CN110135811A - For the supply-chain management system and equipment at project scene - Google Patents

For the supply-chain management system and equipment at project scene Download PDF

Info

Publication number
CN110135811A
CN110135811A CN201910408824.5A CN201910408824A CN110135811A CN 110135811 A CN110135811 A CN 110135811A CN 201910408824 A CN201910408824 A CN 201910408824A CN 110135811 A CN110135811 A CN 110135811A
Authority
CN
China
Prior art keywords
management module
project
module
supplier
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910408824.5A
Other languages
Chinese (zh)
Inventor
向琪
苏鹏
袁游
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Shenshuyun Information Technology Co Ltd
Original Assignee
Wuhan Shenshuyun Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Shenshuyun Information Technology Co Ltd filed Critical Wuhan Shenshuyun Information Technology Co Ltd
Priority to CN201910408824.5A priority Critical patent/CN110135811A/en
Publication of CN110135811A publication Critical patent/CN110135811A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/083Shipping
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0633Lists, e.g. purchase orders, compilation or processing
    • G06Q30/0635Processing of requisition or of purchase orders

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the invention provides a kind of supply-chain management systems and equipment for project scene.The system comprises: supplier management module, project management module, purchasing management module, logistics management module and statistical analysis module;Supplier management module, connect with project management module, is managed for the information to supplier;Project management module is connect with purchasing management module, for being managed to project;Purchasing management module is connect with logistics management module, for being managed to buying state;Logistics management module, connect with statistical analysis module, for being managed to logistics information;Statistical analysis module, it is for statistical analysis for the data to the supply-chain management system for project scene.Supply-chain management system and equipment provided in an embodiment of the present invention for project scene may be implemented at project scene to the systematization of project construction and operation, concert rationality, integrated, synchronized chain-type management.

Description

For the supply-chain management system and equipment at project scene
Technical field
The present embodiments relate to information technology field more particularly to a kind of supply-chain management systems for project scene And equipment.
Background technique
Currently, it in the solution of the business event running automated system at project scene, largely concentrates on To produce and sell the synchronous automatic ordering system for target, accurate decision data is relied on to carry out automatic replenishing, with best object Stream support is managed for target.But due to being solely focused on production and selling link, so there are functions for related art scheme It is single, many and diverse problem of data processing.Current enterprise need to the multinomial data such as project, order, logistics, cash flow, bill into Row comprehensively control, and by these data through project construction, operation links in, thus reality system, concert rationality, Integrated, synchronization.For this purpose, proposing a kind of system for realizing entire project business field operation comprehensive automation, make each link Seamless link realizes the supply chain visualization at whole project scene, the system of IT application in management, it is urgently to be resolved just to become industry Technical problem.
Summary of the invention
In view of the above-mentioned problems existing in the prior art, the embodiment of the invention provides a kind of supply chains for project scene Management system and equipment.
In a first aspect, the embodiment provides a kind of supply-chain management systems for project scene, comprising: supply Answer quotient's management module, project management module, purchasing management module, logistics management module and statistical analysis module;The supplier Management module is connect with the project management module, is managed for the information to supplier;The project management module, It is connect with the purchasing management module, for being managed to project;The purchasing management module, with the logistics management module Connection, for being managed to buying state;The logistics management module, connect with the statistical analysis module, for object Stream information is managed;The statistical analysis module, for the data to the supply-chain management system for project scene It is for statistical analysis.
Further, on the basis of above method embodiment content, what is provided in the embodiment of the present invention is existing for project The supply-chain management system of field, the supplier management module, comprising: supplier information management module, supplier's access management Module and supplier evaluation management module;The supplier information management module, for collecting, arranging and achieving the base of supplier This data, merchandise news and/or billing information;Supplier's access management module, is examined for the qualification to supplier Core;The supplier evaluation management module, for popularity of enterprise, management level to supplier stability, production capacity, grind Hair ability, product quality, delivery just-in-time rate and/or product qualification rate are evaluated.
Further, on the basis of above method embodiment content, what is provided in the embodiment of the present invention is existing for project The supply-chain management system of field, the project management module, comprising: project information management module and item order management module; The project information management module is connect with the item order management module, for delivering complete cycle to being completed to approving and initiate a project Phase is managed;The item order management module, for the newly-built of the item order in the project set up the project, payment, Way and the state of receiving are managed.
Further, on the basis of above method embodiment content, what is provided in the embodiment of the present invention is existing for project The supply-chain management system of field, the purchasing management module, comprising: management of purchasing plan module, is adopted at procurement contract management module Purchase order management module and buying bill management module;The management of purchasing plan module, with the procurement contract management module It is connected with item order management module, for decomposing to the order of generation, works out procurement plan, and generate procurement budget; The procurement contract management module connect with the purchase order management module, is modified for the state to procurement contract And permission control;The purchase order management module is connect, for adopting to by examination & approval with the buying bill management module Purchase plan, executes corresponding procurement process;The buying bill management module, for recording the bill shape generated in adoption process State.
Further, on the basis of above method embodiment content, what is provided in the embodiment of the present invention is existing for project The supply-chain management system of field, the logistics management module, comprising: purchase order logistics management module and inventory management module; The purchase order logistics management module, for recording the logistics track of article on purchase order;The inventory management module is used In the inventory information of record purchase order article, out storage record and/or inventory's warning information.
Further, on the basis of above method embodiment content, what is provided in the embodiment of the present invention is existing for project The supply-chain management system of field, the statistical analysis module, comprising: data acquisition module and data analysis module;The data Acquisition module constructs data warehouse for acquiring data, and according to collected data;The data analysis module, for making Setting analysis rule, according to the analysis rule creation analysis statistical data.
Second aspect, the embodiment provides a kind of electronic equipment, comprising:
At least one processor;And
At least one processor being connect with processor communication, in which:
Memory is stored with the program instruction that can be executed by processor, and the instruction of processor caller is able to carry out first party In the various possible implementations in face, the supply chain management at project scene is directed to provided by any possible implementation System.
The third aspect, the embodiment provides a kind of non-transient computer readable storage medium, non-transient calculating Machine readable storage medium storing program for executing stores computer instruction, and computer instruction makes the various possible realization sides of computer execution first aspect In formula, the supply-chain management system at project scene is directed to provided by any possible implementation.
Supply-chain management system and equipment provided in an embodiment of the present invention for project scene, by integrating in systems Supplier management module, project management module, purchasing management module, logistics management module and statistical analysis module, with supply chain Mode will participate in project construction main body carry out effective integration, may be implemented be to project construction and operation at project scene Systemization, concert rationality, integrated, synchronized chain-type management.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to do a simple introduction, it should be apparent that, the accompanying drawings in the following description is this hair Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with root Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the supply-chain management system flow chart provided in an embodiment of the present invention for project scene;
Fig. 2 is the supply-chain management system overall flow figure provided in an embodiment of the present invention for project scene;
Fig. 3 is the entity structure schematic diagram of electronic equipment provided in an embodiment of the present invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art Every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.In addition, Technical characteristic in each embodiment or single embodiment provided by the invention can mutual any combination, to form feasible skill Art scheme, but must be based on can be realized by those of ordinary skill in the art, when the combination of technical solution occur it is mutual Contradiction or when cannot achieve, it will be understood that the combination of this technical solution is not present, also not the present invention claims protection scope Within.
The embodiment of the invention provides a kind of supply-chain management systems for project scene, referring to Fig. 1, this method packet It includes: supplier management module, project management module, purchasing management module, logistics management module and statistical analysis module;The confession Quotient's management module is answered, is connect with the project management module, is managed for the information to supplier;The project management mould Block is connect, for being managed to project with the purchasing management module;The purchasing management module, with the logistics management Module connection, for being managed to buying state;The logistics management module, connect with the statistical analysis module, is used for Logistics information is managed;The statistical analysis module, for the supply-chain management system for project scene Data are for statistical analysis.
Content based on above method embodiment, as a kind of optional embodiment, the needle that is provided in the embodiment of the present invention To the supply-chain management system at project scene, the supplier management module, comprising: supplier information management module, supplier Access management module and supplier evaluation management module;The supplier information management module, for collecting, arranging and achieve confession Answer basic document, merchandise news and/or the billing information of quotient;Supplier's access management module, for the money to supplier Matter is audited;The supplier evaluation management module, stability, life for popularity of enterprise, management level to supplier Production capacity power, research and development ability, product quality, delivery just-in-time rate and/or product qualification rate are evaluated.
Content based on above method embodiment, as a kind of optional embodiment, the needle that is provided in the embodiment of the present invention To the supply-chain management system at project scene, the project management module, comprising: project information management module and item order pipe Manage module;The project information management module is connect with the item order management module, for handing over approving and initiate a project to being completed Pay the complete period be managed;The item order management module, for the item order in the project set up the project it is newly-built, pay Money is managed on way and the state of receiving.
Content based on above method embodiment, as a kind of optional embodiment, the needle that is provided in the embodiment of the present invention To the supply-chain management system at project scene, the purchasing management module, comprising: management of purchasing plan module, procurement contract pipe Manage module, purchase order management module and buying bill management module;The management of purchasing plan module, with the procurement contract Management module is connected with item order management module, for decomposing to the order of generation, works out procurement plan, and generate and adopt Purchase budget;The procurement contract management module is connect with the purchase order management module, for the state to procurement contract into Row change and permission control;The purchase order management module is connect with the buying bill management module, for by examining The procurement plan criticized, executes corresponding procurement process;The buying bill management module generates in adoption process for recording Bill state.
Content based on above method embodiment, as a kind of optional embodiment, the needle that is provided in the embodiment of the present invention To the supply-chain management system at project scene, the logistics management module, comprising: purchase order logistics management module and inventory's pipe Manage module;The purchase order logistics management module, for recording the logistics track of article on purchase order;The stock control Module, for recording the inventory information of purchase order article, going out storage record and/or inventory's warning information.
Content based on above method embodiment, as a kind of optional embodiment, the needle that is provided in the embodiment of the present invention To the supply-chain management system at project scene, the statistical analysis module, comprising: data acquisition module and data analysis module; The data acquisition module constructs data warehouse for acquiring data, and according to collected data;The data analyze mould Block, for formulating analysis rule, according to the analysis rule creation analysis statistical data.
Supply-chain management system provided in an embodiment of the present invention for project scene, passes through integrated supplier in systems Management module, project management module, purchasing management module, logistics management module and statistical analysis module, with the mode of supply chain The main body that will participate in project construction carries out effective integration, may be implemented project scene to the systematization of project construction and operation, Concert rationality, integrated, synchronized chain-type management.
For the essence for the elaboration technical solution of the present invention being more clear, on the basis of the above embodiments, intend proposing The embodiment of one entirety shows the overall picture of technical solution of the present invention on the whole.It should be noted that the whole implementation example is only It is not limiting the scope of the invention, this field merely to technological essence of the invention is further embodied Technical staff is on the basis of each embodiment of the invention, and by combination technique feature, what is obtained any meets the technology of the present invention The combined technical solution of scheme essence, if can actual implementation, within the protection domain of this patent..Of the invention is whole Body embodiment provides a kind of supply-chain management system for project scene, comprising:
Supplier management module (includes supplier information management module 201, supplier's access management module 202 and supply Quotient's evaluation management module 203), it is connect with project management module, for being managed to supplier.Such as the basic letter of supplier Breath, evaluation information, access information etc. are managed.
Project management module (includes project information management module 204 and item order management module 205), with purchasing management Module connection, for being managed to project, order Life cycle.
Purchasing management module (includes management of purchasing plan module 206, procurement contract management module 207, purchase order management Module 208 and buying bill management module 209), it is connect with logistics management module, for procurement plan, procurement contract, buying Order, buying bill are managed accordingly.
Logistics management module (includes purchase order logistics management module 210 and inventory management module 211), with statistical analysis Module connection carries out the inventory of corresponding purchase order for being managed to the logistics relevant information during procurement orders Management.
Statistical analysis module (data acquisition module 212 and data analysis module 213), for uniting to total system data Meter analysis, auxiliary enterprises carry out product optimization, management and monitoring.
Specifically, the supply-chain management system for project scene, comprising: supplier information management module 201 supplies Answer quotient's access management module 202, supplier evaluation management module 203, project information management module 204, item order management mould Block 205, management of purchasing plan module 206, procurement contract management module 207, purchase order management module 208, buying bill pipe It manages module 209, purchase order logistics management module 210, inventory management module 211, data acquisition module 212, data and analyzes mould Block 213.
Supplier information management module 201, for collecting, arranging, achieve supplier's relevant information.Its packet collected Basic document containing supplier, supplier's merchandise news, supplier's billing information etc..
Supplier's access management module 202 after collecting for supplier information, carries out the qualification of supplier corresponding Audit, be an approval process, it is ensured that the related qualification of supplier meets related request.Only the supplier parties of access can join With the supply of commodity.
Supplier evaluation management module 203, for establishing the relevant evaluation system of supplier.By quantify marking in a manner of pair Supply is comprehensively evaluated.As the index of evaluation have popularity of enterprise, the stability of management level, production capacity, research and development ability, Product quality, delivery just-in-time rate, product qualification rate etc..
Project information management module 204 is connect with item order management module 205, for Whole Life Cycle of Projects into Row management is managed accordingly approving and initiate a project to the delivery complete period of being completed.
Item order management module 205 is connect with management of purchasing plan module 206, for in the project set up the project, institute The order of generation carries out lifecycle management, such as item order is created, paid the bill, being managed in way, link of receiving.
Management of purchasing plan module 206 is connect with procurement contract management module 207, for carrying out to the order generated It decomposes, work out corresponding procurement plan, and generate corresponding procurement budget, this function is a process.
Procurement contract management module 207 is connect with purchase order management module 208, online for carrying out to procurement contract The change to procurement contract state is supported in management, and corresponding permission is supported to control.
Purchase order management module 208 is connect, for having examined the buying passed through with buying bill management module 209 Plan carries out corresponding procurement process operation.
It purchases bill management module 209 and records all kinds of shapes of bill for managing the billing information generated in adoption process State, and unified bill management function is provided.
Purchase order logistics management module 210, for recording logistics track, the accumulation enterprise of article on purchase order in detail Operation information required for administrative decision.
Inventory management module 211, for recording the inventory information of all kinds of purchase order articles in detail, going out storage record, library Deposit warning information etc..
Data acquisition module 212, based on for project scene supply-chain management system generate business datum, be used for pair Various types of data is acquired and forms data warehouse.
Data analysis module 213, based on the data that data acquisition module 212 acquires, for formulating corresponding analysis rule, The analysis statisticaling data that final building client needs.
The whole implementation example passes through supplier management mould integrated in systems on the basis of aforementioned system embodiment Detailed various functions are loaded inside block, project management module, purchasing management module, logistics management module and statistical analysis module The main body for participating in project construction is carried out effective integration from details and on the whole with the mode of supply chain by module, can be more clear It is realized clearly at project scene to the systematization of project construction and operation, concert rationality, integrated, synchronized chain-type management.
The method of the embodiment of the present invention is to rely on electronic equipment to realize, therefore it is necessary to do one to relevant electronic equipment Lower introduction.Based on this purpose, the embodiment provides a kind of electronic equipment, as shown in figure 3, the electronic equipment includes: At least one processor (processor) 301, communication interface (Communications Interface) 304, at least one deposits Reservoir (memory) 302 and communication bus 303, wherein at least one processor 301, communication interface 304, at least one storage Device 302 completes mutual communication by communication bus 303.At least one processor 301 can call at least one processor Logical order in 302, to realize following system: supplier management module, project management module, purchasing management module, logistics Management module and statistical analysis module;The supplier management module, connect with the project management module, for supplier Information be managed;The project management module is connect, for being managed to project with the purchasing management module;Institute Purchasing management module is stated, is connect with the logistics management module, for being managed to buying state;The logistics management mould Block is connect with the statistical analysis module, for being managed to logistics information;The statistical analysis module, for described It is for statistical analysis for the data of the supply-chain management system at project scene.
In addition, the logical order in above-mentioned at least one processor 302 can be real by way of SFU software functional unit Now and when sold or used as an independent product, it can store in a computer readable storage medium.Based in this way Understanding, the technical solution of the present invention substantially portion of the part that contributes to existing technology or the technical solution in other words Dividing can be embodied in the form of software products, which is stored in a storage medium, including several Instruction is used so that a computer equipment (can be personal computer, server or the network equipment etc.) realizes the present invention Whole systems or part system described in each embodiment.For example, supplier management module, project management module, buying Management module, logistics management module and statistical analysis module;The supplier management module connects with the project management module It connects, is managed for the information to supplier;The project management module is connect with the purchasing management module, for pair Project is managed;The purchasing management module is connect with the logistics management module, for being managed to buying state; The logistics management module, connect with the statistical analysis module, for being managed to logistics information;The statistical analysis mould Block, it is for statistical analysis for the data to the supply-chain management system for project scene.And storage medium above-mentioned It include: USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), the various media that can store program code such as magnetic or disk.
The apparatus embodiments described above are merely exemplary, wherein described, unit can as illustrated by the separation member It is physically separated with being or may not be, component shown as a unit may or may not be physics list Member, it can it is in one place, or may be distributed over multiple network units.It can be selected according to the actual needs In some or all of the modules achieve the purpose of the solution of this embodiment.Those of ordinary skill in the art are not paying creativeness Labour in the case where, it can understand and implement.
Through the above description of the embodiments, those skilled in the art can be understood that each embodiment can It realizes by means of software and necessary general hardware platform, naturally it is also possible to pass through hardware.Based on this understanding, on Stating technical solution, substantially the part that contributes to existing technology can be embodied in the form of software products in other words, should Computer software product may be stored in a computer readable storage medium, such as ROM/RAM, magnetic disk, CD, including several fingers It enables and using so that a computer equipment (can be personal computer, server or the network equipment etc.) executes each implementation Method described in certain parts of example or embodiment.
The flow chart and block diagram in the drawings show the system of multiple embodiments according to the present invention, method and computer journeys The architecture, function and operation in the cards of sequence product.Based on this understanding, each box in flowchart or block diagram can To represent a part of a module, section or code, a part of the module, section or code includes one or more A executable instruction for implementing the specified logical function.It should also be noted that in some implementations as replacement, side The function of being marked in frame can also occur in a different order than that indicated in the drawings.For example, two continuous boxes are practical On can be basically executed in parallel, can also execute in the opposite order sometimes, this depends on the function involved.It is also noted that , the combination of each box in block diagram and or flow chart and the box in block diagram and or flow chart can be with executing Defined function or the dedicated hardware based system of movement realize, or can use specialized hardware and computer instruction Combination is to realize.
In this patent, what term " including ", " including " or its any other variant were intended to non-exclusionism includes, So that the process, method, article or equipment for including a series of elements not only includes those elements, but also including not having The other elements being expressly recited, or further include for elements inherent to such a process, method, article, or device.Do not having There is the element limited in the case where more limiting by sentence " including ... ", it is not excluded that including process, the side of the element There is also other identical elements in method, article or equipment.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features; And these are modified or replaceed, technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution spirit and Range.

Claims (8)

1. a kind of supply-chain management system for project scene characterized by comprising
Supplier management module, project management module, purchasing management module, logistics management module and statistical analysis module;
The supplier management module, connect with the project management module, is managed for the information to supplier;
The project management module is connect, for being managed to project with the purchasing management module;
The purchasing management module is connect with the logistics management module, for being managed to buying state;
The logistics management module, connect with the statistical analysis module, for being managed to logistics information;
The statistical analysis module carries out statistical for the data to the supply-chain management system for project scene Analysis.
2. the supply-chain management system according to claim 1 for project scene, which is characterized in that supplier's pipe Manage module, comprising:
Supplier information management module, supplier's access management module and supplier evaluation management module;
The supplier information management module, for collect, arrange and achieve the basic document of supplier, merchandise news and/or Billing information;
Supplier's access management module, is audited for the qualification to supplier;
The supplier evaluation management module, for the stability of popularity of enterprise, management level to supplier, production capacity, Research and development ability, product quality, delivery just-in-time rate and/or product qualification rate are evaluated.
3. the supply-chain management system according to claim 1 for project scene, which is characterized in that the project management Module, comprising:
Project information management module and item order management module;
The project information management module is connect with the item order management module, for delivering approving and initiate a project to being completed Complete period is managed;
The item order management module, for the newly-built of the item order in the project set up the project, payment, on way and receive State is managed.
4. the supply-chain management system according to claim 3 for project scene, which is characterized in that the purchasing management Module, comprising:
Management of purchasing plan module, procurement contract management module, purchase order management module and buying bill management module;
The management of purchasing plan module is connect with the procurement contract management module and item order management module, for pair The order of generation is decomposed, and works out procurement plan, and generate procurement budget;
The procurement contract management module is connect with the purchase order management module, is carried out for the state to procurement contract Change and permission control;
The purchase order management module is connect with the buying bill management module, for by examination & approval procurement plan, Execute corresponding procurement process;
The buying bill management module, for recording the bill state generated in adoption process.
5. the supply-chain management system according to claim 1 for project scene, which is characterized in that the logistics management Module, comprising:
Purchase order logistics management module and inventory management module;
The purchase order logistics management module, for recording the logistics track of article on purchase order;
The inventory management module, for recording the inventory information of purchase order article, going out storage record and/or inventory's early warning letter Breath.
6. the supply-chain management system according to claim 1 for project scene, which is characterized in that the statistical analysis Module, comprising:
Data acquisition module and data analysis module;
The data acquisition module constructs data warehouse for acquiring data, and according to collected data;
The data analysis module, for formulating analysis rule, according to the analysis rule creation analysis statistical data.
7. a kind of electronic equipment characterized by comprising
At least one processor, at least one processor, communication interface and bus;Wherein,
The processor, memory, communication interface complete mutual communication by the bus;
The memory is stored with the program instruction that can be executed by the processor, and the processor calls described program instruction, To realize the system as described in any one of claim 1 to 6 claim.
8. a kind of non-transient computer readable storage medium, which is characterized in that the non-transient computer readable storage medium is deposited Computer instruction is stored up, the computer instruction realizes the computer as described in any one of claims 1 to 6 claim System.
CN201910408824.5A 2019-05-16 2019-05-16 For the supply-chain management system and equipment at project scene Pending CN110135811A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910408824.5A CN110135811A (en) 2019-05-16 2019-05-16 For the supply-chain management system and equipment at project scene

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910408824.5A CN110135811A (en) 2019-05-16 2019-05-16 For the supply-chain management system and equipment at project scene

Publications (1)

Publication Number Publication Date
CN110135811A true CN110135811A (en) 2019-08-16

Family

ID=67574750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910408824.5A Pending CN110135811A (en) 2019-05-16 2019-05-16 For the supply-chain management system and equipment at project scene

Country Status (1)

Country Link
CN (1) CN110135811A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110765481A (en) * 2019-09-11 2020-02-07 珠海格力电器股份有限公司 Authority control method, authority control system, readable storage medium and terminal device
CN112215558A (en) * 2020-11-05 2021-01-12 北京三维天地科技股份有限公司 Purchasing Internet of things cloud platform system
CN113254546A (en) * 2021-05-24 2021-08-13 北京无线电测量研究所 Supply chain management and control system and method and electronic equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050049958A1 (en) * 2003-08-29 2005-03-03 Mercury Advisory Group Pty Ltd. Supply chain data management
CN102324074A (en) * 2011-10-28 2012-01-18 山东城通科技有限公司 Informatization application cluster platform of small and medium enterprises
CN105427055A (en) * 2015-12-15 2016-03-23 北京中科云集科技有限公司 Internet + industrial 4.0 intelligent manufacturing management method and system
CN108241993A (en) * 2017-12-28 2018-07-03 泰康保险集团股份有限公司 Adopt pin integrated management system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050049958A1 (en) * 2003-08-29 2005-03-03 Mercury Advisory Group Pty Ltd. Supply chain data management
CN102324074A (en) * 2011-10-28 2012-01-18 山东城通科技有限公司 Informatization application cluster platform of small and medium enterprises
CN105427055A (en) * 2015-12-15 2016-03-23 北京中科云集科技有限公司 Internet + industrial 4.0 intelligent manufacturing management method and system
CN108241993A (en) * 2017-12-28 2018-07-03 泰康保险集团股份有限公司 Adopt pin integrated management system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110765481A (en) * 2019-09-11 2020-02-07 珠海格力电器股份有限公司 Authority control method, authority control system, readable storage medium and terminal device
CN112215558A (en) * 2020-11-05 2021-01-12 北京三维天地科技股份有限公司 Purchasing Internet of things cloud platform system
CN113254546A (en) * 2021-05-24 2021-08-13 北京无线电测量研究所 Supply chain management and control system and method and electronic equipment

Similar Documents

Publication Publication Date Title
Ramezani et al. Closed-loop supply chain network design under a fuzzy environment
Trkman et al. Estimating the benefits and risks of implementing e-procurement
Balasubramanian et al. Structural metrics for goal based business process design and evaluation
CN102346880B (en) Enterprise Resources Planning computer system and method
CN108241993A (en) Adopt pin integrated management system
CN110135811A (en) For the supply-chain management system and equipment at project scene
CN108711104A (en) Physical assets information flow method, apparatus and equipment based on block chain
US20180218555A1 (en) Facilitating transfer of cash inventories between entities
Mohsen Developments of digital technologies related to supply chain management
Madhwal et al. Proof of delivery smart contract for performance measurements
Diba et al. Compliance and performance analysis of procurement processes using process mining
Terminanto et al. Implementation open source system resource planning in sustainable supply chain management of small and medium enterprise
JPWO2007105698A1 (en) Cost calculation system, cost data input system, program thereof, data structure, and recording medium recording them
Singh et al. A Survey Paper on Identifying Key Performance Indicators for Optimizing Inventory Management System and Exploring Different Visualization Tools
Noorbakhsh et al. Assessing total cost of ownership: Effective asset management along the supply chain
US20200356920A1 (en) Risk reduction system and method
CN114119144A (en) Supply chain supervision method and system suitable for cross-border e-commerce
Mughal et al. Cloud based ERP system for SME industry
CN113837872A (en) Data management system suitable for mobile asset financing buyback business
Rawat Today's inventory management systems: A tool in achieving best practices in indian business
Cattaneo et al. Models, Methods and Tools for Product Service Design: The Manutelligence Project
KR20200134816A (en) Product LifeCycle Management System
Ezeonwumelu et al. Development of swim lane workflow process map for sales and inventory workflow management information system: A case study of petrospan integrated services, Eket, Akwa Ibom State, Nigeria
Rachmaniah et al. PayPOS user experience improved small and medium sized micro business existence in the disruptive era
Ye et al. Comparative Analysis of the Current Status of the Cosmetics Supply Chain Imported from China to Thailand by Applying the SCOR Model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190816

RJ01 Rejection of invention patent application after publication