CN110137967A - A kind of large-scale electrical power system trend convergence method of adjustment for key node - Google Patents
A kind of large-scale electrical power system trend convergence method of adjustment for key node Download PDFInfo
- Publication number
- CN110137967A CN110137967A CN201910388541.9A CN201910388541A CN110137967A CN 110137967 A CN110137967 A CN 110137967A CN 201910388541 A CN201910388541 A CN 201910388541A CN 110137967 A CN110137967 A CN 110137967A
- Authority
- CN
- China
- Prior art keywords
- data
- trend
- convergence
- iteration
- node
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/04—Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
- H02J3/06—Controlling transfer of power between connected networks; Controlling sharing of load between connected networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
Abstract
The present invention is a kind of large-scale electrical power system trend convergence method of adjustment for key node, its main feature is that passing through the intermediate data of Newton iteration method (Newton-Raphson) iteration, establishes the constringent judge index of trend;Specific meaning identification crucial effect node and factor according to representated by index value;Trend convergence domain is portrayed according to crucial effect node and factor;It relies on different adjustment targets and contents is adjusted etc. to critical data amount.With scientific and reasonable, the advantages that strong applicability, effect is good, it can be adjusted for electric network swim and intuitive foundation be provided.
Description
Technical field
The present invention relates to electric power system tide analysis field, be it is a kind of using iteration average information differentiate trend convergence,
Identify key node, and the method for defining trend convergence domain, being adjusted using trend convergence domain to key node data.
Background technique
Load flow calculation is of great significance to the planning and designing and optimization operation of power grid.For with the extensive of heavy load
Electric system is easy to appear the case where Load flow calculation is not restrained.Cause the not convergent factor of trend numerous, there is algorithm, model ginseng
Number and injection data etc. are widely applied and electrical network parameter has been subjected to since Newton-like method has been obtained when solving Power Flow Problem
It repeatedly corrects, it has been generally acknowledged that injection the unreasonable of data is to cause the not convergent major reason of trend in engineering.For extensive
Power System Analysis, how from numerous injection data the constringent critical data of positioning effects trend, and provide adjustable strategies,
Trend convergence is improved, quite there is more practical value.It is existing mainly to emphasize to improve using algorithm about the constringent method of adjustment of trend
Mode expand so that the convergent section of trend, thus form planning class method, Homotopy Method, the side Levenberg-Marquard
A series of tidal current computing methods such as method.However existing research institute proposes that method of adjustment stresses to emphasize power generation node to the whole network power
Compensation lacks directly identification and adjustable strategies for crucial injection data.
Summary of the invention
The technical problems to be solved by the present invention are: making up existing globality method of adjustment can not position, it is specific to influence section
The deficiency of point and factor, emphasizes the identification and adjustment to the not convergent key node of trend is caused, and proposes that one kind is scientific and reasonable, fits
Strong with property, effect is good, can adjust for electric network swim and provide the large-scale electrical power system tide for key node of intuitive foundation
Flow convergence method of adjustment.
The scheme for solving the use of its technical problem is: a kind of large-scale electrical power system trend convergence for key node
Method of adjustment, feature include: to establish trend convergence by the intermediate data of Newton iteration method (Newton-Raphson) iteration
The judge index of property;Specific meaning identification crucial effect node and factor according to representated by index value;According to crucial effect section
Point and factor portray trend convergence domain;Different adjustment targets are relied on to be adjusted critical data amount;Particular content are as follows:
1) by the intermediate data of Newton iteration method (Newton-Raphson) trend iteration, establish that trend is constringent to be sentenced
Severed finger mark: the pilot process data of trend iteration contain the important information of power grid, see in isolation, each trend iterative solution knot
Fruit can represent an independent trend form, i.e., the electrical magnitude relation of each node meets physics law, and redundant power is all
Undertaken by balance nodes, due to calculated result and injection numerical value between error be unable to satisfy required precision, so just need into
Row iterates, and therefore, from continuous, the situation of change of data is able to reflect the convergence energy of power flow equation between iteration twice
Power, if iterative process fall into a trap count according to gradually level off to injection data, illustrate this iterative process to convergence direction develop,
A possibility that trend restrains is larger, in Newton iteration method calculating process, | Δ y(k)| as the amount of unbalance of each node power, body
The situation of change for having showed error between the calculated value of each node power and injection data in iterative process, thus establishes index:
The then trend condition of convergence are as follows:
In formulaFor key factor discriminant criterion;K indicates the number of iterations;kmaxIndicate preset maximum number of iterations;Δy
Indicate node power amount of unbalance;μ indicates preset iterative solution precision;
2) specific meaning identification crucial effect node and factor according to representated by index value: by Δ y(k)Reflect power
The characteristic of error between calculated value and injection data proposes that a kind of identification trend does not restrain the method for key factor, Newton iteration
During method Load flow calculation, Δ x(k)With Δ y(k)The precision of flow solution can be embodied, but meaning representated by the two is not
Together, Δ x(k)The difference that state variable changes between iterative calculation twice is represented, as Δ x(k)It, can be anti-when gradually tending to reduce
The situation of change for reflecting state variable gradually tends towards stability;And Δ y(k)The error between calculated value and true value is then represented, for containing
For equation group higher than two independents variable, error between calculated value and true value is just by | Δ y(k)| in maximum value determine, when |
Δy(k)| when gradually tending to reduce, then explanation in the iterative process, just gradually approach to injection data direction by iterative calculation amount,
Compared to Δ x(k)For, Δ y(k)With more specific practical significance, EmaxUnder bigger expression secondary iteration, calculated value relatively injects number
Error is larger between, opposite, EmaxIt is smaller then to indicate that calculated value is closer to injection data in the secondary iteration;
3) portray trend convergence domain according to crucial effect node and factor: trend convergence domain refers to all meeting trend meter
The set for calculating the operation point data of the condition of convergence, is not restrained key factor according to the trend picked out, is converged to Load flow calculation
Boundary condition portrays trend convergence domain, and the positional relationship with data point relative to convergence domain boundary provides the amendment scheme of data,
When data point is located within convergence domain, Load flow calculation convergence;When other than data point being located at convergence domain, Load flow calculation cannot be received
It holds back, convergence domain can be portrayed to infinite dimension theoretically, but be higher than two-dimensional convergence domain and be unfavorable for analyzing subsequent trend amendment,
Therefore for picking out the problem of factor it is more than two, multiple the two-dimensional fields can be drawn and analyzed respectively;
4) different adjustment targets are relied on to be adjusted critical data amount: when Load flow calculation is not restrained, i.e. data point
When other than convergence domain, data point data is corrected, data point is pulled within convergence domain, that is, realized through the crucial control of amendment
Convergent trend is adjusted to restrain by variable, is used to correct individual data as the data correction scheme of target and to correct data
The data correction scheme of the minimum target of total amount is as the core of the data correction scheme of target using correcting individual data, is asked
Access strong point is parallel to the shortest distance on change in coordinate axis direction to convergence boundary, but when data deviation is more, when departure is larger
Adjustment amount then can be very much;When the data correction scheme to correct the minimum target of total amount of data, one can be theoretically found
Boundary point restrains Load flow calculation, but in the actual operation process, and the distance on data point to convergence boundary should not then be sought, and two
Kind target cuts both ways, and should accordingly be used in combination depending on objectives in practical application.
One kind of the invention directly can position and adjust the method for causing trend not restrain critical issue, due to utilizing ox
Iterative method (Newton-Raphson) iterative calculation, analyzes the changing rule of trend iteration intermediate data, in iterative process
The situation of change of variable is controlled as the diagnostic criteria for causing Load flow calculation not restrain critical data, by comparison trend iteration
Error relationship between calculation amount and injection data, identification cause the not convergent critical data of trend, establish and differentiate Load flow calculation
Constringent index;It proposes trend convergence domain, trend convergence domain is introduced into the evaluation and amendment of flow data, with trend
Calculating converges to boundary condition, seeks that the convergent peak load of trend can be made under current operating conditions, obtains trend convergence domain side
Boundary is modified critical data by data point and the positional relationship on convergence domain boundary.With scientific and reasonable, strong applicability,
The advantages that effect is good.A kind of visual reference foundation that can directly adjust node data can be provided for power grid operation personnel.
Detailed description of the invention
Fig. 1 is iterative process schematic diagram;
Fig. 2 is to correct schematic diagram of the individual data as target;
Fig. 3 is the schematic diagram to correct the minimum target of total amount of data;
Fig. 4 each node active power correction amount P schematic diagram when being the 9th iteration;
Fig. 5 is P15-P12Convergence domain schematic diagram.
Specific embodiment
A kind of large-scale electrical power system trend for key node of the invention is received below with drawings and examples
Holding back property method of adjustment is described further.
A kind of large-scale electrical power system trend convergence method of adjustment for key node, characterized in that it includes: logical
The intermediate data for crossing Newton iteration method (Newton-Raphson) iteration establishes the constringent judge index of trend;According to index
The representative specific meaning identification crucial effect node of value and factor;Trend convergence is portrayed according to crucial effect node and factor
Domain;Different adjustment targets are relied on to be adjusted critical data amount;Particular content are as follows:
1) by the intermediate data of Newton iteration method (Newton-Raphson) trend iteration, establish that trend is constringent to be sentenced
Severed finger mark: the pilot process data of trend iteration contain the important information of power grid, see in isolation, each trend iterative solution knot
Fruit can represent an independent trend form, i.e., the electrical magnitude relation of each node meets physics law, and redundant power is all
Undertaken by balance nodes, due to calculated result and injection numerical value between error be unable to satisfy required precision, so just need into
Row iterates, and therefore, from continuous, the situation of change of data is able to reflect the convergence energy of power flow equation between iteration twice
Power, if iterative process fall into a trap count according to gradually level off to injection data, illustrate this iterative process to convergence direction develop,
A possibility that trend restrains is larger, in Newton iteration method calculating process, | Δ y(k)| as the amount of unbalance of each node power, body
The situation of change for having showed error between the calculated value of each node power and injection data in iterative process, thus establishes index:
The then trend condition of convergence are as follows:
In formulaFor key factor discriminant criterion;K indicates the number of iterations;kmaxIndicate preset maximum number of iterations;Δ
Y indicates node power amount of unbalance;μ indicates preset iterative solution precision;
2) specific meaning identification crucial effect node and factor according to representated by index value: by Δ y(k)Reflect power
The characteristic of error between calculated value and injection data proposes that a kind of identification trend does not restrain the method for key factor, Newton iteration
During method Load flow calculation, Δ x(k)With Δ y(k)The precision of flow solution can be embodied, but meaning representated by the two is not
Together, Δ x(k)The difference that state variable changes between iterative calculation twice is represented, as Δ x(k)It, can be anti-when gradually tending to reduce
The situation of change for reflecting state variable gradually tends towards stability;And Δ y(k)The error between calculated value and true value is then represented, for containing
For equation group higher than two independents variable, error between calculated value and true value is just by | Δ y(k)| in maximum value determine, when |
Δy(k)| when gradually tending to reduce, then explanation in the iterative process, just gradually approach to injection data direction by iterative calculation amount,
Compared to Δ x(k)For, Δ y(k)With more specific practical significance, EmaxUnder bigger expression secondary iteration, calculated value relatively injects number
Error is larger between, opposite, EmaxIt is smaller then to indicate that calculated value is closer to injection data in the secondary iteration;
3) portray trend convergence domain according to crucial effect node and factor: trend convergence domain refers to all meeting trend meter
The set for calculating the operation point data of the condition of convergence, is not restrained key factor according to the trend picked out, is converged to Load flow calculation
Boundary condition portrays trend convergence domain, and the positional relationship with data point relative to convergence domain boundary provides the amendment scheme of data,
When data point is located within convergence domain, Load flow calculation convergence;When other than data point being located at convergence domain, Load flow calculation cannot be received
It holds back, convergence domain can be portrayed to infinite dimension theoretically, but be higher than two-dimensional convergence domain and be unfavorable for analyzing subsequent trend amendment,
Therefore for picking out the problem of factor it is more than two, multiple the two-dimensional fields can be drawn and analyzed respectively;
4) different adjustment targets are relied on to be adjusted critical data amount: when Load flow calculation is not restrained, i.e. data point
When other than convergence domain, data point data is corrected, data point is pulled within convergence domain, that is, realized through the crucial control of amendment
Convergent trend is adjusted to restrain by variable, is used to correct individual data as the data correction scheme of target and to correct data
The data correction scheme of the minimum target of total amount is as the core of the data correction scheme of target using correcting individual data, is asked
Access strong point is parallel to the shortest distance on change in coordinate axis direction to convergence boundary, but when data deviation is more, when departure is larger
Adjustment amount then can be very much;When the data correction scheme to correct the minimum target of total amount of data, one can be theoretically found
Boundary point restrains Load flow calculation, but in the actual operation process, and the distance on data point to convergence boundary should not then be sought, and two
Kind target cuts both ways, and should accordingly be used in combination depending on objectives in practical application.
Trend iterative process according to figure 1 it is found that for convergent trend, | Δ y(k)| in each amount in iteration mistake
Cheng Zhongying gradually tends to reduce, and when trend iteration is difficult to restrain, | Δ y(k)| can then occur concussion even be mutated, always without
Method meets required precision.Take each iteration in calculating process | Δ y(k)| maximum absolute value value is denoted as Emax.Work as EmaxIn iterative process
In gradually tend to reduce when, Load flow calculation just towards restrain direction develop, work as EmaxTrend when being finally decreased to meet required precision
Calculating is judged to restraining.If EmaxAppearance shakes and can not be decreased to meet required precision, trend always under regulation the number of iterations
Calculating does not restrain then.
Two, E in calculating process is takenmaxThe smallest an iteration, then the calculated value of the secondary iteration closest to injection data,
If E at this timemaxRepresent active departure, then it is assumed that there are problem, idle data not to change for the active data of the system;If at this time
EmaxRepresent idle departure, then it is assumed that there are problem, active power data not to change for the System Reactive Power data.Pass through observation
Δ y at this time(k)Which of amount it is larger, just explanation calculated value closest to injection data when, this tittle is still difficult to restrain,
Lead to the not convergent key node of trend and factor to pick out.
Three, assume that the key factor picked out is the active-power P of i-th, two node of ji、Pj, then with PiFor horizontal axis, PjFor
The longitudinal axis, trend converge to boundary condition, do trend convergence domain:
(1)PjZero setting, with fixed step size by PiIt is not restrained by zero growth rate to trend, obtains PjP when being zeroiMaximum value Pimax,
This PimaxThe as maximum value of convergence domain on transverse axis;
(2) in section [0, Pimax] in, equidistantly it is inserted into n node Pi (k)(wherein k=0,1,2 ... ..., n) is utilized
Dichotomy seeks each Pi (k)Under cause the not convergent P of trendjMaximum valueTo obtain the side of n trend convergence domain
Boundary's point;
(3) curve for being fitted to above-mentioned boundary point, as trend restrain boundary, boundary and reference axis area defined
As trend convergence domain, the region other than convergence domain are known as not convergence region.
Four, when to correct individual data as target: the position where intersection point to restrain boundary and reference axis, perpendicular to
Reference axis does vertical line, convergence region can be divided into I, II, III, IV 4 piece of region, as shown in Figure 2.
(1) when data point is in region I, by taking data point 1 as an example.Since data point is less than the maximum on convergence boundary
Value, individually correcting any one horizontal, axis of ordinates amount can be such that trend restrains.Cross of the correlation data point relative to convergence boundary
To and fore-and-aft distance, take shortest distance as the modified measure of trend under this data point.
(2) when data point is in region II, by taking data point 2 as an example.Since data point at this time has been more than convergence boundary
Maximum value P on longitudinal axisjmax, at this time if individually correcting PiData can not make trend reach convergence again, therefore by PjMake
For correction amount.Using data point to the fore-and-aft distance on convergence boundary as P at this timejCorrection amount.
(3) when data point is in region III, by taking data point 3 as an example.Since data point at this time has been more than convergence boundary
Maximum value on transverse axis, at this time if individually correcting PjData can not make trend reach convergence again, therefore by PiAs repairing
Positive quantity.Using data point to the fore-and-aft distance on convergence boundary as P at this timeiCorrection amount.
When to correct total amount of data minimum target: amendment total amount of data minimum i.e. data point to the distance for restraining boundary
It is most short, as shown in Figure 3.When target minimum with modified total amount of data, cross data point do data point to restrain boundary vertical line,
Hand over boundary in point A, then line AM is the shortest distance of the data point to convergence boundary between data point and intersection point, and AM is decomposed into
Two components of transverse and longitudinal, horizontal component OM are PiCorrection amount, indulge component OA be PjCorrection amount.
Below with reference to the feasibility of specific verification experimental verification above scheme, it is detailed in and is described below:
It is as follows using a province in China grade 220kV and above power system simulation model, power grid essential information: total node
Number 177, wherein 500kV node 17,220kV node 126, transformer intermediate node 34, transmission line of electricity and transformer
Winding branch 301.Power flow simulation calculating is restrained not by 3 times of the expansion of the whole network load.
With trend successive iteration, for Δ y after four iteration, the larger value is gradually concentrated in neighbouring several of 15 nodes
In node, and other node regulation amounts are significantly smaller, review Δ x and do not embody apparent Characteristics of Mutation in each secondary iteration,
And Δ x need to calculate Δ y as amount indirectly by Jacobian matrix, and by Δ y and injection data opening relationships, thus illustrate root
Differentiate that the method for causing Load flow calculation not restrain critical data has some superiority according to Δ y.
E under each secondary iterationmaxSituation is shown in Table 1, it is seen that E when the 9th iterationmaxMinimum, E at this timemaxRepresent Section 15
Point active power correction amount P15, when illustrating the calculation amount of the trend iteration closest to injection data, the active amendment of Section 15 point
Amount is maximum.9th time iteration whole active power correction amount situation is as shown in Figure 4.Correct numerical quantity descending front three point
Not are as follows: Δ P15、ΔP12、ΔP10, and the biggish several nodes of correction amount deviation constitute looped network on Topology connection, in looped network
Section 15 point burden with power it is heavier, baneful influence is caused to the power flow of ring net.
Situation under each secondary iteration of table 1
Trend convergence domain is portrayed with maximum two nodes of the 9th iteration active power correction amount, as shown in Figure 5.Currently
Data point position not yet crosses convergence domain transverse and longitudinal axis maximum value, that is, is located within region I shown in Fig. 2.If selection modification is single
Data are adjusted current trend, then Δ P15Minimum adjustment amount is 0.511 [p.u.], and minimum adjustment amount is 0.1205
[p.u.], Section 12 point adjustment amount is smaller, therefore selects that Section 12 point is active is adjusted, adjustment amount 0.1205 [p.u.].
By the amendment of flow data, Load flow calculation is re-started.Load flow calculation reaches receipts by 12 iteration after adjustment
It holds back, the iteration error for adjusting front and back is as shown in table 2 below.
Each secondary iteration error before and after 2 load flow rectification of table
By being analyzed above it is found that the invention proposes one kind to lead to the not convergent critical data differentiation side of Load flow calculation
Method, this method are based on the variation characteristic of Newton iteration method (Newton-Raphson) trend iteration intermediate data, establish trend meter
Constringent discriminant criterion is calculated, so that directly positioning leads to the not convergent key input data of Load flow calculation, is mentioned for load flow rectification
Direct basis is supplied.In addition, defining trend convergence domain by the thought in domain, pass through comparison current data point to convergence domain boundary
Relative position, to Abnormal Load Flow of Power Systems carry out respective objects under data correction so that Load flow calculation is restrained again.The present invention
Mentioned method emphasizes injection data to the constringent impact evaluation of trend, when overcoming trend and not restraining, it is difficult to recognize leading shadow
The problem of ringing node.
The above specific embodiment is merely illustrative of the technical solution of the present invention, rather than its limitations, fields it is general
Lead to it is to be understood by the skilled artisans that any type of modification, equivalent variations are in right of the present invention referring to made by above-described embodiment
Within the scope of claimed.
Claims (1)
1. a kind of large-scale electrical power system trend convergence method of adjustment for key node, feature includes: to pass through newton
The intermediate data of iterative method (Newton-Raphson) iteration, establishes the constringent judge index of trend;According to index value institute's generation
The specific meaning identification crucial effect node and factor of table;Trend convergence domain is portrayed according to crucial effect node and factor;It relies on
Difference adjustment target is adjusted critical data amount;Particular content are as follows:
1) intermediate data for passing through Newton iteration method (Newton-Raphson) trend iteration is established the constringent judgement of trend and is referred to
Mark: the pilot process data of trend iteration contain the important information of power grid, see in isolation, and each trend iterative solution result is all
An independent trend form can be represented, i.e., the electrical magnitude relation of each node meets physics law, and redundant power is all by putting down
Weighing apparatus node undertakes, since the error between calculated result and injection numerical value is unable to satisfy required precision, so just needing to carry out anti-
Multiple iteration, therefore, from continuous, the situation of change of data is able to reflect the convergence capabilities of power flow equation between iteration twice,
If iterative process fall into a trap count according to gradually level off to injection data, illustrate this iterative process to convergence direction develop, tide
A possibility that stream convergence, is larger, in Newton iteration method calculating process, | Δ y(k)| as the amount of unbalance of each node power, embody
In iterative process between the calculated value of each node power and injection data error situation of change, thus establish index:
The then trend condition of convergence are as follows:
In formulaFor key factor discriminant criterion;K indicates the number of iterations;kmaxIndicate preset maximum number of iterations;Δ y is indicated
Node power amount of unbalance;μ indicates preset iterative solution precision;
2) specific meaning identification crucial effect node and factor according to representated by index value: by Δ y(k)Reflect power calculation
The characteristic of error between value and injection data proposes that a kind of identification trend does not restrain the method for key factor, Newton iteration method tide
During stream calculation, Δ x(k)With Δ y(k)The precision of flow solution can be embodied, but meaning representated by the two is different, Δ
x(k)The difference that state variable changes between iterative calculation twice is represented, as Δ x(k)When gradually tending to reduce, it is able to reflect shape
The situation of change of state variable gradually tends towards stability;And Δ y(k)The error between calculated value and true value is then represented, is higher than for containing
For the equation group of two independents variable, error between calculated value and true value is just by | Δ y(k)| in maximum value determine, as | Δ y(k)
| when gradually tending to reduce, then explanation in the iterative process, just gradually approach to injection data direction by iterative calculation amount, compares
Δx(k)For, Δ y(k)With more specific practical significance, EmaxUnder bigger expression secondary iteration, calculated value relatively injection data it
Between error it is larger, opposite, EmaxIt is smaller then to indicate that calculated value is closer to injection data in the secondary iteration;
3) portray trend convergence domain according to crucial effect node and factor: trend convergence domain refers to that all Load flow calculations that meet are received
The set for holding back the operation point data of condition does not restrain key factor according to the trend picked out, converges to boundary with Load flow calculation
Condition portrays trend convergence domain, and the positional relationship with data point relative to convergence domain boundary provides the amendment scheme of data, works as number
When strong point is located within convergence domain, Load flow calculation convergence;When other than data point being located at convergence domain, Load flow calculation cannot restrain,
Convergence domain can be portrayed to infinite dimension theoretically, but be higher than two-dimensional convergence domain and be unfavorable for analyzing subsequent trend amendment, because
The problem of this is for picking out factor is more than two, can draw multiple the two-dimensional fields and be analyzed respectively;
4) rely on different adjustment targets to be adjusted critical data amount: when Load flow calculation is not restrained, i.e., data point, which is located at, receives
When holding back other than domain, data point data is corrected, data point is pulled within convergence domain, that is, realized by correcting key control variable
Not convergent trend is adjusted to restrain, is used to correct individual data as the data correction scheme of target and to correct total amount of data
The data correction scheme of minimum target is as the core of the data correction scheme of target using correcting individual data, seeks counting
Strong point is parallel to the shortest distance on change in coordinate axis direction to convergence boundary, but when data deviation is more, adjusts when departure is larger
Amount then can be very much;When the data correction scheme to correct the minimum target of total amount of data, a boundary can be theoretically found
Point is so that Load flow calculation is restrained, but in the actual operation process, the distance on data point to convergence boundary should not then be sought, two kinds of mesh
Mark cuts both ways, and should accordingly be used in combination depending on objectives in practical application.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910388541.9A CN110137967B (en) | 2019-05-10 | 2019-05-10 | Large-scale power system power flow convergence adjusting method for key nodes |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910388541.9A CN110137967B (en) | 2019-05-10 | 2019-05-10 | Large-scale power system power flow convergence adjusting method for key nodes |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110137967A true CN110137967A (en) | 2019-08-16 |
CN110137967B CN110137967B (en) | 2022-03-22 |
Family
ID=67573183
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910388541.9A Active CN110137967B (en) | 2019-05-10 | 2019-05-10 | Large-scale power system power flow convergence adjusting method for key nodes |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110137967B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112564113A (en) * | 2020-12-15 | 2021-03-26 | 深圳供电局有限公司 | Convergence adjusting method based on approximation tidal current voltage stabilization |
CN113098018A (en) * | 2021-04-14 | 2021-07-09 | 湘潭大学 | Multi-energy-flow calculation convergence adjustment method for electricity-gas region comprehensive energy system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104485661A (en) * | 2014-11-17 | 2015-04-01 | 中国南方电网有限责任公司 | Tidal current automatic regulating method based on node type conversion |
CN104732459A (en) * | 2015-03-31 | 2015-06-24 | 上海交通大学 | Large-scale power system ill-condition load flow analysis system |
CN104953585A (en) * | 2015-07-22 | 2015-09-30 | 西南石油大学 | Method for calculating distribution network flow |
US20150378387A1 (en) * | 2013-05-14 | 2015-12-31 | Rensselaer Polytechnic Institute | Methods of computing steady-state voltage stability margins of power systems |
CN108376984A (en) * | 2018-01-25 | 2018-08-07 | 云南电网有限责任公司 | A kind of Electric Power System Node Voltage automatic adjusting method |
-
2019
- 2019-05-10 CN CN201910388541.9A patent/CN110137967B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150378387A1 (en) * | 2013-05-14 | 2015-12-31 | Rensselaer Polytechnic Institute | Methods of computing steady-state voltage stability margins of power systems |
CN104485661A (en) * | 2014-11-17 | 2015-04-01 | 中国南方电网有限责任公司 | Tidal current automatic regulating method based on node type conversion |
CN104732459A (en) * | 2015-03-31 | 2015-06-24 | 上海交通大学 | Large-scale power system ill-condition load flow analysis system |
CN104953585A (en) * | 2015-07-22 | 2015-09-30 | 西南石油大学 | Method for calculating distribution network flow |
CN108376984A (en) * | 2018-01-25 | 2018-08-07 | 云南电网有限责任公司 | A kind of Electric Power System Node Voltage automatic adjusting method |
Non-Patent Citations (5)
Title |
---|
CHONGRU LIU: "An Improved Approach for AC-DC Power Flow Calculation With Multi-Infeed DC Systems", 《IEEE TRANSACTIONS ON POWER SYSTEMS》 * |
P. J. LAGACE: "Power Flow Methods for Improving Convergence", 《IECON 2012 - 38TH ANNUAL CONFERENCE ON IEEE INDUSTRIAL ELECTRONICS SOCIETY》 * |
彭慧敏: "大电网病态潮流的识别和修正方法", 《电力系统保护与控制》 * |
曹佳: "几种高阶收敛的Levenberg-Marquardt 方法在潮流计算中的应用", 《电网技术》 * |
李智欢: "基于节点类型转换的潮流收敛性调整方法", 《电力系统自动化》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112564113A (en) * | 2020-12-15 | 2021-03-26 | 深圳供电局有限公司 | Convergence adjusting method based on approximation tidal current voltage stabilization |
CN113098018A (en) * | 2021-04-14 | 2021-07-09 | 湘潭大学 | Multi-energy-flow calculation convergence adjustment method for electricity-gas region comprehensive energy system |
CN113098018B (en) * | 2021-04-14 | 2022-06-03 | 湘潭大学 | Multi-energy-flow calculation convergence adjustment method for electricity-gas region comprehensive energy system |
Also Published As
Publication number | Publication date |
---|---|
CN110137967B (en) | 2022-03-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106849112B (en) | Power distribution network multi-objective reactive optimization method based on non-dominant neighborhood immune algorithm | |
CN102832625B (en) | Power distribution network filter Optimal Configuration Method | |
CN105703364A (en) | Photovoltaic power station equivalent modeling method | |
CN106487042A (en) | A kind of Multiple Time Scales micro-capacitance sensor voltage power-less optimized controlling method | |
CN108539797B (en) | Economic island microgrid secondary frequency and voltage control method | |
CN108023364A (en) | Power distribution network distributed generation resource maximum access capability computational methods based on convex difference planning | |
CN110137967A (en) | A kind of large-scale electrical power system trend convergence method of adjustment for key node | |
CN111224404B (en) | Power flow rapid control method for electric power system with controllable phase shifter | |
CN107846024A (en) | Isolated island micro-capacitance sensor Probabilistic Load Flow Analytic Calculation Method | |
CN109510209A (en) | Consider the serial-parallel power grid probability load flow calculation method of the high n-dimensional random variable n containing correlation | |
CN103366062A (en) | Method for constructing core backbone grid structure based on BBO algorithm and power grid survivability | |
CN107257130A (en) | The low-voltage network loss computing method of decoupling is measured based on region | |
CN105893714B (en) | Based on the detection of automatic voltage control system closed loop and appraisal procedure under Bulk power system simulation system | |
CN106374498A (en) | Microgrid power flow calculating method taking secondary voltage and frequency control into consideration | |
CN103279661B (en) | Substation capacity Optimal Configuration Method based on Hybrid quantum inspired evolution algorithm | |
Gupta et al. | A review on optimal sizing and siting of distributed generation system: Integrating distributed generation into the grid | |
CN104638654B (en) | STATCOM (static synchronous compensator) control method for voltage adjusting of wind farm and network nodes | |
CN107039981A (en) | One kind intends direct current linearisation probability optimal load flow computational methods | |
CN105337290B (en) | A kind of idle method of adjustment suitable for low-frequency oscillation of electric power system aid decision | |
CN107123983A (en) | A kind of transformer station's access scheme aided assessment method based on security domain | |
CN109586298A (en) | A kind of more direct current receiving end electric network synthetic load optimal control methods and system | |
CN110543695B (en) | Electric-gas coupling comprehensive energy system feasible region calculation method | |
CN108390390A (en) | A kind of three-phase imbalance active distribution network Random-fuzzy trend method containing preferential consumption wind-powered electricity generation energy source router | |
CN107276093B (en) | The Probabilistic Load calculation method cut down based on scene | |
CN106127334A (en) | A kind of multi-objective particle swarm optimization method based on ordering of grids |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |