CN110138637A - Test data processing method, device, computer equipment and storage medium - Google Patents
Test data processing method, device, computer equipment and storage medium Download PDFInfo
- Publication number
- CN110138637A CN110138637A CN201910405378.2A CN201910405378A CN110138637A CN 110138637 A CN110138637 A CN 110138637A CN 201910405378 A CN201910405378 A CN 201910405378A CN 110138637 A CN110138637 A CN 110138637A
- Authority
- CN
- China
- Prior art keywords
- current test
- test data
- equipment
- data
- current
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/08—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
- H04L43/0805—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability
- H04L43/0817—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability by checking functioning
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/50—Testing arrangements
Abstract
This application involves a kind of test data processing method, device, computer equipment and storage mediums.The described method includes: receiving current test assignment, the current test assignment includes current test object;The current test assignment is executed, the current test data of the current test object is obtained;It sends the current test data and obtains the equipment state of the current test object so that the computer equipment analyzes the current test data to computer equipment;Receive the equipment state of the current test object.Pass through collecting test data, test data is sent to corresponding processing terminal, test data is analyzed by terminal, corresponding analysis result must be beaten, receive analysis result, data are analyzed comprehensively by system, avoid tester because of the situation of test result inaccuracy caused by personal experience, so that test result is more accurate.
Description
Technical field
This application involves field of computer technology more particularly to a kind of test data processing methods, device, computer equipment
And storage medium.
Background technique
In powerline network, the carrying out of O&M operation mainly carries out operation using can carry non intelligent tester.
In operation field, operative goals are inspected to complete the connection of test equipment, and according to the numerical value voluntarily recorded manually to tester
Device carries out data configuration, and tester carries out test jobs.After a test, tester rule of thumb directly carries out test data
Judgement, and the experience of tester is different, causes test accuracy low.
Summary of the invention
In order to solve the above-mentioned technical problem or it at least is partially solved above-mentioned technical problem, this application provides a kind of sides
Method, device, computer equipment and storage medium.
In a first aspect, this application provides a kind of test data processing methods, comprising:
Current test assignment is received, current test assignment includes current test object;
The current test assignment is executed, the current test data of current test object is obtained;
It sends current test data and is obtained to computer equipment so that computer equipment analyzes current test data
To the equipment state of current test object;
Receive the equipment state of current test object.
Second aspect, this application provides a kind of test data processing units, comprising:
Data reception module, for receiving current test assignment, current test assignment includes current test object;
Test module obtains the current test data of current test object for executing current test assignment;
Data transmission blocks, for sending current test data to computer equipment, so that computer equipment is surveyed to current
Examination data are analyzed, and the equipment state of current test object is obtained;
Equipment state receiving module, for receiving the equipment state of current test object.
A kind of computer equipment can be run on a memory and on a processor including memory, processor and storage
Computer program, the processor perform the steps of when executing the computer program
Current test assignment is received, current test assignment includes current test object;
Current test assignment is executed, the current test data of current test object is obtained;
It sends current test data and is obtained to computer equipment so that computer equipment analyzes current test data
To the equipment state of current test object;
Receive the equipment state of current test object.
A kind of computer readable storage medium is stored thereon with computer program, when computer program is executed by processor
It performs the steps of
Current test assignment is received, current test assignment includes current test object;
Current test assignment is executed, the current test data of current test object is obtained;
It sends current test data and is obtained to computer equipment so that computer equipment analyzes current test data
To the equipment state of current test object;
Receive the equipment state of current test object.
The above method, device, computer equipment and storage medium, method includes: to receive current test assignment, current to test
Task includes current test object;Current test assignment is executed, the current test data of current test object is obtained;It sends current
Test data obtains current test object so that computer equipment analyzes current test data to computer equipment
Equipment state;Receive the equipment state of current test object.By collecting test data, test data is sent to corresponding place
Terminal is managed, test data is analyzed by terminal, corresponding analysis must be played as a result, receiving analysis as a result, by system pair
Data are analyzed comprehensively, avoid tester because of the situation of test result inaccuracy caused by personal experience, so that surveying
Test result is more accurate.
Detailed description of the invention
The drawings herein are incorporated into the specification and forms part of this specification, and shows and meets implementation of the invention
Example, and be used to explain the principle of the present invention together with specification.
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, for those of ordinary skill in the art
Speech, without any creative labor, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the applied environment figure of test data processing method in one embodiment;
Fig. 2 is the flow diagram of test data processing method in one embodiment;
Fig. 3 is the structural block diagram of test data processing unit in one embodiment;
Fig. 4 is the internal structure chart of computer equipment in one embodiment.
Specific embodiment
To keep the purposes, technical schemes and advantages of the embodiment of the present application clearer, below in conjunction with the embodiment of the present application
In attached drawing, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described embodiment is
A part of the embodiment of the application, instead of all the embodiments.Based on the embodiment in the application, ordinary skill people
Member's every other embodiment obtained without making creative work, shall fall in the protection scope of this application.
Fig. 1 is the applied environment figure of test data processing method in one embodiment.Referring to Fig.1, which is handled
Method is applied to test data processing system.The test data processing system includes test terminal 110 and computer equipment 120.
Test terminal 110 and computer equipment 120 pass through network connection.Test terminal 110 refer to it is common can be in electric system
The test terminal tested of each logical communication equipment.Computer equipment can be terminal or server, and wherein terminal includes
Terminal console or mobile terminal, mobile terminal specifically can be at least one in mobile phone, tablet computer, laptop, camera etc.
Kind.Server can be realized with the server cluster of the either multiple server compositions of independent server.
As shown in Fig. 2, in one embodiment, providing a kind of test data processing method.The present embodiment is mainly with this
Method is applied to the terminal 110 (or computer equipment 120) in above-mentioned Fig. 1 to illustrate.Referring to Fig. 2, at the test data
Reason method specifically comprises the following steps:
Step S201, receives current test assignment, and current test assignment includes current test object.
Step S202 executes current test assignment, obtains the current test data of current test object.
Step S203 sends current test data to computer equipment so that computer equipment to current test data into
Row analysis, obtains the equipment state of current test object.
Step S204, receive institute currently test object equipment state.
Specifically, the test assignment that current test assignment refers to the test assignment of tester's configuration or automatically generates, when
Preceding test assignment is one or more tasks.Carry corresponding test object in each test assignment, test assignment can be with
Comprising multiple test objects, multiple optical fiber are such as tested.Test object refers to the communication equipment in tested power communication system.
The equipment for wherein receiving current test assignment is the equipment for being detected to tested equipment, including but not limited to optical fiber
The optical time domain reflectometer (Optical Time Domain Reflectometer, OTDR) that is detected detects interface
Port detecting instrument etc..When each test equipment receives corresponding test assignment, according to the testing requirement in test assignment
Corresponding test object is tested, the test data of each test object is obtained.Wherein test data includes test assignment
In the corresponding all data of testing requirement, by taking optical cable as an example, such as use OTDR test optical fibre cables when, refractive index, pulse need to be configured
Width, measuring distance, test optical wavelength, average value, dynamic range etc. parameter, different parameters correspond to different test knots
Fruit.
Computer equipment refers to the terminal and/or server for carrying out data analysis to current test data.Work as reception
To test terminal send current test data when, current test data is analyzed according to preconfigured analysis method,
Obtain the equipment state of the corresponding test equipment of current test data.Wherein equipment state is the operating status for describing equipment
The state parameter relevant to the professional ability of firmware itself and equipment of equipment with bearing capacity etc..By taking optical fiber as an example, include
Whether optical fiber can operate normally the service bearer ability of optical fiber, current carrying data etc..
In one embodiment, before step S203, further includes: the integrality of current test data is verified, when
When the verification state of current test data is complete, the step of sending the current test data to computer equipment is executed, with
Computer equipment is set to carry out completeness check, the school of the current test data received to the current test data received
Test result.
Specifically, need to detect data before transmitting data, after data receiver to received data into
Row detection, such as the integrality of detection data, that is, ensuring to send data is completely, data leakage hair to be avoided, and miss receipts, thus shadow
The analysis for ringing follow-up data, the equipment state inaccuracy for causing analysis to obtain, increases data check process, can be improved to test
The accuracy of the test data of object.
In one embodiment, current test data is sent to computer equipment, so that computer equipment is to current test
Data are analyzed, and the equipment state of current test object is obtained, comprising: send current test data to computer equipment, when
Preceding test data carries the device identification of current test object, so that computer equipment obtains history corresponding with device identification and surveys
Data, analysis of history test data and current test data are tried, the equipment state of test object is obtained.
Specifically, after computer equipment receives current test data, according to the current survey of current test data carrying
The device identification of object is tried, historical test data corresponding with the device identification is obtained.Wherein device identification is for uniquely marking
Know the label data of current test object.Label data customized can be arranged, such as therein using character, text and number
At least one indicates.Historical test data refers to current test object is tested before current test data after obtain
Test data, the historical test data can for before the current test data of current test object whole test datas or part
Test data, specific data screening rule customized can be arranged.By to historical test data and current test data into
Row comparison judges that the healthy trend of current test object, i.e., the equipment of current test object current state and future state are good for
Health trend can be shown in the form of chart.The historical test data and current test data of single tested object are carried out
Comparison, judges the trend of current test object, convenient for single tested object detection monitoring and management.
In one embodiment, current test object is multiple communication equipments, sends current test data to computer and sets
It is standby, so that computer equipment analyzes the current test data, obtain the equipment state of current test object, comprising:
Send the equipment that the current test data of each communication equipment carries current test object to computer equipment, current test data
Mark and corresponding device attribute information, so that computer equipment is according to identical device attribute information to each communication equipment
Current test data is divided, and the current test data of each group communication equipment is obtained, and is carried out to each group communications device data whole
Body analysis, obtains the equipment state of each group communication equipment.
Specifically, current test object includes multiple communication equipments.Each communication equipment is carried in current test data
Device identification and corresponding attribute information, attribute information be the information for being described and managing to equipment, specifically include
Which attribute information can be such as associated with including equipment position, device model with equipment according to the customized setting of business demand
Degree etc..Communication equipment is grouped according to the attribute information of equipment, such as according to communication equipment region to communication equipment
It is grouped, global analysis is carried out to each region communication equipment, obtains the equipment state of the whole equipment in each region.It is whole
Body analysis refers to that the current state for carrying out analysis and individual equipment to the integrality of each group communication equipment is analyzed, such as to it
In the service bearer ability of each equipment in a region analyzed, obtain the service bearer ability of each communication equipment, root
According to the connection relationship between the bearing capacity and each equipment of each equipment, the service bearer ability of whole region is determined.Analysis
The service bearer ability of each communication equipment and each group communication equipment, is managed convenient for the business to system.
In one embodiment, equipment state includes the business tendency information of current test object, current test object
At least one of service bearer information, service bearer information of existing object region.
In one embodiment, after step S204, further includes: show the equipment state of current test object.Equipment shape
State can be adopted and is graphically shown, and such as the state of equipment is described using equipment state curve graph.
Above-mentioned test data processing method, comprising: receive current test assignment, current test assignment includes current test pair
As executing current test assignment, obtaining the current test data of current test object, send current test data to computer and set
It is standby, so that computer equipment analyzes current test data, the equipment state of current test object is obtained, receives current survey
Try the equipment state of object.By collecting test data, test data is sent to corresponding processing terminal, by terminal to survey
Examination data are analyzed, and must be played corresponding analysis as a result, receiving analysis as a result, analyzed by system data comprehensively, be kept away
Tester is exempted from because of the situation of test result inaccuracy caused by personal experience, so that test result is more accurate.
In a specific embodiment, above-mentioned test data processing system includes testing terminal 110 and computer equipment
120。
The product that test terminal is coupled with computer equipment.Communication module is built in test terminal, mould is communicated
Block is attached by bluetooth or WLAN wireless network with the computer equipment that cellular network is connect is possessed, and is connected by internet
It is connected to test data management platform, carries out the network transmission of data.Communication module at work from platform obtain data distributing to
Task configuration module simultaneously will test result and be back to management platform, and management platform is completed this subtask and carried out to the data passed back
Management.
In intelligent communication module, hardware structure main purpose is to realize test platform network communication, task configuration module
Between data interaction and transmission safety.When data interact in a network and between different function module, it will use not
Same agreement and interface.
In one embodiment, it is wirelessly connected in module and is divided into bluetooth wireless connection and WLAN two kinds of connection moulds of wireless connection
Block.Operator equipped with management system and the computer equipment of network connection with communication module by being attached, from network test
Data management platform obtains this mission bit stream, by the Internet Port downloading data of computer equipment, and by with communication
The wireless network connection of module and corresponding network protocol, which pass data to, to be wirelessly connected in module.
In one embodiment, it is attached in wired connection module using USB Type-C interface, operating personnel can be with
It is transferred by different adapters from different computer equipments, completes the terminal connection of multiple interfaces.And pass through
Control program in wired connection and computer equipment carries out data interaction, and completes the number with network testing data management platform
According to interaction.
In one embodiment, in wireless module, being wirelessly transferred the agreement used is 4.0 standard agreement of bluetooth and WLAN
IEEE802.11b standard agreement.Wire transmission module uses USB Type-C Universal Serial Bus Interface agreement.
Design data interface allows communication module to carry out data interaction by interface and task configuration module.It completes net
The passback of network data issuing from communication module to task configuration module and task action result to communication module.Data-interface
Reliability is kept in this course, protects data not to be destroyed, distort or lose, and verify data is complete upon completion of the transmission
Property.Data-interface is developed, the communication protocol used has verifying function, and when carrying out information transmission, transmission receiving end makes
Data packet integrality is verified with checking algorithm.Such as the exclusive or check of message.All transmission data are all specified with one
Initial value (usually 0) exclusive or it is primary, last result is exactly check value, usually it be attached to transmission data finally, will
The transmission data that attached check value are sent together.Oneself an exclusive or and verification are also calculated after recipient receives data
Value illustrates that the data received are complete if consistent with the check value received.
It include mission bit stream processor and register in task configuration module.Communication module will count after receiving mission bit stream
It is stored in the register being transmitted in task configuration module according to packet, data is handled by mission bit stream processor, are solved
Analysis, and be stored again in register, register carries out data friendship by equipment data interface and traditional unintelligent device
Mutually, pass through this interface collecting test after task execution as a result, storage is sent to communication module and passes back into register
Platform is managed, management platform judges test result by analyzing, and result is stored in computer equipment and is issued to
Client.
The test result of conventional method is directly to show in test terminal, and test number just can not be almost saved after test
According to causing data to waste.And test data is recorded and is analyzed in cloud management platform to realize the pipe to test data
Reason, wherein the analysis method of test data includes region entirety analytic approach and trend prediction analysis method etc..Artificial judgment base
Yu Dangci test judges whether the operating status of communication equipment is normal currently, and global analysis may determine that area's device within the domain
Service condition, for example every fiber core carries how many business, bearing optical fiber how many business of whole region etc., healthy trend
It can judge the loss situation of equipment health degree according to the data of equipment, how long can probably not be available after the service life.Using
Different analysis methods analyze test data, so that quickly positioning failure equipment, guarantees the stabilization of power communication system
Operation.
Fig. 2 is the flow diagram of test data processing method in one embodiment.Although should be understood that Fig. 2's
Each step in flow chart is successively shown according to the instruction of arrow, but these steps are not necessarily to indicate according to arrow
Sequence successively executes.Unless expressly stating otherwise herein, there is no stringent sequences to limit for the execution of these steps, these steps
Suddenly it can execute in other order.Moreover, at least part step in Fig. 2 may include multiple sub-steps or multiple ranks
Section, these sub-steps or stage are not necessarily to execute completion in synchronization, but can execute at different times, this
The execution sequence in a little step perhaps stage be also not necessarily successively carry out but can be with other steps or other steps
Sub-step or at least part in stage execute in turn or alternately.
In one embodiment, as shown in figure 3, providing a kind of test data processing unit 200, comprising:
Data reception module 201, for receiving current test assignment, current test assignment includes current test object.
Test module 202 obtains the current test data of current test object for executing current test assignment.
Data transmission blocks 203, for sending current test data to computer equipment, so that computer equipment is to current
Test data is analyzed, and the equipment state of current test object is obtained.
Equipment state receiving module 204, for receiving the equipment state of current test object.
In one embodiment, above-mentioned test data processing unit, further includes:
Data check module is verified for the integrality to current test data, when the verification of current test data
When state is complete, the step of sending current test data to computer equipment is executed, so that computer equipment is to receiving
Current test data carries out completeness check, the check results of the current test data received.
In one embodiment, data transmission blocks are also used to send current test data to computer equipment, current survey
Examination data carry the device identification of current test object, so that computer equipment obtains history corresponding with device identification and tests number
According to analysis of history test data and current test data obtain the equipment state of test object.
In one embodiment, the current test data that data transmission blocks are also used to send each communication equipment extremely calculates
Machine equipment, current test data carries the device identification and corresponding device attribute information of current test object, so that computer
Equipment is divided according to current test data of the identical device attribute information to each communication equipment, is obtained each group communication and is set
Standby current test data carries out global analysis to each group communications device data, obtains the equipment state of each group communication equipment,
In current test object be multiple communication equipments.
In one embodiment, the equipment state in above equipment state receiving module and data transmission blocks includes current
The business tendency information of test object, the service bearer information of current test object, existing object region service bearer
At least one of information.
In one embodiment, above-mentioned test data processing unit, further includes:
Display module, for showing the equipment state of current test object
Fig. 4 shows the internal structure chart of computer equipment in one embodiment.The computer equipment specifically can be Fig. 1
In terminal 110 (or computer equipment 120).As shown in figure 4, it includes passing through to be that the computer equipment, which includes the computer equipment,
Processor, memory, network interface, input unit and the display screen of bus of uniting connection.Wherein, memory includes non-volatile deposits
Storage media and built-in storage.The non-volatile memory medium of the computer equipment is stored with operating system, can also be stored with calculating
Machine program when the computer program is executed by processor, may make processor to realize test data processing method.The built-in storage
In can also store computer program, when which is executed by processor, may make processor execute test data at
Reason method.The display screen of computer equipment can be liquid crystal display or electric ink display screen, the input of computer equipment
Device can be the touch layer covered on display screen, be also possible to the key being arranged on computer equipment shell, trace ball or touching
Plate is controlled, can also be external keyboard, Trackpad or mouse etc..
It will be understood by those skilled in the art that structure shown in Fig. 4, only part relevant to application scheme is tied
The block diagram of structure does not constitute the restriction for the computer equipment being applied thereon to application scheme, specific computer equipment
It may include perhaps combining certain components or with different component layouts than more or fewer components as shown in the figure.
In one embodiment, test data processing unit provided by the present application can be implemented as a kind of computer program
Form, computer program can be run in the computer equipment as shown in figure Y.Composition can be stored in the memory of computer equipment
Each program module of the test data processing unit, for example, data reception module 201 shown in figure Z, test module 202, number
According to sending module 203 and equipment state receiving module 204.The computer program that each program module is constituted executes processor
Step in the test data processing method of each embodiment of the application described in this specification.
For example, computer equipment shown in Fig. 4 can be connect by the data in test data processing unit as shown in Figure 3
It receives module 201 and executes the current test assignment of reception, current test assignment includes current test object.Computer equipment can pass through survey
Die trial block 202 executes current test assignment, obtains the current test data of current test object.Computer equipment can pass through data
Sending module 203, which executes, sends current test data to computer equipment, so that computer equipment carries out current test data
Analysis, obtains the equipment state of current test object.Computer equipment, which can execute to receive by equipment state receiving module 204, to be worked as
The equipment state of preceding test object.
In one embodiment, a kind of computer equipment is provided, including memory, processor and storage are on a memory
And the computer program that can be run on a processor, processor perform the steps of reception current survey when executing computer program
Trial business, current test assignment include current test object;Current test assignment is executed, the current survey of current test object is obtained
Try data;It sends current test data and is obtained to computer equipment so that computer equipment analyzes current test data
The equipment state of current test object;Receive the equipment state of current test object.
In one embodiment, before sending current test data to computer equipment, processor executes computer program
When also perform the steps of the integrality of current test data verified, when the verification state of current test data has been
When whole, the step of sending current test data to computer equipment is executed;So that current test of the computer equipment to receiving
Data carry out completeness check, the check results of the current test data received.
In one embodiment, current test data is sent to computer equipment, so that computer equipment is to current test
Data are analyzed, and the equipment state of current test object is obtained, comprising: send current test data to computer equipment, when
Preceding test data carries the device identification of current test object;So that computer equipment obtains history corresponding with device identification and surveys
Try data;Analysis of history test data and current test data, obtain the equipment state of test object.
In one embodiment, current test object is multiple communication equipments, sends current test data to computer and sets
It is standby, so that computer equipment analyzes current test data, obtain the equipment state of current test object, comprising: send
The current test data of each communication equipment to computer equipment, current test data carries the device identification of current test object
With corresponding device attribute information;So that computer equipment is according to identical device attribute information to the current of each communication equipment
Test data is divided, and the current test data of each group communication equipment is obtained;Whole point is carried out to each group communications device data
Analysis, obtains the equipment state of each group communication equipment.
In one embodiment, equipment state includes the business tendency information of current test object, current test object
At least one of service bearer information, service bearer information of existing object region.
In one embodiment, which is characterized in that after the equipment state for receiving current test object, processor executes meter
The equipment state for showing current test object is also performed the steps of when calculation machine program.
In one embodiment, a kind of computer readable storage medium is provided, computer program is stored thereon with, is calculated
Machine program performs the steps of when being executed by processor receives current test assignment, and current test assignment includes current test pair
As;Current test assignment is executed, the current test data of current test object is obtained;Current test data to computer is sent to set
It is standby, so that computer equipment analyzes current test data, obtain the equipment state of current test object;Receive current survey
Try the equipment state of object.
In one embodiment, before sending current test data to computer equipment, in computer program by processor
It is also performed the steps of when execution and the integrality of current test data is verified, when the verification state of current test data
When being complete, the step of sending current test data to computer equipment is executed;So that computer equipment is current to what is received
Test data carries out completeness check, the check results of the current test data received.
In one embodiment, current test data is sent to computer equipment, so that computer equipment is to current test
Data are analyzed, and the equipment state of current test object is obtained, comprising: send current test data to computer equipment, when
Preceding test data carries the device identification of current test object;So that computer equipment obtains history corresponding with device identification and surveys
Try data;Analysis of history test data and current test data, obtain the equipment state of test object.
In one embodiment, current test object is multiple communication equipments, sends current test data to computer and sets
It is standby, so that computer equipment analyzes current test data, obtain the equipment state of current test object, comprising: send
The current test data of each communication equipment to computer equipment, current test data carries the device identification of current test object
With corresponding device attribute information;So that computer equipment is according to identical device attribute information to the current of each communication equipment
Test data is divided, and the current test data of each group communication equipment is obtained;Whole point is carried out to each group communications device data
Analysis, obtains the equipment state of each group communication equipment.
In one embodiment, equipment state includes the business tendency information of current test object, current test object
At least one of service bearer information, service bearer information of existing object region.
In one embodiment, which is characterized in that after the equipment state for receiving current test object, computer program quilt
Processor also performs the steps of the equipment state for showing current test object when executing.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with
Relevant hardware is instructed to complete by computer program, the program can be stored in a non-volatile computer and can be read
In storage medium, the program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein, provided herein
Each embodiment used in any reference to memory, storage, database or other media, may each comprise non-volatile
And/or volatile memory.Nonvolatile memory may include that read-only memory (ROM), programming ROM (PROM), electricity can be compiled
Journey ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include random access memory
(RAM) or external cache.By way of illustration and not limitation, RAM is available in many forms, such as static state RAM
(SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double data rate sdram (DDRSDRAM), enhanced SDRAM
(ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) directly RAM (RDRAM), straight
Connect memory bus dynamic ram (DRDRAM) and memory bus dynamic ram (RDRAM) etc..
It should be noted that, in this document, the relational terms of such as " first " and " second " or the like are used merely to one
A entity or operation with another entity or operate distinguish, without necessarily requiring or implying these entities or operation it
Between there are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant are intended to
Cover non-exclusive inclusion, so that the process, method, article or equipment for including a series of elements not only includes those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or setting
Standby intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that
There is also other identical elements in the process, method, article or apparatus that includes the element.
The above is only a specific embodiment of the invention, is made skilled artisans appreciate that or realizing this hair
It is bright.Various modifications to these embodiments will be apparent to one skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention
It is not intended to be limited to the embodiments shown herein, and is to fit to and applied principle and features of novelty phase one herein
The widest scope of cause.
Claims (10)
1. a kind of test data processing method, which is characterized in that the described method includes:
Current test assignment is received, the current test assignment includes current test object;
The current test assignment is executed, the current test data of the current test object is obtained;
The current test data is sent to computer equipment, so that the computer equipment carries out the current test data
Analysis, obtains the equipment state of the current test object;
Receive the equipment state of the current test object.
2. the method according to claim 1, wherein described send the current test data to computer equipment
Before, further includes:
The integrality of the current test data is verified, when the verification state of the current test data is complete,
Execute described the step of sending the current test data to computer equipment;
So that the computer equipment carries out completeness check to the current test data that receives, what is received described works as
The check results of preceding test data.
3. the method according to claim 1, wherein the current test data to the computer that sends is set
It is standby, so that the computer equipment analyzes the current test data, obtain the equipment shape of the current test object
State, comprising:
The current test data is sent to computer equipment, the current test data carries setting for the current test object
Standby mark;
So that the computer equipment obtains historical test data corresponding with the device identification;
The historical test data and the current test data are analyzed, the equipment state of the test object is obtained.
4. the method according to claim 1, wherein the current test object be multiple communication equipments, it is described
The current test data is sent to computer equipment, so that the computer equipment divides the current test data
Analysis, obtains the equipment state of the current test object, comprising:
The current test data of each communication equipment is sent to computer equipment, the current test data carry described in work as
The device identification of preceding test object and corresponding device attribute information;
So that the computer equipment is according to identical device attribute information to the current test data of each communication equipment
It is divided, obtains the current test data of each group communication equipment;
Global analysis is carried out to each group communications device data, obtains the equipment state of communication equipment described in each group.
5. the method according to claim 1, wherein the equipment state includes the industry of the current test object
Business tendency information, the service bearer information of the current test object, the service bearer information of the existing object region
At least one of.
6. method according to any one of claims 1 to 5, which is characterized in that the reception current test object
After equipment state, further includes:
Show the equipment state of the current test object.
7. a kind of test data processing unit, which is characterized in that described device includes:
Data reception module, for receiving current test assignment, the current test assignment includes current test object;
Test module obtains the current test data of the current test object for executing the current test assignment;
Data transmission blocks, for sending the current test data to computer equipment, so that the computer equipment is to institute
It states current test data to be analyzed, obtains the equipment state of the current test object;
Equipment state receiving module, for receiving the equipment state of the current test object.
8. device according to claim 7, which is characterized in that the data transmission blocks are also used to send the current survey
Data are tried to computer equipment, the current test data carries the device identification of the current test object, so that the meter
It calculates machine equipment and obtains historical test data corresponding with the device identification, analyze the historical test data and the current survey
Data are tried, the equipment state of the test object is obtained.
9. a kind of computer equipment including memory, processor and stores the meter that can be run on a memory and on a processor
Calculation machine program, which is characterized in that the processor realizes any one of claims 1 to 6 institute when executing the computer program
The step of stating method.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program
The step of method described in any one of claims 1 to 6 is realized when being executed by processor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910405378.2A CN110138637B (en) | 2019-05-16 | 2019-05-16 | Test data processing method and device, computer equipment and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910405378.2A CN110138637B (en) | 2019-05-16 | 2019-05-16 | Test data processing method and device, computer equipment and storage medium |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110138637A true CN110138637A (en) | 2019-08-16 |
CN110138637B CN110138637B (en) | 2021-09-21 |
Family
ID=67574405
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910405378.2A Active CN110138637B (en) | 2019-05-16 | 2019-05-16 | Test data processing method and device, computer equipment and storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110138637B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110619183A (en) * | 2019-09-24 | 2019-12-27 | 中国航空工业集团公司沈阳飞机设计研究所 | Full-life-cycle test flight test data management method |
CN111598503A (en) * | 2020-04-16 | 2020-08-28 | 广东信通通信有限公司 | Material checking method, mobile terminal and computer readable storage medium |
CN112835759A (en) * | 2021-02-01 | 2021-05-25 | 百度在线网络技术(北京)有限公司 | Test data processing method and device, electronic equipment and storage medium |
WO2022062567A1 (en) * | 2020-09-23 | 2022-03-31 | 爱德万测试股份有限公司 | Product test data detection method and system, electronic device, and storage medium |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102231686A (en) * | 2011-06-24 | 2011-11-02 | 北京天融信科技有限公司 | System and method for implementing automated test of network security equipment |
CN102495799A (en) * | 2011-12-02 | 2012-06-13 | 刘伟 | Automatic test system and method of movable terminal |
CN104978259A (en) * | 2014-04-01 | 2015-10-14 | 中国银联股份有限公司 | Mobile equipment software automation test cluster system and test method thereof |
US20150301071A1 (en) * | 2014-04-22 | 2015-10-22 | Wipro Limited | System and method for sequential testing across multiple devices |
CN106874159A (en) * | 2016-12-30 | 2017-06-20 | 北京同有飞骥科技股份有限公司 | A kind of concentrating type automated testing method |
CN107124333A (en) * | 2017-06-13 | 2017-09-01 | 烽火通信科技股份有限公司 | The group network system and method for a kind of automatic test environment |
CN108199929A (en) * | 2018-02-28 | 2018-06-22 | 上海市信息网络有限公司 | Measuring instrument, network intelligence instrument system and network intelligence test method |
CN108804315A (en) * | 2018-05-23 | 2018-11-13 | 北京五八信息技术有限公司 | Applied to the test method of dynamic development, device, electronic equipment and storage medium |
CN109688018A (en) * | 2019-02-26 | 2019-04-26 | 广东信通通信有限公司 | A kind of alarm information method for pushing and system based on unit exception |
-
2019
- 2019-05-16 CN CN201910405378.2A patent/CN110138637B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102231686A (en) * | 2011-06-24 | 2011-11-02 | 北京天融信科技有限公司 | System and method for implementing automated test of network security equipment |
CN102495799A (en) * | 2011-12-02 | 2012-06-13 | 刘伟 | Automatic test system and method of movable terminal |
CN104978259A (en) * | 2014-04-01 | 2015-10-14 | 中国银联股份有限公司 | Mobile equipment software automation test cluster system and test method thereof |
US20150301071A1 (en) * | 2014-04-22 | 2015-10-22 | Wipro Limited | System and method for sequential testing across multiple devices |
CN106874159A (en) * | 2016-12-30 | 2017-06-20 | 北京同有飞骥科技股份有限公司 | A kind of concentrating type automated testing method |
CN107124333A (en) * | 2017-06-13 | 2017-09-01 | 烽火通信科技股份有限公司 | The group network system and method for a kind of automatic test environment |
CN108199929A (en) * | 2018-02-28 | 2018-06-22 | 上海市信息网络有限公司 | Measuring instrument, network intelligence instrument system and network intelligence test method |
CN108804315A (en) * | 2018-05-23 | 2018-11-13 | 北京五八信息技术有限公司 | Applied to the test method of dynamic development, device, electronic equipment and storage medium |
CN109688018A (en) * | 2019-02-26 | 2019-04-26 | 广东信通通信有限公司 | A kind of alarm information method for pushing and system based on unit exception |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110619183A (en) * | 2019-09-24 | 2019-12-27 | 中国航空工业集团公司沈阳飞机设计研究所 | Full-life-cycle test flight test data management method |
CN110619183B (en) * | 2019-09-24 | 2023-04-07 | 中国航空工业集团公司沈阳飞机设计研究所 | Full-life-cycle test flight test data management method |
CN111598503A (en) * | 2020-04-16 | 2020-08-28 | 广东信通通信有限公司 | Material checking method, mobile terminal and computer readable storage medium |
WO2022062567A1 (en) * | 2020-09-23 | 2022-03-31 | 爱德万测试股份有限公司 | Product test data detection method and system, electronic device, and storage medium |
CN112835759A (en) * | 2021-02-01 | 2021-05-25 | 百度在线网络技术(北京)有限公司 | Test data processing method and device, electronic equipment and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN110138637B (en) | 2021-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110138637A (en) | Test data processing method, device, computer equipment and storage medium | |
CN105378810B (en) | Remote sharing of measurement data | |
CN103210357B (en) | There is the handheld field maintenance tools improving diagnosis | |
CN110083340A (en) | Code generating method, device, computer equipment and storage medium | |
JP2016535885A (en) | Method and system for a general purpose wireless platform for asset monitoring | |
CN106874187A (en) | code coverage collection method and device | |
CN107145438A (en) | Code test method, code tester device and code tester system | |
CN110149143A (en) | Test optical fiber data processing method, device, computer equipment and storage medium | |
CN110188036A (en) | A kind of method for testing software and device | |
CN106201856A (en) | A kind of multi version performance test methods and device | |
US20140136139A1 (en) | Optical fiber analysis device, system, and method | |
CN105045714A (en) | Method and device for testing starting duration of application software and terminal | |
JP6467181B2 (en) | Method and system for dynamic workflow prioritization and tasking | |
CA3034830A1 (en) | Validation of test results in network testing | |
CN106022728A (en) | User evaluation method and device | |
CN108629355A (en) | Method and apparatus for generating workload information | |
KR20150138958A (en) | N f c based plant management system | |
CN109032956A (en) | A kind of interface test method and device | |
Klima et al. | Quality and reliability metrics for IoT systems: a consolidated view | |
CN107818262A (en) | The security document management method of network security device | |
US20220333808A1 (en) | Systems and methods for analyzing heating, ventilation, and air conditioning systems including remote monitoring of technicians | |
Zapata-Jaramillo et al. | On the relationship of ISO/IEC 9126 metrics and the alpha states of the SEMAT kernel | |
CN110471967A (en) | A kind of test data management system and method | |
Lenart et al. | Real-time monitoring and analyses of sensory data integrated into the BIM platform | |
KR20140100073A (en) | Integrated Resource Monitoring Method and System using the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |