WAXES
    • C10G9/00Thermal non-catalytic cracking, in the absence of hydrogen, of hydrocarbon oils
    • C10G9/34Thermal non-catalytic cracking, in the absence of hydrogen, of hydrocarbon oils by direct contact with inert preheated fluids, e.g. with molten metals or salts
    • C10G9/36Thermal non-catalytic cracking, in the absence of hydrogen, of hydrocarbon oils by direct contact with inert preheated fluids, e.g. with molten metals or salts with heated gases or vapours

Landscapes

  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

A kind of Coking Tower for Delayed Coking Unit is cold burnt to vapour treatment process, including gives vapour step greatly, and the concrete operations to vapour step greatly include: that the steam of 1.0Mpa is injected into coke drum;And it is also added side by side all the way by the condensed water of temperature-decreased pressure reducer processing;Saturated vapor is finally substituted as the medium that steams out greatly using low pressure moist steam and enters coke drum.Present invention process can either significantly reduce energy consumption, and can slow down very big to the impact that the generation of full factory's steam pipe network is very big, moreover it is possible to ensure that coking avoids the load fluctuation of boiler in switching tower.

Description

A kind of Coking Tower for Delayed Coking Unit is cold burnt to vapour treatment process
Technical field
It is cold burnt to vapour treatment process that the present invention relates to a kind of Coking Tower for Delayed Coking Unit, belongs to delayed coking coke drum skill Art field.
Background technique
Coking Tower for Delayed Coking Unit processing stage mainly include it is small to vapour, greatly to vapour, small water supply, big water supply, overflow, It discharges water, cuts burnt processing, catch up with air, preheat and cut tower, whole cycle is incremental, indispensable.In general, being needed to vapour process greatly A large amount of 1.0Mpa steam injection, is stripped off a large amount of high-temperature oil gas in focus layer, sufficiently recycles the oil gas of old tower, reduce petroleum Burnt volatile matter improves Petroleum Coke.A large amount of steam consumption is a big energy consumption point of device, how to be dropped by Optimizing Reconstruction It is low to give vapour dosage greatly, while ensuring product quality, it appears it is particularly important.
In addition, to up to 430 DEG C of coke temperature in coke drum before vapour, heat transfer temperature difference can be made too big with low-temperature cooling media and Chilling is caused, quenching factor is big, leads to burned and causes Thermal Stress to tower wall, influences the safe operation and use of coke drum Service life, while increasing production accident probability of happening.
Summary of the invention
In order to overcome existing above-mentioned deficiency, the present invention provides that a kind of Coking Tower for Delayed Coking Unit is cold burnt to give vapour processing work Skill, the technique can either significantly reduce energy consumption, and can slow down very big to the impact that the generation of full factory's steam pipe network is very big, moreover it is possible to ensure Coking avoids the load fluctuation of boiler in switching tower.
The technical solution used to solve the technical problems of the present invention is that: it is big to the specific of vapour step including giving vapour step greatly Operation includes: that the steam of 1.0Mpa is injected into coke drum;And it is also added side by side all the way by temperature-decreased pressure reducer processing Condensed water, the branch finally substitute original saturated vapor as the medium that steams out greatly using low pressure moist steam and enter coke drum.
Compared with prior art, a kind of Coking Tower for Delayed Coking Unit of the invention is cold burnt to vapour treatment process, is not changing Under conditions of device operating condition, the operation handled by increasing temperature-decreased pressure reducer is sufficiently mixed condensed water and the cold burnt processing of steam, real Coke drum is showed to be replaced to steam consumption a part in vapour treatment process by condensed water greatly, has significantly reduced plant energy consumption, slow down Full factory's steam pipe network is impacted very big, also ensures that coking avoids the load fluctuation of boiler in switching tower.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is the structural schematic diagram of one embodiment of the invention.
In figure: 1, condensation flow meter, 2, level-one regulating valve, 3, second level regulating valve, 4, give steam flow meter, 5, give vapour adjust Valve, 6, mixing after temperature spot, 7, mixing after pressure spot, 8, temperature-decreased pressure reducer.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiments of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people Member's every other embodiment obtained without making creative work, belongs to protection scope of the present invention.
Fig. 1 shows the structural schematic diagram of a preferred embodiment of the invention, and one of figure delayed coking unit is burnt Charcoal tower is cold burnt to vapour treatment process, including gives vapour greatly, includes: greatly by 1.0Mpa pipe network by 1.0Mpa's to the concrete operations of vapour Low-pressure steam is injected into coke drum;And the condensed water handled all the way by temperature-decreased pressure reducer 8 is added side by side simultaneously;Finally with Low pressure moist steam substitution saturated vapor enters coke drum as the medium that steams out greatly.The embodiment of the present invention is mainly to utilize the cold of recycling Condensate replaces deaerated water, reduces the usage amount of deaerated water, and now big is to vapour by filling the water " moist steam " instead of original " saturation Steam ".
In the present embodiment, the process handled by temperature-decreased pressure reducer 8 includes: condensed water using two-stage regulating valve Process is filled the water, successively enters temperature-decreased pressure reducer 8, after encountering saturated vapor in temperature-decreased pressure reducer 8, passes through temperature-decreased pressure reducer 8 Effect is atomized and has been mixed, and low pressure moist steam is formed.Wherein, two-stage regulating valve water filling process includes: condensed water Enter temperature-decreased pressure reducer 8, level-one regulating valve by level-one regulating valve 2 and second level regulating valve 3 respectively after condensation flow meter 1 2 preliminary water supply mixing, the water supply once again of second level regulating valve 3 mixing.The steam of the 1.0Mpa pass sequentially through to steam flow meter 4 and to Enter temperature-decreased pressure reducer 8 after steam control valve 5.Preferably, the low pressure moist steam come out by the temperature-decreased pressure reducer 8, temperature are 130 DEG C, pressure is not more than 0.6Mpa.
It is further preferred that the process that the temperature-decreased pressure reducer 8 is handled is using DN25 pipeline, the steam of 1.0Mpa is direct Injection is by DN250 pipeline, and steam is through using DN200 pipeline after temperature-decreased pressure reducer 8.
Present invention implementation is mainly to increase a temperature-decreased pressure reducer 8, desuperheat subtracts on the basis of existing through-type technique Depressor 8 using two-stage regulating valve fill the water process, condensed water by condensation flow meter 1, level-one regulating valve 2, second level regulating valve 3 into Enter temperature-decreased pressure reducer 8, the preliminary water supply of level-one regulating valve 2 mixing, the water supply once again of second level regulating valve 3 mixing, while 1.0Mpa's is low Press steam by entering temperature-decreased pressure reducer 8 to steam flow meter 4, to steam control valve 5, using temperature-decreased pressure reducer 8 by condensate water atomizing It is mixed into low pressure moist steam, is filled the water and is atomized using two-stage regulating valve, sufficiently regulates and controls temperature, i.e. temperature upon mixing after pressure and temperature reducing 6 detection temperature of point control 130 DEG C or so, while observing the pressure of pressure spot 7 after mixing no more than 0.6Mpa, with low pressure moist steam Substitution saturated vapor is as the medium that steams out greatly.In turn, low pressure moist steam enters coke drum (A tower, B tower are used alternatingly) afterwards and high temperature After coke contact, low pressure moist steam gasifies rapidly, has not only played to the cooling effect of high-temperature coke, but also can strip inside coke drum Oil gas, vapor, oil gas, which are sent from top of coke tower to blowdown system, carries out cooling recycling.
Locally gasification, rapid spatial expansion when entering focus layer in order to avoid water, causes the accident risk of burned and stifled tower, And keep focus layer cooling more evenly, tower wall temperature stress influences smaller.Need to monitor key parameter (the cooling speed of coke drum simultaneously Degree, pressure etc.) ensure safety operation.Under the premise of guaranteeing coke drum safe condition, water maximum operation.
The above is only presently preferred embodiments of the present invention, not does limitation in any form to the present invention, it is all according to According to technical spirit of the invention, any simple modification and same variation are made to above embodiments, each fall within guarantor of the invention Within the scope of shield.

Claims (6)

1. a kind of Coking Tower for Delayed Coking Unit is cold burnt to vapour treatment process, including gives vapour greatly, include: to the concrete operations of vapour greatly The steam of 1.0Mpa is injected into coke drum, characterized in that be also added side by side all the way by the cold of temperature-decreased pressure reducer (8) processing Condensate;Finally enter coke drum using low pressure moist steam as the medium that steams out greatly.
2. a kind of Coking Tower for Delayed Coking Unit according to claim 1 is cold burnt to vapour treatment process, characterized in that described Include: condensed water using two-stage regulating valve water filling process by the process that temperature-decreased pressure reducer (8) are handled, successively enters pressure and temperature reducing Device (8) is atomized and is mixed by the effect of temperature-decreased pressure reducer (8) after encountering saturated vapor in temperature-decreased pressure reducer (8), Form low pressure moist steam.
3. a kind of Coking Tower for Delayed Coking Unit according to claim 2 is cold burnt to vapour treatment process, characterized in that described Two-stage regulating valve water filling process includes: that condensed water passes through level-one regulating valve (2) and second level respectively after condensation flow meter (1) Regulating valve (3) enters temperature-decreased pressure reducer (8), the preliminary water supply mixing of level-one regulating valve (2), and second level regulating valve (3) water supply once again is mixed It closes.
4. a kind of Coking Tower for Delayed Coking Unit according to claim 2 or 3 is cold burnt to vapour treatment process, it is characterized in that: The steam of the 1.0Mpa passes sequentially through to steam flow meter (4) and enters temperature-decreased pressure reducer (8) afterwards to steam control valve (5).
5. a kind of Coking Tower for Delayed Coking Unit according to claim 4 is cold burnt to vapour treatment process, it is characterized in that: by The low pressure moist steam that the temperature-decreased pressure reducer (8) comes out, temperature are 130 DEG C, and pressure is not more than 0.6Mpa.
6. a kind of Coking Tower for Delayed Coking Unit according to claim 4 is cold burnt to vapour treatment process, it is characterized in that: described The process of temperature-decreased pressure reducer (8) processing use DN25 pipeline, the steam of 1.0Mpa is directly injected into through DN250 pipeline, steam Through using DN200 pipeline after temperature-decreased pressure reducer (8).
CN201910569260.3A 2019-06-27 2019-06-27 A kind of Coking Tower for Delayed Coking Unit is cold burnt to vapour treatment process Pending CN110144239A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910569260.3A CN110144239A (en) 2019-06-27 2019-06-27 A kind of Coking Tower for Delayed Coking Unit is cold burnt to vapour treatment process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910569260.3A CN110144239A (en) 2019-06-27 2019-06-27 A kind of Coking Tower for Delayed Coking Unit is cold burnt to vapour treatment process

Publications (1)

Publication Number Publication Date
CN110144239A true CN110144239A (en) 2019-08-20

Family

ID=67596687

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910569260.3A Pending CN110144239A (en) 2019-06-27 2019-06-27 A kind of Coking Tower for Delayed Coking Unit is cold burnt to vapour treatment process

Country Status (1)

Country Link
CN (1) CN110144239A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102329633A (en) * 2011-08-31 2012-01-25 上海优华系统集成技术有限公司 Energy-saving process of steam mass blowing flow in delayed coking device
CN203440306U (en) * 2013-09-02 2014-02-19 山西宏特煤化工有限公司 Needle coke production device
CN205821247U (en) * 2016-07-08 2016-12-21 中化弘润石油化工有限公司 The cold burnt of delayed coking coke drum improves device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102329633A (en) * 2011-08-31 2012-01-25 上海优华系统集成技术有限公司 Energy-saving process of steam mass blowing flow in delayed coking device
CN203440306U (en) * 2013-09-02 2014-02-19 山西宏特煤化工有限公司 Needle coke production device
CN205821247U (en) * 2016-07-08 2016-12-21 中化弘润石油化工有限公司 The cold burnt of delayed coking coke drum improves device

Similar Documents

Publication Publication Date Title
CN106439855B (en) A kind of steam air pre-heating system of garbage burning boiler
US9410096B2 (en) Method and system for cooling and washing biomass syngas
KR101450660B1 (en) Reduction of white smoke abatement systems and methods
CN206496353U (en) A kind of steam air pre-heating system of garbage burning boiler
CN105132042A (en) Slagging device of crude benzene regenerator and slagging method
CN107286961A (en) A kind of coal oven dithio-gas high temperature section heat high efficiente callback device
CN208594234U (en) A kind of residual heat heat-exchanging device recycling raw coke over gas riser
CN102519285B (en) Integrated technique and special equipment for raw gas waste heat recovery and steam replacement with heat transfer soil
CN110144239A (en) A kind of Coking Tower for Delayed Coking Unit is cold burnt to vapour treatment process
CN201280954Y (en) Rear gland sealing steam supply device for condensing steam turbine
CN209893366U (en) Steam-water circulating system for waste incineration power generation
CN203928764U (en) A kind of electric furnace fume residual heat recycle device
CN214536093U (en) Low-grade waste heat recovery system of coking production system
CN107420868A (en) A kind of coal oven dithio-gas high temperature section heat high efficiente callback technique
CN207047150U (en) A kind of coal oven dithio-gas high temperature section heat high efficiente callback device
CN109401799B (en) High-temperature gas heat recycling system and method
CN203095621U (en) Special waste heat utilization device in production process of sodium hexametaphoshpate
CN209371203U (en) A kind of high parameter waste heat boiler suitable for refuse incineration grate furnace
CN217928787U (en) Closed circulating cooling system of water-cooled grate furnace for waste incineration
CN102759099A (en) Method for rising superheated steam temperature of concurrent boiler during pipe blowing
CN109630998A (en) A kind of high parameter waste heat boiler suitable for refuse incineration grate furnace
CN220376616U (en) Naphtha separation condensate water treatment system
CN111139103B (en) Heat accumulating type pyrolysis gasification device
CN112762425B (en) Multifunctional composite burner power generation device
EP2596286B1 (en) A method and a device for cooling wood gases

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190820