CN110137945A - A kind of emulation test method and system of magnanimity metric data - Google Patents

A kind of emulation test method and system of magnanimity metric data Download PDF

Info

Publication number
CN110137945A
CN110137945A CN201910361320.2A CN201910361320A CN110137945A CN 110137945 A CN110137945 A CN 110137945A CN 201910361320 A CN201910361320 A CN 201910361320A CN 110137945 A CN110137945 A CN 110137945A
Authority
CN
China
Prior art keywords
data
distribution terminal
virtual distribution
metric data
main website
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910361320.2A
Other languages
Chinese (zh)
Other versions
CN110137945B (en
Inventor
雷浩亮
史常凯
关石磊
辛倩
尹惠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Electric Power Research Institute of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, Electric Power Research Institute of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201910361320.2A priority Critical patent/CN110137945B/en
Publication of CN110137945A publication Critical patent/CN110137945A/en
Application granted granted Critical
Publication of CN110137945B publication Critical patent/CN110137945B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Abstract

The invention discloses the emulation test methods and system of a kind of magnanimity metric data, comprising: the quantity based on metric data to be generated determines the quantity for constructing virtual distribution terminal and connect all virtual distribution terminals with tested main website;Each virtual distribution terminal is grouped, and controls the virtual distribution terminal in each group and emulation generation magnanimity metric data is carried out to power distribution network operation data;Each virtual distribution terminal by the magnanimity metric data it is parallel on be sent to tested main website, generate the results of performance analysis of tested main website.The present invention has used distributed packet data management to virtual distribution terminal, generate the metric data of magnanimity, tested main website is accessed by multi-threaded parallel, the testing level and test job efficiency to main station system can be greatly improved, provide specification, science and true test result for test evaluation.

Description

A kind of emulation test method and system of magnanimity metric data
Technical field
The present invention relates to power distribution automation main station detection fields, and in particular to a kind of emulation testing side of magnanimity metric data Method and system.
Background technique
Recently as the continuous development of electric power networks, the sustainable growth of power load, various novel loads are continued to bring out, User focuses more on power quality problem, while also proposed more strict requirements to energy-saving and emission-reduction.Control centre needs more Add effective power monitoring rwan management solution RWAN to cope with above-mentioned variation bring challenge, with realize distribution system continue it is reliable, Efficiently, the operation of low consumption.Electrical power distribution automatization system (DAS) is that one kind can make distribution enterprise in the case of remote, with reality When mode monitor, coordinate and operate the automated system of controller switching equipment;Electrical power distribution automatization system include electric distribution network data collection with Monitor (SCADA system), distribution GIS-Geographic Information System (GIS) and demand side management (DSM).Electrical power distribution automatization system is using modern Mechanics of communication and computer technology are realized to every analysis of distribution system and management function, and the effect of distribution system management is improved Rate ensures the reliable and secure operation of distribution system, helps user to realize electric energy consumption reduction target, to create value for user.
With the rapid development that power distribution automation works, more and more areas implement power distribution automation main station system Construction, to ensure engineering construction quality, the test job of power distribution automation main station system is one of important process.For power distribution network Feature multi-point and wide-ranging, operation data amount is big, simulation distribution terminal generate magnanimity power distribution network operation data and access power distribution automation Main station system is the key that test power distribution automation main station system data acquisition and processing capacity.
Summary of the invention
The problem of in order to test power distribution automation main station system data acquisition and processing capacity, the present invention provide a kind of magnanimity The emulation test method and system of metric data.Mass data is generated by simulation distribution terminal, and uses packet data management Method is managed the virtual distribution terminal of building, realizes the survey of the limit processing capacity to power distribution automation main station system Examination, the technical solution use computer technology, computer networking technology, power system telecommunications technology and distributed packet data management Technology carries out the development of software, has the simulation process ability for simulating millions of a measuring points.Technical solution provided by the invention It is emulated by the massive concurrent of metric data, realizes the verifying of power distribution automation main station system magnanimity metric data access capability.
Present invention provide the technical scheme that a kind of emulation test method of magnanimity metric data, comprising:
Based on the quantity of metric data to be generated, the quantity for constructing virtual distribution terminal is determined and by all virtual distribution Terminal is connect with tested main website;
Each virtual distribution terminal is grouped, and control the virtual distribution terminal in each group to power distribution network operation data into Row emulation generates magnanimity metric data;
Each virtual distribution terminal by the magnanimity metric data it is parallel on be sent to tested main website, generate the performance of tested main website Analyze result.
Preferably, the building of the virtual distribution terminal, comprising:
Based on the communication between distribution terminal and main website, the IP address and port numbers of virtual distribution terminal are set;
Based on the data content of distribution terminal acquisition, the template data that virtual distribution terminal meets rule schemata is generated;
Wherein, the template data includes: state quantity data and analog data.
Preferably, the virtual distribution terminal in the control each group carries out emulation to power distribution network operation data and generates magnanimity amount Measured data, comprising:
Pressure parameter is configured to all virtual distribution terminals, and is that virtual distribution terminal configuration all in same group is identical Pressure parameter;
Based on the pressure parameter of each virtual distribution terminal, emulation is carried out to power distribution network operation data and generates metric data;
Wherein, the pressure parameter includes the change frequency and variation pattern of metric data.
Preferably, described is that virtual distribution terminal all in same group configures identical pressure parameter, comprising:
When virtual distribution terminal all in same group imitates distribution Running State amount data and analog data When true, the change of identical state quantity data and analog data change frequency and state quantity data and analog data is set Change mode;
The variation pattern of the state quantity data includes that odd number becomes, even number becomes and all becomes,
The variation pattern of the analog data includes being incremented by, successively decreasing and sawtooth wave.
Preferably, the pressure parameter based on each virtual distribution terminal, carries out emulation generation to power distribution network operation data Metric data, comprising:
Variation and snowslide variation are measured based on each the conventional of virtual distribution terminal emulation power distribution network operation data, generates and measures Data.
Preferably, conventional measure changes, comprising: each virtual distribution terminal simulates 0.7-1.5 ten thousand measurements in 1 second Data simultaneously change metric data in the change frequency of setting;
Snowslide variation, comprising: on the basis of routinely measuring variation, measurement that partial virtual distribution terminal is simulated The change frequency of data is set as the conventional multiple for measuring change frequency.
Preferably, each virtual distribution terminal simulates ten thousand metric data of 0.7-1.5 in 1 second, comprising:
Within the time of setting, the metric data variation pattern that the group number based on virtual distribution terminal respectively needs to emulate, And the metric data of generation is uniformly exported.
Preferably, virtual distribution terminal carries out emulation to power distribution network operation data and generates magnanimity measurement in the control each group After data, further includes:
Each virtual distribution terminal of real-time monitoring generates the communication shape of the corresponding specification source code of metric data, virtual distribution terminal The metric data of state and real-time change;
Presence based on the specification source code and virtual distribution terminal that monitor checks the work of each virtual distribution terminal State;
The metric data quantity of metric data statistics output based on real-time change;
Metric data quantity validation based on output is tested the received metric data quantity of main website;
Wherein, the quantity of the metric data includes: state quantity data transmission times, the transmission with markers state quantity data Number and analog data transmission times.
Preferably, each virtual distribution terminal by the magnanimity metric data it is parallel on be sent to tested main website, generate quilt Survey the results of performance analysis of main website, comprising:
The received metric data quantity of evaluation index and tested main website based on setting determines that the server of tested main website is flat Equal cpu load and memory usage;
When the server average CPU load and memory usage > threshold value of tested main website, it is qualified to be tested main website.
Preferably, all virtual distribution terminals are connect with tested main website, comprising:
All virtual distribution terminals share an IP address, by distributing different port numbers for each virtual distribution terminal It is communicated with tested main website, or the multiple IP address of simulation, distributes different IP address for each virtual distribution terminal, but use phase Same port numbers are communicated with tested main website.
Based on the same inventive concept, the present invention also provides a kind of emulation test systems of magnanimity metric data, comprising:
Communication module determines the quantity of the virtual distribution terminal of building simultaneously for the quantity based on metric data to be generated All virtual distribution terminals are connect with tested main website;
Generation module for being grouped to each virtual distribution terminal, and controls the virtual distribution terminal in each group to matching Grid operation data carries out emulation and generates magnanimity metric data;
Test module, for each virtual distribution terminal by the magnanimity metric data it is parallel on be sent to tested main website, generate The results of performance analysis of tested main website.
Preferably, the system also includes building modules, for constructing virtual distribution terminal;
The building module includes:
Communication unit is constructed, for based on the communication between distribution terminal and main website, the IP of virtual distribution terminal is set Location and port numbers;
Data content unit is constructed, the data content for being acquired based on distribution terminal is generated virtual distribution terminal and met The template data of rule schemata;
Wherein, the template data includes: state quantity data and analog data.
Compared with prior art, the invention has the benefit that
Technical solution provided by the invention is determined based on the quantity of metric data to be generated and is constructed virtual distribution terminal Quantity and all virtual distribution terminals are connect with tested main website;Each virtual distribution terminal is grouped, and controls each group Interior virtual distribution terminal carries out emulation to power distribution network operation data and generates magnanimity metric data;Each virtual distribution terminal will be described It is sent to tested main website on magnanimity metric data is parallel, generates the results of performance analysis of tested main website, virtual distribution terminal is used Distributed packet data management, generates the metric data of magnanimity, accesses tested main website by multi-threaded parallel, can mention significantly Height provides specification, science and true test result to the testing level and test job efficiency of main station system for test evaluation.
Technical solution provided by the invention uses simulation distribution terminal communication feature, power distribution network operation data emulation, list Largely virtual distribution terminal is concurrently run and magnanimity metric data concurrent access etc. device, which has simulation 70 The simulation capacity of ten thousand -150 ten thousand metric data.
Technical solution provided by the invention uses packet data management technology and multithreading skill to the virtual distribution terminal of magnanimity Art emulates changing pattern using same measurement to the virtual distribution terminal in same group, ensure that and want to efficiency and index It asks.
Detailed description of the invention
Fig. 1 is the emulation test method flow chart of magnanimity metric data of the present invention;
Fig. 2 is the detail flowchart of distribution terminal metric data massive concurrent emulation in the embodiment of the present invention.
Specific embodiment
For a better understanding of the present invention, the contents of the present invention are done further with example with reference to the accompanying drawings of the specification Explanation.
Embodiment 1
As shown in Figure 1, the present invention provides a kind of emulation test methods of magnanimity metric data, comprising:
Step S1, the quantity based on metric data to be generated determines the quantity for constructing virtual distribution terminal and will own Virtual distribution terminal is connect with tested main website;
Step S2, each virtual distribution terminal is grouped, and controls the virtual distribution terminal in each group and power distribution network is transported Row data carry out emulation and generate magnanimity metric data;
Step S3, each virtual distribution terminal by the magnanimity metric data it is parallel on be sent to tested main website, generate tested master The results of performance analysis stood.
As shown in Fig. 2, the present embodiment generates the specific method of magnanimity metric data, comprising:
Step S1, the quantity based on metric data to be generated determines the quantity for constructing virtual distribution terminal and will own Virtual distribution terminal is connect with tested main website, is specifically included:
1) it by simulating the communication between practical distribution terminal and tested main website, establishes and communicates to connect and simulate tested main website What is identified complies with standard the data content of rule schemata, carries out the building of virtual distribution terminal.
70-150 metric data can be emulated in virtual distribution terminal 1 second of building, usually setting is empty in engineer application Quasi- distribution terminal emulates 100 metric data in 1 second.
It needs to generate 1,000,000 metric data in the present embodiment to test tested main website, when each virtual distribution is whole When end emulates 100 metric data in 1 second, need to construct 10 virtual distribution terminals.
2) based on typical distribution data acquisition of terminal content, the template data of virtual distribution terminal is constructed, according to mould Send tested main website in plate data simulation power distribution network operation data, template data includes state quantity data and analog data, described State quantity data includes having the data of Discrete Change feature, and the analog data includes the number with successive value variation characteristic According to.
3) after the measurement of single virtual distribution terminal is provided with, it is raw configuration can be expanded into all virtual distribution terminals in batches At mass data, rapid build pressure test environment carries out the test of correlated performance.
4) packet data management technology is used to all virtual distribution terminals, the virtual distribution terminal in same group is adopted Changing pattern is emulated with same measurement, ensure that the requirement to efficiency and index.
5) messaging parameter, measurement parameters and the pressure parameter of all virtual distribution terminals of flexible configuration;
The messaging parameter includes the communication IP address and port numbers of virtual distribution terminal, realizes virtual distribution terminal and quilt The communication of main website is surveyed there are two types of mode, one kind is that all virtual distribution terminals share an IP address, by virtually matching for difference Electric terminals distribute different port numbers, realize the communication with tested main website;Another kind of is virtual multiple IP address on a workstation, Different IP address is distributed for different virtual distribution terminals, but uses identical port numbers, realizes the communication with tested main website.
The measurement parameters are the metric data particular contents such as remote signalling, telemetering, the remote control of simulation.
The pressure parameter is the time for configuring whole state quantity datas and analog data variation one time, i.e. variation frequency The contents such as rate and variation pattern.
The operation interfaces such as foundation communicates, data interaction starts, suspends and terminates meet and are tested main website under different scenes Data requirements.
Step S2, each virtual distribution terminal is grouped, and controls the virtual distribution terminal in each group and power distribution network is transported Row data carry out emulation and generate magnanimity metric data, specifically include:
6) after establishing virtual distribution terminal communication, all or part of virtual distribution terminal may be selected, carry out manual setting shape The variation pattern of state amount data and analog data, the variation pattern of the state quantity data include that odd number becomes, even number becomes and complete Portion becomes, the variation pattern of the analog data include be incremented by, successively decrease, sawtooth wave etc., it is to provide that data variation, which triggers mode, Time in, respectively need metric data to be simulated to change, export delta data uniformly.
7) simulated on virtual distribution terminal convention amount survey variation and simulation snowslide variation (when power grid accident it is instantaneous greatly Sent in amount data) it test data and is output in tested main website in real time.
Wherein, it is conventional measure variation refer to simulated in 1 second 10,000 or so metric data all variation it is primary and on send by Main website is surveyed, therefore the present embodiment simulation conventional measure selects 10 distribution terminals when changing, 0.7-1.5 ten thousand are generated in 1 second Metric data, and metric data is changed in the change frequency of setting;
Snowslide occurrence quantity is much larger than conventional variable quantity, is in general equivalent to 5 times of conventional variable quantity or so, and occur Can generally occur simultaneously with more station power distribution terminals when snowslide, therefore, when simulating snowslide variation, can become routinely measuring On the basis of change, a portion is selected, usually 20% or so virtual distribution terminal improves the frequency of its data variation N times (N is positive integer), after the analysis of the present embodiment combination history snowslide data, wherein 2 virtual distribution terminals is selected, will be measured After the change frequency of data improves 5 times, the variation of emulation data and transmission are carried out.
8) the virtual distribution terminal of real-time monitoring, which is simulated, measures delta data corresponding specification source code, virtual distribution terminal Communications status, real-time measurement delta data, the quantity of all kinds of simulating measuring data outputs of programming count, including quantity of state send secondary Number, band markers quantity of state transmission times and analog quantity transmission times etc., meet data and check requirement.
Step S3, each virtual distribution terminal by the magnanimity metric data it is parallel on be sent to tested main website, generate tested master The results of performance analysis stood, comprising:
9) metric data of the evaluation index based on setting and the processing of tested main website determines that the server of tested main website is average Cpu load and memory usage.
In the present embodiment, when the server of tested main website runs average CPU load and memory usage < 40% in 5 minutes, It is qualified to be then tested main website.
In technical solution scale provided in this embodiment can by simulate a large amount of virtual distribution terminals simultaneously with tested master It stands online communication, send tested main website on 700,000-150 ten thousand power distribution networks operation metric data of real-time simulation.
Technical solution provided in this embodiment uses multithreading to the virtual distribution terminal of magnanimity, guarantees all virtual The metric data that distribution terminal generates is sent in tested main website on simultaneously.
The software provided in this embodiment uses standalone hardware structure, simple for structure, Yi Jian, easy to maintain, guarantee system fortune Row reliability and stability, portability are effectively ensured anywhere and carry out the detection work of distribution main website.
The software systems provided in this embodiment rely on the operation of LINUX platform, and human-computer interaction interface module and electric power are logical The function interface of letter library module is designed fully according to Windows style, meets user of service's operating habit, easy to use.
Configuration information of the present embodiment according to distribution terminal, FTU quantity, DTU quantity, DTU acquisition number of switches and end Start ip address, address mask, channel number are held, simulation generates FTU the and DTU equipment for meeting power distribution automation requirement.
Further, real-time distribution network equipment state data, operation data and fault actions data etc. are emulated, it is specific to wrap It includes:
1) system carries out YC data simulation, 1 second YC data variation period according to the mathematical model of sawtooth wave or other means ~30000 seconds settable;
System default YX data do not conjugate, if setting YX data variable bit, negates progress according to original state YX conjugates data simulation, and the YX data variation period 1 second~30000 seconds settable;
SOE data simulation is consistent with YX displacement data simulation;
Electrical power distribution automatization system is simulated and be injected into analog data, convenient for checking that distribution automation system data handles function Energy.
2) system has conventional measure of simulation and changes and simulate snowslide (sending in instantaneous mass data when power grid accident) The ability of test data.
3) system communication configuration is configured using the mode of list IP and multiport, is simulated on same work station virtual IP of the distribution terminal when being communicated uses the IP of this work station, and different virtual distribution terminals use different port numbers, Port numbers are automatically configured according to progressive law, are not required to configure one by one for virtual distribution terminal.
4) system is based on ICP/IP protocol, mode of the virtual distribution terminal as server-side, with tested master station communication.Pass through Flexible configuration each corresponds to remote signalling, telemetry and telecommand quantity in the point table of virtual distribution terminal, to meet corresponding DTU, FTU etc. no With the requirement of the representative point table of terminal.
5) the following are the data collection capacities of a typical switch:
Single switch is remotely controlled comprising 8 telemeterings, 2 remote signalling and 1, in actual test configurations, if a DTU acquisition 10 A switch, then settable 80 telemeterings of virtual distribution terminal, 20 remote signalling, 10 remote controls of corresponding simulation DTU.
It is general to acquire 1 to 2 (joint using) a switches to FTU, then the virtual distribution terminal setting of corresponding simulation FTU 16 telemeterings, 4 remote signalling, 2 remote controls.
But it is statistically only sent to the quantity of metric data in tested main website in testing, and is not concerned with which class metric data is What distribution terminal issued, because while distribution terminal is different, but the data type sent be it is identical (analog data with State quantity data), therefore DTU, FTU can not also be distinguished, directly corresponding virtual distribution terminal is configured according to pressure testing requirement Quantity and measurement quantity.
After virtual distribution terminal communicate with tested main website foundation, system is capable of the specification source code that real-time monitoring interacts, virtually The statistic of distribution terminal presence, the metric data of real-time change and output metric data.
Presence based on the specification source code and virtual distribution terminal that monitor checks the work of each virtual distribution terminal State;
The metric data quantity of metric data statistics output based on real-time change;
Metric data quantity validation based on output is tested the received metric data quantity of main website;
Wherein, the quantity of metric data includes: state quantity data transmission times, the transmission times with markers state quantity data With analog data transmission times.
By the magnanimity metric data it is parallel on be sent to tested main website, evaluation index based on setting and tested main website receive Metric data, determine the server average CPU load and memory usage of tested main website;
When the server average CPU load and memory usage > threshold value of tested main website, it is qualified to be tested main website.
In the man-machine interface of system, supports the functions such as foundation communicates, data interaction starts, suspends and terminates, support All control requirements of virtual distribution terminal, continuous multiple virtual distribution terminals or single virtual distribution terminal, support to measure The flexible transmission of data, which controls, to be required, and all information of each virtual distribution terminal are specifically shown with statement form.
Embodiment 2
Based on the same inventive concept, the present embodiment additionally provides a kind of emulation test system of magnanimity metric data, comprising:
Communication module determines the quantity of the virtual distribution terminal of building simultaneously for the quantity based on metric data to be generated All virtual distribution terminals are connect with tested main website;
Generation module for being grouped to each virtual distribution terminal, and controls the virtual distribution terminal in each group to matching Grid operation data carries out emulation and generates magnanimity metric data;
Test module, for each virtual distribution terminal by the magnanimity metric data it is parallel on be sent to tested main website, generate The results of performance analysis of tested main website.
In embodiment, the system also includes building modules, for constructing virtual distribution terminal;
The building module includes:
Communication unit is constructed, for based on the communication between distribution terminal and main website, the IP of virtual distribution terminal is set Location and port numbers;
Data content unit is constructed, the data content for being acquired based on distribution terminal is generated virtual distribution terminal and met The template data of rule schemata;
Wherein, the template data includes: state quantity data and analog data.
It should be understood by those skilled in the art that, embodiments herein can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the application, which can be used in one or more, The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces The form of product.
The application is referring to method, the process of equipment (system) and computer program product according to the embodiment of the present application Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
The above is only the embodiment of the present invention, are not intended to restrict the invention, all in the spirit and principles in the present invention Within, any modification, equivalent substitution, improvement and etc. done, be all contained in apply pending scope of the presently claimed invention it It is interior.

Claims (12)

1. a kind of emulation test method of magnanimity metric data characterized by comprising
Based on the quantity of metric data to be generated, the quantity for constructing virtual distribution terminal is determined and by all virtual distribution terminals It is connect with tested main website;
Each virtual distribution terminal is grouped, and controls the virtual distribution terminal in each group and power distribution network operation data is imitated It is true to generate magnanimity metric data;
Each virtual distribution terminal by the magnanimity metric data it is parallel on be sent to tested main website, generate the performance evaluation of tested main website As a result.
2. the method as described in claim 1, which is characterized in that the building of the virtual distribution terminal, comprising:
Based on the communication between distribution terminal and main website, the IP address and port numbers of virtual distribution terminal are set;
Based on the data content of distribution terminal acquisition, the template data that virtual distribution terminal meets rule schemata is generated;
Wherein, the template data includes: state quantity data and analog data.
3. the method as described in claim 1, which is characterized in that the virtual distribution terminal in the control each group transports power distribution network Row data carry out emulation and generate magnanimity metric data, comprising:
Pressure parameter is configured to all virtual distribution terminals, and is that virtual distribution terminal all in same group configures identical pressure Force parameter;
Based on the pressure parameter of each virtual distribution terminal, emulation is carried out to power distribution network operation data and generates metric data;
Wherein, the pressure parameter includes the change frequency and variation pattern of metric data.
4. method as claimed in claim 3, which is characterized in that described is that virtual distribution terminal all in same group configures phase Same pressure parameter, comprising:
When virtual distribution terminal all in same group emulates distribution Running State amount data and analog data, The variation side of identical state quantity data and analog data change frequency and state quantity data and analog data is set Formula;
The variation pattern of the state quantity data includes that odd number becomes, even number becomes and all becomes,
The variation pattern of the analog data includes being incremented by, successively decreasing and sawtooth wave.
5. method as claimed in claim 3, which is characterized in that the pressure parameter based on each virtual distribution terminal, to matching Grid operation data carries out emulation and generates metric data, comprising:
Variation and snowslide variation are measured based on each the conventional of virtual distribution terminal emulation power distribution network operation data, generates and measures number According to.
6. method as claimed in claim 5, which is characterized in that
Conventional measure changes, comprising: each virtual distribution terminal simulates ten thousand metric data of 0.7-1.5 in 1 second and will amount Measured data changes in the change frequency of setting;
Snowslide variation, comprising: on the basis of routinely measuring variation, metric data that partial virtual distribution terminal is simulated Change frequency be set as the conventional multiple for measuring change frequency.
7. method as claimed in claim 6, which is characterized in that each virtual distribution terminal simulates 0.7-1.5 ten thousand in 1 second A metric data, comprising:
Within the time of setting, the metric data variation pattern that the group number based on virtual distribution terminal respectively needs to emulate, and will The metric data of generation uniformly exports.
8. method as claimed in claim 3, which is characterized in that virtual distribution terminal runs power distribution network in the control each group Data carry out after emulation generation magnanimity metric data, further includes:
Each virtual distribution terminal of real-time monitoring generate the corresponding specification source code of metric data, virtual distribution terminal communications status with And the metric data of real-time change;
Presence based on the specification source code and virtual distribution terminal that monitor checks the working condition of each virtual distribution terminal;
The metric data quantity of metric data statistics output based on real-time change;
Metric data quantity validation based on output is tested the received metric data quantity of main website;
Wherein, the quantity of the metric data includes: state quantity data transmission times, the transmission times with markers state quantity data With analog data transmission times.
9. method according to claim 8, which is characterized in that each virtual distribution terminal by the magnanimity metric data simultaneously It is sent to tested main website on row, generates the results of performance analysis of tested main website, comprising:
The received metric data quantity of evaluation index and tested main website based on setting determines that the server of tested main website is average Cpu load and memory usage;
When the server average CPU load and memory usage > threshold value of tested main website, it is qualified to be tested main website.
10. the method as described in claim 1, which is characterized in that all virtual distribution terminals are connect with tested main website, packet It includes:
All virtual distribution terminals share an IP address, by distributing different port numbers and quilt for each virtual distribution terminal It surveys main website to be communicated, or the multiple IP address of simulation, distributes different IP address for each virtual distribution terminal, but using identical Port numbers are communicated with tested main website.
11. a kind of emulation test system of magnanimity metric data characterized by comprising
Communication module determines the quantity for constructing virtual distribution terminal and by institute for the quantity based on metric data to be generated There is virtual distribution terminal to connect with tested main website;
Generation module for being grouped to each virtual distribution terminal, and controls the virtual distribution terminal in each group to power distribution network Operation data carries out emulation and generates magnanimity metric data;
Test module, for each virtual distribution terminal by the magnanimity metric data it is parallel on be sent to tested main website, generate tested The results of performance analysis of main website.
12. system as claimed in claim 11, which is characterized in that virtual for constructing the system also includes building module Distribution terminal;
The building module includes:
Construct communication unit, for based on the communication between distribution terminal and main website, be arranged virtual distribution terminal IP address and Port numbers;
Data content unit is constructed, the data content for being acquired based on distribution terminal is generated virtual distribution terminal and meets specification The template data of format;
Wherein, the template data includes: state quantity data and analog data.
CN201910361320.2A 2019-04-30 2019-04-30 Simulation test method and system for mass measurement data Active CN110137945B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910361320.2A CN110137945B (en) 2019-04-30 2019-04-30 Simulation test method and system for mass measurement data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910361320.2A CN110137945B (en) 2019-04-30 2019-04-30 Simulation test method and system for mass measurement data

Publications (2)

Publication Number Publication Date
CN110137945A true CN110137945A (en) 2019-08-16
CN110137945B CN110137945B (en) 2024-01-19

Family

ID=67575841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910361320.2A Active CN110137945B (en) 2019-04-30 2019-04-30 Simulation test method and system for mass measurement data

Country Status (1)

Country Link
CN (1) CN110137945B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112202937A (en) * 2020-09-30 2021-01-08 中国核动力研究设计院 Instrument control simulation system IP allocation method, system, equipment and storage medium
CN112543110A (en) * 2019-09-23 2021-03-23 中国电力科学研究院有限公司 Network communication simulation method and system of mass power distribution automatic terminal

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103984335A (en) * 2013-02-07 2014-08-13 国家电网公司 Testing method and system for power distribution automation system
CN106712295A (en) * 2017-01-04 2017-05-24 国网浙江省电力公司电力科学研究院 Logical power distribution terminal based on distributed power distribution automation system and communication method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103984335A (en) * 2013-02-07 2014-08-13 国家电网公司 Testing method and system for power distribution automation system
CN106712295A (en) * 2017-01-04 2017-05-24 国网浙江省电力公司电力科学研究院 Logical power distribution terminal based on distributed power distribution automation system and communication method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112543110A (en) * 2019-09-23 2021-03-23 中国电力科学研究院有限公司 Network communication simulation method and system of mass power distribution automatic terminal
CN112202937A (en) * 2020-09-30 2021-01-08 中国核动力研究设计院 Instrument control simulation system IP allocation method, system, equipment and storage medium
CN112202937B (en) * 2020-09-30 2021-11-30 中国核动力研究设计院 Instrument control simulation system IP allocation method, system, equipment and storage medium

Also Published As

Publication number Publication date
CN110137945B (en) 2024-01-19

Similar Documents

Publication Publication Date Title
CN103176084B (en) Intelligent substation simulation system in panoramic replace mode and integration testing method for intelligent substation simulation system
CN103746882B (en) The method of intelligent substation station level test
CN105045970B (en) Analogue system and its implementation based on Unity dynamic generation three-dimensional scenic
CN105006017B (en) Three-dimensional scenic emulation mode is generated based on Unity dynamic techniques
CN105607509B (en) A kind of wireless industrial control system semi physical safety experiment platform
CA2256507A1 (en) Real-time process control simulation method and apparatus
CN109491910B (en) Visual simulation debugging method and system for protection logic and control logic
CN103781107B (en) The emulation of cordless communication network, simulation process method and device
CN105093017B (en) Intelligent substation GOOSE integrated testabilities device and its method of testing
CN106168993B (en) Real-time simulation analysis system for power grid
CN110137945A (en) A kind of emulation test method and system of magnanimity metric data
CN110766263A (en) Automatic acceptance method for secondary equipment of transformer substation and terminal equipment
CN110673585B (en) Test method, test device and test system for train air conditioning system
CN106453506A (en) Resource unified scheduling test system and method
CN110989547A (en) Detection method and system for intelligent substation one-key sequence control system
CN106681313A (en) Function testing method of dynamic stability control system and dynamic stability control system
CN103984335A (en) Testing method and system for power distribution automation system
CN110611312B (en) On-line simulation system and method for panoramic data of substation bay level
CN107819611B (en) Client test method based on IEC61850 multi-server simulation
CN110689238B (en) Method and system for realizing MMS (multimedia message service) information simulation and point-to-point of intelligent substation
CN101776915A (en) Cross-platform station automatic monitoring system testing method based on concurrency simulating tools
CN203909606U (en) Test system for distribution automation system
CN105391597A (en) Multi-server-simulation-based avalanche testing method, apparatus, and system
CN103676669A (en) Method and system for checking motion information
CN112543110A (en) Network communication simulation method and system of mass power distribution automatic terminal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200819

Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant after: CHINA ELECTRIC POWER RESEARCH INSTITUTE Co.,Ltd.

Applicant after: STATE GRID CORPORATION OF CHINA

Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant before: CHINA ELECTRIC POWER RESEARCH INSTITUTE Co.,Ltd.

Applicant before: STATE GRID CORPORATION OF CHINA

Applicant before: STATE GRID FUJIAN ELECTRIC POWER Research Institute

SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant