CN110138527A - A kind of instruction of resource determines method and device - Google Patents

A kind of instruction of resource determines method and device Download PDF

Info

Publication number
CN110138527A
CN110138527A CN201810135273.5A CN201810135273A CN110138527A CN 110138527 A CN110138527 A CN 110138527A CN 201810135273 A CN201810135273 A CN 201810135273A CN 110138527 A CN110138527 A CN 110138527A
Authority
CN
China
Prior art keywords
reference signal
receiving end
transmitting terminal
resource
transfer resource
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810135273.5A
Other languages
Chinese (zh)
Other versions
CN110138527B (en
Inventor
郑石磊
赵锐
彭莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Mobile Communications Equipment Co Ltd
Original Assignee
Telecommunications Science and Technology Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Telecommunications Science and Technology Research Institute Co Ltd filed Critical Telecommunications Science and Technology Research Institute Co Ltd
Priority to CN202210504917.XA priority Critical patent/CN114844617A/en
Priority to CN201810135273.5A priority patent/CN110138527B/en
Publication of CN110138527A publication Critical patent/CN110138527A/en
Application granted granted Critical
Publication of CN110138527B publication Critical patent/CN110138527B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/0001Arrangements for dividing the transmission path
    • H04L5/0003Two-dimensional division
    • H04L5/0005Time-frequency
    • H04L5/0007Time-frequency the frequencies being orthogonal, e.g. OFDM(A), DMT
    • H04L5/001Time-frequency the frequencies being orthogonal, e.g. OFDM(A), DMT the frequencies being arranged in component carriers
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0053Allocation of signaling, i.e. of overhead other than pilot signals
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/54Allocation or scheduling criteria for wireless resources based on quality criteria

Abstract

This application discloses a kind of instruction of resource, method and device is determined, to meet the demand of the different situations in NR-V2X system by more flexible controllable resource mapping method.In transmitting terminal, a kind of resource indicating method provided by the embodiments of the present application, comprising: transmitting terminal determines the transfer resource for needing the signal transmitted between receiving end to need to occupy;The transmitting terminal sends the dispatch for being used to indicate the receiving end and determining the transfer resource to the receiving end.

Description

A kind of instruction of resource determines method and device
Technical field
This application involves field of communication technology more particularly to a kind of instruction of resource, determine method and device.
Background technique
Existing LTE-V2X resource mapping method is fixed mode, leads directly to link shared channels (Physical for physics Sidelink Shared Channel, PSSCH) for, totally 14 orthogonal frequency division multiplexing in each resource block (RB) (Orthogonal Frequency Division Multiplex, OFDM) symbol, wherein 4 OFDM symbols are demodulated reference Signal (Demodulation Reference Signal, DMRS) occupy, remaining 10 OFDM symbol be used for transmission data, from Dynamic gain control (Automatic Gain Control, AGC) and protection interval (Guard Period, GP).
Summary of the invention
The embodiment of the present application provides a kind of instruction of resource, determines method and device, to by more flexible controllable Resource mapping method meets the demand of the different situations in NR-V2X system.
In transmitting terminal, a kind of resource indicating method provided by the embodiments of the present application, comprising:
Transmitting terminal determines the transfer resource for needing the signal transmitted between receiving end to need to occupy;
The transmitting terminal is sent to the receiving end is used to indicate the scheduling letter that the receiving end determines the transfer resource It enables.
This method provided by the embodiments of the present application, transmitting terminal, which determines, needs the signal transmitted between receiving end to need to occupy Transfer resource, and sent to the receiving end and be used to indicate the dispatch that the receiving end determines the transfer resource, from And can be to avoid using the limitation of fixed resource mapping mode, such as the case where for different port numbers, can generate different Reference signal, after port number increases and reaches certain number, it may be necessary to more OFDM symbols are occupied, therefore, this Shen It please be used to indicate the receiving end by being sent to the receiving end and determine the transfer resource in the method that provides of embodiment Dispatch realizes more flexible controllable resource mapping method, meets the demand of the different situations in NR-V2X system.
Optionally, the signal includes reference signal, includes one of following content or combination in the dispatch:
Channel state information reference signals CSI-RS state;
Reference signal mapping instruction;
The request of feedback information;
The scheduling of feedback information indicates.
To indicate whether current (subframe) needs to send CSI-RS by CSI-RS state;By reference to signal Mapping instruction, can indicate the resource mapping position of the signals such as DMRS and/or CSI-RS;It, can be with by the request of feedback information Indicate that receiving end carries out the feedback of the information such as channel state information;It is indicated by the scheduling of feedback information, can indicate receiving end When the feedback informations such as feeding back channel state information, the information such as scheduling CQI, RI, PMI are indicated how;For CSI dispatch, such as Tri- information of CQI, PMI, RI of fruit feedback are mapped in data symbol with fixed position, then this mode can drop The expense of low CSI dispatch only needs to indicate respectively whether feed back these types of information at this time, does not need to indicate mapped bits The information such as set;In addition, CSI information can also need to indicate that at this time specific resource is reflected by the way of on-fixed mapping position The information of position is penetrated, but this mode is more flexible for signaling scheduling.
Optionally, the feedback information includes one of following message or combination: channel quality indicator (CQI), pre-coding matrix Indicate PMI, order instruction RI.
Optionally, the reference signal mapping instruction, comprising: the port information that the reference signal occupies, wherein described Port information includes: port number and/or port numbers.
Optionally, the transmitting terminal determines the transfer resource of the reference signal, specifically includes:
The transmitting terminal, which determines, transmits the port information that the reference signal needs to occupy;
The transmitting terminal determines the transfer resource of the reference signal according to the port information.
Optionally, the transmitting terminal determines the transfer resource of the reference signal according to the port information, specifically includes:
The transmitting terminal is provided using the transmission of the preset reference signal port information occupied and the reference signal The corresponding relationship in source, or preset formula is utilized, and according to the port information, determine the transfer resource of the reference signal.
To through the corresponding relationship or formula preset in advance in transmitting terminal and receiving end, in dispatch Only need to send the port information etc. of signal occupancy, so that it may so that receiving end determines that resource mapping method of the signal etc. is believed Breath saves signaling overheads, and makes resource mapping method more flexible variable, meets the different demands of different situations.
It optionally, further include feedback information in the signal transmitted between the needs that the transmitting terminal determines and receiving end.
To such as under certain scenes (such as unicast mode) in NR-V2X system, need receiving end to carry out related The feedback of information, these feedback informations also need to carry out resource impact, and need and connect by determining in the embodiment of the present application The signal (including feedback information) transmitted between receiving end needs the transfer resource occupied, and the receiving end Xiang Suoshu sends and is used to indicate institute The dispatch that receiving end determines the transfer resource (needing the transfer resource that occupies including feedback information) is stated, it can be to avoid Fixed resource impact mode is not that the specific information such as these feedback informations reserves mapping position in LTE-V2X system, is led What is caused can not support feedback function.
Correspondingly, receiving end (beneficial effect of following the description is corresponding with the method for above-mentioned transmission end side, it is subsequent no longer Repeat), a kind of resource determining method provided by the embodiments of the present application, comprising:
Receiving end receives the dispatch that transmitting terminal is sent;
The receiving end determines and the signal transmitted between the transmitting terminal is needed to need to occupy according to the dispatch Transfer resource.
Optionally, the signal includes reference signal, includes one of following content or combination in the dispatch:
Channel state information reference signals CSI-RS state;
Reference signal mapping instruction;
The request of feedback information;
The scheduling of feedback information indicates.
Optionally, the feedback information includes one of following message or combination: channel quality indicator (CQI), pre-coding matrix Indicate PMI, order instruction RI.
Optionally, the reference signal mapping instruction, comprising: the port information that the reference signal occupies, wherein described Port information includes: port number and/or port numbers.
Optionally, the receiving end determines the signal for needing to transmit between the transmitting terminal according to the dispatch The transfer resource for needing to occupy, specifically includes:
The receiving end determines according to the dispatch and transmits the port information that the reference signal needs to occupy;
The receiving end determines the transfer resource of the reference signal according to the port information.
Optionally, the receiving end determines the transfer resource of the reference signal according to the port information, specifically includes:
The receiving end is provided using the transmission of the preset reference signal port information occupied and the reference signal The corresponding relationship in source, or preset formula is utilized, and according to the port information, determine the transfer resource of the reference signal.
Optionally, the receiving end needs in the signal transmitted between the transmitting terminal to further include feedback information.
In transmitting terminal, a kind of resource instruction device provided by the embodiments of the present application, comprising:
Memory, for storing program instruction;
Processor is executed for calling the program instruction stored in the memory according to the program of acquisition:
Determine the transfer resource that transmitting terminal needs the signal transmitted between receiving end to need to occupy;
The dispatch for being used to indicate the receiving end and determining the transfer resource is sent to the receiving end.
Optionally, the signal includes reference signal, includes one of following content or combination in the dispatch:
Channel state information reference signals CSI-RS state;
Reference signal mapping instruction;
The request of feedback information;
The scheduling of feedback information indicates.
Optionally, the feedback information includes one of following message or combination: channel quality indicator (CQI), pre-coding matrix Indicate PMI, order instruction RI.
Optionally, the reference signal mapping instruction, comprising: the port information that the reference signal occupies, wherein described Port information includes: port number and/or port numbers.
Optionally, the processor determines the transfer resource of the reference signal, specifically includes:
Determine that the transmitting terminal transmits the port information that the reference signal needs to occupy;
The transfer resource of the reference signal is determined according to the port information.
Optionally, the transfer resource that the reference signal is determined according to the port information, specifically includes:
The port information occupied using the preset reference signal is corresponding with the transfer resource of the reference signal to close System, or preset formula is utilized, and according to the port information, determine the transfer resource of the reference signal.
Optionally, the transmitting terminal of the determination needs in the signal transmitted between receiving end to further include feedback information.
In receiving end, a kind of resource determining device provided by the embodiments of the present application, comprising:
Memory, for storing program instruction;
Processor is executed for calling the program instruction stored in the memory according to the program of acquisition:
Receive the dispatch that transmitting terminal is sent;
According to the dispatch, the biography that receiving end needs the signal transmitted between the transmitting terminal to need to occupy is determined Defeated resource.
Optionally, the signal includes reference signal, includes one of following content or combination in the dispatch:
Channel state information reference signals CSI-RS state;
Reference signal mapping instruction;
The request of feedback information;
The scheduling of feedback information indicates.
Optionally, the feedback information includes one of following message or combination: channel quality indicator (CQI), pre-coding matrix Indicate PMI, order instruction RI.
Optionally, the reference signal mapping instruction, comprising: the port information that the reference signal occupies, wherein described Port information includes: port number and/or port numbers.
Optionally, the processor determines that the receiving end needs between the transmitting terminal according to the dispatch The signal of transmission needs the transfer resource occupied, specifically includes:
According to the dispatch, determines and transmit the port information that the reference signal needs to occupy;
The transfer resource of the reference signal is determined according to the port information.
Optionally, the transfer resource that the reference signal is determined according to the port information, specifically includes:
The port information occupied using the preset reference signal is corresponding with the transfer resource of the reference signal to close System, or preset formula is utilized, and according to the port information, determine the transfer resource of the reference signal.
Optionally, the receiving end needs in the signal transmitted between the transmitting terminal to further include feedback information.
In transmitting terminal, another kind resource instruction device provided by the embodiments of the present application, comprising:
Determination unit, the transfer resource for needing the signal transmitted between receiving end to need to occupy for determining transmitting terminal;
Transmission unit, for sending the scheduling for being used to indicate the receiving end and determining the transfer resource to the receiving end Signaling.
In receiving end, another kind resource determining device provided by the embodiments of the present application, comprising:
Receiving unit, for receiving the dispatch of transmitting terminal transmission;
Determination unit, for determining the letter that receiving end needs to transmit between the transmitting terminal according to the dispatch Number need the transfer resource that occupies.
Another embodiment of the application provides a kind of computer storage medium, and the computer storage medium is stored with calculating Machine executable instruction, the computer executable instructions are for making the computer execute any of the above-described kind of method.
Detailed description of the invention
In order to more clearly explain the technical solutions in the embodiments of the present application, make required in being described below to embodiment Attached drawing is briefly introduced, it should be apparent that, the drawings in the following description are only some examples of the present application, for this For the those of ordinary skill in field, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing.
Fig. 1 is resource impact schematic diagram provided by the embodiments of the present application;
Fig. 2 is the schematic diagram of resource impact mode (pattern) 1 provided by the embodiments of the present application;
Fig. 3 is the schematic diagram of pattern 2 provided by the embodiments of the present application;
Fig. 4 is the schematic diagram of pattern 3 provided by the embodiments of the present application;
Fig. 5 is the schematic diagram of pattern 4 provided by the embodiments of the present application;
Fig. 6 is the resource impact pattern diagram of single port provided by the embodiments of the present application (pattern 1);
Fig. 7 is the resource impact pattern diagram of single port provided by the embodiments of the present application (pattern 2);
Fig. 8 is the resource impact pattern diagram of dual-port provided by the embodiments of the present application (pattern 1);
Fig. 9 is the resource impact pattern diagram of dual-port provided by the embodiments of the present application (pattern 2 completely mapped);
Figure 10 is that the resource impact mode of dual-port provided by the embodiments of the present application (pattern 2 of non-full mapping) is illustrated Figure;
Figure 11 is that the resource impact mode of 4 ports (pattern 2 completely mapped) provided by the embodiments of the present application is illustrated Figure;
Figure 12 is that the resource impact mode of 4 ports (pattern 2 of non-full mapping) provided by the embodiments of the present application is shown It is intended to;
Figure 13 is the resource impact pattern diagram of 8 ports (pattern 2) provided by the embodiments of the present application;
Figure 14 is the resource impact schematic diagram of embodiment 2 provided by the embodiments of the present application;
Figure 15 is a kind of resource impact schematic diagram of embodiment 3 provided by the embodiments of the present application;
Figure 16 is another resource impact schematic diagram of embodiment 3 provided by the embodiments of the present application;
Figure 17 is the resource impact schematic diagram of embodiment 4 provided by the embodiments of the present application;
Figure 18 is a kind of flow diagram of resource indicating method provided by the embodiments of the present application;
Figure 19 is a kind of flow diagram of resource determining method provided by the embodiments of the present application;
Figure 20 is a kind of structural schematic diagram of resource instruction device provided by the embodiments of the present application;
Figure 21 is a kind of structural schematic diagram of resource determining device provided by the embodiments of the present application;
Figure 22 is the structural schematic diagram of another resource instruction device provided by the embodiments of the present application;
Figure 23 is the structural schematic diagram of another resource determining device provided by the embodiments of the present application.
Specific embodiment
The embodiment of the present application provides a kind of instruction of resource, determines method and device, to by more flexible controllable Resource mapping method meets the demand of the different situations in NR-V2X system.
Since NR-V2X stage antenna port number purpose increases, the case where for different port numbers, can generate different The mapping mode of reference signal, the reference signal, such as DMRS/ channel state information reference signals (alternatively referred to as detection ginseng Examine signal) (Channel State Information Reference Signal, CSI-RS).When port number increases, reach After certain number, it may be necessary to more OFDM symbols are occupied, so fixed resource impact mode is obviously not suitable for.
In addition, NR-V2X needs receiving end to carry out the feedback of relevant information under certain scenes (unicast mode), these are anti- The information of feedback also needs to carry out resource impact, however LTE-V2X fixed resource impact mode is not these specific letters Reserved mapping position is ceased, therefore can not support feedback function.
Technical solution provided by the embodiments of the present application is using more flexible controllable resource mapping method, to cope with NR- Different situations in V2X select specific region in the region of legacy data mapping and distribute to each specific information, such as DMRS, CSI-RS, channel quality indicate (Channel Quality Indicator, CQI), pre-coding matrix instruction (Precoding Matrix Indicator, PMI), order instruction (Rank Indication, RI), positive acknowledgment (ACK) it is no Fixed confirmation (NACK) etc..
As shown in Figure 1, including 14 OFDM symbols with a RB, and has in a RB and carry out for 4 column DMRS symbols Explanation, it should be noted that feedback information here can be any information for needing receiving end to feed back, and be not limited only to channel shape State information is only for feeding back CSI information herein;The resource mapping position of each information can be, but not limited to position in Fig. 1, Can be more flexible and changeable, specific mapping mode can be controlled by the dispatch that transmitting terminal is sent to receiving end, The columns of DMRS can also carry out adjustment appropriate according to specific scene condition in one RB.When dispatch indicates to need When mapping a certain specific information (such as reference signal and/or feedback information), then advance reservation is just needed to go out resource appropriate Corresponding resource impact is carried out, this section of resource location should be skipped when mapping data at this time.
It should be noted that resource described in the embodiment of the present application, can be time-domain resource, e.g. OFDM symbol is provided Source.Transmitting terminal described in the embodiment of the present application can be network side equipment and be also possible to terminal, described in the embodiment of the present application Receiving end, be also possible to network side equipment or terminal, i.e. transmitting terminal described in the embodiment of the present application and receiving end, be not limited to It is network side equipment or terminal side equipment, technical solution provided by the embodiments of the present application can be applied between network side equipment Transmitting scene, the transmitting scene between terminal, the transmitting scene between network side equipment and terminal.
For NR-V2X system, due to needing to consider that the factor of relative velocity and different frequency range, the application are implemented In example, adaptive adjustment reference signal can be changed according to concrete scene parameter (such as speed and carrier frequency of terminal movement) Density, i.e. OFDM symbol number shared by reference signal.The frequency range that can mainly refer at present has 5.9GHz, 30GHz, 60GHz, It is 30km/h, 120km/h, 280km/h than more typical relative velocity;Since high band transmission range is limited, while frequency deviation It is very big, therefore relatively it is suitble to the scene of relative velocity lower (30km/h).Assuming that in 60GHz frequency range, two user equipmenies (UE) Relative velocity be 30km/h, can calculate channel coherency time at this time is about 253.8us;Assuming that frequency range is 5.9GHz, phase Belong to when being 280km/h to speed than more typical extreme case, channel coherency time at this time is about 276.5us;Each The duration that OFDM symbol occupies is about 60-70us, is at most spaced 4 symbols between two column DMRS, so that it may guarantee estimation letter The accuracy in road;In conclusion at most only needing 4 column DMRS to ensure that the channel under a variety of different scenes in each RB Estimate performance.In practical applications, flexible DMRS density can be configured according to specific circumstances, can both guarantee that channel is estimated The accuracy of meter, and can reduce the expense that reference signal occupies data.
The dispatch provided in the embodiment of the present application can indicate to need different port number in NR-V2X different Reference signal mapping mode etc. further also can indicate that and need the correlations such as receiving end feedback information under specific transmission mode Content.
For example, the dispatch provided in the embodiment of the present application may include as follows by taking feeding back channel state information as an example One or more information field:
1) CSI-RS status signaling: it is used to refer to whether current subframe needs to send CSI-RS;
2) reference signal maps indication signaling: for example, indicating the resource impact position of DMRS and/or CSI-RS according to port number It sets.Wherein the resource mapping position information of CSI-RS only (needs to send CSI-RS's in CSI-RS status signaling open state In the case of) under just effectively;
3) it CSI-request signaling (i.e. the request of feedback information): is used to indicate receiving end and carries out channel state information Feedback;
4) channel state information (Channel State Information, CSI) dispatch (the i.e. tune of feedback information Degree instruction): for when receiving end feeding back channel state information, indicating how scheduling tri- information of CQI, RI, PMI etc.;Wherein, For CSI dispatch, if tri- information of CQI, PMI, RI of feedback are mapped in data symbol with fixed position, So this mode can reduce the expense of CSI dispatch, only need to indicate respectively whether feed back these types of information i.e. at this time Can, do not need the information such as instruction mapping position;In addition, CSI dispatch can also be by the way of on-fixed mapping position, this When need to indicate the information of specific resource mapping position, but this mode for signaling scheduling more flexibly.
In addition, it is necessary to explanation, port described in the embodiment of the present application refers both to antenna port (port).
The illustration of several specific embodiments is given below.
Embodiment 1:
Functional block diagram in embodiment 1 carries out scheme explanation, the present embodiment master for including 3 column DMRS in a RB Illustrate reference signal caused by NR-V2X antenna port number increases using different resource impact mode and is likely to occur Situation, wherein DMRS is mapped in OFDM symbol in the form of pectination, and CSI-RS is interspersed to be mapped to the vacant resource location of DMRS. The port number that CSI-RS is occupied is greater than or equal to DMRS port number.The present embodiment is by taking the DMRS maximum port number supported is 8 as an example.
In addition, needing to guarantee that the density of resource impact is at least each PORT and at least reflects on each RB for CSI-RS Penetrate a RE;Due to the port number that the CSI-RS port number occupied would generally be occupied more than DMRS, successively using CSI-RS It is mapped to the mapping mode of the vacant resource outside the resource of DMRS occupancy, the port number requirement for needing to occupy until meeting CSI-RS , in order to facilitate the control of CSI-RS resource mapping position, the port number that CSI-RS is occupied can choose 2 power number;
Being left rest resource for DMRS pectinate texture can choose transmission data, or carries out interference using it and disappear Except promotion receiver performance;
It both can be in such a way that the period have sent or using aperiodic sending method for CSI-RS;
The case where for not needing mapping CSI-RS resource, give the following pattern3 and pattern4 for supporting to retract Both of which can save the expense of dispatch using the pattern of this fixation.
The signal transmitted between pattern described in the embodiment of the present application, i.e. transmitting terminal and receiving end is in every RB Resource impact mode or resource mapping method embody the transmission money that the signal transmitted between transmitting terminal and receiving end needs to occupy Source.
The various pattern provided in the embodiment of the present application, can be by the way of protocol conventions, in transmitting terminal and reception It pre-sets, can also be arranged by network side and is notified to terminal in end, specific set-up mode does not limit.
Alternatively, various pattern can not also be preset in the embodiment of the present application in transmitting terminal and receiving end, but One or more calculation formula are previously provided with, transmitting terminal is determined in conjunction with calculation formula by the information carried in dispatch The signal transmitted between receiving end needs the transfer resource occupied.Specific calculation formula, in the embodiment of the present application without It limits, can be decided according to the actual requirements.In the embodiment of the present application, is mainly sent and be used to indicate to receiving end by transmitting terminal Receiving end determines the dispatch for the transfer resource that the signal transmitted between transmitting terminal and receiving end needs to occupy, to realize flexibly Resource impact instruction, specifically, how transmitting terminal determines what the signal that transmits between transmitting terminal and receiving end needed to occupy How transfer resource and receiving end, which pass through dispatch, determines what the signal transmitted between transmitting terminal and receiving end needed to occupy Transfer resource can according to need there are many implementation, and the application is without limiting.
Above scheme does not represent final NR-V2X reference signal mapping scheme, only carries out scheme explanation as example.This Shen Please embodiment provide specific pattern be described below:
Pattern1: referring to fig. 2, it is 1 that each column DMRS, which occupies OFDM symbol number: it uses 2-FD-OCC (adjacent frequency domain RE), Maximum is supported to the DMRS for occupying 2 ports.CSI-RS uses 2-FD-OCC (adjacent frequency domain RE), can support to occupy over 2 The channel measurement of a port.
Pattern2: referring to Fig. 3, it is 2 that each column DMRS, which occupies OFDM symbol number: using combination (Combination, comb) + cyclic shift (cyclic shifts, CS) 2 modes (or 2-FD-OCC)+TD-OCC ({ 1,1 } and { 1, -1 }), maximum are supported to arrive Occupy the DMRS of 8 ports;CSI can support the channel measurement more than 8 ports using 2-TD-OCC (adjacent time domain RE);It is right In more than the channel measurement of 8 ports the case where, the gap resource that need to only continue in the resource for occupying secondary series DMRS is whole The channel measurement of 16 ports can be supported by being mapped to CSI-RS signal;Wherein, TD-OCC ({ 1,1 } and { 1, -1 }) indicates two It is multiplexed between port using time domain orthogonal overlay code (TD-OCC), { 1,1 } { 1, -1 } is the multiplexing coefficient of two ports respectively.
Wherein, wherein comb be exactly between frequency domain multiplexing, such as port 0 and 2 comb2 multiplexing relationship.CS2 is port Between sequence be multiplexed using cyclic shift mode (cyclic shifts), for example be exactly answering for CS2 between port 0 and 1 With relationship.
Wherein, TD-OCC is time domain orthogonal overlay code (Orthogonal Cover Code, OCC) multiplexing.
Pattern3: referring to fig. 4, existing due in certain scenes, still will use single port or transmission diversity (TxD) etc. Some V2X transmission modes, only need to send DMRS at this time, and no need to send CSI-RS, therefore retain the resource of existing DMRS Mapped mode, DMRS symbolic number is 1, and by the way of CS2, maximum supports that occupying port number is 2;
Pattern4: referring to Fig. 5, port number is more in order to cope with, and the open loop for not needing feeding back channel state information passes Defeated mode, DMRS symbolic number is 2 at this time, maximum using comb+CS2 (or 2-FD-OCC)+TD-OCC ({ 1,1 } and { 1, -1 }) The DMRS for occupying 8 ports is supported (to be equivalent to the mapping that pattern2 eliminates CSI-RS, whole resources are used to be mapped to DMRS sequence).
The embodiment that the embodiment of the present application is enumerated is to carry out proof explanation for having 3 column reference signals in a RB, Actual conditions should can be with flexible configuration;1 port is wherein schematically illustrated respectively, the case where 2 ports, 4 ports and 8 port.
The present embodiment mainly puts to the proof the mapping method of possible two kinds of novel pattern1 in NR-V2X, 2, and receiving end can be with It can be true to determine antenna port number and corresponding resource impact mode using the dispatch that reference signal resource maps Determine the resource impact scheme (determining the transfer resource of reference signal) of reference signal.
Signal (by taking reference signal as an example) is exemplified below and occupies different antenna port numbers, corresponding different moneys Source mapped mode (pattern).
When signal occupies 1 antenna port (1-port):
When using above-mentioned pattern1, specific pattern as shown in fig. 6, each column DMRS occupy OFDM symbol number be 1, Wherein DMRS uses pectinate texture, and CSI-RS is inserted in the vacant position DMRS;
When using above-mentioned pattern2, specific pattern is as shown in fig. 7, it is 2 that each column DMRS, which occupies OFDM symbol number,.
When signal occupies 2 antenna ports (2-port):
When using above-mentioned pattern1, specific pattern as shown in figure 8, each column DMRS occupy OFDM symbol number be 1, DMRS uses 2-FD-OCC, CSI-RS also to use 2-FD-OCC.
, can be there are two types of selection when using above-mentioned pattern2, the first is exactly that the resource of the DMRS of full pattern2 is reflected Mode is penetrated, i.e. DMRS takes whole resource mapping positions in pattern2, and specific pattern is as shown in Figure 9.
Second is using the resource mapping method of the DMRS of non-full pattern2, i.e. DMRS will not be in pattern2 Whole resource mapping positions take, and specific pattern is as shown in Figure 10.
When signal occupies 4 antenna ports (4-port):
Pattern1 is no longer applicable at this time, can only use pattern2, using the DMRS of two symbolic numbers, the first is to adopt With the resource impact mode of full pattern, specific pattern is as shown in figure 11.
Using non-full pattern resource mapping method when, specific pattern is as shown in figure 12.
When signal occupies 8 antenna ports (8-port):
For occupying the DMRS situation of 8 ports, since the port number that DMRS is occupied at this time is more, can only select Pattern2 carries out the resource impact mode of full pattern, and specific pattern is as shown in figure 13.
Embodiment 2:
Referring to Figure 14, the feelings of closed-loop communication mode (needing receiving end feedback information) are used between transmitting terminal and receiving end Under condition, need to send CSI-RS, so in dispatch (SA):
CSI-RS status signaling should be open state, to indicate to carry CSI-RS in dispatch at this time;
Validity is all had for the mapped position information of DMRS and CSI-RS in reference signal mapping indication signaling, at this time Before doing data (DATA) mapping, it should with CSI-RS reserve corresponding resource location for DMRS, then, receiving end can be with Indication signaling is mapped according to reference signal, specifically used antenna port number and resource impact mode is obtained, with implementation Method in example 1 is similarly.
CSI-request signaling should be in effective status, be used to refer to receiving end and need feeding back channel state information;
CSI dispatch should be in invalid state, not need feedback channel information at this time.
Embodiment 3:
For using any transmission mode between transmitting terminal and receiving end, after transmitting terminal has determined transmission mode, Two kinds of transmission modes based on code book Yu non-code book can be divided at this time, the selection of the pre-coding matrix of both transmission modes is equal It is that channel information measurement is carried out by CSI-RS to determine.Wherein, codebook-based pre-coding matrix is to pass through receiving end Carry out selection after feedback CQI, the pre-coding matrix based on non-code book be by transmitting terminal using the CSI-RS that receives into It is independently selected after the measurement of row channel state information.
When carrying out codebook-based precoding (precoding), need to notify the specific precoding code book in receiving end Information.The resource impact scheme of specific reference signal is in the same manner as in Example 1, referring to Figure 15.
Wherein, the CSI-request signaling in dispatch should be in effective status, be used to refer to receiving end and need instead Present channel state information;
CSI dispatch in dispatch (SA) is in invalid state, but wherein the dispatch of PMI should be in Open state, being used to indicate receiving end decoding needs the information of precoding matrix to be used;Data should in mapping process Reserved one section of resource is used for the transmission of PMI information.
When carrying out the precoding based on non-code book, since DMRS and data carry out identical precoding, so Receiving end can be directly decoded;The resource impact scheme of specific reference signal is in the same manner as in Example 1, referring to Figure 16.
In dispatch (SA) at this time:
CSI-RS status signaling is closed;
The resource mapping position information that reference signal maps only DMRS in indication signaling is effective, the resource of specific DMRS Mapping scheme is in the same manner as in Example 1.
CSI-request signaling is in effective status, is used to refer to receiving end and needs feeding back channel state information;
RI is partially in effective status in CSI dispatch, is used to indicate the specifically used number of plies, equally maps in data It should be reserved in the process for it resource location appropriate (depending on actual needs).
Embodiment 4:
The case where needing receiving end to feed back CQI, and/or PMI, and/or RI transmitting terminal, when receiving end is according to receiving Dispatch in CSI-request signaling come determine need to transmitting terminal feed back CSI when, no need to send CSI- at this time RS, but need to carry the information of CQI, and/or PMI and/or RI;Therefore, in dispatch:
CSI-RS status signaling is closed;
The mapped position information that reference signal maps only DMRS in indication signaling is effective;The resource impact of specific DMRS Scheme is in the same manner as in Example 1, referring to Figure 17.
CSI-request signaling is in invalid state;
CSI dispatch is in the open state, if tri- information of CQI, PMI, RI of feedback are all with fixed position It is mapped in data symbol, only needs open state at this time;By the way of on-fixed mapping position, need to refer at this time Show the resource mapping position information of specific CQI, PMI, RI.
In conclusion in transmitting terminal, referring to Figure 18, a kind of resource indicating method provided by the embodiments of the present application, comprising:
S101, transmitting terminal determine the transfer resource for needing the signal transmitted between receiving end to need to occupy;
S102, the transmitting terminal send the tune for being used to indicate the receiving end and determining the transfer resource to the receiving end Spend signaling.
This method provided by the embodiments of the present application, transmitting terminal, which determines, needs the signal transmitted between receiving end to need to occupy Transfer resource, and sent to the receiving end and be used to indicate the dispatch that the receiving end determines the transfer resource, from And can be to avoid using the limitation of fixed resource mapping mode, such as the case where for different port numbers, can generate different Reference signal, after port number increases and reaches certain number, it may be necessary to more OFDM symbols are occupied, therefore, this Shen It please be used to indicate the receiving end by being sent to the receiving end and determine the transfer resource in the method that provides of embodiment Dispatch realizes more flexible controllable resource mapping method, meets the demand of the different situations in NR-V2X system.
Optionally, the signal includes reference signal, includes one of following content or combination in the dispatch:
Channel state information reference signals CSI-RS state;
Reference signal mapping instruction;
The request of feedback information;
The scheduling of feedback information indicates.
To indicate whether current (subframe) needs to send CSI-RS by CSI-RS state;By reference to signal Mapping instruction, can indicate the resource mapping position of the signals such as DMRS and/or CSI-RS;It, can be with by the request of feedback information Indicate that receiving end carries out the feedback of the information such as channel state information;It is indicated by the scheduling of feedback information, can indicate receiving end When the feedback informations such as feeding back channel state information, the information such as scheduling CQI, RI, PMI are indicated how;For CSI dispatch, such as Tri- information of CQI, PMI, RI of fruit feedback are mapped in data symbol with fixed position, then this mode can drop The expense of low CSI dispatch only needs to indicate respectively whether feed back these types of information at this time, does not need to indicate mapped bits The information such as set;In addition, CSI dispatch can also need to indicate at this time specifically to provide by the way of on-fixed mapping position The information of source mapping position, but this mode is more flexible for signaling scheduling.
Optionally, the feedback information includes one of following message or combination: channel quality indicator (CQI), pre-coding matrix Indicate PMI, order instruction RI.
Optionally, the reference signal mapping instruction, comprising: the port information that the reference signal occupies, wherein described Port information includes: port number and/or port numbers.
Optionally, the transmitting terminal determines the transfer resource of the reference signal, specifically includes:
The transmitting terminal, which determines, transmits the port information that the reference signal needs to occupy;
The transmitting terminal determines the transfer resource of the reference signal according to the port information.
Optionally, the transmitting terminal determines the transfer resource of the reference signal according to the port information, specifically includes:
The transmitting terminal is provided using the transmission of the preset reference signal port information occupied and the reference signal The corresponding relationship in source, or preset formula is utilized, and according to the port information, determine the transfer resource of the reference signal.
To through the corresponding relationship or formula preset in advance in transmitting terminal and receiving end, in dispatch Only need to send the port information etc. of signal occupancy, so that it may so that receiving end determines that resource mapping method of the signal etc. is believed Breath saves signaling overheads, and makes resource mapping method more flexible variable, meets the different demands of different situations.
It optionally, further include feedback information in the signal transmitted between the needs that the transmitting terminal determines and receiving end.
To such as under certain scenes (such as unicast mode) in NR-V2X system, need receiving end to carry out related The feedback of information, these feedback informations also need to carry out resource impact, and need and connect by determining in the embodiment of the present application The signal (including feedback information) transmitted between receiving end needs the transfer resource occupied, and the receiving end Xiang Suoshu sends and is used to indicate institute The dispatch that receiving end determines the transfer resource (needing the transfer resource that occupies including feedback information) is stated, it can be to avoid Fixed resource impact mode is not that the specific information such as these feedback informations reserves mapping position in LTE-V2X system, is led What is caused can not support feedback function.
Correspondingly, receiving end (beneficial effect of following the description is corresponding with the method for above-mentioned transmission end side, it is subsequent no longer Repeat), referring to Figure 19, a kind of resource determining method provided by the embodiments of the present application, comprising:
S201, receiving end receive the dispatch that transmitting terminal is sent;
S202, the receiving end determine that the signal for needing to transmit between the transmitting terminal needs according to the dispatch The transfer resource to be occupied.
Optionally, the signal includes reference signal, includes one of following content or combination in the dispatch:
Channel state information reference signals CSI-RS state;
Reference signal mapping instruction;
The request of feedback information;
The scheduling of feedback information indicates.
Optionally, the feedback information includes one of following message or combination: channel quality indicator (CQI), pre-coding matrix Indicate PMI, order instruction RI.
Optionally, the reference signal mapping instruction, comprising: the port information that the reference signal occupies, wherein described Port information includes: port number and/or port numbers.
Optionally, the receiving end determines the signal for needing to transmit between the transmitting terminal according to the dispatch The transfer resource for needing to occupy, specifically includes:
The receiving end determines according to the dispatch and transmits the port information that the reference signal needs to occupy;
The receiving end determines the transfer resource of the reference signal according to the port information.
Optionally, the receiving end determines the transfer resource of the reference signal according to the port information, specifically includes:
The receiving end is provided using the transmission of the preset reference signal port information occupied and the reference signal The corresponding relationship in source, or preset formula is utilized, and according to the port information, determine the transfer resource of the reference signal.
Optionally, the receiving end needs in the signal transmitted between the transmitting terminal to further include feedback information.
In transmitting terminal, referring to fig. 20, a kind of resource instruction device provided by the embodiments of the present application, comprising:
Memory 520, for storing program instruction;
Processor 500 is executed for calling the program instruction stored in the memory according to the program of acquisition:
Determine the transfer resource that transmitting terminal needs the signal transmitted between receiving end to need to occupy;
The scheduling for being used to indicate the receiving end and determining the transfer resource is sent to the receiving end by transceiver 510 Signaling.
Wherein, transceiver 510 is not the necessary setting of resource instruction device.
The resource instruction device can be network side equipment, naturally it is also possible to be terminal device.
Optionally, the signal includes reference signal, includes one of following content or combination in the dispatch:
Channel state information reference signals CSI-RS state;
Reference signal mapping instruction;
The request of feedback information;
The scheduling of feedback information indicates.
Optionally, the feedback information includes one of following message or combination: channel quality indicator (CQI), pre-coding matrix Indicate PMI, order instruction RI.
Optionally, the reference signal mapping instruction, comprising: the port information that the reference signal occupies, wherein described Port information includes: port number and/or port numbers.
Optionally, the processor determines the transfer resource of the reference signal, specifically includes:
Determine that the transmitting terminal transmits the port information that the reference signal needs to occupy;
The transfer resource of the reference signal is determined according to the port information.
Optionally, the transfer resource that the reference signal is determined according to the port information, specifically includes:
The port information occupied using the preset reference signal is corresponding with the transfer resource of the reference signal to close System, or preset formula is utilized, and according to the port information, determine the transfer resource of the reference signal.
Optionally, the transmitting terminal of the determination needs in the signal transmitted between receiving end to further include feedback information.
Transceiver 510, for sending and receiving data under control of the processor 500.
Wherein, in Figure 20, bus architecture may include the bus and bridge of any number of interconnection, specifically by processor The various circuits for the memory that 500 one or more processors represented and memory 520 represent link together.Bus architecture Various other circuits of such as peripheral equipment, voltage-stablizer and management circuit or the like can also be linked together, these It is all it is known in the art, therefore, it will not be further described herein.Bus interface provides interface.Transceiver 510 It can be multiple element, that is, include transmitter and transceiver, provide for over a transmission medium being communicated with various other devices Unit.Processor 500, which is responsible for management bus architecture and common processing, memory 520, can store processor 500 and is executing behaviour Used data when making.
Processor 500 can be centre and bury device (CPU), specific integrated circuit (Application Specific Integrated Circuit, ASIC), field programmable gate array (Field-Programmable Gate Array, ) or Complex Programmable Logic Devices (Complex Programmable Logic Device, CPLD) FPGA.
In receiving end, referring to fig. 21, a kind of resource determining device provided by the embodiments of the present application, comprising:
Memory 620, for storing program instruction;
Processor 600 is executed for calling the program instruction stored in the memory according to the program of acquisition:
The dispatch that transmitting terminal is sent is received by transceiver 610;
According to the dispatch, the biography that receiving end needs the signal transmitted between the transmitting terminal to need to occupy is determined Defeated resource.
Wherein, which is not the necessary setting of the resource determining device.
The resource determining device, can be terminal device, is also possible to network side equipment.
Optionally, the signal includes reference signal, includes one of following content or combination in the dispatch:
Channel state information reference signals CSI-RS state;
Reference signal mapping instruction;
The request of feedback information;
The scheduling of feedback information indicates.
Optionally, the feedback information includes one of following message or combination: channel quality indicator (CQI), pre-coding matrix Indicate PMI, order instruction RI.
Optionally, the reference signal mapping instruction, comprising: the port information that the reference signal occupies, wherein described Port information includes: port number and/or port numbers.
Optionally, the processor 600 is according to the dispatch, determine the receiving end need with the transmitting terminal it Between the signal that the transmits transfer resource that needs to occupy, specifically include:
According to the dispatch, determines and transmit the port information that the reference signal needs to occupy;
The transfer resource of the reference signal is determined according to the port information.
Optionally, the transfer resource that the reference signal is determined according to the port information, specifically includes:
The port information occupied using the preset reference signal is corresponding with the transfer resource of the reference signal to close System, or preset formula is utilized, and according to the port information, determine the transfer resource of the reference signal.
Optionally, the receiving end needs in the signal transmitted between the transmitting terminal to further include feedback information.
Transceiver 610, for sending and receiving data under the control of processor 600.
Wherein, in Figure 21, bus architecture may include the bus and bridge of any number of interconnection, specifically by processor The various circuits for the memory that 600 one or more processors represented and memory 620 represent link together.Bus architecture Various other circuits of such as peripheral equipment, voltage-stablizer and management circuit or the like can also be linked together, these It is all it is known in the art, therefore, it will not be further described herein.Bus interface provides interface.Transceiver 610 It can be multiple element, that is, include transmitter and receiver, provide for over a transmission medium being communicated with various other devices Unit.For different user equipmenies, user interface 630, which can also be, external the interface for needing equipment is inscribed, connection Equipment includes but is not limited to keypad, display, loudspeaker, microphone, control stick etc..
Processor 600, which is responsible for management bus architecture and common processing, memory 620, can store processor 600 and is holding Used data when row operation.
Optionally, processor 600 can be CPU (centre buries device), ASIC (Application Specific Integrated Circuit, specific integrated circuit), (Field-Programmable Gate Array, scene can compile FPGA Journey gate array) or CPLD (Complex Programmable Logic Device, Complex Programmable Logic Devices).
In transmitting terminal, referring to fig. 22, another kind resource instruction device provided by the embodiments of the present application, comprising:
Determination unit 11, for determining that the transmission that transmitting terminal needs the signal transmitted between receiving end to need to occupy provides Source;
Transmission unit 12, for sending the tune for being used to indicate the receiving end and determining the transfer resource to the receiving end Spend signaling.
In receiving end, referring to fig. 23, another kind resource determining device provided by the embodiments of the present application, comprising:
Receiving unit 21, for receiving the dispatch of transmitting terminal transmission;
Determination unit 22, for determining what receiving end needed to transmit between the transmitting terminal according to the dispatch Signal needs the transfer resource occupied.
The embodiment of the present application provides a kind of computer storage medium, above-mentioned provided by the embodiments of the present application for being stored as Computer program instructions used in device, it includes the programs for executing above-mentioned either method provided by the embodiments of the present application.
The computer storage medium can be any usable medium or data storage device that computer can access, packet Include but be not limited to magnetic storage (such as floppy disk, hard disk, tape, magneto-optic disk (MO) etc.), optical memory (such as CD, DVD, BD, HVD etc.) and semiconductor memory (such as it is ROM, EPROM, EEPROM, nonvolatile memory (NAND FLASH), solid State hard disk (SSD)) etc..
Any the method provided by the embodiments of the present application can be applied to terminal device, also can be applied to network and sets It is standby.Also, any described device provided by the embodiments of the present application, can be terminal device, also can be applied to the network equipment.
Wherein, terminal device is also referred to as user equipment (User Equipment, referred to as " UE "), mobile station (Mobile Station, referred to as " MS "), mobile terminal (Mobile Terminal) etc., optionally, which can have The ability communicated through wireless access network (Radio Access Network, RAN) with one or more core nets, for example, Terminal can be mobile phone (or for " honeycomb " phone) or the computer etc. with mobile property, for example, terminal can be with It is portable, pocket, hand-held, built-in computer or vehicle-mounted mobile device.
The network equipment can be base station (for example, access point), refer to the accession in net and pass through one or more on interface in the sky The equipment of sector and wireless terminal communications.The air frame that base station can be used for receive mutually is converted with IP grouping, as nothing Router between line terminal and the rest part of access net, wherein the rest part for accessing net may include Internet protocol (IP) net Network.Attribute management of the base station also tunable to air interface.For example, base station can be base station (BTS, Base in GSM or CDMA Transceiver Station), it is also possible to the base station (NodeB) in WCDMA, can also be the evolved base station in LTE (NodeB or eNB or e-NodeB, evolutional Node B), or the gNB etc. being also possible in 5G system.Present aspect is real It applies in example without limitation.
Above method process flow can realize that the software program can store in storage medium with software program, when When the software program of storage is called, above method step is executed.
In conclusion technical solution provided by the embodiments of the present application, has broken the fixed resource impact mould of original LTE-V2X Formula is increased using the NR-V2X port number that the resource mapping method of flexibility and changeability solves and receiving end needs asking for feedback information Topic.The embodiment of the present application can use different resource mapping methods according to the scene of specific NR-V2X, can cope with different Antenna port number corresponds to different reference signal mapped modes;It, can also be according to specific need when receiving end needs feedback information The information wanted carries out corresponding resource impact.Specific mapping mode utilizes dispatch provided by the embodiments of the present application (SA) It is scheduled, correct suitable resource impact instruction can be carried out according to the state of signaling each in SA in actual use.
For example, since NR-V2X is no longer as LTE-V2X is mainly for the scene of broadcast communication, it may appear that unicast and multicast Signal intelligence, and antenna port number is also increase accordingly, therefore the resource impact mode of the original fixation of LTE-V2X is no longer applicable in The V2X in NR stage;The embodiment of the present application is added to CSI-RS status signaling, ginseng on the basis of original LTE-V2X dispatch Signal mapping indication signaling, CSI-request, CSI dispatch are examined, then dispatch in this way is corresponding to carry out Resource impact control provides a kind of more flexible changeable resource impact mode, for solve antenna port number increase and The problems such as feeding back CQI, while improving the utilization rate of resource.
It should be understood by those skilled in the art that, embodiments herein can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the application, which can be used in one or more, The shape for the computer program product implemented in usable storage medium (including but not limited to magnetic disk storage and optical memory etc.) Formula.
The application is referring to method, the process of equipment (system) and computer program product according to the embodiment of the present application Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
Obviously, those skilled in the art can carry out various modification and variations without departing from the essence of the application to the application Mind and range.In this way, if these modifications and variations of the application belong to the range of the claim of this application and its equivalent technologies Within, then the application is also intended to include these modifications and variations.

Claims (31)

1. a kind of resource indicating method, which is characterized in that this method comprises:
Transmitting terminal determines the transfer resource for needing the signal transmitted between receiving end to need to occupy;
The transmitting terminal sends the dispatch for being used to indicate the receiving end and determining the transfer resource to the receiving end.
2. the method according to claim 1, wherein the signal includes reference signal, in the dispatch Including one of following content or combination:
Channel state information reference signals CSI-RS state;
Reference signal mapping instruction;
The request of feedback information;
The scheduling of feedback information indicates.
3. according to the method described in claim 2, it is characterized in that, the feedback information includes one of following message or combination: Channel quality indicator (CQI), pre-coding matrix instruction PMI, order instruction RI.
4. according to the method described in claim 2, it is characterized in that, reference signal mapping instruction, comprising: described with reference to letter Number occupy port information, wherein the port information includes: port number and/or port numbers.
5. according to the method described in claim 4, it is characterized in that, the transmitting terminal determines the transmission money of the reference signal Source specifically includes:
The transmitting terminal, which determines, transmits the port information that the reference signal needs to occupy;
The transmitting terminal determines the transfer resource of the reference signal according to the port information.
6. according to the method described in claim 5, it is characterized in that, the transmitting terminal determines the ginseng according to the port information The transfer resource for examining signal, specifically includes:
The port information and the transfer resource of the reference signal that the transmitting terminal is occupied using the preset reference signal Corresponding relationship, or preset formula is utilized, and according to the port information, determine the transfer resource of the reference signal.
7. according to any method of claim 2~6, which is characterized in that the needs and receiving end that the transmitting terminal determines Between further include feedback information in the signal that transmits.
8. a kind of resource determining method, which is characterized in that this method comprises:
Receiving end receives the dispatch that transmitting terminal is sent;
The receiving end determines the biography for needing the signal transmitted between the transmitting terminal to need to occupy according to the dispatch Defeated resource.
9. according to the method described in claim 8, it is characterized in that, the signal includes reference signal, in the dispatch Including one of following content or combination:
Channel state information reference signals CSI-RS state;
Reference signal mapping instruction;
The request of feedback information;
The scheduling of feedback information indicates.
10. according to the method described in claim 9, it is characterized in that, the feedback information includes one of following message or combination: Channel quality indicator (CQI), pre-coding matrix instruction PMI, order instruction RI.
11. according to the method described in claim 9, it is characterized in that, reference signal mapping instruction, comprising: the reference The port information that signal occupies, wherein the port information includes: port number and/or port numbers.
12. according to the method for claim 11, which is characterized in that according to the dispatch, determining is needed for the receiving end The signal to transmit between the transmitting terminal needs the transfer resource occupied, specifically includes:
The receiving end determines according to the dispatch and transmits the port information that the reference signal needs to occupy;
The receiving end determines the transfer resource of the reference signal according to the port information.
13. according to the method for claim 12, which is characterized in that the receiving end is according to port information determination The transfer resource of reference signal, specifically includes:
The port information and the transfer resource of the reference signal that the receiving end is occupied using the preset reference signal Corresponding relationship, or preset formula is utilized, and according to the port information, determine the transfer resource of the reference signal.
14. according to any method of claim 9~13, which is characterized in that the receiving end needs and the transmitting terminal Between further include feedback information in the signal that transmits.
15. a kind of resource instruction device, which is characterized in that the device includes:
Memory, for storing program instruction;
Processor is executed for calling the program instruction stored in the memory according to the program of acquisition:
Determine the transfer resource that transmitting terminal needs the signal transmitted between receiving end to need to occupy;
The dispatch for being used to indicate the receiving end and determining the transfer resource is sent to the receiving end.
16. device according to claim 15, which is characterized in that the signal includes reference signal, the dispatch In include one of following content or combination:
Channel state information reference signals CSI-RS state;
Reference signal mapping instruction;
The request of feedback information;
The scheduling of feedback information indicates.
17. device according to claim 16, which is characterized in that the feedback information includes one of following message or group It closes: channel quality indicator (CQI), pre-coding matrix instruction PMI, order instruction RI.
18. device according to claim 16, which is characterized in that the reference signal mapping instruction, comprising: the reference The port information that signal occupies, wherein the port information includes: port number and/or port numbers.
19. device according to claim 18, which is characterized in that the processor determines the transmission money of the reference signal Source specifically includes:
Determine that the transmitting terminal transmits the port information that the reference signal needs to occupy;
The transfer resource of the reference signal is determined according to the port information.
20. device according to claim 19, which is characterized in that determine the reference signal according to the port information Transfer resource specifically includes:
Using the corresponding relationship of the preset reference signal port information occupied and the transfer resource of the reference signal, or Person utilizes preset formula, and according to the port information, determines the transfer resource of the reference signal.
21. 6~20 any device according to claim 1, which is characterized in that the transmitting terminal of the determination is needed and received It further include feedback information in the signal transmitted between end.
22. a kind of resource determining device, which is characterized in that the device includes:
Memory, for storing program instruction;
Processor is executed for calling the program instruction stored in the memory according to the program of acquisition:
Receive the dispatch that transmitting terminal is sent;
According to the dispatch, determine that the transmission that receiving end needs the signal transmitted between the transmitting terminal to need to occupy provides Source.
23. device according to claim 22, which is characterized in that the signal includes reference signal, the dispatch In include one of following content or combination:
Channel state information reference signals CSI-RS state;
Reference signal mapping instruction;
The request of feedback information;
The scheduling of feedback information indicates.
24. device according to claim 23, which is characterized in that the feedback information includes one of following message or group It closes: channel quality indicator (CQI), pre-coding matrix instruction PMI, order instruction RI.
25. device according to claim 23, which is characterized in that the reference signal mapping instruction, comprising: the reference The port information that signal occupies, wherein the port information includes: port number and/or port numbers.
26. device according to claim 25, which is characterized in that the processor determines institute according to the dispatch The transfer resource that receiving end needs the signal transmitted between the transmitting terminal to need to occupy is stated, is specifically included:
According to the dispatch, determines and transmit the port information that the reference signal needs to occupy;
The transfer resource of the reference signal is determined according to the port information.
27. device according to claim 26, which is characterized in that described to determine that the reference is believed according to the port information Number transfer resource, specifically include:
Using the corresponding relationship of the preset reference signal port information occupied and the transfer resource of the reference signal, or Person utilizes preset formula, and according to the port information, determines the transfer resource of the reference signal.
28. according to any device of claim 23~27, which is characterized in that the receiving end needs and the transmitting terminal Between further include feedback information in the signal that transmits.
29. a kind of resource instruction device, which is characterized in that the device includes:
Determination unit, the transfer resource for needing the signal transmitted between receiving end to need to occupy for determining transmitting terminal;
Transmission unit, for sending the scheduling letter for being used to indicate the receiving end and determining the transfer resource to the receiving end It enables.
30. a kind of resource determining device, which is characterized in that the device includes:
Receiving unit, for receiving the dispatch of transmitting terminal transmission;
Determination unit, for according to the dispatch, determining that the signal that receiving end needs to transmit between the transmitting terminal needs The transfer resource to be occupied.
31. a kind of computer storage medium, which is characterized in that the computer storage medium is stored with the executable finger of computer It enables, the computer executable instructions are for making the computer perform claim require 1 to 14 described in any item methods.
CN201810135273.5A 2018-02-09 2018-02-09 Resource indicating and determining method and device Active CN110138527B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202210504917.XA CN114844617A (en) 2018-02-09 2018-02-09 Resource indicating and determining method and device
CN201810135273.5A CN110138527B (en) 2018-02-09 2018-02-09 Resource indicating and determining method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810135273.5A CN110138527B (en) 2018-02-09 2018-02-09 Resource indicating and determining method and device

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN202210504917.XA Division CN114844617A (en) 2018-02-09 2018-02-09 Resource indicating and determining method and device

Publications (2)

Publication Number Publication Date
CN110138527A true CN110138527A (en) 2019-08-16
CN110138527B CN110138527B (en) 2022-05-27

Family

ID=67567973

Family Applications (2)

Application Number Title Priority Date Filing Date
CN202210504917.XA Pending CN114844617A (en) 2018-02-09 2018-02-09 Resource indicating and determining method and device
CN201810135273.5A Active CN110138527B (en) 2018-02-09 2018-02-09 Resource indicating and determining method and device

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN202210504917.XA Pending CN114844617A (en) 2018-02-09 2018-02-09 Resource indicating and determining method and device

Country Status (1)

Country Link
CN (2) CN114844617A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112237044A (en) * 2020-09-18 2021-01-15 北京小米移动软件有限公司 Resource mapping method, device, equipment and readable storage medium
WO2021056376A1 (en) * 2019-09-27 2021-04-01 Qualcomm Incorporated Configurations for omitting channel state information

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105264988A (en) * 2014-01-09 2016-01-20 华为技术有限公司 Configuration method, device and system for signalling resources
CN107040345A (en) * 2016-02-03 2017-08-11 华为技术有限公司 The method and apparatus for transmitting pilot signal

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102546110A (en) * 2011-12-31 2012-07-04 电信科学技术研究院 Channel state information transmission method and device
CN107294682A (en) * 2016-04-01 2017-10-24 中兴通讯股份有限公司 DMRS sending method and device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105264988A (en) * 2014-01-09 2016-01-20 华为技术有限公司 Configuration method, device and system for signalling resources
CN107040345A (en) * 2016-02-03 2017-08-11 华为技术有限公司 The method and apparatus for transmitting pilot signal

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021056376A1 (en) * 2019-09-27 2021-04-01 Qualcomm Incorporated Configurations for omitting channel state information
CN112237044A (en) * 2020-09-18 2021-01-15 北京小米移动软件有限公司 Resource mapping method, device, equipment and readable storage medium
CN112237044B (en) * 2020-09-18 2023-10-10 北京小米移动软件有限公司 Resource mapping method, device, equipment and readable storage medium

Also Published As

Publication number Publication date
CN114844617A (en) 2022-08-02
CN110138527B (en) 2022-05-27

Similar Documents

Publication Publication Date Title
KR102305312B1 (en) Method, apparatus, and system for signal transmission
CN108111282B (en) Wireless communication method and device
WO2021073508A1 (en) Transmission method, apparatus, first communication node, second communication node, and medium
US20190150018A1 (en) Method and radio node for handling csi reporting
WO2021254506A1 (en) Uplink transmission method and related apparatus
CN107040345B (en) Method and apparatus for transmitting pilot signal
CN102611524B (en) Method, system and equipment for information transmission
CN111769857B (en) Method and communication device for reporting terminal equipment capability
CN106856426A (en) A kind of DMRS indicating means, terminal and base station
CN109565823B (en) Short TTI mode
CN107734686B (en) Method, device, base station and terminal for sending and receiving downlink control signaling
CN111817798B (en) Channel measurement method and communication device
WO2019137058A1 (en) Resource indication method, terminal device, and network device
US20210409186A1 (en) Communication method and network device
US10177938B2 (en) Device and method for adaptive channel estimation
WO2018126987A1 (en) Uplink reference signal sending and receiving processing methods and apparatuses, base station, and terminal
JP7361692B2 (en) Base stations, terminals and communication methods
US20190305902A1 (en) Reference signal transmission method and apparatus
CN110138527A (en) A kind of instruction of resource determines method and device
CN112671442B (en) Communication method and communication device
CN109150801A (en) A kind of uplink control channel transmission method and device
CN107078783B (en) Method for transmitting information, access point and user equipment
CN108631835B (en) Signaling indication method and device of transmission mode
WO2018171687A1 (en) Method and device for transmitting pilot frequency of channel state information, processor and storage medium
CN109474557B (en) Communication method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210527

Address after: 100085 1st floor, building 1, yard 5, Shangdi East Road, Haidian District, Beijing

Applicant after: DATANG MOBILE COMMUNICATIONS EQUIPMENT Co.,Ltd.

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Applicant before: Telecommunications Science and Technology Research Institute Co.,Ltd.

GR01 Patent grant
GR01 Patent grant